Result
Dismissed
Bench
Mv Muralidaran
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

29. For the foregoing discussions, this Court is of the view that there is no merit in MC (WP) No.346 of 2022 and accordingly dismissed and thus, the interim order dated

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

SHAMURAILATPAM SUSHIL SHARMA SHAMURAILATPAM SUSHIL SHARMA Date: 2022.12.22 17:11:07 +05'30' Page |1 IN THE HIGH COURT OF MANIPUR AT IMPHAL MC(WP(C)) No. 346 of 2022 Ref:- WP(C) No. 833 of 2022 The Manipur Lokayukta through its Secretary, 3rd Floor Directorate Complex, 2nd M.R. North AOC, P.O. & P.S. Imphal, Imphal West District- 795001. …Applicant/Respondent No. 2 - VERSUS 1. Shri N. Sarat Singh, aged about 64 years, S/o (L) N. Modhumangol Singh, a resident of Thangmeiband Yumnam Leikai, P.O. Lamphelpat & P.S. Imphal, Imphal West District, Manipur. 2. Shri Th. Bimol Singh, aged about 55 years, S/o (L) Th. Dwijamani Singh of Ward No. 3, Ningthoukhong, P.O. & P.S. Bishnupur, Bishnupur District, Manipur. … Principal Respondent/Writ Petitioners 3. The State of Manipur through the Chief Secretary, Government of Manipur, Secretariat South Block, Babupara, P.O. & P.S. Imphal – 795001. … Pro-Forma Respondent/Respondent No.1 BEFORE HON’BLE MR. JUSTICE M.V. MURALIDARAN For the Petitioners :: Mr. M. Rarry, Advocate For the Respondents Date of Hearing and :: Mr. HS Paonam, Sr. Adv. MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |2 reserving Judgment & Order :: 01.12.2022 Date of Judgment & Order 19.12.2022 :: JUDGMENT AND ORDER (CAV) This petition has been filed by the petitioner to vacate, set aside, modify and not to extend any further the interim order dated 29.09.2022 passed in W.P.(C) No.833 of 2022, which is in operation. 2. Heard Mr. M. Rarry, learned counsel for the applicant and Mr. HS Paonam, the learned senior counsel for the respondents. 3. The petitioner is the second respondent in the writ petition. The respondents 1 and 2 herein are the writ petitioners and the third respondent is the first respondent in the writ petition. 4. The learned counsel for the petitioner submitted that the respondents 1 and 2 have filed W.P.(C) No.833 of 2022 for closing Complaint Case No.5 of 2022 as not maintainable due to barred by limitation and also for issuance of a writ in view of Section 53 of Manipur Lokayukta Act, 2014. He would submit that when the said writ petition was listed on 29.9.2022 the MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |3 respondents 1 and 2 basing on the so called handing over/taking over certificate dated 14.8.2015 of the associated 33 KV line and related civil works between Turn Key firm i.e. Ms.Shyama Power India Limited and one officer of MSPCL i.e. DGM, TD-III on the letter head of the Turn Key Firm obtained interim order dated 29.9.2022. According to the learned counsel for the petitioner the interim order was passed on the incorrect premises that the complaint is time barred one and apart from this, it was also observed that the petitioner herein has no right to pass any order for the personal appearance of the officers concerned as ordered on 23.9.2022. 5. The learned counsel for the petitioner further submitted that the observations found in the order dated 29.9.2022 are misreading the power and jurisdiction of Manipur Lokayukta Act, 2014, especially, Sections 20(1)(a), 22 and 27 and also the overall power of the Manipur Lokayukta being a sui generis quasi-judicial authority as enumerated and propounded by the Hon’ble Supreme Court as well various High Courts. 6. The learned counsel for the petitioner added that prima facie, it is require to consider as to who is the appropriate institution/authority to decide whether the Complaint Case No.5 MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |4 of 2022 for embezzlement of and misappropriation of Government fund in tune of Crores of rupees against the Managing Director of MSPCL and the Turn Key Firm and the Government Department against whose officials the allegation has been made, which is barred by limitation. 