HIGH COURT OF TRIPURA
AGARTALA
WP(C) No.828/2018
1. Swapna Printing Works Private Ltd. represented by its Director,
having its registered office at Doltala, Doharia, P.O. Ganganagar,
District- North 24 Parganas, Kolkata-700132.
2.
Shri Souvik Bhattacharjee, S/o. Arunava Bhattacharjee,
Director, Swapna Printing Works Private Ltd. having its registered
office at Doltala, P.O. Ganganagar, District- North 24 Parganas,
Kolkata-700132.
---- Petitioners(s).
Versus
1. The State of Tripura, represented by Secretary to the
Government of Tripura in the School Education Department having
its office at Civil Secretariat, New Capital Complex, Agartala, P.O.
Kunjaban, District- West Tripura.
2. State Council of Educational Research and Training,
Government of Tripura, having its office at Abhoynagar, Agartala,
West Tripura, P.O. Abhoynagar.
3.
Director, SCERT,
Agartala, West Tripura.
Government
of
Tripura,
Abhoynagar,
---- Respondent(s).
For Petitioner(s)
:
Mr. T.D. Majumder, Advocate,
Mr. K.K. Pal, Advocate.
For Respondent(s)
:
Mr. A.K. Bhowmik, Advocate General,
Mr. M. Debbarma, Addl. G.A.
HON’BLE THE CHIEF JUSTICE MR. AJAY RASTOGI
Judgment
Fit for reporting
: Yes.
Judgment reserved on
: 17th September, 2018.
Date of Judgment
: 24th September, 2018.
Page - 2 of 28
By the Court (Per Hon’ble Mr. Justice Ajay Rastogi):
The instant writ petition has been filed at the instance of
one of the bidder petitioner who had participated in the e-tender
initiated at the instance of the Director, State Council of
Educational Research and Training, Tripura (for short „SCERT‟)
from such of the firms of the Indian origin and operating within
India having sufficient multicolour printing, binding and supply
facilities for printing multicolour/bi-colour cover pages and inner
pages of textbooks of Classes-I to XII for the academic session2019 dt.24th July, 2018 in online bidding process but the bid of the
petitioner was declared technically non-responsive/disqualified by
the Tender Screening Committee/Tender Evaluation Committee in
its meeting held on 28th August 2018 on the premise that the
petitioners failed to upload the “factory registration certificate”.
[2] The indisputed facts, in brief, which are delineated for the
present purpose, are that the Director of State Council of
Educational Research and Training, Tripura (SCERT) invited an
item wise e-tender from the firms of the Indian origin and
operating within India having sufficient multicolour printing,
binding and supply facilities for printing multicolour/bi-colour
cover pages and inner pages of textbooks of Classes-I to XII for
the academic session-2019 vide its bid documents dt.24th July,
2018 and to be opened for eligible bidders/printers/firms until 16th
August, 2018 at 9.00 a.m. for the various works. It was pointed
out that bidders shall participate in bidding only in online through
Page - 3 of 28
website through e-procurement portal of the State of Tripura and
will not allow any bidder to attempt bidding after the scheduled
date and time and submission of bids physically was not
permitted.
[3]
It may be relevant at this stage to note that the bidding
was invited for various categories of Group A-F but the petitioner
bid was for Group A-E and he was not the Bidder for category
Group F. That under the Bid document there was instructions to
bidders that after the bidder get himself enrolled in the eprocurement portal and obtained User ID and Password for
bidding was permitted to download the DNIT and all the other
materials including printing, binding and supply of textbooks
mentioned in Group-A to Group-F in the DNIT and was excepted
to go though the instructions/terms & conditions/eligibility criteria
of the DNIT.
[4]
As per the list of dates originally notified in the bid
document, bid submission was ended on 16th August, 2018 at
9.00 a.m and Technical Bid opening date and time was on 16th
August, 2018 at 16.00 hours and the financial Bid date and time
was to be separately notified to all technically shortlisted/qualified
bidders and at the stage of technical evaluation the bidder was
supposed to satisfy at the pre-qualification criteria as referred to
in the clause („D‟) submission of Bids under clause 14 of the
Instructions to Bidders which the Bidder was supposed to scan &
upload the Technical Bid documents required during actual bidding
Page - 4 of 28
along with the tender as referred to under Clause 3 and 3.2 read
with Clause 14.2 and the bid document. All such documents which
are to be scanned and uploaded have been specifically indicated
by the authority under Clause 14.2 (a) & (b) respectively although
while submitting the bid document it was required to re-visit once
again, going through the check list to accompany the bid. I
consider it appropriate to quote the extract of the relevant Clauses
of the bid document to which we are presently concerned from the
instructions to the bidders made available are quoted hereunder :
“3. Pre-Qualification date of the Bidders
3.1 The bidder should satisfy the pre-qualification criteria
as fixed here under and in case any bidder is not fund
satisfying any of such criteria as fixed, his/her bid will be
summarily rejected. The bidder shall furnish the following
particulars in the PDF of 100 dpi resolution.
a) Copies of documents relating to the (i) Registration of
the
firm/partnership
Professional
Tax
deed/Articles
clearance
of
certificate
Association,
(ii)
(iii)
GST
valid
Registration and Tax clearance certificate (iv) Pan card of
the bidder.
