WPC No.5944/2021 & con.cases
-1-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 5944 OF 2021
PETITIONER:
SUDHEER KUMAR V.V.
S/O. LATE ACHUTHAN VYDIER, VALIYA VALAPPIL HOUSE,
P.O NUT STREET, VATAKARA TALUK, KOZHIKODE DISTRICT
673 104
BY ADVS.
SRI B.KRISHNAN
SHRI.R.PARTHASARATHY
SMT.SEEMA
RESPONDENT:
NATIONAL HIGHWAYS AUTHORITY OF INDIA
(MINISTRY OF ROAD TRANSPORT AND HIGHWAYS), OFFICE OF
THE PROJECT DIRECTOR, NHA1, PROJECT IMPLEMENTATION
UNIT, REPRESENTED BY PROJECT DIRECTOR, 34/743-B,
VAISHNAVAM, CIVIL STATION P.O, KOZHIKODE 673 020
THE SPECIAL DEPUTY COLLECTOR LA(NH) AND CALA,
KOZHIKODE 673 020
THE SPECIAL TAHSILDAR (L.A)
NHAI, VATAKARA, KOZHIKODE 673 020
BY ADVS.
SRI MATHEWS K.PHILIP
SRI T.C.KRISHNA
SRI B.G.BIDAN CHANDRAN
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITON (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).7775/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-2-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 7775 OF 2021
PETITIONER:
K.RAVEENDRAN
AGED 60 YEARS
S/O. KELAPPAN, AMBADI HOUSE, PERUMALPURAM, OPP
PAYYOLI GOVT HIGH SCHOOL, TIKKODI VILLAGE,
KOYILANDY TALUK, KOZHIKODE DISTRICT 673 529.
BY ADVS.
SRI SHYAM PADMAN
SHRI.RAZAK M.
SRI.C.M.ANDREWS
SMT.BOBY M.SEKHAR
KUM.LAYA MARY JOSEPH
SRI.HARISH ABRAHAM
RESPONDENTS:
THE NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI)
REPRESENTED BY THE PROJECT DIRECTOR, NHAI,
KOZHIKODE NH PIU OFFICE, BLD. NO. 34/743-B,
VAISHNAVAS, BEHIND POPULAR MARUTHI SHOW ROOM,
CIVIL STATION, P.O. KOZHIKODE 673 020.
THE SPECIAL DEPUTY COLLECTOR, LA-NH 66,
COMPETENT AUTHORITY NHAI, KOZHIKODE CIVIL STATION,
KOZHIKODE 673 020.
SPECIAL TAHSILDAR (LA NH 66),
KOYILANDY TALUK OFFICE,
OPP. STATE BANK OF INDIA,
KOYILANDY P.O.
KOZHIKODE 673 305.
WPC No.5944/2021 & con.cases
-34
DISTRICT COLLECTOR,
KOZHIKODE, CIVIL STATION, KOZHIKODE 673 020.
SRI T.C.KRISHNA
SRI B.G.BIDAN CHANDRAN
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-4-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 7978 OF 2021
PETITIONER:
ABOOBACKER K
AGED 68 YEARS
S/O USSAIN, SAYOOJ, 253, KATALUR P.O.KOYILANDI,
KOZHIKODE DISTRICT-673 529.
BY ADVS.
SRI P.A.MOHAMMED SHAH
SRI.C.R.SYAMKUMAR
SHRI.ABDUL RASAK A.
SHRI.MUNAS K.P
SHRI.ASWIN KUMAR M J
SMT.HELEN P.A.
SHRI.ARUN ROY
SRI.SHAHIR SHOWKATH ALI
RESPONDENTS:
UNION OF INDIA
REPRESENTED BY SECRETARY, MINISTRY OF ROAD TRANSPORT
AND HIGHWAYS, NEW DELHI-110 001.
STATE OF KERALA,
REPRESENTED BY SECRETARY, REVENUE DEPARTMENT,
SECRETARIAT, THIRUVANANTHAPURAM-695 001.
NATIONAL HIGHWAY AUTHORITY OF INDIA,
G-586, SECTOR-10, DWARAKA, NEW DELHI-110 075,
REPRESENTED BY ITS CHAIRMAN
THE PROJECT DIRECTOR,
NATIONAL HIGHWAY AUTHORITY OF INDIA, VVV/511 B,
NEITHELI-MAVELIPURAM ROAD,
MAVELIPURAM,
KAKKANAD, KERALA-682 030.
WPC No.5944/2021 & con.cases
-55
SPECIAL DEPUTY COLLECTOR AND COMPETENT AUTHORITY,
LAND ACQUISITION, NATIONAL HIGHWAY AUTHORITY OF
INDIA, COLLECTORATE, KOZHIKODE-673 101.
DISTRICT COLLECTOR, KOZHIKODE, CIVIL STATION,
KOZHIKODE-673 020.
BY ADVS.
SMT.MINI GOPINATH, CGC
SRI E.C.KURIAKOSE
SRI T.C.KRISHNA
SRI B.G. BIDAN CHANDRAN
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-6-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 8939 OF 2021
PETITIONER:
PARAYIL PREMALATHA
W/O. V.P.CHANDRAN,AGED 52 YEARS SAYOOJYAM,
VILAYANCODE, (VIA) MANDOOR, KANNUR DISTRICT-670 501.
BY ADV SRI V.N.RAMESAN NAMBISAN
RESPONDENTS:
DISTRICT COLLECTOR
COLLECTORATE, KANNUR DISTRICT, PIN-670 002.
SPECIAL DEPUTY COLLECTOR (LAND ACQUISITION)
NATIONAL HIGHWAY AUTHORITY OF INDIA, KANNUR,
TALIPARAMBA AND COMPETENT AUDHOTITY, TALIPARAMBA,
KANNUR DISTRICT, PIN-670 141.
SPECIAL TAHSILDAR
LAND ACQUISITION, (NATIONAL HIGHWAY AUTHORITY OF
INDIA), UNIT2, TALIPARAMBA, KANNUR DISTRICT,
PIN-670 141.
THE PROJECT DIRECTOR
NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI),
KOZHIKODE DISTRICT, PIN- 673 529
BY ADVS.
MATHEWS K.PHILIP
SRI T.C.KRISHNA
RI B.G. BIDAN CHANDRAN
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-7IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 12030 OF 2021
PETITIONER:
SUDHEER KUMAR V.V
AGED 50 YEARS
S/O.LATE ACHUTHAN VYDIER,
VALIYA VALAPPIL HOUSE, P.O.
NUT STREET,
VATAKARA TALUK,
KOZHIKODE DISTRICT-673 104.
BY ADV SRI R.PARTHASARATHY
RESPONDENTS:
THE UNION OF INDIA
REPRESENTED BY THE SECRETARY,
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS,
TRANSPORT BAHVAN, NO.1,
PARLIAMENT STREET,
NEW DELHI, PIN-110 001.
NATIONAL HIGHWAY AUTHORITY OF INDIA,
(MINISTRY OF ROAD TRANSPORT AND HIGHWAYS),
OFFICE OF THE PROJECT DIRECTOR, NHAI,
PROJECT IMPLEMENTATION UNIT,
REPRESETNED BY PROJECT DIRECTOR, 34/743-B,
VAISHNAVAM, CIVIL STATION P.O.,
KOZHIKODE-673 020.
THE SPECIAL DEPUTY COLLECTOR LA (NH) AND CALA,
KOZHIKODE, PO CIVIL STATION,
KOZHIKODE-673 020.
THE SPECIAL TAHSILDAR (LA),
NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI),
VATAKARA,
KOZHIKODE-673 020.
THE DISTRICT COLLECTOR, KOZHIKODE DISTRICT,
(PO) CIVIL STATION, KOZHIKODE,
PIN-673 020.
WPC No.5944/2021 & con.cases
-8BY ADVS.
SMT.MINI GOPINATH, CGC
SRI.T.C.KRISHNA, SCGC
SRI.B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-9-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 17221 OF 2021
PETITIONER:
SAINULABDEEN,
AGED 78 YEARS
S/O. MUHAMMAD KUNJU, K.K. VILLA,
KALLAMBALAM P.O. NAVAIKULAM,
THIRUVANANTHAPURAM 695 605.
BY ADV T.M.ABDUL LATHEEF
RESPONDENTS:
UNION OF INDIA,
REPRESENTED BY SECRETARY , MINISTRY OF ROAD
TRANSPORT AND HIGHWAYS,
GOVERNMENT OF INDIA,
CENTRAL DELHI P.O.
NEW DELHI 110001.
PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA (HEAD OFFICE),
DWARAKA SECTOR 10,
SOUTH,
WEST DELHI P.O.
NEW DELHI 110075.
SPECIAL DEPUTY COLLECTOR,
(LA) NH & COMPETENT AUTHORITY OFFICE OF NH66,
KUDAPPANAKKUNNU P.O.
THIRUVANANTHAPURAM 695 043.
SPECIAL TAHSILDAR,
(LA) NH III,
OFFICE OF SPECIAL TAHSILDAR,
ATTINGAL P.O.
THIRUVANANTHAPURAM 695 101.
WPC No.5944/2021 & con.cases
-105
STATE OF KERALA
REP. BY ITS SECRETARY,
PUBLIC WORKS DEPARTMENT, SECRETARIAT,
THIRUVANANTHAPURAM 695 001.
BY ADV MATHEWS K.PHILIP
SRI TC KRISHNA (SCGC)
SRI B.G.BIDAN CHANDRAN
SMT.N.SUDHADEVI, SPL.GOVT.PLEADER
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, THE COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-11IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 2259 OF 2022
PETITIONERS:
MOIDUTTY,AGED 68 YEARS
S/O. AHAMU, AMBALATH VEETTIL, EDAKKAZHIYOOR P.O.,
THRISSUR-680 515.
UMMER HAJI,AGED 70 YEARS
S/O. HASSAN, PONNETH HOUSE, NALAMKALLU,
EDAKAZHIYOOR P.O., THRISSUR-680 515.
KUNHI MOHAMMED N.K.,
AGED 62 YEARS
S/O. HASSAN MUSALIAR, NALAKATH KALLINGAL HOUSE,
EDAKKAZHIYOOR P.O., CHAVAKKAD, THRISSUR-680 515.
C. ABDUL GAFOOR,
AGED 60 YEARS
S/O. KHADER MOULAVI, CHALIL HOUSE, PERIYAMBALAM,
ANDATHODE P.O., THRISSUR-679 564.
NAZAR P.M.,
AGED 42 YEARS
S/O. MUHAMMEDEEN, PANDIKASHALAPARAMBIL,
P.O. THIRUVATHRA, THRISSUR-680 516.
JABI SALEEM,
AGED 35 YEARS
W/O. SALIM, NARANATH HOUSE, EDAKKAZHIYOOR P.O.,
THRISSUR-680 515.
SAKEENA,
AGED 63 YEARS
W/O. SAYID, VALIYAPURAKKAL KOTTAPPURATH,
THIRUVATHRA P.O., THRISSUR-680 516.
MUHAMMED KUNHI VADAKKOOTT,
AGED 68 YEARS
S/O. ABDUTTY, NARANATH HOUSE, PANCHAVADI,
EDAKKAZHIYOOR P.O., THRISSUR-680 515.
BY ADVS.
SRI P.SATHISAN
MS.DONA AUGUSTINE
WPC No.5944/2021 & con.cases
-12-
RESPONDENTS:
UNION OF INDIA,
REPRESENTED BY THE SECRETARY, MINISTRY OF ROAD,
TRANSPORT AND HIGHWAYS, NEW DELHI P.O., PIN-110 001.
THE NATIONAL HIGHWAYS AUTHORITY OF INDIA,
G-586, SECTOR -10, DWARAKA P.O., NEW DELHI-110 075,
REPRESENTED BY ITS CHAIRMAN.
THE PROJECT DIRECTOR, NHAI,
TC 29/1539/1, RAJASREE KAIRALI, PERUMTHANNI,
VALLAKKADAVU P.O., THIRUVANANTHAPURAM-695 008.
SPECIAL DEPUTY COLLECTOR AND COMPETENT AUTHORITY,
LAND ACQUISITION, NHAI, KODUNGALLOOR P.O.,
THRISSUR, KERALA-680 669.
THE DISTRICT COLLECTOR, THRISSUR
COLLECTORATE, G5CQ+GJ, FIRST FLOOR, CIVIL STATION,
CIVIL LINES ROAD, KALYAN NAGAR, AYYANTHOLE,
THRISSUR, KERALA-680 003.
THE PRINCIPAL SECRETARY,
REVENUE DEPARTMENT, GOVERNMENT SECRETARIAT,
THIRUVANANTHAPURAM P.O., PIN-695 001.
BY ADVS.
SMT.MINI GOPINATH, CGC
SHRI.MATHEWS K.PHILIP, SC, NHAI
SRI.T.C.KRISHNA, SCGC
SRI.B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-13IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 14056 OF 2022
PETITIONERS:
ABDUL GAFOOR
AGED 52 YEARS
S/O BAPPUMUSLIYAR.T.V.,
VATTAMPARAMBIL HOUSE, EDAKKAZHIYUR.P.O,
THRISSUR-680 515.
KALATHINGAL USMAN
AGED 70 YEARS
S/O M.P. EANU, KALATHINGAL HOUSE,
PUNNAYUR KULAM, ANDATHODE.P.O,
THRISSUR-679 564.
ASHRAF@ SAINUDHEEN,
AGED 40 YEARS
S/O BAPPUMUSLIYAR.T.V.,
VATTAMPARAMBIL HOUSE,
PUNNAYUR,
AGALAD .P.O, THRISSUR-680 518.
FIROZ.P.K
AGED 51 YEARS
S/O R.O.BEERAN, PUTHIYAVEETIL KARAYIL HOUSE,
ORUMANAYUR.P.O, CHAVAKKAD, THRISSUR-680 512.
P.D.PREMLAL
AGED 67 YEARS
S/O.DAMODARAN, PULIPARAMBIL HOUSE,
TALIKKULAM.P.O,
THRISSUR-680 569.
ASIYA,
AGED 42 YEARS
C/O ASHIK , MOOTHEDATH HOUSE,
AKALAD.P.O, PUNNAYUR,
THRISSUR-680 518.
FATHIMA ALI
AGED 63 YEARS
WPC No.5944/2021 & con.cases
-14C/O ALI PALAKKAL, PALAKKAL HOUSE,
EDAKKAZHIYUR.P.O,
THRISSUR-680 515.
ELLATHAKAYIL SHAJITHA,
AGED 45 YEARS
W/O SHAJAHAN, ELLATHAKAYIL HOUSE,
EDAKAZHIYUR.P.O,
THRISSUR-680 515.
SHAHEEN SULEMAN,
AGED 31 YEARS
C/O E.P.SULEMAN, ELAYADATH PUTHEN VEETIL,
AKALAD, PUNNAYUR.P.O,
THRISSUR, KERALA-680 518.
V.ABOO
AGED 64 YEARS
S/O MAMUNNI, VETTILAKATH,
VELIANCODE SOUTH,
VELIANCODE P.O.,
MALAPPURAM -679579.
V.T.NABEESU
AGED 71 YEARS
W/O MOIDUNNI HAJI,
VALIYAKATH THAIVALAPPIL HOUSE,
NEAR SUBRAMUYA TEMPLE,
ORUMANAYUR P.O., THRISSUR -680512.
PAUL.M.S
AGED 67 YEARS
MADUMPAL, PORKULAM P.O,
THRISSUR-680 542.
FAISAL,
AGED 43 YEARS
S/O MUHAMMEDUNNI ELAYADATH,
PUTHENVEETIL HOUSE AKALAD,
PUNNAYUR, AGALAD.P.O,
THRISSUR, KERALA-680 518.
SALIL.N.V.
AGED 48 YEARS,
S/O. VASU,CHARUTHA, MANATHALA,
CHAVAKKAD.P.O,
THRISSUR, KERALA-680 506
WPC No.5944/2021 & con.cases
-15BY ADVS.
SRI P.SATHISAN
MS.DONA AUGUSTINE
RESPONDENTS:
UNION OF INDIA
REPRESENTED BY SECRETARY, MINISTRY OF ROAD TRANSPORT
& HIGHWAYS, GOVERNMENT OF INDIA,
CENTRAL DELHI.P.O,
NEW DELHI-110 001.
DIRECTOR GENERAL (ROAD DEVELOPMENT) &
SPECIAL SECRETARY, ROOM NO. 213, MINISTRY OF ROAD
TRANSPORT & HIGHWAYS, TRANSPORT BHAVAN, I,
P[ARLIAMENT STREET, CENTRAL DELHI.P.O,
NEW DELHI-110001.
PROJECT DIRECTOR,
NATIONAL HIGHWAYS, AUTHORITY OF INDIA (HEAD OFFICE),
DWARAKA SECTOR 10, SOUTH WEST DELHI.P.O,
NEW DELHI-110075.
CHAIRMAN
NHAI, G-5 & 6, SECTOR-10,
DWARAKA, SOUTH WEST DELHI.P.O,
NEW DELHI-110075.
STATE OF KERALA
REP.BY ITS SECRETARY, PUBLIC WORKS DEPARTMENT,
SECRETARIAT, THIRUVNANTHAPURAM.P.O,
PIN-695 001.
PROJECT DIRECTOR, NHAI,
THE PROJECT DIRECTOR, NATIONAL HIGHWAYS AUTHORITY OF
INDIA, PROJECT IMPLEMENTATION UNIT-KOCHI,
VII/511, NEYTHELI-MAVELIPURAM ROAD,
KAKKANAD.P.O,
ERNAKULAM-682 030.
SPECIAL DEPUTY COLLECTOR (LA) NH & COMPETENT
AUTHORITY,
OFFICE OF NH 17,
(KUTTIPURAM-EDAPPALLY), KODUNGALLOR.P.O,
THRISSUR-680 664.
WPC No.5944/2021 & con.cases
-168
DISTRICT COLLECTOR,
THRISSUR, COLLECTORATE, CIVIL STATION, AYYANTHOLE
.P.O, THRISSUR-680 003.
BY ADVS
SRI MATHEWS K.PHILIP
SRI T.C.KRISHNA, SC.
SRI B.G.BIDAN CHANDRAN, SC.
SMT.N.SUDHA DEVI SPL. GOVT.PLEADER
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-17IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 15009 OF 2022
PETITIONERS:
SINDHU JAYAKUMAR
AGED 49 YEARS
W/O.JAYAKUMAR, 2A, CENTRE HOMES,
NANGIYARKULANGARA.P.O, ALAPPUZHA DISTRICT-690513.
ANU PRABHAKAR,
8A, CENTER HOMES, NANGIYARKULANGARA.P.O,
ALAPPUZHA DISTRICT-690513.
BY ADVS.
SRI P.A.MOHAMMED SHAH
SRI RENOY VINCENT
SRI ASWIN KUMAR M J
HELEN P.A.
SRI ARUN ROY
SRI SHAHIR SHOWKATH ALI
RESPONDENTS:
UNION OF INDIA
REPRESENTED BY SECRETARY, MINISTRY OF ROAD TRANSPORT
AND HIGHWAYS, NEW DELHI-110001.
STATE OF KERALA,
REPRESENTED BY SECRETARY, PUBLIC WORKS DEPARTMENT,
SECRETARIAT, THIRUVANANTHAPURAM-695001.
NATIONAL HIGHWAY AUTHORITY OF INDIA
G-586, SECTOR-10, DWARAKA, NEW DELHI-110075,
REPRESENTED BY ITS CHAIRMAN.
THE PROJECT DIRECTOR,
NATOINAL HIGHWAY AUTHORITY OF INDIA, TC-29/1539/1,
RAJASREE KAIRALI, PERUMTHANNI, VALLAKKADAVU.P.O,
THIRUVANANTHAPURAM-695008.
WPC No.5944/2021 & con.cases
-185
SPECIAL DEPUTY COLLECTOR AND COMPETENT AUTHORITY,
LAND ACQUISITION, NATIONAL HIGHWAY AUTHORITY OF
INDIA, COLLECTORATE, ALAPPUZHA-688001.
ASSISTANT EXECUTIVE ENGINEER
PWD, NH DIVISION, ALAPPUZHA-688013.
BY ADV
SRI K.A.SALIL NARAYANAN
SRI T.C.KRISHNA, SC.
SRI B.G.BIDAN CHANDRAN, SC.
SMT.N.SUDHA DEVI SPL. G.P.
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-19-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 19257 OF 2022
PETITIONERS:
NALINI E
AGED 77 YEARS
W/O.M.C.PADMANABHAN NAMBIAR, RESIDING AT
KATTUMMACHAL, MUNDAYADU P.O.,
KANNUR-670 597.
LESITHA DEVI.E.,
AGED 56 YEARS
W/O.PREMANANDAN.G.,
RESIDING AT SAARANG,
KATTUMMACHAL,
MUNDAYADU P.O.,
KANNUR-670 597.
E.NAVIL PRASAD,
AGED 47 YEARS
S/O.M.C.PADMANABHAN NAMBIAR,
RESIDING AT KATTUMMACHAL,
MUNDAYADU P.O.,
KANNUR-670 597.
BY ADV SRI SERGI JOSEPH THOMAS
RESPONDENTS:
UNION OF INDIA,
REPRESENTED BY ITS SECRETARY TO GOVERNMENT,
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS,
TRANSPORT BHAVAN, 1,
PARLIAMENT STREET,
NEW DELHI-110 001.
THE SPECIAL TAHSILDAR AND COMPETENT AUTHORITY,
LA(NH) UNIT NO.II,
COLLECTORATE,
KANNUR, PIN-670 002.
WPC No.5944/2021 & con.cases
-203
THE PROJECT DIRECTOR,
NATIONAL HIGHWAY AUTHORITY OF INDIA,
PROJECT IMPLEMENTATION UNIT,
MALAPARAMBA, KOZHIKODE-673 009.
BY ADVS.
SRI E.C.KURIAKOSE
SRI LEJO JOSEPH GEORGE
SRI T.C.KRISHNA, SC
SRI B.G.BIDAN CHANDRAN, SC.
SMT.N.SUDHA DEVI SPL. G.P.
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-21-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 22865 OF 2022
PETITIONER:
JAYAFER M.P.
AGED 73 YEARS
S/O. KUNHAMMADUKUTTY HAJI, KADEEJA MANZIL,
MADAPPALLY COLLEGE, VADAKARA, KOZHIKODE - 673102.
BY ADVS.
SRI P.A.MOHAMMED SHAH
HELEN P.A.
SRI ARUN ROY
SRI SHAHIR SHOWKATH ALI
SRI RENOY VINCENT
RESPONDENTS:
UNION OF INDIA REPRESENTED BY SECRETARY MINISTRY OF
ROAD TRANSPORT AND HIGHWAYS, NEW DELHI-110 001.
STATE OF KERALA REPRESENTED BY SECRETARY, PUBLIC
WORKS DEPARTMENT, SECRETARIAT, THIRUVANANTHAPURAM695 001.
NATIONAL HIGHWAY AUTHORITY OF INDIA,
G-586, SECTOR-10, DWARAKA, NEW DELHI- 110075
REPRESENTED BY ITS CHAIRMAN.
THE PROJECT DIRECTOR,
NATIONAL HIGHWAY AUTHORITY OF INDIA, TC-29/1539/1,
RAJASREE KAIRALI, PERUMTHANNI, VALLAKKADAVU P.O,
THIRUVANANTHAPURAM- 695 008.
DISTRICT COLLECTOR AND COMPETENT ARBITRATOR,
LAND ACQUISITION (NATIONAL HIGHWAY AUTHORITY OF
INDIA), COLLECTORATE, CIVIL STATION P.O.,
KOZHIKODE - 673020.
WPC No.5944/2021 & con.cases
-226
SPECIAL DEPUTY COLLECTOR AND COMPETENT AUTHORITY,
LAND ACQUISITION (NATIONAL HIGHWAY AUTHORITY INDIA),
COLLECTORATE, CIVIL STATION P.O., KOZHIKODE 673020.
ASSISTANT EXECUTIVE ENGINEER,
NATIONAL HIGHWAY SUB DIVISION, KOZHIKODE – 673020.
SRI.K.A.SALIL NARAYANAN
SMT.C.S.SHEEJA, SR.GP
SRI.B.G.BIDAN CHANDRAN, SC
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-23-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 29886 OF 2022
PETITIONER:
UMMU HABEEBA
AGED 30 YEARS
W/O SAINUDHEEN K.P,
KODALAM PATTATH HOUSE,
KOORADA, AYANKALAM P.O.,
TAVANUR, PONNANI,
MALAPPURAM-679573.
BY ADVS.
SRI P.SATHISAN
MS.DONA AUGUSTINE
RESPONDENTS:
UNION OF INDIA
REPRESENTED BY SECRETARY, MINISTRY OF ROAD TRANSPORT
& HIGHWAYS, GOVERNMENT OF INDIA,
CENTRAL DELHI P.O., NEW DELHI-110001.
DIRECTOR GENERAL (ROAD DEVELOPMENT) & SPECIAL
SECRETARY,
ROOM NO.213, MINISTRY OF ROAD TRANSPORT & HIGHWAYS,
TRANSPORT BHAVAN, 1, PARLIAMENT STREET,
CENTRAL DELHI P.O., NEW DELHI-110001.
PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA (HEAD OFFICE),
DWARAKA SECTOR 10, SOUTH WEST DELHI P.O.,
NEW DELHI-110075.
CHAIRMAN,
NHAI, G-5 & 6, SECTOR-10, DWARAKA,
SOUTH WEST DELHI P.O.,
NEW DELHI-110075.
WPC No.5944/2021 & con.cases
-245
THE PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA, PROJECT
IMPLEMENTATION UNIT- KOCHI, VII/511 B, NEITHELI
-MAVELIPURAM ROAD, MAVELIPURAM, KAKKANAD, KERALA
682030.
STATE OF KERALA,
REPRESENTED BY ITS SECRETARY, PUBLIC WORKS
DEPARTMENT, SECRETARIAT, THIRUVANANTHAPURAM P.O.,
PIN - 695 001.
THE SPECIAL DEPUTY COLLECTOR AND COMPETENT
AUTHORITY,
OFFICE OF DEPUTY COLLECTOR, LAND ACQUISITION (NH17)
VALAKKULAM P.O., KOZHICHENA, MALAPPURAM - 676 508.
DISTRICT COLLECTOR
MALAPPURAM, UP HILL, CIVIL STATION P.O., MALAPPURAM676505
SRI.B.G.BIDAN CHANDRAN, SC
SRI.T.C.KRISHNA, SC
SMT.N.SUDHA DEVI, SPL.GP
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-25IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 30126 OF 2022
PETITIONERS:
BABY
W/o.C.C.JOSEPH
RESIDING AT CHOWALLORE HOUSE, CHAKKAMKANDAM.P.O,
CHAVAKKAD PALUVAI, THRISSUR, KERALA, PIN - 680522
GRACY
W/O JOSE, RESIDING AT OLAKKANGIL HOUSE, VENMANAD,
PAVARTY P.O, PIN - 680507
BY ADV SRI V.C.MADHAVANKUTTY
RESPONDENTS:
UNION OF INDIA REPRESENTED BY SECRETARY
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS, GOVERNMENT
OF INDIA CENTRAL DELHI P.O, NEW DELHI, PIN - 110001
DIRECTOR GENERAL(ROAD DEVELOPMENT) & SPECIAL
SECRETARY
ROOM NO.213, MINISTRY OD ROAD TRANSPORT AND HIGH
WAYS, TRANSPORT BHAVAN, 1, PARLIAMENT STREET,
CENTRAL DELHI.P.O, NEW DELHI, PIN - 110001
PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA, (HEAD
OFFICE)DWARAKA SECTOR 10, SOUTH WEST DELHI P.O, NEW
DELHI, NEW DELHI, PIN - 110075
CHAIRMAN NHAI
G-5 & 6, SECTOR -10, DWARAKA, SOUTH WEST DELHI P.O,
NEW DELHI, P.O.NEW DELHI, PIN - 110075
STATE OF KERALA
REPRESENTED BY ITS SECRETARY, PUBLIC WORKS
DEPARTMENT, SECRETARIAT, THIRUVANANDAPURAM P.O, PIN
- 695001
WPC No.5944/2021 & con.cases
-266
PROJECT DIRECTOR
NHAI, THE PROJECT DIRECTOR, NATIONAL HIGHWAYS
AUTHORITY OF INDIA, PROJECT IMPLEMENTATION UNIT
-KOCHI, VII/511,NEYTHELI-MAVELIPURAM ROAD, KAKKANAD
P.O, ERNAKULAM, – 682030
SPECIAL DEPUTY COLLECTOR (LA) NH AND COMPETENT
AUTHORITY
OFFICE OF NH 17, (KUTTIPPURAM - EDAPPALLY),
KODUNGALLORE P.O, THRISSUR, PIN - 680664
DISTRICT COLLECTOR
THRISSUR, COLLECTORATE, CIVIL STATION, AYYANTHOLE
P.O, THRISSUR, PIN - 680003
SRI.T.C.KRISHNA, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
SRI.B.G.BIDAN CHANDRAN, SC
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-27IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 30766 OF 2022
PETITIONERS:
AYSHA@AYISHABI
AGED 63 YEARS
S/O.KUNHAMMU, MUTHALAKULANGARA, VENTHATTIL,
PUNNAYOOR, CHAVAKKAD P.O., THRISSUR-680518.
KADEEJA ABOOBACKER,
AGED 53 YEARS
W/O.ABOOBACKER, VALIYAKATH HOUSE, NEAR CHETTUVA
TOLL, ORUMANAYUR P.O., THRISSUR-680512.
ABOOBACKER P.,
AGED 51 YEARS
S/O.MOIDUTTY, PONNAMBATHALYIL HOUSE, AKALAD P.O.,
PUNNAYUR, THRISSUR-680518.
AMINAKUTTY,
AGED 64 YEARS
W/O.ABOOBACKER, KARUPPAM VEETTIL, EDAKKAZHIYUR P.O.,
THRISSUR-680515.
V.A.VENUGOPALAN,
AGED 57 YEARS
S/O.ARAVINDAKSHAN, VAYAKKATTIL HOUSE, ELITEPADY,
ENGADIYUR P.O., THRISSUR-680615.
SEMEERA,
AGED 47 YEARS
W/O.MUHAMMED HANEEFA, PALATTUTHARAYIL HOUSE,
EDAKKAZHIYUR P.O., THRISSUR-680515.
ABDUL LATHEEF,
AGED 60 YEARS
S/O.HYDROS KUTTY, PERUMBADI HOUSE, ORUMANAYUR P.O.,
THRISSUR-680512.
MUSTHAFA E.P., AGED 71 YEARS
S/O.ABDUL KADER, ELAYADATH PUTHENVEETTIL HOUSE,
WPC No.5944/2021 & con.cases
-28THIRUVATHRA P.O., CHAVAKKAD, THRISSUR-680506.
SABU BALAN,
S/O.BALAN, NEDIYEDATH HOUSE, THIRUVATHRA P.O.,
CHAVAKKAD, THRISSUR-680506.
FAUSIYA K.V.,AGED 45 YEARS
W/O.KAMARUDHEEN, KOMUNDAM, THARAYIL HOUSE, CHAVAKKAD
P.O., THRISSUR-680506.
BY ADVS.
SRI P.SATHISAN
MS.DONA AUGUSTINE
RESPONDENTS:
UNION OF INDIA,
REPRESENTED BY SECRETARY, MINISTRY OF ROAD TRANSPORT
& HIGHWAYS, GOVERNMENT OF INDIA, CENTRAL DELHI P.O.,
NEW DELHI-110001.
DIRECTOR GENERAL (ROAD DEVELOPMENT) & SPECIAL
SECRETARY,
ROOM NO.213, MINISTRY OF ROAD TRANSPORT & HIGHWAYS,
TRANSPORT BHAVAN, 1, PARLIAMENT STREET, CENTRAL
DELHI P.O., NEW DELHI-110001.
PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA (HEAD OFFICE),
DWARAKA SECTOR 10, SOUTH WEST DELHI P.O., NEW DELHI110075.
CHAIRMAN,
NHAI, G-5 & 6, SECTOR-10, DWARAKA,
SOUTH WEST DELHI P.O.,
NEW DELHI-110075.
THE PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA, PROJECT
IMPLEMENTATION UNIT- KOCHI, VII/511 B, NEITHELI
-MAVELIPURAM ROAD, MAVELIPURAM,
KAKKANAD, KERALA- 682030.
STATE OF KERALA,
REPRESENTED BY ITS SECRETARY,
PUBLIC WORKS DEPARTMENT, SECRETARIAT,
THIRUVANANTHAPURAM P.O., PIN - 695 001.
WPC No.5944/2021 & con.cases
-297
SPECIAL DEPUTY COLLECTOR,
LAND ACQUISITION (NH17), CIVIL STATION,
CIVIL LINES RD, KALYAN NAGAR, AYYANTHOLE P.O.,
THRISSUR, KERALA -680 003.
DISTRICT COLLECTOR,
COLLECTORATE, THRISSUR, FIRST FLOOR, CIVIL STATION,
CIVIL LINES RD, KALYAN NAGAR, AYYANTHOLE P.O.,
THRISSUR, KERALA- 680 003.
SMT.MINI GOPINATH, CGC
SRI.T.C.KRISHNA, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
SRI.B.G.BIDAN CHANDRAN, SC
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023, ALONG WITH WP(C).5944/2021 AND CONNECTED CASES, THE
COURT ON 21.03.2024 DELIVERED THE FOLLOWING:
WPC No.5944/2021 & con.cases
-30IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 31730 OF 2022
PETITIONERS:
MARIYAM
AGED 59 YEARS, W/O.HAMSA,
MANDALAPPARAMBU HOUSE, PUNNAYOOKULAM P.O., THRISSUR
- 679 564.
ABOOBACKER M.
AGED 40 YEARS, S/O.ABDULLA,
MUKKILAPEEDIKAYIL, AKALAD P.O., PUNNAYUR
MANNALAKUNNU, THRISSUR - 680 518.
MUHAMMED SUDHEER R.M.
AGED 60 YEARS,
S/O.SAIDU MUHAMMED HAJI, VPS MANZIL, MANGOTTUPADY,
ORUMANAYUR P.O., THRISSUR - 680 512.
HASSAN HAJI
S/O.KUNJUMOHAMMED HAJI, KUMARANTHARAYIL HOUSE,
ANDANTHODE PUNNAYOORKULAM P.O., THRISSUR - 679 564.
NOUSHAD P.K.
AGED 47 YEARS, S/O.BAPPUTTY,
PAPPALIYIL HOUSE, PAPPALLY,
ANDANTHODE, KADIKKADU,
PUNNAYOORKULAM P.O., THRISSUR - 679 564.
MUHAMMED ASHRAF
AGED 70 YEARS
S/O.ALI AHAMMEDUNNY,
VALIYAKATH HOUSE, KURKAMADU,
KADAPPURAM P.O.,
THRISSUR - 680 514.
BY ADVS.
SRI P.SATHISAN
MS.DONA AUGUSTINE
WPC No.5944/2021 & con.cases
-31RESPONDENTS:
UNION OF INDIA
REP.BY SECRETAY,
MINISTRY OF ROAD TRANSPORT & HIGHWAYS,
GOVERNMENT OF INDIA,
CENTRAL DELHI P.O.,
NEW DELHI - 110 001.
DIRECTOR GENERAL (ROAD DEVELOPMENT) & SPECIAL
SECRETARY
ROOM NO.213,
MINISTRY OF ROAD TRANSPORT & HIGHWAYS,
TRANSPORT BHAVAN, 1,
PARLIAMENT STREET,
CENTRAL DELHI P.O.,
NEW DELHI - 110 001.
PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA (HEAD OFFICE),
DWARAKA SECTOR 10,
SOUTH WEST DELHI P.O.,
NEW DELHI - 110 075.
CHAIRMAN
NHAI, G-5 & 6, SECTOR 10, DWARAKA,
SOUTH WEST DELHI P.O.,
NEW DELHI - 110 075.
STATE OF KERALA
REP. BY ITS SECRETARY, PUBLIC WORKS DEPARTMENT,
SECRETARIAT, THIRUVANANTHAPURAM P.O.,
PIN - 695 001.
THE PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA, PROJECT
IMPLEMENTATION UNIT – KOCHI,
VII/511, NEYTHELI - MAVELIPURAM ROAD,
KAKKANAD P.O.,
ERNAKULAM - 682 030.
SPECIAL DEPUTY COLLECTOR (LA) NH & COMPETENT
AUTHORITY
OFFICE OF NH 17,
(KUTTIPPURAM - EDAPPALLY),
KODUNGALLOOR P.O.,
THRISSUR - 680 664.
WPC No.5944/2021 & con.cases
-328
DISTRICT COLLECTOR
THRISSUR, COLLECTORATE,
CIVIL STATION, AYYANTHOLE P.O.,
THRISSUR - 680 003.
BY ADVS.
SRI KRISHNA T C, SC
SRI B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-33IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 32197 OF 2022
PETITIONER:
RAHIYA ABDUL HAMEED
AGED 50 YEARS
W/O.ABDULHAMEED, KANNANKILATH DOUSE, EDATHURUTHY
P.O. THRISSUR-680703.
BY ADVS.
SRI P.SATHISAN
MS.DONA AUGUSTINE
RESPONDENTS:
UNION OF INDIA
REP. BY SECRETARY, MINISTRY OF ROAD TRANSPORT &
HIGHWAYS GOVERNMENT OF INDIA CENTRAL DELHI P.O.,
NEW DELHI-110 001.
REGIONAL OFFICER
NATIONAL HIGHWAYS AUTHORITY OF INDIA. REGIONAL
OFFICE - KERALA. T.C 86/1036-1, AMBLY ARCADE,
S.N.N.R.A-9, PETTAH P.O.
THIRUVANANTHAPURAM, 695 024.
PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA (HEAD OFFICE)
DWARAKA SECTOR 10, SOUTH WEST DELHI P.O.
NEW DELHI-110 075.
DIRECTOR GENERAL
(ROAD DEVELOPMENT) & SPECIAL SECRETARY, ROOM NO.213,
MINISTRY OF ROAD TRANSPORT & HIGHWAYS TRANSPORT
PHAVAN, 1, PARLIAMENT STREET CENTRAL DELHI P.O.,
NEW DELHI-110 001.
THE PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA PROJECT
IMPLEMENTATION UNIT KOCHI,
WPC No.5944/2021 & con.cases
-34VII 511 B, NEITHELI -MAVELIPURAM ROAD,
MAVELIPURAM, KAKKANAD P.O.,
KERALA 682030.
STATE OF KERALA,
REP. BY ITS SECRETARY, PUBLIC WORKS DEPARTMENT,
SECRETARIAT, THIRUVANANTHAPURAM P.O.,
PIN - 695 001.
SPECIAL DEPUTY COLLECTOR,
LAND ACQUISITION (NH17), CIVIL STATION, CIVIL LINES
RD., KALYAN NAGAR, AYYANTHOLE P.O.,
THRISSUR, KERALA 680 003
DISTRICT COLLECTOR,
COLLECTORATE, THRISSUR, FIRST FLOOR, CIVIL STATION,
CIVIL LINES RD, KALYAN NAGAR,
AYYANTHOLE P.O., THRISSUR,
KERALA 680 003
VALAPAD GRAMA PANCHAYAT,
VALPAD P.O, THRISSUR- 680567,
REPRESENTED BY ITS SECRETARY.
THE SECRETARY,
VALAPAD GRAMA PANCHAYAT, VALPAD P.O, THRISSUR680567.
BY ADVS.
SHRI.RAJ PRADEEP R., SC, VALAPAD GRAMA PANCHAYAT
SRI KRISHNA T C, SC
SRI BIDAN CHANDRAN, SC,
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-35IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 34845 OF 2022
PETITIONER:
SULFATH O A
AGED 55 YEARS, W/O ABDULLAKUTTY,
RESIDING AT THOTTUPARAMBATH, VAZHIYAMBALAM,
KAIPAMANGALAM, KOORIKUZHI, THRISSUR-680681.
BY ADVS.
SRI V.N.HARIDAS
SRI SAIFUDEEN T.S
MS.PARVATHY S.R.
RESPONDENTS:
NATIONAL HIGHWAY AUTHORITY OF INDIA
REPRESENTED BY ITS PROJECT DIRECTOR, PROJECT
IMPLEMENTATION UNIT, VII/511B NEYTHELI-MAVELIPURAM
ROAD, MAVELIPURAM, KAKKANAD.P.O, ERNAKULAM-682030.
THE COMPETENT ARBITRATOR,
DISTRICT COLLECTOR, 1ST FLOOR, CIVIL STATION, KALYAN
NAGAR, AYYANTHOLE, THRISSUR-680003.
COMPETENT AUTHORITY FOR LAND ACQUISITION SPECIAL
DEPUTY COLLECTOR,
NH-17, KUTTIPPURAM-EDAPPALLY, KODUNGALLOOR,
THRISSUR-680003.
BY ADVS.
SRI T.C.KRISHNA, SC
SRI B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-36IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 35020 OF 2022
PETITIONER:
MUHAMMED @ MANI
AGED 68 YEARS, S/O. MUHAMMED,
ARUKANDATHIL HOUSE, AYANKALAM P.O., TAVANUR,
MALAPPURAM DISTRICT, PIN - 679573
BY ADV SRI C.M.MOHAMMED IQUABAL
RESPONDENTS:
UNION OF INDIA, REPRESENTED BY THE SECRETARY,
MINISTRY OF ROAD TRANSPORT AND HIGHWAY,
NEW DELHI 110 001
NATIONAL HIGHWAYS AUTHORITY OF INDIA - NHAI
G 5 & 6, SECTOR 10, DWARAKA,
NEW DELHI, PIN - 110075
REPRESENTED BY ITS DIRECTOR.
THE DISTRICT COLLECTOR
MALAPPURAM, COLLECTORATE, MALAPPURAM P.O.,
MALAPPURAM DISTRICT,
PIN - 676505
THE DEPUTY COLLECTOR AND COMPETENT AUTHORITY
LAND ACQUISITION (NH 66), COLLECTORATE,
MALAPPURAM P.O., MALAPPURAM DISTRICT,
PIN - 676505
THE TAHSILDAR (LA NH), PONNANI,
OFFICE OF THE TAHSILDAR, PONNANI P.O., PONNANI
TALUK, MALAPPURAM DISTRICT,
PIN - 679577
THE VILLAGE OFFICER
TAVANUR VILLAGE OFFICE, TAVANUR P.O.,
PONNANI TALUK, MALAPPURAM DISTRICT, PIN - 679573
WPC No.5944/2021 & con.cases
-377
THE PROJECT DIRECTOR (NHAI)
COCHIN, VII/511B, NETHELI MAVELIPURAM ROAD,
MAVELIPURAM, KAKKANAD, ERNAKULAM, PIN - 682030
BY ADVS.
SRI KRISHNA T C,SC
SRI B.G.BIDAN CHANDRAN,
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-38-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 36709 OF 2022
PETITIONER:
JEKSY ALIAS LEONS JEKSY,
S/O JOKIM BAVA,
THOTTAKATH HOUSE,
CHERANALLOOR VILLAGE,
PIN-682034,
ERNAKULAM DISTRICT.
BY ADVS.
SRI C.P.WILSON
SMT.ROSE MICHAEL
SRI MICHAEL PAUL CHITTINAPPILLY
RESPONDENTS:
UNION OF INDIA,
REPRESENTED BY SECRETARY,
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS,
TRANSPORT BHAWAN, 1,
PARLIAMENT STREET,
NEW DELHI - 110 001
REPRESENTED BY ITS CHAIRMAN.
DEPUTY GENERAL MANAGER
AND PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA,
PIU COCHIN.
COMPETENT AUTHORITY AND SPECIAL DEPUTY COLLECTOR
- LA (NH – 66),
OFFICE OF THE SPECIAL DEPUTY COLLECTOR - LA (NH - 66),
NORTH PARAVUR P. O.,
ERNAKULAM - 683 513.
WPC No.5944/2021 & con.cases
-394
SPECIAL TAHSILDAR
- LA (NH - 66), UNIT - 1,
OFFICE OF THE SPECIAL TAHSILDAR -LA (NH),
NORTH PARAVUR,
ERNAKULAM - 683 513.
BY ADVS.
SRI KRISHNA T C, SC
SRI B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
SRI N.J.ASHWIN
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-40-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 37012 OF 2022
PETITIONERS:
IBRAHIMKUTTY K.K.,
AGED 60 YEARS, C/O KUNJUMOHAMMED,
KARAPPAMVEETTIL, VAZHIYAMBALAM, KAIPAMANGALAM PO,
KODUNGALLUR, THRISSUR, 680681.
SULPHIKKAR ALI,
AGED 47 YEARS, S/O MOIDEEN, AMBALATHUVEETTIL,
CHAVAKKADU, TIRUVITRA P.O., THRISSUR KERALA, 680516.
KOLANGARA VEETTIL MOHAMMED,
AGED 66 YEARS, S/O K MAKKARU KOLANGARA VEETIL,
ALSAFA, NEAR WILLIAMS ORUMANAYUR P.O., THRISSUR,
680512.
MUHAMMED AMEEN,
AGED 53 YEARS, S/O KADER, VALIYAKATH HOUSE,
KARUVARAKUND, ORUMANAYUR P.O., THRISSUR KERALA
680512.
HAMZATH,
AGED 54 YEARS, S/O MOIDUNNI KUTTY, KOTTARAMBATTAYIL
HOUSE, PUNNAYURKULAM, ANDATHODE P.O., THRISSUR,
KERALA 679564.
A.R.MOHAMED,
AGED 66 YEARS, S/O.UMMER KOYA, ARANGARATHAIL,
EDAKKAZHIYUR P.O., THRISSUR, KERALA, 680515.
HASFA,AGED 47 YEARS, W/O RASHEED, MANGULANGRA,
ANDATHOD P.O., PUNNAYURKULAM, THRISSUR, KERALA,
679564.
VAHIDA,
AGED 47 YEARS, W/O MOHAMMED, CHOZHEERAKATH HOUSE,
THIRUVATHRA, POST THIRUVATRA P.O., THRISSUR 680516.
WPC No.5944/2021 & con.cases
-419
PEEDIYEKKAL ABOOBACKER,
AGED 62 YEARS, C/O KALLIVALAPPIL, HAMZA PEEDIYAKKAL
HOUSE, EDAKKZHIYUR P.O., THRISSUR, KERALA, 680515.
M.C UMMER,
S/O MAYAN, CHERUTHOTTUPURATH HOUSE, AKALAD P.O.,
THRISSUR-680518.
BY ADVS.
SRI P.SATHISAN
MS.DONA AUGUSTINE
RESPONDENTS:
UNION OF INDIA,
REP. BY SECRETARY, MINISTRY OF ROAD TRANSPORT &
HIGHWAYS, GOVERNMENT OF INDIA, CENTRAL DELHI P.O.,
NEW DELHI-110001.
DIRECTOR GENERAL (ROAD DEVELOPMENT) & SPECIAL
SECRETARY,
ROOM NO.213, MINISTRY OF ROAD TRANSPORT & HIGHWAYS,
TRANSPORT BHAVAN, 1, PARLIAMENT STREET, CENTRAL
DELHI P.O., NEW DELHI-110001.
PROJECT DIRECTOR, NATIONAL HIGHWAYS AUTHORITY OF
INDIA (HEAD OFFICE),
DWARAKA SECTOR 10, SOUTH WEST DELHI P.O., NEW DELHI110075.
CHAIRMAN, NHAI, G-5 & 6,
SECTOR-10, DWARAKA, SOUTH WEST DELHI P.O., NEW
DELHI-110075.
STATE OF KERALA,
REP. BY ITS SECRETARY, PUBLIC WORKS DEPARTMENT,
SECRETARIAT, THIRUVANANTHAPURAM P.O.,
PIN - 695 001.
PROJECT DIRECTOR,
PROJECT IMPLEMENTATION UNIT - THIRUVANATHAPURAM,
PROJECT IMPLEMENTATION UNIT,
TC 36/414(5), KOYIKKAL VEEDU,
KAVU LANE, PALKULANGARA P.O.,
THIRUVANANTHAPURAM-695024.
WPC No.5944/2021 & con.cases
-427
SPECIAL DEPUTY COLLECTOR (LA) NH & COMPETENT
AUTHORITY,
OFFICE OF NH 17, (KUTTIPPURAM - EDAPPALLY),
KODUNGALLOR P.O., THRISSUR-680 664.
DISTRICT COLLECTOR, THRISSUR,
COLLECTORATE, CIVIL STATION, AYYANTHOLE P.O.,
THRISSUR-680003.
BY ADVS.
SRI KRISHNA T C, SC
SRI B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-43-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 38168 OF 2022
PETITIONER:
RAMESAN.K.K
AGED 55 YEARS, S/O.KUNCHAKKAN,
KANDAM KULANGARA HOUSE, P.O. PUTHUPPANAM, VATAKARA,
KOZHIKODE DISTRICT -673 105.
BY ADV SRI ZUBAIR PULIKKOOL
RESPONDENTS:
UNION OF INDIA
REPRESENTED BY SECRETARY, MINISTRY OF ROAD TRANSPORT
AND HIGHWAYS, GOVERNMENT OF INDIA, CENTRAL DELHI
P.O, NEW DELHI 110 001.
DIRECTOR GENERAL (ROAD DEVELOPMENT) AND SPECIAL
SECRETARY
ROOM NO. 213, MINISTRY OF ROAD TRANSPORT AND
HIGHWAYS, TRANSPORT BHAVAN-1, PARLIAMENT STREET,
CENTRAL DELHI P.O, NEW DELHI -110 001.
PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA (HEAD OFFICE),
DWARAKA SECTOR 10, SOUTH WEST DELHI P.O, NEW DELHI110 075.
CHAIRMAN,
NHAI, (NATIONAL HIGHWAY AUTHORITY OF INDIA), G-5 AND
6, SECTOR -10, DWARAKA, SOUTH WEST DELHI P.O, NEW
DELHI- 110 075.