7. The learned counsel urged that it cannot be nor there can be a failure to consider the work order dated 2.7.2014 that the contract period of the contract work is 18 months and an agreement shall be signed within 30 days from the date of issue of the work order dated 2.7.2014. The project is alleged to have been completed long before the period of completion of the contract work and these facts could only be ascertained on production of the documents called for vide order of the Manipur Lokayukta dated 8.9.2022 passed in Complaint Case No.5 of 2022, inasmuch as the project is funded by NLCPR. If the completion of the project as per the document dated 14.8.2015 is accepted to be correct, it would certainly justify the allegation that the project for laying 33 KV transmission line of 20 kms. from 33/11/ KV substation New Chayang to Sugnu had been commissioned by tapping only 3 km from the existing 33 KV new Chayang-Joupi line at Khongnang Paishabi and embezzled the fund and materials for the remaining 17 kms. MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |5 8. The learned counsel next submitted that as per the record available with the Manipur Lokayukta, the Complaint Case No.5 of 2022 is not barred by limitation as provided under Section 53 of the Manipur Lokayukta Act, 2014, inasmuch as it would be prima facie clear under the work order dated 2.7.2014 that the contract period for execution of the project which includes installation of 2x5 MVA 33/11 KV substation at Sugnu is 18 months with effect from 2.7.2014. He would submit that the disputed question of fact ought not to be decided in a writ petition nor can any prima facie finding ought to be given that complaint is barred by limitation and specially when such finding was made solely on the basis of the alleged handing over/taking over certificate dated 14.9.2015 produced by the Turn Key Firm, M/s.Shyama Power India Limited and that the said handing over/taking over certificate is only for the line portion and does not mention the length of the transmission line and does not include the main work of installation of 2x5 MVA 33/11 KV substation at Sugnu and the said claim is required to be verified. 9. By placing reliance upon the decision of the Hon’ble Supreme Court in the case of Ramesh B. Desai and others v. Bipin Vadilal Mehta and others, (2006) 5 SCC 638, the learned counsel for the petitioner submitted that the MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |6 limitation is a mixed question of fact and law and that the impugned order ought to follow this settled principle of law regarding law of limitation while passing the impugned interim order dated 29.9.2022 in W.P.(C) No.833 of 2022 specifically when the issue of limitation is said to be disputed. 10. The learned counsel then submitted that the writ petitioners have no locus standi to file the writ petition challenging the order of Manipur Lokayukta dated 8.9.2022 and 23.9.2022 passed in Complaint Case No.5 of 2022 directing the Administrative Secretary, Department of Power to furnish information and produce documents for verification prior to the preliminary inquiry and investigation by registering a case at this stage. 11. Finally, the learned counsel submitted that the interim order has failing to consider and appreciate the power and jurisdiction of Lokayukta and its nature, in the light of the decisions of the Hon’ble Supreme Court and also the statutory power of Manipur Lokayukta as provided under the Manipur Lokayukta Act, 2014. Therefore, there is an urgency to vacate, set aside, modify and not to extend any further the interim order dated 29.9.2022 granted in the writ petition. MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |7 12. Per contra, Mr. HS Paonam, the learned senior counsel appearing for the respondents 1 and 2/writ petitioners submitted that the interim order passed by this Court in W.P.(C) No.833 of 2022 has completely disturbed the malafide intention of Manipur Lokayukta in its journey of witch hunting in the name of taking cognizance and preliminary inquiry in pursuance of the Complaint Case No.5 of 2022, inasmuch as stand taken by the Manipur Lokayukta about its not believing the handing over and taking over certificate thereby seems to have been looking for other means to take up further proceedings indirectly, including collection of documents connected with installation of 33 KV sub-station along with associated 33KV line at Sugnu which is the subject matter of Complaint Case No.5 of 2022. He would submit that the aforesaid submission will support from an order dated 21.10.2022 passed by the Manipur Lokayukta leading to passing an order authorising investigating officer in connection with FIR No.4(02)2022 CB-PS under Section 7(b)/13 PC Act, 120-B/34 IPC added with Section 468 and 461 IPC pursuant to the order passed in Complaint Case No.2 of 2020 for search and seizure at the residence of the first respondent as well as the office premises. MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |8 13. The learned senior counsel for the respondents 1 and 2 further submitted that the whole case has been taken up on the basis of instigation and information furnished by some vested interest officials working in the MSPCL and MSPDCL who are in quest of further promotion irrespective of nonpossession of eligibility criteria had come to the fore very recently when the first respondent along with two other officials including the Principal Secretary (Power), Government of Manipur was scheduled to attend a conference of Power and New and Renewable Energy Ministers of States and UT from 14th and 15th October, 2022 at Udaipur and Rajasthan. 