HIGH COURT OF TRIPURA
AGARTALA
RSA 09 of 2016
1. The Indian Oil Corporation Limited,
(Assam Oil Division),
(Through the Executive Director, AOD),
Digboy, Assam
2. The Executive Director,
Indian Oil Corporation Limited,
Assam oil Division,
Digboy, Assam
3. The Deputy Manger (Marketing),
Indian Oil Corporation Limited,
(Assam Oil Division),
Kunjaban Depot, Agartala,
PO: Abhoynagar,‟
PS: East Agartala,
District: West Tripura
4. The Senior Manager (Operation),
Indian Oil Corporation Limited,
(Assam Oil Division),
Marketing Operation Office,
2, Dr. Mani Kanta Kakoti Lane,
Kachari Basti, Ulubari,
Guwahati - 781007
----Appellant-Defendant(s)
Versus
1.
Smti. Pallabi Majumder (Roy), alias Pallabi Roy,
wife of late Rahul Roy,
2.
Master Shimak Roy
son of late Rahul Roy
Both are residents of 30, Akaura Road, Agartala.
PO: Agartala, PS: West Tripura,
District: West Tripura
---- Respondent-Plaintiff(s)
For Petitioner(s)
For Respondent(s)
Date of hearing
Date of pronouncement
Whether fit for reporting
: Ms. P. Dhar, Adv.
: Mr. S. M. Chakraborty, Sr. Adv.
Mr. S. Bhattacharjee, Adv.
: 22.12.2020
: 03.02.2021
: YES
HON‟BLE MR. JUSTICE S. TALAPATRA
Judgment & Order
This is an appeal under Section 100 of the CPC from the
judgment of reversal dated 23.02.2015 as delivered in Money Appeal
No. 08 of 2012 by the Additional District Judge, Court No.4, West
Tripura, Agartala.
[2]
By the said judgment dated 23.02.2015, the judgment
dated 07.01.2006 delivered in MS 02 of 2016 by the Civil Judge, Senior
Division,
Court No.1, West Tripura, Agartala has been reversed on
observing that the finding of the Civil Judge that due to non delivery of
the petroleum product by the plaintiff, the defendant (the appellant
herein) had no other option but to show the cost of the said petroleum
product as accidental loss is totally contrary to the law as the
defendants being the statutory authority had no scope to make any
recovery from the private individual on any imaginary ground such as
accidental loss without following the principles of natural justice as
enunciated in Ka Oldphimai Mukhim vs. The District Council Jaintia
Hills, Autonomous District Jowai and Others reported in AIR 1983
Gauhati 1. The suit was thus decreed directing the appellants herein to
pay an amount of Rs.3,56,302/- with interest at 7% per annum from
the date of filing of the suit i.e. 07.01.2006 till the date of payment.
[3]
The said finding has been seriously questioned in this
appeal. At the time of admitting the appeal by the order dated
15.07.2017, the following substantial questions for purpose of hearing
of this appeal were framed:
1. Whether the reversal judgment and decree passed by [first]
the appellate Court suffer from perversity for not considering the
fact that the agreement between the plaintiffs and the
defendants had [even though] expired, but the terms and
condition of the agreement extended on the basis of which the
carrying of the goods by the plaintiffs was allowed and thereby
the [said] appellate Court arrived at a wrong finding?
2. Whether the findings of the appellate court that the principle
of natural justice as not followed is justified?
[4]
For purpose of appreciating the substantial questions of law
as reproduced above, it would be appropriate to refer the basic fact of
the suit. The suit was filed for realization of a sum of Rs.3,53,302/- with
interest and costs. The plaintiff, now represented by his legal heirs, the
respondents herein, had pleaded that he had long term relation with the
appellants as he was transporting POL (the petroleum products) on their
behalf. In lieu of referring the legal heirs as the plaintiffs, for
convenience‟s sake they would be referred to as the plaintiff. An
agreement was struck between the plaintiff and the defendant No.1,
(the respondent No. 1 herein) under No.NE/JT-1/99 for the period of
three years w.e.f. 01.02.2000 to 31.03.2003. On expiry of the said
tenure, the plaintiff was asked to continue as the transporting
contractor and according to the plaintiff, that was so done “on the basis
of mutual trust.” The plaintiff obliged the said request and went on
transporting POL from Dharmanagar Depot of the respondent No.1 to
different destinations within the state of Tripura. However, the said
arrangement was formalized by the letter dated 30.04.2003 extending
the tenure of the agreement till 31.05.2003. No further extension was
given, but the plaintiff has pleaded thus:
“At the request of the defendant No. 3 the plaintiff
continued the said transportation job on the basis of
mutual trust and faith and without any reliability as per
stipulation contained in the agreement No.NE/JT-1/99.
The tanker of the plaintiff bearing rTRL3592 was given the
load of motor spirit from Dharmanagar Depot to Agarala,
but when the said tanker reached the Jirania outlet owned
by one M/s GC Raichoudhury and son a dispute regarding
the density of the motor spirit was raised and the sample
of POL from the tank was collected.”
