IN THE HIGH COURT OF MANIPUR
AT IMPHAL
W.P. (C) No. 248 of 2018
Shri Khumanthem Khelendro Singh, aged about 46 years, S/o
Late Kh. Tombi Singh of Laingoubi Makha Leikai, P.O. Moirang,
P.S. Kumbi, Bishnupur District, Manipur now staying at Paona
Bazar, Opposite to Indra Colour, P.O. Imphal., P.S. City, Imphal
West District, Manipur.
… Petitioner
-Versus1. The State of Manipur, represented by the Commissioner
(Works), Government of Manipur, Imphal.
2. The Chief Engineer, Public Works Department (P.W.D),
Khuyathong, Imphal, Manipur.
3. The Superintending Engineer–I, PWD, Khuyathong, Imphal,
Manipur.
4. The Executive Engineer, Tamenglong Division, PWD,
Manipur.
5. The Section Officer, Sub-Division-V, Tamenglong Division,
PWD, Manipur.
6. Shri Z. Kaigailungbou, 1st Class Contractor, resident of
Langol Tarung, P.O. & P.S. Lamphel, Imphal West District,
Manipur.
(...impleaded as Respondent No. 6 vide order dated 0808-2018)
…. Respondents
B E F O R E
HON’BLE MR. JUSTICE KH. NOBIN SINGH
:: Shri T. Rajendro, Advocate.
For the Petitioner
For the respondents
::
Smt. Momota Oinam, Addl. A.G
asstd. by Beedyasaree M., Advocate;
Shri K. Rabei, Advocate &
Shri N. Savitri, Advocate.
Date of Hearing
::
09-09-2019
Date of Judgment & Order
::
05-11-2019
W.P. (C) No. 248 of 2018
[2]
JUDGMENT & ORDER
[1]
Heard Shri T. Rejendro, learned Advocate appearing for the
petitioner; Shri Momota Oinam, learned Addl. Advocate assisted by Ms.
Beedyasaree M., learned Advocate appearing for the State respondents,
Shri K. Rabei, learned Advocate appearing for the private respondent and
Ms. N. Savitri, learned Advocate appearing for the Chief Engineer.
[2]
By the instant writ petition, the petitioner has prayed for issuing a
writ of certiorari or any other appropriate writ to quash and set aside the
letter dated 27-12-2017 issued by the Executive Engineer, Tamanglong
Division, PWD, Manipur.
[3.1]
Facts and circumstances as narrated in the writ petition, are that
the petitioner is a contractor and has been doing the execution of contract
works awarded to him by the State respondents with utmost sincerity and
dedication. Taking into consideration of his sincere and dedicated efforts,
he has been designated as the special class contractor in the year, 2013.
[3.2]
In response to an invitation of tenders for the work of
improvement of road from Noney to Marangching (Railway Project Road)
SH-Shingling 4.85 Kms and Constructions of 900 mm dia RCC Pipe
Culvert NP 3-7.5 Rm-40 Nos (hereinafter referred to as „the work’), the
petitioner submitted his tender. After his tender being accepted, the
petitioner was awarded the said work vide order dated 30-03-2016 issued
by the Executive Engineer, Tamenglong Division, PWD, Manipur. The
W.P. (C) No. 248 of 2018
[3]
estimated cost of the work was Rs.2,60,46,240/- (Rupees two crore sixty
lakhs forty six thousand two hundred and forty) only and the time allowed
for its execution, was twelve months which was to be reckoned from 0604-2016. As per the schedule of the work, the same is divided into two
phases.
[3.3]
The petitioner immediately started executing first phase of the
work by hiring a large number of skilled and unskilled workers numbering
about 35 and used heavy machineries like Road Roller, Tata trucks and
others for the execution of the said work. According to him, he completed
about 70% of the work in respect of the 1st phase spending about
Rs.85,70,714/- (Rupees eighty
five lakhs seventy thousand seven
hundred and fourteen) only.
[3.4]
The petitioner was very much interested in completion of the said
work within twelve months but due to certain reasons beyond his control,
he could not complete it. Some of the reasons as stated in the petition, are
that the execution could not immediately be started due to objections
raised by the villagers for non-payment of their compensation towards their
affected lands; that there was a heavy rainfall in the year, 2016-2017 and
that there was a continuous economic blockade extending for some
months which ended only in the month of March, 2017.
