OSA No. 87 of 2019
IN THE HIGH COURT OF JUDICATURE AT MADRAS
Reserved on : 24-06-2026
Pronounced on : 16.07.2026
CORAM
THE HON'BLE MR JUSTICE P. VELMURUGAN
AND
THE HON'BLE MRS.JUSTICE K. GOVINDARAJAN THILAKAVADI
OSA No. 87 of 2019
AND
CMP NO. 8575 OF 2019
Mrs. B. Anubhama
No.292/a, Arcot Road, Kodambakkam,
Chennai. 600 024
..Appellant
Vs
1.S. Baskaran
Flat No.F1, A Block,
Indira Grandeur Apartment,
EB Office Road, Mugappair East,
Chennai 600 037
2.M.V. Salai Abaranam
D 139, Parameswari Vihar,
No.28, Arcot Road,
Chennai 600 093
R. Kalanjiam (deceased)
3.K. Venkatraman
No.3, Sanjay Gandhi Nagar
Virugambakkam
Chennai 600 092
__________
Page1 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
4.Justice Thiru. A. Raman
NCB 7A PFK Raja Salai,
R.A. Puram, Chennai 600 028
..Respondents
PRAYER: Original Side Appeal filed under Order XXXVI Rule 9 of O.S.
Rules and Clause 15 of Letters Patent praying to set aside Judgment and Decree
dated 09.11.2017 passed in OP No.19 of 2015.
For Appellant:
Mr.S.R. Rajagopal, Senior Advocate
for Mrs. R.Balambigai Gowri
For Respondent(s):
Mrs. Chitra Sampath, Senior Advocate
for Mr. V.R.Anna Gandhi
For R2
Judgment
(Judgment of the Court was delivered by K.Govindarajan Thilakavadi J.)
This appeal is filed praying to set aside the order dated 09.11.2017
passed in OP No.19 of 2015.
2. For the sake of convenience the parties are referred to as per their
ranking in the Tribunal.
__________
Page2 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
3. Facts leading to invoke arbitral proceedings are as follows:
3.1. The claimant, namely, M.V, Salai Abarama, is in Real Estate
Business and offers his services on service charge basis by identifying
prospective buyers for any offer of sale of land by any third party. The 1 st
respondent
in
the
Arbitral
proceeding
and
appellant
herein,
namely,Mrs.S.Anubama is doing Real Estate business under the name and style
M/s. Sameera Associates. The 2nd respondent, namely, Mr.S.Baskaran is the
husband and Power Agent of the 1st respondent. The 1st respondent is engaged
in purchasing and organising purchase of pieces of land from various third
parties, consolidate the same, prepare layout and offer it for sale to prospective
buyers through her Power of Attorney. The 2 nd respondent for and on behalf of
the 1st respondent approached the claimant and respondents 3 and 4, namely, R.
Kalanjiam and K. Venkatraman to fix and nominate buyer in 1170 acres in
villages such as Thirumangalam, Vasanapattur, Thirupandiyur, Mampakkam,
Kaliyamanikkam and other villages in Sripeumbudur Taluk. Respondents 1 and
2 promised to pay service charge of Rs.1,500/- per cent jointly to the claimant
and respondents 3 and 4, which was to be shared by them in equal share. The
service charges had to be paid at the time of registration of every sale deed. A
Memo of understanding was entered into on 19.05.2006 incorporating the
clauses relating to offer of payment of service charges and the same was
accepted and signed by the parties. The Memo of Understanding also provides
__________
Page3 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
for Arbitration to resolve disputes arising between the parties.
3.2. M/s. ETA Star Properties Developers purchased through respondents
1 and 2, 500 acres in the above villages identified by the claimant. Hence, the
respondents 1 and 2 are liable to pay Rs.7,50,00,000/- jointly to the claimant
and the respondents 3 and 4, out of which the claimant is legally entitled to a
sum of Rs.2,50,00,000/- towards his share. The respondents 1 and 2 have paid
only Rs.27,00,000/- to the claimant leaving a balance of Rs.2,23,00,000/-.
Hence, the claimant filed a Claim before the Arbitral Tribunal claiming that he
is entitled to interest at the rate of 24% till the date of Claim Petition in a sue of
Rs,1,60,56,000/- and future interest and costs.