[5]
According to the plaintiff, he filed the suit being MS 23 of
2004 in respect of difference on a claim that arose during that time, for
the loss that plaintiff suffered for not releasing his vehicle for pretty
long time. The vehicle got completely damaged causing huge pecuniary
loss to the plaintiff. However, ex facie the claim against the pecuniary
loss as raised in the previous money suit being MS 23 of 2004, herein
after is referred to as the earlier suit, is quite distinct from the loss as
claimed to have been suffered by the plaintiff in MS 23 of 2004. The
plaintiff has stated that he had no role in the matter of maintaining
density. According to the plaintiff, the defendants (the appellant
herein), took undue advantage by deducting the loss as arbitrarily
determined by the defendants from the transportation bills without
giving any opportunity to the plaintiff to have his say. The Plaintiff had
configured the loss and claimed the same by instituting the suit. As
there is no dispute regarding the amount that has been deducted by the
defendants from the transportation bill, this court is not called upon to
re-determine the amount of deduction. A sum of Rs.3,56,302/- was
deducted from the total transportation bill of
Rs.4,30,617/-. After
deduction, the remainder of the amount i.e. Rs.74,368/- was paid to
the plaintiff and there is no dispute in this regard. Another sum of
Rs.23403/- was paid to the plaintiff thus and the total amount that was
paid to him stood at Rs.97,721/-. The deduction had been made under
the head of recovery against the accident even though no accident ever
took place while transporting POL product for the defendant (see Para 7
of the plaint).
[6]
The plaintiff raised serious objection to such deduction
inasmuch as he did not find any justification or legal sanction behind
the recovery of the said amount. That was an arbitrary deduction for
purported loss suffered by the defendants. The plaintiff claimed 10%
interest per annum on the recovered amount till the date of refund. The
said plea was also raised in the notice served by the plaintiff. It has
been admitted by the plaintiff that he had received a reply under
No.G/M0/74-11 dated 01.11.2004 from the defendant No.1. According
to the plaintiff by the said reply, the defendants tried to justify their
illegal action. The plaintiff has raised serious objection in respect of the
manner in which the said deduction was made without serving a prior
notice. Thus, the reply is of no value. The plaintiff has also responded to
the said reply dated 01.11.2004 by his letter dated 16.11.2004
explaining the position that the defendants had illegally deducted the
said amount. If the said amount was not refunded, he would take the
action at law raising the claim of interest at 15% per annum. There had
been no response to the said letter dated 16.11.2004. In the earlier
suit, the plaintiff made an attempt to incorporate his plea against the
said deduction but the civil judge did not allow the amendment of the
plaint observing that a separate cause cannot be included by way of
amendment. The plaintiff was at liberty to file a separate suit.
Accordingly, the plaintiff filed the present suit. The plaintiff has stated
categorically in the plaint that the action of the respondent is grossly
arbitrary, unreasonable and high-handed as no authority was ever
conferred on them the authority to deduct such amount from his bills.
After the expiry of the agreement as refereed before on 31.05.2004,
there was no mutually agreed terms operating in the area of
transportation. Hence, such deduction is liable to be termed illegal and
unauthorized.
[7]
There is no dispute regarding the cause of action and the
suit was filed within time. The defendants, however, disputed the claim
of the plaintiffs but substantially admitted the fact narrated in respect of
the agreement and currency of the agreement till 31.05.2004. But they
have controverted the claim and the narrative of the plaintiff by stating
as follows, in response to Para 2 of the plaint:
“It is, however, submitted that the plaintiff has
been working as Transport Contractor on the basis of the
contractual Agreement for a pretty long time. The
Defendant No. 1 is one of the Wings of a Statutory
Corporation, namely, Indian Oil Corporation Ltd. of the
Central Government and everything in the administration
of the Defendant No.1 takes place according to the Rules,
Regulation and practice that exist for the purpose. There
is hardly any scope to work beyond the statutory
framework of the Defendant No. 1. The claim that after
expiry of the original contractual period the Plaintiff was
requested to continue as Transport Contractor under them
on the basis of mutual trust, is not correct as there cannot
be anything regarding transaction on a mutual trust. It is,
however, not disputed and denied that even after expiry
of the contractual period and till new contract is entered
into, the Transport Contractor at their request was
allowed to carry on transportation of POL products on the
basis of the terms and condition stipulated in the existing
agreement, validity of which has been expired. This is so
because of the admitted fact that there is no scope for any
individual official of defendant No.1 to fix and arrange
new terms and conditions and rate for transportation of
the POL products.”
Thus, it is apparent that continuation of transportation
beyond the day of expiry on the basis mutual trust and faith has been
concretely denied by the defendants. That apart, they have stated that
the defendant No. 3 did not have the authority to enter into a new
arrangement with the plaintiff for transportation of POL. It has been
also stated by the defendants thus:
1. According to the practice after expiry of the existing
contract period till the new one is entered into the
Transport Contractors are allowed at their request to
transport the POL products from Dharmangar to different
destinations within the State of Tripura on the basis of the
rate, terms and conditions of the contract agreement,
validity of which got expired.
2. Vehicle No. TRL 3592 was given a load on 06.08.2003 of
Motor Spirit from Dharmanagar Depot for Agartala for
which the said Tanker Truck reached Jirania outlet owned
by M/S G. C. Roy Chowdhury & Sons and a dispute
regarding density of the Motor Spirit was raised after
collecting samples from the said Tank Truck by breaking
upon the seal by the said outlet owner. Some disputes and
differences regarding the said issue had cropped up for
which the plaintiff had already filed the Suit being No.MS23/04 which was pending for disposal when the new suit
was instituted. The defendants further added that the said
load was given at the instance of the plaintiff after expiry
of the term of the earlier contract on following the
practice as stated. The rate, terms and conditions
stipulated in
the last expired agreement was to be
followed, not on the basis of mutual trust and faith, as
claimed by the Plaintiff.
3. According to the terms and conditions of the
Agreement, the Transport Contractor is bound to carry out
any instruction given by the defendant No. 1 or his
officials either by writing or verbally. In the wake of the
dispute regarding the load given to Tanker Truck No. TRL
3592, the Plaintiff was requested to take back the load to
Dharmanagar by the Depot Officer at Dharmanagar more
than once, but he did not comply such instruction and
kept the vehicle No. TRL 3592 with Motor Spirit in the
premiss of M/S G. C. Roy Chowdhury & Sons at Jirania.
