W.P. NO. 17996/2015
IN THE HIGH COURT OF MADHYA PRADESH
AT JABALPUR
BEFORE
HON’BLE SHRI JUSTICE VIVEK JAIN
WRIT PETITION NO. 17996 OF 2015.
BETWEEN :RAMNIK POWER AND ALLOYS PVT. LTD.
(A PRIVATE COMPANY REGISTERED
UNDER THE INDIAN COMPANIES ACT)
MAIN ROAD BLAGHAT (MP) THR. ITS
DIRECTOR SHRI NISHCHAL K. TRIVEDI
S/O SHRI KIRAN TRIVEDI, REGISTERED
OFFICE: A.P. TRIVEDI SONS WARD NO.15
MAIN ROAD BALAGHAT (MADHYA
PRADESH)
.…PETITIONER
(BY SHRI SAURABH SUNDER -ADVOCATE)
AND
1. THE ELECTRICITY OMBUDSMAN
MADHYA
PRADESH
STATE
ELECTRICITY
REGULATORY
COMMISSION THR. REGISTRAR
5TH FLOOR METRO PLAZA ARERA
COLONY BITTAN MARKET BHOPAL
(MADHYA PRADESH)
2. SECRETARY
M.P.
STATE
ELECTRICITY
REGULATORY
COMMISION
THROUGH
ITS
SECRETARY HAVING ADDRESS AS
5TH FLOOR METRO PLAZA ARERA
W.P. NO. 17996/2015
COLONY BITTAN MARKET BHOPAL
(MADHYA PRADESH).
3. MADHYA
PRADESH
POORVA
KSHETRA VIDYUT VITRAN CO. LTD.
SHAKTI
BHAWAN,
RAMPUR
JABALPUR (MADHYA PRADESH)
THROUGH
ITS
MANAGING
DIRECTOR
….RESPONDENTS
(RESPONDENT NO. 1 & 2 BY KU. AKASHMI TRIVEDI - ADVOCATE)
(RESPONDENT NO. 3 BY SHRI PRAKASH UPADHYAY – ADVOCATE)
------------------------------------------------------------------------------------Reserved on
:
05/12/2023
Pronounced on
:
22/01/2024
------------------------------------------------------------------------------------This petition having been heard and reserved for
judgment/order, coming on for pronouncement this day, this Court
passed the following:
ORDER
The present petition has been filed challenging the orders
Annexure P-12, P-14 and P-22.
2.
The brief facts for the purpose of disposal of the present petition
are that the petitioner is a High Tension Industrial consumer of the
respondent No.3-Distribution Company. Some disputes arose between
the petitioner and the respondent No.3 and the petitioner approached
the Electricity Consumer Grievances Redresal Forum, Jabalpur (for
W.P. NO. 17996/2015
short, referred to as “ECGRF”), constituted by the respondent No.3, in
terms of provisions of section 42 (5) of the Electricity Act 2003.
3.
The dispute agitated before the ECGRF related to the manner in
which application for load reduction of the petitioner was dealt with by
the respondent No.3, and a demand of Rs. 2,40,90,680/- was
questioned. The ECGRF decided the matter vide order dated 03.3.2014
(Annexure P-2) and contrary to the plea of the petitioner to make the
reduction of contract demand from 4800 KVA to 600 KVA effective
from the date of supplementary agreement i.e. 16.9.2013, held it
effective from 16.9.2013. This made the petitioner liable to penal
charges on the over-drawal of energy after 01.7.2013.
4.
Being aggrieved by the aforesaid order of the EGRF, the
petitioner approached the Electricity Ombudsman, an authority
constituted under section 42 (6) of the Electricity Act 2003. The
Electricity Ombudsman decided the matter vide his order dated
01.10.2014 (Annexure P-3). The Ombudsman held the effective date of
load reduction to be 16.9.2013, and to be deemed as 01.10.2013 for the
purpose of billing i.e. the date of start of next billing cycle. Thus, the
petitioner got relieved of penal charges for over-drawal of load more
than 600 KVA upto 30.9.2013.
W.P. NO. 17996/2015
5.