THE DISTRICT COLLECTOR,
KOZHIKIODE DISTRICT, P.O. CIVIL STATION, KOZHIKODE,
PIN -673 020.
WPC No.5944/2021 & con.cases
-446
STATE OF KERALA,
REPRESENTED BY ITS SECRETARY, PUBLIC WORKS
DEPARTMENT, SECRETARIAT, THIRUVANANTHAPURAM P.O, PIN
-695 001.
PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA, PROJECT
IMPLEMENTATION UNIT, KOZHIKODE, LOTUS (H), 34/1487
A, PROVIDENCE WOMEN COLLEGE ROAD, MALAPARAMBA P.O,
KOZHIKODE- 673 009.
SPECIAL DEPUTY COLLECTOR,
LAND ACQUISITION (NH) & CALA, COLLECTORATE, CIVIL
STATION P.O, ERANHIPALAM, KOZHIKODE -673 020.
SPECIAL TAHSILDAR (LA(NH),
VATAKARA MINI CIVIL STATION, COURT ROAD, VATAKARA
P.O, KOZHIKODE- 673 101.
BY ADVS.
SRI KRISHNA T C, SC
SRI B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-45-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 39952 OF 2022
PETITIONER:
AJI MON
AGED 39 YEARS, S/O.ABOOBAKER KUTTI,
PADANILATH PUTHEN VEEDU HOUSE, KAYAMKULAM P.O.,
KOTTUKULANGARA, ALAPPUZHA-690502.
BY ADVS.
SRI P.SATHISAN
SRI BIJU P.PAUL
SRI SHIBU B.S
RESPONDENTS:
UNION OF INDIA
REP. BY SECRETARY, MINISTRY OF ROAD TRANSPORT &
HIGHWAYS, GOVERNMENT OF INDIA,
CENTRAL DELHI P.O., NEW DELHI-110001.
DIRECTOR GENERAL (ROAD DEVELOPMENT) & SPECIAL
SECRETARY,
ROOM NO.213, MINISTRY OF ROAD TRANSPORT & HIGHWAYS,
TRANSPORT BHAVAN, 1, PARLIAMENT STREET, CENTRAL
DELHI P.O., NEW DELHI-110001.
PROJECT DIRECTOR,
NATIONAL HIGHWAYS AUTHORITY OF INDIA (HEAD OFFICE),
DWARAKA SECTOR 10, SOUTH WEST DELHI P.O.,
NEW DELHI-110075.
CHAIRMAN,
NHAI, G-5 & 6, SECTOR-10,DWARAKA,
SOUTH WEST DELHI P.O., NEW DELHI-110075.
THE PROJECT DIRECTOR
NATIONAL HIGHWAYS AUTHORITY OF INDIA PROJECT
IMPLEMENTATION UNIT KOCHI, VII/511 B, NEITHELI
-MAVELIPURAM ROAD,
WPC No.5944/2021 & con.cases
-46MAVELIPURAM,
KAKKANAD, KERALA -682030.
STATE OF KERALA,
REP. BY ITS SECRETARY, PUBLIC WORKS DEPARTMENT,
SECRETARIAT, THIRUVANANTHAPURAM P.O., PIN - 695 001.
SPECIAL DEPUTY COLLECTOR AND COMPETENT AUTHORITY,
LAND ACQUISITION, NHAI, COLLECTORATE, ALAPPUZHA
COLLECTORATE P.O., PIN-688001.
DISTRICT COLLECTOR,
ALAPPUZHA, BESIDE ZILLA PACHAYATH OFFICE, CIVIL
STATION WARD P.O., ALAPPUZHA-688001.
ASSISTANT EXECUTIVE ENGINEER,
PWD NH SUB-DIVISION, ALAPPUZHA P.O-690514.
BY ADVS.
SRI KRISHNA T C, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-47-
IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT
THE HONOURABLE MR. JUSTICE T.R.RAVI
THURSDAY, THE 21ST DAY OF MARCH, 2024/ 1ST CHAITHRA, 1946
WP(C) NO. 41889 OF 2022
PETITIONER:
VARGHESE THOMAS
AGED 66 YEARS
S/O LATE. K. THOMAS,
THEKKEKOIPPURATHU VEEDU,
CHATHANNOOR,
KOLLAM,
PIN - 691572
BY ADVS.
SRI M.KIRANLAL
SRI MANU RAMACHANDRAN
SRI R.RAJESH (VARKALA)
SRI SAMEER M NAIR
MS.GEETHU KRISHNAN
MS.SAILAKSHMI MENON
RESPONDENTS:
THE NATIONAL HIGHWAY AUTHORITY
REPRESENTED BY ITS PROJECT DIRECTOR,
N.H DIVISION,
BEACH ROAD,
KOLLAM,
PIN - 691006
THE DISTRICT COLLECTOR
COLLECTORATE,
CIVIL STATION ROAD,
KAANKATHU MUKKU,
KOLLAM,
PIN – 691013
WPC No.5944/2021 & con.cases
-48-
THE SPECIAL DEPUTY COLLECTOR (LAND ACQUISITION)
NATIONAL HIGHWAY AND COMPETENT AUTHORITY,
KOLLAM, PIN – 691013
BY ADVS.
SRI KRISHNA T C, SC
SRI B.G.BIDAN CHANDRAN, SC
SMT.N.SUDHADEVI (SPL.GOVT.PLEADER)
THIS WRIT PETITION (CIVIL) HAVING BEEN FINALLY HEARD ON
18.12.2023
ALONG
WITH
WP(C)
NO.5944/2021,
21.03.2024 DELIVERED THE FOLLOWING:
THE
COURT
ON
WPC No.5944/2021 & con.cases
-49-
“CR”
T.R. RAVI, J.
-------------------------------------------W.P.(C)Nos.5944/2021, 7775/2021, 7978/2021 ,
8939/2021, 12030/2021, 17221/2021, 2259/2022,
14056/2022, 15009/2022 , 19257/2022 , 22865/2022,
29886/2022, 30126/2022 , 30766/2022, 31730/2022,
32197/2022, 34845/2022 , 35020/2022 , 36709/2022,
37012/2022, 38168/2022 , 39952/2022 & 41889/2022
-------------------------------------------Dated this the 21st day of March, 2024
JUDGMENT
“Property is a human right because it is a human’s right.”
Walter Barnes in “Third World Ways in Cambridge
USA”, The Wall Street Journal, December 1983
The writ petitioners in these cases are persons whose land and
buildings had been acquired for the purpose of widening the National
Highway under the provisions of the National Highways Act. They are
aggrieved since part of their properties and buildings are acquired,
leaving out small strips of land or buildings that are unusable. In
some cases, awards have been passed and in some, awards are yet
to be passed. The common question that arises for consideration in
all these writ petitions is whether Section 94 of the Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation
and Resettlement Act, 2013 ('the 2013 Act' for short) will apply to
WPC No.5944/2021 & con.cases
-50-
acquisitions under the National Highways Act.
History
2. The Land Acquisition Act of 1894 ('the 1894 Act' for short) is
a pre-constitutional law that provided for the acquisition of land for
public purposes and for companies. The Act provides for payment of
compensation to persons who lost their lands due to compulsory
acquisition. The exercise of the power of eminent domain to
expropriate was statutorily recognised by the enactment. Several
amendments have been effected to the 1894 Act to bring it in
conformity with the requirement of the Constitution of India. The
Legislature thought it fit to exclude the operation of the 1894 Act
when it came to acquisition for certain specific purposes for which
separate law was enacted, with provisions for acquisition. The
National Highways Act, 1956 ('the NH Act' for short), which came
into force in 1956, did not originally contain provisions for land
acquisition. Acquisition for the purpose of National Highways was
made under the 1894 Act, and the owners were given in addition to
the market value, solatium as well as interest under the provisions
of the said Act. By an amendment brought about by the National
Highways Laws (Amendment) Act, 1997, provisions were introduced
into the NH Act for empowering acquisition for the purpose of
development of highways. Section 49 of the 1894 Act recognised a
WPC No.5944/2021 & con.cases
-51-
right for the landowners to express their desire that the whole of a
house, manufactory, or building may be acquired instead of a part
thereof. The 1997 amendment of the NH Act did not contain a
similar provision that safeguards the above-said right of the
landowner. Instead, what was available was Section 3-G(7), which
deals with the determination of the amount of compensation. The
only provision which was almost akin to Section 49 of the 1894 Act
was Section 3-G(7) (b) and (c), which identified the damage
sustained by a reason of severing of the land from other land and
the damage sustained at the time of taking possession by the reason
of the acquisition injuriously affecting other immovable property of
the land owner or his earnings, as matters, that have to be taken
into account while determining compensation.
3. The entire concept behind acquisition underwent a sea
change when the 2013 Act was brought into force. The 2013 Act,
which was enacted 120 years after the earlier enactment, has
attempted to replace the expropriation legislation by providing for a
humane, participative, informed, and transparent process for land
acquisition, as the preamble to the new Act suggests. The preamble
says that the intention is to acquire land with the least disturbance
to the owners and other affected families, provide just and fair
compensation to the affected persons, make adequate provisions for
WPC No.5944/2021 & con.cases
-52-
their rehabilitation and resettlement, and ensure that the cumulative
outcome of the compulsory acquisition should be that the affected
persons become partners in development leading to an improvement
in their post-acquisition social and economic status. The 2013 Act
recognised the special enactments providing for the acquisition of
land for specific purposes, like the NH Act. Section 105 (1) of the
2013 Act says that subject to sub-section (3), the provisions of the
Act will not be applied to enactments relating to land acquisition,
which are specified in the Fourth Schedule. Sub-section (3) provides
for the issuance of a notification within one year from the date of
commencement of the 2013 Act, directing that any of the provisions
of the 2013 Act relating to the determination of compensation in
accordance
with
the
First
Schedule
and
rehabilitation
and
resettlement specified in the Second and Third Schedules, being
beneficial to the affected families, shall apply to the cases of land
acquisition under the enactment specified in the Fourth Schedule,
with such exceptions or modifications. There is a rider that the
exceptions or modifications shall not reduce the compensation or
dilute the provisions of the 2013 Act relating to compensation or
rehabilitation
and
resettlement
as
may
be
specified
in
the
notification.
4. Section 94 of the 2013 Act is a provision similar to Section
WPC No.5944/2021 & con.cases
-53-
49 of the 1894 Act that recognises the right of the landowner to
express his desire to have the entire building acquired, and it also
provides that possession shall not be taken till a decision is taken in
this regard. The claim of the petitioners is that the benefit of the
above provision is available to the petitioners as well, though there
is no such specific provision in the NH Act.
5.
Heard
Sri
P.Sathisan,
Sri
Shyam
Padman,
Sri R.Parthasarathy, Sri P.A.Mohammed Shah, Sri V.N.Ramesan
Nambisan,
Sri
K.A.Salil
Narayanan,
Sri
B.G.Bidan
Chandran,
Sri T.C.Krishna and Smt.N.Sudhadevi (Special Government Pleader),
who
led
the
arguments
on
behalf
of
the
petitioners
and
respondents.
6. The hearing was completed over several days and spread
over a few months. The individual arguments of each counsel are not
being narrated in the judgment for the purpose of brevity. Instead,
the questions that have been posed by the petitioners and
respondents, which call for a decision, are identified and considered.
QUESTIONS THAT ARISE FOR CONSIDERATION:I.
Whether a classification of lands and landowners,
based on the enactment under which land is
acquired
and
whether
different
treatment
of
landowners whose lands are acquired under the NH
Act
and
the
Act,
when
it
comes
to
WPC No.5944/2021 & con.cases
-54compensation, rehabilitation, and resettlement, are
permissible in law?
II.
Whether the NH Authorities can be compelled to
acquire land that is not required for the purpose of
the National Highway, having regard to the fact that
the acquisition under the NH Act is a linear
acquisition, which is a class by itself?
III.
Whether the principles of salus populi require that
larger public interest should outweigh what is
beneficial to the landowner?
IV.
Whether recognition of the right contained in
Section 94 of the 2013 Act, through Section 28 of
said Act, will amount to a re-introduction of what is
barred by Section 105(1) of the 2013 Act?
V.
Whether the “just equivalent” compensation is to
include the loss caused to the landowner with
respect to the market value of the property, the
annual
profits
fetched
by
the
property,
the
expenditure that would be incurred in constructing
or acquiring a similar asset, and the cost of
reinstatement and rehabilitation and such other
factors?
VI.
Whether the right under Section 94 of the 2013 Act
is to be recognised for arriving at “just equivalent”
compensation, having regard to the meaning of the
term “compensation,” which includes anything given
to make things equal in value, anything given as an
equivalent, to make amends for loss or damage?
VII.
Whether the provision contained in Section 94 of
the
Act
is
part
of
rehabilitation
resettlement rights of the landowner?
and
WPC No.5944/2021 & con.cases
-55VIII. Whether Section 94 of the 2013 Act is a substantive
provision or merely procedural?
7. The Counsel for the petitioners relied on the decisions in;
1.
The State of WB vs Bela Banerjee and Ors [AIR 1954
SC 170]
2.
P.Vajravelu Mudaliar v. Special Deputy Collector for
Land Acquisition West Madras [AIR 1965 SC 1017]
3.
RC Cooper & Ors Vs. UOI [1970 (1) SCC 248]
4.
Nagpur Improvement Trust & Anr. Vs. Vithal Rao &
Ors. [AIR 1973 SC 689]
5.
State of Mysore and Ors. vs. K. C Adiga and Ors [AIR
1976 SC 853]
6.
Bishambhar Dayal Chandra Mohan & Ors. vs State of
UP. [AIR 1982 SC 33]
7.
Basantibai Fakirchand Khetan and Ors. Vs. State of
Maharashtra and Ors.[AIR 1984 (Bom) 366]
8.
State of Maharashtra & Anr. Vs. Basantibai Mohanlal
Khetan and Ors. [AIR 1986 SC 1466]
9.
Jilubhai Nanbhai Khachar and Ors vs State of Gujarth
[1995 Supp(1) SCC 596]
10.
Whirlpool Corp. V. Registrar of Trade Marks [AIR
1999 SC 22]
11.
UOI V. Naveen Jindal &Ors [AIR 2004 SC 1559]
12.
State of Haryana Vs. Ranbir [AIR 2006 SC 1796]
13.
M.
Naga
Venkata
Lakshmi
vs
Viskhapatnam
Municipal Corp. & Anr. [2007 (8) SCC 748]
14.
Popcorn Entertainment & Ors V. City Industrial
Development Cor. And Ors [(2007) 9 SCC 593]
15.
M/S. Entertainment Network (India) Ltd vs M/S.
Super Cassettee Industries Ltd. [2008 (13) SCC 30]
16.
The Project Director, NHAI Vs. M. Hakeem and Ors.
[AIR 2021 SC 3471]
17.
NHAI Vs. P Nagaraju and Ors. [(2022) 15 SCC 1]
WPC No.5944/2021 & con.cases
-5618.
National Highway Authority of India v. R.Raju [2022
(1) KLT 154]
19.
Ibrahimkutty
K.K
vs.
UOI
and
Ors
[WP(C)7544/2022]
20.
Kunhiraman K vs. UOI and ors.[WP(C) 5609/2022]
21.
Project Director NHAI & Ors. Vs. Dharmaratnam &
Ors. (RP No. 581 of 2019 in W.P.(C) No.39160 of
2018)
22.
Saramma Itticheriya v. State of Kerala & Ors. [AIR
2008 Kerala 72 (FB)]
23.
State of Maharashtra & Ors. v. Reliance Industries
Ltd. & Ors. [(2017) 10 SCC 713]
24.
Lalita & Ors. v. Union of India & Ors. [2003 KHC
3675]
25.
Union of India & Anr. v. Tarsem Singh & Ors. [(2019
(9) SCC 304]
26.
Caritas India v. Union of India [(2019) 5 MLJ 641]
27.
Transstroy
(India)
Ltd.
v.
State
of
Telangana
[Manu/AP/0023/2016]
28.
Noushad KM v Union of India (WPC 14570 of 2021)
29.
K.Chellapandian v. Government of India & Ors.
[Manu/TN/0442/2019]
30.
Tukaram Kana Joshi & Ors. v. M.I.D.C. & Ors. [(2013)
1 SCC 353]
31.
Vidya Devi v. State of Himachal Pradesh & Ors.
[2020 KHC 6015]
32.
Golden Iron and Steel Forging v. Union of India &
Ors. [2011 (4) RCR (Civil) 375]
33.
Balammal and Ors. V. State of Madras and ors. [AIR
1968 SC 1425].
34.
Ghaziabad Development Authority v. Balbir Singh
[AIR 2004 SC 2141]
35.
K.T.Plantation Pvt.Ltd & Anr. v. State of Karnataka
[(2011) 9 SCC 1]
WPC No.5944/2021 & con.cases
-57-
8. The counsel for the respondents relied on the following
decisions;
a.
Harsook Das Bal Kishan Das v First Land
Acquisition Collector (1975) 2 SCC 256
b.
State of Bihar v. Kundan Singh [AIR 1964 SC 350]
c.
Project Director, Project Implementation Unit v. P.V.
Krishnamoorthy [(2021) 3 SCC 572]
d.
Girnar Traders v. State of Maharashtra & Ors.
[2011(3)SCC 1]
e.
Prithipal Singh & Ors. v. State of Punjab & Anr.
[(2012) 1 SCC 10]
f.
Hira Tikkoo v. Union Territory of Chandigarh & Ors.
[(2004) 6 SCC 765]
g.
National Highways Authority of India v. Sayedabad
Tea Company Limited & Ors. [(2020) 15 SCC 161]
h.
Mohammed v. Project Director [1993 (1) KLT 730]
9. STATUTORY PROVISIONS WHICH NEED CONSIDERATION:
9.1 Land Acquisition Act, 1894:
Section 49: Acquisition of part of house or building. (1) The provisions of this Act shall not be put in force for the
purpose of acquiring a part only of any house, manufactory
or other building, if the owner desires that the whole of such
house, manufactory or building shall be so acquired:
Provided also that, if any question shall arise as to
whether any land proposed to be taken under this Act does
or does not form part of a house, manufactory or building
within the meaning of this section, the Collector shall refer
the determination of such question to the Court and shall not
take possession of such land until after the question has been
determined.
In deciding on such a reference the Court shall have
WPC No.5944/2021 & con.cases
-58regard to the question whether the land proposed to be
taken, is reasonably require for the full and unimpaired use
of the house, manufactory or building.
(2) If, in the case of any claim under section 23, sub-section
(1) thirdly by a person interested, on account of the severing
of the land to be acquired from his other land, the
[appropriate Government] is of opinion that the claim is
unreasonable or excessive, it may, at any time before the
Collector has made his award, order the acquisition of the
whole of the land of which the land first sought to be
acquired forms a part.
(3) In the case last hereinbefore provided for, no fresh
declaration or other proceedings under sections 6 to 10, both
inclusive, shall be necessary; but the Collector shall without
delay furnish a copy of the order of the appropriate
Government to the person interested, and shall thereafter
proceed to make his award under section 11.
9.2 The Right to Fair Compensation and Transparency
in Land Acquisition, Rehabilitation and Resettlement
Act, 2013.
9.2.1. Preamble -An Act to ensure, in consultation with
institutions of local self-government and Gram Sabhas
established under the Constitution, a humane, participative,
informed and transparent process for land acquisition for
industrialisation, development of essential infrastructural
facilities and urbanisation with the least disturbance to the
owners of the land and other affected families and provide
just and fair compensation to the affected families whose
land has been acquired or proposed to be acquired or are
affected by such acquisition and make adequate provisions
for
such
affected
persons
for
their
rehabilitation
and
WPC No.5944/2021 & con.cases
-59resettlement and for ensuring that the cumulative outcome
of compulsory acquisition should be that affected persons
become partners in development leading to an improvement
in their post acquisition social and economic status and for
matters connected therewith or incidental thereto.
9.2.2. Section 3(p). Definition.–In this Act, unless the
context otherwise requires,—
(p) ―”land” includes benefits to arise out of land, and things
attached to the earth or permanently fastened to anything
attached to the earth;
9.2.3. Section 28. Parameters to be considered by
Collector in determination of award. In determining the
amount of compensation to be awarded for land acquired
under this Act, the Collector shall take into consideration—
firstly, the market value as determined under section 26
and the award amount in accordance with the First and
Second Schedules;
secondly, the damage sustained by the person interested,
by reason of the taking of any standing crops and trees
which may be on the land at the time of the Collector's
taking possession thereof;
thirdly, the damage (if any) sustained by the person
interested, at the time of the Collector's taking possession
of the land, by reason of severing such land from his other
land;
fourthly, the damage (if any) sustained by the person
interested, at the time of the Collector's taking possession
of the land, by reason of the acquisition injuriously affecting
his other property, movable or immovable, in any other
manner, or his earnings;
fifthly, in consequence of the acquisition of the land by the
WPC No.5944/2021 & con.cases
-60Collector, the person interested is compelled to change his
residence or place of business, the reasonable expenses (if
any) incidental to such change;
sixthly, the damage (if any) bona fide resulting from
diminution of the profits of the land between the time of the
publication of the declaration under section 19 and the time
of the Collector's taking possession of the land; and
seventhly, any other ground which may be in the interest of
equity, justice and beneficial to the affected families.
9.2.4. Section 31. Rehabilitation and Resettlement
Award for affected families by Collector.
(1)
The
Collector
shall
pass
Rehabilitation
and
Resettlement Awards for each affected family in terms of
the entitlements provided in the Second Schedule.
(2) The Rehabilitation and Resettlement Award shall
include all of the following, namely:—
(a)
rehabilitation and resettlement amount payable
to the family;
(b)
bank account number of the person to which the
rehabilitation and resettlement award amount is
to be transferred;
(c)
particulars of house site and house to be
allotted, in case of displaced families;
(d) particulars of land allotted to the displaced
families;
(e)
particulars of one time subsistence allowance
and transportation allowance in case of displaced
families;
(f)
particulars of payment for cattle shed and petty
shops;
(g)
particulars of one-time amount to artisans and
WPC No.5944/2021 & con.cases
-61small traders;
(h)
details of mandatory employment to be provided
to the members of the affected families;
(i)
particulars of any fishing rights that may be
involved;
(j)
particulars of annuity and other entitlements to
be provided;
(k)
particulars
of
special
provisions
for
the
Scheduled Castes and the Scheduled Tribes to be
provided:
PROVIDED that in case any of the matters specified under
clauses (a) to (k) are not applicable to any affected family
the same shall be indicated as not applicable:
PROVIDED FURTHER that the appropriate Government may,
by notification increase the rate of rehabilitation and
resettlement amount payable to the affected families,
taking into account the rise in the price index.
9.2.5. Section 38. Power to take possession of land to
be acquired.
(1) The Collector shall take possession of land after
ensuring that full payment of compensation as well as
rehabilitation and resettlement entitlements are paid or
tendered to the entitled persons within a period of three
months for the compensation and a period of six months
for the monetary part of rehabilitation and resettlement
entitlements listed in the Second Schedule commencing
from the date of the award made under section 30:
PROVIDED that the components of the Rehabilitation and
Resettlement Package in the Second and Third Schedules
that relate to infrastructural entitlements shall be provided
within a period of eighteen months from the date of the
WPC No.5944/2021 & con.cases
-62award:
PROVIDED FURTHER that in case of acquisition of land for
irrigation or hydel project, being a public purpose, the
rehabilitation and resettlement shall be completed six
months prior to submergence of the lands acquired.
(2) The Collector shall be responsible for ensuring that the
rehabilitation and resettlement process is completed in all
its aspects before displacing the affected families.
9.2.6. Section 94. Acquisition of part of house or
building.
(1) The provisions of this Act shall not be put in force for
the purpose of acquiring a part only of any house,
manufactory or other building, if the owner desires that the
whole of such house, manufactory or building shall be so
acquired:
PROVIDED that, if any question shall arise as to whether
any land proposed to be taken under this Act does or does
not form part of a house, manufactory or building within
the meaning of this section, the Collector shall refer the
determination of such question to the Authority concerned
and shall not be taken possession of such land until after
the question has been determined.
(2) In deciding on such a reference made under the
proviso to sub-section (1), the Authority concerned shall
have regard to the question whether the land proposed to
be taken, is reasonably required for the full and unimpaired
use of the house, manufactory or building.
(3) If, in the case of any claim under this Act, by a person
interested, on account of the severing of the land to be
acquired from his other land, the appropriate Government
is of opinion that the claim is unreasonable or excessive, it
WPC No.5944/2021 & con.cases
-63may, at any time before the Collector has made his award,
order the acquisition of the whole of the land of which the
land first sought to be acquired forms a part.
(4) In the case of any acquisition of land so required no
fresh declaration or other proceedings under sections 11 to
19, (both inclusive) shall be necessary; but the Collector
shall without delay furnish a copy of the order of the
appropriate Government to the person interested, and shall
thereafter proceed to make his award under section 23.
9.2.7. Section 105. Provisions of this Act not to apply
in
certain
cases
or
to
apply
with
certain
modifications.
(1) Subject to sub-section (3), the provisions of this Act
shall
not
apply to
the
enactments
relating to
land
acquisition specified in the Fourth Schedule.
