Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
WP No. 5301 of 2026
IN THE HIGH COURT OF JUDICATURE AT MADRAS
DATED: 24-02-2026
CORAM
THE HON'BLE MR.JUSTICE V. LAKSHMINARAYANAN
WP No. 5301 of 2026
and WMP Nos. 5814 & 5815 of 2026
V.Harikumar Babu
..Petitioner(s)
Vs
1. State of Tamilnadu
Rep. by Chief Secretary,
St. Fort George, Chennai-600 009.
2. The Member Secretary
Chennai Metropolitan Developmental
Authority, Thalamuthu Natarajar Maligai,
No.1, Gandhi Irwin Road,
Egmore, Chennai-600 008.
3. The Superintending Engineer
Chennai Metropolitan Developmental Authority
Tower-III Building,
“E” Road Opposite to Fruit Market,
Koyambedu, Chennai-600 107.
4. The Thasildhar
Ponneri, Tiruvallur district.
5. The State Express Transport Corporation
Thiruvalluvar House,
Pallavan Salai, Chennai-600 002.
6. Metropolitan Transport corporation
Pallavan House, Anna Salai,
Chennai.
__________
Page1 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
7. Andrapradesh State Roadways Transport
Corporation, RTC House,
Near Pandit Nehru Bus Station,
Vijayawada-5200 013, Andhra Pradesh.
..Respondent(s)
Prayer: This petition has been filed under Article 226 of the Constitution of
India, calling for the records pertaining to the allotment order of the Shop
No.A4, issued by the 2nd respondent bearing No.SE/CW/A3/1243 dated
16.09.2019 located inside the Madhavaram Mofussil Bus Terminus(MMBT)
Madhavaram of the 2nd and 3rd respondents and quash the demand notice dated
10.04.2023 in related to the arrears of rent bearing letter No.A3/ Dis.II/ CW/
1243/ 2021 and consequent Revenue Recovery notice dated 19.2.2025 bearing
Na.Ka. No.485/2025 issued by the 2nd and 4th respondents respectfully with the
direction to the 2nd and 3rd respondents to freshly reckon the due of monthly rent
based upon the operation of number of buses and the consequent footfall of
passengers in the Madhavaram Mofussil Bus Terminus, (MMBT) Madhavaram,
Chennai considering the various representations of the petitioner by rendering
the proper accounts of the payments made by the petitioner
For Petitioner(s):
For Respondent(s):
M/s.S.Makesh
Mr.L.S.M.Hasan Fizal, AGP R1,R4,R5 & R6
Mr.B.Sanjay Balachandar, R2 & R3
ORDER
The petitioner was allotted a shop at the Madhavaram Mofussil Bus
Terminus (MMBT). The allotment was made by the respondents 2 and 3. The
petitioner had taken the shop bearing No. A4 for vending snacks and
refreshment for passengers, who would be using the bus stand.
__________
Page2 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
2. The petitioner claims that at the time of allotment, the respondents 2
and 3 held out that of the 200 bus bays available in the Madhavaram Mofussil
Bus Terminus, the State Transport Corporation of Andhra Pradesh and Tamil
Nadu, the respondents 5 to 7, will operate not less than 170 buses. The
petitioner, expecting high footfall of passengers, and thereby in the lookout for
potential customers for shop, took the shop for a monthly rent at Rs.367/- per
square feet. He states that whereas, the market rent for the properties
functioning in the adjoining areas outside the Madhavaram Mofussil Bus
Terminus is only Rs.60/-. The petitioner claims that the respondents 5 to 7 are
not operating as many number of buses as assured by them, and a maximum of
40 buses alone are plying in the area.
3. The petitioner states that without taking into consideration the
aforesaid circumstance of non-operation of buses by respondents 5 to 7,
respondents 2 to 4 have been demanding arrears of rent at the same rate, as per
the original allotment order, which the petitioner claims to be exorbitant and
disproportionate. The petitioner states that on 10.04.2023, the respondent No.3
had affixed a notice, calling upon him to remit 50% of the rental arrears within
seven days from the receipt of the letter, or in default, the allotment order would
be cancelled.
__________
Page3 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
4. As the arrears were not paid, the respondents proceeded to initiate
action under the Revenue Recovery Act, 1890, for recovery of Rs.10,96,496/-.
Challenging the proceedings dated 10.04.2023 and 19.10.2025, the petitioner is
before this Court.
5.
Heard
Mr.S.Makesh,
learned
counsel
for
the
petitioner,
Mr.L.S.M.Hasan Fizal, learned Additional Government Pleader for respondents
1 and 4 to 6, and Mr.B.Sanjay Balachandar, learned counsel for the respondents
2 and 3.
6. Though a reading of the prayer would also show that the petitioner
seeks to call for the records of allotment dated 16.09.2019, the learned counsel
for the petitioner states that the quashing is only confined to the demand notice,
and not to the order of allotment.
7. After narrating the facts, Mr.S.Makesh represents that the impugned
proceedings dated 10.04.2023 and 19.10.2025 deserves to be set aside on the
following grounds:
(1) The petitioner, at the time of issuance of allotment order, was
orally promised of heavy footfall of passengers in the
Madhavaram Mofussil Bus Terminus. However, as there has been
no reflection of such representation on the ground, the petitioner
__________
Page4 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
claims entitlement to a reduction in rentals. He relies upon the
representation made by the Tamil Nadu Government Shop
Owners’ Welfare Association, as well as his own representation,
to urge that an oral promise of reduction was made and this oral
promise has been breached;
(2) The petitioner claims that he has a legitimate expectation that
once the number of passengers is reduced, the rent should also be
reduced accordingly;
(3) On the expansion of the first point, he pleads that the action of the
respondents in demanding the rental arrears is hit by the
principles of promissory estoppel;
(4) Finally, inviting my attention to the proceedings dated
10.04.2023, he states that the respondents have themselves called
upon the petitioner to pay only 50% of the arrears, which implies
that they have admitted to the petitioner’s demands in the
representation being reasonable, and therefore, the proceedings
deserve to be quashed.