The plaintiff did not take any action to minimize the
dispute to keep the defendant No.1 harmless. It was also
stipulated in the agreement that the transport Contractor
shall keep the defendant No. 1 indemnified against all
damages and losses, and that the defendant No. 1 has got
the authority to realize the value of POL products from the
Contractor from the due, payable by the defendant No.1,
against the value of POL products, not delivered by the
transport-contractor. In accordance with the said terms
and conditions, value of 12 Kl Motor Spirit amounting to
Rs.3,56,302/- had been deducted from the transportation
bills of the plaintiff. Such action was taken after
exhausting all possible efforts to convince the plaintiff to
take back the load of Motor Spirit given to his Tanker
Truck No. TL 3592 from Jirania Outlet to Dharmanagar
Depot for taking further steps in the matter in order to
minimize the dispute between the parties, but he did
comply the instruction.
4. On deducting the amount of Rs.3,56,302/-, the
remainder of the bill amount was handed over to the
Plaintiff by the Defendant No. 3 on 08.10.2004. The
deduction of Rs.3,56,302/- was made from the total bill of
Rs.4,30,670/-. Hence, the plaintiff received an amount of
Rs.74,368/- only. Even from the said amount, a sum of
Rs.50/- was deducted as draft commission, say an amount
of Rs.74,318/- only was payable. After adding another
transportation bill of Rs.23,403/- for the month of July,
2004, the total amount that was paid to the plaintiff came
to be Rs.97,721/-. The defendants did not dispute this
account.
The defendants have also stated that the recovery has been
[8]
effected from the plaintiff by way of deduction from his transportation
bill No.NE/JT/1/99.
On the basis of rival pleadings, the following issues were
framed by the order dated 07.04.2006:
I.
Is the suit maintainable?
II.
Was the parties bound by the terms and conditions of
agreement No.NE/JT-1/99 after its admitted expiry on
31.05.03?
III.
Was there any violation of any terms or conditions of the
agreement No.NE/JT-1/99 by the plaintiff?
IV.
Was the deduction of Rs.3,56,302/- by the defendants
from the transportation bills of the plaintiff legal?
[9]
V.
Is the plaintiff entitled to get decree as prayed for?
VI.
To what other relief plaintiff is entitled?
Having recorded the evidence and evaluation thereof, the
civil judge by his judgment dated 19.03.2012 delivered in MS 02 of
2006 has observed that the fact relating to recovery of RS. 3,56,302/has been admitted by the defendants of the suit. Even the fact of
extension of the agreement bearing No.NE/JT/1/99 till 31.05.2003 has
been admitted by the defendants. It has been admitted by the parties
that a load of the petroleum product (motor spirit) to the tune of 12000
liters was given to the plaintiff on 06.08.2003 for transportation from
Dharmanagar to Agartala. To this extent, there surfaced no dispute. The
civil judge has observed that the plaintiff has not proved any allegation
in respect of non-payment of the carrying charge. The dispute had
surfaced when one of the dealers of the defendants (the appellants
herein) refused to accept the motor spirit on the plea of poor density of
the motor spirit. The plaintiff admittedly left the said quantity of the
motor spirit in the premises of the said dealer namely M/S G. C. Roy
Chowdhury and Sons, proprietor of Jirania Petrol Pump. The defendants
have categorically asserted that defying their request to take back the
load to Dharmanagar, the plaintiff left that tanker in the premises of the
Jirania petrol Pump causing loss of 12,000 liters of motor spirit.
Acceding to the objection on density of petroleum product as raised by
the said dealer, the defendants (the appellants herein) directed the
plaintiff to take back that load to their deport at Dharmangar wherefrom
he had accepted the load. In this perspective fact, the Civil Judge has
observed in his judgment as follows:
“Section 73 of the Indian Contract Act, 1872 provides that when
contract has been broken, the party who suffers by such breach
is entitled to receive, from the party who has broken the
contract, compensation for any loss or damage caused to him
thereby, which naturally arose in the usual course of things
from such breach, or which the parties knew, when they made
the contract, to be likely to result from the bre3ach of it and
such compensation is not to be given for any remove and
indirect loss of damage sustained by reason of the breach.
Admittedly, the originally plaintiff of this suit neither delivered
the petroleum product to the consignees nor returned the said
petroleum products to the defendants or produced the tank truck
in question before the defendants by which the petroleum
products were carried by the original plaintiff from Dharmanagar
to Agartala and, therefore, the defendants had no other option
but to show the cost of the said petroleum products as accidental
loss.
In the case of M/S. Modi Sugar Mills Limited Versus Union of
India, reported in AIR 1984 SC 1248, the Hon‟ble Supreme Court
of India opined that
decision of the court below directing
adjustment of determined value of containers from the security
deposit with the government was correct when there was a
contract for manufacturing of Biscuit from the flour supplied by
the government, any failure to return the containers in which the
flour was supplied, in terms of agreement as per provisions of
law contained in sections 70 & 73 of the Indian Contract Act,
1872.
So, in view of the evidence on record and the aforesaid
provisions, of law, I find that the defendants committed no
mistake by making deduction of Rs.3,56,302/- from the
transportation bills of the plaintiff when the original plaintiff
disclosed no terms and conditions of his oral agreements with
the defendants regarding transportation of petroleum products
by this tank truck as a result of which the plaintiffs are not
entitled to get any decree as prayed for in this suit.”