3.2 Qualification/Eligibility Criteria: The tenderer shall
have to upload & submit the following documents along
with
the
Tender
Document,
otherwise
their
bid
will
summarily be rejected.
(i) Up to date valid Trade License issued by Competent
Government Authority.
(ii) Valid Factory Registration Certificate as per Factory Act,
1948 and Rules made there under issued by Competent
Government Authority.
(iii) List of printing machines and allied machineries to be
engaged in the printing process with due specification(s).
(iv) Copy of the Income Tax Return of the preceding
financial year with copy of PAN Card.
(v) Up to date Professional Tax Clearance Certificate.
Page - 5 of 28
(vi) Copy of valid GST Registration Certificate and other
Tax Clearance Certificate.
(vii) Proven records of printing i.e. printing, binding and
supply of at least 2 lakhs copies of Textbooks during
preceding
years
of
any
recognized
Educational
Board/University or Government Body/PSU/Private Institute
within the territory of India. Proven record for the purpose
means tangible documents like a work order, a credential
certificate
or
any
other
documents
issued
by
any
Government Department within the territory of India.
Provide the supply order details in year-wise.
(viii) Last 3(Three) years Audited Balance Sheets for the
year
2015-16,
produced.
Total
2016-17
and
2017-2018
yearly
turnover
should
should
be
at
be
least
Rs.50,00,000/- (Rupees Fifty Lakhs) only. Self-certified
Balance Sheet for the year 2018-19 may be entertained.
(ix) Bidders having valid Eligibility Certificate in respect of
procurement
preference,
exemption
from
payment
of
Earnest Money Deposit shall be given as per norms.
(x) Up to date Labour Registration Certificate issued by the
Competent Govt. Authority.
(xi) An Affidavit (in original duly authenticated by a Notary)
executed by the bidder on stamp paper of Rs.20/-(Twenty)
only should be uploaded & submitted as per Annexure-III.
(xii) The bidders should fulfill the eligibility criteria and also
upload & submit documentary evidences in support of
fulfilling the conditions while uploading & submitting the
Technical Bid.
7. Clarification on Bid Documents
7.1 A prospective Bidder requiring any clarification on Bid
documents
may
seek
clarification
through
e-mail:
publication scert@redifmail.com. The Bid Inviting authority
will also respond to such clarification through e-mail.
However, Bidder may contact the Bid Inviting Officer at the
address indicated in the NIT for clarification on the bid
document.
Page - 6 of 28
D. Submission of Bids
14. Submission of Bids:
14.1 The Bidders, who intend to participate in the bid, shall
submit their Pre-Qualification and other details etc., in the
Standard formats prescribed in the Tender Documents
through the application https://tripuratenders.gov.in
14.2 List of documents to be scanned and uploaded:
A. Documents to be kept in “My Document” folder of
Bidder: The following documents, as per standard format
detailed in Tender Document, or as per standard dictated
by Regulatory/Statutory bodies, shall be scanned and
uploaded along with the bid document as per requirements.
For ease of biding, the bidders shall scan the following
documents at 100 dpi resolution and upload them as per
the folder structure provided in his/her “My Document”,
which is provided free of cost to all bidders, post his/her
registration in the application https://tripuratenders.gov.in.
This
operation
is
expected
to
be
completed,
before
commencement of actual biding by the bidder.
Sl.
Folder Name
Documents to be uploaded
1.
BIS/Mfg
Copies of documents relating
Lie/Dealership
to the
(i) Registration/License of the
firm/Printer/Bidder/Partnership
deed/Articles of Association
2.
DNIT
(ii)
Downloaded
Document
Document
as
a
Tender
proof
of
acceptance of terms conditions
in the Tender Document.
3.
Tax
related
document
Copies of documents relating
to the (iii) Professional Tax
Clearance Certificate, (iv) GST
&
other
Tax
Clearance
Certificate,
During the actual bidding, the bidder shall select/check these
documents from his/her My Document, which will ensure
Page - 7 of 28
completion of biding within the same session, even if the bidder
is connecting to the application over a slow speed network.
B.
Technical
Bid
Documents
required
during
actual
Bidding:
Sl.
Technical Documents to be uploaded
No.
1.
Scanned copy of “Demand Draft” of any Nationalised
/Scheduled Bank guaranteed by RBI Against EMD and
scanned copy Demand Draft of any Nationalised/
Scheduled Bank guaranteed by RBI towards Tender
Fee, both in a single PDF.