The respondent No.3 was dissatisfied with the said order and
thus, in terms of clause 5.3 of the M.P. Electricity Regulatory
Commission (Establishment of Forum and Electricity Ombudsman for
Redressal of Grievances of the Consumers) Revision-I Regulations
2009 (for short, “Regulations 2009”), the respondent No.3 submitted a
representation to the Regulatory Commission. The relevant clause of
the said Regulations is as under :5.3 The Distribution Licensee or the Complainant may also
make an application to the Commission within thirty days of
receipt of order and seek suitable directions in case, in their
opinion the Forum/Electricity Ombudsman has passed any
order which is not consistent with the provisions in the
Act/Rules/Regulations/Tariff
orders/Codes/
directions
issued from time to time by the Commission. Any directions
issued by the Commission in such cases shall then be
binding on the Forum/Ombudsman/ Licensees
(Emphasis supplied).
6.
It is the order Annexure P-12 passed by the MPERC on the said
representation and subsequent developments based on this order, that
are challenged in the present petition.
7.
The MPERC (present respondent No.2) passed the order
annexure P-12 on the representation of the respondent No.3, against
the order of the Ombudsman. The MPERC held that the effective date
of reduction of contract demand shall be 01.7.2013, and remanded the
W.P. NO. 17996/2015
matter to the Ombudsman to review its order dated 01.10.2014. The
following is the operative part of the order of the MPERC :“9. The consumer has completed the formalities and the
Supplementary agreement has been finalized in accordance
with period mentioned in the sanction letter dated
08/08/2013, so the effective date of reduction in contract
demand shall stand as 01/07/2013. Under the aforesaid
circumstances, the Commission remands back the case to the
Electricity Ombudsman to review its impugned Order dated
01/10/2014.”
8.
The Ombudsman took its order in review and vide order
annexure P-14 dated 13.8.2015, recorded that the direction given by
the MPERC are binding on it as per Clause 5.3 of the Regulations of
2009. Thus, its earlier order dated 01.10.2014 was withdrawn and the
order of the ECGRF was confirmed. The following is the operative
part of the order Annexure P-14 :-
e?;izns’k fo+|qr fu;ked vk;ksx ¼miHkksDrk dh f’kdk;rksa ds
fujkdj.k gsrq Qksje rFkk fo|qr yksdiky dh LFkkiuk½
¼iqujh{k.k izFke½ fofu;e 2009 dh dafMdk 53 ds rgr fn;s
x;s fn’kk funsZ’k yksdiky ij ca/kudkjh gS] vr% yksdiky ds
vkns’k fnukad 01-10-2014 esa fn, x;s fu.kZ; dks vikLr
djrs gq, Qksje }kjk fn;s x;s fu.kZ; dh iqf”V dh tkrh gS A
9.
The petitioner had also filed a separate application under section
86 (1) (k) of the Electricity Act to direct the respondent No.3 to comply
the order of Ombudsman dated 01.10.2014. This application was
closed in terms of the fact that the Ombudsman has already affirmed
the order of ECGRF, Jabalpur on 13.8.2015 (Annexure P-14).
W.P. NO. 17996/2015
10.
The learned counsel for the petitioner has made two-fold
submissions.
11.
First, that the MPERC could not have passed order in case of a
particular consumer and particular bill, and could only issue general
directions in the matter of policy. A number of judgements have been
cited in the matter, that the MPERC could not issue directions in matter
of a particular consumer and a particular demand.
12.
Second, that it was not open for the MPERC to have issued
mandatory and binding directions to the Ombudsman without hearing
the petitioner. If the Ombudsman was bound by the direction of the
MPERC, then if the MPERC was giving any directions contrary to the
earlier order of the Ombudsman, then since the order of Ombudsman
was in favour of the petitioner, the petitioner could not be non-suited
without hearing it.
13.
It is common ground between the parties, that now the
Regulations of 2009 have bene replaced with M.P. Electricity
Regulatory Commission (Establishment of Forum and Electricity
Ombudsman for Redressal of Grievances of the Consumers) RevisionII Regulations 2021 (for short, “Regulations 2021”). These have been
notified in Gazette of Madhya Pradesh, Part-4 (c), dated 30.7.2021. In
the Regulations of 2021, the power of the MPERC to issue directions
W.P. NO. 17996/2015
as to validity of a particular order of the Ombudsman, as was in clause
5.3 of the earlier Regulations of 2009, has not been provided. Thus,
now since 2021, the MPERC is not vested with such power to give
directions in the matter of a particular case disposed by the
Ombudsman.