3.3. The respondents were served with notice.
Respondents 1 and 2
represented by counsel and though took several adjournments for filing their
counter, remained absent. Respondents 3 and 4 also remained absent.
3.4. The learned Arbitrator, having found that the respondents did not
evince any interest to appear, passed the Award with the available material in
favour of the claimant by directing the respondents 1 and 2 to pay a sum of
Rs.2,57,92,000/- with interest at the rate of 12% from 02.12.2010 till the date of
realisation within a period of six months from the date of Award and further
directed the respondents 1 and 2 pay a sum of Rs.6,04,000/- to the claimant
__________
Page4 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
towards cost of the claim.
3.5. Aggrieved over the same, petitions were filed by the respondents 1
and 2 under Section 34 of the Arbitration and Conciliation Act, 1996 (in short
A&C Act, 1996) in O.P. Nos.19 and 18 of 2015 respectively. The learned
Single judge while allowing the Petition in O.P. No.18 of 2015 filed by the 2 nd
respondent (Power Agent of the 1st respondent) on the ground that for any action
or inaction relatable to the Principal, the agent cannot be made liable, dismissed
O.P. No.19 of 2015.
4. Aggrieved over the same, the 1st respondent has filed the present
appeal.
5. The present appeal challenges the order dismissing the petition filed by
the appellant under Section 34 of the A&C Act, 1996, in O.P. No.19 of 2015.
By the same impugned order, the petition filed by the 2nd respondent, in O.P.
No.18 of 2015 was allowed, and the ex parte award was modified thereby
exonerating the 2nd respondent from liability, holding that he acted merely as an
agent of the principal and that fastening liability upon him was contrary to
Section 230 of the Contract Act, 1872.
__________
Page5 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
5.1. The learned Single Judge while affirming adverse inference drawn by
the Arbitral Tribunal on account of the appellants' continued absence during the
Arbitral Proceedings, nevertheless directed that the issue of discharge of
liability be determined by the Executing Court.
5.2. Mr.S.R.Rjagopal, learned Senior Advocate appearing for the
appellant would submit that, the award was liable to be interfered under Section
34(2)(a)(iii) on the ground of insufficiency of hearing proceedings to the
appellant herein. That the Arbitral Award was violative of the decision of the
Hon'ble Division Bench in the case of Saraswathi Chemicals vs. Balmer
Lawrie & Company Limited reported in 2011 (3) CTC 9, which follows the
decision of Hon'ble Supreme Court in Sohan Lal Gupta (dead) through Lrs vs.
Asha Devi Gupta reported in (2003) 7 SCC 492.
5.3. It is further contended that, the learned Single Judge while exercising
jurisdiction under Section 34, did not possess the power to modify the Arbitral
Award dated 07.07.2014. The petition under Section 34, having been filed in
November 2014 and adjudicated on 09.11.2017 was governed by the law as it
stood on that date, under which the Courts exercising jurisdiction under Section
34 did not have the authority / power to modify an Arbitral Award, but were
confined only to setting it aside on the limited grounds prescribed therein. In
this regard, the decision in Mcdermott International Inc. v. Burn Standard
__________
Page6 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
Co. Ltd., & Ors., reported in (2006) 11 SCC 181 and Project Director,
National Highways No.45E and 220 National Highways Authority of India
vs. M. Hakeem & Another reported in (2021) 2 SCC 1 were relied upon. He
would further submit that, the Hon'ble Supreme Court in Gayathri Balasamy
vs. I.S.G. Novasoft Technoloties Ltd., reported in (2025) 7 SCC 1, by judgment
dated 30.04.2025 clarified that Courts exercising jurisdiction under Section 34
possesses a limited, restricted and implied power to modify, sever, or partially
set aside the Arbitral Award. Prior to the said authoritative pronouncement, the
settled legal position was that Courts under Section 34 lacked the power to
modify or partially set aside an Award. In the present case, however, the
learned Single Judge while allowing O.P.No.18 of 2015 filed by Mr.S.Baskaran,
arrayed as the 1st respondent herein, proceeded to modify the Arbitral Award to
the extent of exonerating him from liability, not withstanding the legal position
prevailing at that time.
