The Central Power Distribution Company of A.P. Limited vs M/s Rama Spinners Pvt. Limited

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Telangana High Court
Date
19 February 2026
Case No.
WA 88/2026
Result
Allowed
Bench
Aparesh Kumar Singh, G.m. Mohiuddin
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

Filed under

Code of Civil Procedure, 1908 Section 151, Code of Civil Procedure, 1908

The sections, explained

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

[ 34881 HIGH COURT FOR THE STATE OF TELANGANA AT HYDERABAD THURSDAY, THE NINETEENTH DAY OF FEBRUARY TWO THOUSAND AND TWENTY SIX PRESENT THE HONOURABLE THE CHIEF JUSTTCE SRI APARESH KUMAR SINGH D THE HONOURABLE SR! JUSTICE G.M. MOHIUDDIN oF 20 Writ Appeal under clause 15 of the Letters patent Against the Order Dated O3lO7l2O25 in W.P. No. 9397 of 2010 on the fite of the High Court. Between: 1. The Central Power Dishibution Company of A. Southern Power Distribution Comvpany of Telahgana by its Chairman and Managing Eiireclor, Mint Co-mpo 2. The.Superintending Engineer, APCPDCL, (presenfly TGSPDCL), Operation Circle, Medak at Sanga Reddy 3. Thg^_Divisional Engi-n-ee1,. EJechical, Operation, APCPDCL (presenfly TGSPDCL), Toopran, Medak District. E AND !!Q[amq S^pinners Pvt. Limited, Rama Towers, 2nd Ftoor, 5-4-83, TSK Chambers, V.e.Bp"-0, Secunderabad, Represented by its Managing Director Sri Gopal Agarwi, S/o M L Agarwal ...RESPONDENTS 77itn Petition under Section 151 CPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High Court may be pleased to receive the following documents viz. copy of the counter Affidavit filed in w p No. 9397 of 2010. Copy of relevant General Terms & Conditions of Supply, as Additional Material Papers in the above Writ Appeal, in the interest of justice and pass such other or further orders. lA NO: 2 OF 2026 Petition under Section 151 CPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High Court may be pleased to suspend the o;)eration of the Order dated 31712O25 passed in W P No. 9397 of 2010, pending disposal of W.A.No. of 2025. lA NO: 4 OF Petition under Section 151 CPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High Court may be pleased to receive the cop'/ of the inspection report with regard to inspection conducted on 25.11.2OO9 on the writ petitioner / respondent's service connection, as addl material paper in the above writ appeal, in the interest of justice. Counsel for the Appellant : SRI N.SREEDHAR REDDY, (SC FOR TGTRANSCO) counserrortheRespondents:?$.1;t;i,5tll$I"t^'rtriitiniorcounser The Court made the following: JUDGMENT ,. ,, IN THI HIGH COUF(r r1ORII{E STATE OF TEI.ANGANA AT ITYDERABAI) THE HON'BI,E THE CHIE,F JUS"UCE SRI APARESH XI'MAR SINGH AND TIIE HON'BLE SRI JUSTICE G.M.MOHIUDDIN WRIT AppEAL No.88 of 2O26 DATE:L9.o.2.2o126 Between: The Central Power Distribution Company of A.p. Limited (presently southern Power Distribution company of relangana Limited (SPDCTL)) represented by its Vice Chainnan and Managing Director, Mint Compound, Hyderabad and 2 others ...Appellants And M/s Rama Spinners Private Limited Respondent JUDGMENT Heard sri N.Sreedhar Reddy, learned standing counsel for Transmission corporation of relangana Limited (TGTRANSCO) appearing for the appellants and Sri M.p.chandramouli, learned senior counsel representing sri ch.satya sadhan, learned counsel for the respondent. 2- This writ appeal, preferred under clause 15 of the Letters Patent, assails the order dated og.oz.2o25 passed by the learned single Judge in w.P.No.9397 of 201o. By the said order, the learned single Judge allowed the writ petition filed by the respondent herein and set aside the demand proceedings dated 2s.o3.2olo issued by the 2nd appellant, whereby a sum of Rs.2,gs,4ool- was demanded from the respondent towards back-billing charges on the allegation of .'.:_' r.-* --*y :4F"6Fq-.:r:- . -' "_-'"- -.*..::._:: I:.. -",'ffi-,-";l;-:.Tl-" i.",il.el}...,."::i'''"' t- low re:ording of eners/ consumption due to a defective potential Transfrlrmer (PT). The appelants have assailed the said order on the grounds that the learned single Judge misapplied the provisions of the Ge'eral rerms and conditions of Supply (GTCS) to the facts of the case, which primarily involved a defective pr and not a defective meter per se. Factual background {in brieff 3. The respondent (writ petitioner) is a High rension (HT) consurrrer availing power supply under service connection No.MDK_ 755. Ttre dispute arises out of a demand raised by the appellants towards. back-billing charges on the allegation of under-recording of eners/ <:onsumption. 