14.
The Regulations of 2009 were framed in exercise of powers
under clauses (r},{s} and {zp} of Sub-section (2) of Section 181 read
with Sub-sections (5) (6) and (7) of Section 42 of the Electricity Act
2003 and also in compliance of the notification dated 8th June 2005
issued by the Ministry of Power, Government of India. In absence to
challenge to vires of Clause 5.3 of the Regulations of 2009, the
argument of the petitioner, that the MPERC was not competent to issue
directions in the matter of a particular consumer and a particular
demand, cannot be accepted.
15.
Now taking up the plea of denial of opportunity of hearing.
16.
The respondents No. 1 and 2 have filed their reply and in their
reply, it is admitted at page-4, that no opportunity was provided to the
petitioner by the MPERC while passing the order Annexure P-12,
because there is no such provision in the said clause 5.3. The following
averments have been made by these respondents :-
W.P. NO. 17996/2015
“Also there is no provision of conducting hearing under
Regulation 5.3 and the Commission has only to opine whether the
Electricity Ombudsman has passed the order which is not
consistent with the provisions in the Act/Rules/ Regulations/ Tariff
orders/ Codes/ directions issued from time to time by the
Commission or not and thereby to issue suitable directions to the
Electricity Ombudsman.
17.
These respondents have relied on withdrawal of a writ petition
filed by the petitioner in the matter of implementation of the earlier
order dated 01.10.2014 passed by the Ombudsman. However, the
petitioner filing a separate application before the MPERC seeking to
imlement order dated 01.10.2014 passed by the Ombudsman will not
justify the action of the MPERC in issuing mandatory direction in a
separate representation submitted by the DISCOM, to the Ombudsman
to review its order dated 01.10.2014 and fix a particular date for
reduction of contract demand/load.
18.
The MPERC while issuing the direction vide order annexure P-
12 fixed a particular date for reduction of load/demand which was as
per the order of ECGRF that had been set aside by the Ombudsman.
Thus, in reality, the order of the ECGRF was being restored and the
order of the Ombudsman was being set aside. Clause 5.3 of the
regulations of 2009 as it then stood, made the directions by the
MPERC mandatory. Thus, the Ombudsman was now only required to
W.P. NO. 17996/2015
do a ministerial act by withdrawing/recalling its earlier order dated
01.10.2014.
19.
This order Annexure P-12 passed by the MPERC, thus, has civil
consequences on the petitioner. It is true that the Regulations of 2009
did not provide for an opportunity of hearing at the stage of passing
order/issuing directions by the MPERC in terms of the then clause 5.3.
However, the opportunity of hearing was not barred either expressly or
by necessary implication.
20.
The Supreme Court in the case of Manohar Vs. State of
Maharashtra, reported in 2012 (13) SCC 14, has held as under :“24. In Udit Narain Singh Malpaharia v. Board of Revenue, Bihar
[AIR 1963 SC 786] the Court stressed upon compliance with the
principles of natural justice in judicial or quasi-judicial
proceedings. Absence of such specific requirement would
invalidate the order. The Court, reiterating the principles stated in
the English Law in R. v. Electricity Commissioners, ex p London
Electricity Joint Committee Co. (1920) Ltd. [(1924) 1 KB 171 :
1923 All ER Rep 150 (CA)] , held as under: (Udit Narain case
[AIR 1963 SC 786] , AIR pp. 788-89, para 8)
“8. … The following classic test laid down by Lord Justice
Atkin, as he then was, in R. v. Electricity Commissioners, ex
p London Electricity Joint Committee Co. (1920) Ltd.
[(1924) 1 KB 171 : 1923 All ER Rep 150 (CA)] and
followed by this Court in more than one decision clearly
brings out the meaning of the concept of judicial act: (KB p.
205)
‘Wherever any body of persons having legal authority to
determine questions affecting the rights of subjects, and
having the duty to act judicially, act in excess of their legal
authority they are subject to the controlling jurisdiction of
W.P. NO. 17996/2015
the King's Bench Division exercised in these writs.’ Lord
Justice Slesser in R. v. London County Council, ex p
Entertainments Protection Assn. Ltd. [(1931) 2 KB 215
(CA)] dissected the concept of judicial act laid down by
Atkin, L.J., into the following heads in his judgment: (KB p.