8. I have carefully considered the submissions of both sides and I have
gone through the records.
__________
Page5 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
9. The relationship between the writ petitioner and the respondents 2 and
3 is that of a lessor and lessee. The allotment order has not been placed before
the Court. What has been placed before the Court is the handing over letter of
the CMDA for allotment of a shop at Madhavaram Mofussil Bus Terminus on
rental basis w.e.f. 16.11.2019. The shop was handed over on 08.02.2020. In
none of these proceedings, has it been shown that the rent for the shop bearing
Door No.A4, on the ground floor in the Madhavaram Mofussil Bus Terminus
building is linked to the number of passengers arrived at the bus terminus or that
it is in the nature of profit sharing between the CMDA and the writ petitioner. It
is a pure and simple lease agreement, whereunder the petitioner had agreed to
take the shop at the rate of Rs.367/- per sq. ft.
10. I shall deal with each of the pleas individually.
11. The plea of legitimate expectation of the petitioner cannot stand even
a moment’s scrutiny. Legitimate expectation arises where there is a holding out
by the State or any other authority, creating an expectation in favour of the
petitioner, which on violation thereof, gives rise to a right.
12. I have already pointed out that the facts do not reveal that the lease
amount was fixed on the basis of footfall of the passengers; neither is there any
reference to the respondents 5 to 7 operating a sufficient number of buses to and
__________
Page6 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
from the Madhavaram Mofussil Bus Terminus. It is the role of a Transport
Corporation to ferry passengers from one place to another and not to operate
buses in order to facilitate shop owners in the terminus to sell their wares. In
any event, legitimate expectation is at best, a weak right. If at all the petitioner
expected a booming business and it did not occur, he has nobody else to blame
but himself for making such a miscalculation. He cannot place the burden of
such miscalculation at the doorstep of the lessor /CMDA.
13. Insofar as the plea that there was an oral promise made by the
respondents 2 and 3 regarding the passenger footfall is concerned, this aspect
need not detain us for long. This is essentially a contractual agreement. In case
there are any variations, the same has to be effected in writing. Even if an oral
promise is made by the officials of the CMDA, the later authority, which being
a Corporation with perpetual succession and a common seal, cannot be held
responsible for the representation made by its subordinates/employees. No
records have been produced before the Court to show that the Board of
Directors of CMDA had given assurance regarding the number of passengers
using the Madhavaram Mofussil Bus Terminus, or for the fact that the rate of
Rs.367/- per sq.ft. directly co-relates to the number of persons using the
Madhavaram Mofussil Bus Terminus.
__________
Page7 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
14. The plea on promissory estoppel is also untenable. The basic premise
of promissory estoppel is the existence of a promise. Acting upon such promise,
another should have altered the situation/circumstances in which the person was
placed. Thereafter, there should have been a breach thereof. Then, promissory
estoppel operates. When there is no promise as stated above, the question of
applying the principles of promissory estoppel does not arise.
15. The last point, viz., the notice that had been issued at page No.100 of
the typed set of papers dated 09.01.2023 merely indicates that the CMDA had
called upon the petitioner to clear 50% of their arrears within seven days from
the date of receipt of the notice. This is an opportunity granted to the petitioner
to pay the dues, so as to enable him to not to be labelled as a defaulter, and to
save his allotment.
16. Nowhere have the respondents stated that their demand for 50% of the
arrears is linked to the alleged fall in footfall of passengers. On the contrary, the
papers revealed that the CMDA had helped persons, who are having the shops
inside the Madhavaram Mofussil Bus Terminus at Madhavaram, by reducing
the rental amount during the Covid-19 lockdown.
__________
Page8 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
17. As all the points raised by the learned counsel for the petitioner fail, I
am not inclined to admit the writ petition and the same is dismissed. No costs.
Consequently, connected miscellaneous petitions are closed.
24-02-2026
Index: Yes/No
Speaking/Non-speaking order
Maya
To
1. The Chief Secretary,
St. Fort George, Chennai-600 009.
2. The Member Secretary
Chennai Metropolitan Developmental Authority, Thalamuthu Natarajar
Maligai,
No.1, Gandhi Irwin Road,
Egmore, Chennai-600 008.
3. The Superintending Engineer
Chennai Metropolitan Developmental Authority
Tower-III Building,
“E” Road Opposite to Fruit Market,
Koyambedu, Chennai-600 107.
4. The Thasildhar
Ponneri, Tiruvallur district.
5. The State Express Transport Corporation
Thiruvalluvar House,
Pallavan Salai, Chennai-600 002.
6. Metropolitan Transport corporation
Pallavan House, Anna Salai,
Chennai.
7. Andrapradesh State Roadways Transport Corporation, RTC House,
Near Pandit Nehru Bus Station,
Vijayawada-5200 013, Andhra Pradesh.
__________
Page9 of 10
https://www.mhc.tn.gov.in/judis
WP No. 5301 of 2026
V.LAKSHMINARAYANAN, J.
Maya
WP No. 5301 of 2026
24-02-2026
__________
Page10 of 10
https://www.mhc.tn.gov.in/judis
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review