Civil · Reportable judgment

Indian Railway Construction Company Limited vs M/s National Buildings Construction Corporation Limited

Court
Supreme Court of India
Date
17 March 2023
Case No.
Civil Appeal No. 8460 of 2022
Result
Allowed
Bench
M.R. Shah, M.M. Sundresh
Citation
[2023] 2 S.C.R. 713 : 2023 INSC 248
Supreme Court Reports [2023] 2 S.C.R. 713 : 2023 INSC 248
Headnote

Arbitration & Conciliation Act, 1996 – ss. 34, 37 – AppellantIRCON and the respondent-NBCC entered into an agreement under which NBCC was awarded the work of construction of railway station cum commercial complex – NBCC failed to carry out the work within the time stipulated and the work was practically abandoned – IRCON served notice upon the NBCC for termination of the contract relying upon clause 60.1 of the agreement – NBCC invoked the arbitration clause – Arbitral Tribunal rejected the NBCC’s claim for refund of two security deposits i.e. claim nos.33 and 34 – Tribunal held termination with reference to clause 60.1 bad in law, but justified the termination with reference to clause

Read the full headnote (6 more paragraphs)

17.4 and consequently rejected NBCC’s claim for refund of two security deposits – Tribunal also allowed counter claim no.3 (towards interest at rate of 18% p.a. on various advances given to NBCC, particularly (1) special advance and (2) advance against hypothecation of equipment) in favour of IRCON – Single Judge of the High Court set aside the rejection by the Arbitral Tribunal of claim nos. 33 and 34 of NBCC to the extent it concerned the return of security deposit amounts concluding that once the Arbitral Tribunal found that the termination with regard to Clause 60.1 was not justified, it was not open for the Arbitral Tribunal thereafter to consider the termination under Clause 17.4 justifying forfeiture of the security deposits – Single Judge also set aside the award passed by the Tribunal on counter claim no.3, observing that there is no clause in the contract awarding 18% interest p.a. on special advance – Division Bench of the High Court partly allowed the said appeal and allowed the interest in favour of IRCON at the rate of 18% so far as special advance is concerned – On appeal, held : The finding recorded by the Arbitral Tribunal on applicability of Clause 17.4 and/or rescinding of the contract under Clause 17.4 was not set aside either by the Single Judge or by the Division Bench of the High Court and therefore, the findings recorded by the Arbitral Tribunal on applicability of Clause 17.4 has attained the finality – Both, under Clause 17.4 and 60.1, on failure of the contractor to complete the work, the IRCON was justified in rescinding the contract and forfeit the security deposit – Award passed by the Tribunal rejecting the claim nos.33 and 34 restored – However, at the same time award of interest @ 18% on advance for hypothecation of equipment by the Tribunal can be said to be on a higher side and therefore in the facts and circumstances of the case, if the interest is awarded @ 12% on advance for the hypothecation of equipment, the same can be said to be reasonable interest. Allowing the appeal, the Court

HELD: 1. It is required to be noted that as such the finding recorded by the Arbitral Tribunal on applicability of Clause 17.4 and/or rescinding of the contract under Clause 17.4 has not been set aside either by the Single Judge or by the Division Bench of the High Court and therefore, the findings recorded by the Arbitral Tribunal on applicability of Clause 17.4 has attained the finality. The Arbitral Tribunal as such was absolutely justified in considering whether IRCON was justified in rescinding the contract, may be either under Clause 60.1 or under Clause 17.4. [Para 7.2][724-E-F]

2. Both, under Clause 17.4 and 60.1, on failure of the contractor to complete the work, the IRCON is justified in rescinding the contract and forfeit the security deposit. At the cost of repetition it is observed that the Arbitral Tribunal on appreciation of entire evidence on record, had specifically observed that the contractor failed to complete the work even within the stipulated extended period of time and even abandoned the work and therefore, the IRCON was justified in rescinding the contract. The said finding as observed hereinabove has attained finality. Therefore, the IRCON was absolutely justified in forfeiting the security deposits and therefore, the Arbitral Tribunal was absolutely justified in rejecting Claim Nos.33 and NATIONAL BUILDINGS CONST. CORP. LTD.

34, which were with respect to forfeiture of security deposits by the IRCON. Both, the Single Judge as well as Division Bench of the High Court have seriously erred in setting aside the award passed by the Arbitral Tribunal rejecting Claim Nos.33 and 34. The Single Judge, therefore, exceeded in its jurisdiction under Section 34 of the Arbitration Act quashing and setting aside the well-reasoned award passed by the Arbitral Tribunal on rejecting Claim Nos.33 and 34, which the Division Bench of the High Court has wrongly affirmed. [Para 7.3][725-E-H]

3. Under the circumstances, the impugned judgment and order passed by the learned Single Judge as well as the Division Bench of the High Court quashing and setting aside the award passed by the Arbitral Tribunal rejecting Claim Nos.33 and 34 deserve to be quashed and set aside and the award passed by the Arbitral Tribunal rejecting Claim Nos.33 and 34 is required to be restored and upheld. [Para 7.4][726-A-B]

4. Applying the law laid down by this Court in Raveechee and Company to the facts of the case on hand, once it was found that the advance amount was paid for hypothecation of equipment and thereafter when the Arbitral Tribunal awarded the interest on advance for hypothecation of equipment, the same was not required to be interfered with by the Single Judge in exercise of the powers under Section 34 of the Arbitration Act and even by the Division Bench of the High Court while exercising the powers under Section 37 of the Arbitration Act. However, at the same time to award the interest @ 18% can be said to be on a higher side. In the facts and circumstances of the case, if the interest is awarded @ 12% on advance for the hypothecation of equipment, the same can be said to be reasonable interest. [Para 7.5][726G-H; 727-A-B] Raveechee and Company Vs. Union of India (2018) 7 SCC 664 : [2018] 5 SCR 138 – referred to.

As published in the Supreme Court Reports, Supreme Court of India. Text from the Indian Supreme Court Judgments open data set (Dattam Labs), CC BY 4.0.

Full Judgment Text

The Judgment of the Court was delivered by M. R. SHAH, J. 1. Feeling aggrieved and dissatisfied with the impugned judgment and order dated 14.08.2018 passed by the High Court of Delhi at New Delhi in FAO(OS) No.112 of 2018 by which the High Court has partly allowed the said appeal, the Indian Railway Construction Company Limited (hereinafter referred to as “IRCON”) has preferred the present appeal. 2. The brief facts leading to filing of the present appeal in nutshell are as under: 2.1 That, an Agreement was entered into between IRCON and the respondent – M/s. National Buildings Constructi
Full text available to subscribers
Subscribe to access complete judgment text, daily digests, and AI-powered legal research tools. For informational and research purposes only.
View Subscription Plans →
Annual plans from ₹1,599 + GST.

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

All SC judgments →