The court's order
The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.
4. 1 the Scheme-2012 shall be applicable to all micro, small, medium and large enterprises which commence their commercial production in the State, on or after the first day of April 2012, but before or on thirty-first day of March, 2017, in the private sector, co-operative sector, self-help groups, joint sector and also companies owned or managed by the State Government. Thus, the petitioners are eligible under the Scheme,2012 for receiving incentives on investment on land and civil works for their respective manufacturing units. [15] As already noted that the overall ceiling of Rs.50 lakhs for manufacturing enterprises has been laid in the Scheme of 2012. It cannot be related to the NEIIPP 2007. It is disjuncted and hence, is separate. That aspect of the matter has been clarified by the notification dated 23.07.2015. Therefore, the limit is that so far the land and the civil work of the manufacturing unit is concerned, those will be only considered under the scheme, 2012. Hence, the petitioners are entitled to the incentive/benefits under the scheme, 2012 on those components as explained under Para 3 (iv) of the Scheme, 2012. [16] The counsel for the respondents have raised another ground of objection that benefits under that scheme can only be granted w.e.f.
23. 07.2015. This is an abstract submission and cannot be harmonized with the notification dated 23.07.2015 which has unambiguously laid that in continuation of the earlier notification No.F.DI/SUB/TIIS/42(21)/2012/4750-64 dated 26.03.2012, whereby the Scheme, 2012 was introduced and got into effect. [17] Having observed thus, it is declared that the petitioners are entitled to get additional incentive for their investment on land and civil works under the Scheme, 2012. Further, the state-respondents are directed to make the due inquiry for determining the quantum of subsidy within the framework of the NEIIPP and the Scheme, 2012, and release the incentive/benefit to the petitioners in two instalments. First instalment shall be released within six months from the day when a copy of this order shall be furnished to the respondents by the petitioners and the second installment be released within one year from the date of release of the first instalment. In terms of the above, these writ petitions are allowed. There shall be no order as to costs. Dipak
Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
HIGH COURT OF TRIPURA
AGARTALA
WP(C) 1337 of 2017
WP(C) 1403 of 2019
WP(C) 1337 of 2017
Sri Sajib Saha,
Proprietor of Tarasankar Plastic Industries,
Factory-Bypass Road, West Dukli,
Agartala, West Tripura,
PIN: 799003.
----Petitioner(s)
Versus
1.
The State of Tripura,
represented by the Secretary,
Government of Tripura,
Department of Industries & Commerce,
Government of Tripura,
Khejur Bagan, PO: Agartala, District-Tripura (W).
2.
Directorate of Industries and Commerce,
Government of Tripura, Khejur Bagan, Kunjaban,
District: West Tripura, PIN: 799006.
---- Respondent(s)
WP(C) 1403 of 2019
Mutha Industries Private Limited,
A company registered under the Companies Act, 1956,
Having the registered office at 51, Advent, 12-A,
Gen. Jagannathrao Bhosale Marg, Nariman Point,
Mumbai-400021, India
represented by Power of Attorney, Sri Rabin Bose.
----Petitioner(s)
Versus
1.
The State of Tripura,
represented by the Secretary,
Government of Tripura,
Department of Industries & Commerce,
Government of Tripura,
Khejur Bagan, PO: Agartala, District-Tripura (W).
2.
Directorate of Industries and Commerce,
Government of Tripura, Khejur Bagan, Kunjaban,
District: West Tripura, PIN: 799006.
---- Respondent(s)
For Petitioner(s)
For Respondent(s)
: Ms. S. Deb Gupta, Adv.
: Mr. D. Bhattacharjee, GA
Mr. D. Sharma, Addl. GA.
Mr. B. Majumder, CGC [for the
respondent No.3 in WP(C) No.1337 of
2017]
Date of hearing, date of delivery
of judgment and order
Whether fit for reporting
: 12.01.2021
: NO
HON’BLE MR. JUSTICE S. TALAPATRA
Judgment & Order (Oral)
Heard Ms. S. Deb Gupta, learned counsel appearing for the
petitioners as well as Mr. D. Bhattacharjee, learned GA, Mr. D. Sharma,
learned Addl. GA appearing for the respondents No.1 and 2. Also heard
Mr. B. Majumder, learned CGC appearing for the respondents.