[10]
On the basis of the said observations, the money suit as
instituted by the plaintiff stood dismissed but without cost. The plaintiff
challenged the said judgment by filing an appeal being Money Appeal
No. 08 of 2012 in the court of the District Judge, West Tripura,
Agartala. In the course of time, the said appeal stood transferred to the
court of the Addl. District Judge, Court No. 4, West Tripura, Agartala
and the same was heard on 07.02.2015 and disposed by the judgment
of reversal on 23.02.2015. The said judgment has been challenged by
the defendants in the present appeal. While quashing the order of the
civil Judge, the first appellate court has observed that the civil judge
has failed to consider that any action taken by an instrumentality of the
State like IOC without serving any prior notice is contrary to principles
of natural justice. It has been observed further by the first appellate
court has observed as follows:
The defendants may have their claim against the
plaintiff but they are under obligation to make a specific
claim to the plaintiff prior to making any deduction from
his bill. In the present case no such claim was made and
taking the advantage of the custodian of the money of the
plaintiff they recovered the amount in an unauthorized
and illegal manner without any adjudication of their claim
as to whether they are legally entitled to get it or not.
11. While deciding the issues Nos. IV, V and VI,
analogously the learned Trial Court gave purported finding
in page-12 of the judgment that the plaintiff did not return
the petroleum product to the defendants and made claim
for carrying charge. It was also erroneously found by the
learned trial court that the original plaintiff did not do so
and he gladly accepted the amount of bill from the
defendants without raising any objection whereof the
defendants recovered the value of 12,000 liters of
petroleum product which the plaintiff was supposed to
deliver to M/S G.C. Roy and Sons Agency at Jirania as well
as the GREF at Lichubagan, Agartala.
The said finding of the learned Court below is totally
arbitrary and not based on evidence as the learned Trial
Court failed to appreciate the statement made in Para-4 of
the plaint and admitted by the defendants in Para-4 of
their written statement that the tank truck of the plaintiff
reached the said petrol pump and after breaking the seal
by the pump owner when dispute regarding the density
cropped up the said petrol was not received by the said
pump owner and the tank truck was detained in that
petrol pump by the Deputy Manager (Marketing) on
10.08.2013 as revealed from page-2 of the letter of
plaintiff dated 16.11.2004 (Exbt-4).
Under the circumstances the plaintiff had not
scope to move the truck from that petrol pump as the
vehicle went under the detention of IOC Ltd. The finding
of the learned Trial Court is also erroneous because it did
not consider the letter of protest written by the plaintiff
on 11.10.2004, Exbt.2 and 16.11.2004, Exbt.4, challenging
that illegal recovery.”
[Emphasis added]
[11]
According to the first appellate court it was the liability of
the defendants to arrange the delivery of the petroleum products as the
plaintiff brought the tanker truck the in sealed condition in the petrol
pump. Having relied on a decision of the Gauhati High Court in
Oldphimai Mukhim (supra), it has been held thus “If the purpose of the
rule of natural justice is to prevent miscarriage of justice, one fails to
see why those rules should not be made inapplicable to administrative
enquiries. Arriving at a just decision is the aim of both quasi-judicial
enquiries as well as administrative enquiries. An unjust decision in an
administrative enquiry may have more far-reaching effect than a
decision in a quasi-judicial enquiry.”
[12]
The decision of the Civil Judge was interfered with,
observing that Modi Sugar Mill (supra) was set up in a different factsituation which cannot be compared with the fact-situation of the
money suit, instituted by the plaintiff. Having observed thus, a part of
the observation in Oldphimai Mukhim (supra) has been referred to, for
holding the action of recovery by the defendants as “patently violating
the principle of natural justice.” It has been further observed that
showing the loss as the accidental loss by the defendants is totally
contrary to law as the defendants being the statutory authority could
not have violated the principles of natural justice.
Ms. P. Dhar, learned counsel appearing for the appellants
[13]
has
seriously
criticized
the
judgment
and
contended
that
the
transportation was configured by the terms and conditions of the
previous agreement. Even if there is no formal acknowledgement in that
regard. According to Ms. Dhar, learned counsel, the clauses 9, 15, 17
and 35 of the agreement are material for the present purpose. Since
those clauses have been referred, those are being reproduced for
reference:
“9. That the compliance of all enactment and/or all
Government
Rules
and
Regulations
regarding
transportation of petroleum products and route permits
etc, will be the responsibility of the Contractor/s and any
fines for prosecution for non-compliance of any such Rules
will be borne and suffered by the Contractor/s.
*******************************************
15. That the Contractor/s is/are totally responsible for
delivering the correct quality and quantity of product as
per Invoice at the destination specified. The Contractor/s
driver/s should satisfy himself/themselves regarding the
dips and quality prior to the sealing of the tank lorry/ies.
In the event of any loss of product recorded at the
destination, as reflected by fall in dips, the cost of such
shortages would be debited either to the contractor‟s bills
if any with Corporation or will b e made good directly by
the contractor or will be adjusted against any deposit or
other amounts payable to the contractor.
*******************************************
17. The contractors shall also be responsible for safe
conduct of supplies in transit. If at any time, the product
is found contaminated during the transit and/or at the
time of delivery to the consignee, the Corporation shall
have absolute discretion to take back the product or to
refuse taking back of such products and in case of such
contaminated stock, the Corporation shall be at liberty to
debit the contractor the cost of product plus a sum
equivalent to the cost of product and damage. That is to
say that the contractors shall be responsible to pay to the
Corporation a sum equivalent to the double of the cost of
such product.
*******************************************
35. The Contractor shall remain fully responsible to
Corporation for the custody of the product its quantity and
quality. If at any time it is found that the contractor/s
his/their sub-contractor, agents and employees is/are
involved and/or indulged in malpractice then the
Corporation shall be at liberty to claim necessary
compensation form the Contractor in addition to the total
cost of the product under his/their custody. At the rate
then prevailing on the day on which the product was
placed under his/their custody. In case of first occurrence
of such malpractice the Corporation will be at liberty not
to take the service of the Tank lorry/ies and the crew so
involved for Corporation‟s work for transporting to take
any suitable steps permissible under the law and also to
terminate the contract and /or confiscation of security
deposit in addition to cost of product and compensation
mentioned herein before, without any further notice to the
contractor and also at the risk of the contractor.
