IN THE HIGH COURT FOR THE STATE OF TELANGANA
AT HYDERABAD
132521
(Special Original Jurisdiction)
MONDAY, THE FIFTEENTH DAY OF JUNE
TWO THOUSAND AND TWENTY SIX
PRESENT
THE HONOURABLE MRS JUSTICE SUREPALLI NANDA
WRIT PETITION NO: 17390 OF 2026
Between:
MD. Mahemood, S/o Sri Mohammed Khaleel, Aged 56 Years, Occu. Civil
Contractor, R/o H.No.11-87/A, Vasavi Nagar, Jogipet Village, Andoe Mandal,
Sangareddy District-502270.
...PETITIONER
AND
1. The State of Telangana, Rep. By its Prl. Secretary, Finance Department,
Secretariat Buildings, Hyderabad, Telangana State.
2. The State of Telangana, Rep. by Addl. Secretary, Finance Department,
Secretariat Buildings, Hyderabad, Telangana State.
3. Assistant Pay and Accounts Officer, Works and Projects, Medak, Medak
District.
4. The State of Telangana, Rep. by its Prl. Secretary, Panchayat Raj and Rural
Development Department, Secretariat Buildings, Hyderabad, Telangana
State.
5. The Engineer-in-Chief, Rural Water Supply and Sanitation, Mission
Bhagiratha, S.R.K. TGN Bhavan, Erramanzil, Hyderabad.
6. The Chief EngineerRural Water Supply and Sanitation, Mission
Bhagiratha, S.R.K. TGN Bhavan, Erramanzil, Hyderabad.
7. The Superintendent Engineer, M.B (Mission Bhagiratha) Circle, Sangareddy,
at Sangareddy.
ll,
8. The Executive Engineer, M.B.lntra Division (Mission Bhagiratha), Medak, at
Medak.
9. The Deputy Executive Engineer, M.B.lntra Sub-Division (Mission Bhagiratha),
Medak' at Medak
District
...RES'.NDENT'
Petition under Article 226 of the Constitution of lndia praying that in the
circumstances stated in the affidavit filed therewith, the High Court may be pleased
to issue an order or direction or writ, more particularly one in the nature of a Writ of
Mandamus declaring the action of the respondents in not releasing bills for an
amount of Rs. 1,83,4691 in respect of the Agreement No. 12022-23, dated
il=G'F7
15-02-2023, signed by the 7th respondent for the civil works executed by the
petitioner as arbitrary and illegal and violative of Articles 14, 19(1)9 and 21 of the
Constitutiorr of lndia, and consequently direct the respondents herein, to release the
bills for an amount of Rs. 1,83,469/- in respect of the Agreement No. t2022-23,
dated 15-02-2023, with 18% interest from the date of actual due for payment to till
the date of payment.
l.A. NO: 1 oF 2026
Petition under Section 151 CPC praying that in the circumstances stated in the
affidavit filed in support of the petition, the High Court may be pleased to direct the
respondents herein to release the bills for an amount of Rs. 1,83,469/- in expect of
the Agreement No. 12022-23, dated 15-02-2023, with 18% interest pending disposal
of the above writ petition.
Counsel for the Petitioner: SRI A.yADAVA REDDY
counsel for the Respondent Nos.1 To 3: AGp FoR FINANGE & PLANNING
counsel for the Respondent Nos.4 To 9: AGp FoR pANcHAyATH RAJ &
RURAL DEV
The Court made the following: ORDER
IN THE HIGH COURT FOR THE STATE OF TELANGANA
AT HYDERABAD
HON'BLE MRS. JUSTICE SUREPALLI NANDA
WRIT PETITION No.17390 of 2026
DATED 15.06.2026
Between:
Sri Md. Mahemood
,
Petitioner
And
The State of Telangana and Others
.Respondents
ORDER
Heard Sri A.Yadava Reddy, learned counsel
appearing on behalf of petitioner, learned Assistant
Government Pleader for Finance and Planning
appearing on behalf of the respondent Nos.1 to 3 and
learned Assistant Government Pleader Panchaya Rai
and Rural Development appearing on behalf of the
respondent Nos.4 to 9.