14. The learned senior counsel then submitted that during Diwali and Ningol Chakkouba festivals when the first respondent organising and inviting his sisters for the festival left his residence on 24.10.2022, a team of police personnel led by the investigating officer, namely Shri Shrey Vats, SP, Kakching rushed to the residence of the first respondent armed with search and seizure authorisation given by the Secretary, Lokayukta with reference to an order dated 21.10.2022 referring to Complaint Case No.2 of 2022 which is wholly a non-existent complaint case involving the first respondent. The team had under search and seizure both at the residence and office MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) Page |9 premises of the first respondent and while making search, the team started looking for documents relevant to the work order for installation of 2x5 MVA, 33/11 KV sub-station along with associated 33 KV line and related civil works at Sugnu which is not at all connected in Complaint Case No.2 of 2020 as well as the above referred FIR. 15. The learned senior counsel urged that the Manipur Lokayukta and its agency are carrying out activities which they cannot do directly but indirectly even to the extent of circumventing the order passed by this Court in W.P.(C) No.833 of 2022. The attitude of the petitioner even referring to the order dated 27.1.2022 passed in W.P.(C) No.75 of 2022 indicates its improprieties and irregularities as the petitioner having knowledge that W.P.(C) No.75 of2022 has been closed on withdrawal with liberty to approach this Court again by the order dated 19.4.2022. Thus, the Manipur Lokayukta, as expected by the general public, may confine its obligated duty within the four corners of the provision of the statute provided by the Act and may not indulge into embarking on a journey of witch hunting. Therefore, there is no necessity to vacate or modify the interim order dated 29.9.2022 and in fact, the extension of interim order is very much required to protect the writ petitioners from MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 10 relentless harassment in the guise of investigation of the time barred complaint. 16. This Court considered the rival submissions and also perused the materials available on record. 17. The petitioner-Manipur Lokayukta seeks to vacate the interim order dated 29.9.2022 passed in W.P.(C) No.833 of 2022 on the ground that the interim order was passed on an incorrect premise that the complaint is time barred by limitation and the Manipur Lokayukta has no right to pass any order for personal appearance of the officers concerned, as ordered on 23.9.2022. 18. W.P.(C) No.833 of 2022 has been filed by respondents 1 and 2 herein for issuance of a writ of mandamus for closing the Complaint Case No.5 of 2022 as not maintainable being barred by limitation and restraining the Manipur Lokayukta from proceeding with the Complaint Case No.5 of 2022 pending disposal of the writ petition. 19. On 29.9.2022, when W.P.(C) No.833 of 2022 was taken up for hearing, this Court passed the following order: MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 11 “[1] Heard Mr. HS Paonam, learned senior counsel for the petitioner and perused the record. [2] Mr. HS Paonam, learned senior counsel for the petitioner argued the case that prima facie the compliant taken by the Manipur Lokayukta in complaint case No. 5 of 2022 is not at all maintainable only on the ground that as per the Section 53 of Manipur Lokayukta Act if the alleged occurrence was lapsed for 7(seven) years, the complaint should not be taken by the Lokayukta. Mr. H.S Paonam, learned senior counsel for the petitioner further raised another ground that in order dated 23.09.2022, the Manipur Lokayukta has passed an order in which in para No.9 of order dated 23.09.2022 which read as follows: “Put up the case on 10.10.2022 for the personal appearance of (i) Administrative Secretary, Department of Power, Government of Manipur and (ii) Mrs. Orjubala Haorongbam, Deputy Secretary (power) Government of Manipur on 10.10.2022 at 11:00 am, However of the Manipur Lokayukta Act, the learned Lukayukta have no power to issue any notice for personal appearance of the Administrative office concerned. But by the MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 12 order dated 23.09.2022 of the learned Manipur Lokayukta directly issued order for personal appearance of the Administrative officer. Therefore, once the complaint itself is not maintainable one before the Lokayukta and order dated 23.09.2022 is also not maintainable one. [3] Mr. Mr. Rarry, learned Standing counsel represented the petitioner has not served case papers to him before taking up the matter for admission since he is the standing counsel for the Manipur Lokayukta. Anyhow, Mr. H. S Paoanam , learned senior counsel for the petitioner has given all the paper to Mr. M. Rarry, learned standing counsel in the open Court. [4] After gone through the writ petition and documents, Mr. M. Rarry, learned Standing counsel for the Manipur Lokayukta represented the compliant case is not taken for registration as on date by the Manipur Lokayukta and the very file of the writ petition is premature one. Therefore, for proper instruction from the Manipur Lokayukta and for filing counter affidavit, he seeks time. MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 13 [5] Mr. HS Paonam learned senior counsel for the petitioner has produced certificate dated 14.08.2015 which read as follows: Handing over/Taking Over (Certificate) Date 14/08/2015 Project: Installation of 2x5 MVA, 33/11 kV Sub-Station along with the associated 33 KV line and related Civil works at Sugnu in Thoubal District on turn-key basis. Ref.: LOA No. 4/109/33KV/SUG/13ED(PURCH)/706-17, dated 02/07/2014. Name of Line: Associated 33 kV transmission line. With reference to the above mentioned LOA/Work Order, the construction activities of the associated 33 kV transmission line of the above project has been completed by tapping from existing 33 kV transmission line from New Chayang to Joupi in looping in — looping out (LILO) configuration by M/s Shyama Power India Limited, Gurgaon, and the line has been successfully tested and commissioned on 14/08/2015 in presence of MSPCL officials. The completed transmission line facility is taken over by the Dy. General Manager, TD-IIl, Manipur State Power Company Limited (MSPCL) on this day i.e., 14/08/2015. ‘For and behalf of Manipur State Power Company Limited For and Behalf of Shyama Power India Limited. DGM, TD-III (taken over) Project manager (handing over) MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 14 [6] As per the above certificate dated 14.08.2015 issued by Shyama Power India Limited which was handing over/taking over on 14.08.2015, it is made clear that as per the Section 53 of the Manipur Lokayukta Act, 2014, the complaint is time barred one. Apart from this the learned Lokayukta has no right to pass any order for the personal appearance officers concerned as ordered 23.09.2022. [7] Therefore, prima facie of the petitioner is made out the case before this Court. [8] Accordingly, this writ petition is admitted. [9] Notice to the respondents. Since Mr. Rarry, learned counsel takes notice for the Lokayukta, no formal notice is required. [10] Post this matter on 20.10.2022. [11] Till such time, there shall be an order of interim stay of the order dated 23.09.2022 passed by learned Manipur Lokayukta. [12] Print the name of Mr. Rarry in the cause list.” 20. The respondents 1 and 2 have filed W.P.(C) No.833 of 2022, inter alia, contending that irrespective of the actual state of affairs which may not be disputed about the MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 15 completion of the project in the month of August, 2015, the Manipur Lokayukta is not appreciating the stand of the Government and have been insisting on making inquiry which otherwise is outside its jurisdiction thereby making it clear that Manipur Lokayukta has become an instrument at the hand of few persons who indulged in making complaints on surmises and information provided against the official documents and records. Such action demonstrates personal interest of the inquiring authority and the respondents 1 and 2 have also given illustrations in the writ petition. Therefore, it has become imperative that interference of this Court in the matter has become highly necessary so that systematic harassment in the name of investigation and inquiry at the behest of vested interested individuals be prevented, thereby restoring the faith of general public including officials working in such Government establishment manning the essential service. According to the respondents 1 and 2, no productive work is being executed in the Company/Department while attending to such inquiry and investigation filed by the vested interested persons. 