5.4. It is further contended that, the learned Single Judge erred in not
appreciating that the Award was in conflict with Public policy for the reason
that the 2nd respondent herein, M.C. Salai Abraman had entered into MOU with
appellant on 19.05.2006 in furtherance of which, consideration of Rs.1,500/- per
cent was payable at the time of registration of every sale deed. That the
payments in discharge were made, acknowledged by his other partners.
Ostensibly a dispute between partnership has resulted in the claim being
__________
Page7 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
preferred.
5.5. When Clause 4 of the MOU, Ex.C1 reads thus:
“Whereas the party of the first part has agreed in consideration of the services
rendered by party of the second part to pay an agreed service charges to party
of the second part on the following terms”, whether an award by the learned
Arbitrator, misinterpreting the clause, awarding amount to the claimant holding
the same to be his share was the possible view based on reasonable construction
of terms and one not falling within the contravention of fundamental policy of
India warranting the Award to be set aside.
5.6. He further contended that, the ground of patent illegality, having
been specifically raised in the petition filed under Section 34 of the A&C Act,
1996, was not duly considered by the learned Judge in the impugned order. On
the contrary, the learned Single Judge, in the impugned order has observed as
follows:
”on the other contention regarding the discharge, considering the
scope of Section 34 of the Arbitration and Conciliation Act, 1996,
this Court cannot go into the same, as the role to be played by this
Court is circumscribed by Section 34. Therefore, when the statute
places a fetter on the power to be exercised, this Court cannot act
contrary to the same. The Award merely statesabout the liability, if
__________
Page8 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
it is one of discharge, it is for the petitioner to substantiate it before
the Execution Court.”
Such an approach, whereby a material ground of challenge is declined to be
adjudicated and instead relegated to stage of execution, vitiates the impugned
order. Hence, it is submitted that, failure to consider the plea of patent illegality,
going to the root of the award, renders the award liable to be set aside, an issue
squarely arising for consideration in the present appeal. Further, the learned
Single Judge erred in drawing adverse inference based on the continued absence
of the parties before the Arbitral Tribunal.
5.7. He further submitted that, it is well settled law that Arbitrators must
follow a fair and evidence based procedure even in a ex parte proceeding. Non
appearance or absence of a party in Arbitral proceedings cannot form the basis
for drawing adverse inferences on the merits of the case in the absence of any
evidence supporting the same. Section 25 (C) of the 1996 Act, states that, in the
event a party fails to appear at an oral hearing or to produce documentary
evidence, the Arbitral Tribunal may continue the proceedings and make the
Arbitral Award on the basis of evidence before it. However, an Arbitral Award
based on no evidence, would be perverse and thus, patently illegal under
Section 34(2-A) of 1996 Act. In the present case, the learned Arbitrator without
satisfying on evidence, the proof of facilitation services rendered by the 2 nd
__________
Page9 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
respondent herein or on payment of consideration to the other partners imposed
liability on the appellant. To support his contentions, he has relied on the
following judgments:
1. Delta Distilleries Limited vs. United Spirits Limited and Another
reported in (2014) 1 SCC 113.
2. Juggilal Kamlapat vs. General Fibre Dealers Limited reported
in 1954 SCC OnLine Cal 53.
3. Associates Builders vs. Delhi Development Authority reported in
(2015) 3 SCC 49
5.8. Therefore, the award passed by the learned Arbitrator on 07.07.2014
directing the appellant to pay the claim, inter alia is liable to be set aside as the
amount has already been paid and there is no due on the part of the appellant.
As such, the award is in contravention of
public policy and hence, the
impugned order dated 09.11.2017 dismissing the Original Petition in O.P.
19/2018 is liable to be set aside and the matter may be remanded for fresh
consideration by the Arbitrator.
