HIGH COURT OF TRIPURA
AGARTALA
RFA 16 of 2016
1.
The Union of India,
represented by the Secretary
to the Govt. of India,
Ministry of Home Affairs,
North Block, New Delhi
2.
The Director General,
BSF, CGO Complex,
Lodhi Road,
New Delhi-110003
---- Appellant(s)
Versus
1.
Sri Raj Karan Jain,
son of Late Shermal Jain (Barad),
resident of 60/5, Central Road,
P.O. Agartala, P.S. West Agartala
Dist. West Tripura, PIN-799001
2.
The State of Tripura,
(represented by the Commissioner/Secretary,
Revenue Department, Govt. of Tripura,
Agartala)
3.
The Land Acquisition Collector,
West Tripura, Agartala
---- Respondent(s)
CO(FA) 04 of 2016
Sri Raj Karan Jain,
son of Late Shermal Jain (Barad),
resident of 60/5 Central Road, P.O. Agartala,
P.S.-West Agartala, Dist.-West Tripura.
---- Cross-Objector(s)
Versus
1.
The Union of India,
Represented by the Secretary to the
Govt. of India, Ministry of Home Affairs,
North Block, New Delhi
2.
The Director General,
BSF, CGO Complex, Lodhi Road,
New Delhi-03
3.
The State of Tripura,
(represented by the Commissioner/Secretary,
Revenue Department, Govt. of Tripura,
Agartala)
4.
The Land Acquisition Collector,
West Tripura, Agartala
---- Respondent(s)
In RFA 16 of 2016
For appellant(s)
: Mr. Biswanth Majumder, CGC.
For Respondent(s)
: Mr. R. Debnath, Adv.
In CO(FA) 4 of 2016
For Cross Objector(s)
: Mr. R. Debnath, Adv.
For Respondent(s)
: Mr. Biswanth Majumder, CGC.
Date of hearing and
delivery of
judgment and order
: 11.02.2021
Whether fit for reporting
: NO
HON’BLE MR. JUSTICE S. TALAPATRA
HON’BLE MR. JUSTICE S.G. CHATTOPADHYAY
Judgment & Order (Oral)
S. Talapatra, J
Heard Mr. Biswanath Majumder, learned CGC
appearing for the appellants in RFA 16/2016 and for the
respondents in CO(FA) 04/2016 and Mr. R. Debnath, learned
counsel appearing for the respondents in RFA 16/2016 and
the cross-objector in CO(FA) 04/2016.
[2]
By means of this appeal under Section 96 of the
CPC, judgment dated 01.04.2016 delivered in Money Suit 35
of 2011 has been challenged in RFA 16/2016 whereas in the
cross objection filed under Order 41, Rule 22 of the CPC, the
plaintiff-cross-objector has filed the cross objection. The
cross-objector has challenged the quantum of the damage
as ascertained in the Money Suit 35 of 2011. The said suit
being Money Suit 35 of 2011 was instituted in the court of
the Civil Judge (Senior Division), West Tripura, Agartala
(Court No.1) for a decree for damages tentatively quantified
at Rs.82,70,364/-. According to the plaintiff, the defendants
No. 3 & 4 were in occupation over the land of the plaintiff
since 1966. By the land acquisition proceeding initiates by
the
notification
No.
F.9(24)-REV/ACQ/VI/2001
dated
01.10.2001 a substantive part of the land has been acquired
from
the
plaintiff
measuring
1.88
acres.
Thereafter,
compensation for acquisition has been paid. The assessment
and payment of the compensation are not the subject
matter in the suit. The subject matter of this suit has been
clearly laid down in the plaint as under:
―That the land of schedule 2 below was
acquired by issuing notification under section
of
the
L.A.