243) ‘Wherever any body of persons (1) having legal
authority (2) to determine questions affecting rights of
subjects and (3) having the duty to act judicially (4) act in
excess of their legal authority—a writ of certiorari may
issue.’ It will be seen from the ingredients of judicial act
that there must be a duty to act judicially. A tribunal,
therefore, exercising a judicial or quasi-judicial act cannot
decide against the rights of a party without giving him a
hearing or an opportunity to represent his case in the
manner known to law. If the provisions of a particular
statute or rules made thereunder do not provide for it,
principles of natural justice demand it. Any such order
made without hearing the affected parties would be void. As
a writ of certiorari will be granted to remove the record of
proceedings of an inferior tribunal or authority exercising
judicial or quasi-judicial acts, ex hypothesi it follows that
the High Court in exercising its jurisdiction shall also act
judicially in disposing of the proceedings before it.”
25. Thus, the principle is clear and settled that right of hearing,
even if not provided under a specific statute, the principles of
natural justice shall so demand, unless by specific law, it is
excluded. It is more so when exercise of authority is likely to vest
the person with consequences of civil nature.
21.
A recent Full Bench of this Court in the case of Bhopal
Cooperative Central Bank Vs. State of Madha Pradesh, reported
in AIR 2021 MP 137, has held as under :“19. Coming now to the third question that whether section
50-A of the Act of 1960 is a deeming provision for holding a
Director of a Society as disqualified, an opportunity of
hearing is still required to be given. We should at the outset
deal with the argument that if it is not disputed that the parent
society, of which the petitioners are representatives and in
that capacity, elected as members of the Board of Director, is
W.P. NO. 17996/2015
in default, providing opportunity of hearing to them would be
an useless formality, cannot be countenanced for the reasons
to be stated presently. It needs no emphasis to state that
question that the Society is in default for consecutive period
of 12 months in term of Rule 45(3) of the Rules of 1962 is
essentially a question of fact. Therefore, the scope of the
opportunity of hearing to be given to such
representative/delegate of the Society, who is sought to be
unseated from the office of member of the Board of Director,
would be to call upon him to prove to the contrary that the
Society in question is not actually in default. There may be
variety of situations like the Society having paid its dues but
relevant entries are not made in the account books of the
concerned Co-operative Bank or there may be mismatch in
the record maintained by them or there can be a possibility of
negligent or even deliberate omission in the record by the
officials/accountants of a given Society. In such a scenario, a
limited opportunity would be required to be given to the
affected persons, which need not be elaborate. The notice to
the petitioners/ representatives/ delegates of the parent
Society may only briefly contain the factum that the society is
in default for consecutive 12 months, giving opportunity to
them to prove otherwise and show that the Society is not
actually in default and has already cleared its dues.
Howsoever limited may be the scope of opportunity of
hearing but it cannot be held that the principles of natural
justice at this stage should be given a complete go by because
discontinuation /removal of representative/delegate of the
parent Society or declaring his/her seat of the office of the
Member of the Board of Directors vacant, would certainly
have civil consequences for him. What would be “civil
consequence” has been deliberated in Mohinder Singh Gill v.
Chief Election Commissioner, New Delhi, (1978) 1 SCC 405,
by his Lordship Krishna Iyer J. in his inimitable style,
observed while speaking for the majority thus:—
“66.……Civil Consequences’ undoubtedly cover
infraction of not merely property or personal rights but
of civil liberties, material deprivations and nonpecuniary damages. In its comprehensive connotation,
everything that affects a citizen in his civil life inflicts
a civil consequence.”