4- oa 21. 1 1-2009, while recording the monthry meter reading, tJre oflicials of the appellant-company noticed that the consumption for November, 2oo9 was 5,s1,7o0 units, which was substantially rower than th. average consumption of the preceding three months (August, septemtrer and october 2oogl. A suspicion was recorded that t].e low recording might be attributable to absence of y, phase voltage. consequently, on a provisional basis, a shortfal of r,o3,4so units was assessecl based on the average consumption of three consecutive months ;end added to trre November, 2009 bill. The respondent paid t].e said bill, including the additional units so assessed. herein 5. Thereafter, on 25.11.2009, a detailed inspection was conducted by the Divisional Engineer (DPE/HT) at the respondent's premises. During the inspection, it was found that the Y' Phase PT was defective, and the voltage in the Y'phase was recorded as zero both at the Test Terminal Box (TTB) and on the meter display. The defective PT was replaced on the same day. The relevant portion of inspection report is reproduced hereunder: '9. Inciminating Points obserued at th.e time of inspection 1) Y ph uoltage is z.ero at TTB and in meter. 2) MRT data allected. 3) Gilled Gate to be prouided." 6. On analysis of the Common Meter Reading Instrument (CMRI) and data retrieved from the meter, it was concluded that the defect in the Y' Phase PT persisted from O3.10.2OO9 to 25.LL.2OO9. The appellants, invoking Clause 7.5.1 of the GTCS, undertook a back- billing assessment for the said period and issued a notice dated L9.L2.2OO9, initially determining the additional liability at Rs.3,89,3L7 /-. 7. The respondent submitted its objections to the notice, and a personal hearing was afforded on 24.O2.2OLO. Upon consideration of the objections, the 2nd appellant passed final proceedings dated 25.03.2010, reducing the demand by allowing eligible Load Factor lncentive and determining the net payable amount at Rs.2,85,4OO/-. Aggrieved ttrereby, the respondent herein instituted the writ petition, which came to be allowed by the learned Single Judge. Contentions on behalf of the appellants 8. Learned Standing Counsel appearing for the appellants, assailec[ the order of the learned Single Judge and has raised the contentions as under: i.'l'hat the impugned order proceeds on an erroneous interpretation of Clause 7.5.L of the GTCS. The procedural requirements contemplated under Clauses 7.5.1-1 to 7.5.1.3; rramely, preparation of an inspection report in the prescribed lbrmat, testing of the meter in the Meter Relay Testing (MRT) I.aboratory in the presence of the consumer, and issuance of notice within the stipulated time, are attracted only in cases rvhere the recording meter itself is found to be defective. ii. That in the instant case, the defect was not in the meter but in the Y' Phase PT, which is only an associated component of l.he metering circuit. A PT, being a voltage transformer, merely r;teps down high voltage to a level that the meter can safely record. If the PT is defective, particularly where a phase rroltage is absent, the meter *ouid consequently record lower <:onsumption; however, the meter itself cannot be termed "defective" in the sense of being inaccurate. The defect, in siuch circumstances, lies in the circuitry. Therefore, the provisions applicable for sending the meter to the MRT Laboratory were neither warranted nor practicable, as the pr alone required replacement, which was done on 25. Lt.2oog- iii- That the assessment was made on the basis of CMRI data, which is an objective electronic record of the meter,s internar diagnostics and has established tl.at the y, phase voltage was absent from 03.10.2009 to 2s-LL.2oog. since no laboratory testing of the meter was required, the question of issuing a two-week advance notice to respondent for such testing under Clause Z.S.L.2 did not arise. iv. That the principles of natural justice were duly complied with. A detailed notice dated 19.L2.2oo9 was issued, the respondent submitted objections, and a personal hearing was afforded on 24.o2.2olo. The frnal order dated 2s.o3.2olo was a reasoned order which was passed after considering the respond.ent's specific objections, wherein even the benefit of Load Factor Incentive was granted, thereby reducing the demand to Rs.2,85,4oo/-.The learned single Judge erred in interfering with a lawful