Act
on
01-10-2001
although physical possession of the said land
was taken over by the requiring department
i.e. B.S.F. in the year 1966. At that time, the
entire acquired land was orchard, full of fruit
bearing Cashew Nut trees and Jack Fruit
trees, though the land was classified in the
than Khatian as Bastu Tilla land. Out of 4
kanis 14 gandas 3 karas 8 dhur (i.e. 1.88
acre) of land, an orchard of 280 numbers of
cashew nut trees were there covering about 3
½ kanis of land and a garden of 80 numbers
of jack fruit trees were in the rest area of the
said land. At the time of occupying the said
land in 1966 by the B.S.F., all the cashew nut
and jack fruit trees were in fruit bearing stage
and each cashew nut tree produced at least
12 Kg. cashew nut per year in average and
therefore, the total production of cashew nut
from all the cashew nut trees was more or
less 3360 Kgs. Per year, the market value of
which
was
more
or
less
Rs.3360
X
30=1,00,800/- at the rate of Rs.80 X 300 =
Rs.24,000/- at the rate of Rs.300/- per jack
fruit trees. Therefore, the total income was
Rs.1,00,800/-+Rs.24,000/-=Rs.1,24,800/per year at the time of occupying the said
acquired land in 1966 by the B.S.F. The land
was acquired in October, 2001 and therefore,
the plaintiff is entitled to compensation for
the loss of income from the said orchard at
the rate of Rs.1,24,800/- per year from 1966
to 2001 and at the same time the plaintiff is
entitled to rent for the land since 1966 to
2001 and at the same time the plaintiff is
entitled to rent for the land since 1966 to the
date of acquisition at the rate of Rs.1,000/per month.‖
[3]
For purpose of realizing damage, the total loss of
usufruct and the rent were summed up and in the process
the total compensationdamage as drawn up by the plaintiff
has been ascertained at Rs.54,75,845/- for loss of produce
and
jackfruits
and
Rs.18,39,000.00
for
usufructs.
Rs.9,55,519/- has been ascertained on account of the rent.
Hence, a decree for damages to the extent of [Rs.9,55,519
+ Rs.54,75,845 + Rs.9,55,519] Rs.82,70,364/- has been
prayed in the suit.
[4]
The respondents disputed those facts by filing
reply in the additional written statement. In the written
statement, the defendants, the appellants in the appeal
being RFA 16/2016, has asserted that BSF has already paid
first payment of Rs.1,04,179/- as the cost of 2.30 acre of
land including cost for trees thereon as assessed by the LA
Collector, Agartala and thereafter again paid Rs.28,29,792/to
the
plaintiff
in
September,
as
enhanced
compensation determined in the reference [under Section 18
of the Land Acquisition Act, 1894] raised by the plaintiff
being Misc. (LA)26/2005 for enhancement of compensation
of acquired land and loss of trees. But, the LA Judge, Court
No.2, West Tripura, Agartala by his order dated 06.10.2010
has
dismissed
the
claim
of
the
plaintiff
relating
to
compensation on account of trees after considering all
aspect of the case. The L.A. Judge has observed that the
said claim has not been substantiated by the evidence. As
such according to the defendants (the appellants in the
appeal being RFA 16/2016) the suit cannot survive.
[5]
In para 8 of their additional written statement,
the defendants (the appellants herein) have categorically
asserted that the plaintiff-respondent has failed to place any
cogent evidence to prove the narrative that on the land that
has been acquired or that was occupied by the appellants
were having trees. It has been also asserted that as per
record the land measuring 1.88 acres (Jote land) belonged
to Smt. Mohini Devi, wife of Shermal Jain, pertaining to
Khatian No.355/1, CS Plot No. 725 of Mouja-Gandhigram
and land measuring 0.42 acres pertaining to Khatian
No.641, CS Plot No. 721 belonged to Sri Nirmal Choudhury.
Thus, the total land (measuring 2.30 acres) was acquired for
the Border Security Force(BSF) after observing all formalities
as laid down under section 4 & 6 of the Land Acquisition Act.