6. On the other hand, Mrs. Chitra Sampath, learned Senior Advocate
appearing for the second respondent would submit that, the Arbitrator has made
a reasoned award dated 07.07.2014 holding that the claimant is entitled to a
__________
Page10 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
sum of Rs.2,57,92,000/- with interest at the rate of 12% from 02.12.2010 till the
date of realisation and the amount shall be paid within 6 months from the date
of award and directed the appellant and 2nd respondent therein to pay a sum of
Rs.6,04,000/- to the claimant towards cost of this claim. Further, it is submitted
that under Section 37 of the Act, 1996, the power to remand is only in
exceptional cases and not as matter of routine. If the Courts dealing with
appeals under Section 37 of the A&C Act, 1996, starts routinely passing the
orders of remand, the Arbitral procedure will cease to be efficient and it will
cease to be cost effective. Such orders will delay the conclusion of the
proceedings, thereby defeating the very object of the Arbitration Act. In the
facts of the present case, the remand was completely unwarranted. To support
her contentions, she has relied upon the following judgments:
1. J.C. Budhraja vs. Chairman, Orissa Mining Corporation Ltd.,
and another reported in (2008) 2 SCC 444
2. Bombay Slum Redevelopment Corporation Private Limited vs.
Samir Narain Bhojwani reported in (2024) 7 SCC 218
7. Heard on both sides. Records perused.
__________
Page11 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
8. The appeal is directed against the order of the learned Single Judge
dismissing the petition filed under Section34 of the A&C Act, 1996, whereby
the Arbitral Award dated 07.07.2014 was upheld with modifications.
9. Before the learned Single Judge, the appellant herein assailed the
Award principally on the ground that, the Arbitral proceedings were conducted
in violation of the principles of natural justice, that the learned Arbitrator
proceeded ex parte after issuing only a single notice , thereby the appellant was
deprived of his opportunity to plead and submit documentary evidence
regarding discharge of the claim amount to the other partners, which was also
acknowledged by them. It is further contended by the learned counsel for the
appellant that the learned Single Judge failed to exercise the jurisdiction vested
on him under Section 34 of the A&C Act, 1996 and erroneously held that the
question of discharge could be agitated before the Executing Court, which is
contrary to the fundamental policy of Indian Law. It is the further contention on
the side of the appellant that the learned Single Judge, by the impugned order,
modified the Arbitral Award dated 07.07.2014 to the extent of exonerating one
Mr. Baskaran, who was arrayed as the first respondent in O.P.No.19 of 2015
and as the petitioner in O.P. No.18/2015, from any liability under the Award,
holding that he acted merely as an agent of the principal and that fastening
liability upon him was contrary to Section 230 of the Contract Act, 1872, which
is patently illegal warranting interference of this Court.
__________
Page12 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
10. Now, it has to be firstly seen whether the award was liable to be
interfered under Section 34(2)(a)(iii) in the petition filed under Section 34 of the
A&C Act, 1996, on the ground of insufficiency of hearing proceedings to the
appellant herein. The term ‘reasonable opportunity’ would mean that the party
must be given opportunity to explain his arguments and adduce evidence. In
this regard, the Hon’ble Supreme in the case of Saraswathi Chemicals vs.
Balmer Lawrie & Company Limited (cited supra) has held as follows:
“19. Observing that the procedural rule applicable to Arbitration
proceedings is more tolerant than the rule followed in Court of
law, in Juggilal Kamlapat v. General Fibre Dealers Limited,
AIR 1955 Cal. 354 the Calcutta High Court summarised the
principles which govern the matter as follows:
“If a party to an Arbitration Agreement fails to appear at
one of the sittings, the arbitrator cannot or, at least,
ought not to, proceed ex parte against him at that sitting.
Where the non-appearance was accidental or casual, the
Arbitrator ought ordinarily to proceed in the ordinary
way, fixing another date of hearing and awaiting the
future behaviour of the defaulting party.
__________
Page13 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
If, on the other hand, it appears that the defaulting party
had absented himself with a view to preventing justice or
defeating the object of the reference, the Arbitrator
should issue a notice that he intends at specified time and
place to proceed with the reference and that if the party
concerned does not attend, he will proceed in his
absence. But, if after making such a peremptory
appointment and issuing such a notice, the Arbitrator
does not in fact proceed ex parte on the day fixed, but
fixes another subsequent date, he cannot proceed ex
parte on such subsequent date, unless he issues a similar
notice in respect of that date as well.