(2) Subject to sub-section (2) of section 106, the Central
Government may, by notification, omit or add to any of the
enactments specified in the Fourth Schedule.
(3) The Central Government shall, by notification, within
one year from the date of commencement of this Act,
direct that any of the provisions of this Act relating to the
determination of compensation in accordance with the First
Schedule and rehabilitation and resettlement specified in
the Second and Third Schedules, being beneficial to the
affected
families,
shall
apply
to
the
cases
of
land
acquisition under the enactments specified in the Fourth
Schedule
or
shall
apply
with
such
exceptions
or
modifications that do not reduce the compensation or
dilute the provisions of this Act relating to compensation or
rehabilitation and resettlement as may be specified in the
notification, as the case may be.
WPC No.5944/2021 & con.cases
-64(4) A copy of every notification proposed to be issued
under sub-section (3), shall be laid in draft before each
House of Parliament, while it is in session, for a total period
of thirty days which may be comprised in one session or in
two or more successive sessions, and if, before the expiry
of the session immediately following the session or the
successive
sessions
aforesaid,
both
Houses
agree
in
disapproving the issue of the notification or both Houses
agree in making any modification in the notification, the
notification shall not be issued or, as the case may be, shall
be issued only in such modified form as may be agreed
upon by both the Houses of Parliament.
9.3. National Highways Act, 1956
9.3.1. Section 3(b): 3. Definitions.—In this Act, unless
the context otherwise requires,—
(b) “land” includes benefits to arise out of land and things
attached to the earth or permanently fastened to anything
attached to the earth
9.3.2. Section 3E(1): Power to take possession.
(1) Where any land has vested in the Central Government
under sub-section (2) of section 3-D, and the amount
determined by the competent authority under section 3-G
with respect to such land has been deposited under subsection (1) of section 3-H, with the competent authority by
the Central Government, the competent authority may by
notice in writing direct the owner as well as any other
person who may be in possession of such land to surrender
or deliver possession thereof to the competent authority or
any person duly authorised by it in this behalf within sixty
days of the service of the notice.
9.3.3. Section 3-G: Determination of amount payable
WPC No.5944/2021 & con.cases
-65as compensation.
(1) Where any land is acquired under this Act, there shall
be paid an amount which shall be determined by an order
of the competent authority.
(2) Where the right of user or any right in the nature of an
easement on, any land is acquired under this Act, there
shall be paid an amount to the owner and any other
person whose right of enjoyment in that land has been
affected in any manner whatsoever by reason of such
acquisition an amount calculated at ten per cent, of the
amount determined under sub-section (1), for that land.
(3) Before proceeding to determine the amount under subsection (1) or sub-section (2), the competent authority
shall
give
a
public
notice
published
in
two
local
newspapers, one of which will be in a vernacular language
inviting claims from all persons interested in the land to be
acquired.
(4) Such notice shall state the particulars of the land and
shall require all persons interested in such land to appear
in person or by an agent or by a legal practitioner referred
to in sub-section (2) of section 3-C, before the competent
authority, at a time and place and to state the nature of
their respective interest in such land.
(5) If the amount determined by the competent authority
under sub-section (1) or sub-section (2) is not acceptable
to either of the parties, the amount shall, on an application
by either of the parties, be determined by the arbitrator to
be appointed by the Central Government.
(6) Subject to the provisions of this Act, the provisions of
the Arbitration and Conciliation Act, 1996 (26 of 1996)
shall apply to every arbitration under this Act.
WPC No.5944/2021 & con.cases
-66(7) The competent authority or the arbitrator while
determining the amount under sub-section (1) or subsection
(5),
as
the
case
may
be,
shall
take
into
consideration—
(a) the market value of the land on the date of
publication of the notification under section 3A;
(b) the damage, if any, sustained by the person
interested at the time of taking possession of
the land, by reason of the severing of such
land from other land;
(c) the damage, if any, sustained by the person
interested at the time of taking possession of
the
land,
injuriously
by
reason
affecting
his
of
the
acquisition
other
immovable
property in any manner, or his earnings;
(d) if, in consequences of the acquisition of the land,
the person interested is compelled to change
his
residence
or
place
of
business,
the
reasonable expenses, if any, incidental to such
change.
9.3.4. Section 3-H(1): Deposit and payment of
amount.- (1) The amount determined under section 3-G
shall be deposited by the Central Government in such
manner asmay be laid down by rules made in this behalf
by that Government, with the competent authority before
taking possession of the land.
9.3.5. Section 3-J: Land Acquisition Act 1 of 1894
not to apply.—Nothing in the Land Acquisition Act, 1894
shall apply to an acquisition under this Act.
WPC No.5944/2021 & con.cases
-67-
CONSIDERATION:
Question No.I:
10. In Bela Banerjee (supra), a Constitution Bench of the
Hon'ble Supreme Court considered the correctness of the judgment
of the High Court of Calcutta, declaring certain provisions of the
West
Bengal
Land
Development
and
Planning
Act,
1948,
unconstitutional and void. The controversy centered around the
constitutionality of a condition whereby compensation payable was
limited so as not to exceed the market value of the land on
31.12.1946. Article 31(2) of the Constitution of India as it stood
then provided that no property shall be acquired under any law
authorising
such
acquisition
unless
the
law
provides
for
compensation for the property and either fixes the amount of
compensation or specifies the principles on which the compensation
is to be determined. Rejecting the contention that compensation
under Entry 42 of List III of the Constitution of India could not be full
cash equivalent, the Constitution Bench held that what is determined
as payable must be compensation, that is, a just equivalent of what
the owner has been deprived of. The Court further held that within
the limited requirement of full indemnification of the expropriated
owner, the Constitution allows free play to the legislative judgment
as to what principles should guide the determination of the amount
WPC No.5944/2021 & con.cases
-68-
payable. It was also held that whether such principles take into
account all the elements which make up the true value of the
property
appropriated
and
exclude
matters
which
are to
be
neglected is a justiciable issue. The judgment was rendered on
11.12.1953. Article 31(2) was later amended in 1955 by the
Constitution 4th Amendment Act.
11. In RC Cooper (supra), an Eleven Judge Bench of the
Hon'ble Supreme Court considered the validity of the Banking
Companies (Acquisition and Transfer of Undertaking) Act. The
Hon'ble Supreme Court noted that the dictionary meaning of the
word “compensation” meant anything given to make things equal in
value, anything given as an equivalent, to make amends for loss or
damage. In all States where the rule of law prevails, the right to
compensation is guaranteed by the Constitution or regarded as
inextricably involved in the right to property. The Hon'ble Supreme
Court further held that the Court was unable to hold that a principle
specified by the Parliament for determining compensation of the
property to be acquired is conclusive. The Court was of the opinion
that if such a view is accepted, the Parliament will be invested with a
charter of arbitrariness, and by abuse of the legislative process, the
constitutional guarantee of the right to compensation may be
severely impaired. The Court laid down the important methods for
WPC No.5944/2021 & con.cases
-69-
the determination of compensation as follows;
“94. The important methods of determination
of
compensation
determined
from
are-(i)
market
sales
of
value
comparable
properties, proximate in time to the date of
acquisition, similarly situate, and possessing
the same or similar advantages and subject to
the same or similar disadvantages. Market
value is the price the property may fetch in the
open
market
if
sold
by
a
willing
seller
unaffected by the special needs of a particular
purchase; (ii) capitalization of the net annual
profit out of the property at a rate equal in
normal cases to the return from gilt-edged
securities. Ordinarily value of the property may
be determined by capitalizing the net annual
value obtainable in the market at the date of
the
notice
of
acquisition;
(iii)
where
the
property is a house, expenditure likely to be
incurred for constructing a similar house, and
reduced by the depreciation for the number of
years since it was constructed; (iv) principle of
reinstatement,
where
it
is
satisfactorily
established that reinstatement in some other
place is bona fide intended, there being no
general market for the property for the purpose
for which it is devoted (the purpose being a
public purpose) and would have continued to be
devoted, but for compulsory acquisition. Here
WPC No.5944/2021 & con.cases
-70-
compensation will be assessed on the basis of
reasonable cost of reinstatement; (v) when the
property has outgrown its utility and it is
reasonably incapable of economic use, it may
be valued as land plus the break-up value of
the structure. But the fact that the acquirer
does not intend to use the property for which it
is used at the time of acquisition and desires to
demolish it or use it for other purpose is
irrelevant; and (vi) the property to be acquired
has ordinarily to be valued as a unit. Normally
an
aggregate
of
the
value
of
different
components will not be the value of the unit.”
It was, however, observed that the above are not the only methods.
12. In Vajravelu Mudaliar (supra), a Constitution Bench of the
Hon'ble Supreme Court considered the constitutionality of the Land
Acquisition (Madras Amendment) Act, 1961. The Court held that
even
after
the
amendment
of
Article
31(2),
the
expression
'compensation' continued to mean “just equivalent.” The amending
Act sought to differentiate between persons with regard to payment
of
the
compensation. The
Hon'ble Supreme Court held that
discretion is writ large on the Amending Act, and it cannot be
sustained on the principle of reasonable classification. That was a
case where the object of the Amending Act was to acquire lands for
housing schemes at a lesser cost. It empowered the State to acquire
WPC No.5944/2021 & con.cases
-71-
lands for housing schemes at a price lower than what the State has
to pay if the same was acquired under the Principal Act.
13. Later, a Seven Judge Bench of the Hon'ble Supreme Court
in
Nagpur
Improvement
Trust
(supra)
considered
the
constitutionality of certain provisions of the Nagpur Improvement
Trust Act, 1936. The Hon'ble Supreme Court followed the judgment
in Vajravelu (supra) and the judgment in Balammal (supra) and
held that classification is bad and impermissible. The Court held that
different principles of compensation cannot be formulated for lands
acquired on the basis that the owner is old or young, healthy or ill,
tall or short, or whether the owner has inherited the property or built
it with his own efforts, or whether the owner is a politician or an
advocate. It is further stated that the object being to compulsorily
acquire for a public purpose, object is equally achieved whether the
land belongs to one type or another type. The Court further held
that it is immaterial whether the acquisition is under the Land
Acquisition Act or under another enactment and that if the existence
of two enactments would enable the State to give one owner
different treatment from another equally situated, the owner who is
discriminated against can claim the protection under Article 14. The
Court held that while it is well settled that a classification, in order to
be reasonable, must be founded on intelligible differentia and a
WPC No.5944/2021 & con.cases
-72-
rational relation with the object sought to be achieved by the
legislation in question, the object itself cannot be discriminatory. The
Court went on to consider what can be a reasonable classification for
the purpose of determining compensation, if the object of the
legislation is to compulsorily acquire land for public purposes.
14. In K.T. Plantation (P) Ltd. (supra), a 5-judge bench of
the Hon’ble Supreme Court held that public purpose is a precondition for deprivation of a person from his property under Article
300A and the right to claim compensation is also inbuilt in that
article and when a person is deprived of his property the State has
to justify both the grounds, which may depend on scheme of the
Statute, legislative policy, object and purpose of the legislature and
other related factors. It was also held that a Statute depriving a
person of his property is, therefore, amenable to judicial review on
grounds hereinbefore discussed. In the cases on hand, we are not
concerned with the validity of the NH Act or the 2013 Act. However,
the above decision has a bearing on the case on hand, insofar as it
lays down that the right to claim compensation is built into Article
300A of the Constitution of India.
15. In Lalita (supra), a learned Single Judge of the Karnataka
High Court held that Section 3-J insofar as it says that the provisions
of the 1894 Act will not apply for acquisitions under the NH Act is
WPC No.5944/2021 & con.cases
-73-
unconstitutional and violative of Article 14. A Division Bench of the
Punjab and Haryana High Court in Golden Iron (supra) considered
the validity of the amendment of the NH Act in 1997, whereby
provisions
empowering
acquisition
were
included.
The
Court
considered the question whether different compensation can be paid
in cases of acquisition under the NH Act. The Court held that the
expeditious construction of Highways, the expeditious conclusion of
acquisition
proceedings,
the
reference
of
disputes
regarding
compensation to an arbitrator, the statutory power to associate
private entrepreneurs, and the legal ability to access private capital,
have no relevance to the assessment/payment of compensation and
that the expeditious acquisition of land can be validly achieved by
resorting to the urgency provisions contained in Section 17A of the
Land Acquisition Act. The Court held that the impugned enactment
merely replaces the procedure for acquisition, envisaged by the Land
Acquisition Act with a new procedure, stated to be expeditious, more
efficient, and in tune with the need for expeditious construction of
national highways, but does not disclose a distinct or peculiar public
purpose as would justify the denial of solatium and other statutory
benefits relating to compensation. The above judgment of the
Punjab and Haryana High Court was declared to be correctly held by
WPC No.5944/2021 & con.cases
-74-
the Hon’ble Supreme Court in paragraph 29 of the judgment in
Tarsem Singh (supra), which is extracted for reference.
“29. Both, P.Vajravelu
Mudaliar v. LAO,(AIR
Mudaliar
[P.Vajravelu
SC
and Nagpur
1017)]
Improvement Trust [Nagpur Improvement Trust v. Vithal
Rao, (1973) 1 SCC 500] clinch the issue in favour of the
respondents, as has been correctly held by the Punjab
and
Haryana
High
Court
in Golden
Iron
and
Steel
Forging [Golden Iron and Steel Forging v. Union of India,
2008 SCC OnLine P&H 498 : (2011) 4 RCR (Civil) 375].
First and foremost, it is important to note that, as has
been
seen
hereinabove,
the
object
of
the
Amendment was to speed up the process of acquiring
lands for National Highways. This object has been
achieved in the manner set out hereinabove. It will be
noticed that the awarding of solatium and interest has
nothing to do with achieving this object, as it is nobody's
case that land acquisition for the purpose of National
Highways slows down as a result of award of solatium and
interest. Thus, a classification made between different
sets of landowners whose lands happen to be acquired for
the purpose of National Highways and landowners whose
lands are acquired for other public purposes has no
rational relation to the object sought to be achieved by
the Amendment Act i.e. speedy acquisition of lands for
the purpose of National Highways. On this ground alone,
the Amendment Act falls foul of Article 14.”
16. The Hon'ble Supreme Court in Tarsem Singh (supra) was
considering a batch of appeals filed by the Union of India challenging
WPC No.5944/2021 & con.cases
-75-
the view of the Punjab and Haryana High Court that non-grant of
solatium and interest to lands acquired under the National Highways
Act is bad in law and consequently Section 3-J of the National
Highways Act, 1956 is struck down as violative of Article 14 to that
extent. In paragraph 29 of the judgment which has been extracted
above,
after
referring
to
Vajravelu
(supra)
and
Nagpur
Improvement (supra), the Court held that the object of the 1997
Act was to speed up the process of acquiring lands for National
Highways and the awarding of solatium and interest has nothing to
do with achieving the said object. The Court found that the
classification made between different sets of landowners whose
lands happened to be acquired for the purpose of National Highways
and land owners whose lands have been acquired for other purposes
have no rational relation to the object sought to be achieved by the
Amendment Act, that is, speedy acquisition of lands for the purpose
of National Highways.
17. Even after Tarsem Singh (supra), contentions were raised
as to the applicability of Section 3-J of the NH Act, with regard to
aspects other than solatium and interest. The issues were set at rest
to a great extent by the judgment of the Hon’ble Supreme Court in
P. Nagaraju (supra). Paragraphs 27 to 29 of the judgment are
extracted for reference.
WPC No.5944/2021 & con.cases
-76“27. In that view of the matter, though Section 3-G(7)(a) of
the NH Act provides the parameters to be taken into
consideration, it only provides the basic parameters to be
taken note of, for determining the amount payable as
compensation. While applying the said parameters for
determination of compensation, since the RFCTLARR Act,
2013 is also applicable as the NH Act is contained in the
Fourth Schedule, the factors as provided under Sections 26
and 28 of the RFCTLARR Act, 2013 including the seventh
factor will also be applicable in appropriate cases for the
determination of the market value as fair compensation for
the acquired land.
28. When land is acquired from a citizen, Articles 300-A and
31-A of the Constitution will have to be borne in mind since
the deprivation of property should be with authority of law,
after being duly compensated. Such law should provide for
adequately compensating the landloser keeping in view the
market value. Though each enactment may have a different
procedure
prescribed
for
the
process
of
acquisition
depending on the urgency, the method of determining the
compensation cannot be different as the market value of the
land and the hardship faced due to deprivation of the
property would be the same irrespective of the Act under
which it is acquired or the purpose for which it is acquired. In
that light, if Section 28 of the RFCTLARR Act, 2013 is held
not applicable in view of Section 3-J of the NH Act, the same
will be violative of Article 14 of the Constitution. In that
circumstance, the observation in Tarsem Singh [Union of
India v. Tarsem Singh, (2019) 9 SCC 304 : (2019) 4 SCC
(Civ) 364] that Section 3-J of the NH Act is unconstitutional
to that extent though declared so while on the aspect of
WPC No.5944/2021 & con.cases
-77solatium and interest, it is held so on all aspects relating to
determination of compensation.
29. In any event, the extracted portion of the Notification
dated 28-8-2015 is explicit that the benefits available to the
landowners under the RFCTLARR Act is to be also available to
similarly placed landowners whose lands are acquired under
the 13 enactments specified in the Fourth Schedule, among
which NH Act is one. Hence all aspects contained in Sections
to
of
the RFCTLARR Act
for
determination
of
compensation will be applicable notwithstanding Sections 3-J
and 3-G(7)(a) of the NH Act.”
18. P.Nagaraju (supra) also considered the decision in
M.Hakeem (supra), which was relied on by the counsel for the
respondents, to submit that the Court should not interfere with
awards passed and orders of the arbitrator under the NH Act unless
a patent illegality which goes to the root of the matter is pointed
out. The Apex Court held that the permissibility of interference is on
specific grounds of (i) the arbitrator not adopting a judicial approach,
(ii) a breach of principles of natural justice, (iii) a contravention of
Statute not linked to public policy or public interest, as being patent
illegality under Section 34(2A) and (iv) most basic notions of justice.
19. In Dharmarathnam (supra), this Court held that while
enacting the 2013 Act, the Parliament intended to retain the special
enactments and give such benefits wherever it is advantageous to
the landowners for acquisition under the special enactments. It was
WPC No.5944/2021 & con.cases
-78-
held that the substantive provisions regarding the determination of
compensation and rehabilitation and resettlement referred to in the
First Schedule, Second Schedule and Third Schedule of the 2013 Act
will apply to acquisition under the National Highways Act in view of
Section 105. This Court held that Section 105 only makes the
substantive provisions applicable and not the procedural provisions.
It is thus well settled that as far as compensation is concerned, there
cannot be any discrimination on the basis of the enactment under
which the acquisition is made and that in acquisitions under the NH
Act,
all
aspects
relating
to
compensation,
rehabilitation
and
resettlement contained in Sections 26 to 28 of the 2013 Act will be
applicable.
Question Nos.V to VIII :20. The above four questions are interlinked and hence
considered together. The questions also call for a discussion of the
nature of right to property and the protection that is afforded by the
Constitution of India to such proprietary rights of an individual.
What exactly compensation in the present scenario is?.
21. The meaning of “just equivalent of what is deprived of”
cannot be held to mean the mere money equivalent of the stretch of
land. To know what a person is deprived of on account of the
acquisition of his property, it is necessary to know what exactly
WPC No.5944/2021 & con.cases
-79-
property and the ownership of the property is. According to the
ancient English doctrine, the Crown alone can be the owner of the
land. The highest right that a subject can have, was thus not
ownership but only a mere encumbrance upon the ownership of the
Crown. The above concept is no longer recognised, and, in the
present day, one can be the owner of property, and the right of the
Crown is only a contingent right to succession in case there is no
person to inherit the property (escheat or bona vacantia). Salmond
on Jurisprudence, 12th Edn., discusses the different incidents of
'ownership' from pages 246 to 264. ‘Ownership’, according to
Salmond, denotes the relation between a person and an object
forming the subject matter of his ownership. The author has
identified the incidents of ownership as (i) a right to possess the
thing which one owns, though he may not necessarily have
possession, (ii) the right to use and enjoy the thing owned; the
right to manage it i.e., the right to decide how it shall be
used; and the right to the income from it, (iii) the right to
consume, destroy or alienate the thing, (iv) the characteristic of
being indeterminate in duration; the position of an owner differs
from that of a non-owner in possession in that the latter's interest is
subject to be determined at some future time and (v) residual right,
ie., the rights that remain after giving away lesser rights like lease,
WPC No.5944/2021 & con.cases
-80-
easement, right to take profits etc. (emphasis supplied). The
above views of the author have been quoted with approval by the
Hon’ble Supreme Court in several of its judgments.
22. In Entertainment Network (India) Ltd. (supra), the
Hon’ble Supreme Court held that the owner of copyright indisputably
has a right akin to the right to property and that it is also a human
right. The Apex Court observed that human rights have started
gaining a multifaceted approach and that property rights vis-a-vis
individuals are also incorporated within the “multiversity” of human
rights. The right to property has been stated to be a constitutional
right as well as a human right by the Hon’ble Supreme Court in
N.Padmamma & Ors. v. S.Ramakrishna Reddy & Ors. [2008
(15) SCC 517]. The above judgment has been referred to with
approval in Vidya Devi (supra) wherein the Hon’ble Supreme Court
held that an 80 year old illiterate woman, who did not challenge the
deprivation of her land in any proceedings from 1967-68 when
possession was taken without recourse to any law, till 2010, was
found entitled to compensation.
23. In Tukaram Kana Joshi (supra), the Hon’ble Supreme
Court held that the right to property is now considered to be not
only a constitutional or a statutory right but also a human right and
that though, it is not a basic feature of the Constitution or a
WPC No.5944/2021 & con.cases
-81-
fundamental right, human rights are considered to be in the realm of
individual rights, such as the right to health, the right to livelihood,
the right to shelter and employment, etc. The Court further held that
human rights are gaining an even greater multifaceted dimension
and that the right to property is considered very much to be a part
of
such
new
dimension.
[Vide Lachhman
Dass v. Jagat
Ram [(2007) 10 SCC 448], Amarjit Singh v. State of Punjab
[(2010)
SCC
43], State
of
M.P. v. Narmada
Bachao
Andolan [(2011) 7 SCC 639], State of Haryana v. Mukesh
Kumar [(2011) 10 SCC 404] and Delhi Airtech Services (P)
Ltd. v. State of U.P. [(2011) 9 SCC 354].
24. Under Section 3(i) of the 2013 Act, 'cost of acquisition' is
defined to include the cost of Rehabilitation and Resettlement and
the cost of acquisition of land and building for the settlement of
displaced or adversely affected families. It also includes demurrage
to be paid for damages caused to the land and standing crops in the
process of acquisition. Section 28 of the 2013 Act deals with the
matters which have to be considered while determining the amount
of compensation. Section 3-G(7) of the NH Act has to be read along
with Section 28 of the 2013 Act in view of the categoric
pronouncement of the Hon’ble Supreme Court in P.Nagaraju
(supra). Section 28 takes in seven aspects for consideration as
WPC No.5944/2021 & con.cases
-82-
against the four items specified in Section 3-G (7) of the NH Act. The
additional aspects which have been included are the damage
sustained by the person interested by reason of the taking of any
standing crops and trees which may be on the land, the damage
resulting from the diminution of the profits of the land between the
time of publication of the declaration under Section 19 and the time
of taking possession and any other ground which may be in the
interest of equity, justice and beneficial to the affected families.
Section 28 of the 2013 Act is almost similarly worded as Section 23
of the 1894 Act.
25. There is no dispute that in view of the notification issued
under Section 105 (3) of the 2013 Act, the provisions of the 2013
Act relating to the determination of compensation in accordance with
the First Schedule and rehabilitation and resettlement specified in
the Second and Third schedules, being beneficial to the affected
parties, shall apply to the cases of land acquisition under the NH Act,
with such exceptions or modifications that do not reduce the
compensation or dilute the provisions of the 2013 Act relating to
compensation or rehabilitation and resettlement. The provisions
contained in Sections 27 and 28 of the 2013 Act are applicable to
acquisitions under the NH Act. Under the new regime (2013 Act), the
word “compensation” does not mean the market value of land alone
WPC No.5944/2021 & con.cases
-83-
but also includes several other factors like rehabilitation and
resettlement. In view of the sea change that has been brought about
in the law relating to compulsory acquisition, it has necessarily to be
held that a compensation would include not only the money
equivalent of the property that is acquired, but also the cost of
rehabilitation and resettlement. The above conclusion is also
strengthened by the fact that the 2013 Act postulates passing of two
awards passed, one for fixing the compensation for the property that
was acquired and the other for the purpose of resettlement and
rehabilitation.
Section 49 of the 1894 Act and Section 94 of the 2013 Act:
26. The question then is whether Section 94 is also a factor
which relates to compensation payable on compulsory acquisition,
rehabilitation and resettlement. The 2013 Act repealed the earlier
Land Acquisition Act, 1894. The 1894 Act came into force much
before the National Highways Act of 1956. Section 49 of the 1894
Act is almost similar to the provisions contained in Section 94 of the
2013 Act. Both Section 49 of the 1894 Act and Section 94 of the
2013 Act are to a certain extent prohibitive in nature, that is, they
begin by saying that the provisions of the Act shall not be put in
force for the purpose of acquiring a part only of any house,
manufactory, or other buildings, etc.