Being stationed over that land BSF has been managing BOP,
Bhagalpur since 1966. The actual owner of the land
measuring 1.88 acres namely, Mohini Devi did never made
any correspondence with BSF to deliver or vacate possession
of the said land. Moreover, the compensation that has been
paid to the extent of Rs.28,29,792/- had included the loss
accruing from acquisition of the land and the loss of the
usufruct of other loss as covered by Section 23 of the L.A
Act.
[6]
In respect of possession as claimed by the
plaintiff-respondent over a land measuring 0.59 acres by
BSF, the plaintiff had made some correspondence. But that
claim has not been accepted by the defendant-appellants as
there was no documentary proof to ascertain that fact. In
para 11 of the said additional written statement, filed by the
defendants No. 3 & 4 it has been asserted that though BSF
has been manning BOP Bhagalpur since 1966, yet the area
under their possession was not properly demarcated and
identified
by
the
Revenue
Authority.
Later
on,
the
measurement of the land occupied by BSF, BOP Bhagalpur
was done by the Revenue Authority and it had been
established that 1.88 acres of land belonged to Smt. Mohini
Devi. The Revenue Authority has never shown details of the
standing trees on such land and as such allegation leveled
by the plaintiff was not admitted and accordingly the same
had been denied by the defendants No. 3 & 4. Against the
basic claim and on the basis of the rival pleadings the Civil
Judge framed the following issues:
1. Is the suit is maintainable in its present
form and nature?
2. Has the Plaintiff any cause of action to
institute the instant suit?
3. Is the Plaintiff entitled to compensation,
as prayed for?
4. What other relief/reliefs the parties are
entitled to?
[7]
The plaintiff examined himself as PW-1 and
proved certain documents such as (1) the demand notice,
dated 10.05.2011 in two sheets [Exbt.1] (2) the certified
copy of the evidence adduced by Union of India in
connection with Case No. Misc. (LA) 26 of 2005 [Exbt.2
series] and/ (3) the certified copy of the judgment in 8
(eight) sheets [Exbt.3].
[8]
For the defendant-appellants, one Sri Sanjoy
Singh Thakhur was examined as DW-1, one Sri Yashvir
Hooda was examined as DW-2 on behalf of the defendants
No. 3 & 4. Through DW-1, certain documents namely, (a)
certified copy of the judgment and order dated 05.01.2012
passed in LA case No. 18 of 2011 [Exbt.A] was also
introduced in the evidence.
[9]
The
Civil
Judge
on
appreciation
of
all
the
evidentiary materials, both documentary and oral, has
observed as under:
―8..............Hon'ble
High
Court
vide.,
judgement dated 05.01.2012(Exbt. A) made
in L.A. Appeal No. 18 of 2011 considering the
fact that the schedule-2 land is situated near
the Airport and considering the scope of
expansion of Airport township and its market
area therein has increased the value of the
land. In this view of the matter and their
being no denial as to the rate of the rent
claimed by the plaintiff, I am of the opinion
that the plaintiff is entitled to rent at the rate
of `.1,000/- per month on the schedule -2
with effect from 1966 to 2001 with a general
increase of 10% on the rent per year. Though
it
is
an
admitted
position
that
the
BSF
authority is possessing the land, but none of
the parties placed any material to indicate the
date
or
month
of
from
which
the
defendant Nos. 3 & 4 have been possessing
the
land.
In
such
a
situation,
I
find
it
appropriate to calculate the rent from the
month of January, 1966 to the month of
September, 2001 since the land was acquired
in the month of October, 2001. Accordingly,
the amount of rent @ `1,000/- with general
increase of 10% per year has been calculated
at
`12,11,500/-
in
total
along
with
6%
interest per annum thereon. The Plaintiff is
not entitled to interest on the entire amount
right from 1966 since the entire amount
become due in the month of September, 2001.
So, I find it appropriate to direct that the
interest to be calculated from October 2001
till the date of payment.