[2]
In both the writ petitions, the petitioners staked their claim
to the Director of Industries and Commerce, Government of India to
have
their
subsidy
released
in
terms
of
the
Tripura
Industrial
Investment Promotion Incentives Scheme, 2012, so far the land and the
building (Civil Construction) are concerned. Before this court embarks
on the common issues to be decided by a common judgment, a brief
resume of fact, unique to the each of the cases be introduced at the
outset. The petitioner of the writ petition being WP(C) No.1337 of 2017
[Sri Sajib Saha] has set up his manufacturing unit which falls within the
definition of industrial unit, on 20.09.2013 as stated in the form
claiming
capital
industrial
subsidy
under
the
Tripura
Industrial
Investment Promotion Incentives Scheme, 2007 (hereinafter referred to
as the as the scheme, 2012). The said unit is named and styled as M/S
Tarasankar Plastic Industries, situated at the bypass road. Moulded
plastic items like chair, dining table, tools etc. are manufactured in the
said unit. According to the petitioner, of the writ petition being WP(C)
1337 of 2017, he has invested Rs.15.12 lacs on land, Rs. 175.00 lacs on
building, Rs.400.28 lacs on Plant & Machineries, Rs.40.00 lacs on
Electrical Installations, Rs.1.52 lacs for fixed asset, Rs.20.00 lacs on
Preliminary & Pre-operative Expenses. Rs. 127.42 lacs has been utilized
on Working capital (as per DPR) being total Rs.779.34 lacs.
[3]
According to the said petitioner (Sri Sajib Saha), he is
covered by the said scheme of 2012 for getting the incentives or
benefits on the fixed capital investment inasmuch the said scheme
provides that all eligible enterprises will be entitled to an incentive at
the rate of 30% [subsequently modified to 25%] of the fixed capital
investment, subject to an aggregate ceiling of Rs.50 lacs in each
enterprise. The sole proprietorship units belonging to ST, SC and
Women individuals or the partnership business where all the partners
belong to ST, SC and women will be eligible for an additional subsidy at
the rate of 2.5% on fixed capital investment, subject to an aggregate
ceiling of Rs.50 lacs per enterprise provided that wherever or when an
enterprise is eligible for the capital investment subsidy under NEIIPP2007, the amount of subsidy to be provided under this clause shall
stand reduced to the extent of subsidy entitlement under NEIIPP-2007.
But this provision has been modified subsequently by publishing a
notification. The enterprise shall have to mandatorily apply for the
subsidy under NEIIPP-2007.
[4]
It has been further provided in para 7.2 of the said scheme
that the incentive will be disbursed in two equal instalments, first
instalment after the commencement of commercial production and on
completion of all formalities and second instalment after an interval of
12 months from the date of disbursement of the first installment,
subject to the condition that the unit continues to operate and has not
been closed down.
In the said scheme, it has been further provided that “Fixed
Capital Investment” shall be calculated as follows:
(a) Land: Actual price or premium paid for the land,
freehold or leasehold, as determined by the authorized
agent.
(b) Building: The actual expenditure incurred for
construction of the office building, factory sheds etc, as
necessary for the enterprise, but no including the
residential quarters.
(c) Plant & Machinery: The fixed capital investment in
plant and machinery shall also include the cost of
machinery and installation of captive power generation
unit, cost of drawal of high tension and low tension power
lines and installation of transformer, provided that such
costs have not been otherwise reimbursed by the State or
Central Government. The fixed capital investment on plant
and machinery shall be the cost of plant and machinery as
erected, including the cost of productive equipments such
as jigs, dies, moulds etc but excluding the cost of any
second-hand plant and machinery.