2.
Scan copy of the PAN Card of the bidder.
3.
Declaration of the Bidder as per Annexure-II,
4.
Affidavit as per Annexure-III
5.
Undertaking of the bidder as per Annexure-IV
6.
Details of EMD as per Annexure-V
7.
Proof of Average Turn Over as per Annexure-VI
8.
Details of Machines as per Annexure-VII
9.
Certificate regarding capacity of Printing, Binding &
Supply as per Annexure-VIII
10.
Copy of the Income Tax Return of the preceding
Financial Year
11.
Copy of valid Trade Licence issued by competent
authority
Copy of Up to date Labour Registration Certificate
issued by competent authority
13.
Proven records of Printing, Binding & Supply of at
least 2 lakhs copies of Textbooks during preceding
five years. Provide Supply Order details in year
wise.
Note: Bidder shall fill the necessary information & put signature with
stamp/seal, and then scan them into PDF (in 100 dpi resolution).
Finally those documents should be uploaded (with digital signing).
C. Financial Bid Documents required during actual Bidding: In
addition to the technical documents, the following documents are also
to be uploaded to the e-Procurement application during actual
bidding.
Page - 8 of 28
Sl. No.
Financial Documents to be uploaded
1.
Bill of Quantity
Indisputably in clause „B‟ Technical Bid documents required
during actual bidding there is no reference of “factory registration
certificate”.
[5]
As per the scheduled dates which are notified in connection
with the bid the Technical Bid was to be opened on 16th August,
2018 at 16.00 hours but as per records it was opened by the
tender screening committee in its meeting held on 28th August,
2018 at 12 noon for Technical evaluation of the bid document
uploaded by the bidders. It reveals from the record that in all
there were 11 bidders who had participated in the e-tender
process including petitioner and according to the tender screening
committee, 4 bidders were found to be responsive/qualified and
the rest of the 7 bidders were declared to be non-responsive
/disqualified bidders, amongst them one was the petitioner.
[6]
The tender screening committee‟s evaluation sheet has
been placed on record. It reveals that all the other bidders who
were declared to be non-responsive/disqualified there are number
of deficiencies which they failed to annex the relevant necessary
documents desired by the authority while participating in the etender but as regard to the present petitioner is concerned, he
was declared to be non-responsive/disqualified only on the
premise that he failed to enclose “factory registration certificate
Page - 9 of 28
not uploaded” and rest according to the respondents even after
filing counter affidavit the petitioner‟s bid document was found to
be in order in all respect by the Tender Evaluation Committee.
Indisputably, there is no reference of the “factory registration
certificate” in Clause 14.2 „B‟ Technical Bid documents required for
actual Bidding.
[7]
If we look into the terms and conditions of the tender
document to be scanned and uploaded in clause 14.2 of the Bid
document reference has been made of the series of documents
which has to be enclosed with the tender document and Para
3.2(ii) indicating of “valid factory registration certificate” but it
appears to be misleading for the reason that at the stage of
Technical Bid required for actual bidding as referred to under Para
14.2 the list of documents to be scanned and uploaded but
indisputably there is no reference of the “factory registration
certificate” and indisputably, the series of documents which are
specifically indicated to be scanned and uploaded under Para 14.2
(a) & (b) was complied with by the petitioner as per the terms &
conditions of the bid document.
[8]
The petitioner was declared non-responsive/disqualified by
the tender screening committee/tender evaluation committee in
its meeting held on 28th August, 2018 holding that he has failed to
upload “factory registration certificate” the petitioner without any
loss of time submitted representation on 30th August, 2018
addressed to the Director, SCERT, Tripura in which it was
Page - 10 of 28
specifically stated that in the format displayed on the eprocurement of the State of Tripura there was no column to
upload the “factory registration certificate” & so also in clause
14.2(a) & (b) as such failed to take further course of action
although he is holding the factory registration certificate much
before the e-tendering process was initiated and enclosed the
hard copy for perusal and he was not going to be benefitted by
not uploading the same when it was in his custody and
accordingly requested that the requirement of uploading a factory
registration certificate was not an inevitable condition of the
contract having adverse consequence and rejection of his tender
on this premise may be re-looked and his financial bid may also
be opened which was scheduled on 31st August, 2018.
Indisputably, his representation dt.30th August, 2018 was
[9]
received in the office of the respondents on 31st of August, 2018
and
he
was
responded
vide
Annexure-R/1
placed
by
the
respondents on record along with their counter affidavit stating
inter alia that although it is true that there was no column to
upload the factory registration certificate but the e-procurement
system,
Government
of
Tripura
indicates
tender
details
(Annexure-5) and the documents which were specifically indicated
are
at Sl. No.1 to 6 and Sl. No.7 referred to “other technical
details” and this according to the respondents includes the
“factory registration certificate” which the petitioner failed to
upload and accordingly his representation was turned down under
Page - 11 of 28
communication
dt.31st
simultaneously
convened
August,
the
and
the
respondents
meeting
of
the
financial
bid
evaluation committee on 31st August, 2018 at 4.00 P.M. and out
of the 4 bidders who are found to be responsive/qualified bidders,
there was only solitary bidder for Group-F and since there was no
effective bidders for Group A to E and the petitioner was
eliminated on the hyper technical reason.