Save and except simple statements made in
the plaint and reproduced in the examinationin-chief, no cogent evidence led to show the
existence of orchard on the said land or any
cogent evidence to show the existence of
claimed number of either cashew nut plants
or jack fruit trees or any other trees. Hence,
claim of the plaintiff as to the damage of trees
and consequently loss of income thereon
stands discarded. The plaintiff is, therefore,
entitled to a decree as indicated herein above.
Accordingly Issue Nos. 3 & 4 stand answered
to the extend as indicated above.
[10]
Thus, the defendant-appellants were directed to
make payment of Rs.12,11,500/- towards rent of the land as
described under the Schedule-2 along with 6% interest per
annum w.e.f. October, 2001 till the date of payment within
four months. Further, it has been observed that failure to
make payment within the said stipulated period, the amount
so awarded shall carry interest at the rate of 9% per annum
w.e.f October, 2001 till the date of payment.
[11]
The said judgment dated 01.04.2016 delivered in
Money Suit 35 of 2011 is challenged in this appeal.
[12]
Mr. B. Majumder, learned CGC appearing for the
defendant-appellants has quite robustly submitted that the
suit was hopelessly barred by the limitation. Mr. Majumder,
learned CGC has taken us to the statement made in the
plaint in respect of cause of action. According to the plaintiff,
cause of action for the suit arose on various dates and on
06.10.2010 when the land acquisition judge did not consider
the claim of the plaintiff and lastly on expiry of the period of
the notice dated 10.05.2011 under section 80(1) of the CPC.
According to Mr. Majumder, learned CGC this cannot be the
cause of action, inasmuch as, delivery of the judgment in a
particular case cannot be the relevant date for cause of
action except for appeal, revision or review. The cause of
action arose when the BSF came over possession of the suit
land as described in the Schedule-2 measuring 1.88 acres or
when
due
claim
has
been
denied
by
the
defendant
appellants.
[13]
It appears from the records that the judgment in
the reference case being Misc. (LA) 26 of 2005 was delivered
on
06.10.2010
[Exbt.3]
and
the
judgment
has
been
delivered in the appeal therefrom on 05.01.2012 in LA
Appeal 18 of 2011.
[14]
According to Mr. Majumder, learned CGC, that the
suit ought to have been instituted within 3 (three) years
from the day when the cause arose. Mr. Majumder, learned
CGC has pointed out the cause arose on anytime within
1966 to 07.12.2001 when the declaration for acquisition on
public interest was published under section 6 of the LA Act,
1894. There is no dispute according to Mr. Majumder,
learned CGC thereafter, as reflected in the suit which was
filed on 19.11.2011. Thus, the plaint would have been
returned in view of the provisions laid down under Order VII
Rule 11(c) & (d) of the CPC. But, the Civil Judge has not
done so and carried the proceeding forward for pronouncing
the judgment based on the evidence recorded in the
proceeding.
[15]
Mr. Majumder, learned CGC has submitted quite
emphatically that pursuing the reference under Section 18 of
the LA Act in the court of the Land Acquisition Judge will not
leverage application of Section 14 of the Limitation Act,
inasmuch as, the reference made by Land Acquisition
Collector was made to the proper forum and the proper
forum had answered the reference in accordance with law.
In the reference, the issue of not acquiring the land from
any date of 1966, as, according to the plaintiff, the said land
was in occupation of the Border Security Force (represented
by the defendant No. 4) was not the subject matter. The
reference was confined to the determination of the value of
the land and other properties standing thereon like trees and
structure etc. No reference was made for determining the
damage that the respondent [the plaintiff] had suffered for
occupation of the land from 1966 to 2001. Therefore, in the
face of it, the provisions of Section 14 of the Limitation Act
will not apply.
[16]
For purpose of reference, Section 14 of the
Limitation Act is reproduced below:
―14 Exclusion of time of proceeding bona fide
in court without jurisdiction. —
(1) In computing the period of limitation for
any suit the time during which the plaintiff
has
been
prosecuting
with
due
diligence
another civil proceeding, whether in a court of
first instance or of appeal or revision, against
the defendant shall be excluded, where the
proceeding relates to the same matter in
issue and is prosecuted in good faith in a
court which, from defect of jurisdiction or
other cause of a like nature, is unable to
entertain it.