[14]
According to Ms. Dhar, learned counsel the clause 15 of the
said agreement (Exbt-X) is relevant and the action of the defendants
has been taken in observance of those clauses as reproduced above.
Clause 35 has created the liability of the transport contractor to make
necessary compensation in the event of loss. Ms. Dhar, learned counsel
has further contended that the observation of the first appellate court
that the principles of natural justice were not observed is not tenable.
That apart, one observation that has been made that when the motor
spirit was not accepted by the dealer in the Jirania petrol Pump, the
Deputy
Manager (Marketing) detained the tank on 10.08.2013, as
revealed from page 2 of the letter of the plaintiff dated 16.11.2004
(Exbt-4). Ms. Dhar, learned counsel has quite emphatically submitted
that the statement made in the communication dated 16.11.2004
(Exbt-4) reads as under
“……Indian Oil Corporation Ltd. on the date of detention of
my vehicle on 08.04.2003 by Deputy Manager (Marketing)
Kunjaban Depot Agartala at Jirania Outlet.”
[15]
The said statement has been made to assert that on the
date of transportation under reference, no such agreement was in
existence. Ms. Dhar, learned counsel has quite categorically asserted
that the plaintiff who had examined himself as PW1 did not prove that
fact, though a detailed examination in chief was filed having been
affirmed on oath under Order 18, Rule 4 of the CPC. The first appellate
court has considered that statement in the reply as a fact duly proved
by the plaintiff. The defendants have categorically denied such fact and
stated that on several times, the plaintiff was asked to take back the
vehicle to their depot from where the load was given to the plaintiff. For
this purpose, the relevant part of the testimony by which the letter
dated 16.11.2004 was introduced in the evidence as Exbt-4 be
reproduced
”This is my letter dated 16.11.2004 addressed to Sr.
manager, (OPS) in reply and reference to his letter dated
01.11.2004, containing two sheets of paper which is
marked as Exbt-4.”
[16]
Therefore, by no means, it can be held that the said officer
of the defendants detained the vehicle. The first appellate court has
grossly misread that part of the evidence by throwing all canons of
appreciation and came to inference that the said fact has been proved.
That apart, Ms. Dhar, has placed her serious reliance on the
communication dated 01.11.2004 (Exbt-3) as referred before. For
purpose of better appreiciation, the entire text of the said letter dated
01.11.2004 as sent by the Sr. Manager (Ops) for Indian Oil Corporation
Ltd. Assam oil Division is extracted hereunder:
Ref.No:- G.MO/74-11
Date:01.11.04
M/s. Automobile Enterprise,
30, Akhaura Road
Agartala
Tripura
Dear Sir,
Sub: Recover of Product value for 12 KL MS on non
delivery by the carrier.
We refer to your letter dated 11.10.04 addressed to ED
(AOD) and would like to mention the following for your
kind information.
That you are a registered Transporter of POL product since
1986 and have gathered sufficient experience in POL
transportation rules, activities.
In the instant case you had taken a load of 12,000 lts of
MS (from our Dharmanagar Depot) under the terms and
condition for Transportation of the product by your TT
bearing registration No.TRL 3592 agreeing to deliver 8000
Lts of MS to M/s G.C.R.C, Tirania and remaining 4000 Lts
to GREF, Litchu Bagan at Litchu Bagan Agartala vide
invoice no.1277 of D0043 Dtd. 06.08.2003. The value of
12000 lts MS was of Rs.3,56,302/- which was fully within
your knowledge. But you have failed to discharge your
obligation as a Transporter in terms of agreed
arrangement and the product consignment was not
delivered to the respective consignees.
Bulk POL Road transport agreement Clause No.7 (b) is
quoted below for your instant refreshing regarding
recovery of dues form transporters.
Quote:
7(b) Company shall be entitled to adjust any sum due to it
from the Security Deposit amount and/or any transport
changes/dues pending for payment the carrier.
Unquote.
The following clauses of above mentioned Transport
agreement may please be referred for any further clearity
on the subject.
i.
Clause No.9: with all sub clauses.
ii.
Clause No.10: on owner‟s responsibility
As clarified above, your request for refund cannot be
entertained.
Thanking You,
Indian Oil Corporation Limited
(Assam Oil Division)
(A. ADUT)
Sr. Manager (Ops)
[17]
Finally, Ms. Dhar learned counsel has referred to the
judgment dated 08.05.2015 passed by this court in Indian Oil
Corporation Ltd. and others vs. Pallavi Ray and others in RSA 08 of
2010 (Annexure-9 to the memorandum of appeal). The said appeal was
the culmination of the claim raised in the suit filed by the plaintiff, being
Money Suit No. 23 of 2004 whereby the plaintiff had claimed
compensation for damage of his oil tanker which was left in the
premises of the Jirania Petrol Pump. The transaction which was subject
matter of MS 23 of 2004 is the same transaction based on which the
plaintiff (the respondents in the appeal) claimed realization of the
deducted sum of Rs.3,56,302/- with interest etc. In the said judgment
(Annexure-9), this court had unambiguously observed as follows:
“15. The issue is not complex. If the admission
made by the original plaintiff in his cross-examination is
appreciated, there cannot be denial that the plaintiff
admitted that the contract (Exbt-17) was in force during
the relevant transit and as such the terms and conditions
of that contract were binding on the parties.”
