Civil · Reportable judgment

Hanuman Laxman Aroskar vs Union of India

Court
Supreme Court of India
Date
29 March 2019
Case No.
Civil Appeal No. 12251 of 2018
Result
Disposed
Bench
D.Y. Chandrachud, Hemant Gupta
Citation
[2019] 5 S.C.R. 916 : 2019 INSC 434
Supreme Court Reports [2019] 5 S.C.R. 916 : 2019 INSC 434
Headnote

Environmental Law:

Environmental clearance (EC) – Grant of – For development of airport in Goa – Challenged before National Green Tribunal (NGT) – NGT affirmed the EC holding that the project did not compromise with the environment and concluded that further safeguards for environmental protection needed to be incorporated – On appeal, held: Rule of law requires a regime which has effective, accountable and transparent institutions – Responsive, inclusive, participatory and representative decision making are key ingredients to the rule of law – Public access to information is fundamental to the preservation of rule of law – Environmental governance that is founded on the rule of law emerges from the value of the Constitution – Health of environment is key to preserving the right to life as a constitutionally recognized value under Art.21 – Proper structures for environmental decision-making find expression in the guarantee against arbitrary action and the affirmative duty of fair treatment u/Art. 14 of the Constitution – In the area of environmental governance, the process of decision-making are as crucial as the ultimate decision – The basic postulate of 2006 Notification was that the path which was prescribed for disclosures, studies, gathering data, consultation and appraisal was designed in a manner that would secure a transparent, responsive and inclusive decisionmaking – In the present case there was failure to follow binding norms under the 2006 Notification – There were serious flaws in decision-making process – Relevant material was excluded from consideration and extraneous circumstances were borne in mind – EAC as an expert body abdicated its obligations to make an expert determination based on reasons – NGT as an adjudicatory body failed to exercise the jurisdiction entrusted to it u/s. 16(h) r/w. s. 20 of NGT Act by merely deferring to the decision to recommend and grant an EC – However, the need for setting up a new airport is a matter of policy – In order to bring about a wholesome balance between the development of infrastructure and preservation of environment, in exercise of jurisdiction of Art. 142 of Constitution, EAC is directed to revisit the conditions subject of which it had granted EC, in a time bound manner – Constitution of India – Arts. 14, 21, 51A(g) and 142 – National Green Tribunal Act, 2010 – ss. 16(h) and 20.

Read the full headnote (48 more paragraphs)

Government of India approved setting up of an airport in Goa in the year 2000. Ministry of Environment and Forests of Government of India issued Notification in 2006, mandating prior Environmental Clearance (EC). In 2011 State of Goa as the project proponent submitted Form 1 as stipulated in 2006 Notification. In 2015 Expert Appraisal Committee (EAC) which was constituted under 2006 Notification recommended the grant of an EC for the project and the Ministry concerned approved grant of EC. Grant of EC was challenged by the appellants before the National Green Tribunal (NGT). NGT upheld the EC and imposed additional conditions to safeguard the environment. Hence, the present appeals.

Disposing of the appeals, the Court

HELD: 1. The Constitution (Forty-second Amendment) Act 1976, which came into force with effect from 3 January 1977, inserted Article 48A to the Constitution which mandates that the State shall endeavor to protect and improve the environment and safeguard the forests and wildlife of the country. Article 51A(g) of the Constitution places a corresponding duty on every citizen to protect and improve the natural environment including forests, lakes, rivers and wild life and to have compassion for living creatures. Following the decisions taken at the United Nations Conference on the Human Environment held at Stockholm in June 1972 in which India participated, Parliament enacted the Environment Protection Act 1986 to protect and improve the environment and prevent hazards to human beings, other living creatures, plants and property. [Para 32][951-A-C]