(2) In computing the period of limitation for
any application, the time during which the
applicant
has
been
prosecuting
with
due
diligence another civil proceeding, whether in
a court of first instance or of appeal or
revision, against the same party for the same
relief
shall
be
excluded,
where
such
proceeding is prosecuted in good faith in a
court which, from defect of jurisdiction or
other cause of a like nature, is unable to
entertain it.
(3) Notwithstanding anything contained in
rule 2 of Order XXIII of the Code of Civil
Procedure, 1908 (5 of 1908), the provisions
of sub-section (1) shall apply in relation to a
fresh suit instituted on permission granted by
the court under rule 1 of that Order where
such permission is granted on the ground that
the first suit must fail by reason of a defect in
the jurisdiction of the court or other cause of
a like nature.
Explanation.—
For
the
purposes
of
this
section,—
(a) in excluding the time during which a
former civil proceeding was pending, the day
on which that proceeding was instituted and
the day on which it ended shall both be
counted;
(b) a plaintiff or an applicant resisting an
appeal shall be deemed to be prosecuting a
proceeding;
(c) misjoinder of parties or of causes of action
shall be deemed to be a cause of a like nature
with defect of jurisdiction.
[17]
From a reading of the provision, it would surface
that the period that the plaintiff has prosecuted a proceeding
with due diligence in the court of the first instance or in the
court of appeal or of revision against the defendant shall be
excluded in by the proceeding that would emerge on the
same matter in issue. The former proceeding has to be
prosecuted in good faith in a court, which for defect of
jurisdiction, was unable to entertain it.
The required factors, as defined in Section 14, are
[18]
absent in the present case. Therefore, there had been no
scope
of
applying
Section
of
Limitation
Act.
Mr.
Majumder, learned CGC appearing for the appellants has
submitted that the guillotine of Section 3 of the Limitation
Act would fall on the suit of such nature as the suit has not
been instituted within 3 (three) years, inasmuch as, Article
52 of the Schedule appended to the Limitation Act provides
a period of 3(three) years of institution of the suit of this
nature.
[19]
On the other side, Mr. R. Debnath, learned
counsel has strenuously persuaded us that the Civil Judge
has correctly observed that the cause of action is a set of
facts sufficient to justify a right to sue and obtain money
decree for enforcement of the right against another party.
The term also refers to the legal theory upon which a
plaintiff brings suit to pursue a cause of action. A plaintiff
pleads or alleges facts in the plaint which is the pleading
that
initiates
the
suit.
A
cause
of
action
generally
encompasses both the legal wrong that the plaintiff has
claimed to have suffered and the relief a court is asked to
grant.
[20]
The plaintiff’s claim of entitlement of the rent for
the suit land w.e.f. [Schedule-2] 1966 to 2001 on the
ground of taking over its possession in October, 1966 and
the claim of the entitlement of the compensation. Damages
for trees and loss of income from the usufruct has been
considered
in
the
reference
and
determined.
Non-
determination of the rent gives rise to the cause of action.