If he issues a similar notice and the party concerned
does not appear, an award made ex parte, will be in
order. But if he does not issue such a notice on the
second occasion, but nevertheless proceeds ex parte, the
award will be liable to be set aside in spite of a notice of
a peremptory hearing having been given in respect of
the earlier date, subject, however, to the condition that
prejudice was caused to the party against whom the ex
parte order was made. But this duty to give notice of an
intention to proceed ex parte is not an absolute duty.
__________
Page14 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
If it appears from the circumstances of the case that a
particular party is determined not to appear before the
Arbitrators in any event, as when he has openly
repudiated either the reference itself or the particular
Arbitrators and has show no desire to recant, the
Arbitrators are not required to issue a notice of an
intention to proceed ex parte against such a recusant
person and may proceed ex parte and make a valid
award without issuing a notice. The better course,
however even in such a case is to issue a notice and
give the party concerned a chance to change his mind.”
10.1. The learned counsel for the appellant drew our attention to the
minutes of meeting maintained in the Arbitration proceedings and submitted
that on 19.12.2011 the learned Arbitrator recorded the presence of counsel for
the appellant / 1st respondent and on the next hearing, i.e., on 18.01.2012, the
learned Arbitrator proceeded to record that the respondents are set ex parte.
Hence, the learned counsel for the appellant would submit that the learned
Arbitrator ought to have provided reasonable time for the appellant to putforth
her arguments and evidence. The records disclose that only one notice was
issued by the learned Arbitrator to the appellant. On her non appearance, she
__________
Page15 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
was set ex parte and the Award came to be passed. There is nothing on record to
indicate that the learned Arbitrator satisfied himself that the appellant had been
afforded a fair and effective opportunity to present her case before depriving her
such valuable right. The Hon’ble Supreme Court in Sohan Lal Gupta (dead)
through Lrs. and others vs. Asha Devi Gupta (SMT) and others (cited supra)
has held that, for constituting a reasonable opportunity ,the following conditions
are required to be observed.
1. Each party must have notice that the hearing is to take place.
2. Each party must have a reasonable opportunity to be present at the
hearing, together with his advisers and witnesses.
3. Each party must have the opportunity to be present throughout the
hearing.
4. Each party must have a reasonable opportunity to present evidence
and argument in support of his own case.
5. Each party must have a reasonable opportunity to test his opponent's
case by cross-examining his witnesses, presenting rebutting evidence and
addressing oral argument.
6. The hearing must, unless the contrary is expressly agreed, be the
occasion on which the parties present the whole of their evidence and
argument.
__________
Page16 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
Further Section 18 of the A&C Act, mandates equal treatment of parties and
requires each party to be given a full and fair opportunity to present their case.
Section 24 of the A&C Act, 1996, also contemplates a meaningful opportunity
of hearing. An Arbitral Award rendered in breach of these statutory safeguard
is liable to set aside under Section 34(2)(a)(iii) of the A&C Act, 1996. The
Hon’ble Supreme Court has consistently held that adherence to the principles of
natural justice is the foundation of every arbitral proceedings and that denial of
a reasonable opportunity vitiates the award. The appellant had also raised a
specific defence that payments had already been made to other partners of the
agreement. Such a plea goes to the root of the claim and renders the Award
vulnerable under Section 34 of the A&C Act, 1996. The learned Single Judge,
in the proceedings under Section 34 of the A&C Act, 1996, instead of
examining these jurisdictional errors, observed that the appellant could establish
her plea of discharge before the Executing Court. Such an approach is legally
untenable. The Executing Court cannot travel beyond the decree or the Arbitral
Award. The question relating to discharge of the contractual liability before
passing of the award, or matters falling exclusively within the adjudicatory
domain of the Arbitrator and, where necessary, the Court exercising jurisdiction
under Section 34 of the A&C Act, 1996, they cannot be relegated to Execution
Proceedings.