2. The MoEF, in exercise of the powers conferred by subsection (1) and clause (v) of sub-section (2) of Section 3 of the 1986 Act read with clause (d) of sub-rule 3 of rule 5 of the Environment (Protection) Rules, 1986, issued a notification imposing restrictions and prohibitions on the expansion and modernisation of any activity or new project unless an EC was granted under the procedure stipulated in the notification. Under the notification, any person undertaking a new project or expanding and modernizing an existing project was required to submit an application to the Secretary, Ministry of Environment and Forests, New Delhi. On 14 September 2006, MoEF released another notification in supersession of the previous notification. The salient objective which underlies the 2006 notification is the protection, preservation and continued sustenance of the environment when the execution of new projects or the expansion or modernization of existing projects is envisaged. It imposes certain restrictions and prohibitions based on the potential environmental impact of projects unless prior EC has been granted by the concerned authority. The EC is required before any construction work, or preparation of land (except for securing the land) is started on the project or activity listed in the Schedule to the notification. [Paras 33, 37 and 40][951-C-E; 952-C; 954A-B]

3.The process to obtain environmental clearance as stipulated by the notification for new projects comprises a maximum of four stages, all of which may not apply depending on the specific case stipulated under the notification: Screening; Scoping; Public Consultation; and Appraisal. [Para 43][955-E-G]

4.The 2006 notification embodies the notion that the development agenda of the nation must be carried out in compliance with norms stipulated for the protection of the environment and its complexities. It serves as a balance between development and protection of the environment: there is no tradeoff between the two. The protection of the environment is an essential facet of development. It cannot be reduced to a technical formula. The notification demonstrates an increasing awareness of the complexities of the environment and the heightened scrutiny required to ensure its continued sustenance, for today and for generations to come. It embodies a commitment to sustainable development. In laying down a detailed procedure for the grant of an Environmental Clearance (EC), the 2006 notification attempts to bridge the perceived gap between the environment and development. [Para 54][959-C-E]

5. The State of Goa as the project proponent in failing to disclose wet lands, water sources, water bodies, biospheres, mountains and forests within an aerial distance of 15 kilometres as required by Form 1. The disclosure in Form 1 constitutes the very foundation of the process which is initiated on the basis of the information supplied by the project proponent. Following the disclosure in Form 1, Terms of Reference (ToR) are formulated, and this leads to the preparation of the Environmental Impact Assessment (EIA) report. A duty is cast upon the project proponent to make a full, complete and candid disclosure of all aspects bearing upon the environment in the area of study. The project proponent cannot profess an ignorance about the environment in the study area. The project proponent is bound by the highest duty of transparency and rectitude in making the disclosures in Form 1. [Para 67][967-D-F]

6. Form 1 is an important ingredient in the entire process envisaged under the 2006 notification. Hence, clause (vi) of para

8 of the 2006 notification provides that deliberate concealment or submission of false or misleading information or data which is material to screening or scoping or appraisal or decision on the application shall make the application liable for rejection and lead to the cancellation of a prior EC granted on that basis. The declaration which is required of the project proponent is to a similar effect. [Para 68][967-F-G]

7. Form 1 requires a disclosure of areas which are important or sensitive for ecological reasons, among them, being “forests”. The expression “forests” is used without reference to a statutory or artificial definition and must hence incorporate a meaning which bears upon the ordinary description of the term. The expression “forests”, means a forest as commonly understood, without reference to a notification under the Indian Forest Act 1927 or any other statutory enactment. Such an interpretation will subserve the purpose of an (EIA). The purpose is to ensure that all relevant facets of the environment are noticed, that base-lines are documented, and that the potential impact of a project or activity on the environment is assessed. Forests are forests without reference to recognition in a statutory form devised for a specific purpose. Therefore, it is not correct that the disclosure required was of reserved forests comprehended within a notification under sub-section (2) of Section 20 of the Indian Forest Act 1927. [Para 69][967-H; 968-A-C]

T N Godavarman Thirumalpad v. Union of India

(1997) 2 SCC 267 : [1996] 9 Suppl. SCR 982;

Construction of Park at Noida near Okhla Bird Sanctuary Anand Arya v. Union of India (2011) 1 SCC

744 : [2010] 15 SCR 783 – referred to.

