Page No.# 1/20
GAHC040012562023
2026:GAU-AP:309
THE GAUHATI HIGH COURT
(HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)
Case No. : WP(C)/451/2023
Sindica Welfare Society (SWS) and 11 Ors.
represented by its Chairman Shri Tengari Linggi, S/o Gane Linggi, R/o Roing, Lower
Dibang Valley District Arunachal Pradesh.
2: Shri Dingu Linggi
Age:
Occupation :
S/o Tengari Linggi
R/o
Simari-II
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
3: Shri Iho Pulu
Age:
Occupation :
S/o Jatan Pulu
R/o Yibuk
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
4: Shri Deho Pulu
Age:
Occupation :
S/o Jatan Pulu
R/o Yibuk
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
5: Shri Kotri Menjo
Age:
Occupation :
R/o Chidu
P.O/P.S Roing
Page No.# 2/20
Lower Dibang Valley District Arunachal Pradesh.
6: Ms. Unti Menjo
Age:
Occupation :
R/o Chidu
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
7: Shri Shan Dele
Age:
Occupation :
R/o Chidu
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
8: Shri Ram Dele
Age:
Occupation :
R/o Chidu
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
9: Smti Mila Linggi
Age:
Occupation :
R/o Iduli
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
10: Smti Jamela Linggi
Age:
Occupation :
R/o Mayu-II
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
11: Smti Mila Linggi
Age:
Occupation :
R/o Mayu-II
P.O/P.S Roing
Lower Dibang Valley District Arunachal Pradesh.
12: Shri Dela Mena
Age:
Occupation :
R/o Bizari
Page No.# 3/20
P.O/P.S Dambuk
Lower Dibang Valley District Arunachal Pradesh
VERSUS
The State of AP and 4 Others
Represented by the Chief Secretary, Government of Arunachal Pradesh, Itanagar.
2:Secretary
Age: 0
Occupation :
(Land Management)
Government of Arunachal Pradesh
Itanagar.
3:The Deputy Commissioner-Cum-District Collector
Age: 0
Occupation :
Lower Dibang Valley
Roing.
4:Andome Elapra Iluli Welfare Society
Age: 0
Occupation :
represented by its Chairman Shri Atige Elapra
S/o Lt. D. Elapra
R/o Iduli
P/s Roing
Lower Dibang Valley
Arunachal Pradesh.
5:Ms. Pretty Elapra
Age: 0
Occupation :
Society
Andome Elapra Iluli
Welfare Society
R/o Iduli
Po/Ps Roing
Lower Dibang Valley
Arunachal Pradesh
Advocate for the Petitioner
: Taja Garam, P Siga
Advocate for the Respondent : , Tao Tarin,Binter Picha,Jumgam Jini,T T Tara,GA (AP)
Page No.# 4/20
BEFORE
HONOURABLE MR. JUSTICE ROBIN PHUKAN
JUDGMENT
27.03.2026
Heard Mr. P. Yobin, learned counsel for the petitioners; Mr. R.H. Nabam,
learned Additional Advocate General for the State respondent Nos. 1, 2 & 3; and
Mr. J. Jini, learned counsel for the respondent Nos. 4 & 5.
2.
In this petition, under Articles 226/227 of the Constitution of India, the
petitioners have challenged the land acquisition proceedings, initiated vide
preliminary notification dated 27.08.2013; issued under Section 4(1) of the Land
Acquisition Act, 1894 (1894 Act hereinafter); final notification dated 14.12.2014,
issued under Section 6 of the 1894 Act; and the notice dated 25.01.2016, issued
under Section 9 of the 1894 Act. Further, the petitioners have prayed for issuing
direction to the respondent authorities, more particularly the Deputy
Commissioner to recover the amount of compensation paid to the private
respondents by freezing their accounts.
Background Facts:3.