[5]
Thus, it is clear that an enterprise which is eligible for
capital investment subsidy under NEIIPP 2007, the amount of subsidy
to be provided under the clause shall stand reduced to the extent of
subsidy entitlement under NEIIPP 2007 subject to the notification dated
23.07.2015. From a simple reading, it clearly surfaces that the
enterprise shall have to mandatorily apply for the subsidy under NEIIPP
2007. The writ petitioner of WP(C) 1337 of 2017 has received the
subsidy for an amount of Rs.1,18,33,025 as the capital investment
subsidy under NEIIPP 2007. No subsidy under the head of land and
building [Civil Construction] is given under NEIIPP, 2007. NEIIPP stands
for North East Industrial and Investment Promotion Policy (NEIIPP).
The assertion that the petitioner has received the capital investment
subsidy of Rs.1,18,33,025, subsidy on interest on working capital to the
extent
of
Rs.2,24,483/-
and
the
central
insurance
subsidy
of
Rs.1,30,313/- has not been disputed by the petitioner, even though the
petitioner has filed the rejoinder.
[6]
The Union of India-respondent by filing their reply have
submitted that whatever the petitioner was entitled to under the NEIIPP
2007, has been disbursed and on that aspect, both the petitioners do
not have any grievance against them. The petitioners‟ grievance is
confined to the benefits under the said scheme, 2012.
[7]
The petitioners by means of these writ petitions have
broadly prayed the reliefs viz. the respondent be directed to act strictly
in accordance with NEIIPP 2007 which shall remain in force till
31.03.2017. It has been urged further that the benefit that the
petitioner is entitled to, under the Notification No.F.DI/TIS/SUB/42(21)/2006/P-III/13165-274 dated 23.07.2015 of Tripura Industrial
investment Promotion incentives Scheme, 2012 be released forthwith.
[8]
The writ petitioner of WP(C) No. 1403 of 2019 namely
Mutha Industries Pvt. Ltd.
had set up their manufacturing unit and
that had started industrial operation on 02.02.2014. They are engaged
in production of bamboo-wood materials. The said petitioner has stated
that
TIDC (Tripura industrial Development Corporation) had allotted
the land required for setting up their unit on 23.03.2012. According to
them, they were under impression that they would be able to avail 30%
subsidy on civil work from the state government under their incentives
scheme and 30% subsidy on the plant and machinery under the NEIIPP,
2007 scheme, as the two schemes were complementing each other. But
for the revision in the scheme, as it appears, they will not be able to
avail the capital investment subsidy for civil work under NEIIPP 2012 as
they are not eligible to receive the amount more than 50 lacs from the
central government under the NEIIPP. The said petitioner has asserted
those deficit in the representation dated 09.05.2014, addressed to the
Secretary, Department of Industries and Commerce, Government of
Tripura. But the said plea has not been reiterated in their writ petition.
In the writ petition, they have urged this court for directing the
respondents to act in conformity with the scheme in terms of the NEIIPP
Scheme 2007 which has come into effect from 01.04.2007 and had
remained in force till 31.03.2017. The said petitioner has further urged
that by an appropriate direction, the respondents be asked to release
the incentives or the benefits to the petitioner in terms of the
notification
No.F.DI/TIS/SUB/4-2(21)/2006/P-III/13165-274
dated
23.07.2015
under
the
Tripura
Industrial
Investment
Promotion
Incentive Scheme, 2012.
[9]
It has not been denied by the said petitioner that they have
received the capital investment subsidy for plant and machinery to the
extent of Rs. 2,41,68,000/- under the NEIIPP scheme 2007. Even the
petitioner by filing the rejoinder not has denied that fact as averred by
the respondents in para 14 of their reply. A specific response has been
avoided in the rejoinder by the petitioner.