[3.5]
The respondent No.5, the Section Officer, Sub-Division-V,
Tamenglong Division, PWD, Manipur was to make entries in the
measurement book for the works executed by the petitioner but he failed to
W.P. (C) No. 248 of 2018
[4]
do that in spite of the repeated requests being made by him. However, the
petitioner received a letter dated 27-12-2017 from the Executive Engineer,
Tamenglong Division, PWD, Manipur stating that the agreement towards
the said work had been rescinded and consequently, the security deposit
of the petitioner stood absolutely forfeited to the State Government. The
reason given in the letter dated 27-12-2017 was that the petitioner had
failed to complete the work within the stipulated time and he did not reply
to the show cause notices dated 12-01-2017 and 19-07-2017. The
petitioner did not receive personally any of the said show cause notices as
he was/ is staying at Paona Bazar, Imphal which is known to the
respondents.
[3.6]
The petitioner learnt from the reliable sources that the work had
been awarded to another contractor and the amount for the 1st phase for
which the petitioner had completed about 70% thereof, would be released
to the new contractor and that the name of the new Contractor was not
disclosed by the State respondents. Being aggrieved by the said letter
dated 27-12-2017 issued by the Executive Engineer, the instant writ
petition has been filed by the petitioner on the inter-alia grounds that the
letter dated 27-12-2017 issued by the Executive Engineer was in violation
of the principle of natural justice; that the various clauses as contained in
the booklet called “General Conditions of Contract for Public Works
Department, Government of Manipur” had not been followed while issuing
W.P. (C) No. 248 of 2018
[5]
the letter dated 27-12-2017 and that the petitioner had been deprived of
the money spent by him towards the execution of the work in part.
[4]
On 29-03-2018 when this matter was listed for consideration, this
Court was pleased to issue notice to the respondents. Thereafter, an
affidavit dated 19-06-2018 was filed on behalf of the respondent No.1
denying the averments made in the writ petition and in addition thereto, it
has been stated that the petitioner failed to start the execution of the work
within the stipulated period of completion i.e., on or before 05-04-2017 and
therefore, there was no question of deployment of heavy machineries for
completion of about 70% of the work, as is evident from the reply dated 1609-2017 of the petitioner to the show cause notice dated 19-07-2017 for
which photographs of the road have been relied upon. The petitioner did
not bring to the notice of the respondents any hindrance for seeking
extension of time before the lapse of the stipulated period of completion.
No entry was made in the measurement book about the progress of the
work as there was nothing to enter in it due to the non-execution of the
work by the petitioner. No official intimation was given by the petitioner to
the Engineer-in-charge about his new address. However, the Department
delivered the show cause notices, at his address, which were received by
his relatives. The petitioner was given an opportunity of being heard by
serving two show cause notices dated 12-01-2017 and 19-07-2017. The
petitioner failed to respond to both the show cause notices within the date
specified therein. Since the reasons given by the petitioner in his reply
W.P. (C) No. 248 of 2018
[6]
dated 16-09-2017 were unsatisfactory, the contract was rescinded. There
was no violation of the principle of natural justice as the contract was
terminated after the notices being given to him. As per the clause of the
General Conditions of Contract for Public Works, the question of extension
did not arise at all. The contract work was awarded to a new contractor
through a re-tender in the interest of early completion of the work and
therefore, the payment was to be made to him. In other words, after the
contract work having been terminated, the work was re-tendered and was
awarded to Z. Kaigailungbou, 1st Class Contractor, Langol Tarung,
Lamphel. While the amount of work was Rs.2,60,46,240/- (Rupees two
crore sixty lakh forty six thousand two hundred forty) only, the time to
complete the same was twelve months to be reckoned from 07-03-2018.