(emphasis supplied)
W.P. NO. 17996/2015
20. The Supreme Court in Sahara India (Firm), Lucknow v.
Commissioner of Income Tax, (2008) 14 SCC 151 relying on
its earlier judgment in State of Orissa v. Dr. (Miss) Binapani
Dei, AIR 1967 SC 1269, held that the distinction between
quasi-judicial and administrative orders was perceptively
mitigated and even an administrative order or decision in
matters involving civil consequences, has to be made in
consonance with the principles of natural justice. Since then
the concept of natural justice has made great strides and is
invariably read into administrative actions involving civil
consequences, unless the statute, conferring power, excludes
its application by express language. The Supreme Court in
Canara Bank v. V.K. Awasthy, (2005) 6 SCC 321 extensively
discussed the concept, scope, history of development and
significance of principles of natural justice and observed
that the principles of natural justice are those rules which
have been laid down by the Courts as being the minimum
protection of the rights of the individual against the
arbitrary procedure that may be adopted by a judicial,
quasi-judicial and administrative authority while making an
order affecting those rights. In para 14, the Supreme Court
has held as under:—
“14. Concept of natural justice has undergone a great
deal of change in recent years. Rules of natural justice
are not rules embodied always expressly in a statute or
in rules framed thereunder. They may be implied from
the nature of the duty to be performed under a statute.
What particular rule of natural justice should be
implied and what its context should be in a given case
must depend to a great extent on the fact and
circumstances of that case, the frame- work of the
statute under which the enquiry is held. The old
distinction between a judicial act and an
administrative act has withered away. Even an
administrative order which involves civil consequences
must be consistent with the rules of natural justice.
Expression
‘civil
consequences’ encompasses
infraction of not merely property or personal rights but
of civil liberties, material deprivations O and nonpecuniary damages. In its wide umbrella comes
everything that affects a citizen in his civil life.”
W.P. NO. 17996/2015
21. The Constitution Bench of the Supreme Court in Olga
Tellis v. Bombay Municipal Corporation, (1985) 3 SCC 545
while interpreting section 314 of the Bombay Municipal
Corporation Act, 1888, which confers discretion on the
Municipal Commissioner to get any encroachment removed,
with or without notice, observed as follows:
“45. It must further be presumed that, while vesting in
the Commissioner the power to act without notice, the
Legislature intended that the power should be
exercised sparingly and in cases of urgency which
brook no delay. In all other cases, no departure from
the audi alteram partem rule (‘Hear the other side’)
could be presumed to have been intended. Section 314
is so designed as to exclude the principles of natural
justice by way of exemption and not as a general rule.
There are situations which demand the exclusion of the
rules of natural justice by reason of diverse factors like
time, place the apprehended danger and so on. The
ordinary rule which regulates all procedure is that
persons who are likely to be affected by the proposed
action must be afforded an opportunity of being heard
as to why that action should not be taken. The hearing
may be given individually or collectively, depending
upon the facts of each situation. A departure from this
fundamental rule of natural justice may be presumed
to have been intended by the Legislature only in
circumstances which warrant it. Such circumstances
must be shown to exist, when so required, the burden
being upon those who affirm their existence.”
22. Subsequently, the Supreme Court in C.B. Gautam v.
Union of India, (1993) 1 SCC 78 while dealing with the
question as to whether in the absence of a provision for
giving the concerned parties an opportunity of being heard
before an order is passed invoking section 269-UD of the
Income Tax Act, for peremptory purchase of immovable
property by the Central Government, an opportunity of
hearing is required to be given or not, held as under:—
“30. …Although Chapter XX-C does not contain any
express provision for the affected parties being given
an opportunity to be heard before an order for
purchase is made under section 269-UD, not to read
the requirement of such an opportunity would be to
give too literal and strict an interpretation to the
W.P. NO. 17996/2015
provisions of Chapter XX-C and in the words of Judge
Learned Hand of the United States of America “to
make a fortress out of the dictionary.” Again, there is
no express provision in Chapter XX-C barring the
giving of a show cause notice or reasonable
opportunity to show cause nor is there anything in the
language of Chapter XX-C which could lead to such
an implication. The observance of principles of
natural justice is the pragmatic requirement of fair
play in action. In our view, therefore, the requirement
of an opportunity to show cause being given before an
order for purchase by the Central Government is made
by an appropriate authority under section 269-UD
must be read into the provisions of Chapter XX-C.
There is nothing in the language of section 269-UD or
any other provision in the said Chapter which would
negate such an opportunity being given. Moreover, if
such a requirement were not read into the provisions of
the said Chapter, they would be seriously open to
challenge on the ground of violations of the provisions
of Article 14 on the ground of non- compliance with
principles of natural justice. The provision that when
an order for purchase is made under section 269-UDreasons must be recorded in writing is no substitute for
a provision requiring a reasonable opportunity of
being heard before such an order is made.”