SN,J
w.P.No.1739O of 2026
The oetitioner aDDroac hed the
Court se kino
or aver a s und er:
".. to issue an order or direction or writ, more
particularly one in the nature of a Writ of Mandamus
declaring the action of the respondents in not releasing
bills for an amount of Rs. 1,83,469/- in respect of the
Agreement No. /2022-23, dated 15-02-2023, signed by
the 7tr respondent for the civil works executed by the
petitioner as arbitrary and illegal and violative of
Articles 14, 19(1)g and 21 of the Constitution of India,
and consequently direct the respondents herein, to
release the bills for an amount of Rs. L,83,469/- in
respect of the Agreement No. 12022-23, dated 15-022023, with l8PERCENT interest from the date of actual
due for payment to till the date of payment and
pass...,."
The case of t e oetitio ner in br ief as De
the
aver ents mad in the affi davit filed v the Deti ioner
ln su oort of th e Dresent Writ Petiti onisasu der: T]
3.1 The petitioner is a registered Class-IV Civil Contractor.
The Government of Telangana accorded administrative
sanction vide G.O.Rt.No.24 dated 10.01.2017 and
c.O.Rt.No.688 dated 17.09.2018 for providing safe drinking
water on a sustainable basis at household level.
-
J
-
SN,J
W.P.No.1739(, of 2026
3.2 Pursuant thereto, the 5th respondent accorded
technical sanction and the petitioner was awarded the work
of "Intra Village System for providing water facility to
habitations at Vaikuntadhamaams of Alladurg Mandal,
Medak District." Thereafter, the petitioner completed the
entrusted work within the stipulated period and the same
was duly recorded in the Measurement Book and checkmeasured by the competent authorities.
3.3 However, despite completion of the work, recording of
measurements, issuance of QC reports, satisfactory
certificates and approval of the final bill, the respondents
failed to release the admitted and undisputed amount of
Rs.1,83,469/- for more than two years without any valid
justification. Aggrieved by the same, the petitioner
approached this Court by filing the present writ petition'
4.
PERUSED THE RECORD:-
(A) The relevant oortion of the iudgment
dated O8.O3.2019 passed in M/s. Surya Constructions
Vs. State of Uttar Pradesh and others reDorted in
ardr ot r e Caa 7Or'. hv ih
'7*
Trrr.\ lrr.l.ra
Rart. lr af *ha
SN,J
w.P.No,17390 0f 2026
Aoex Court in Civil Apoeal No.261O of 2O19 (Arisino
out of SLP (C) No.295O5 ot 2Ol4l, is extracted
hereu nder:
"...It is clear, therefore, from the
aforesaid order dated 22.03.20t4 that there is
no dlspute as to the amount that has to be paid
to the appellant. Despite this, when the
appellant knocked at the doors of the High
Court in a writ petition being Writ Civil
No.25126 of 2074, the impugned judgment
dated 02.05.2014 dismissed the writ petition
stating that disputed questions of fact arise and
that the amount due arises out of contract. yy!
are afraid the Hioh Court was wholly
incorrect inasmuch as there was no
disouted question of fact. On the contrary,
the amount pavable to the appellant is
whollv undisouted. Equally. it is well
settled that where the State behaves
arbitrarily. even in the realm of contract,
the High Court could interfere under Article
,rA
^3 J h a
a^h-lihi
+i,rr
rf lrr,li-
r i^El
International Ltd. and Another v. Export
Credit Guarantee Corporation of India Ltd.
and Others' (2O 4 (3) SCC ss3)I.
This being the case and the work having
been completed long back in 2009, we direct
the Uttar Pradesh lal Nigam to make the
necessary payment within a period of four
weeks from today. Given the long period of
delay, interest at the rate of 6 per cent per
annum may also be awarded.
The
appeal stands disposed of
accordingly. "
-
SN,J
w.P.No.1739O of 2026
(B) The Apex Court in the iudoment rePorted in
"39. A Bench of two learned Judges of
this Court in Shrilekha Vidyarthi (Kumari) v.
State of U.P.a observed that there exists "an
obvious difference" between contracts
concerning private parties to those which have
State as a pafty. The primary difference being
that the State while exercising its powers and
discharging its functions "acts indubitably, as is
expected of it, for public good and in public
interest". The said factor singularly is sufficient
to bring into any transaction the minimal
requirements of public law, to which the State is
a party. The fact that a dispute falls into the
contractual realm does not relieve the State of
its obligation to comply with the requirements
of Article 14.
