Civil · Reportable judgment

M/s. Elite Engineering and Construction (Hyd.) Private Limited Rep. by Its Managing Director vs M/s. Teachtrans Construction India Private Limited Rep. by Its Managing Director

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Supreme Court of India
Date
23 February 2018
Case No.
Civil Appeal No. 2439 of 2018
Result
Allowed
Bench
A.K. Sikri, Ashok Bhushan
Citation
[2018] 4 S.C.R. 585 : 2018 INSC 192
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.
Supreme Court Reports [2018] 4 S.C.R. 585 : 2018 INSC 192
Headnote

Arbitration and Conciliation Act, 1996 – s. 7(5) – Incorporation of arbitration clause in contract by reference – If made out – National Highway Authority of India entered into Concession agreement, whereby it awarded a contract to M/s. T.K. (Concessionaire) for maintenance of the Project Highway on Build Operate and Transfer (BOT) basis – Concessionaire vide EPC agreement awarded that work to M/s. UE (EPC Contractor) – EPC Contractor, in turn, executed a Construction agreement with respondent to execute the works as per terms and conditions entailed in that agreement – Respondent sub-contracted the work to the appellant – Some dispute arose between the appellant and respondent in connection with execution of the said work – Appellant invoked arbitration – Respondent contended that there was no arbitration agreement – Appellant contended that the agreement entered into between the parties (appellant and respondent), by implication, incorporated the arbitration agreement contained in the agreement entered into between the EPC Contractor and the respondent – High Court held that there was only a reference to another document with no intention to incorporate the arbitration clause thereof in a contract between the parties – Propriety of – Held: Proper – In instant case, it was not intended to make the arbitration clause as a part of the contract between the appellant and the respondent – When the incorporation clause refers to certain particular terms and conditions, only those terms and conditions are incorporated and not the arbitration clause.

Dismissing the appeal, the Court

HELD: 1. As per sub-section (5) of section 7 of Arbitration and Conciliation Act, 1996, an arbitration clause contained in an independent document can also be imported and engrafted in the contract between the parties, by ref erence to such independent document in the contract, even if there is no specific provision for arbitration. However, such a recourse can be adopted only ‘if the reference is such as to make the arbitration clause in such document, a part of the contract.’ [Para 16] [593E-F]

2. The High Court has correctly held that, in the instant case, it was not intended to make the arbitration clause as a part of the contract between the appellant and the respondent. Clause

Read the full headnote (5 more paragraphs)

2 and clause 9.10 are given correct interpretation by the High Court. By these clauses, only those conditions and sub-conditions of the contract, specification etc. which relate to the works and quality are incorporated. Clause 9.10 only talks of ‘items’ which are not mentioned in the contract and terms and conditions relating to the execution of those items are to be taken from the main contracts. Reference to clause 8.7 is also inconsequential. By this clause only, those terms contained in the main agreement which relate to ‘terms of work’ are incorporated. Procedure relating to ‘termination’ is altogether different from resolution of disputes. Dispute may arise even de hors the termination of the contract and is an altogether different aspect, not necessarily connected with the termination of work. [Para 18] [596-B-D] M.R. Engineers and Contractors Private Limited v. Som Datt Builders Ltd. (2009) 7 SCC 696 : [2009] 10 SCR 373; Groupe Chimique Tunisien SA v. Southern Petrochemicals Industries Corpn. Ltd. (2006) 5 SCC

275 : [2006] 2 Suppl. SCR 954; Larsen & Toubro Limited v. Mohan Lal Harbans Lal Bhayana (2015) 2 SCC 461 : [2014] 3 SCR 162; Sharma and Associates Contractors Private Limited v. Progressive

Constructions Limited (2017) 5 SCC 743 – referred to.

Alimenta S. A. v. National Agricultural Coop. Mktg. Federation of India Ltd. (1987) 1 SCC 615 : [ 1987] 1 SCR 957 – relied on.

TEACHTRANS CONST. INDIA PVT. LTD.

Read this judgment in
हिन्दी Hindi PDF বাংলা Bengali PDF ਪੰਜਾਬੀ Punjabi PDF

Translations made available by the Supreme Court of India in its e-SCR, opened as PDF files from the Indian Supreme Court Judgments data set. A translation is for understanding the judgment; the English judgment is the authentic text for all official purposes.

As published in the Supreme Court Reports, Supreme Court of India. Text from the Indian Supreme Court Judgments open data set (Dattam Labs), CC BY 4.0.

Ask LexAI about this judgment What was decided, on what reasoning, and which later cases follow it. Answers name the judgments they rely on. Ask

Filed under

Arbitration and Conciliation Act, 1996 Section 7, Arbitration and Conciliation Act, 1996 Arbitration and Conciliation Act

Guides on this topic, in plain language:

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Cases cited

As listed in the Supreme Court Reports. Linked where the judgment is on LegalFirms.in.

  • [2009] 10 SCR 373 referred to
  • [2006] 2 Suppl. SCR 954 referred to
  • [2014] 3 SCR 162 referred to
  • (2017) 5 SCC 743 referred to
  • [1987] 1 SCR 957 relied on

Cited in 1 later judgment on LegalFirms.in

From the case lists those reports print.

Full Judgment Text

The Judgment of the Court was delivered by A. K. SIKRI, J. 1. Leave granted. 2. National Highway Authority of India (NHAI) had entered into agreement dated July 19, 2007 (hereinafter referred to as the ‘Concession Agreement’) whereby it had awarded a contract to M/s. T.K. Toll Road Pvt. Ltd. (hereinafter referred to as the ‘Concessionaire’) for undertaking, inter alia, the design, engineering, financing, procurement, construction, operation and maintenance of the Project Highway on Build Operate and Transfer (BOT) basis on the National Highway 67 connecting Coimbatore and Nagapattinam. The C
Full text available to subscribers
Subscribe to access complete judgment text, daily digests, and AI-powered legal research tools. For informational and research purposes only.
View plans →
Annual plans from ₹799 + GST.

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All SC judgments →

Arbitration & Mediation advocates near the Supreme Court of India

Dealing with a similar matter? Send a free enquiry to advocates who handle it. Fees are agreed with the advocate directly.

All Arbitration & Mediation advocates in India