23. The Supreme Court in Rajesh Kumar v. Dy. CIT, (2007) 2
SCC 181 was dealing with the question that if the Assessing
Officer directing special audit as under section 142(2A) of
the Income Tax Act by formulating the opinion, even if with
the previous approval of the Chief Commissioner to audit of
the account, was required to afford an opportunity of
hearing to the assessee, relying on many previous judgments
including one of Dr. (Miss) Binapani Dei (supra), in paras
60 and 61 of the report held as under:—
“60. Whereas the order of assessment can be the
subject-matter of an appeal, a direction issued under
section 142(2-A) of the Act is not. No internal remedy
is prescribed. Judicial review cannot be said to be an
appropriate remedy in this behalf. The appellate power
under the Act does not contain any provision like
section 105 of the Code of Civil Procedure. The power
of judicial review is limited. It is discretionary. The
W.P. NO. 17996/2015
Court may not interfere with a statutory power. [See
for example Jhunjhunwala Vanaspati Ltd. v. CIT,
(2004) 266 ITR 657 (All), see, however, U.P. State
Handloom Corpn. Ltd. v. CIT, (1988) 171 ITR 640
(All)].
61. The hearing given, however, need not be elaborate.
The notice issued may only contain briefly the issues
which the assessing officer thinks to be necessary. The
reasons assigned therefor need not be detailed ones.
But, that would not mean that the principles of justice
are not required to be complied with. Only because
certain consequences would ensue if the principles of
natural justice are required to be complied with, the
same by itself would not mean that the Court would
not insist on complying with the fundamental
principles of law. If the principles of natural justice
are to be excluded, Parliament could have said so
expressly. The hearing given is only in terms of section
142(3) which is limited only to the findings of the
special auditor. The order of assessment would be
based upon the findings of the special auditor subject
of course to its acceptance by the assessing officer.
Even at that stage the assessee cannot put forward a
case that power under section 142(2-A) of the Act had
wrongly been exercised and he has unnecessarily been
saddled with a heavy expenditure. An appeal against
the order of assessment, as noticed hereinbefore,
would not serve any real purpose as the Appellate
Authority would not go into such a question since the
direction issued under section 142(2-A) of the Act is
not an appellate order.”
24. In Supreme Court judgment of Swadeshi Cotton Mills v.
Union of India, (1981) 1 SCC 664, His Lordship Chinnappa
Reddy, J. in his dissenting judgment, summarized the legal
position in the following terms:—
“106. The principles of natural justice have taken
deep root in the judicial conscience of our people,
nurtured by Binapani (supra), Kraipak (A.K.
Kraipak v. Union of India, (1969) 2 SCC 262,
Mohinder Singh Gill, (1978) 1 SCC 405, Maneka
Gandhi [Maneka Gandhi v. Union of India, (1978) 1
SCC 248]. They are now considered so fundamental
as to be ‘implicit in the concept of ordered liberty’
W.P. NO. 17996/2015
and, therefore, implicit in every decision-making
function, call it judicial, quasi-judicial or
administrative. Where authority functions under a
statute and the statute provides for the observance of
the principles of natural justice in a particular
manner, natural justice will have to be observed in
that manner and in no other. No wider right than that
provided by statute can be claimed nor can the right
be narrowed. Where the statute is silent about the
observance of the principles of natural justice, such
statutory silence is taken to imply compliance with
the principles of natural justice. The implication of
natural justice being presumptive it may be excluded
by express words of statute or by necessary
intendment. Where the conflict is between the public
interest and the private interest, the presumption
must necessarily be weak and may, therefore, be
readily displaced.”
25. In State of Orissa v. Dr. (Miss) Binapani Dei (supra), the
Supreme Court while holding that even administrative order
which involves civil consequence has to be passed in
consonance with the principles of natural justice, observed
as under:—
“12. It is true that some preliminary enquiry was
made by Dr. S. Mitra. But the report of that Enquiry
Officer was never disclosed to the first respondent.