[10]
The comparative statement of the financial bid evaluation
held its meeting held dt.31st August, 2018 has been placed by the
respondents on record is as follows :
**** A comparative statement has been generated through online
eprocurement portal was downloaded and reference has been taken
from that statement. Now a comparative statement of quoted rates
offering by the above 4(four) responsive/qualified bidders found from
BOQ is given below:
Sl.
No
.
1.
Name of Bidders
GroupA
Grou
p-B
Rate offered
Grou
Grou
p-C
p-D
Grou
p-E
GroupF
CDC Printers Pvt. Ltd.
2.00
2.09
2.05
2.15
2.13
Not
Quoted
2.
K.C.Printing & Allied
Works
Kalpana Offset Pvt. Ltd.
1.92
1.94
1.99
1.99
2.09
1.94
1.97
1.84
Not
Quot
ed
1.86
Not
Quot
ed
1.86
Not
Quot
ed
1.90
Not
Quoted
Saraswati Print Factory
Pvt. Ltd.
Not
Quote
d
1.87
3.
4.
Rema
rks
Not
Quoted
At the same time, the financial bid of the petitioner which
has not been disputed by the respondents just for comparison, it
is although subject to further evaluation by the financial bid
evaluation committee still considers it appropriate to quote the
extract of the financial bid which is as follows:
Page - 12 of 28
Sl.
No
.
1.
Name of Bidder
GroupA
Grou
p-B
Rate offered
Grou
Grou
p-C
p-D
Grou
p-E
GroupF
Swapna Printing Works
Pvt. Ltd.
1.37
1.54
1.54
1.62
Not
Quoted
1.54
Rema
rks
Apparently, the financial bid of the bidder L-1 prima facie is
of 9.33 crores at the same time the proposed financial bid of the
petitioner which although is still to be examined by the financial
bid advisory committee is of 7.61 crores which is almost 1.72
crores less than the price evaluation bid of L-1 considered by the
financial bid advisory committee.
[11]
The financial bid evaluation committee finally found
Saraswati Print Factory Pvt. Ltd as a lowest bidder L-1 for Group
A-E and K.C Printers Pvt. Ltd. for Group F. The comparative
statement with recommendations of the committee has to be
placed
before
the
Supply
Advisory
Board
who
has
been
authorized to take final decision in the matter. At this stage the
petitioners approached this Court by filing of a writ petition and
notices were duly served, counter affidavit has been filed by the
respondents and with the consent of parties the matter has been
heard finally at this stage.
[12]
Counsel for the petitioner submits that under instruction
to the Bidders Para-D submission of Bids of the tender documents
is in reference to the details of Technical Bid documents required
during actual bidding to be scanned and uploaded and the eprocurement
system
of
Government
of
Tripura
on
record
Page - 13 of 28
(Annexure-5) P.114 commensurate with the list of documents as
referred to be uploaded for actual bidding under clause 14.2(a) &
(b) and even under the separate head of other important
documents Sl. No.7 of e-procurement portal of the State of
Tripura no such specific details are indicated for the bidders to
furnish particularly the “factory registration certificate”. On the
contrary the desired documents for actual bidding which the
tendering authority expected from the bidders to furnish, their
details have been referred to in important documents Sl. No.1 to 6
and this, indeed, covers the list of documents to be scanned and
uploaded as referred to under clause 14.2 (a) & (b) respectively
and Sl. No.7 was very vague of “other technical documents” and
for such reason the petitioner was mislead and could not furnish
the copy of “factory registration certificate” at the given point of
time when e-tender was submitted by the petitioner for Group A-E
although he was holding the valid document on the date when the
e-tender was floated by the responders and in the given
circumstances the decision of the Tender Evaluation Committee in
holding the petitioner Bid to be non-responsive/disqualified for the
aforesaid reason is an arbitrary exercise of power and needs to be
interfered by this Court.
[13]
Counsel further submits that under the list of critical date
of the Bid circulated along with the NIT dt.24th July, 2018 the
Technical Bid opening date and time was 16th August, 2018 at
16.00 hours although the petitioner had no grievance if it was
Page - 14 of 28
postponed from 16th August 2018 to 28th August, 2018 but for
opening date and time of financial bid it was to be separately
notified may be to the technically shortlisted/qualified bidders but
for the best of his information it was never notified and
immediately on finalization of the Technical Bid on 28th August,
2018 without giving a breathing time on 31st August, 2018 the
financial bid evaluation committee held its meeting and made its
recommendation but still without any loss of time the petitioner
approached to the authority to ventilate his grievance and to
exhibit that his Technical Bid has been arbitrarily rejected by the
authority has failed to examine in the right prospective and open
the financial bid on 31st August, 2018 without affording a
reasonable opportunity to the petitioner.