The background facts, leading to filing of the present petition, are
adumbrated herein below:“In the year 2002, the Government of India, through the Ministry of
Power, handed over the 2880 MW Dibang Valley Multipurpose Project to
National Hydroelectric Power Corporation (NHPC hereinafter) for execution
of the project.
Thereafter, the NHPC had conducted a survey and prepared
Maps/Areas/Locations and list of the project affected families, without any
Page No.# 5/20
joint verification with the concerned Deputy Commissioner, Roing (DC
hereinafter), who is the Land Settlement Officer.
Thereafter, vide letter dated 09.11.2009, the NHPC had submitted a
proposal to the DC, for issuance of notification under Section 4 of the
1894 Act. While sending the proposal, the NHPC, vide letter dated
15.03.2010, had also submitted a sample notification under Section 4 of
the 1894 Act. Then, the DC had observed certain errors in the report of
the NHPC and accordingly, ordered to rectify the map, circulars dated
07.09.2011 and 01.08.2012. Thereafter, the NHPC prepared a revised
map.
Thereafter, the Secretary (Land Management), Government of
Arunachal Pradesh, Itanagar, vide Notification dated 27.08.2013, had
issued a preliminary Notification, under Section 4(1) of the 1894 Act,
whereby it is notified that the Government is acquiring about 1628.441
hectares of land for the company, namely NHPC Limited (Government of
India Enterprises), for execution of Dibang Multipurpose Project. In the
said notification, the landed property of the petitioners is shown at serial
numbers 9 & 11.
Thereafter, before any further formalities could be conducted, the
Right to Fair Compensation and Transparency in Land Acquisition,
Rehabilitation and Resettlement Act 2013 (LARR Act hereinafter) was
brought into force, w.e.f. 01.01.2014, vide notification No. S. O 0729 (E),
dated 19.12.2013.
In the said Act, Section 24 provides that the Land Acquisition
initiated under the Old Act deemed to have lapsed, if no award under
Page No.# 6/20
Section 11 have been made or award has been made five years or more
prior to the commencement of the Act or the compensation has not been
paid. In the instant case, though the initiation proceeding comes under
the Old Act, however, the respondent authorities, vide final notification
dated 04.12.2014, under Section 6 of the 1894 Act; vide notice dated
25.01.2016, under Section 9 of the 1894 Act; and vide notice dated
22.03.2016, had issued a circular for final hearing for determination of
land ownership and the hearing for the petitioners’ area was fixed on
18.04.2016. In response to the same, the private respondents had stacked
a bogus claim, against which, objections were filed and ultimately, the civil
suits were filed. However, during pendency of the civil suits, the
compensation amount was paid to the private respondents in the year
2021, which demonstrate that the proceeding is without jurisdiction.
Being aggrieved, the petitioners have approached this Court, by
filing a writ petition, being W.P.(C) No. 452(AP)/ 2022 and the same was
disposed of on 24.11.2021, with liberty to file a fresh.”
Then the petitioners have approached this Court by filing the present petition,
under Article 226 of the Constitution of India.
4.
The respondent No. 3, the DC, has filed affidavit-in-opposition, wherein a
stand has been taken that the letter dated 16.04.2016, received from Andome
Elapra Clan, in respect of the area presently being claimed by the petitioners,
vide following letters/representations:(i)
Letter from Atige Elapra, dated 14.06.2010, claiming ownership over
Iluli and Epali;
(ii)
Representation dated 24.10.2011, claiming ownership over right and
Page No.# 7/20
left bank of river Ilu in response to the circular issued on
07.09.2011;
(iii)
Representations dated 19.09.2011 and 18.10.2021, praying for
inclusion in Iluli and claiming ownership of area over Iluli;
(iv)
Representation dated 16.04.2016, claiming ownership over 177.663
hectares of land and 76.50 hectares of land for area listed at serial
Nos. 9 & 11 of the Notification, under Section 9 of the 1894 Act; and
(v)
No Objection Certificates (NOC hereinafter) dated 18.04.2016,
certifying the ownership of 177.663 hectares of land and 76.50
hectares of land by Andome Elapra Clan for areas listed at serial
Nos. 9 & 11 of the Notification issued by Mamuni Menjo, Muni
Menjo, Jameta Elapra, Drai Linggi, Apodi Menjo, Tengari Linggi and
Pike Pulu. These NOCs were specific in respect of nomenclature,
area, location and size of the area listed at serial Nos. 9 & 11 of the
Notifications belonged to Andome Elapra Clan. The petitioner No. 1
was one of the individuals who had issued the NOC certifying the
claim and therefore, the claim of the petitioners that the matter
came to light only in the year 2021 is misleading.