[Emphasis added]
[18]
Ms. Dhar, learned counsel has categorically submitted that
the said judgment dated 08.05.2015 was not challenged in the superior
forum by the plaintiff and as such by efflux of time, the said judgment
reached its finality. Hence, the plaintiff cannot be allowed to contend
that the former agreement (Exbt-X and Exbt-17 in the earlier suit) was
not in force or binding or creating obligation in the transaction under
reference. Hence, the fundamental plea of the plaintiff that the said
agreement cannot bind him cannot stand the test of law.
[19]
Having referred to the communication dated 01.11.2004
(Exbt-3), Ms. Dhar, learned counsel has submitted that the petitioner
was apprised of the action and even he had responded to that, by his
letter dated 16.11.2004 (Exbt-4). Thus, the plea of denial of reasonable
opportunities under the principles of natural justice cannot survive in
the context of the suit.
[20]
In order to refute the grounds of objection as raised by the
respondents,
vis-à-vis
the
substantial
question
of
law
that
the
transportation was bound by the former agreement and thus obligation
to return the load to the Dharmanagar depot of the appellant cannot be
wished away inasmuch as according to the said agreement, it was the
duty and obligation of the plaintiff to deliver the products safely and
maintaining the appropriate quality to the petrol pumps. The analogy of
the first appellate court is based on non-appreciation of the evidence
and hence is perverse.
[21]
Mr. Chakraborty, learned senior counsel has contended that
the law as laid down in M/s Modi Sugar Mills Ltd. (supra) has not been
correctly applied in the fact-situation of the suit. Mr. Chakraborty,
learned senior counsel has clearly submitted that at the relevant time of
transportation, the agreement in question was not in force. But Mr.
Chakraborty, learned senor counsel has not advanced any reason why
this court will not give due weightage to the statement made by PW-
1(the plaintiff) admitting categorically that “at the relevant time of
carriage there was no terms and conditions, but I had to carry the load
as per the previous terms and conditions”. In his deposition, the plaintiff
has further admitted that “the appellant-defendant No. 3 by sending
letters, telegrams, etc on different occasions requested me to bring the
vehicle in question at Dharmanagar but I did not place it as the said
letter did not contain any terms for payment towards back journey.”
[22]
Mr. Chakraborty, leaned senior counsel has in defence of
the judgment dated 23.02.2015 highlighted two aspects with emphasis.
Those aspects are – (i) principles of natural justice have not been
observed before determining the loss and causing deduction from the
pending bills of the plaintiff and (ii) the former agreement which had
expired on 31.05.2003 could not bind the plaintiff in any manner. The
transportation was based on a new arrangement and hence, the first
appellate court has correctly observed while reappraising the issue No.
(ii) that the plaintiff was not bound by the terms and conditions of the
agreement No. NE/JT-1-99. To a query, Mr. Chakraborty has fairly
admitted that in the plaint, the plaintiff did not lay down the terms and
conditions which according to him were settled orally. The plaintiff has
stated that the transportation was made on “as per mutual trust and
faith” without conferring any stipulated right upon the defendants.
Hence, without any notice on the plaintiff before deducting the said
amount from his bills, as the said amount was the property of the
plaintiff, the defendants have acted illegally and unauthorisedly.
[23]
In support of his contention, Mr. Chakraborty, learned
senior counsel has relied on Ka Oldphimai Mukhim (supra), as noted
before, where the Gauhati High Court had occasion to observe as
follows:
7. Admittedly, it was a proceeding where two contending
parties were there, one claimed the right of renewal of the
patta and the other disputed his claim the proceeding was
adjudicatory in character and respondent No.3 was called
upon to resolve the dispute. The rule casts duty on all
public authorities who decide dispute in the exercise of
legal power to follow the rule diligently. The rule which is
respected the world over, cannot be immolated or
sacrificed at the altar of administrative celerity. In some
area „justice and convenience are not on speaking term‟ as
aptly put by Lord Atkin in G.M C. of Medical Education v.
Spackman (1943) AC 627. It is true that in England before
the landmark case of Ridge v. Baldwin 1964 AC 40, the
rules of natural justice were applied only to judicial and
quasi-judicial proceedings which necessitated the Courts
to discern whether the impugned action was taken by the
authority in exercise of its administrative or quasi-judicial
power. After Ridge vs. Baldwin concept of natural justice
has made a great leap in the field of administrative law. In
state of Orissa v. Dr. Binapani Dei, AIR 1967 SC 1269, the
Supreme Court has held that even an administrative order
or decision involving “Civil consequences” has to be made
consistently with the rule of natural justice. The supposed
distinction between quasi-judicial and administrative
decision was mollified in Binapani Dei. Skipping over a
number o leading decision we find that the distinction was
eroded in A.K. Kraipak v. Union of India, AIR 1970 SC 150,
where the Constitution Bench observed (Paras 13 & 20):
“If the purpose of these rules of natural justice is to
prevent miscarriage of justice one fails to see why those
rules should be made inapplicable to administrative
enquiries. Arriving at a just decision is the aim of both
quasi-judicial enquiries as well as administrative
enquiries. An unjust decision in an administrative enquiry
may have more far-reaching effect than a decision in a
quasi-judicial enquiry.”
“In a welfare State like ours, it is inevitable that the organ
of the State under our Constitution is regulated and
controlled by the rule of law. In a welfare State like ours it
is inevitable that the jurisdiction of the administrative
bodies is increasing at a rapid rate. The concept of rule of
law would lose its validity if the instrumentalities of the
State are not charged with the duty of discharging their
function in a fair and just manner. The requirement of
acting judicially in essence is nothing but a requirement to
act justly and fairly and not arbitrarily or capriciously.”
“With the increase of the power of the administrative
bodies it has become necessary to provide guidelines for
the just exercise of their power. To prevent the abuse of
that power and to see that it does not become a new
despotism…..”
“The aim of the rules of natural justice is to secure justice
or to put it negatively to prevent miscarriage of justice.