[14]
Counsel further submits that the comparative statement of
the financial evaluation of the Bidders made by the Financial Bid
Evaluation Committee in its meeting held on 31st August, 2018
has been placed on record by the respondents (Annexure-R/4)
and the petitioner being the bidder for the category Group-A to
Group-E. The petitioner has come out with his financial bid which
was made available to the respondents and it has not been
disputed that in all the groups of “Group A to Group E” the
petitioner‟s financial Bid offered is much lower than the rates of
the bidder who has been considered as the lowest bidder L-1 and
for all the Groups A to E the rates of L-1 is of 9.33 crores and the
financial bid of the present petitioner of Group A to E is of 7.61
Page - 15 of 28
crores and the difference is of 1.72 crores and it has not been
disputed by the respondents and to eliminate the petitioner in the
given circumstances from being considered for financial evaluation
of his bid may not be in public interest and the method adopted
by the respondents eliminating the petitioner from participating in
the financial bid is completely an arbitrary exercise of power and
violative of Art.14 of the Constitution and that needs to be
interfered by this Court.
[15]
Counter affidavit has been filed by the respondents and
justification has been tendered in Para 5 of the counter affidavit
disclosing the narration of facts how the matter has been
processed after the e-tenders have been invited by the NIT dt.24th
July, 2018 and the justification attached to the reason assigned by
the tender evaluation committee in holding the petitioner to be
non-responsive/disqualified as he failed to upload the „factory
registration certificate‟ and with justification that even if there is
no such specific reference of document in the list of documents to
be scanned and uploaded under clause 14.2 and so also in the eprocurement
system
of
Government
of
Tripura
and
“other
important documents” at Sl. No.7 referred to Technical details that
includes the copy of “factory registration certificate.”
[16]
The emphasis of the respondents‟ counsel is that clause
3.2 has to be read with clause 14.2 and that indicates that
tenderer has to fulfill the eligibility criteria and submit the details
of the documents and Para (ii) of Clause 3.2 indicates of “factory
Page - 16 of 28
registration certificate” and that the petitioner has failed to upload
which was the requirement of the tender document to be
examined at the pre-qualification stage. According to the ld.
Advocate General, no error was committed by the respondents in
the decision making process and the petitioner has rightly been
declared disqualified/non-responsive by the Tender Evaluation
Committee in its meeting held on 28th August, 2018.
[17]
Counsel further submits that what is to be examined is
the decision making process and not the final decision and if no
error has been committed by the respondents in its decision
making process which has been acted upon strictly in accordance
with the terms and conditions of the tender document the action
of
the
respondents
in
declaring
the
petitioner
to
be
disqualified/non-responsive at the technical evaluation stage on
account of failing to upload the “factory registration certificate”
being strictly in accordance with the terms and conditions of the
tender document needs no interference of this Court.
[18]
Ld. Advocate General further submits that it is not the
case of the petitioner that the action of the respondents was
either imputed by malice or so unreasonable in absence whereof,
the writ petition not sustainable and further submits that those
who have been qualified by the tender evaluation committee in its
meeting held on 28th August, 2018 are the necessary party to the
petition and in their absence, the present writ petition is not
maintainable and the petitioner is not entitled to claim as the right
Page - 17 of 28
has been accrued to the bidders who have been declared to be
technically qualified and considered by the financial bid evaluation
committee in its meeting held on 31st August, 2018, in their
absence, no relief could be granted to the petitioner.
[19]
I have heard counsel for the parties and with their
assistance perused the materials available on record. The law
relating
to
the
award
of
contract
by
the
State
or
its
instrumentalities has been considered by the Apex Court in Tata
Cellular Versus Union of India reported in (1994) 6 SCC 651
which is reproduced hereunder :
“77. The duty of the court is to confine itself to the question of
legality. Its concern should be :
1. Whether a decision-making authority exceeded its powers?
2. Committed an error of law,
3. committed a breach of the rules of natural justice,
4. reached a decision which no reasonable tribunal would have
reached or,
5. abused its powers.
Therefore, it is not for the court to determine whether a
particular policy or particular decision taken in the fulfillment of
that policy is fair. It is only concerned with the manner in which
those decisions have been taken. The extent of the duty to act
fairly will vary from case to case. Shortly put, the grounds
upon which an administrative action is subject to control by
judicial review can be classified as under:
(i)
Illegality
:
This
means
the
decision-
maker
must
understand correctly the law that regulates his decision-making
power and must give effect to it.
(ii) Irrationality, namely, Wednesbury unreasonableness.