WPC No.5944/2021 & con.cases
-84-
27. The provisions give much importance to the desire of the
owner as to what is to be done with a portion of the property which
may remain after the acquisition of a part. If the owner of the land
desires that the entire building is to be acquired, the Collector must
refer the determination of the question to either the Court or the
Government and there is an embargo to take possession till the
question is determined. The provisions are clearly beneficial to the
landowner who is given an option in a situation where a portion of
the property which is left out from acquisition may go waste.
28. The right which is dealt with in Section 49 of the 1894 Act
and Section 94 of the 2013 Act, is the same as right of the owner of
a property to decide how he should use it and his right to consume,
destroy or alienate the property, spoken to by Salmond in his thesis
on Jurisprudence. The above said right of the owner is also
acquired/taken over, when he is deprived of his property. The right
recognised in Section 94 is hence a right which is a necessary
incident of the “ownership” of property. The above right is
constitutional right as well as a human right as held by the Apex
Court in the judgments referred to earlier.
Section 49 and its Scope:
29. The scope of Section 49 of the 1894 Act had come up for
consideration before the Hon’ble Supreme Court in Kundan Singh
WPC No.5944/2021 & con.cases
-85-
(supra), wherein the Hon’ble Supreme Court held that obections
under Section 49 of the 1894 Act, to the acquisition of a part of the
building has to be considered and dealt with before an award is
made under the Act. Later, in Harsook Das (supra), the Apex Court
held that even if there is vacant land, Section 49(2) of the Act will be
attracted by reason of definition of land and that acceding to the
contention on behalf of the appellant that Section 49(2) speaks only
of acquisition of land along with a building and not to the case of
acquisition of vacant land is to rob the meaning of land under
Section 49(2) of the Act and the content of Section 49(2) of the Act.
The question came up for consideration before a Full Bench of this
Court in Saramma Itticheriya (supra). The Full Bench posed the
following three questions for consideration.
“1. Is Collector vested with power to reject the claim under
Section 49(1) put forward by the owner to acquire entire
building and proceed with acquisition of part of the
building without Court interventions?
2.
Whether tenant can file a writ petition challenging the
action taken by the Collector when the option under
Section 49(1) is exercised by the landlord?
3.
When the Collector accepted the option to acquire the
entire building, whether only building materials are to be
acquired or the entire building including the land where it
is situated also need be acquired?”
30. Relying on Kundan Singh (supra), the Full Bench held that
WPC No.5944/2021 & con.cases
-86-
Section 49 prescribes a definite prohibition against putting in
force any of the provisions of the Act for the purpose of acquiring a
part only of any house, if the owner desires that the whole of such
house shall be acquired, that where a part of the house is proposed
to be acquired and a notification is issued in that behalf, the owner
must make up his mind as to whether he wants to allow the
acquisition of a part of his house or not, that he should indicate his
desire to the Land Acquisition Officer before an award is made under
Section 11, in which case, all further proceedings under the relevant
provisions of the Act must stop, and that if the objection is not
taken at the relevant time, it would still be open to him to
claim adequate compensation in the light of the material
provisions of Section 23 of the 1894 Act. (emphasis supplied).
The Full Bench referred to the decision in Harsook Das (supra),
which accepted the decision in Kundan Singh (supra) and explained
the difference between Sections 49(1) and (2) and held that the
object of Section 49(1) is to give the owner the option whether he
would like part of the building to be acquired. The Apex Court had
also held that Section 49(2) of the Act gives the option to the
Government only where the claim under the third clause of Section
23(1) of the Act, which is for severance, is excessive and that the
Government in such a case of acquisition of the remaining portion of
WPC No.5944/2021 & con.cases
-87-
the land under Section 49(2) of the Act saves the public exchequer
money which otherwise will be the subject-matter of a claim for
severance. The Full Bench further held that when the Collector
accepts the option to acquire the entire building, not only the
building materials are to be acquired, but the entire building,
including the land where the building is situated, needs to be
acquired. The Full Bench specifically held that the words ‘whole of
such house or manufactory or building’ includes land in which it is
situated. The decisions in Harsook Das (supra) and Saramma
Itticheriya (supra) came up for consideration before the Hon’ble
Supreme Court in Reliance Industries (supra), wherein the Court
held that there can be no dispute regarding the propositions laid
down in the above decisions. It was however held that in cases
where the owner of the building is not the owner of the land, the
land need not be acquired and the entire interest of the owner of the
building can be acquired. The Court was considering a case where
the land belonged to the Government and the Port Trust. Since
Section 94 of the 2013 Act and Section 49 of the 1894 Act, are more
or less worded similarly, the principles of law contained in the above
decisions will apply while considering the scope of Section 94 of the
2013 Act also.
WPC No.5944/2021 & con.cases
-88-
Right conferred by Section 94 – an analysis:
31. Section 94 starts with a prohibition to acquire a part only of
a house, manufactory, or other building if the owner desires that the
entire building should be acquired. The said option to the owner is
not dependent on whether the owner will be able to put to use the
part that is not proposed to be acquired. If a question arises as to
whether any land proposed to be acquired does or does not form
part of a house, etc., the issue has to be referred for determination
by such Authority concerned, and possession is not to be taken till
the question is determined. While deciding the above aspect, the
Authority shall have regard to the question whether the land
proposed to be taken, is reasonably required for the full and
unimpaired use of the house, manufactory, or building. One wonders
whether the land forms part of a house or a house forms part of the
land. I would think that a house, manufactory, or building can be
attached to a land, but to say that the land is attached to a house,
manufactory, or building may not be appropriate. One need not
spend time on the way the provision is drafted since Section 3(p) of
the Act defines 'land' to include benefits that arise out of land and
things attached to the earth or permanently fastened to anything
attached to the earth. So, whether what is left out is a building or
land after a portion is acquired, Section 94 gives an option to the
WPC No.5944/2021 & con.cases
-89-
landowner to require that the entire property be acquired. In
Mohammed (supra), a Division Bench of this Court held that the
owner will be a person interested, but all persons interested need
not be owners, as contemplated under Section 49 of the 1894 Act.
The Court considered the question whether the right to demand the
acquisition of the entire extent under Section 49(1) is available to a
person other than the owner and held that the right is available only
to the owner. The same is the position under Section 94 of the 2013
Act.
32. Section 94(3) says that if the claim made by the person
interested, on account of the severing of the land to be acquired
from
his
other
land,
is,
in
the
opinion
of
the
appropriate
Government, unreasonable or excessive, the Government can order
acquisition of the whole of the land before the Collector has made
the award. It can thus be seen that the claim on account of
severance has been linked to the right to demand acquisition of the
whole building/land. The claim for damage on account of severance
is provided for in Section 28(3) of the 2013 Act. It is already settled
that Section 28(3) will apply to acquisition under the NH Act also.
Thus Section 28 is intrinsically linked to Section 94 of the 2013 Act.
The above view is strengthened by the judgment of the Hon’ble
Supreme Court in Kundan Singh (supra), wherein the Hon’ble
WPC No.5944/2021 & con.cases
-90-
Supreme Court held that if the objection is not taken at the relevant
time, it would still be open to him to claim adequate compensation in
the light of the material provisions of Section 23 of the 1894 Act,
which is almost similar to Section 28 of the 2013 Act. It can, hence,
necessarily be concluded that even if the option under Section 94 is
not exercised in time, it is open to the claimant to make a claim
regarding severance under Section 28 of the 2013 Act.
33. To elaborate, the ingredients that have to be considered
under Section 28 of the 2013 Act while fixing the compensation
include the loss that the owner suffers because of the severance of
the land from other properties belonging to at the time of taking
possession of the land, as well as the damage sustained by reason of
the
acquisition
injuriously
affecting
his
property,
movable
or
immovable, in any other manner, or his earnings. It also includes the
reasonable expenses incidental to a change of residence or place of
business, which a person interested may be compelled to do as a
consequence of the acquisition. There is also an omnibus provision
that says that while fixing compensation, the Collector has to take
into consideration any other ground that may be in the interest of
equity, justice and beneficial to the affected families. The 3 rd, 4th and
7th aspects included in Section 28, are wide enough to include the
rights available under Section 94 of the Act. It cannot be disputed
WPC No.5944/2021 & con.cases
-91-
that the option given to a landowner to desire that his entire land
may be taken is a right incidental to ownership of property, and his
right to get compensation for losing such a right, cannot be taken
away as it is in the interest of equity, justice and beneficial to the
affected family. The person who loses the land knows what is most
beneficial to him. Going by Section 105, what is more beneficial to a
person who loses the land cannot be denied, and the payment for
such benefit is necessarily an endorsement of a right that is
substantive in nature and not procedural. One cannot say such
payments are not “compensation” since these payments will also
help the person who is losing the land to rehabilitate and resettle
himself.
34. How a landowner suffers because of part acquisition is
something that can be visualised. If a small extent of land with a
portion of the building remains after acquisition, there is no
possibility for the owner to repair the construction and make it
habitable since the Panchayat and Municipal Laws will not permit the
grant of any such permission for reconstruction, particularly since
the property is abutting the National Highway. Even if a construction
is to be made, it can only be done after providing for the necessary
setback, which again means the area that is lost as a setback has
become unusable because of the acquisition. Even if carrying out
WPC No.5944/2021 & con.cases
-92-
repairs and reconstruction is permitted, it would necessarily mean
expending a lot out of the compensation which has been received for
the property which has been notified and acquired. The end result is
that a person is left with a small extent of land with a broken
structure, where he has no choice, but to demolish the existing
structure
and
retain
the
land
as
land
without
making
any
construction. The land only falls waste, and it is no solace to say that
the land is abutting the National Highway since, as far as the person
who loses it is concerned, it is worthless. Such losses can be
compensated only if there is a compulsion to acquire such lands.
Such
compulsion
also
forms
part
of
the
resettlement
and
rehabilitation. Even the 1894 Act was mindful of such situations
when it gave an option to the landowner to express his desire to the
acquisition of the entire area. Such loss is damage that is suffered
because of the acquisition of a part of the holding and resulting from
the severance of the acquired portion from the un-acquired portion.
It would be preposterous to state that a right that was available in a
Statute that was enacted in 1894 is no longer available, despite the
fact that there has been a sea change in the concept of eminent
domain and compensation, with the coming into force of the 2013
Act.
35. In P. Nagaraju (supra), the Court was concerned with the
WPC No.5944/2021 & con.cases
-93-
applicability of Sections 27 and 28 of the 2013 Act, and it was held
that the provisions would apply to acquisitions under the NH Act.
The reasoning in all the judgments that held the right of the
landowner is that the purpose of the amendment to the NH Act,
including provisions for acquisition, is the speedy acquisition of land
and that the said object has no relation to the denial of adequate
compensation. Viewed from that perspective, it can be said that the
prohibition in Section 94, not to put into effect the provisions of the
Act for the purpose of acquiring part only of a building, will affect the
object of the enactment and hence cannot be made applicable to the
NH Act. At the same time, the substantive right available to the
landowner to demand that the entire property should be acquired
cannot be taken away. The right of the landowner as declared by the
Hon’ble Supreme Court in Tarsem Singh (supra), Nagaraju
(supra), and Kundan Singh (supra) and the right under Section 94
need to be balanced; without in any way affecting the right of the
landowner and the purpose of the NH Act.
36. In the cases on hand, the possession of the portion of
property notified has been taken, and what remains is the balance
portion left out. The work of the National Highway expansion is also
underway. As such, no purpose will be served by holding that
possession shall not be taken till a decision is taken regarding the
WPC No.5944/2021 & con.cases
-94-
question of whether the portion of land left out forms part of the
building acquired, as required under Section 94(1) of the 2013 Act.
The above view is also justified in the light of the judgments in
Kundan Singh (supra), Harsook Das (supra) and Saramma
Itticheriya (supra), since the desire to have the entire property
acquired had not been expressed immediately after the notification.
It is hence declared that Section 28 of the 2013 Act takes in the
right of the owner, from whom a part of a building is acquired, to
have his entire land acquired, as contemplated in Section 94, but the
prohibition in Section 94 not to put the provisions of the Act to use,
for acquiring part only of a building will not apply to acquisitions
under the NH Act.
37. In this connection, it would be worthwhile to note that
under
the
Green
National
Highways
Corridor
Project,
the
Government of India drew a resettlement policy framework, a copy
of which was made available for the Court’s reference. In the
Entitlement Matrix shown in Table 4 in the Policy document, it is
stated that compensation for all land acquired under the NH Act for
the project shall be calculated and payable in accordance with
Sections 26 to 30 and Schedule I of the 2013 Act. It is also stated
that if only part of any plot is affected and the owner desires the
whole plot to be acquired (under Section 94 and Note C), the
WPC No.5944/2021 & con.cases
-95-
competent authority can award compensation for the remaining part
of the plot or award 25% of the actual value of the land as additional
compensation, allowing the owner to retain the remaining land, if
agreeable. It is seen that the Central Government was very much
aware of the loss that would be caused by acquisition only of a part,
in an acquisition under the NH Act.
Question Nos.II to IV:
38. The above questions are interconnected and are being
considered together. In view of the conclusion regarding the extent
to which Section 94 of the 2013 Act is included in Section 28 of the
2013 Act, the question whether there is a re-introduction of what is
barred under Section 105 by including Section 94 within the fold of
Section 28 does not arise. The right recognised under Section 94 is
the very same right that is already recognised in Section 28 of the
Act, and the above finding is very much in accordance with the
dictum laid down in Kundan Singh (supra), wherein the Hon’ble
Supreme Court has held that even if the objection regarding part
acquisition is not taken before the award is passed, the right under
Section 23 of the 1894 Act is available.
39. The argument that was advanced by the respondents to
justify the absence of a provision similar to Section 94 of the 2013
Act is that the acquisition under the NH Act is a linear acquisition,
WPC No.5944/2021 & con.cases
-96-
which is a class by itself. It is hence submitted that all the provisions
of the Land Acquisition Act cannot be applied to such linear
acquisitions. It is argued that what is beneficial to the landowner
need not always be the criteria in the case of acquisition under the
NH Act and the principles of salus populi would govern such
situations. It is stated that the larger public interest has to be looked
into, and there cannot be a compulsion on the National Highway
Authority to acquire lands that are not required for the purpose of
the National Highway merely because the landowner expresses such
a desire under Section 94. The respondents submit that the NH Act
is a code in itself, and reference to the 2013 Act can only be for the
purpose of determining the compensation and nothing more. It is
submitted that what is provided under Section 94 is acquisition and
not payment of compensation. It is hence submitted that there
cannot be a compulsion to acquire land which is not required and a
direction to pay compensation for such acquisitions. It is further
submitted that Sections 26 to 30 of the 2013 Act would apply for the
purpose of grant of compensation alone. It is further submitted that
Section 105(1) of the 2013 Act is similar in terms of Section 3-J of
the NH Act, and what is barred by Section 105(1) cannot be
introduced by including Section 94 through Section 28 of the 2013
Act. The counsel referred to Section 10 of the 2013 Act and
WPC No.5944/2021 & con.cases
-97-
submitted that even in the case of agricultural land, linear
acquisitions are left open.
40. As regards the question whether the State can be
compelled to acquire which is not required, in view of the decisions
of the Hon’ble Supreme Court in Kundan Singh (supra) and
Harsook Das (supra) and that of the Full Bench of this Court in
Saramma Itticheriya (supra), the right under Section 23 of the
1894 Act is available. The above said right permits the landowner to
compensation for damages for severance of the acquired portion and
the unacquired portion. There is, hence, no real compulsion on the
State to acquire. However, there is a compulsion to compensate for
the loss/damage caused. It is for the Government to make an
appropriate decision whether the portion should also be acquired
since the liability to compensate cannot be denied. A reading of
Sections 94 (3) and (4) would strengthen the above conclusion. The
contention that Section 105(1) of the 2013 Act and Section 3-J of
the NH Act are similar in terms can be self-defeating since it has
already been held that Section 3-J is unconstitutional. I do not
propose to go into that controversy since it is not required for the
purpose of deciding these cases. Prithipal Singh (supra) and Hira
Tikkoo (supra) relied on to submit that the doctrine of the welfare of
an individual should yield to that of the community (Salus populi est
WPC No.5944/2021 & con.cases
-98-
suprema lex: regard for the public welfare is the highest law) does
not also apply to the fact situation. Prithipal (supra) was rendered
in the context of the right of an accused as against the duty of the
police. Hira Tikkoo (supra) was rendered in a case that was
concerned with the allotment of plots under development schemes.
Neither of the cases consider the rights of persons whose lands are
compulsorily acquired under the provisions of a Statute and their
respective rights under the said law. In the case on hand, the court
is concerned with the rights of a person who is deprived of property,
which are safeguarded under the statute itself.
41. The Counsel for the respondents relied on Girnar Traders
(supra), to submit that the NH Act is a complete code in itself and
the application of the provisions of the 2013 Act is limited to the
extent provided in the notification issued under Section 105 of the
2013 Act, for determining compensation payable. It is hence
submitted that all the provisions of the 2013 Act will not be
applicable to the acquisitions under the NH Act. In the above
decision, the Hon’ble Supreme Court has considered the effect of
legislation by reference in extenso. The question involved was
whether all the provisions of the 1894 Act would apply to acquisition
under the Maharashtra Regional and Town Planning Act. The
question involved in the case on hand is whether Section 94 of the
WPC No.5944/2021 & con.cases
-99-
2013 Act, has been taken in by the notification issued under Section
105 of the 2013 Act. Even if the NH Act is to be treated as a
complete code in itself, with provisions for the acquisition of land and
excluding the application of the 1894 Act, the fact remains that by
Section 105 of the 2013 Act, the legislature has thought it fit to
make some provisions of the 2013 Act applicable for acquisition
under the NH Act. The decision in Girnar Traders (supra) will not in
any manner affect the consideration of the question as to which of
the provisions of the 2013 Act have been made applicable. Moreover,
the Hon’ble Supreme Court has held that the “self-contained code”
argument based on the above judgment cannot be used as a
discriminatory tool to deny benefits available to landowners merely
because the acquisition is under a different enactment. [See Nagpur
Improvement Trust (supra) and Tarsem Singh (supra)]. In
Sayedabad (supra) also, the Hon’ble Supreme Court had held that
the NH Act was a special enactment and a complete code in itself,
while considering the question of whether the claimant can approach
the Court under Section 11(6) of the Arbitration and Conciliation Act,
in the absence of the Central Government appointing an arbitrator as
contemplated in the NH Act. The Court held that Section 11(6)
cannot be invoked, and the remedy was to either file a writ petition
or a civil suit.
WPC No.5944/2021 & con.cases
-100-
42. I shall now consider some other incidental contentions
raised and arguments advanced, and the decisions that were cited
during
the
arguments.
Reliance
placed
on
Ghaziabad
Development Authority (supra), is not quite relevant to the point
in issue, since it does not relate to compensation payable on
compulsory acquisition of land. The decision in K.C.Adiga (supra)
relates to the validity of certain executive orders restricting the right
of kumkidars and the Court held that the orders are violative of
Articles 19 and 31. The judgment is not of much relevance to the
issue on hand. So also, the decisions in Bishambhar Dayal (supra)
and Basantibai (supra), are also not very relevant for deciding the
case on hand. In Basantibai (supra), the fixing of compensation in
urban and rural areas differently was found to be justified and the
Court also found that it was a case prior to the introduction of Article
300A. In Jilubhai Nanbhai (supra), the Hon’ble Supreme Court
held that Article 300A was only a constitutional right and not a basic
feature of the Constitution. The Court held that the compensation
granted for the acquisition of mines, etc., was not illusory. The
judgment
in
P.V.Krishnamoorthy (supra)
relied
on
by
the
respondents also does not deal with the issue in question and only
speaks about the power of the Central Government to acquire for
development of highways and the effect of the declaration as
WPC No.5944/2021 & con.cases
-101-
highways. The decision does not deal with the applicability of the
provisions of the 2013 Act to acquisitions under the NH Act. Naga
Venkata Lakshmi (supra) only reiterates the law that the right to
property cannot be deprived without paying compensation.
43. In Caritas (supra), a Division Bench of the Madras High
Court considered the constitutionality of an amendment brought in
by the State Government whereby three State enactments were
sought to be exempted from the provisions of the 2013 Act. The said
enactments got the assent of the President on 27.9.2014. The Court
held that the three enactments cannot be said to have come into
force, and all acquisitions made under the three enactments made
on or after 27.9.2013 were held illegal. The above judgment was
challenged before the Hon’ble Supreme Court. While so, the
Government enacted a revival and revalidation Act, to save the
repugnancy of the above three enactments. The new enactment was
also challenged before the Supreme Court. The Hon’ble Supreme
Court in the judgment in G.Mohan Rao v. State of Tamil Nadu
[(2022) 1) SCC 696], held that the 2019 Validation Enactment was
a legitimate legislative exercise coming within the four corners of
Article 254 of the Constitution.
44.
In
Jindal
(supra),
while
considering
the
question
regarding respect to the National Flag, the Hon’ble Supreme Court
WPC No.5944/2021 & con.cases
-102-
held
that
the
Constitution
is
a
living
organ
and
ongoing
interpretation is permissible. Reliance was placed by the respondents
on the decision of a Division Bench of this Court in R.Raju (supra) to
submit that once possession of the entire building is taken and
compensation paid, the landowner cannot, as of right, claim to retain
the portion of the building which is notified. The above case was one
in which the compensation for the entire building was paid, and the
entire building was sought to be demolished. The judgment is not an
authority for a proposition that Section 94 of the 2013 Act cannot be
applied in the case of acquisition under the NH Act.
45. Incidentally, it is also contended by the respondents that
the writ petitions cannot be entertained since the petitioners have
alternate remedies and they have not pursued the remedies
available under the statute. Popcorn Entertainment (supra) and
Whirlpool Corporation (supra) have laid down the parameters for
exercising the power of judicial review under Article 226 of the
Constitution. There can be no dispute regarding the maintainability
of these writ petitions since the prayer regarding the applicability of
Section 94 of the 2013 Act to the acquisitions under the NH Act, is
not a matter that can be decided by the authorities contemplated
under the NH Act. Moreover, if the contention of the petitioners as to
the applicability of Section 94 is accepted, necessarily, these will be
WPC No.5944/2021 & con.cases
-103-
cases where the fundamental rights of the petitioners are affected,
in the sense that they will be deprived of their right to property,
without payment of compensation and without the authority of law.
As such, these writ petitions are maintainable.
46. A contention was raised that the petitioners have a remedy
before the Arbitrator in view of Section 3-G(2),(5) and (7). The
contention cannot be endorsed since the issues raised in these writ
petitions necessarily have to be answered by this Court, and the
Arbitrator cannot decide on the constitutionality of provisions of a
Statute and their interpretation. The Arbitrator can decide after the
law is declared by this Court. Section 38 of the 2013 Act lays down a
timeline for the purpose of complying with the obligations of the
State under Schedules I, II, and III dealing with compensation,
rehabilitation, and resettlement. The said obligations will have to be
complied with on the basis of the law declared in this judgment.
47. In the judgment in W.P.(C)No.13795 of 2020 [Jyothi A.
v. Union of India], a learned Single Judge of this Court considered
a contention based on Section 94 of the 2013 Act and found that the
competent authority and arbitrator is required to determine the
compensation as well as elements of rehabilitation and resettlement
on a case to case basis as per the First and Second Schedule of the
2013 Act. It was observed that the other procedural provisions
WPC No.5944/2021 & con.cases
-104-
cannot be applied to acquisitions under the NH Act and that in that
view of the matter Section 94 of the 2013 Act may not have any
application. The counsel for the petitioners, relying on the decision of
the Hon’ble Supreme Court in Ranbir (supra), contended that the
above observation could only be considered as an obiter dictum since
the Court had not considered the issue on merits. I find considerable
force in the said contention. In the judgment in Kunhiraman
(supra), a learned Single Judge directed the authorities to ensure
that the petitioner gets necessary access to his building, enough for
at least an ambulance to pass, and if not, to consider the application
of the petitioner under Section 94 of the 2013 Act. The Court had
not gone into the question of whether Section 94 is applicable on
merits. In the judgment in Ibrahimkutty (supra), a learned Single
Judge held that if the petitioners had in their applications before the
Arbitrator raised contentions based on Section 94 of the 2013 Act,
the same will have to be considered by the authority immediately,
before demolition of the buildings is done. In the said decision also,
there does not appear to be any consideration of the issue on merits.
However, neither of the judgments were taken up in appeal by the
respondents. A similar view was taken in Noushad (supra) as well.
None of the above four judgments can be treated to be a precedent
regarding the applicability or otherwise of Section 94 of the 2013 Act
WPC No.5944/2021 & con.cases
-105-
to the acquisitions under NH Act, since the question had not been
examined on merits.