assessment made in accordance with t].e applicable terms and conditions of supply. Contentions on behalf of the respondent 9. Learned senior counsel appearing for the respondent has supported the order of the learned single Judge and raised the contentions as under: i. That the GTCS, having been approved by the Andhra Pradesh Electricity Regulatory Commission (APERC), mandate strict adherence. Clause 7 -5.L governs the entire field of defective metering equipment and cannot be narrowly construed by segregating the meter from the PT' ii. That the appellants failed to comply with the mandatory sal'eguards under Clauses 7.5.1.1 to 7.5.1.3, including prerparation and service of inspection report in the prescribed forrnat, testing in the presence of the consumer, and issuance of lotice within the stipulated period. Such violations are not mere procedural irregularities but substantive violations that vitietted the entire assessment and rendered the consequential demand unsustainable. iii- That the right of the consumer to witness the testing of the equioment to veriff the alleged defect, is a substantive safe65uard to ensure transparency and fairness, and denial of such opportunity amounts to violation of principles of natural justic:e. The plea of absence of prejudice is misconceived, as breach of a statutory procedure is itself prejudicialiv. That the respondent had already paid for the additional units provisrionally added in the November, 2oo9 bill; and the subsequent demand for a much larger amount was an attempt a7 -' to lev3'double charges, which is impermissible in law. 1(). We have taken note of the respective contentions urged and perused the material on record. Consideration by this Court 11. The main controversy revolves around the interpretation of Clause 7.5.1 of the GTCS and its sub-clauses. The learned Single Judge has proceeded on a strict and literal construction of ttre said provision. While it is undoubtedly settled that procedures prescribed under statutory regulations must ordinarily be adhered to, it is equally well established that such provisions must receive a contextual and purposive interpretation so as to advance the object of the regulation and avoid impracticable or unintended consequences. 12. It is pertinent to note that Clause 7.5 of the GTCS bears the heading "Replacement of Meters", and Clause 7.5.1 deals specifically with "Defective Meters". A plain reading of Clauses 7.5.1.1 to 7.5.1.3 would indicate that the procedural safeguards contemplated therein; namely, preparation of inspection report, dispatch of the meter to the MRT Laboratory for testing, issuance of a test report, and consequential notice within the stipulated time are structured around a situation where the meter itself is suspected to be defective. In particular, clause 7-5-L-2 expressly stipulates that the meter found defective shall be sent to the MRT laboratory for testing and the subsequent steps are clearly predicated upon such laboratory \ i examination. clauses 7.5 to 7.s.I.3 of the GTCS are extracted hereunder: ?.5 Replacement of Meters 7.5-7 Defectiue Meters: Trrc foilowing procedure shan be ad.opted by the atmpany in respect of defectiue meters (other than stuck up meters which do not inwlue ang dispute) 7-5-7.7 T?rc authorbed Inspecting officer as per Designated. officers, Nc'tification slnll reard the obseruations mad.e at tlre time of Inspection bg prepaing the Inspection Report o.s per the format prescibed in Appendix M (Appendix IV A for LT ansumers or Appendix IV B for HT o*sume(s) and serue a copa of the same to the ansumer at trc end. of the inspection. The autharised inspecting olficer shail send a opy of su<'h Inspection Report bg trc nert working daa to the officer aul/n,i.sed for preparation of tlrc assessmenf notice in case of defectiue meter. 7.5.7.2 Tlrc a.ssociated ciranitry tncluding cr/yr shall be tested. at the pre;nises of the @nsuffLer. In addition wherever the ansumer dbputes or otherwise ansidered necessary, the Inspecting olfier shail arso ensltre that the mater, which is found. to be defectiue at the time of insp'ection, is sent to tte MRT raboratory for testing after repracement witf,. a cnrrect meter. The testing at MRT shall be and.ucted bg an officer notiJied by tle @mpana as per Designated. olficers Notificition in the presence of the onsumer (or his authaised representatiue) wlw shoutd. be giuen atleast two weeres aduance notice bg the @mpana. He shail senci the Meter Test Report to the officer authorised. as per Designated. Offia"-rs' Notification fo Issue assessmenf notice, within 3 d.ays from date of testing with apy to @nsumer and. all oth.er concemed. 