(iii) Procedural impropriety.
Page - 18 of 28
The above are only the broad grounds but it does not rule out
addition of further grounds in course of time. As a matter of
fact, in R. v. Secretary of State for the Home Department, ex
Brind (1991) 1 AC 696, Lord Diplock refers specifically to one
development, namely, the possible recognition of the principle
of proportionality. In all these cases the test to be adopted is
that the court should, "consider whether something has gone
wrong of a nature and degree which requires its intervention".
[20]
The Apex Court in Air India Ltd. Versus Cochin
International Airport Ltd. reported in (2000) 2 SCC 617 held
as under :
“7. The law relating to award of a contract by the State, its
corporations
and
bodies
acting
as
instrumentalities
and
agencies of the Government has been settled by the decision of
this Court in Ramana Dayaram Shetty v. International Airport
Authority of India, (1979) 3 SCC 488; Fertilizer Corporation
Kamgar Union (Regd.) v. Union of India, (1981) 1 SCC 568;
Asstt. Collector, Central Excise v. Dunlop India Ltd. (1985) 1
SCC 260, Tata Cellular v. Union of India, (1994) 6 SCC
651. Ramniklal N. Bhutta v. State of Maharashtra, (1997) 1
SCC 134 and Raunaq International Ltd. v. I.V.R. Construction
Ltd., (1999) 1 SCC 492. The award of a contract, whether it is
by a private party or by a public body or the State, is
essentially
a
commercial
transaction.
In
arriving
at
a
commercial decision considerations which are paramount are
commercial considerations. The State can choose its own
method to arrive at a decision. It can fix its own terms of
invitation to tender and that is not open to judicial scrutiny. It
can enter into negotiations before finally deciding to accept one
of the offers made to it. Price need not always be the sole
criterion for awarding a contract. It is free to grant any
relaxation, for bona fide reasons, if the tender conditions
permit such a relaxation. It may not accept the offer even
though it happens to be the highest or the lowest. But the
State, its corporations, instrumentalities and agencies are
bound to adhere to the norms, standards and procedures laid
down by them and cannot depart from them arbitrarily. Though
Page - 19 of 28
that decision is not amenable to judicial review, the Court can
examine the decision making process and interfere if it is found
vitiated by mala fides, unreasonableness and arbitrariness. The
State, its corporations, instrumentalities and agencies have the
public duty to be fair to all concerned. Even when some defect
is found in the decision making process the Court must
exercise its discretionary power under Article 226 with great
caution and should exercise it only in furtherance of public
interest and not merely on the making out of a legal point. The
Court should always keep the larger public interest in mind in
order to decide whether its intervention is called for or not.
Only when it comes to a conclusion that overwhelming public
interest requires interference, the Court should intervene.”
[21]
It is true that this Court has very limited scope of judicial
review while invoking its writ jurisdiction u/Art.226 of the
constitution of India in the matters relating to tender or award of
contracts and whether it is by a private party or by a public body
or the State is essentially a commercial transaction in arriving at a
commercial decision based on commercial considerations but the
basic requirement u/Art.14 is fairness and action of the State and
non arbitrariness in essence and substance is the heart bit of fair
play.
[22]
Actions are indisputably amenable to judicial review but
only to the extent that the State must act validly for a discernable
reason not whimsical or for any ulterior purposes. It is also true
that when some defect is found in the decision making process the
court has to circumscribe its discretionary power u/Art.226 of the
Constitution with a caution and should only exercise in furtherance
of public interest which always has to be kept as a paramount
Page - 20 of 28
consideration and the power of judicial review will not be
permitted to be invoked to protect/individual interest at the cause
of public interest in deciding such contractual/commercial disputes
and if the court arrives to a conclusion the decision making
process of authority either vitiated by unreasonableness or
arbitrariness can always interfere in exercise of power u/Art.226
of the Constitution obviously with caution and in furtherance of
paramount public interest and if arrives to a conclusion the
overwhelming public interest requires interference it is always
desirable for the court to interfere even within the limited scope of
judicial review u/Art.226 of the Constitution in keeping the utmost
public interest into consideration. It is also true that each case has
to be looked into on its own facts and there can‟t be any straight
jacket formula.
[23]
Taking note of the Broad principles and if examine in the
instant case I find that the necessary details which has been
noticed by me are the indisputed facts and manifest in nutshell
that the e-tender was invited by the Director, SCERT, Tripura vide
tender document dt.24th July, 2018 for printing, binding and
supply of textbooks and for maintaining transparency in the
process
bidding
shall
be
online
through
website
and
no
submissions of bid physically was permitted. In the instructions to
bidders the bidders were permitted to download the DNIT and all
the work of printing, binding and supply of textbooks mentioned in
Group-A to Group-F in the DNIT and obviously one has to go
Page - 21 of 28
through minutely with the instructions/terms & conditions/ critical
dates/eligibility criteria of the DNIT.