8. Para 2 of the Executive Summary introducing the EIA report acknowledges that the “surrounding land use of the airport site is predominantly forest land”. In the context of land environment, the EIA report records that “forest is the predominant land use in the study area”. The EIA report acknowledges that territories in Maharashtra fall within one kilometre from the proposed greenfield airport. Villages falling in Goa and Maharashtra within the 10 kilometre radius were considered for assessment. Para 2.3.1 of Chapter II deals with land use. Land use/land cover statistics for a 10 kilometre radius from the Mopa airport in the State of Maharashtra have been tabulated. [Para 73][969-D-E]

9. The presence of a “diverse system set as dense and open forest, cultivated lands, sand dune vegetation, wet lands and human habitation” is noticed in para 4.6 dealing with the biological environment. Annexure IX to the EIA report provides land use/land cover maps for both Goa and Maharashtra in the study area. The maps in Annexure IX cover forested areas in Maharashtra and Goa within an aerial boundary of 10 kilometres from the project site. Annexure XI contains the hydro-geomorphological maps for Goa and Maharashtra. [Para 74] [970-A-B]

10. Information furnished in Form 1 is crucial to the preparation of the ToR by the Expert Appraisal Committee (EAC). The EAC comprises of experts. It is constituted, among other reasons, for the specific purpose of assessing the information furnished in Form 1 and preparing comprehensive ToR. There is an intrinsic link between the disclosures in Form 1 which constitute the basis for formulating the ToR and between the ambit of the EIA report required by the ToR and the final EIA report. The ToR guide the preparation of the EIA report. A failure to disclose information in Form 1 impairs the functioning of the EAC in the preparation of the ToR and in consequence, leads to preparation of a deficient EIA report. [Para 75][970-D-E]

11. EACs and State Expert Appraisal Committees (SEACs) are conferred with the authority to reject applications for the grant of an EC at the stage of scoping itself, prior to the preparation of the ToR. The application may be rejected on the basis of the information furnished by the project proponent in Form 1. Claiming an EC as a matter of right merely because the EIA report has assessed parameters that were omitted in Form 1, bypasses the authority of the EAC and SEAC to reject an application at the preliminary stage and cannot be countenanced. The regulatory authority is required to assess the final documents submitted to it “strictly with reference to the ToR” and communicate to the EAC and SEAC any discrepancies between the EIA report and the ToR. A deficient ToR on the basis of the non-disclosure of material information in Form 1 impedes this process. [Para 76][970-F-H]

12. The failure on part of a project proponent to disclose material information in Form 1 as stipulated under the 2006 notification has a cascading effect on the salient objective which underlies the 2006 notification. The 2006 notification represents an independent code with the avowed objective of balancing the development agenda with the protection of the environment. An applicant cannot claim an EC, under the 2006 notification, based on substantial or proportionate compliance with the terms stipulated in the notification. The terms of the notification lay down strict standards that must be complied with by an applicant seeking an EC for a proposed project. The burden of establishing environmental compliance rests on a project proponent who intends to bring about a change in the existing state of the environment. Whereas, in the present case, there has thus been a patent failure on part of the project proponent to make mandatory disclosures stipulated in Form 1 under the 2006 notification, that must have consequences in law. There can be no gambles with the environment: a ‘heads I win, tails you lose’ approach is simply unacceptable; unacceptable if environmental governance is to be preserved under the rule of law. [Para 77][971-A-D]

13. The report of the High Level Working Group (HLWG) dated 15 April 2013 recommends that there should be a complete ban on mining, quarrying and sand mining activity in the Ecologically Sensitive Zone (ESZ). Similarly, it recommends that no thermal power project should be allowed in ESZs and that all ‘red category’ industries should be strictly banned. Building and construction projects of 20,000 square metres and above should not be allowed. However, all other infrastructure and development projects, which have been recommended, should be subject to the grant of ECs under Category ‘A’ projects of the 2006 notification. [Para 82][974-B-C]