[10]
Ms. S. Deb Gupta, learned counsel has submitted that the
contention of the respondents is that since the capital investment
subsidy as provided under the NEIIPP 2007 is higher than 50 lakhs, no
further incentive or benefit under the Scheme, 2012 can be allowed to
the petitioner. Such plea, according to the learned counsel, is absolutely
untenable. Ms. S. Deb Gupta, learned counsel has emphatically read
Para 7.1 of the scheme as adverted by the state. It has been provided
that the incentive on fixed capital investment for land and civil works
will be provided under the said Scheme, 2012. As we have reproduced
the said provision [see Para 4], it would not be reiterated for brevity. In
response to the assertion of the respondents that as the capital
investment subsidy has already crossed 50 lakhs under the NEIIPP,
2007, no further incentive/subsidy can be allowed to the petitioner, the
counsel for the petitioner has referred to the notification dated
23.07.2015
issued
by
the
Secretary,
Government
of
Tripura,
Department of Industries and Commerce (Annexure-14 to the writ
petition being WP(C) No.1403 of 2019) and Annexure-4 to the writ
petition being WP(C) No.1337 of 2017). As this notification is crucial for
determining the entitlement of the petitioners, the entire text is
reproduced hereunder:
NO.F.DI/TIS/SUB/4-2(21)2006/P-III/13165-274
GOVERNMENT OF TRIPURA
DEPARTMENT OF INDUSTRIES AND COMMERCE
AGARTALA: TRIPURA
Dated, Agartala, the 23rd july, 2015
NOTIFICATION
In
continuation
of
Notification
No.F.DI/SUB/TIIS/4-2(21)/2012/4750-64, dated 26th
March, 2012, the Governor is pleased to accord sanction of
the modification of Tripura Industrial Investment
Promotion Incentives Scheme, 2012, as per the details
appended with this notification with effect from the date
of notification.
By order of the Governor,
(M.Nagaraju)
Secretary,
Government of Tripura.
MODIFICATION OF TRIPURA INDUSTRIAL INVESTMENT
PROMOTION INCENTIVE SCHEME, 2012
1. Capital Investment subsidy @ 25% of investment in
Land and Civil works with an overall ceiling of Rs.50.00
lacss for manufacturing enterprises. This is in addition to
the benefit as provided under NEIIPP, 2007 which was
currently suspended by Government of India, Capital
investment Subsidy @ 25 % of fixed capital investment in
land, civil works and equipments within the overall ceiling
of Rs.50.00 lacss shall continue for service sector
enterprise, as per the provision of the Sheme, 2012.
2. Reduction of value addition from 30% to 20% for
entitlement of getting Procurement Preference benefit.
This is a restoration of the value addition clause as was
envisages under State Scheme, 2007.
[11]
It is not in dispute that by the said notification dated
23.07.2015,
Tripura
Industrial
Investment
Promotion
Incentives
Scheme, 2012 (the scheme 2012) has been modified. It is evident
therefrom that the capital investment subsidy at 25% of the investment
on land and civil works within overall ceiling of Rs.50 lakhs will be
entitled to the manufacturing enterprises. There cannot be any amount
of confusion that the said modified incentive scheme 2012 is in addition
to benefits as provided under the NEIIPP 2007 which had been
suspended for sometimes by the Government of India. The capital
investment subsidy at 25% on the fixed capital investment in the land
and civil construction within the overall ceiling of Rs.50 lakhs has been
introduced as well for service enterprises by the Scheme, 2012. The
latter part of the modification is not relevant for our purpose.
[12]
Mr. D. Sharma, learned Addl.GA has submitted that the
maximum subsidy limit under the Scheme, 2012 and the NEIIPP 2007
(both inclusive) is 50 lakhs. Since the petitioners have received their
subsidy under the NEIIPP 2007 more than 50 lakhs, they are not
entitled to get any further subsidy. According to Mr. Sharma, learned
Addl.GA and Mr. Bhattacharjee, learned GA, the writ petitions are liable
to be dismissed without further consideration.