21. Section 53 of the Manipur Lokayukta Act 2014, provides bar in taking up of complaint in respect of the allegation of committing offence after the expiry of 7 years. As per the MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 16 said provision, the Lokayukta shall not inquire into any complaint, if the complaint is made after the expiry of a period of seven years from the date on which the offence mentioned in such complaint is alleged to have been committed. 22. According to the respondents 1 and 2, the execution of associated 33 KV transmission line pursuant to the letter of award dated 2.7.2014 which is the prime focus of allegation of the complainant in the complaint has been successfully completed and after following the due process as per the laid down procedure including testing and commissioning in the presence of MSPCL official, handing over and taking over of the completed works was done on 14.8.2015 between the executing agency i.e. M/s. Shyama Power (India) Private Limited and MSPCL, represented by its DGM. Transmission Division-III. Thus, it is the specific case of the respondents 1 and 2 in W.P.(C) No.833 of 2022 that the complaint filed before the Manipur Lokayukta is in respect of associated 33 KV transmission line of the project whereof had already been completed long back on 14.8.2015 and thus, it would be out of the purview of the Manipur Lokayukta as per the scheme of the Manipur Lokayukta Act, 2014. MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 17 23. As rightly argued by the learned senior counsel for the respondents 1 and 2 and as could be seen from the available records produced by the parties, this Court is of the view that irrespective of the actual state of affairs which may not be disputed about the completion of the project in the month of August, 2015, the Manipur Lokayukta without appreciating the stand of the Government, insisting for personal appearance of the respondents 1 and 2 and other officers concerned under the guise of inquiry which prima facie is outside its jurisdiction. Therefore, this Court, upon appreciating the submissions put forth by the learned counsel appearing on either side, particularly, the learned counsel appearing for the petitioner herein, granted interim stay of the order dated 23.9.2022 passed by the Manipur Lokayukta. 24. The learned counsel for the petitioner submitted that the complaint case is not taken for registration by the Manipur Lokayukta and the filing of the writ petition is premature one. The said submission cannot be appreciated for the simple reason that under the guise of enquiry and/or investigation, the authorities shall not harass the individual at the behest of vested interested persons. That apart, a bar has been imposed under Section 53 of the Manipur Lokayukta Act, 2014 for taking up the MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 18 complaint in respect of allegation of committing offence after the expiry of seven years. As stated supra, the work in question was completed way back on 14.8.2015, however, the Complaint Case No.5 of 2022 based on the complaint lodged by the Shri Ngangom Ibotombi Singh against the first respondent; N.Sarat Singh, Managing Director of MSPCL; Transmission Division-III, Lamphel and M/s.Syama Power (India) Private Limited was taken up for adjudication on 8.9.2022 by the Manipur Lokayukta. 23. A perusal of the file produced by the petitioner Manipur Lokayukta during the course of hearing in respect of Complaint Case No.5 of 2022, makes it is clear that Shri Ngangom Ibotombi Singh has filed the complaint before the Manipur Lokayukta on 31.8.2022. According to respondents 1 and 2, the work in question was completed way back on 14.8.2015 and the complaint as per the file was lodged on 31.8.2022, which is beyond the period of seven years as per the Section 53 of the Manipur Lokayukta Act, 2014. 24. It is to be noted that the order dated 29.9.2022 which is sought to be vacated/modified is not an ex parte order and this Court only after hearing the learned counsel appearing MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 19 for the petitioner Manipur Lokayukta and upon finding prima facie case in favour of the respondents 1 and 2 granted interim stay of the order dated 23.9.2022 passed by the Manipur Lokayukta. 