14. The glaring deficiency which emerges from the EIA report is its failure to notice the existence of ESZs within a buffer distance of 10 kilometres of the project site. On one hand, the EIA report takes note of the HLWG report dated 15 April 2013. But, on the other hand, the EIA report ignores the existence of ESZs within the study area on the ground that the project site is not situated in an ESZ. The purpose and object of the EIA report is to map areas, understand their vulnerabilities, and conduct a study on a scientific basis of the impact of the proposed project on an ecologically sensitive terrain. The EIA report fails to meet a classical requirement of administrative law: to take into account a relevant consideration namely, that within the study area which has to be considered, there is the presence of ESZs. [Para 85] [974-G-H; 975-A-B]

15. In deducing the impact of a proposed activity on an ESZ, it is not sufficient to take recourse to a generic assessment of a proposed activity on the ecology of the study area. The EIA report must factor in those specific features which make an area ecologically sensitive. These would encompass all aspects of environmental concern which render the area ecologically sensitive. This would include wet lands, water sources, water bodies, costal zones, biospheres, mountains and forests. The vulnerabilities of each of them must be studied as distinctive components together with a holistic analysis of their existence in a chain of bio-diversity. Where an area is ecologically sensitive because of the presence of flora or fauna requiring protection, that must be specifically adverted to and studied. The deficiency of the EIA report emanates from its failure to notice that the purpose of the study was not only to determine whether the project site is ecologically sensitive. Confining itself to this aspect, the EIA report failed to consider a crucial and relevant consideration. [Para 86][975-C-E]

16. Since the entire study area within a radius of 10 kilometres was considered for monitoring air quality, the Court accepts the submission that the location of the sampling points within Goa did not preclude the monitoring of air quality within the study area. The impact of a greenfield airport on the closing of natural channels which feed the water bodies has not been scientifically mapped or studied. While monitoring the noise quality, the EIA report covered a radius of 10 kilometres. In order to obtain baseline data of noise quality, nine monitoring stations were chosen in the study area. While it is true that all nine locations were situated in the State of Goa, one (Patradevi) was situated on the border shared between Goa and Maharashtra. The EIA report contains an impact study and the study area covered includes both the States. The collection of both primary and secondary data of fauna in the EIA report was perfunctory. The primary study is not based on data collected from acknowledged sources such as the Zoological Survey of India, Wildlife Institute of India and Ministry of Earth Sciences as required under the Guidance manual. Similarly, as regard avi-faunal studies, the EIA report lists 385 plant species in table 4.15 of Chapter IV, titled ‘Description on Environment’. It also states that 86 species of birds were observed during the survey in the 10 kilometre study area from the proposed site. According to the Guidance manual, secondary data has to be collected within an aerial distance of 15 kilometres for the parameters specifically specified in column 9(III) of Form 1 of the 2006 notification. This was evidently not done. A careful avi-faunal study was necessary, having due regard to the fact that the proposed project is an airport site. Bearing in mind the profile of airport operations, foraging or nesting by bird species in and around the airport must not be discarded. It must be accepted that in a project involving the setting up of an airport, the EIA report must deal with the impact of the airport on birds and likewise the impact of birds on aircraft operations. [Paras 88, 90 and 94][976-C-D; G-H; 977-A; 979-A-E]

17. The EIA report ought to have scrutinized the number of trees, their nature and longevity. Issues such as the extent to which the trees or some of them were capable of being transplanted had to be considered in the EIA report. The location of the trees is also significant. In a given case, if the trees appear in clusters or in a dense formation in segments of the project site, it would be necessary to determine whether felling all of them was necessary for the project to be implemented. [Para 97][981-G-H; 982-A-B]