These rules can operate only in areas not covered by any
law validly made. In other words they do not supplant the
law of the land but supplement it. Arriving at a just
decision is the aim of both quasi-judicial enquiries as well
as administrative enquiries. An unjust decision in an
administrative enquiry may have more far-reaching effect
than a decision in a quasi-judicial enquiry.”
[Emphasis added]
[24]
Mr. Chakraborty learned senior counsel has also placed his
reliance on Automotive Tyre Manufactures Association vs. Designated
Authority and Others reported in (2011) 2 SCC 258 to refer the passage
as extracted hereunder:
80. It is thus, well settled that unless a statutory
provision, either specifically or by necessary implication
excludes the application of principles of natural justice,
because in that event the Court would not ignore the
legislative mandate, the requirement of giving reasonable
opportunity of being heard before an order is made, is
generally read into the provisions of a statute, particularly
when the order has adverse civil consequences which
obviously cover infraction of property, personal rights and
material deprivations for the party affected. The principle
holds good irrespective of whether the power conferred
on a statutory body or Tribunal is administrative or quasijudicial. It is equally trite that the concept of natural
justice can neither be put in a strait-jacket nor is it a
general rule of universal application.”
[25]
Having duly appreciated the grounds of objection, the
records and submission of learned counsel appearing for the parties, let
us now proceed to give answer to the substantial question of law as
formulated by this court (reproduced in Para 3 of this judgment).
Whether the reversal judgment and decree passed by the [first]
appellate Court suffer from perversity for not considering the fact that
the agreement between the plaintiffs and the defendants which had
[even though] expired but the terms and condition of the agreement
extended on the basis of which the carrying of the goods by the
plaintiffs was allowed and thereby the [said] appellate Court arrived
at a wrong finding?
[26]
The finding of this court in the judgment dated 08.05.2015
titled as Indian Oil Corporation Ltd. and others vs. Pallavi Ray and
others
(Annexure-9)
that
the
plaintiff
has
admitted
that
the
contract/agreement (Exbt-17, Exbt-X in the suit being MS 02 of 2016)
was in force during the relevant transit and as such the terms and
conditions of that contract/agreement were binding on the parties and
that decision is bound to operate as res judicate. Hence, no different
finding can be returned. In view of the said observation, the finding of
the first appellate court that the former agreement since had expired on
31.05.2003 did not create any obligation for the plaintiff is grossly
perverse. The finding of the first appellate court in this regard that the
agreement which was in existence between the plaintiff and the
defendants had no ramification is equally unsustainable. On the date of
„detention‟ of his vehicle i.e. on 8.10.2003 the agreement as per the
specific admission made by the plaintiff in his testimony, part of which
has been reproduced herein before, was in force. There cannot be any
transaction on mutual trust and faith. These are vague words and
cannot form any agreement. Such expression is unknown in the
municipal laws. It also leaves space for deduction that the plaintiff did
not come out with clean hands and he had suppressed the material
facts from the court.
[27]
That apart, as noted before, this issue has been clinched by
the judgment dated 08.05.2015 (Annexure-9 to the memorandum of
appeal). Even if it is assumed that there was no former agreement for
the transportation, which is the subject matter of the suit, the plaintiff is
bound by the principle of bailment (see Section 148 of the Indian
Contract Act, 1872). Section 151 of the Indian Contract Act provides
that in all cases of bailment, the bailee is bound to take as much care of
the goods bailed to him as a man of ordinary prudence would, under
similar circumstances, take of his own goods of the same bulk, quality
and delivers the goods bailed to him. If the bailee makes any use of the
goods bailed which is not according to the conditions of the bailment, he
is liable to make compensation to the bailer for any damages arising to
the goods from or during such use of them (see Section 154 of the
Indian Contract Act).
[28]
It has been clearly admitted by the plaintiff that he was
given the load of the motor spirit to deliver them
to M/s G.C.Roy
Chowdhury and Sons, Jirania and to GREF at Salbagan, Agartala. It has
been also admitted that he left the vehicle and the entire load of motor
spirit in the premises of M/s GC Roy Chowdhury and Sons Company by
disobeying
the
instruction
of
the
bailer
to
return
the
load
to
Dharmanagar Depot. Hence, for loss, whether accidental or not, the
plaintiff as the bailee is liable to pay the compensation, unless it is
shown that he made utmost efforts to mitigate the loss. The defendants
have not charged anything but the value of 12000 liters of the motor
spirit which was the quantity of the entire load given to the plaintiff for
transportation. As such, the finding of the first appellate court is
palpably wrong and liable to be interfered with and set aside.
Accordingly, it is ordered. Per Consequenti, the finding of the Civil Judge
is restored, but subject to additional reasons as have been added by
this court.
Whether the findings of the appellate court that the principle of
natural justice as not followed is justified?
[29]
Since this court has come to an inference that the former
agreement (Exbt-X) was operating in the matter of transportation under
consideration and hence, the terms and conditions of the former
agreement will be binding on the plaintiff. From Clause 15 of the said
agreement (Exbt-X), it is apparent that the contractor is totally
responsible for delivering the „correct quality and quantity‟ of the
product as per invoice at the destinations specified. It has been also
provided that in the event of any loss of product, recorded at the
destination, the cost of such shortage would be debited either from the
counter bills, if any, with the corporation or will be made good directly
from the contractor or will be adjusted against any deposit or other
amounts payable to the contractor.