4.1. It is also stated that Andome Elapra Clan was not the only community that
submitted their claims over the area listed at serial Nos. 9 & 11. Claims were
also received from the following:(i)
Narko Linggi and party, vide letter dated 08.08.2011;
(ii)
Junti Linggi and party, vide letter dated 13.09.2010;
Page No.# 8/20
(iii)
Narko Linggi and party; vide letter dated 07.09.2008;
(iv) Narko Linggi, vide letter dated 08.10.2012;
(v)
Bota Mimi and party, vide letter dated 24.12.2011;
(vi) Junti Linggi and party, vide letter dated 22.09.2011;
(vii) Junti Linggi and party, vide letter dated 12.02.2016;
(viii) Wuti Mimi, vide letter dated 18.04.2016;
(ix)
Bota Mimi and party, vide letter dated 19.03.2013;
(x)
Bota Mimi and party, vide letter dated 28.12.2013;
(xi)
Junti Linggi, vide letter dated 12.02.2016;
(xii) Tisa Linggi, vide letter dated 29.11.2016;
(xiii) Ramesh Linggi, vide letter dated 10.02.2016 and 11.02.2016; and
(xiv) Shri Narko Linggi, vide letter dated 12.02.2016.
4.2. It is also stated that the claims, so received, were informed to all members
during the course of the meeting and the members themselves agreed to share
the ownership of the land and the same was submitted vide two letters dated
21.04.2016 and 11.05.2016, by Narko Lingii and Junti Linggi, respectively.
4.3. It is further stated that the notice, under Section 9 of the 1894 Act, was
issued on 25.01.2016, so that all persons interested to stake their claim and
interest and vide letter date 06.02.2017, pertaining to the report submitted by
CO(LM) subsequent hearings were called. As such, the petitioners’ claimed that
Page No.# 9/20
none of the actual landowners or representatives of the Clan members were
present is entirely false. The attendance sheet clearly indicates that the
petitioner Nos. 1 & 2 were present in the meeting (serial Nos. 36 & 58) for Iluli
upstream and left bank of Ilu Pani area (serial Nos. 9 & 11) as per schedule in
the circular. But no objection was submitted by the petitioners during the course
of the meeting.
4.4. It is also stated that the representations of the petitioners claiming
ownership of the land notified at serial Nos. 9 & 11 was received vide letter
dated 30.03.2021 and the objection to the maps was received on 16.04.2021.
These claims were received five years after the conduct of final hearing under
Section 9 of the 1894 Act and two years after the State Government has
accorded approval to the award, vide letter dated 22.02.2019.
4.5. Further, it is submitted that the proposed area of their lands remained
unchanged, lacks clarity, as to which particular parcel of the land they are
referring. The de-notification under Section 48 of the 1894 Act includes a
column which shows the area that had been notified and another column shows
the extent of the area that is being de-notified. And that this petition pertains to
the lands mentioned at serial Nos. 9 & 11 as indicated in the de-notification and
as such, the area of Iluli upstream had been reduced by 36.939 hectares and
the left bank of Ilu Pani area has been reduced by 3.5 hectares.