40. Further the Court in Shrilekha
Vidyarthi case4 had observed that: (SCC p.237,
para 24)
"24. The State cannot be attributed the
split personality of Dr.Jekyll and Mr. Hyde in the
contractual field so as to impress on it all the
characteristics of the State at the threshold
while making a contract requiring it to fulfil the
obligation of Afticle 14 of the Constitution and
thereafter permitting it to cast off its garb of
State to adorn the new robe of a private body
sN,l
W.P.No.1739O of 2026
during the subslstence of the contract enabling
it to act arbitrarily subject only to the
contractual obligations and remedies flowing
from it. It is really the nature of its personality
as State which is significant and must
characterize all its actions, in whatever field,
and not the nature of function, contractual or
otherwise, which is decisive of the nature of
scrutiny permitted for examining the validity of
its act. The requirement of Article 14 being the
duty to act fairly, justly and reasonably, there is
nothing which militates against the concept of
requiring the State always to so act, even in
contractual matters. There is a basic difference
between the acts of the State which must
invariably be in public interest and those of a
private indivldual, engaged in similar activities,
being primarily for personal gain, which may or
may not promote public interest. Viewed in this
matter, in which we find no conceptual difficulty
or anachronism, we find no reason why the
requirement of Article 14 should not extend
even in the sphere of contractual maXers for
regulating the conduct of the State activity."
(c)
-
SN,J
w.P.No.17390 of 2(J26
the Constitution of India. The counsel for the
petitioner rightly placed reliance on the decision
of the Apex Court in Surya Constructions Vs.
State of Utter Pradesh and others, following the
judgment in ABL International Ltd. Vs. Expoft
Credit Guarantee Corporation of India Ltd. Cited
supra. In view of the Apex Court judgment, the
contention of the learned Government Pleader
that the writ petition is not maintainable before
this Court could not be countenanced. The bills
of the petitioner dated 13.3.2019 are admitted
by the respondents and forwarded for payment
after due measurements and obtaining quality
control and the Vigilance repoft. Hence, the
authorities are estopped from stating that the
bills are submitted without executing the works.
On the mere ground of pendency of Vigilance
report, payment cannot be
stopPed.
Accordinolv, there shall be a direction to
the respondents to oav the bill amount of
Rs.8.O8,828/- to the oetitioner within a
period of six weeks from the date of
receiDt of coDv of this order-"
(D)
The relevant Dortio n of the iudoment
dated 16.03.2021 passed bv the Hiqh Court of Andhra
Pradesh in Mutyala Veeravenkata,Satvanaravana vs.
The State of Andhra Pradesh reoorted in 2O21
SCCOnline AP 141O, in oarticular paraqraoh Nos.8 and
9, is extracted hereunder:
"8. The provisions of the Act make it
clear that it is a welfare legislation meant to
create employment/eradicate unemployment in
SN,J
W.P.No.17390 of 2026
rural areas and in the process to create durable
assets for rural India. Thus, it is clear that a
public element is involved in these works with
State participation and funding. The "States"
presence is therefore all pervasive in this
scheme. The law on the interpretation of
welfare legislation is also very clear. As held in
number of cases including K.H.Nazar v. Mathew
K Jacob case by the Supreme Court of India
"Judges ought to be concerned with the colour,
content and the context of such statutes".
Therefore, in view of the settled law and
keeping in mind the purpose for which the
legislation is enacted, this Court has to hold
that there is a public element involved in this
and that it is not a pure case of the State
entering into a commercial contract.
9. Apart from this when State or
State instrumentalities act in an arbitrarv
manner or fail to act within tame the Wrat
Court does have iur sdiction to entertain
the matter. Even the case law cited by the
learned counsel for the petitioner supports this
to an extent. Besides this Couft notices that
there is no method/mode for settlement of
disputes provided for. Section 23 of the Act and
Rule 14 of Schedule-I for example provide for
constant monitoring of the works/books to be
maintained etc. Despite this, there is no strict
denial of the exact quantum of work executed."