18. There was a glaring omission of the factual existence of as many as 54,676 trees in the EIA report. For project proponents, the environment may not possess a human voice. But the purpose of prescribing an EIA report is precisely to undertake a baseline study on all aspects of the environment and to anticipate the impact of a projected activity on the environment. Ignoring any component of the environment amounts to a serious dereliction of duty which detracts from the rule of law in matters of environmental governance. [Para 98][982-E-F]

19. The order of the Principal Chief Conservator of Forests mandating transplantation, where possible, and the plantation of ten trees for every tree felled provides a measure of rectification. But there is a reason why issues pertaining to vegetational cover must be taken seriously in the EIA process. The formula of planting a set number of trees for every existing tree felled must be alive to the fact that the survival of new plantations is replete with uncertainty. The survival of transplanted trees is equally a matter of uncertainty. Though the development of infrastructure may necessitate the felling of trees, the process stipulated under the 2006 notification must be transparent, candid and robust. A regulatory regime for environmental governance is based on the hypothesis that all stakeholders will act with rectitude. Hiding significant components of the environment from scrutiny is not an acceptable modality to secure project approvals. There was a serious lacuna in regard to disclosures and appraisal on this aspect of the controversy. [Para 99][982-F-H; 983-A-B]

20. Public consultation involves a process of confidence building by giving an important role to those who have a plausible stake. It also recognizes that apart from the knowledge which is provided by science and technology, local communities have an innate knowledge of the environment. The knowledge of local communities is transmitted by aural and visual traditions through generations. By recognizing that they are significant stakeholders, the consultation process seeks to preserve participation as an important facet of governance based on the rule of law. Participation protects the intrinsic value of inclusion. [Para 101][983-E-F]

21. Public consultation cannot be reduced to a mere incantation or a procedural formality which has to be completed to move on to the next stage. Underlying public consultation is the important constitutional value that decisions which affect the lives of individuals must, in a system of democratic governance, factor in their concerns which have been expressed after obtaining full knowledge of a project and its potential environmental effects. Apart from the intrinsic value of public consultation, it serves an instrumental function as well. The purpose of ascertaining the views of stakeholders, is to account for all the material concerns in the design of the proposed project or activity. For this reason, the process of public consultation involves several important stages. The Pollution Control Board is under a mandate to forward the proceedings to the regulatory authority. The project proponent must address all material environmental concerns and make appropriate changes in the draft EIA and Environment Management Plan (EMP). The project proponent may even submit a supplementary report to the draft EIA. Each of these elements is crucial to the design features of the 2006 notification. A breach will render the process vulnerable to challenge on the ground that: (i) significant environmental concerns have not been taken into account; (ii) there was an absence of a full disclosure when the EIA report was put up for consultation; and (iii) concerns which have been expressed by persons affected by the project have not been adequately dealt with or analysed. [Paras 102 and 103][984-D-H]

Utkarsh Mandal v. Union of India (2009) SCC Online Del 3836 – relied on.

22. Crucial objections and environmental concerns which were raised during the consultative process were reduced to a single issue by the project proponent before the EAC: the need for employment opportunities. The project proponent failed in its duty to inform the EAC. The record does not indicate a critical appraisal or analysis by the EAC. The EAC was duty bound to apply its mind to the environmental concerns raised by stakeholders. The duty of the project proponent to place fairly all the environmental concerns raised during the public hearing is the crucial link in the appraisal by the EAC. The Minutes of the meeting indicate that there was no fair and complete disclosure of the objections which were raised during the public hearing before the EAC. There is evidently a failure in the process of applying and implementing the norms laid down in the 2006 notification in this regard. [Para 107][986-F-H; 987-A-B]

23. Appraisal by the EAC is structured and defined by the 2006 notification. The process of appraisal is defined to mean “a detailed scrutiny” by the EAC of the application and other documents like the EIA report and the outcome of the public consultation, including the public hearing proceedings, submitted by the applicant to the regulatory authority for the grant of an EC. The EAC is under a mandate to conduct the process of appraisal in “a transparent manner”. On the conclusion of these proceedings, the EAC has to make “categorical recommendations” to the regulatory authority either for: (i) the grant of a prior environmental clearance on stipulated terms and conditions; or (ii) the rejection of the application. The recommendations made by the EAC to the regulatory authority must be based on “reasons”. [Para 108][987-B-D]