25. In a case where the High Court is prima facie of the opinion that an exceptional case is made out for grant of interim stay of further investigation, after considering the broad parameters, while exercising the powers under Article 226 of the Constitution of India, the High Court has to give brief reasons why such an interim order is warranted and/or is required to be passed. This Court is of the view that prima facie case for grant of interim order has been established by the respondents 1 and 2 and this Court has also set out brief reasons for passing the interim order in the order dated 29.9.2022. Thus, there is no valid ground to vacate and/or modify the interim order of this Court dated 29.9.2022 and on the other hand, the interest of justice, warrants extension of the interim order dated 29.9.2022 till the disposal of the main writ petition. 26. At this stage, it is apposite to mention that subsequent to the filing of W.P.(C) No.833 of 2022, the first MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 20 respondent herein filed W.P.(C) No.938 of 2022 challenging the impugned letter dated 31.10.2022 issued by Deputy Registrar, Manipur Lokayukta and to issue a writ in the nature of prohibition or any other writ of the like nature prohibiting the Manipur Lokayukta from taking further proceedings and consequential action in respect of the Complaint Case No.2 of 2020 and Complaint Case No.5 of 2022 in view of the action indicated by the warrant of search and seizure dt. 21/10/2022 and seizure memo dated 24.10.2022 which has virtually circumvented the interim order dated. 29.09.2022 passed by this Hon’ble Court in WP(C) No.833 of 2022. 27. By the order dated 22.11.2022, this Court passed the following order: “36. In the aforesaid factual scenario, when this Court analysed the prayer of the petitioner for grant of interim order, this Court is of the view that the petitioner has established a prima facie case for granting interim order of staying the further proceedings and the consequential action in respect of the Complaint Case No.2 of 2020 and Complaint Case No.5 of 2022 and the balance of convenience is also in favour of the petitioner and in case the order restraining the second MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 21 respondent from taking further proceedings in the aforementioned two Complaint Cases is not passed, definitely the petitioner would put to not only irreparable loss and damage but also it will tarnish his image and also in view of letter dated 17.2.2022, whereby the Secretary (Power), Government of Manipur observed that it is not feasible to accept the recommendations of the second respondent dated 7.2.2022 at present due to administrative reasons under Section 32(2) of the Lokpal and Lokayukta Act, 2013, in the interest of justice, this Court is inclined to pass the following orders: (i) The writ petition is admitted. (ii) Issue notice to the respondents, returnable in four weeks. The petitioner is also permitted to take private service to the Respondent Nos. 1, 3 and 4 (iii) Mr.Rarry, learned counsel, takes notice on behalf of the second respondent – Manipur Lokayukta. No formal notice is required. (iv) Let the writ petition be listed on 20.12.2022. (v) Till such time, the second respondent is restrained from taking further proceedings and consequential action in respect of the Complaint Case No.2 MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022) P a g e | 22 of 2020 and Complaint Case No.5 of 2022 pending on its file, which were initiated against the petitioner.” 28. Nothing has been produced by the petitioners to show that as against the interim order dated 22.11.2022 passed in W.P.(C) No.938 of 2022, an appeal has been preferred. In view of the said interim order passed in W.P.(C) No.938 of 2022 thereby restraining the enquiry officer from taking further proceedings and consequential action in respect of Complaint Case No.5 of 2022, no contra view is possible in this case, as no appeal has been preferred against the interim order dated 22.11.2022 passed in W.P.(C) No.938 of 2022. 29. For the foregoing discussions, this Court is of the view that there is no merit in MC (WP) No.346 of 2022 and accordingly dismissed and thus, the interim order dated 29.9.2022 passed in W.P.(C) No.833 of 2022 is made absolute till the disposal of the writ petition. JUDGE FR/NFR Sushil MC(WP(C)) No. 346 of 2022 (Ref:- WP(C) No. 833 of 2022)

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Manipur HC judgments →