(E) The relevant oortion of the judgment
dated
2.O3.2()22 D ssed bv the
Prades h
in W.P.N o.2511 of
ioh Court of ndhra
O22. in Da icular
oaraoraoh Nos.23 and 24, is extracted hereunden
-
SN,J
W.P.No.U39O of 2026
*231 Tha Hioh Crlurf of Andhra
,]
(F)
u
n
n
SN,J
W.P.No.17390 ot 2(J26
(G) The relevant oortion of the order of this
"12. In the light of the pleadings and
arguments referred to above, it is clear that
there is no dispute with regard to amounts
payable under Bill Nos.34, 35 and 36. It has
t)
,]
observed above, in the present case there is no
dispute as such between the parties. The only
issue is with regard to release of payment under
Bill Nos.34, 35 and 36 by the respondents State. No explanation is forthcoming from the
respondents as to why the amounts covered by
Bill Nos.34, 35 and 36 cannot be released.
According to the respondents, Bill Nos.34, 35
and 36 are pending for want of budgetary
clearance. On the face of it, action of the
lt
-
SN,J
W.P.No.1739() of 2026
respondents is arbitrary, unreasonable and
unjust and the same cannot be countenanced.
The contention of the learned
Additional Advocate General that the
petitioners have to approach cavil Court
even for pavment of admitted bills runs
contrarv to the settled leoal oroposation.
This Court would also look into the public
13.
Interest involved. The project, as informed by
the learned counsel on either side, is an
ongoing project and the bills worth of hundreds
of crores are kept pending for no reason and
there is every possibility of non-release of
payment impacting the ongoing project and the
game would not be in public interest. Even for
this reason, this Court holds that the petitioner
has made out a case warranting interference in
writ jurisdiction. Further, as there is inordinate
delay in release of payments covered by the
subject bills by the respondents to the
petitioner without any justification, in the
opinion of this Court, the respondents are liable
to pay penal interest. However, as against the
claim of 18o/o per annum sought by the
petitioner, this Court holds that the respondents
are liable to pay penal interest at 9olo per
annum,"
(H) The iudoment of the Apex Court in Hari
Krishna Mandir Trust V. State of Maharashtra and
Others reoo
n
in AIR 2O2O Suoreme C urt 3969 and
in oarticular oara Nos.lOO and 1O1 he d as follows:
"100. The High Courts exercising their jurisdiction
under Article 226 of the Constitution of India, not only
have the power to issue a writ of mandamus or in the
t2
SN,J
W.P.No.17390 of 2026
nature of mandamus, but are duW-bound to
exercise such power, where the Government or a
oublic authoritv has failed to exercise or has
wronolv exercised discretion conferred uoon it
bv a statute, or a rule, or a policv decision of the
Government or has exercised such discretion
mala fide. or on irrelevant consideration.
101. In all such cases, the High Court must issue a
writ of mandamus and give directions to compel
performance in an appropriate and lawful manner of
the discretion conferred upon the Government or a
public authority."
DISCUSSION AND CONCLUSION
The learned counsel ao earinq on behalf of the
oetitioner submits that the subiect issue in the
oresent writ oetition is souarelv covered bv the order
of this Court dated 02.03.2026 oassed in W.P. No.
3346 of 2O26 and hence. t he oetitioner is entitled for
the orant of relief as extended to the Detitioner in
W.P. No. 3345 of 2O 5, dated 02.O3.2026.
6.
The learned Assistant Government Pleader for
Finance & Planning appearing on behalf of the
respondent Nos,1 to 3 do not dispute the said
submission made by the learned counsel appearing on
behalf of the petitioner, in so far as the application of
the principle laid down in the said judgments
-
l3
-
SN,J
W.P.No.17390 of 2026
(referred to and extracted above) to the facts of the
present case on the point that when there is nonpayment of the undisputed bills, the same is violative
of Articles 14 & 16 of the Constitution of India and the
state is bound to act fairly.
7. A bare perusa! of the record indicates that a
specific plea is taken by the petitioner at para '7' of
the affidavit filed by the petitioner that an amount of
Rs.10,25,644l- towards first and part bill was paid on
18.08.2023 and a bill for an amount of Rs.1,83,469l-
towards full and final payment after deducting the
amounts towards statutory deductions was forwarded
to the 4th respondent i.e., Assistant Pay and Accounts
Officer, Medak for release of the amount. The
aforesaid facts had not been disputed by the learned
counsel appearing on behalf of the respondents. In
view of the clear admission of the liability of the
respondents herein, thas Court opines, being
instrumentalities of the State, the respondents are
duty bound to act in a just fair and non arbitrary
manner in all their dealings especially with respect to
l4
SN,J
W.P.No.1739O of 2O25
public contracts. Hence, this Court opines that
petitioner is entitled for grant of relief in the present
case.
8.