24. The analysis of the EIA report is sketchy and perfunctory and discloses an abdication of its functions by the EAC. The requirement that the EAC must record reasons, besides being mandatory under the 2006 notification, is of significance for two reasons: (i) The EAC makes a recommendation to the regulatory authority in terms of the 2006 notification. The regulatory authority has to consider the recommendation and convey its decision to the project proponent. The regulatory authority, as para 8(ii) provides, shall normally accept the recommendations of the EAC. Where it disagrees, it would request reconsideration, stating the reasons for its disagreement. In turn, the EAC will consider the observations of the regulatory authority and furnish its views within a stipulated period; and (ii) The grant of an EC is subject to an appeal before the NGT under Section 16 of the NGT Act 2010. The reasons furnished by the EAC for its recommendation are a basic link in the ultimate decision of the regulatory authority. They constitute substantive material which will be considered by the Tribunal when it considers a challenge to the grant of an EC. [Para 111][989-H; 990-A-D]

25. The EAC refers to the delay in acquisition proceedings, a larger public interest and the fact that the project proponent “has not concealed facts and circumstances”. Each one of the reasons which has weighed with the EAC betrays a lack of comprehension of the true nature of its function under the 2006 notification. The EAC has failed to consider relevant circumstances bearing on the environmental impact of the project and has instead considered circumstances extraneous to its function. That the project proponent, according to the EAC, has not concealed facts and circumstances is not reason enough to warrant a grant of an EC. Moreover, even this hypothesis is incorrect. There is no analysis of the EIA report. The EAC has failed to answer to the call to its expertise. [Para 112][927-E-G]

26. Deliberate concealment or the submission of false or misleading information or data material for screening, scoping, appraisal or decision on the application makes it liable for rejection. That the project proponent must submit all information and data without concealing relevant features is a basic hypothesis and expectation of the 2006 notification. The EAC has not applied its mind at all to the environmental concerns raised in relation to the project nor do its reasons indicate an appraisal of those concerns by evaluating the impact of the project. [Para 113] [991-B-D]

27. The EAC is an expert body. It must speak in the manner of an expert. Its remit is to apply itself to every relevant aspect of the project bearing upon the environment. It is not bound by the analysis which is conducted in the EIA report. It is duty bound to analyse the EIA report. Where it finds it deficient it can adopt such modalities which, in its expert decision-making capacity, are required. The reasons which are furnished by the EAC constitute a live link between its processes and the outomce of its adjudicatory function. In the absence of cogent reasons, the process by its very nature, together with the outcome stands vitiated. [Para 114][991-D-F]

28. The EAC, as an expert body, has to scrutinize all relevant aspects of the project or activity proposed, including its impact on the environment. In taking that decision, the EIA report is an input for its analysis. The scrutiny and appraisal has to be undertaken by the EAC as an expert body and its reasons must reflect that this has been done. As the Minutes indicate, the nonapplication of mind by the EAC is evident with reference to the presence of 15 ESZs in the study area. The EAC notes that the project is outside the ESZ delineated by the Kasturirangan Committee. In the absence of a critical analysis, the EAC failed in discharging its duties under the 2006 notification. The recommendations of the EAC furnish a guide for the MoEFCC. Indeed, the 2006 notification stipulates that the recommendations of the EAC would normally be accepted. Consequently, a failure of due process before the EAC, as in the present case, must lead to the invalidation of the EC. [Para 116][992-B-E]