[30]
Clause 17 of the said agreement had created further
obligation that the contractor shall be responsible for the said conduct
of supplies in transit. If at any time, the product is found contaminated
during the transit and/or at the time of delivery to the consignee, the
corporation shall have absolute discretion to take back the product or to
refuse taking back of such product. In case of such contaminated stock,
the Corporation shall be at liberty to debit the contractor the cost of the
product plus a sum equivalent to the cost of product and damage. That
is to say that the contractor shall be responsible to pay the Corporation
a sum equivalent to the double of the cost of such product. Further,
Clause 35 of the said agreement has provided that the contractor shall
remain fully responsible to the corporation for the custody of the
product, its quantity and quality. It has been also provided that the
corporation will be at discretion to realize the loss by way of
confiscation of the security deposit “without any further notice to the
contractor and also at the risk of the contractor.”
[31]
Mr. Chakraborty, learned senior counsel has not taken note
of these clauses for obvious reasons. As the plaintiff has denied
currency of the said agreement (Exbt-X) in respect of transportation of
the said load, the said clauses were kept out of consideration. Mr.
Chakraborty has persuaded to impress this court to declare the action
of the defendants as unsustainable, as has been done by the fist
appellate court, for purported non compliance of the rule of natural
justice. This court does not have any difficulty in accepting the opinion
of the apex court, but the solitary question which is relevant for the
present purpose is that in view of the specific prescription in clause 35
of the said agreement and for the communication dated 01.11.2004
(Exbt-3) as extracted in para 16, whether this court can come to an
inference that the rule of natural justice had been flouted by the
defendants? In Swadeshi Cotton Mills v. Union of India reported in
(1981) 1 SCC 66, the apex court having referred to the similar decision
observed thus:
"Rules of natural justice are not embodied rules. Being
means to an end and not an end in themselves, it is not
possible to make an exhaustive catalogue of such rules.
But there are two fundamental maxims of natural justice
viz. (i) audi alteram partem and (ii) nemo judex in re sua.
The audi alteram partem rule has many facets, two of
them being (a) notice of the case to be met; and (b)
opportunity to explain. This rule cannot be sacrificed at
the altar of administrative convenience or celerity. The
general principle--as distinguished from an absolute rule
(1981) 1 SCC 664 of uniform application--seems to be that
where a statute does not, in terms, exclude this rule of
prior hearing but contemplates a post-decisional hearing
amounting to a full review of the original order on merits,
then such a statute would be construed as excluding the
audi alteram partem rule at the pre-decisional stage.
Conversely if the statute conferring the power is silent
with regard to the giving of a pre-decisional hearing to the
person affected and the administrative decision taken by
the authority involves civil consequences of a grave
nature, and no full review or appeal on merits against that
decision is provided, courts will be extremely reluctant to
construe such a statute as excluding the duty of affording
even a minimal hearing, shorn of all its formal trappings
and dilatory features at the pre-decisional stage, unless,
viewed pragmatically, it would paralyse the administrative
process or frustrate the need for utmost promptitude. In
short, this rule of fair play must not be jettisoned save in
very
exceptional
circumstances
where
compulsive
necessity so demands. The court must make every effort
to salvage this cardinal rule to the maximum extent
possible, with situational modifications. But, the core of it
must, however, remain, namely, that the person affected
must have reasonable opportunity of being heard and the
hearing must be a genuine hearing and not an empty
public relations exercise."
[Emphasis added]
These rules are rules of fair play and these are applicable
generally as regards the administrative decision taken by the authority
having consequence of a grave nature.
[32]
From the letter dated 01.11.2004 (Exbt-3), it appears to
this court that the plaintiff was apprised that the defendants are entitled
to adjust any sum due to it from the security deposit and from in any
transport bill pending for payment to the contractors of the motor spirit
(Exbt-7B). the defendants have clearly proposed that the value of
12000 liters amounting to Rs. 3,56,302/- which the plaintiff failed to
return to the defendants when the density of the said load was
challenged by one of the consignees was deducted. It is apparent from
reading
of the letter dated 01.11.2004 that the petitioner demanded
the refund of the amount, but by the letter dated 01.11.2004, the said
demand was turned down by the defendants. The petitioner‟s reasons
for such refund is available from the communication dated 16.11.2004
(Exbt-4). According to him, the reference to the agreement was faulty
as the agreement had, by then, lost its force. The plaintiff had claimed
that
one
Deputy
Manager
(Marketing)
detained
his
vehicle
on
08.04.2003, but there is no evidence at all in this regard. The first
appellate court has relied on the letter dated 16.11.2004 without proof
of its content. According to the plaintiff, there was no fresh contract
after 31.05.2003 and hence, the said recovery as made from the
transportation bills is not authorized, but arbitrary, highhanded and
untenable in the eye of law, and above all, is illegal. His demand was
turned down. As we have noted that if the agreement (Exbt-X) were in
force, Clause 35 will operate in the field and such recovery made
“without any further notice to the contractor and also at the risk of the
contractor” cannot be faulted with.
[33]
Having read all the materials, this court has no hesitation
to form the opinion that the special arrangement as stated by the
plaintiff is imaginary. On the contrary, it has been proved that the said
agreement (Exbt-X) was binding on the plaintiff and thus, Clause 35
became operative. When a particular clause of the agreement is binding
on the parties, observance of the rules of natural justice may not be
treated compulsory, as the action as taken by the executive is
supported by the contract. However, there had been due consideration
of all the objections as raised by the plaitiff, even though such
consideration was post-decisional. But in the context of the case, this
court is not inclined to interfere with the said decision on the purported
ground of non-observance of the rule of natural justice. As corollary, the
finding of the first appellate court in this regard is interfered with and
set aside.
In the result, the appeal stands allowed. Judgment and
decree dated 23.02.2015 delivered in Money Appeal 08 of 2012 are set
aside. As consequence of the above findings, the judgment and decree
dated 19.03.2012 of the Civil Judge delivered in MS 02 of 2006 is
restored.
Draw the decree in terms of the above.
Send down the LCRs thereafter.
JUDGE
Dipak
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review