__________
Page17 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
10.2. Further the contention of the learned counsel for the appellant is that
the findings of the learned Single Judge exonerating the Power Agent from
personal liability
also call for interference. The question arising for
consideration is whether the Court exercising jurisdiction under Section 34 of
the A&C Act, 1996, could exonerate the Power Agent from liability by applying
Section 230 of the Indian Contract Act, 1872, when such issue had neither been
decided by the Arbitral Tribunal nor form part of the limited supervisoty
jurisdiction under Section 34 of the A&C Act, 1996. It is undisputed that the
Arbitral Tribunal rendered an award fastening liability upon the respondents in
the Arbitral proceedings. While considering the challenge under Section 34 of
the A&C Act, 1996, the Court held that the Power Agent could not be made
personally liable by applying Section 230 of the Indian Contract Act and
consequently exonerated the 1st respondent herein from liability, leaving the
remaining award in tact. Such an approach cannot be sustained in law. Section
34 of the A&C Act, 1996, confers only a limited supervisory jurisdiction. The
Court does not sit in appeal over the findings of the Arbitral Tribunal. It cannot
re appreciate evidence, decide fresh issues, substitute its own findings, or
modify the award except to the limited extent recognized by law. The Hon’ble
Supreme Court has authoritatively held that Section 34 Court has no power to
modify an Arbitral Award except for limited severance of invalid portion or
corrections of clerical or computation errors (Ref: Gayathri Balasamy vs.
__________
Page18 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
I.S.G. Novasoft Technoloties Ltd.).
10.3. Whether a Power Agent incur personal liability under Section 230
of the Indian Contract Act depends upon the nature of the agency, the terms of
the contract, the conduct of the parties, and the evidence on record. Such
determination is essentially a question falling within the exclusive domain of
the Arbitral Award. If the Arbitrator failed to decide the issue or decided it
erroneously, the remedy of the Court under Section 34 of the A&C Act, 1996, is
confined to the Courts enumerated therein. The Hon’ble Supreme Court’s
decision in Gayathri Balasamy vs. I.S.G. Novasoft Technoloties Ltd., was
delivered subsequently, hence, it does not validate the action of the Section 34
Court. Even prior to that decision, the settled principle was that proceedings
under Section 34 of the A&C Act, 1996, were supervisory and not appellate and
the Court could not substitute its own conclusions on merits. Therefore, by
exonerating the Power Agent on the basis of Section 230 of the Indian Contract
Act, Section 34 Court effectively modified the arbitral award and rendered a
finding on a question reserved for adjudication by the Arbitrator. Such an
exercise amounts to exceeding the jurisdiction vested under Section 34 of the
A&C Act, 1996. Accordingly, this Court holds that the finding exonerating the
Power Agent is without jurisdiction and liable to be set aside.
__________
Page19 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
10.4. As rightly pointed out by the learned counsel for the appellant,
while exercising the jurisdiction under Section 34 of the A&C Act, the 34 Court
did not have the authority to modify Arbitral Award for the reason that the
Award was passed on 07.07.2014 and the order of the Single Judge is dated
09.11.2017 and the 34 Court is governed by the law as it stood on that date.
10.5. For the foregoing reasons, the impugned order dated 09.11.2017
passed by the learned Single Judge in OP No.19 of 2015 is set aside.
Consequently, the Arbitral Award dated 07.07.2014 is also set aside. The
dispute is remitted for fresh adjudication before the same Arbitrator or before
different Arbitrator appointed in accordance with the arbitration agreement or,
failing such agreement, in accordance with law. The Arbitrator shall afford
adequate opportunity to both parties to file their pleadings, adduce evidence,
and advance oral submissions, and shall thereafter pass a reasoned award,
uninfluenced by any observations contained in the earlier award or in this
judgment.
__________
Page20 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
In the result, the Original Side Appeal is allowed.
No costs.
Consequently, connected miscellaneous petition is closed.
(P.V.,J.)
(K.G.T.,J.)
16-07-2026
Index: Yes/No
Speaking/Non-speaking order
BGA
To
Justice Thiru. A. Raman
NCB 7A PFK Raja Salai, R.A. Puram, Chennai.
__________
Page21 of 22
https://www.mhc.tn.gov.in/judis
OSA No. 87 of 2019
P.VELMURUGAN J.
AND
K.GOVINDARAJAN THILAKAVADI J.
BGA
Pre delivery Judgment in
OSA No. 87 of 2019
AND
CMP NO. 8575 OF 2019
16-07-2026
__________
Page22 of 22
https://www.mhc.tn.gov.in/judis
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.