[24]
It may be relevant to note that the petitioner was the
bidder for Group-A to Group-E and not for Group-F although there
was a requirement under clause 1.14 that during technical
evaluation process if there arises any confusion in any of the
technical documents the tender evaluation committee could have
called upon the bidder to bring the original document and
produced the same in front of the tender screening committee and
clause 3 relates to pre-qualification data of the bidders and clause
3.1 relates to the essential documents on which the authority has
put much stress as referred to under clause 3.1(a) & (b) that
indicates the details of documents to be furnished along with the
tender document although it mentioned “valid factory registration
certificate” but if that is being looked into with clause 14.2 which
specifies the detail list of documents at the stage of Technical Bid
required during actual bidding to be scanned and uploaded, it has
escaped notice of the authority to include the requirement of a
“valid
factory
registration
certificate”
and
indisputably
no
reference has been made of scanning and uploading the “factory
registration certificate” in the list of documents referred to in the
tender document under clause 14.2 (a) & (b) in particular and if
the document was not scanned and uploaded although referred to
in clause 3.2 but the e-procurement system of the State of Tripura
(Annexure-5)
also
nowhere
specify
to
upload
the
factory
Page - 22 of 28
registration certificate and that appears to be the reason for which
the petitioner as his defence on record stands mislead although
the petitioner has placed his “factory registration certificate” which
he was holding much prior to the date before the tender process
was initiated by the respondents and it is not the case of the
respondents that document was withheld for some underlying
interest or indirect gain or some hidden consideration but on the
contrary there was no mentioned of the document “factory
registration certificate” in clause 14 of the Bid document which
specifically notify the Bidder to scan and upload the list of
Technical Bid documents required during actual bidding does not
contain the relevant document “factory registration certificate”
and that was the reason and defence of the petitioner that it could
not be scanned and uploaded and his defence being mislead
indeed cannot be ruled out and the tender evaluation committee
in its meeting held on 28th August, 2018 declared the petitioner
disqualified/non-responsive because of the aforesaid reason that
he has failed to furnish “factory registration certificate” is
technically not sustainable and deserves to be interfered with.
[25]
It may be noticed at this stage that 11 number of
tenderers had participated in the bidding process which is also
reflected from Annexure-R/2 dt.16th August, 2018 (Technical Bid
opening summary) and the note sheet of the tender evaluation
committee dt.28th August, 2018 indicates that 7 bidders have
been disqualified/non-responsive, each of them have not uploaded
Page - 23 of 28
the necessary documents which were essentially required and
specifically indicated in clause 14.2 (a) &(b) and also in their eprocurement portal.
[26]
The petitioner is the solitary bidder who was declared
disqualified/non-responsive only for non-furnishing/uploading the
“factory registration certificate” although along with the petitioner
there is one more bidder N.A.P Printers Pvt. but he had failed to
furnish balance sheet and work experience documents along with
factory registration certificate and from perusal of the list of
documents to be uploaded as referred to in clause 3.2 read with
14.2 of the bid document of which detail reference has been made
and the e-procurement portal the requirement in the tender notice
can be classified into two categories, those who have laid down
the essential conditions of eligibility and others which are merely
ancillary or subsidiary with the main object to be achieved. The
authority issuing the tender may be required to enforce those
documents specifically indicated rigidly and non-furnishing of
ancillary or subsidiary requirement would not entail any adverse
consequence.
[27]
It
is
admitted
by
the
respondents‟
counsel
that
although under clause 14.2 under the list of Technical Bid of
documents required during actual bidding there is no reference of
the document “factory registration certificate” to be uploaded and
scanned nor it is specifically mentioned in the e-procurement
portal of State of Tripura (Annexure-5) on record but the stress of
Page - 24 of 28
the ld. Advocate General is that clause 3.2 refers to essential
qualification and that could not be ignored and the petitioner could
have at least consulted the Tender Evaluation Committee if at all
there was any confusion must have sought a clarification as being
referred to in Clause 7.1 of the document appears to be a hyper
technical approach of the State Government just to non-suit the
right of fair consideration in the tender process initiated pursuance
to NIT dt. 24.07.2018.
[28]
At the same time it has not been disputed by the
respondents‟ counsel that the public interest has to be uphold and
the financial bid evaluation committee in its meeting held on 31 st
August, 2018 (Annexure-R/4) considered the Bidder responsive
for Group A to E to which the petitioner is concerned and as
proposed by the Financial Bid Evaluation Committee the lowest
bidder for Group A to E, the financial bid of L-1 is of 9.33 crores
and of the petitioner is of 7.61 crores and the difference of Rs.