[21]
Mr. Debnath, learned counsel has also referred to
the judgment and award [Exbt.3] of the Land Acquisition
Judge where the Land Acquisition Judge has observed as
follows:
―14. Viewed in the above perspective, the
land in question as assessed by the L.A
Collector appears to be unreasonable. It is
worth to mention here that this Court has no
jurisdiction to give any compensation about
the damage of any trees or any property
thereof following the occupation by the BSF
Personnel since 1966 prior to the notification
of the land for acquisition. As it appears from
the khatian under Exbt.1 –series that the BSF
Personnel occupying and using the land in
question since 1966 for their BOP. Besides, it
is an admitted fact. Be that as it may, no
sufficient and excessive trees should be there
since their occupation. Moreover, the claimant
could not place any cogent evidence about the
story of trees during the period of acquisition
of the land in question. The fact needs to be
appreciated in this way. So, the L.A. Collector
rightly awarded the amount of Rs.10,000
towards the cost of trees in favour of the
claimant. Therefore, further demand of the
claimant-petitioner about the trees carries no
importance.‖
[Emphasis added]
[22]
According to Mr. Debnath, learned counsel, since
the Land Acquisition Judge did not have the jurisdiction to
take the plea of rent under the reference, the said period
what the plaintiff has exhausted prosecuting the referring
case should be deducted from the period of delay in filing
the suit. Mr. Debnath, learned counsel also made an unique
submission having referred to a decision of the Apex Court
in N.C. Dhoundial Vs. Union of India & Ors. reported in
(2004) 2 SCC 579 where the Apex Court having referred to
Section 36 of Protection of Human Rights Act has observed
that the bar under section 36(2) is sought to be got over by
the Commission by invoking the theory of continuing wrong
and the recurring cause of action.
[23]
According to the Commission, every violation of
human right is a continuing wrong until and unless due
reparation is made. We find it difficult to accept this
proposition propounded by the Commission in the present
context. The short answer to this view point is that such a
view, if accepted, makes Section 36(2) practically a dead
letter. Moreover, going by the language employed in Section
36(2), we do not think that the concept of continuing wrong
could at all be pressed into service in the instant case. The
time limit prescribed is referable to the alleged 'act'
constituting the violation of human rights. In a case like
illegal detention, the offensive act must be deemed to have
been committed when a person is placed under detention
and it continues so long as the affected person remains
under illegal detention. The commission of the offensive act
is complete at a particular point of time and it does not
continue to be so even after the unauthorized detention
ends.
[24]
Section 36 of the Protection of Human Rights Act
provides as follows:
―36. Matters not subject to jurisdiction of the
Commission-(1) The Commission shall not
inquire into any matter which is pending
before a State Commission or any other
Commission duly constituted under any law
for the time being in force.
(2) The Commission or the State Commission
shall not inquire into any matter after the
expiry of one year from the date on which the
act constituting violation of human rights is
alleged to have been committed."
[25]
We are really in quandary how this provision is
relevant and applicable in the suit. Before we embark on
appreciating the submission of the learned counsel for the
parties, we find that the solitary question that falls for our
consideration is, whether the suit was barred by limitation in
view of the provisions of Section 3 of the Limitation Act
which provides that subject to the provisions contained in
Section 4 to 24 (inclusive), every suit instituted, appeal
preferred, and application made after the prescribed period
of limitation shall be dismissed, although limitation has not
been set up as a defence.
[26]
Since the Land Acquisition Judge by his judgment
dated 06.10.2010 [Exbt.3] has clearly observed that the
claim of standing trees on the occupied land could not be
substantiated by the plaintiff, he would not grant any
damage for that. The judgment and award of the LA Judge
has been challenged in the appeal which was dismissed.
However, in the cross-objection emerged out of the said
appeal the land value was enhanced to Rs.2,00,000/- per
kani.
[See
the
common
Judgment
dated
05.01.2012
delivered in LA Appeal No.18 of 2011 and C.O(FA) No.06 of
2011]
[27]
The suit for realization of rent will definitely be
covered by Article 52 so far the limitation for the suit is
concerned. That apart, the reference as it appears has been
made under Section 18 of the Land Acquisition Act. Section
18 of the Land Acquisition Act provides that any person
interested, who has not accepted the award may, by written
application to the Collector, require that the matter be
referred by the Collector for the determination of the Court,
whether his objection be (a) to the measurement of the
land, (b) the amount of the compensation, (c) the persons
to whom it is payable, or/ (d) the apportionment of the
compensation among the persons interested.