7-5-1.3 such Designated olfier shall issue fhe Assessment Notice as per ttie format prouided in Appendix vll, to the ansumer within two dags from the date of receipt of the Meter Testing Report from the MRT labonttory, whereuer applicabte. 13. In the present case, the material on record discloses that the inspection conducted on 25.1 1 .2oo9 revealed that the 1(' phase Potential Transformer (PT) was defective with the voltage in that phase registering as zero. The defect was thus not in the recording mechanism of the m7,ter. A PT is an external component forming part of the assoc:iated metering circuitr5r, whose function is to step down high voltage to a measurable level. If the pr fails, particularly by loss of phase voltage, the meter may consequently record lower consumption; however, the meter's internal accuracy or calibration is not thereby rendered defective- The fault, in such circumstances, lies upstream in the circuitry and not in the metering instrument. L4. It is also to be noted that to mechanically apply the procedure meant for a defective meter to a case of defective pr would be misconceived, as the MRT Laboratory is intended for testing the accuracy and functionality of meters; it is neither designed nor required to diagnose or repair high-voltage transformers such as pTs. A defective PT is ordinarily replaced, as was done on 2s.Ll.2oog, rather than subjected to Laboratory testing in the manner contemplated for meters. consequently, the insistence on sending the meter to the MRT Laboratory and issuing prior notice for such testing would be inapposite in the underlying circumstances of the present case. Therefore, a purposive reading of clause 7.5.1 makes it clear that the prescribed procedure applies where the meter itself is defective, and not where an associated component of the circuitry, such as a PT, has failed and thereby resulted in under-recording of consumption. 15. on perusal of the inspection report, dated 2s.Ll.2oo9, it clearly discloses that the defect was in the y' phase pr and not in the recording meter. In such a case, the demand for strict compliance with clauses 7.5.1.1 to 7.s.1.3, as urged by the respondent, cannot be accellted. The aforesaid provisions apply to cases where the meter itself is found defective and is required to be sent to the MRT Laboratc'ry for testing. 16. Further, the substantive basis for assessment in cases of defective metering equipment is provided under Clause 7.5.1.4 of the GTCS, which deals with the computation of assessed units for the period during which the system remained defective. The object of the provision is to determine, on a rational basis, the quantum of energr that escaped proper recording. In the present case, the appellants relied upc'n the CMRI data, which constitutes an objective electronic record of the meter's parameters, to ascertain the precise period during which the Y' Phase voltage was absent, namely from 03.10.200') to 25.LL.2OO9. Thereafter, in terms of Clause 7.5.1.4.I, the appelkmts computed the average consumption on the basis of the preceding:nonths during which the metering system was functioning normally. The methodolory adopted is identifying the period of defect through electronic data and applying the prescribed average consumption formula, which cannot be said to be arbitrary or contrar5r to the GTCS. Clauses 7.5-L.4 and 7.5.1.4.1 of the GTCS are extracted hr:reunder: 7.5.7.4 When a meter is found to be defective during meter reading or on inspedion or othenaise, th.e following guidelines shall be folloued for amputation of tle. assessed units ,f 7.5.7,4.7 Thenarpb.er of units to be billed during tlrc period in which the rleter n@{ b function or became defectiue, sl,r;Llt be detennined bg taking tlre auerage of the electicity supplied duing tlw preeding tlvee billing cycles to the bilting cgcle in whichthe said meter eased to function or became defecttue prouided ttwt ttte qndition with regard to use of electricity during the said. ttvee biiling cades raere not different from *ase which preuailed. during the period in uthtch the Meter ceased to function or became defeaiui. 