1.72 crores is indeed substantial and keeping the public interest
into consideration which is paramount for such hyper technical
reasons with the defence of the petitioner that he was mislead
because of a clear contradiction between the Clauses of the Bid
document and Clause 3.2 and 14.2 in particular read with the eprocurement portal of the State of Tripura elimination of the
petitioner
for
such
consideration
certainly
be
held
to
be
unreasonable and arbitrary exercise of power of the authority who
throughout intended to participate in the transparent process
Page - 25 of 28
adopted by the respondents and action of the respondents from
the materials which has come on record needs to be interfered by
this Court.
The submission of the respondents‟ counsel that those
[29]
who have declared qualified/responsive in the Tender Evaluation
Committee has to be implead as party respondent and in their
absence the petitioner is not entitled to claim relief being a
necessary party is without substance for the reason that we are at
the stage when the Financial Bid Evaluation Committee in its
meeting held on 31st August, 2018 has considered the financial bid
of
the
responsive/qualified
bidders
and
made
its
recommendation with a comparative statement of rates of a
lowest bidder in Group A-E is still a proposal to be considered by
the Supply Advisory Board which has been authorized to take a
final decision in the matter and indisputably, that is yet to be
examined by the Board.
[30]
Who could be a necessary or proper party to the writ
petition has been examined by the Apex Court in the judgment in
Udit Narain Singh versus Additional Member, Board of
Revenue Bihar reported in AIR 1963 SC 786 which is
reproduced hereunder :
“7. To answer the question raised
It would be convenient at the outset to ascertain who
are necessary or proper parties in a proceeding.
Page - 26 of 28
The law on the subject is well settled : it is enough if
we state the principle. A necessary party is one
without whom no order can be made effectively; a
proper party is one in whose absence an effective
order can be made out whose presence is necessary
for a complete and final decision on the question
involved in the proceeding.”
[31]
In the instant case it is the action of the State authority
which is under challenge at the same time no final decision has
been taken by the authority and there is no order passed in favour
of any of the bidder at present which may culminate into
conformity of right as being prayed for by the respondents‟
counsel and as such, either of the qualified/responsive bidder in
the opinion of this Court is not a necessary party to the petition
although it may not preclude the Court to add or implead proper
parties for setting all the questions that may be involved in the
controversy either suo moto or on the application filed at the
instance of such proper party, but no application has been filed by
either of the qualified/responsive bidder seeking permission of this
Court to participate in the proceedings. Thus, as observed, either
of the qualified/responsive bidder is not a necessary party to the
petition and no application has been filed by the so called qualified
/responsive bidder as they are not even the proper parties for
adjudication of the dispute. The preliminary objection of the
respondents‟ counsel is without substance and deserves to be
rejected.
Page - 27 of 28
[32]
The further submission of the respondents‟ counsel is that
it is a decision making process and not the decision which may be
looked into within the limited scope of judicial review u/Art.226 of
the Constitution. On principle this Court is also of the view that it
is a decision making process which is required to be examined
within the limited scope of judicial review but in the instance case
the very decision making process adopted by the respondents in
the facts and circumstances of eliminating the petitioner on a
technical ground of “factory registration certificate” not being
uploaded which was not required for the bidder to furnish while
the Technical Bid documents during actual Bidding to be scanned
& uploaded as indicated in Clause-14.2 and same was in the eprocurement portal of the Government of Tripura under the head
“other technical details” of the document referred to in Sl. No.7
being vague not considered to be essential documents for
qualifying the Technical Bid and stress of the respondents on
Clause 3.2 appears to be a decision which is hyper technical and
unreasonable and is not in public interest to eliminate the bonafide
bidder (the petitioner) from consideration to participate in the etender process and that needs to be interfered by this Court.
[33]
Since we are at the stage when the financial bid has been
evaluated by the Financial Bid Evaluation Committee it its meeting
held on 31st August, 2018 and as informed to this Court the
matter has not been further processed because of the writ petition
being filed to the Supply Advisory Board who will take the final
Page - 28 of 28
decision in the matter, this Court considers it appropriate to
observe that as the reason assigned by the respondents in
eliminating
the
petitioner
in
holding
him
non-responsive
/disqualified by the Tender Evaluation Committee in its meeting
held on 28th August, 2018 is not sustainable and to be an
apparent error in the decision making process which the Tender
Evaluation Committee has committed in its meeting held on 28th
August, 2018 needs interference by this Court.
[34]
Consequently, the writ petition succeeds and allowed. The
decision of the respondents in holding the petitioner to be nonresponsive/disqualified by the Tender Evaluation Committee in its
meeting held on 28th August, 2018 qua the petitioner is hereby
quashed and set aside and the respondents are directed to
consider the bid of the petitioners by the Financial Bid Evaluation
Committee expeditiously and the matter thereafter be placed
before the Supply Advisory Board for final decision in the matter in
terms of the bid document & in accordance with law. No costs.
CHIEF JUSTICE
Certificate:- All corrections made in the judgment
have been incorporated in the judgment.
Dipesh
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review