29. In the present case, there was a failure to follow binding norms under the 2006 notification. There were serious flaws in the decision-making process. Relevant material was excluded from consideration and extraneous circumstances were borne in mind. The EAC as an expert body abdicated its obligations to make an expert determination based on reasons. The National Green Tribunal (NGT) as an adjudicatory body failed to exercise the jurisdiction entrusted to it under Section 16(h) read with Section 20 of the NGT Act 2010 by merely deferring to the decision to recommend and grant an EC. The parameters in regard to the existence of substantial questions of law have hence been established in the classical or conventional sense of that expression. [Para 125][998-D-F]

Vellore Citizens Welfare Forum v. Union Of India (1996)

5 SCC 647 : [1996] 5 Suppl. SCR 241; M C Mehta v Kamal Nath (1997) 1 SCC 388 : [1996] 10 Suppl. SCR 12; M C Mehta v. Union of India (1997) 2 SCC 353 : [1996] 10 Suppl. SCR 973 ; A P Pollution Control Board v. Prof M V Nayudu (Retd.) (1999) 2 SCC 718 : [1999]

1 SCR 235; Narmada Bachao Andolan v. Union of India (2000) 10 SCC 664 : [2000] 4 Suppl. SCR 94 ; Indian Council for Enviro Legal Action v Union of India (2011) 8 SCC 161 : [2011] 9 SCR 146 ; Save Mon Region Federation v. Union of India 2013 (1) All India NGT Reporter 1; Shreeranganathan K P v. Union of India 2014 ALL (I) NGT Reporter (1) (SZ) 1 ; Lafarge Umiam Mining Private Limited v. Union of India (2011) 7 SCC 338 : [2011] 7 SCR 954; Mantri Techzone Pvt. Ltd. v Forward Foundation (2019) 4 SCALE 218 ; Sir Chunilal v. Mehta and Sons, Ltd. v Century Spinning and Manufacturing [1962] 3 Suppl. SCR 549 – referred to.

30. The environmental rule of law provides an essential platform underpinning the four pillars of sustainable development— economic, social, environmental, and peace. It imbues environmental objectives with the essentials of rule of law and underpins the reform of environmental law and governance. The environmental rule of law becomes a priority particularly when it is acknowledged that the benefits of environmental rule of law extend far beyond the environmental sector. While the most direct effects are on protection of the environment, it also strengthens rule of law more broadly, supports sustainable economic and social development, protects public health, contributes to peace and security by avoiding and defusing conflict, and protects human and constitutional rights. Similarly, the rule of law in environmental matters is indispensable “for equity in terms of the advancement of the Sustainable Development Goals, the provision of fair access by assuring a rights-based approach, and the promotion and protection of environmental and other socio-economic rights.” [Para 128][999-A-D]

31. The rule of law requires a regime which has effective, accountable and transparent institutions. Responsive, inclusive, participatory and representative decision making are key ingredients to the rule of law. Public access to information is, in similar terms, fundamental to the preservation of the rule of law. In a domestic context, environmental governance that is founded on the rule of law emerges from the values of Constitution. The health of the environment is key to preserving the right to life as a constitutionally recognized value under Article 21 of the Constitution. Proper structures for environmental decision making find expression in the guarantee against arbitrary action and the affirmative duty of fair treatment under Article 14 of the Constitution. [Para 140][1004-C-E]

32. The 2006 notification must hence be construed as a significant link in India’s quest to pursue the Sustainable Development Goals (SDGs). Many of those goals, besides being accepted by the international community of which India is a part, constitute a basic expression of constitutional value system. The fundamental principle which emerges from interpretation of the 2006 notification is that in the area of environmental governance, the means are as significant as the ends. The processes of decision are as crucial as the ultimate decision. The basic postulate of the 2006 notification is that the path which is prescribed for disclosures, studies, gathering data, consultation and appraisal is designed in a manner that would secure decision making which is transparent, responsive and inclusive. [Para 141][1004-F-G; 1005-A-B]

33. The need for setting up a new airport is a matter of policy. The role of the decision makers entrusted with authority over the EIA process is to ensure that every important facet of the environment is adequately studied and that the impact of the proposed activity is carefully assessed. This assessment is integral to the project design because it is on that basis that a considered decision can be arrived at as to whether necessary steps to mitigate adverse consequences to the environment can be strengthened. [Para 142][1005-C-E]