4.6. It is also stated that in W.P.(C) No. 170(AP)/2020, the petitioners were
granted liberty to approach the competent civil court and as per direction of this
Court, dated 01.11.2021, passed in IA(Civil) No. 90/2021, the project affected
families, which were not arrayed as a party in the said writ petition,
compensations were disbursed to them.
Page No.# 10/20
4.7. Another stand taken by the respondent No. 3 that an application was filed
before the Collector/DC to refer the case, under Section 64 of the LARR Act.
5.
In the affidavit-in-opposition filed by the respondent Nos. 4 & 5, it is stated
that the petitioner No. 1 himself signed the final list of project affected families
belonged to the Sindica community, on 03.01.2017 and that no objection was
received from any of the petitioners claiming any misrepresentation of area of
nomenclature during the rectification process and during the subsequent
notification period, under Sections 4, 6 & 9 of the 1894 Act, NOCs or claims
were received from the petitioners pertaining to the map, nomenclature or size
of the areas listed at serial Nos. 9, 10 & 11 of the Notification.
5.1. It is also stated that none of the individuals or communities, who had
submitted representations for other areas and attended the Section 5 of the
1894 Act hearings objected to the land being taken for acquisition and NOCs or
claims were received from the petitioners in response to the notice, under
Section 4 of the 1894 Act regarding the acquisition, nomenclature, area or
boundary description, especially concerning serial Nos. 9 & 11 and under
Section 6 of the 1894 Act final Notification was issued on 14.12.2014, after
compliance of procedures of Sections 4 & 5 of the 1894 Act, since no individual,
community or organization had objected to the acquisition of land. And during
the Section 9 of the 1894 Act proceeding also, the petitioners neither submitted
any claims nor any objection to the acquisition, nomenclature or size of land
listed at serial Nos. 9 & 11 and they have neither submitted specific objection or
claim in respect of the area now being claimed under serial Nos. 9 & 11 of the
notification nor there was any objection to the terms ‘Iluli’ and ‘Iluli’ being used
instead of ‘Andambu Meyapa’.
Page No.# 11/20
5.2. It is also stated that the petitioners have acknowledged the entire process
undertaken by the District Administration in 2011 – 2012 to rectify date,
determine claims and facilitate arrangements among parties/clans/communities
and now they cannot claim that they are unaware of the notified areas under
serial Nos. 9 & 11.
5.3. Further, it is stated that the petitioner Nos. 1 & 2 attended the meeting for
Sindica and staked their claim during the final hearing for all the areas under
acquisition were held in response to claims and objections received under
Section 9 of the 1894 Act and subsequently, the draft award, under Section 11
of the 1894 Act, was referred to the Government and the Government approved
the same, vide order dated 22.02.2019.
5.4. Another stand taken by the respondent Nos. 4 & 5 is that the petitioners
had filed one title suit, being Title Suit No. 07/2021, before the learned Civil
Judge (Senior Division), Roing (trial court hereinafter) and the same was
dismissed, vide order dated 29.03.2022, citing provisions under Section 63 of
the LARR Act. Thereafter, against the order of the learned trial court, the
petitioners approached the learned reference court by filing an application under
Section 64 of the LARR Act. However, during the course of hearing, the learned
reference court, upon consideration of the submissions made by the counsel for
both the parties, observed that the petitioners had not filed any application or
representation before the competent authority, i.e. the DC, as required under
Section 64(1) of the LARR Act and thereafter, the petitioners had withdrawn the
same.
5.5. Further, it is stated that the present writ petition is clear abuse of process
of law, being filed by suppressing fact and deliberate attempt to make multiple
Page No.# 12/20
claims and no cause of action survives in favour of the petitioners and therefore,
this petition is liable to the dismissed.
6.
The petitioners have submitted their reply denying the statements and
averments made by the respondent authorities in their affidavits-in-opposition.
Submissions:7.