[13]
Having extended the anxious consideration and particularly,
on attending the notification dated 23.07.2015, this court is of the firm
view that the maximum limit of the subsidy as set up by the Scheme
2012 cannot be deduced by aggregating both the schemes. As far the
symbiotic relation is concerned, it can be gathered from proviso to para
7.1 of the scheme 2012. It has been provided therein that
an
enterprise is eligible for capital investment subsidy under the NEIIPP
2007 and that quantum of subsidy shall be to the extent of the subsidy
entitlement under NEIIPP 2007. It may be noted that it has been made
mandatory for the enterprises seeking incentives under the Scheme,
2012 to apply for the subsidy under the NEIIPP -2007. Thus, it is made
rigid that the eligible enterprise shall have to apply for the subsidy
under the NEIIPP-2007 and that subsidy be reduced from the
incentives/benefits, as would be provided under the Scheme, 2012.
Under the Scheme 2012, on the entire capital investment, an eligible
unit is entitled to the incentives/benefits. The fixed capital investment,
has been segregated from the land and the building but plant and
machineries by definition have been included. This clause has been rephrased in the manner that if the subsidy is availed for the plant and
machinery under the NEIIPP 2007, no subsidy/incentive on that account
be available under the scheme, 2012. Provisions of reduction have been
made for this purpose in the scheme, 2012. The notification dated
23.07.2015 has been introduced to reduce the percentage of the
subsidy. What it has provided further is that the subsidy on the
investment in land and civil work within overall ceiling of Rs.50 lakhs
will be provided to manufacturing enterprises. That subsidy/incentive is
in addition to the benefit as provided under the NEIIPP 2007. Thus, the
original provision of the clause 7.1 has been modified to that extent.
Implication of „reduction‟ has to be gathered or understood by the
modified provisions as brought into effect by the notification dated
23.07.2015.
[14]
It is also an admitted fact that none of the petitioners has
received any subsidy/incentive or benefit for their investment on land or
the civil works and as such they are entitled to that benefit as their
respective industries have been set up within the tenure of the Scheme
i.e. 01.04.2012 to 31.03.2017. For this purpose para 4.1 of the scheme
2012 may be referred and for reference, the same is reproduced.
4.1 the Scheme-2012 shall be applicable to all micro,
small, medium and large enterprises which commence
their commercial production in the State, on or after the
first day of April 2012, but before or on thirty-first day of
March, 2017, in the private sector, co-operative sector,
self-help groups, joint sector and also companies owned
or managed by the State Government.
Thus, the petitioners are eligible under the Scheme,2012 for
receiving incentives on investment on land and civil works for their
respective manufacturing units.
[15]
As already noted that the overall ceiling of Rs.50 lakhs for
manufacturing enterprises has been laid in the Scheme of 2012. It
cannot be related to the NEIIPP 2007. It is disjuncted and hence, is
separate. That aspect of the matter has been clarified by the notification
dated 23.07.2015. Therefore, the limit is that so far the land and the
civil work of the manufacturing unit is concerned, those will be only
considered under the scheme, 2012. Hence, the petitioners are entitled
to the incentive/benefits under the scheme, 2012 on those components
as explained under Para 3 (iv) of the Scheme, 2012.
[16]
The counsel for the respondents have raised another ground
of objection that benefits under that scheme can only be granted w.e.f.
23.07.2015. This is an abstract submission and cannot be harmonized
with the notification dated 23.07.2015 which has unambiguously laid
that in continuation of the earlier notification No.F.DI/SUB/TIIS/42(21)/2012/4750-64 dated 26.03.2012, whereby the Scheme, 2012
was introduced and got into effect.
[17]
Having observed thus, it is declared that the petitioners are
entitled to get additional incentive for their investment on land and civil
works under the Scheme, 2012. Further, the state-respondents are
directed to make the due inquiry for determining the quantum of
subsidy within the framework of the NEIIPP and the Scheme, 2012, and
release the incentive/benefit to the petitioners in two instalments. First
instalment shall be released within six months from the day when a
copy of this order shall be furnished to the respondents by the
petitioners and the second installment be released within one year from
the date of release of the first instalment.
In terms of the above, these writ petitions are allowed.
There shall be no order as to costs.
JUDGE
Dipak
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review