48. In Transstroy (supra), a learned Single Judge of the High
Court of Telangana and Andhra Pradesh was called upon to consider
the issue of whether Section 94 of the 2013 Act will apply in the
case of acquisition for Metro rail. The Court, however, did not have to
enter into the merits of the contention since the learned Advocate
General did not join issue on the contention and readily offered that
if such a request is made, the same will be considered.
49. In Chellapandian (supra), the High Court of Madras
considered the applicability of the provisions of the 2013 Act to
acquisitions
under
the
NH
Act.
The
court
considered
the
appropriateness of issuing notification under Section 103 instead of
Section 105(3). The Court was of the view that if there is a failure on
the part of the Central Government to issue a notification under
Section 105(3), the provisions of the 2013 Act will become
automatically applicable. However, taking note of the notification
issued, the Court concluded that even though notification is issued
invoking power under Section 103, the intention to treat the
landowners similarly has been effectuated. In view of the judgment
in P.Nagaraju (supra), it is not necessary to discuss the merits of
the decision any further.
WPC No.5944/2021 & con.cases
-106-
50. An argument was advanced based on Sections 103 and 107
of the 2013 Act to submit that since the provisions of the Act are in
addition to and not in derogation of any other law for the time being
in force, it follows that Section 94 will apply to acquisitions under NH
Act since there is no similar provision in the NH Act. The above
argument cannot be countenanced in view of Section 105, which
makes the provisions of the 2013 Act not applicable to enactments
specified in the fourth schedule of the Act, subject to Section 105(3).
51.
In view of the findings rendered above, that all aspects
contained in Sections 26 to 28 of the 2013 Act for determination of
compensation will be applicable notwithstanding Sections 3-J and 3G(7)(a) of the NH Act, that Section 28 of the 2013 Act includes the
right of the owner, from whom a part of a building is acquired, to
have his entire land acquired, as contemplated in Section 94, and
that the prohibition in Section 94 not to put the provisions of the Act
to use, for acquiring part only of a building will not apply to
acquisitions under the NH Act, the writ petitions are disposed of with
the following directions.
(a)
There will be a direction to the competent among
the respondents to consider the request of the
petitioners
in
all
these
writ
petitions,
for
acquisition of the entire building/land and either
WPC No.5944/2021 & con.cases
-107-
compensate the petitioners for the loss suffered by
them due to the severance of the unacquired
portion from the acquired portion or acquire the
entire portion and pay compensation for the same
as the case may be, as provided for in Sections 26
to 28 and Schedules I to III of the Right to Fair
Compensation
and
Transparency
in
Land
Acquisition, Rehabilitation and Resettlement Act,
2013, read with Section 3-G(7) of the National
Highways Act, 1956. While considering the above
request, the respondents shall have due regard to
the findings that have been rendered above on the
applicability of Section 94 read with Section 28 of
the 2013 Act. The above directions shall be
irrespective of whether proceedings are pending
before the Competent Authority or the Arbitrator
appointed by the Central Government.
(b) The respondents may complete the proceedings
already initiated for acquisition in accordance with
the law laid down by the Hon’ble Supreme Court in
P.Nagaraju (supra), and the directions contained
in (a) above will not affect the said process.
WPC No.5944/2021 & con.cases
-108-
(c)
The directions contained in (a) shall be completed
within four months from the date of receipt of a
copy of this judgment.
Sd/T.R. RAVI
JUDGE
dsn
WPC No.5944/2021 & con.cases
-109APPENDIX OF WP(C) 5944/2021
PETITIONER EXHIBITS
EXHIBIT P1
TRUE COPY OF THE BUILDING PERMIT DATED 1307-1999
FOR
COMMERCIAL
BUILDING
FROM
VATAKARA MUNICIPALITY
EXHIBIT P2
TRUE COPY OF THE DRAWING AND VALUATION
REPORT PREPARED BY M/S. AMOD CONSULTANTS
LTD,
AUTHORIZED
BY
NATIONAL
HIGHWAYS
AUTHORITY OF INDIA.
EXHIBIT P3
TRUE COPY OF LETTER DATED 16-09-2020
SUBMITTED
BY
THE
PETITIONER
TO
THE
NATIONAL
HIGHWAY
AUTHORITY
OF
INDIA,
PROJECT IMPLEMENTATION UNIT, KOZHIKODE
EXHIBIT P4
TRUE COPY OF LETTER DATED 31-10-2020 TO
THE
SPECIAL
DEPUTY
COLLECTOR
LAND
ACQUISITION (NH) AND CALA, KOZHIKODE
WPC No.5944/2021 & con.cases
-110APPENDIX OF WP(C) 7775/2021
PETITIONER EXHIBITS
EXHIBIT P1
TRUE COPY OF THE APPLICATION OF THE
PETITIONER DT.25.6.2018 FILED BEFORE THE
LA OFFICER, NH, KOYILANDY.
EXHIBIT P2
TRUE COPY OF THE REPLY LETTER DATED
19.07.2018 ISSUED BY THE STATE PUBLIC
INFORMATION OFFICER OF THE OFFICE OF THE
2ND RESPONDENT.
EXHIBIT P3
TRUE COPY OF
ISSUED
BY
CONSTRUCTION.
EXHIBIT P4
TRUE COPY OF THE LETTER DATED 10.03.2020
OF THE PETITIONER TO THE 1ST RESPONDENT.
EXHIBIT P5
TRUE COPY OF THE LETTER DATED 13.06.2020
SENT
BY
THE
PETITIONER
TO
THE
1ST
RESPONDENT.
EXHIBIT P6
TRUE COPY OF THE LETTER DATED 15.07.2020
OF
THE
1ST
RESPONDENT
TO
THE
2ND
RESPONDENT.
EXHIBIT P7
TRUE COPY OF THE LETTER DATED 20.07.2020
OF THE PETITIONER TO THE 2ND RESPONDENT.
EXHIBIT P8
TRUE COPY OF THE LETTER DATED 09.09.2020
OF THE PETITIONER TO THE 2ND RESPONDENT.
EXHIBIT P9
TRUE COPY OF THE LETTER DATED 23.09.2020
ISSUED BY THE 2ND RESPONDENT TO THE
PETITIONER.
EXHIBIT P10
TRUE COPY OF THE LETTER DATED 16.11.2020
SENT BY THE PETITIONERS LAWYER ALONG WITH
THE WRITTEN OBJECTIONS OF THE PETITIONER
BEFORE THE 4TH RESPONDENT.
EXHIBIT P11
TRUE COPY OF THE NOTICE DATED NIL ISSUED
BY THE 2ND RESPONDENT TO THE PETITIONER
UNDER S. 3E(1) OF THE NATIONAL HIGHWAY
THE CERTIFICATE DATED
NIRMAN
ENGINEERING
NIL
&
WPC No.5944/2021 & con.cases
-111ACT.
EXHIBIT P12
TRUE
COPY
OF
THE
ESTIMATE
FOR
THE
RESIDENTIAL BUILDING OF THE PETITIONER
GIVEN
BY
THE
ENGINEER
OF
NIRMAN
ENGINEERING & CONSTRUCTION
Exhibit P13
TRUE COPIES OF THE PHOTOGRAPHS SHOWING THE
PETITIONER'S HOUSE WHICH IS PROPOSED TO BE
PARTIALLY DEMOLISHED.
Exhibit P14
TRUE COPY OF THE REPRESENTATION DATED
10.01.2022
SUBMITTED
BEFORE
THE
2ND
RESPONDENT.
Exhibit P15
TRUE COPY OF
11.01.2022.
Exhibit P15(A)
TRUE COPY OF THE
DATED 13.01.2022.
Exhibit P16
TRUE COPIES OF THE PHOTOGRAPHS SHOWING THE
STATUS OF THE HOUSES FOR WHICH FULL
PAYMENT WAS MADE VIDE LAC/458/19 AND
LAC/746/19.
Exhibit P17
TRUE COPY OF REPRESENTATION
BEFORE THE RESPONDENTS.
SUBMITTED
Exhibit P18
TRUE
COPIES
DT.18.6.22.
RECEIPTS
Exhibit P19
TRUE COPIES OF THE ACKNOWLEDGEMENT CARDS
SHOWING THE PROOF OF DELIVERY.
THE
OF
POSTAL
RECEIPT
DATED
ACKNOWLEDGEMENT
CARD
THE
POSTAL
WPC No.5944/2021 & con.cases
-112APPENDIX OF WP(C) 7978/2021
PETITIONER EXHIBITS
EXHIBIT P1
THE TRUE COPY OF THE TAX RECEIPT ISSUED TO
THE PETITIONER DATED 27.8.2020
EXHIBIT P2
THE
TRUE
COPY
OF
THE
POSSESSION
CERTIFICATE ISSUED TO THE PETITIONER DATED
17.1.2021
EXHIBIT P3
TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED BY MOODADI GRAMA PANCHAYATH DATED
26.8.2020
EXHIBIT P4
THE TRUE COPY OF THE NOTICE ISSUED BY THE
5TH RESPONDENT LAC NO 659/2019 DATED NIL
EXHIBIT P5
THE TRUE COPY OF THE NOTICE ISSUED BY THE
55TH RESPONDENT LAC NO 106/2020 DATED NIL
EXHIBIT P6
THE TRUE COPY OF THE CALCULATION PROVIDED
BY THE 5TH RESPONDENT DATED NIL
EXHIBIT P7
THE
TRUE COPY
OF THE
REPRESENTATION
SUBMITTED BY THE PETITIONER BEFORE THE 6TH
RESPONDENT DATED 20.10.2020
EXHIBIT P8
THE
TRUE COPY
OF THE
REPRESENTATION
SUBMITTED BY THE PETITIONER BEFORE THE
TAHSIDAR, KOYILANDI DATED 23.10.2020
EXHIBIT P9
THE TRUE COPY OF THE PROCEEDING LAC NO
106/2020/3D2 DATED 11.2.2021
EXHIBIT P10
THE TRUE COPY OF THE PROCEEDING LAC NO
659/19/3D1 DATED 22.2.2021
EXHIBIT P11
THE TRUE COPY OF THE COMPLAINT FILED BY
THE
PETITIONER
BEFORE
THE
DISTRICT
COLLECTOR DATED 4.3.2021
Exhibit P12
THE TRUE COPY OF THE ORDER UNDER SECTION
105(3) DATED 28.08.2015.
Exhibit P13
THE TRUE COPY OF THE ORDER UNDER SECTION
WPC No.5944/2021 & con.cases
-113113 DATED 28.08.2015.
Exhibit P14
THE TRUE COPY OF THE JUDGMENT OF THIS
HON'BLE COURT IN WPC. NO. 26634/2019 AND
CONNECTED CASES.
WPC No.5944/2021 & con.cases
-114APPENDIX OF WP(C) 8939/2021
PETITIONER EXHIBITS
EXHIBIT P1
PHOTOGRAPHS OF THE SITE INVOLVED IN THE MATTER.
EXHIBIT P2
TRUE COPY OF THE REPRESENTATION DATED 11.2.2019
SUBMITTED BY THE PETITIONER BEFORE THE IST
RESPONDENT.
EXHIBIT P3
TRUE COPY OF THE ORDER NO.DCKNR/776/2016-C5(1)
DATED 13.3.2019 ISSUED BY THE IST RESPONDENT.
EXHIBIT P4
TRUE
COPY
OF
THE
LETTER
NO.B-146/19
DATED
22.3.2019 ISSUED BY 3RD RESPONDENT, SPECIAL
TAHSILDAR TO THE ASSISTANT EXECUTIVE ENGINEER, PWD
(ROAD SUB DIVISION), THALASSERY.
EXHIBIT P5
TRUE COPY OF THE PETITION DATED
SUBMITTED BEFORE THE 2ND RESPONDENT.
EXHIBIT P6
TRUE COPY OF THE LETTER NO.18/12 DATED 14.2.2020
TO THE ASSISTANT EXECUTIVE ENGINEER, PWD (BUILDING
SECTION) TALIPARAMBA.
EXHIBIT P7
TRUE COPY OF THE LETTER NO.REF.A-624/18
1.1.2020 OF THE 2ND RESPONDENT.
EXHIBIT P8
TRUE COPY OF THE LETTER DATED 31.10.2020 BEFORE
THE 2ND RESPONDENT SPECIAL DEPUTY COLLECTOR (LA).
EXHIBIT P9
TRUE COPY OF THE LETTER DATED 6.11.2020 SENT TO
THE HON'BLE PWD MINISTER BY REGISTERED POST.
EXHIBIT P10
TRUE COPY OF THE LETTER NO.RE.C5-101116/2017 DATED
18.12.2020 OF THE IST RESPONDENT DIRECTING THE 2ND
RESPONDENT TO GET REPORT FROM THE NHAI.
EXHIBIT P11
TRUE
COPY
OF
THE
PETITION
DATED
23.1.2021
SUBMITTED BY THE PETITIONER BEFORE THE REVENUE
ADALATH.
EXHIBIT P12
TRUE COPY OF THE LETTER NO.B-18/12 DATED 3.3.2021
ISSUED BY THE 3RD RESPONDENT.
EXHIBIT P13
TRUE COPY OF THE AWARD VIDE REF.NO.A624/2016(LAC
18.12.2019
DATED
WPC No.5944/2021 & con.cases
-1152084)-113 DATED
RESPONDENT.
21.7.2020
PASSED
BY
THE
3RD
WPC No.5944/2021 & con.cases
-116APPENDIX OF WP(C) 12030/2021
PETITIONER’S EXHIBITS
Exhibit P1
TRUE COPY OF THE BUILDING PERMIT DATED
13.07.1999 FOR COMMERCIAL BUILDING FROM
VATAKARA MUNICIPALITY.
Exhibit P2
TRUE COPY OF THE DRAWING AND VALUATION
REPORT PREPARED BY M/S. AMOD CONSULTANTS
LTD., AUTHORIZED BY NATIONAL HIGHWAYS
AUTHORITY OF INDIA.
Exhibit P3
TRUE COPY OF LETTER DATED 16.09.2020
SUBMITTED BY THE PETITIONER TO THE
NATIONAL HIGHWAY AUTHORITY OF INDIA,
PROJECT IMPLEMENTAITON UNIT, KOZHIKODE.
Exhibit P4
TRUE COPY OF LETTER DATED 31.10.2020 TO
THE SPECIAL DEPUTY COLLECTOR LAND
ACQUISION (NH) & CALA, KOZHIKODE.
Exhibit P5
TRUE COPY OF THE AWARD PASSED BY THE
COMPETENT AUTHORITY DATEED 15.03.2021.
Exhibit P6
TRUE COPY OF THE APPLICATION DATED
08.04.2021.
Exhibit P7
TRUE COPY OF THE PROCEEDINGS DATED
19.02.2013 ISSUED BY THE GOVERNMENT OF
INDIA (TYPED COPY OF EXT.P7).
WPC No.5944/2021 & con.cases
-117APPENDIX OF WP(C) 17221/2021
PETITIONER EXHIBITS
Exhibit P1
TRUE COPY OF THE LAND TAX RECEIPT DATED
24/7/202 OF NAVAIKULAM VILLAGE OFFICE.
Exhibit P2
TRUE COPY OF THE OWNERSHIP CERTIFICATE
DATED 26/7/2021 ISSUED BY THE NAVAIKULAM
GRAMA PANCHAYAT.
Exhibit P3
TRUE COPY OF THE SITE PLAN SHOWING
LOCATION OF THE PETITIONERS HOUSE, OUT
HOUSE ETC.
Exhibit P4
TRUE COPY OF THE COMPLAINT FILED BY THE
PETITIONER BEFORE THE 2ND RESPONDENT DATED
20/7/2021.
Exhibit P5
TRUE COPY OF THE COMPLAINT FILED BY THE
PETITIONER BEFORE THE 3RD RESPONDENT DATED
20.7.2021.
Exhibit P6
TRUE
COPY
OF
THE
PHOTOGRAPH
SHOWING
PETITIONER'S RESIDENTIAL HOUSE AND THE
YELLOW MARKING WHICH IS MADE IN THE WALL
OF THE HOUSE.
Exhibit P7
TRUE COPY OF THE ALIGNMENT PREPARED BY THE
HIGHWAY AUTHORITIES WHEREIN THE MOSQUE IS
SHOWN.
Exhibit P8
TRUE
COPY
OF
THE
INTIMATION
13/11/2020 OF 4TH RESPONDENT.
DATED
WPC No.5944/2021 & con.cases
-118APPENDIX OF WP(C) 2259/2022
PETITIONER’s EXHIBITS
Exhibit P1
TRUE COPY OF THE SECTION 3E NOTICE ISSUED
TO 1ST PETITIONER.
Exhibit P1(A)
TRUE COPY OF THE SECTION 3E NOTICE ISSUED
TO 2ND PETITIONER.
Exhibit P1(B)
TRUE COPY OF THE SECTION 3E NOTICE ISSUED
TO 3RD PETITIONER.
Exhibit P1(C)
TRUE COPY OF THE SECTION 3E NOTICE ISSUED
TO 4TH PETITIONER.
Exhibit P1(D)
TRUE COPY OF THE SECTION 3E NOTICE ISSUED
TO MUHAMMED YUSAF.
Exhibit P1(E)
TRUE COPY OF THE SECTION 3E NOTICE ISSUED
TO 7TH PETITIONER.
Exhibit P1(F)
TRUE COPY OF THE SECTION 3E NOTICE ISSUED
TO KABEER , SHAKEER.
Exhibit P2
TRUE COPY OF THE GAZETTE NOTIFICATION
DATED 28/08/2015.
Exhibit P3
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF 1ST
PETITIONER.
Exhibit P3(A)
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF 2ND
PETITIONER.
Exhibit P3(B)
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF 3RD
PETITIONER.
Exhibit P3(C)
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF 4TH
PETITIONER.
Exhibit P3(D)
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF MOHAMMED
WPC No.5944/2021 & con.cases
-119YUSAF.
Exhibit P3(E)
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF NARANATH
SALEEM
Exhibit P3(F)
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF 7TH
PETITIONER.
Exhibit P3(G)
TRUE COPY OF THE EXTRACT OF STRUCTURAL
PLAN OF THE CONSTRUCTION OF OF KABEER AND
SHAKEER.
Exhibit P4
TRUE COPY OF THE REPRESENTATION DATED
13/10/2021 SUBMITTED BY THE 1ST PETITIONER
ALONG WITH POSTAL RECEIPT.
Exhibit P4(A)
TRUE COPY OF THE REPRESENTATION DATED
10/01/2022 SUBMITTED BY THE 3RD PETITIONER
ALONG ITS ACKNOWLEDGEMENT.
Exhibit P4(B)
TRUE COPY OF THE REPRESENTATION DATED
26/12/2021 SUBMITTED BY THE 4TH
PETITIONER.
Exhibit P4(C)
TRUE COPY OF THE REPRESENTATION DATED
09/12/2021 SUBMITTED BY MUHAMMED YUSAF
ALONG ITS ACKNOWLEDGEMENT.
Exhibit P4(D)
TRUE COPY OF THE REPRESENTATION DATED
16/12/2021 SUBMITTED BY NARANATH SALIM
ALONG ITS ACKNOWLEDGMENT.
Exhibit P4(E)
TRUE COPY OF THE REPRESENTATION DATED
16/12/2021 SUBMITTED BY THE 7TH PETITIONER
ALONG ITS ACKNOWLEDGEMENT.
Exhibit P4(F)
TRUE COPY OF THE ACKNOWLEDGEMENT RECEIPT
OF REPRESENTATION SUBMITTED BY THE 2ND
PETITIONER DATED 16/12/2021.
Exhibit P4(G)
TRUE COPY OF THE ACKNOWLEDGEMENT RECEIPT
OF REPRESENTATION SUBMITTED BY KABEER AND
SHAKEER DATED 02/12/2021.
Exhibit P5
TRUE COPY OF THE STRUCTURAL STABILITY
WPC No.5944/2021 & con.cases
-120CERTIFICATE OF 1ST PETITIONER'S BUILDING
DATED 04/01/2022.
Exhibit P5(A)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF 2ND PETITIONER'S BUILDING
DATED 11/12/2021.
Exhibit P5(B)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF 3RD PETITIONER'S BUILDING
DATED 04/01/2022.
Exhibit P5(C)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF 4TH PETITIONER'S BUILDING
DATED 04/01/2022.
Exhibit P5(D)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF MUHAMMED YUSAF'S BUILDING
DATED 04/01/2022.
Exhibit P5(E)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF NARANATH SALEEM'S BUILDING
DATED 04/01/2022.
Exhibit P5(F)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF 7TH PETITIONER'S BUILDING
DATED 04/01/2022.
Exhibit P5(G)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF KABEER AND SHAKEER'S
BUILDING DATED 04/01/2022.
RESPONDENT EXHIBITS
Exhibit R3(a)
TRUE COPY OF THE NOTIFICATION DATED
28.12.2017 ISSUED BY MINISTRY OF ROAD
TRANSPORT OF HIGHWAYS
Exhibit R3(b)
TRUE COPY OF THE DIRECTIONS ISSUED BY THE
REGIONAL OFFICE NHAI DATED 11.8.2020
REGARDING PROCEDURE OF STRUCTURAL
VALUATION.
WPC No.5944/2021 & con.cases
-121APPENDIX OF WP(C) 14056/2022
PETITIONERS’ EXHIBITS
Exhibit P1
TRUE COPY OF THE PROPERTY TAX RECEIPT
NO.9354940 DATED 18.08.2021.
Exhibit P1(a)
TRUE COPY OF THE OWNERSHIP CERTIFICATE
NO.5071601/1228/2021 DATED 01/07/2021.
Exhibit P1(b)
TRUE COPY OF THE OWNERSHIP CERTIFICATE
NO.5071501/1500/2021 DATED 18/08/2021.
Exhibit P1(c)
TRUE COPY OF THE OWNERSHIP CERTIFICATE
NO.5075701/976/2021 DATED 23/07/2021.
Exhibit P1(d)
TRUE COPY OF THE OWNERSHIP CERTIFICATE
NO.5071501/1557/2021 DATED 09/09/2021.
Exhibit P1(e)
TRUE COPY OF THE PROPERTY TAX RECEIPT
NO.A1988093 DATED 20.02.2021.
Exhibit P1(f)
TRUE COPY OF THE PROPERTY TAX RECEIPT
NO.6071513000973 DATED 15.06.2021.
Exhibit P1(g)
TRUE COPY OF THE OWNERSHIP CERTIFICATE
NO.5071307/592/2021 DATED 26/07/2021.
Exhibit P1(h)
TRUE COPY OF THE PROPERTY TAX RECEIPT
NO.7346681 DATED 09/02.2021.
Exhibit P2
TRUE COPY OF THE 3G AWARD NO.01/2021E1/KAD/001205/2021 DATED 05.11.2021.
Exhibit P2(a)
TRUE COPY OF THE 3G AWARD NO.01/2021E2/EDA/010519/2021 DATED 06.12.2021.
Exhibit P2(b)
TRUE COPY OF THE 3G AWARD NO.01/2021E2/EDA/002272/2021 DATED 13.01.2022.
Exhibit P2(c)
TRUE COPY OF THE 3GAWARD NO.01/2021LA2/ORU/09742/2022 DATED 28.02.2022.
Exhibit P2(d)
TRUE COPY OF THE 3G AWARD NO.01/2021LA2/TAL/010947/2021 DATED 24/02/2022.
WPC No.5944/2021 & con.cases
-122Exhibit P2(e)
TRUE COPY OF THE 3G AWARD NO.01/2021LA2/TAL/010964/2021 DATED 24/02/2022.
Exhibit P2(f)
TRUE COPY OF THE 3G AWARD NO02/2021LA2/TAL/010962/2021 DATED 24.02.2022.
Exhibit P2(g)
TRUE COPY OF THE 3G AWARD NO.01/2021
-LA2/TAL/010006/2021 DATED 24.02.2022.
Exhibit P2(h)
TRUE COPY OF THE 3GAWARD NO.02/2021LA2/TAL/012532/2021 DATED 24.02.2022.
Exhibit P2(i)
TRUE COPY OF THE 3G AWARD NO02/2021LA2/TAL/012534/2021 DATED 24.02.2022.
Exhibit P2(j)
TRUE COPY OF THE 3G AWARD NO. 1/2021D4/PUN/013090/2022 DATED 21.02.2022.
Exhibit P2(K)
TRUE COPY OF THE 3G AWARD NO.1/2021E2/EDA/002648/2021 DATED 28.02.2022.
Exhibit P2(1)
TRUE COPY OF THE 3G AWARD NO1/2021E2/EDA/004777/2021 DATED 28/02/2022.
Exhibit P2(m)
TRUE COPY OF THE 3G AWARD NO.1/2021E2/EDA/007078/2021 DATED 16.10.2021.
Exhibit P2(n)
TRUE COPY OF THE 3G AWARD NO.1/2021D4/PUN/003014/2021 DATED 06.01.2022.
Exhibit P2(o)
TRUE COPY OF THE 3G AWARD NO.1/2021D4/PUN/004549 DATED 30.06.2021.
Exhibit P2(p)
TRUE COPY OF THE 3G AWARD NO.1/2021D4/PUN/003012/2021 DATED 06.01.2022.