Mr. Yobin, learned counsel for the petitioners submits that the petitioners
have now challenged the order passed by the learned reference court, dated
31.08.2022, wherein the learned reference court had misinterpreted the
provision of Section 64 of the LARR Act and that the conducting counsel for the
petitioners never wanted to withdraw the petition, but the same was put into his
month and thereafter, the order was passed. Mr. Yobin further submits that in
view of the proviso to Section 64 of the LARR Act, the impugned order is illegal
and arbitrary and as such, he has contended to set aside the impugned order
dated 31.08.2022 and to remand the matter to the learned reference court to
proceed with the case in accordance with law.
7.1. Mr. Yobin has pointed out that the petitioners, on 30.03.2021 and
16.04.2021, had complained to the DC regarding illegal inclusion of Andambu
Meyappa Iluli area, under Elapra Hali and Mimi Shango. But, the DC has refused
to act upon the same, rather he had issued an order on 09.07.2021, directing
the petitioners to approach the civil court to decide the issue pertaining to
title/ownership of the land. Thereafter, the petitioners have preferred the title
suit before the learned trial court and the learned trial court, vide order dated
29.03.2022, had dismissed the same on the ground that Section 63 of the LARR
Act clearly bars the jurisdiction of the civil court. Thereafter, the petitioners have
Page No.# 13/20
approached the learned reference court, under Section 64 of the LARR Act, but
the same was shown to be withdrawn, which is incorrect.
7.2. Further, Mr. Yobin submits that the petitioners have no remedy available
and therefore, they have approached this Court by preferring this writ petition
claiming the reliefs as stated above. However, he submits that now the
petitioners have abandoned the relief(s) sought for in the petitioner and praying
for moulding the relief and to set aside the order dated 31.08.2022, passed by
the learned reference court and further to remand the matter to the learned
reference court for proceeding with the complaint in accordance with law.
8.
Per-contra, Mr. Nabam, learned Additional Advocate General for the State
respondents has vehemently opposed the petition and submits that the
petitioners were very much present at the time of hearing before issuance of
the respective Notification under Sections 4, 6 & 9 of the 1894 Act and that they
have not raised any objection therein. Mr. Nabam further submits that when the
final Notification was issued and the compensation was disbursed, then only in
the year 2021 they have filed the application, without proper explanation.
8.1. Referring to the prayer made in the writ petition, Mr. Nabam submits that
after filing of the affidavit-in-opposition, now the petitioners have sought for
moulding the relief by challenging the order passed by the learned reference
court and that such a relief cannot be granted by this Court. Mr. Nabam also
submits that the petitioners have not approached this Court with clean hand and
under such circumstances, it is contended to dismiss the petition.
9.
On the other hand, Mr. Jini, learned counsel for the respondent Nos. 4 & 5,
on the other hand, referring to the stand taken by the respondent Nos. 4 & 5, in
Page No.# 14/20
their affidavit-in-opposition, submits that before issuance of the Notifications
under Sections 4, 6 & 9 of the 1894 Act, no complain was made and that the
petitioners were very much present at the time of hearing, but at that time they
have not raised any objection, instead they have submitted NOC and the said
NOC has been enclosed with the affidavit-in-opposition, at page No. 364. Mr. Jini
also submits that the presence of the petitioners at the ti9me of hearing claims
and objection, is duly reflected in page Nos. 364, 365 & 366 (the attendance
sheet) and in the page Nos. 370 – 373 of the affidavit.
9.1. Mr. Jini further submits that the learned trial court has rightly held that the
claim of title over the land, which the petitioners are claiming now, is not
maintainable because of the bar under Section 63 of the LARR Act and that the
petition filed by the petitioners before the learned reference court is also
withdrawn by them and besides, there is disputed question of facts, which
cannot be adjudicated by this Court, in exercise of the jurisdiction under Article
226 of the Constitution of India. Under such circumstances, he has contended
to dismiss this petition.
10. In his reply, Mr. Yobin, learned counsel for the petitioners, submits that in
view of the given facts and circumstances, the petitioners have sought for
moulding the relief, instead of pursuing the earlier relief that were sought for in
the petition, and now they are challenging the order passed by the learned
reference court.