Thereafter the first respondent was required to show
cause why April 16, 1907, should not be accepted as
the date of birth and without recording any evidence
the order was passed. We think that such an enquiry
and decision were contrary to the basic concept of
justice and cannot have any value. It is true that the
order is administrative in character, but even an
administrative
order
which
involves
civil
consequences, as already stated, must be made
consistently with the rules of natural justice after
informing the first respondent of the case of the State,
the evidence in support thereof and after giving an
opportunity to the first respondent of being heard and
meeting or explaining the evidence. No such steps
were admittedly taken, the High Court was in our
judgment, right in setting aside the order of the
State.”
W.P. NO. 17996/2015
26. Reiterating the law laid down in Dr. (Miss) Binapani's
case (supra), the Constitution Bench of the Supreme Court in
A.K. Kraipak v. Union of India, (1969) 2 SCC 262 held as
under:—
“13. The dividing line between an administrative
power and a quasi judicial power is quite thin and is
being gradually obliterated. For determining whether
a power is an administrative power or a quasijudicial
power one has to look to the nature of the power
conferred, the person or persons on whom it is
conferred, the framework of the law conferring that
power, the consequences ensuing from the exercise of
that power and the manner in which that power is
expected to be exercised. Under our Constitution the
rule of law pervades over the entire field of
administration. Every organ of the State under our
Constitution is regulated and controlled by the rule of
law. In a welfare State like ours it is inevitable that the
jurisdiction of the administrative bodies is increasing
at a rapid rate. The concept of rule of law would lose
its vitality if the instrumentalities of the State are not
charged with the duty of discharging their functions in
a fair and just manner. The requirement of acting
judicially in essence is nothing but a requirement to
act justly and fairly and not arbitrarily or capriciously.
The procedures which are considered inherent in the
exercise of a judicial power are merely those which
facilitate if no ensure a just and fair decision”
27. Judgment cited by the learned Additional Advocate
General in State of Punjab v. Tehal Singh (supra) has no
application to the facts of the present case because in that
case, the question was whether the State Government was
required to provide opportunity of hearing to the affected
persons while issuing notice regarding establishment of
Gram Sabha areas and constitution of Gram Sabhas. It was
held that power of the State Government under section 3 and
4 of the Punjab Panchayati Raj Act, 1994, is legislative in
character and the principles of natural justice need not be
observed by the State Government in the absence of clear
provisions stipulating such observance. The impugned order
in the present case cannot be described legislative in
W.P. NO. 17996/2015
character and therefore, aforesaid judgment does not in any
manner help the case of the respondent/State.”
22.
Thus, the law is well settled that the distinction between quasi-
judicial and administrative orders has been perceptively mitigated and
even an administrative order or decision in matters involving civil
consequences, has to be made in consonance with the principles of
natural justice. Since then the concept of natural justice has made great
strides and is invariably read into administrative actions involving civil
consequences, unless the statute, conferring power, excludes its
application by express language. The principles of natural justice are
those rules which have been laid down by Courts as being the
minimum protection of the rights of the individual against the arbitrary
procedure that may be adopted by a judicial, quasi- judicial and
administrative authority while making an order affecting those rights.
23.
In view of the above, the order Annexure P-12 directing the
Ombudsman to review/recall its earlier order dated 01.10.2014 and to
fix a particular date as effective date for load reduction, cannot be
given stamp of approval being passed in denial of opportunity of
hearing to the petitioner. The order Annexure P-12, therefore, stands
quashed. As a natural consequence, the order annexure P-14 also
stands quashed.
W.P. NO. 17996/2015
24.
Usually, this Court would have remanded the matter to the
MPERC to pass a fresh order. However, now with enforcement of
Regulations of 2021, the MPERC is not vested with the jurisdiction
which was conferred on it as per clause 5.3 of the Regulations of 2009.
Therefore, the respondent No.3 is set at liberty to take recourse to such
remedies as available to it under law, to challenge the order dated
01.10.2014 passed by the Ombudsman. It is made clear that this Court
has not expressed any opinion on the merits of the order dated
01.10.2014 passed by the Ombudsman. If such challenge to order dated
01.10.2014 is made within 2 months from today, then the aspect of
limitation would not come in way of the respondent No.3.
25.
In terms of above, the present petition stands allowed and
disposed of.
(VIVEK JAIN)
JUDGE
MISHRA
ARVIND KUMAR MISHRA
2024.01.30 16:48:35 +05'30'
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review