Exhibit P2(q)
TRUE COPY OF THE 3G AWARD NO.1/2021D4/PUN/004555 DATED 30.06.2021.
Exhibit P2(r)
TRUE COPY OF THE 3G AWARD NO.1/2021E1/KAD/002000/2021 DATED 16.10.2021.
Exhibit P2(s)
TRUE COPY OF THE 3G AWARD NO.4/2021LA2/ORU/010919/2021. DATED 03.02.2022.
Exhibit P2(t)
TRUE COPY OF THE 3G AWARD NO.2/2021-
WPC No.5944/2021 & con.cases
-123D4/PUN/004996/2021 DATED 18.02.2022.
Exhibit P2(u)
TRUE COPY OF THE 3G AWARD NO.1/2021D4/PUN/003095/2021 DATED 18.02.2022.
Exhibit P2(v)
TRUE COPY OF THE 3G AWARD NO.1/2021D4/PUN/002998/2021 DATED 18.02.2022.
Exhibit P3
TRUE COPY OF JUDGMENT IN W.P.(C) NO.23142
OF 2021 DATED 30.11.2021.
Exhibit P3(a)
TRUE COPY OF JUDGMENT IN W.P.(C) NO.27967
OF 2021 DATED 16.12.2021.
Exhibit P4
TRUE COPY OF GOVERNMENT ORDER DATED
28.08.2015.
Exhibit P5
TRUE COPY OF THE STRUCTURAL PLAN OF VASU
NAYARASSERY'S BUILDING.
Exhibit P5(a)
TRUE COPY OF THE STRUCTURAL PLAN OF USMAN
BUILDING.
Exhibit P5(b)
TRUE COPY OF THE STRUCTURAL PLAN OF ABDUL
GAFOOR'S BUILDING.
Exhibit P5(c)
TRUE COPY OF THE STRUCTURAL PLAN OF
ASHRAF'S VATTAPARAMBIL BUILDING.
Exhibit P5(d)
TRUE COPY OF THE STRUCTURAL PLAN OF ABDUL
SHAHEEM'S BUILDING.
Exhibit P5(e)
TRUE COPY OF THE STRUCTURAL PLAN OF
PREMLAL'S BUILDING.
Exhibit P5(f)
TRUE COPY OF THE STRUCTURAL PLAN OF ASHIK
M & ASIYA'S BUILDING.
Exhibit P5(g)
TRUE COPY OF THE STRUCTURAL PLAN OF
FATHIMA'S BUILDING.
Exhibit P5(h)
TRUE COPY OF THE STRUCTURAL PLAN OF
ELLATHAKAYIL SHAJITHA'S BUILDING.
Exhibit P5 (i)
TRUE COPY OF THE STRUCTURAL PLAN OF
WPC No.5944/2021 & con.cases
-124SHAHEEN SULAIMAN & OTHERS.BUILDING.
Exhibit P5(j)
TRUE COPY OF THE STRUCTURAL PLAN OF ABU'S
BUILDING.
Exhibit P5(k)
TRUE COPY OF THE STRUCTURAL PLAN OF
V.T.NABEEZU'S BUILDING.
Exhibit P5(1)
TRUE COPY OF THE STRUCTURAL PLAN OF PAUL
M.S.'S BUILDING.
Exhibit P5(m)
TRUE COPY OF THE STRUCTURAL PLAN OF
FATHIMA'S BUILDING.
Exhibit P6
TRUE COPY OF THE STABILITY CERTIFICATE OF
THE USMAN'S BUILDING DATED 17.12.2020.
Exhibit P6(a)
TRUE COPY OF THE STABILITY CERTIFICATE OF
THE ABDUL GAFOOR'S BUILDING DATED
25.03.2022.
Exhibit P6(b)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE MR.
ASHRAF,VATTAPARAMBIL'S BUILDING DATED
25.03.2022.
Exhibit P6(c)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE MR. ABDUL SHAHEEM'S
BUILDING DATED 25.03.2022.
Exhibit P6(D)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE MR. PREMLAL'S BUILDING
DATED 25.03.2022.
Exhibit P6(e)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THEMR.ASHIK M &ASIYA'S
BUILDING DATED 25.03.2022.
Exhibit P6(f)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE FATHIMA'S DATED
25.03.2022.
Exhibit P6(g)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF MRS.SHAJITHA & MRS SHABNA'S
THE BUILDING DATED 31.03.2022.
Exhibit P6(H)
TRUE COPY OF THE STRUCTURAL STABILITY
WPC No.5944/2021 & con.cases
-125CERTIFICATE OF THE MR. SHAHEEN
SULAIMAN&OTHERS BUILDING DATED 31.03.2022.
Exhibit P6(i)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF MR. ABU S/O MAMUNNY
BUILDING DATED 25.03.2022.
Exhibit P6(j)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE MRS V.T NABEEZU'S
BUILDING DATED 31.03.2022.
Exhibit P6(k)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THEMR.PAUL M.S.'S, BUILDING
DATED 25.03.2022.
Exhibit P6(1).
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE MRS.FATHIMA'S BUILDING
DATED 25.03.2022.
Exhibit P6(m)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE MR. VASU NAYARASSERY'S.
Exhibit P7
TRUE COPY OF THE REQUEST DATED 26.11.2021
SUBMITTED BY THE USMAN.
Exhibit P7(a)
TRUE COPY OF THE REQUEST DATED 13.03.2022
SUBMITTED BY THE MR. ABDUL GAFOOR ALONG
WITH ITS ACKNOWLEDGMENT.
Exhibit P7(b)
TRUE COPY OF THE REQUEST DATED 02.02.2022
SUBMITTED BY THE MR. ASHRAF ALONG WITH ITS
ACKNOWLEDGMENT.
Exhibit P7(c)
TRUE COPY OF THE REQUEST DATED 16.03.2022
SUBMITTED BY THE MR., ABDUL SHAHEEM ALONG
WITH ITS ACKNOWLEDGMENT.
Exhibit P7(d)
TRUE COPY OF THE REQUEST DATED 11.03.2022
SUBMITTED BY THE MR. PREMLAL ALONG WITH
ITS ACKNOWLEDGMENT.
Exhibit P7(e)
TRUE COPY OF THE REQUEST DATED 09.03.2022
SUBMITTED BY THE MR.ASHIK M &ASIYA ALONG
WITH ITS ACKNOWLEDGMENT.
WPC No.5944/2021 & con.cases
-126Exhibit P7(f)
TRUE COPY OF THE REQUEST DATED 16.03.2022
SUBMITTED BY THE MRS.FATHIMA ALONG WITH
ITS ACKNOWLEDGMENT.
Exhibit P7(g)
TRUE COPY OF THE REQUEST DATED 16.03.2022
SUBMITTED BY THE MR.SHAHEEN SULAIMAN
&OTHERS ALONG WITH ITS ACKNOWLEDGMENT.
Exhibit P7(h)
TRUE COPY OF THE REQUEST DATED 16.03.2022
SUBMITTED BY THE MR. ABU ALONG WITH ITS
ACKNOWLEDGMENT.
Exhibit P7(i)
TRUE COPY OF THE REQUEST DATED 16.03.2022
SUBMITTED BY THE MRS V.T NABEEZU ALONG
WITH ITS ACKNOWLEDGMENT
Exhibit P7(i)
TRUE COPY OF THE REQUEST DATED 16.03.2022
SUBMITTED BY THE MR., PAUL ALONG WITH ITS
ACKNOWLEDGMENT.
Exhibit P7(k)
TRUE COPY OF THE REQUEST DATED 16.03.2022
SUBMITTED BY THE SALIL N V ALONG WITH ITS
ACKNOWLEDGMENT
Exhibit P8
TRUE COPY OF THE INTERIM ORDER IN W.P.(C)
NO.7544 OF 2022 DATED 08.03.2022.
Exhibit P8(a)
TRUE COPY OF THE JUDGMENT IN W.P.(C)
NO.7544 OF 2022 DATED 23.03.2022.
RESPONDENTS’ EXHIBITS
Exhibit R6(a)
TRUE COPY OF THE NOTIFICATION DATED
28.12.2017 ISSUED BY MINISTRY OF ROAD
TRANSPORT OF HIGHWAYS.
Exhibit R6(b)
TRUE COPY OF THE DIRECTIONS ISSUED BY THE
REGIONAL OFFICE NHAI DATED 11.8.2020
REGARDING PROCEDURE OF STRUCTURAL
VALUATION.
WPC No.5944/2021 & con.cases
-127APPENDIX OF WP(C) 15009/2022
PETITIONERS’ EXHIBITS
Exhibit P1
THE TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED TO THE PETITIONER NO.1 BY HARIPAD
MUNICIPALITY DATED 23.06.2021.
Exhibit P2
THE TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED TO THE PETITIONER NO.2 BY HARIPAD
MUNICIPALITY DATED 04.05.2019.
Exhibit P3
THE TRUE COPY OF THE SALE DEED EXECUTED IN
FAVOUR OF THE PETITIONER NO.1 DATED
05.01.2017.
Exhibit P4
THE TRUE COPY OF THE RELEVANT PAGES IN THE
NOTIFICATION NUMBERED AS S.O.671(E) ISSUED
BY THE 1ST RESPONDENT DATED 15.02.2018.
Exhibit P5
THE TRUE COPY OF THE PHOTOGRAPH OF THE
APARTMENT COMPLEX 'CENTRE HOMES'.
Exhibit P6
THE TRUE COPY OF THE RELEVANT PAGES IN THE
NOTIFICATION NUMBERED AS S.O.817(E) ISSUED
BY THE 1ST RESPONDENT DATED 12.02.2019.
Exhibit P7
THE TRUE COPY OF THE JUDGMENT PASSED IN
WRIT PETITION(CIVIL)NO.1853/2019 DATED
22.07.2021.
Exhibit P8
THE TRUE COPY OF THE REPRESENTATION
SUBMITTED BY THE APARTMENT OWNERS OF
'CENTRE HOMES' DATED 30.07.2021.
Exhibit P9
THE TRUE COPY OF THE REPRESENTATION
SUBMITTED BY THE APARTMENT OWNERS OF
'CENTRE HOMES' DATED 10.02.2022.
Exhibit P10
THE TRUE COPY OF THE LETTER SUBMITTED BY
THE APARTMENT OWNERS OF 'CENTRE HOMES'
BEFORE THE EXECUTIVE ENGINEER, PWD, NH,
ALAPPUZHA DATED 21.02.2022.
WPC No.5944/2021 & con.cases
-128APPENDIX OF WP(C) 19257/2022
PETITIONERS’ EXHIBITS
Exhibit P1
TRUE COPY OF THE AWARD NO.REF. C34/2012(20)(LAC NO.6169) DATED 24.09.2020
PASSED BY THE 2ND RESPONDENT.
Exhibit P2
TRUE COPY OF THE REQUEST DATED 23.03.2019
SUBMITTED BY THE PETITIONERS BEFORE THE
2ND RESPONDENT.
Exhibit P3
TRUE COPY OF THE REQUEST DATED 09.07.2021
SUBMITTED BY THE 1ST PETITIONER BEFORE THE
3RD RESPONDENT.
Exhibit P4
TRUE COPY OF LETTER NO.LAC 6169(2) DATED
24.11.2021 SENT BY THE 2ND RESPONDENT TO
THE FIRST PETITIONER.
Exhibit P5
TRUE COPY OF THE REPRESENTATION DATED
11.05.2022 SUBMITTED BY THE PETITIONERS
BEFORE THE 2ND RESPONDENT.
Exhibit P6
TRUE COPY OF THE PROCEEDING NO.REF. C34(20)(LAC NO.6169) DATED 09.05.2022 PASSED
BY THE 2ND RESPONDENT.
Exhibit P7
TRUE COPY OF THE REPRESENTATION DATED
27.05.2022 SUBMITTED BY THE 1ST PETITIONER
BEFORE THE 3RD RESPONDENT.
WPC No.5944/2021 & con.cases
-129APPENDIX OF WP(C) 22865/2022
PETITIONER EXHIBITS
Exhibit P1
THE TRUE COPY OF THE LAND TAX RECEIPT
ISSUED TO THE PETITIONER DATED 23.10.2021.
Exhibit P2 (a)
THE TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED TO THE PETITIONER BY ONCHIYAM GRAMA
PANCHAYAT WITH RESPECT TO BUILDING NO.
15/278 DATED 23.01.2021.
Exhibit P2 (b)
THE TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED TO THE PETITIONER BY ONCHIYAM GRAMA
PANCHAYAT WITH RESPECT TO BUILDING NO.
15/279 DATED 23.01.2021.
Exhibit P2 (c)
THE TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED TO THE PETITIONER BY ONCHIYAM GRAMA
PANCHAYAT WITH RESPECT TO BUILDING NO.
15/280 DATED 23.01.2021.
Exhibit P2 (d)
THE TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED TO THE PETITIONER BY ONCHIYAM GRAMA
PANCHAYATWITH RESPECT TO BUILDING NO.
15/281 DATED 23.01.2021.
Exhibit P2 (e)
THE TRUE COPY OF THE OWNERSHIP CERTIFICATE
ISSUED TO THE PETITIONER BY ONCHIYAM GRAMA
PANCHAYAT WITH RESPECT TO BUILDING NO.
15/282 DATED 23.01.2021.
Exhibit P3
THE TRUE COPY OF THE RELEVANT PAGES THE
NOTIFICATION NUMBERED AS S.O. 2855 (E)
ISSUED BY THE 1ST RESPONDENT DATED
07.12.2012.
Exhibit P4
THE TRUE COPY OF THE PHOTOGRAPH OF THE
PETITIONER'S PROPERTY IS PRODUCED.
Exhibit P5
THE TRUE COPY OF THE REPORT PREPARED BY
THE VALUATION AGENCY AND APPROVED BY THE
RESPONDENT NO.7.
Exhibit P6
THE TRUE COPY OF THE LETTER SUBMITTED BY
THE PETITIONER TO THE RESPONDENT NO.6
WPC No.5944/2021 & con.cases
-130DATED 02.12.2021.
Exhibit P7
THE TRUE COPY OF THE D.O. LETTER NO.PWDH3/09/2021-PWD ISSUED BY THE 2ND
RESPONDENT DATED 08.01.2021.
Exhibit P8
THE TRUE COPY OF THE LETTER SUBMITTED BY
THE PETITIONER BEFORE THE RESPONDENT NO.7
DATED 21.06.2022.
WPC No.5944/2021 & con.cases
-131APPENDIX OF WP(C) 29886/2022
PETITIONER EXHIBITS
Exhibit P1
TRUE COPY OF THE PROPERTY TAX RECEIPT
NO.A7208790 DATED20.04.2021 ISSUED BY
TAVANUR GRAMA PANCHAYAT.
Exhibit P1 (a)
TRUE COPY OF LAND TAX RECEIPT
NO.KL10030907863/2022 DATED 13.06.2022
ISSUED BY TAVANUR VILLAGE.
Exhibit P2
TRUE COPY OF THE SECTION 3G AWARD
NO.PNI/1505/2018.
Exhibit P3
TRUE COPY OF THE JUDGMENT IN W.P.
(C)NO.23142 OF 2021 DATED 30.11.2021.
Exhibit P4
TRUE COPY OF THE JUDGMENT IN W.P.
(C)NO.27967 OF 2021 DATED 16.12.2021.
Exhibit P5
TRUE COPY OF THE RELEVANT EXTRACT OF THE
NOTIFICATION DATED 28.08.2015.
Exhibit P6
TRUE COPY OF THE STRUCTURAL PLAN OF
BUILDING.
Exhibit P6 (a)
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 25.08.2022.
Exhibit P7
TRUE COPY OF THE REQUEST SUBMITTED BY
PETITIONER BEFORE THE 8TH RESPONDENT.
Exhibit P8
TRUE COPY OF THE JUDGMENT IN WP(C) NO.3562
OF 2021 DATED 24.09.2021.
Exhibit P9
TRUE COPY OF THE ARBITRATION REQUEST
SUBMITTED BEFORE THE 8TH RESPONDENT DATED
13.07.2022.
WPC No.5944/2021 & con.cases
-132APPENDIX OF WP(C) 30126/2022
PETITIONER EXHIBITS
Exhibit P1
TRUE COPY OF THE MAHSOR SHOWING THE
DETAILS OF THE PROPERTY ACQUIRED DATED NIL
Exhibit P2
TRUE COPY OF THE PROCEEDINGS OF SPECIAL
DEPUTY COLLECTOR & COMPETENT AUTHORITY OF
LAND ACQUISITION L.A.N.H -66 KODUNGALLOR
AND ORDER NO. C5.652/2021 (3) DATED
10.03.2021
Exhibit P3
TRUE COPY OF THE VALUATION REPORT FOR THE
STRUCTURE PREPARED BY THE VALUER DATED NIL
Exhibit P4
TRUE COPY OF THE AFFIDAVIT FILED BY THE
PETITIONERS AND OTHER LEGAL HEIRS OF
DECEASED THOMAS. E.K BEFORE THE
AUTHORITIES
WPC No.5944/2021 & con.cases
-133APPENDIX OF WP(C) 30766/2022
PETITIONER EXHIBITS
Exhibit P1
TRUE COPY OF PROPERTY TAX RECEIPT
NO.120040104747 WITH RESPECT TO THE NAME OF
1ST PETITIONER'S HUSBAND ISSUED FROM PUNNAYUR
GRAMA PANCHAYATH.
Exhibit P1(a)
TRUE COPY OF PROPERTY TAX RECEIPT
NO.1220100417/G080102 DATED 22.06.2022 ISSUED
FROM ORUMANAYUR GRAMA PANCHAYAT .
Exhibit P1(b)
TRUE COPY OF PROPERTY TAX RECEIPT NO.
121040103117 DATED 25.11.2021 ISSUED FROM
PUNNAYUR GRAMA PANCHAYATH WITH RESPECT TO THE
3RD PETITIONER.
Exhibit P1(c)
TRUE COPY OF PROPERTY TAX RECEIPT NO.
121040102355 DATED 18.10.2021 ISSUED FROM
PUNNAUR GRAMA PANCHAYATH WITH RESPECT TO THE
NAME OF 4TH PETITIONER'S HUSBAND.
Exhibit P1(d)
TRUE COPY OF PROPERTY TAX RECEIPT NO.
6975511002172 DATED 16.04.2022 ISSUED FROM
ENGADIYUR GRAMA PANCHAYATH.
Exhibit P1(e)
TRUE COPY OF PROPERTY TAX RECEIPT NO.
6071511001306 DATED 11.08.2021 ISSUED FROM
PUNNAYUR GRAMA PANCHAYATH.
Exhibit P1(f)
TRUE COPY OF PROPERTY TAX RECEIPT NO.
121080100387 DATED 23.07.2021 ISSUED FROM
ORUMANAYUR GRAMA PANCHAYAT WITH RESPECT TO
THE 7TH PETITIONER.
Exhibit P1(g)
TRUE COPY OF PROPERTY TAX RECEIPT NO. 0021865
DATED 03.11.2021 ISSUED FROM CHAVAKKAD
MUNICIPALITY WITH RESPECT TO THE 8TH
PETITIONER.
Exhibit P1(h)
TRUE COPY OF PROPERTY TAX RECEIPT NO. 0021403
DATED 22.10.2021 ISSUED FROM CHAVAKKAD
MUNICIPALITY WITH RESPECT TO THE 9TH
PETITIONER AND HIS CO-OWNER SARASWATHY.
Exhibit P1(i)
TRUE COPY OF PROPERTY TAX RECEIPT NO.
WPC No.5944/2021 & con.cases
-13420201000021424 DATED 07.10.2020 ISSUED FROM
PUNNAYUR GRAMA PANCHAYATH.
Exhibit P2
TRUE COPY OF SECTION 3G AWARD NO.1/2021D4/PUN/002936/2021 DATED 16.12.2021 WITH
RESPECT TO THE STRUCTURE IN THE PROPERTY OF
1ST PETITIONER.
Exhibit P2(a)
EXHIBIT:P2(A). TRUE COPY OF SECTION 3G AWARD
NO. 1/2021-D4/PUN/003059/2021 DATED
28.12.2021 WITH RESPECT TO THE STRUCTURE IN
THE PROPERTY OF 3RD PETITIONER.
Exhibit P2(b)
TRUE COPY OF SECTION 3G AWARD NO. 1/2021 E2/EDA/002227/2021 DATED 21.02.2022 WITH
RESPECT TO THE STRUCTURE IN THE PROPERTY OF
4TH PETITIONER .
Exhibit P2(c)
TRUE COPY OF SECTION 3G AWARD NO. 1/2021 E2/EDA/010979/2021 DATED 21.02.2022 WITH
RESPECT TO THE STRUCTURE IN THE PROPERTY OF
6TH PETITIONER.
Exhibit P2(d)
TRUE COPY OF SECTION 3G AWARD NO. 1/2021 LA2(ORU)/010387/2021 DATED 24.03.2022 WITH
RESPECT TO THE STRUCTURE IN THE PROPERTY OF
7TH PETITIONER.
Exhibit P2(e)
TRUE COPY OF SECTION 3G AWARD NO. 1/2021
-C2/MAN/009154/2021 DATED 14.03.2022 WITH
RESPECT TO THE STRUCTURE IN THE PROPERTY OF
9TH PETITIONER.
Exhibit P2(f)
TRUE COPY OF SECTION 3G AWARD NO. 1/2021E2/EDA/002293/2021 WITH RESPECT TO THE
STRUCTURE IN THE PROPERTY OF 10TH PETITIONER
DATED 15.3.2022.
Exhibit P3
TRUE COPY OF COPY OF JUDGMENT IN WP(C) 23142
OF 2021 DATED 30.11.2021.
Exhibit P4
TRUE COPY OF THE COPY OF JUDGMENT IN WP(C)
27967 OF 2021 DATED 16.12.2021.
Exhibit P5
TRUE COPY OF THE GOVERNMENT NOTIFICATION
DATED 28.08.2015.
WPC No.5944/2021 & con.cases
-135Exhibit P6
TRUE COPY OF THE STRUCTURAL PLAN OF THE 1ST
PETITIONER'S BUILDING.
Exhibit P6(a)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 2ND
PETITIONER'S BUILDING.
Exhibit P6(b)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 3RD
PETITIONER'S BUILDING.
Exhibit P6(c)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 4TH
PETITIONER'S BUILDING.
Exhibit P6(d)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 5TH
PETITIONER'S BUILDING.
Exhibit P6(e)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 6TH
PETITIONER'S BUILDING.
Exhibit P6(f)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 7TH
PETITIONER'S BUILDING.
Exhibit P6(g)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 8TH
PETITIONER'S BUILDING.
Exhibit P6(h)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 9TH
PETITIONER AND CO-OWNER IS BUILDING.
Exhibit P6(i)
TRUE COPY OF THE STRUCTURAL PLAN OF THE 10TH
PETITIONER'S BUILDING.
Exhibit P7
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 1ST PETITIONER'S BUILDING.
Exhibit P7(a)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 2ND PETITIONER'S BUILDING.
Exhibit P7(b)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 3RD PETITIONER'S BUILDING.
Exhibit P7(c)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 4TH PETITIONER'S BUILDING.
Exhibit P7(d)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 5TH PETITIONER'S BUILDING.
Exhibit P7(e)
TRUE COPY OF THE STRUCTURAL STABILITY
WPC No.5944/2021 & con.cases
-136CERTIFICATE OF THE 6TH PETITIONER'S BUILDING.
Exhibit P7(f)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 7TH PETITIONER'S BUILDING.
Exhibit P7(g)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 8TH PETITIONER'S BUILDING.
Exhibit P7(h)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 9TH PETITIONER'S BUILDING.
Exhibit P7(i)
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 10TH PETITIONER'S
BUILDING.
Exhibit P8
TRUE COPY OF THE SECTION 24 REPRESENTATION
SUBMITTED BY THE 1ST PETITIONER BEFORE THE
8TH RESPONDENT.
Exhibit P8(a)
TRUE COPY OF REPRESENTATION SUBMITTED BY THE
2ND PETITIONER BEFORE THE 8TH RESPONDENT
DATED 20.06.2022.
Exhibit P8(b)
TRUE COPY OF SECTION 24 REPRESENTATION
SUBMITTED BY THE 4TH PETITIONER BEFORE THE
8TH RESPONDENT.
Exhibit P8(c)
TRUE COPY OF SECTION 24 REPRESENTATION
SUBMITTED BY THE 5TH PETITIONER BEFORE THE
8TH RESPONDENT DATED 18.06.2022.
Exhibit P8(d)
TRUE COPY OF SECTION 24 REPRESENTATION
SUBMITTED BY THE 6TH PETITIONER BEFORE THE
8TH RESPONDENT.
Exhibit P8(e)
TRUE COPY OF SECTION 24 REPRESENTATION
SUBMITTED BY THE 7TH PETITIONER BEFORE THE
7TH RESPONDENT DATED 16.06.2022.
Exhibit P8(f)
TRUE COPY OF SECTION 24 REPRESENTATION
SUBMITTED BY THE 8TH PETITIONER BEFORE THE
8TH RESPONDENT.
Exhibit P8(g)
TRUE COPY OF SECTION 24 REPRESENTATION
SUBMITTED BY THE 10TH PETITIONER BEFORE THE
8TH RESPONDENT.