10.1.
Referring to a decision of Hon’ble Supreme Court, in the case of
Kasinka Trading and Another vs. Union of India and Another,
reported in (1995) 1 SCC 274, he submits that principle of estoppels is not
attracted against the Government and the equity has to be kept in mind by the
Page No.# 15/20
court and the doctrine of promissory estoppels or equitable estoppels represent
a principle evolved by equity to avoid injustice. And since injustice is caused to
the petitioners, the said doctrine is not applicable in the present case and as
such, Mr. Yobin has contended to allow this petition.
Consideration of this Court:11. Having heard the submissions of learned counsel for both the parties, this
Court has carefully gone through the petition as well as the documents placed
on record and also gone through the impugned Notification and the award.
12. The basic facts, herein this case, are not in dispute. The land was acquired
by the Government for execution of Dibang Valley Multipurpose Project, by the
NHPC and under Sections 4, 6 & 9 of the 1894 Act, Notifications were issued
after hearing claims and objections of all the parties and the petitioners had also
remained present at that time and also participated in the said process. This fact
is apparent from the attendance sheet, enclosed with affidavit-in-opposition filed
by the respondent Nos. 4 & 5, at page Nos. 364, 365 & 366 and page Nos. 370
– 373, it appears that they were very much present at the time of hearing. Mr.
Jini, the learned counsel for the respondent No. 4 and 5 had rightly pointed this
out at the time of hearing. And indisputably, they had not raised any objection
at the time of hearing. Rather they have submitted NOC , and this fact is
apparent from the Annexure 22, from page No. 403 to 409 of the affidavit-inopposition filed by the respondent No.4 and 5.
12.1.
Further it appears that after 5 years of final hearing under Section 9
of Land Acquisition Act and after 2 years of according approval of the award by
the State Government vide letter dated 22.02.2019, and also after disbursal of
the compensation, they have lodged the complaint with the DC first on
Page No.# 16/20
30.03.2021 and 16.04.2021. But, the same was not entertained by the DC on
the ground that the award of land acquisition is sub-judice in W.P.(C)
170(AP)/2020 and also on the ground that there is no area termed as Mimi
Shango in the acquisition process and that acquisition of land claimed as Elapra
Illuli was taken up in the acquisition process and also on the ground that the
claim put forth grounds pertains to matter of title/ownership, vide order dated
09.07.2021,
Annexure
No.
of
the
petition.
However,
the
Deputy
Commissioner had granted liberty to the petitioners to take up the matter in the
competent civil court.
12.2. It also appears that thereafter, though the petitioners have approached
the court of learned Civil Judge, Roing, by filing title suit, being T.S. No. 07 of
2021, yet the same was also dismissed under Order XIV Rule 2(2)(b) of the
CPC, as Section 63 of the LARR Act bars the jurisdiction of the civil court.
12.3. Thereafter, the petitioners have approached the learned reference court,
under Section 64 of the LARR Act, but the learned reference court in the order
dated 31.08.2022, has observed that the petitioners have to file proper petition
under Section 64 of LARR Act before the DC and then, the petitioners have
withdrawn the said petition and now, the petitioners have challenged the order
of the learned reference court, dated 31.08.2022 and contended to set it aside
by moulding the relief and to refer the matter to the learned reference court
again for proper adjudication.
13. It is to be noted here that though the petitioners have filed this writ
petition, under Article 226 and 227 of the Constitution of India, yet nowhere in
the petition, they have made any challenge to the order dated 31.08.2022.
Page No.# 17/20
13.1.