34. In the present case, there has been a failure of due process commencing from the non-disclosure of vital information by the project proponent in Form 1. Disclosures in Form 1 are the underpinning for the preparation of the ToR. The EIA report, based on incomplete information has suffered from deficiencies including the failure to acknowledge that within the study area contemplated by the Guidance manual, there is a presence of ESZs. [Para 143][1005-D-E]

35. The EAC, as an expert body abdicated its role and function by taking into account circumstances which were extraneous to the exercise of its power and failed to notice facets of the environment that were crucial to its decision making. The 2006 notification postulates that normally, the MoEFCC would accept the recommendation of the EAC. This makes the role of the EAC even more significant. The NGT is an adjudicatory body which is vested with appellate jurisdiction over the grant of an EC. The NGT dealt with the submissions which were urged before it in essentially one paragraph. It failed to comprehend the true nature of its role and power under Section 16(h) and Section 20 of the NGT Act 2010. In failing to carry out a merits review, the NGT has not discharged an adjudicatory function which properly belongs to it. [Para 144][1005-F-H]

36. Thus, neither the process of decision making nor the decision itself can pass legal muster. Equally, as an area requiring balance between development of infrastructure and the environment, appropriate directions should be issued by this Court, which would ensure that while the need for a public project as significant as an international airport is duly factored into the decision making calculus, such development proceeds on a considered view of the importance of the prevailing state of the environment. Bearing in mind the need to bring about a wholesome balance between the development of infrastructure of an airport and the preservation of the environment, time bound directions should be issued. [Para 145][1006-A-C]

37. It would be appropriate if the EAC is directed to revisit the conditions subject to which it granted its EC on the basis of the specific concerns which have been highlighted in this judgment. Such an exercise primarily is for the EAC to carry out in its expert decision making capacity. The EAC is entrusted with that function as an expert body. The role of judicial review is to ensure that the rule of law is observed. Hence, in exercise of jurisdiction under Article 142 of the Constitution, EAC is directed to revisit the conditions for the grant of an EC. While doing so, it would be open to the EAC to have due regard to the conditions which were incorporated in the order of the NGT and to suitably modulate those conditions in pursuance of the liberty which the Court has preserved to it. To facilitate an expeditious decision, the EAC is directed to carry out this exercise in a prescribed time schedule during which period, the EC shall remain suspended. After the EAC has formulated its views, they shall be placed before this Court in a Miscellaneous Application in the present proceedings, so as to enable the Court to pass final orders. The Miscellaneous Application may be filed either by the State of Goa as the project proponent or by the MoEFCC. No other Court or Tribunal shall entertain any challenge to the ultimate decision of the EAC and final orders thereon shall be passed by this Court in the present proceedings. [Para 146] [1006-C-G]

As published in the Supreme Court Reports, Supreme Court of India. Text from the Indian Supreme Court Judgments open data set (Dattam Labs), CC BY 4.0.

Full Judgment Text

The Judgment of the Court was delivered by DR. DHANANJAYA Y. CHANDRACHUD, J. Index A Introduction B Submissions C Scheme of the 2006 notification and the Guidance manual for Airports C.1 EIA process C.2 Guidance manual for airports Forests Ecologically Sensitive Zones (ESZs) Sampling Points F.1 Air Quality F.2 Water Quality F.3 Noise Quality F.4 Flora and Fauna F.5 Felling of Trees Public Consultation Appraisal by the EAC I The appellate jurisdiction of the NGT: the requirement of a merits review J Environmental Rule of Law K Directions Introduction 1. An appeal
Full text available to subscribers
Subscribe to access complete judgment text, daily digests, and AI-powered legal research tools. For informational and research purposes only.
View Subscription Plans →
Annual plans from ₹1,599 + GST.

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

All SC judgments →