[28]
It appears from the records that the application
by which the reference was sought has not been admitted in
the evidence. But, in response to the notice issued under
Section 9 of the Land Acquisition Act, the plaintiff had placed
his demand to make necessary arrangement for payment of
compensation of the land which were in possession of BSF
within 15 days from the receipt of the letter otherwise under
a painful circumstances as the plaintiff has asserted, he
would be bound to take action at law. The said letter dated
05.07.2001 had placed the claim before the Commandant,
13th Battalion, BSF, Fatikcherra. Thereafter, the plaintiff,
received is a letter of the said Commandant, 13th Battalion,
BSF in reply to said notice. By the said reply dated
07.07.2001 [Exbt.9] the plaintiff was informed in respect of
the demarcation of the land under their occupation and for
identification of the land which is not under their occupation.
After such demarcation, as it appears, the land acquisition
proceeding did commence.
[29]
It was brought to our notice that even an appeal
was filed by the appellants in the Gauhati High Court being
LA Appeal No. 18 of 2011. But, the plaintiff did not file any
appeal. It has been located that the plaintiff-respondent filed
one cross-objection which was registered as CO(FA) 06 of
2011 claiming valuation of land to Rs.4,00,000/- per kani
relying on the contemporaneous documents and the land
value was enhanced to Rs.2,00,000/- per kani by the
common judgment dated 05.01.2012 delivered in LA Appeal
No. 18 of 2011 and C.O(FA) 06 of 2011.
[30]
No document has been placed before us that any
reference regarding determination of rent for occupation of
the land before the acquisition was made. It transpires very
clearly that enquiry was confined under Section 11 of the
Land Acquisition Act and the plaintiff respondent did not
press for determination of the rent to the Land Acquisition
Collector. At least there is no such evidence before this
Court.
[31]
Even if the LA Collector denied the determination
of rent and that was not part of the reference under Section
18. It appears that the Land Acquisition Judge has observed
that he had no jurisdiction to determine the said rent. As it
has not been referred, the said observation does not form
infirmities. Such observations is corollary of two occasions
viz., (1) when there was no claim before the Land
Acquisition Collector for determination of the rent for
occupying the land from 1966 to 2001, or/ (2) that the claim
for rent was made before the Land Acquisition Judge for the
first time, but he did not determine the loss on account of
the rent as that aspect was beyond the reference. But, the
Land Acquisition Judge has not exercised any authority as he
rightly considered that he had no jurisdiction. Such denial
could only be challenged in the appeal. Unfortunately, the
memorandum of cross objection is also not before us. In
such circumstances, we are of the considered view that the
cause of action last arose when the declaration under
Section 6 of the Land Acquisition Act was issued on
01.01.2002 for acquisition of land. No step was taken for
assessment of rent. On acquisition, the title of the land
extinguished. Hence, from 01.01.2002 the plaintiff did not
have any right to claim rent. They have not even claimed.
The independent suit for the rent should have been filed on
or before 31.12.2004. But as noted, the suit has been filed
on 19.11.2011.
[32]
According to us the suit is clearly barred under
Section 3 of the Limitation Act and as such finding of the
Civil Judge that the suit is maintainable for claiming the loss
of rent from 1966 to 2001 is not maintainable and
accordingly the same is set aside.
[33]
In the result, the appeal being RFA 16/2016
stands allowed. As consequence of the above conclusion on
limitation, the suit being Money Suit 35 of 2011 is
dismissed. As the suit has been dismissed, the cross
objection being CO(FA) 04/2016 as well stands dismissed.
Draw the decree accordingly. Send down the LCRs forthwith.
[34]
Before parting with the records, the plaintiff is
given liberty to approach the Land Acquisition Collector
under Section 35 of the Land Acquisition Act for assessment
of rent for the period of 1966 – 2001, considering occupation
by the BSF over the land described in the Schedule-2 of the
suit as deemed requisition. Since the BSF has not disputed
their occupation from 1966 to 2001 over the said land, no
inquiry in this regard may be necessary by the Land
Acquisition Collector. Only the rate of rent be determined by
the LA Collector, west Tripura.
JUDGE
Rudradeep
JUDGE
This page is for informational and research purposes only and does not constitute legal advice.