However, a perusal of the said order reveals that the petitioners had
withdrawn the said petition, when it was pointed out by the learned reference
court that the petitioner have to file appropriate application before the Deputy
Commissioner, Roing for reference under Section 64 of the Right to Fair
Compensation and Transparency in Land Acquisition, Rehabilitation and
Resettlement Act, 2013. But, indisputably, they petitioners had failed to file any
application before the Deputy Commissioner. Though the learned counsel for the
petitioners submits that the petitioners were compelled to withdraw the petition
from the reference court, though it was put in the mouth of the counsel of the
petitioner, yet the same left this court unimpressed.
13.2. Section 64 deals with reference to Authority. Sub- Section (1) provides
that :Any person interested who has not accepted the award may, by
written application to the Collector, require that the matter be
referred
by
the
Collector
for
the
determination
of
the
Authority, as the case may be, whether his objection be to the
measurement of the land, the amount of the compensation, the
person to whom it is payable, the rights of Rehabilitation and
Resettlement under Chapters V and VI or the apportionment of the
compensation among the persons interested:
Provided that the Collector shall, within a period of thirty
days from the date of receipt of application, make a reference
to the appropriate Authority:
Provided further that where the Collector fails to make such
reference within the period so specified, the applicant may
Page No.# 18/20
apply to the Authority, as the case may be, requesting it to
direct the Collector to make the reference to it within a period
of thirty days.
(2) The application shall state the grounds on which objection
to the award is taken:
Provided that every such application shall be made—
(a) if the person making it was present or represented
before the Collector at the time when he made his
award,
within
six
weeks
from
the
date
of
the
Collector’s award;
(b) in other cases, within six weeks of the receipt of
the notice from the Collector under section 21, or
within six months from the date of the Collector’s
award, whichever period shall first expire:
Provided further that the Collector may entertain an
application after the expiry of the said period, within a
further period of one year, if he is satisfied that there
was sufficient cause for not filing it within the period
specified in the first proviso.
13.4. Thus, a perusal of the second proviso to Sub-Section 1 of Section 64
indicates that there is no scope of filing a complaint directly before the
reference authority. The party have to file application before the Deputy
Commissioner first and the application must be pending before the Deputy
Commissioner. When the Deputy Commissioner fails to make such reference
within the period so specified, the applicant may request the reference
Page No.# 19/20
authority, requesting it to direct the Deputy Commissioner to make the
reference to it within a period of thirty days. Thus, the petitioner, without filing
such application before the Deputy Commissioner approached the reference
authority directly.
13.5. Thus, examining the order dated 31.08.2022, so passed by the reference
authority, from the aforesaid stand points, it cannot be said that the same
suffers from any illegality or infirmity requiring any interference of this court.
14. Further, in view of the stands, so taken by the state respondents, and also
by the private respondents and also in view of the documents produced before
this Court, this Court is of the view that the petitioners have suppressed
material facts. They have not approached it with clean hand. It appears that
they have participated in the hearing process before issuance of the
notifications, under Section 4, 6 & 9 of the 1894 Act and also they have given
NOC. And as such, their contention that they came to know about receipt of
compensation by unknown person in the year 2021, while the final notification
was published in the year 2019 and the compensation was disbursed, left this
Court unimpressed.
15. It is true that this Court has the power to mould the relief though the relief
has not prayed for as the jurisdiction under Article 226 of the Constitution of
India is equitable in nature. But, it appears that the petitioners have not
approached this Court with clean hand. They have suppressed the material fact
that they were unaware of the receipt of compensation by some unknown
persons only in the year 2021 in spite of the NOC issued by them and in spite of
their presence in the hearing, which is apparent from the attendance sheet,
enclosed with the affidavit-in-opposition filed by the respondent Nos. 4 & 5, at
Page No.# 20/20
page Nos. 364, 365 & 366 (the attendance sheet) and in the page Nos. 370 –
373. Thus, this Court is of the view that the petitioners are not entitled to any
relief in equity.
16. Under the given facts and circumstances on the record, this Court finds no
merit in this petition and accordingly, the same stands dismissed leaving the
parties to bear their own costs.
JUDGE
Comparing Assistant
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review