WPC No.5944/2021 & con.cases
-137Exhibit P9
TRUE COPY OF THE JUDGEMENT IN W.P.(C) NO.7544
OF 2022 DATED 23.03.2022.
Exhibit P10
TRUE COPY OF THE RELEVANT EXTRACT OF
ARBITRATION REQUEST SUBMITTED BY THE 4TH
PETITIONER BEFORE THE 8TH RESPONDENT DATED
06.06.2022.
Exhibit P10(a)
TRUE COPY OF THE RELEVANT EXTRACT OF
ARBITRATION REQUEST SUBMITTED BY THE 10TH
PETITIONER BEFORE THE 8TH RESPONDENT DATED
06.06.2022.
Exhibit P11
TRUE COPY OF THE RECEIPT OF ARBITRATION
REQUEST WITH RESPECT TO THE 6TH PETITIONER.
Exhibit P11(a)
TRUE COPY OF THE RECEIPT OF ARBITRATION
REQUEST WITH RESPECT TO THE 7TH PETITIONER.
Exhibit P11(b)
TRUE COPY OF THE RECEIPT OF ARBITRATION
REQUEST WITH RESPECT TO THE 8TH PETITIONER.
WPC No.5944/2021 & con.cases
-138APPENDIX OF WP(C) 31730/2022
PETITIONERS' EXHIBITS
Exhibit P1
TRUE COPY OF LAND TAX RECEIPT
NO.KL08042704224/2022 DATED 13/06/2022 OF
1ST PETITIONER'S SON.
Exhibit P1A
TRUE COPY OF PROPERTY TAX RECEIPT
NO.121040102350 DATED 18/10/2021 OF 2ND
PETITIONER.
Exhibit P1B
TRUE COPY OF LAND TAX RECEIPT
NO.KL08040602375/2021 DATED 28/07/2021 OF
3RD PETITIONER.
Exhibit P1C
TRUE COPY OF CERTIFICATE NO.JC3-2021/1186
DATED 29/10/2021 ISSUED BY PUNNAYURKULAM
GRAMA PANCYAYATH REGARDING THE PAYMENT OF
PROPERTY TAX OF 4TH PETITIONER.
Exhibit P1D
TRUE COPY OF LAND TAX RECEIPT
NO.KL08042702652/2021 DATED 25/08/2021 OF
5TH PETITIONER.
Exhibit P1E
TRUE COPY OF LAND TAX RECEIPT
NO.KL08041503873/2021 DATED 28/07/2021 OF
6TH PETITIONER.
Exhibit P2
TRUE COPY OF SECTION 3G AWARD NO.1/2021E1/KAD/001934/2021 DATED 27/01/2022 ISSUED
TO 1ST PETITIONER.
Exhibit P2A
TRUE COPY OF THE SECTION 3G AWARD
NO.2/2021-D4/PUN/05018/2021 DATED
16/12/2021 ISSUED TO 2ND PETITIONER.
Exhibit P2B
TRUE COPY OF SECTION 3G AWARD NO.2/2021D4/PUN/005019/2021 DATED 16/12/2021 ISSUED
TO 2ND PETITIONER.
Exhibit P2C
TRUE COPY OF SECTION 3G AWARD NOS.1/2021LA2/ORU/0031151/2021 DATED 30/06/2021
ISSUED TO 3RD PETITIONER.
Exhibit P2D
TRUE COPY OF SECTION 3G AWARD NO.2/2021-
WPC No.5944/2021 & con.cases
-139LA2/ORU/008285/2021 DATED 30/06/2021
ISSUED TO 3RD PETITIONER.
Exhibit P2E
TRUE COPY OF SECTION 3G AWARD NO.2/2021LA2/ORU/010957/2021 DATED 30/06/2021
ISSUED TO 3RD PETITIONER.
Exhibit P2F
TRUE COPY OF SECTION 3G AWARD NO.2/2021E1/KAD/004463/2021 DATED 30/12/2021 DATED
30/12/2021 ISSUED TO 4TH PETITIONER.
Exhibit P2G
TRUE COPY OF SECTION 3G AWARD NO.2/2021E1/KAD/003333/2021 DATED 30/12/2021 ISSUED
TO 4TH PETITIONER.
Exhibit P2H
TRUE COPY OF SECTION 3G AWARD NO.1/2021E1/KAD/002036/2021 DATED 28/12/2021 ISSUED
TO 5TH PETITIONER.
Exhibit P2I
TRUE COPY OF SECTION 3G AWARD NO.1/2021C2/MAN/008417/2021 DATED 15/02/2022 ISSUED
TO 6TH PETITIONER.
Exhibit P2J
TRUE COPY OF SECTION 3G AWARD NO.1/2021C2/MAN/008419/2021 DATED 15/02/2022 ISSUED
TO 6TH PETITIONER.
Exhibit P3
TRUE COPY OF JUDGMENT IN WP(C) 27967 OF
2021 DATED 16/12/2021.
Exhibit P4
TRUE COPY OF GOVERNMENT ORDER DATED
28/08/2015.
Exhibit P5
TRUE COPY OF THE STRUCTURAL PLAN OF 1ST
PETITIONER'S BUILDING.
Exhibit P5A
TRUE COPY OF STRUCTURAL PLAN OF 2ND
PETITIONER'S BUILDING.
Exhibit P5B
TRUE COPY OF THE STRUCTURAL PLAN OF 3RD
PETITIONER'S BUILDING.
Exhibit P5C
TRUE COPY OF THE STRUCTURAL PLAN OF 4TH
PETITIONER'S BUILDING.
Exhibit P5D
TRUE COPY OF THE STRUCTURAL PLAN OF 5TH
WPC No.5944/2021 & con.cases
-140PETITIONER'S BUILDING.
Exhibit P5E
TRUE COPY OF THE STRUCTURAL PLAN OF 6TH
PETITIONER'S BUILDING.
Exhibit P6
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE OF THE 1ST PETITIONER'S
BUILDING DATED 20/09/2022.
Exhibit P6A
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE ISSUED TO 2ND PETITIONER'S
BUILDING DATED 20/09/2022.
Exhibit P6B
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE ISSUED TO 3RD PETITIONER'S
BUILDING.
Exhibit P6C
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE DATED 20/09/2022 ISSUED TO 4TH
PETITIONER'S BUILDING.
Exhibit P6D
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE ISSUED TO 5TH PETITIONER'S
BUILDING.
Exhibit P6E
TRUE COPY OF THE STRUCTURAL STABILITY
CERTIFICATE DATED 20/09/2022 ISSUED TO 6TH
PETITIONER'S BUILDING.
Exhibit P7
TRUE COPY OF THE REQUEST DATED 29/08/2022
SUBMITTED BY 1ST PETITIONER ALONG WITH ITS
ACKNOWLEDGMENT.
Exhibit P7A
TRUE COPY OF THE REQUEST DATED 22/09/2022
SUBMITTED BY 2ND PETITIONER ALONG WITH ITS
ACKNOWLEDGMENT.
Exhibit P7B
TRUE COPY OF THE REQUEST DATED 29/08/2022
SUBMITTED BY 3RD PETITIONER ALONG WITH ITS
ACKNOWLEDGMENT.
Exhibit P7C
TRUE COPY OF THE REQUEST DATED 29/08/2022
SUBMITTED BY 4TH ALONG WITH ITS
ACKNOWLEDGMENT.
Exhibit P7D
TRUE COPY OF THE REQUEST SUBMITTED BY 5TH
PETITIONER ALONG WITH ITS ACKNOWLEDGMENT
WPC No.5944/2021 & con.cases
-141DATED 15/09/2022.
Exhibit P7E
TRUE COPY OF THE REQUEST SUBMITTED BY 6TH
PETITIONER ALONG WITH ITS ACKNOWLEDGMENT
DATED 15/09/2022.
Exhibit P8
TRUE COPY OF THE INTERIM ORDER IN WP(C)
NO.30766/2022 DATED 27/09/2022.
Exhibit P8A
TRUE COPY OF THE JUDGMENT IN WP(C) NO.7544
OF 2022 DATED 23/03/2022.
WPC No.5944/2021 & con.cases
-142APPENDIX OF WP(C) 32197/2022
PETITIONERS' EXHIBITS
Exhibit P1
TRUE COPY OF SALE DEED NO. 1339/2007 DATED
30.05.2007 OF CHAVAKKAD SUB REGISTRAR
OFFICE.
Exhibit P1 A
TRUE COPY OF BUILDING PERMIT
NO.BA(10427)/2016 DATED 15.03.2016 ISSUED
BY 9TH RESPONDENT.
Exhibit P2
TRUE COPY OF PROPERTY TAX RECEIPT
NO.KL08040107570/2019 DATED 27.12.2019.
Exhibit P2 A
TRUE COPY OF PROPERTY TAX RECEIPT NO,
NO.KL08040106496/2019 DATED 23.09.2019.
Exhibit P2 B
TRUE COPY OF PROPERTY TAX RECEIPT NO.
NO.KL08040100676/2020 DATED 20.03.2020.
Exhibit P2 C
TRUE COPY OF PROPERTY TAX RECEIPT NO.
NO.KL08040100509/2019 DATED 19.03.2019.
Exhibit P3
TRUE COPY OF SECTION 3E NOTICE IN LAC
NO.D2/VPD/005553/2021.
Exhibit P3 A
TRUE COPY OF SECTION 3E NOTICE IN LAC
NO.D2/VPD/004493/2021.
Exhibit P4
TRUE COPY OF JUDGEMENT IN WP(C) 16146 OF
2022 DATED 07.06.2022.
Exhibit P5
TRUE COPY OF THE PHOTOGRAPHS OF
NEIGHBORING PROPERTY OF PETITIONER'S
BUILDING.
Exhibit P6
TRUE COPY OF THE POSSESSION CERTIFICATE
NO.7585/15 DATED 21.10.2015 ISSUED TO THE
PETITIONER.
Exhibit P7
TRUE COPY OF THE POSSESSION CERTIFICATE
NO.5656/17 DATED 28.12.2017.
Exhibit P8
TRUE COPY OF THE COMMUNICATION NO.A5-
WPC No.5944/2021 & con.cases
-143270/18 DATED 05.03.2018.
Exhibit P9
TRUE COPY OF THE LATEST REQUEST DATED
13.09.2022 SUBMITTED BY PETITIONER BEFORE
THE 9TH RESPONDENT.
Exhibit P10
TRUE COPY OF THE RECEIPT ISSUED ON
SUBMISSION OF REQUEST BY PETITIONER BEFORE
7TH RESPONDENT.
Exhibit P11
TRUE COPY OF THE POSTAL RECEIPT OF REQUEST
SUBMITTED BY THE PETITIONER BEFORE THE
NHAI.
Exhibit P12
TRUE COPY OF LETTER DATED 30.08.2022
SUBMITTED BY THE PETITIONER.
RESPONDENTS' EXHIBITS
Exhibit R10(a)
PHOTOGRAPHS SHOWING THE BOUNDARY OF THE
PLOT OF THE PETITIONER.
WPC No.5944/2021 & con.cases
-144APPENDIX OF WP(C) 34845/2022
PETITIONER'S EXHIBITS
Exhibit P1
A TRUE COPY OF LAND TAX RECEIPT DATED.
11.08.2021 ISSUED BY THE KAIPAMANGALAM
VILLAGE OFFICE
Exhibit P2
A TRUE COPY OF PROPERTY TAX RECEIPT PAID
FOR ONE OF THE ROOM NO. 10/360 BY THE
PETITIONER TO THE GRAMA PANCHAYAT DATED
11.08.2021
Exhibit P3
A TRUE COPY OF THE REPRESENTATION MADE BY
THE PETITIONER TO THE 3RD RESPONDENT DATED
10/11/2021
Exhibit P4
A TRUE COPY OF THE ACKNOWLEDGEMENT RECEIPT
DATED 12.11.2021
Exhibit P5
A TRUE COPY OF THE REPRESENTATION MADE BY
THE PETITIONER TO THE 2ND RESPONDENT DATED
25/11/2021
Exhibit P6
A TRUE COPY OF THE ACKNOWLEDGEMENT RECEIPT
DATED 29.11.2021
Exhibit P7
A TRUE COPY OF THE CERTIFICATE ISSUED BY
THE CHARTERED ENGINEER TO THE PETITIONER
DATED 04/12/2021
Exhibit P8
A TRUE COPY OF THE JUDGMENT OF THE HON'BLE
HIGH COURT OF KERALA IN WP(C)
NO.29425/2021 DATED 21.01.2022
Exhibit P9
A TRUE COPY OF THE PROCEEDINGS OF THE 3RD
RESPONDENT DATED 11.07.2022
Exhibit P10
A TRUE COPY OF THE RECOMMENDATION OF THE
SAMARA CONSULTANCY GIVEN TO THE 3RD
RESPONDENT DATED 26.02.2022.
WPC No.5944/2021 & con.cases
-145-
APPENDIX OF WP(C) 35020/2022
PETITIONER'S EXHIBITS
Exhibit P1
THE TRUE COPY OF THE POSSESSION
CERTIFICATE ISSUED BY 6TH RESPONDENT DATED
5.4.2017
Exhibit P2
THE TRUE COPY OF COMPLETION PLAN IN
BUILDING NO. 97/3, 5, 6 OF TAVANUR VILLAGE
Exhibit P3
THE TRUE COPY OF THE NOTICE ISSUED BY THE
5TH RESPONDENT DATED 20.3.2019
Exhibit P4
THE TRUE COPY OF THE STATEMENT PREPARED BY
THE 5TH RESPONDENT
Exhibit P5
THE TRUE COPY OF THE AWARD ISSUED BY THE
4TH RESPONDENT DATED 8.9.2021
Exhibit P6
THE TRUE COPY OF THE MAHASAR ISSUED BY THE
4TH RESPONDENT DATED 25.11.2021
Exhibit P7
THE TRUE COPY OF REPRESENTATION SUBMITTED
BY THE PETITIONER BEFORE 3RD RESPONDENT
DATED 13.12.2021
WPC No.5944/2021 & con.cases
-146-
APPENDIX OF WP(C) 36709/2022
PETITIONER'S EXHIBITS
Exhibit P1
THE TRUE COPY OF THE VALUATION REPORT
DATED 08.03.2021.
Exhibit P2
PROCEEDINGS COPY OF THE 050/2021/LA2
VPZHA-4878/2022-INITIATED BY 4TH
RESPONDENT.
Exhibit P3
ORIGINAL PHOTOGRAPHS OF THE PETITION
SCHEDULED BUILDING.
Exhibit P4
THE TRUE COPY OF THE REPRESENTATION DATED
22.08.2022 SUBMITTED BY THE PETITIONER TO
THE R4.
Exhibit P5
THE TRUE COPY NOTICE OF REJECTION ISSUED
BY THE 4TH RESPONDENT ON EXHIBIT P4.
WPC No.5944/2021 & con.cases
-147APPENDIX OF WP(C) 37012/2022
PETITIONERS' EXHIBITS
Exhibit P1
TRUE COPY OF PROPERTY TAX RECEIPT
1220100153/G081402 DATED 12.04.2022 OF 1ST
PETITIONER.
Exhibit P1 A
TRUE COPY PROPERTY TAX RECEIPT NO.0016454
DATED 15.07.2021 IN THE NAME OF MOIDEEN
FATHER OF 2ND PETITIONER.
Exhibit P1 B
TRUE COPY OF PROPERTY TAX RECEIPT
NO.1220101422/G080102 DATED 10.11.2022 IN
THE NAME OF 3RD PETITIONER.
Exhibit P1 C
TRUE COPY OF PROPERTY TAX RECEIPT
NO.1220101421/G080102 DATED 10.11.2022 IN
THE NAME OF 4TH PETITIONER.
Exhibit P1 D
TRUE COPY OF PROPERTY TAX RECEIPT NOS.36,
41, 40, 38, 39 AND 37 DATED 06.02.2021 IN
THE NAME OF 5TH PETITIONER.
Exhibit P1 E
TRUE COPY OF PROPERTY TAX RECEIPT
NO.6071511001137 DATED 15.07.2021 IN THE
NAME OF ASOORA WIFE OF 6TH PETITIONER.
Exhibit P1 F
TRUE COPY OF PROPERTY TAX RECEIPT NOS.67
AND 70 DATED 12.07.2021 IN THE NAME OF
RASHEED HUSBAND OF 7TH PETITIONER.
Exhibit P1 G
TRUE COPY OF PROPERTY TAX RECEIPT
NO.01/121010103062 DATED 18.08.2021 IN THE
NAME OF 8TH PETITIONER.
Exhibit P1 H
TRUE COPY OF OWNERSHIP CERTIFICATE
NO.5071501/1782/2021 DATED 18.10.2021 IN
THE NAME OF 9TH PETITIONER.
Exhibit P1 I
TRUE COPY OF PROPERTY TAX RECEIPT
NO.1220101258/G080103 DATED 01.07.2022 IN
THE NAME OF 10TH PETITIONER'S DAUGHTERS
SEKKIYA K.C., MISIRIYYA AND RAFIYA K.C.
Exhibit P2
TRUE COPY OF SECTION 3G AWARD NO.1/2021-
WPC No.5944/2021 & con.cases
-148C3/KPM/008036/2021 DATED 02.12.2021.
Exhibit P2 A
TRUE COPY OF SECTION 3G AWARD NO.1/2021C2/MAN/012823/2022 DATED 06.08.2022.
Exhibit P2 B
TRUE COPY OF SECTION 3G AWARD NO.1/2021C2/MAN/008289/2021 DATED 02.02.2022.
Exhibit P2 C
TRUE COPY OF SECTION 3G AWARD NO.3/2021 LA2/ORU/010715/2021 DATED 08.12.2021
Exhibit P2 D
TRUE COPY OF SECTION 3G AWARD NO.2/2021
LA2/ORU/010397/2021 DATED 20.12.2021.
Exhibit P2 E
TRUE COPY OF SECTION 3G AWARD NO.2/2021
LA2/ORU/010402/2021 DATED 20.12.2021.
Exhibit P2 F
TRUE COPY OF SECTION 3G AWARD NO. 1/2021E1/KAD/001392/2021 DATED 14.12.2021.
Exhibit P2 G
TRUE COPY OF SECTION 3G AWARD NO.1/2021E1/KAD/003555/2021 DATED 27.11.2021.
Exhibit P2 H
TRUE COPY OF SECTION 3G AWARD NO.1/2021E2/EDA/002756/2021 DATED 14.02.2022.
Exhibit P2 I
TRUE COPY OF SECTION 3G AWARD NO. 1/2021E2/EDA/006930/2021 DATED 14.02.2021.
Exhibit P2 J
TRUE COPY OF SECTION 3G AWARD NO.1/2021C2/MAN/008467/2021 DATED 13.12.2021.
Exhibit P2 K
TRUE COPY OF SECTION 3G AWARD NO.1/2021E2/EDA/002599/2021 DATED 06.12.2021.
Exhibit P2 L
TRUE COPY OF SECTION 3G AWARD NO.1/2021D4/PUN/005451/2021 DATED 15.11.2021
Exhibit P3
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING OF 1ST PETITIONER
Exhibit P3 A
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING IN THE NAME OF FATHIMA MOTHER OF
2ND PETITIONER.
Exhibit P3 B
TRUE COPY OF STRUCTURAL PLAN OF THE
WPC No.5944/2021 & con.cases
-149BUILDING OF 3RD PETITIONER.
Exhibit P3 C
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING OF 4TH PETITIONER
Exhibit P3 D
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING OF 5TH PETITIONER.
Exhibit P3 E
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING IN THE NAME OF ASOORA WIFE OF 6TH
PETITIONER.
Exhibit P3 F
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING OF 7TH PETITIONER.
Exhibit P3 G
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING OF 8TH PETITIONER.
Exhibit P3 H
TRUE COPY OF STRUCTURAL PLAN OF THE
BUILDING OF 10TH PETITIONER.
Exhibit P4
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 19.02.2022 ISSUED TO 1ST
PETITIONER.
Exhibit P4 A
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 19.02.2022 ISSUED IN THE
NAME OF FATHIMA MOTHER OF 2ND PETITIONER.
Exhibit P4 B
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 19.02.2022 ISSUED TO 3RD
PETITIONER.
Exhibit P4 C
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 19.02.2022 ISSUED TO 4TH
PETITIONER.
Exhibit P4 D
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 19.02.2022 ISSUED IN THE
NAME OF ASOORA WIFE OF 6TH PETITIONER.
Exhibit P4 E
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 19.02.2022 ISSUED TO 9TH
PETITIONER.
Exhibit P4 F
TRUE COPY OF STRUCTURAL STABILITY
CERTIFICATE DATED 19.02.2022 ISSUED TO
WPC No.5944/2021 & con.cases
-15010TH PETITIONER.
Exhibit P5
TRUE COPY OF THE JUDGMENT IN WP(C) 7544 OF
2022 DATED 23.03.2022.
Exhibit P6
TRUE COPY OF RECEIPT NO.E6 388823/22 DATED
18.06.2022 ISSUED TO 1ST PETITIONER.
Exhibit P6 A
TRUE COPY OF RECEIPT NO.E6 374947/22 DATED
07.05.2022 ISSUED TO 4TH PETITIONER.
Exhibit P6 B
TRUE COPY OF RECEIPT NO.E6 371370/22 DATED
22.04.2022 ISSUED TO 5TH PETITIONER.
Exhibit P6 C
TRUE COPY OF RECEIPT NO.E6-369329/22 DATED
16.04.2022 ISSUED TO 6TH PETITIONER.
Exhibit P6 D
TRUE COPY OF RECEIPT NO.E6 388985/22 DATED
18.06.2022 ISSUED TO 7TH PETITIONER.
Exhibit P6 E
TRUE COPY OF RECEIPT NO.E6 - 369344/22
DATED 16.04.2022 ISSUED TO 8TH PETITIONER.
Exhibit P6 F
TRUE COPY OF RECEIPT NO.E6 -375173/22
DATED 07.05.2022 ISSUED TO 9TH PETITIONER.
Exhibit P6 G
TRUE COPY OF RECEIPT NO.E6 -375210/22
DATED 07.05.2022 ISSUED TO 10TH
PETITIONER.
Exhibit P7
TRUE COPY OF GOVERNMENT NOTIFICATION DATED
28.08.2015.
WPC No.5944/2021 & con.cases
-151APPENDIX OF WP(C) 38168/2022
PETITIONER'S EXHIBITS
Exhibit P1
THE TRUE COPY OF THE LAND TAX RECEIPT OF
THE PROPERTY OF THE PETITIONER DATED
18.4.2022.
Exhibit P2
TRUE COPY OF SKETCH PREPARED TO SHOW THE
EXTEND OF ACQUISITION OF THE PETITIONER'S
PROPERTY DATED NIL.
Exhibit P3
TRUE PHOTOGRAPH OF THE PETITIONER'S
PROPERTY.
Exhibit P4
TRUE COPY OF THE LETTER ISSUED BY THE 8TH
RESPONDENT ISSUED TO THE PETITIONER DATED
9.6.2022.
Exhibit P5
TRUE COPY OF THE LETTER ISSUED BY THE
EXECUTIVE ENGINEER TO THE PETITIONER DATED
4.7.2022.
Exhibit P6
TRUE COPY OF THE LETTER SENT BY THE
NATIONAL HIGHWAY AUTHORITY OF INDIA TO THE
8TH RESPONDENT DATED 12.7.2022.
Exhibit P7
TRUE COPY OF THE REPRESENTATION SUBMITTED
BY THE PETITIONER BEFORE 9TH RESPONDENT
DATED 24.8.2022.
WPC No.5944/2021 & con.cases
-152-
APPENDIX OF WP(C) 39952/2022
PETITIONER'S EXHIBITS
Exhibit P1
TRUE COPY OF VALUATION REPORT IN REF
NO.KKG/ALP/KARTHIKAPALLY/KEERIKKAD/RMS-106
DATED 24.07.2021.
Exhibit P2
TRUE COPY OF THE VALUATION REPORT IN REF
NO. KKG/ALP/KARTHIKAPALLY /KEERIKKAD/001
DATED 04.11.2022.
Exhibit P3
TRUE COPY OF THE SECTION 3G AWARD IN LAC
NO.1548/2019/ KEERIKKAD/ BL24/ S.O.817(E)
A3-474 /2022 DATED 24.03.2022.
Exhibit P4
TRUE COPY OF THE ARBITRATION REQUEST
SUBMITTED BY THE PETITIONER BEFORE THE
HON'BLE ARBITRATOR APPOINTED UNDER
NATIONAL HIGHWAYS ACT 1956, ALAPPUZHA,
ALONG WITH IT'S ACKNOWLEDGEMENT DATED
08.07.2022.
WPC No.5944/2021 & con.cases
-153APPENDIX OF WP(C) 41889/2022
PETITIONER'S EXHIBITS
Exhibit P1
A TRUE COPY OF THE PROCEEDINGS DATED
22.02.2022
Exhibit P2
A TRUE COPY OF THE REPRESENTATION
PREFERRED BY THE PETITIONER DATED
27.05.2022
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review