TAKING INTO CONSIDERATION:
a) The aforesaid facts and circumstances of the
case,
b) The submissions made by the learned counsel
appearing on behalf of the petitioner and learned
Assistant Government Pleader for Finance & Planning
appearing on behalf of the respondent Nos.1 to 3,
c) The observations in the judgments (referred to
and extracted above and again enlisted below):
(a) (2o1e) 16 SCC 794,
(ii) (2023) 8 SCC 24O,
(iai) MANU / AP / 07 2L / 2022,
(iv) 2021 SCCOnline AP L4LO,
(v) The judgment dated 22.03.2022 passed by
the High Court of Andhra Pradesh in
W.P.No.2511 of 2022,
(vi) The judgment dated 2L.O4.2O25 passed by
this Court in W.P.No.tL744 ol 2025,
(vii)The order dated 03.1O.2023 passed by this
Court in W.P.No.12655 ol 2023,
(viii) AIR 2O2O Supreme Court 3969
-
l5
-
SN,J
w.P.No.1739O of 2026
(d) The discussion and conclusion as arrived at
paragraph Nos.S & 6 of this order,
The oresent writ oetition is also disoosed of in
terms of the order of this Court, dated 02.03.2O26
nreead
in
lll D Na ??4.6
t
ln A
dir
aita
+h
resDonde nts herein to co sider the reoue t of the
oetitioner for release of the admitted, undisDuted bil!
amount of Rs.1,83,469/- (Rupees One Lakh Eaohtv
Three Thousand Four Hundred and Sixtv Nine onlv) in
of the work of "Intra Villaqe Svstem for
providino water facilitv to Habitations at
resDect
Vaikuntadha
aams of Alladurq Ma dal. Medak
Distract" executed by the petitioner Dursu?nt to
Aqreement
o.AEE3/--lIntra Villaqe vKDt2022-23
dated 15.O2.2O23, as oer the full and final bill as
aoDroved bv the comDetent Authoritv
alono with
interest, within a oeriod of four (04) weeks from the
date of receiot of a coov of this order dulv takino into
considerataon the observations of the
'l
x Court and
other Courts in the various Judqments (referred to
and extracted above) and pass appropriate orders
l6
SN,J
W.P.No.1739O of 2026
Miscellaneous petitions, if any, pending in this Writ
Petition, shall stand closed.
SD/-A. SREENIVASA REDDY
ASSISTANT REGISTRAR
//TRUE COPY//
_,_. -_- -+-L
ECTION OFFICER
To
. The Prl. Secretary, Finance Department, Secretariat Buildings, Hyderabad,
Telangana State.
2. The Addl. Secretary, Finance Department, Secretariat Buildings, Hyderabad,
Telangana State.
3. Assistant Pay and Accounts Officer, Works and projects, Medak, Medak
District.
4. The Prl. Secretary, Panchayat Raj and Rural Development Department,
Secretariat Buildlngs, Hyderabad, Telangana State.
5. The Engineer-in-Chief, Rural Water Supply and Sanitation, Mission
Bhagiratha, S.R K. TGN Bhavan, Erramanzil, Hyderabad.
6. The Chief Engineer- ll, Rural Water Supply and Sanitation, Mission
Bhagliratha, S.R.K. TGN Bhavan, Erramanzil, Hyderabad.
7. The superintendent Engineer, M.B (Mission Bhagiratha) circre, sangareddy,
at Sangareddy.
8. The Executive Engineer, M.B.lntra Division (Mission Bhagiratha), Medak, at
Medak.
9. The Deputy Executive Engineer, M.B.lntra sub-Division (Mission Bhagiratha),
Medak, at Medak District.
10. One CC to SRI A.YADAVA REDDY, Advocate
tOpUCl
11.Two ccs to GP FoR FINANCE & PLANNING, High court for the state of
Telangana, at Hyderabad. [OUT]
12.rwo ccs to GP FoR PANCHAYATH RAJ & RURAL DEV, High court for the
State of Telangana, at Hyderabad. [OUT]
13.Two CD Copies
PSK.
BS
,N
CC TODAY
HIGH COUR
DATED: 1510612026
'
1 \l E STA rS
ORDER.
WP.No.17390 of 2026
q
o
2 5 JUN 2026
* Pl--
DISPOSING OF THE WRIT PETITTON
WITHOUT COSTS.
grl \ a\
*
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review