17- It is also borne out from the record t],at t].e appellants did not proceed in a mechanical manner. A detailed notice was issued; the respondent submitted objections; and a personal hearing was afforded on 24.o2-2olo. The final proceedings dated 2s.og.2olo constitute a reasoned order, wherein the objections were considered, the defect was confirmed with reference to the cMRI data, and the benefit of Load Factor Incentive was extended., thereby reducing the initial demand. Thus, the process complies with the prescribed procedure before issuing an assessment notice. 18. The respondent's contention that the subsequent demand amounts to double charging is misconceived. The additional units added in the November, 2oog bill was only provisional, pending detailed verification. upon inspection and analysis of the cMRI data, a final assessment was made for the entire defective period, in which the earlier provisional addition stood adjusted. Thus, there is no attempt to lery double charges. 19. The learned Single Judge observed that no inspection report in Appendix IV-B format was served upon the respondent petitioner). However, the record discloses a detailed (writ "HT Inspection Report" dated 2s-rL.2oo9 prepared by the inspecting officer, which L2 contains atl material particulars of the inspection; namely, the following: i) T,re readings at tl-e TTB and meter display ii) T.re specific observation that the Y'Phase voltage was zero' a:rd iii) The signature of the respondent's representative i.e', M. Narasimha Rao, Stores Incharge' Furtlrer,thesubstanceoftherequirement,suchas,recording the defect and communicating the same to the respondent also stands duly complied with by the appellants. Thus, mere non-adherence to a particular format or a Form with a particular nomenclature, in the absence of demonstrated prejudice, cannot vitiate the proceedings' 2f,. At t.:ris juncture, it is pertinent to note that the principal reasoning rrf the learned single Judge, based on the absence of MRT test in the presence of the respondent, overlooks the clear distinction between a defective meter and a defective PI. Since the meter itself was not fotrnd to be defective, there was no requirement to send it to the MRT L:rboratory- The assessment was made on the basis of the on-site inspection and the CMRI data, which established the period of under-recor.ding. Therefore, the requirement of issuing notice testing or passing arl assessment within two days of a test for MRT report does not arise. The demand, having been frnalized after nolice and personal ht:aring, cannot be interfered with on a purely technical interpretation ' .,,,;- Conclusion 21. For the foregoing reasons, this court is of the considered view that clauses 7-5.L.1 to 7.5.1.3 0f the GTCS, laboratory testing, apply only where the meter itself is defective and not where the defect ries in an associated Potential Transformer (PT). The impugned w'P'No.9392 of 2oLo, having proceeded component such as a order, dated o3.o..2o2s in on an erroneous apprication of the relevant provisions of the GTCS, cannot 22' relating to MRT be sustained. Accordingly, tJre writ Appear is a,owed. dated o3-oz -2025 passed in w.p.No .g3gr of 2o1o by the learned single Judge is set aside, and the wr.it petition demand proceedings dated 2s-o3.2oro for The impugned order stands dismissed. The a sum of Rs.2,gs ,4oo/ - are upheld' The respondent shall pay the said amount, if not already paid, within a period of eight (g) weeks from the date of receipt of a copy of this judgment, failing which the appellants shall be at liberty to recover the same in accordance with law. As a sequel, miscellaneous petitions, pending if any, stand closed. No costs. //TRUE COPYII SD/-M.RAMANA KRTSHNA JOINT FFICER To, 1. Director, Central power Distribution Southern Power Distribution Mint Compound, Hyderabad. 2. fh" Superintending Enqineer. APCPDCL, operation Circle, Medak atbangd Reddy (presently TGSpDCL), 3. The Divisional Engine-er, .Electrical, operation, ApcpDCL (presenfly TGSPDCL), Tooprah, Mecjak Diiirict. 4liiflixi:iT,iJl"fi"{#.[1t;f; Agarwa, S/o M L Agarwal f sHff rvuv' t".",fr vvvqr rvsrqwcr(r' [?l,F,f, t3,,T?[?fi \)lr \ruP i 5. one cc to SRI N.SREEDHAR REDDY, sc FoR TG TRANSCO. topucl 6. One CC to SRt CH.SATYASADHAN, Advocate. tOpUCl ry. 7. Two CD Copies. HIGH COURT DATED:1910212026 irti S o .J 2 5 l4At{ /lJ26 L. JUDGMHNT WA.No.88 of 2026 ALLOWING THE WRIT APPEAL THOUT COSTS ) b * *

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Telangana HC judgments →
LegalFirms.in Directory
Find an advocate for this matter
Dealing with a similar case? Find an advocate who handles this kind of matter on LegalFirms.in.
Find an advocate →