The new contractor completed 23% of the total contract work as on 19-032018 and accordingly, the Department proposed to release an amount of
Rs.67.05 lakhs but the amount had not been released by the Department
on account of the interim order dated 29-03-2018 passed by this Court. A
reply affidavit was filed by the petitioner denying the averments made in
the counter filed on behalf of the respondent No.1 stating that the reason
as to why the contract was rescinded, was that he had failed to reply to the
show cause notices in time.
[5]
An application being MC[WP(C)] No.181 of 2018 came to be filed
by the petitioner praying for impleading Shri Z. Kaigailungbou as the
private respondent and at about the same time, Shri Z. Kaigailungbou also
W.P. (C) No. 248 of 2018
[7]
filed an application being MC[WP(C)] No.206 of 2018 praying for his
impleadment as the private respondent. Both the applications were
allowed by this Court vide its order dated 08-08-2018 and consequently, a
recast petition was filed by the petitioner. Few days thereafter, an
application being MC[WP(C)] No.240 of 2018 was filed by the petitioner
praying for amendment in the writ petition for the reason that the work
order dated 28-02-0218 had been issued in favour of the private
respondent which was issued without following due procedure prescribed
in law. A notice was issued in the application and after hearing the counsel
appearing for the parties, this Court allowed it on 19-12-2018 and
consequently, a second recast petition was filed by the petitioner on
21-12-2018.
[6]
A counter affidavit was filed by the private respondent and the
stand taken by him is similar to that of the respondent No.1 and therefore,
the details thereof are not repeated here for the sake of brevity. It has been
stated by him that the petitioner failed to start the execution of work
resulting in the termination of his contract vide letter dated 27-12-2017 and
thereafter, a fresh tender was floated in which three persons including the
private respondent, participated and after accepting hid bid, the work was
awarded to him. The private respondent immediately started the execution
of the work by completing 23% thereof as on 19-03-2018 and therefore, he
is entitled to payment for the work done by him. The averments made in
the counter of the private respondent were denied in the reply filed by the
W.P. (C) No. 248 of 2018
[8]
petitioner wherein it has been stated that the alleged re-tender which was
claimed to be a restricted tender, was approved by the Chief Engineer
without any reason and without applying its mind. As per the provisions
contained in the CPW Manual, a restricted tender can be called under
certain conditions mentioned therein.
[7]
An affidavit on behalf of the respondent No.1 was filed wherein it
has been stated that the contract work of the petitioner was rescinded
pursuant to Clause 3 (ii) of the General Conditions of Contract. The
measurement for the balance work was not carried out, as the petitioner
had not started the work at all. A restricted tender was floated vide notice
dated 08-01-2018 and the tender was opened on 24-01-2018. The
financial bid submitted by the private respondent was negotiated to reduce
his tender amount and on 28-02-2018, the work order was issued in favour
of the private respondent who started the execution of the work as detailed
in the affidavit. The writ petition was filed by the petitioner with malafide
intention which made himself liable for action under various sections of the
General Conditions of Contract. An affidavit also has been filed on behalf
of the respondent Nos.3, 4 and 5 wherein the stand taken by them is
similar to that of the respondent No.1 and therefore, the averments made
therein are not repeated here for the sake of brevity. A reply affidavit has
been filed by the petitioner to the counter filed on behalf of the respondent
No.1 wherein his earlier stand has been reiterated by the petitioner.
W.P. (C) No. 248 of 2018
[9]
[8]
During the course of the proceedings i.e., on 23-07-2019, this
Court granted one weeks‟ time to the petitioner to file an affidavit as
regards the receipt of the said two show cause notices dated 12-01-2017
and 19-07-2017. In compliance with the Court‟s order, an affidavit dated
29-07-2019 was filed by the petitioner stating therein that the show cause
notices dated 12-01-2017 and 19-07-2017 were not received personally by
him. As far as the show cause notice dated 12-01-2017 is concerned, on
an enquiry being made by him, his family members told him that they had
not received the same. It has been stated that although seven days time
was granted by the said notice dated 12-01-2017, no adverse action was
taken against him even after the expiry of seven days. So far as the show
cause notice dated 19-07-2019 is concerned, it was received by his family
members but due to lapse of time, he could not remember the date on
which it was received and after the receipt of the show cause notice dated
19-07-2017, a reply statement dated 16-09-2017 was submitted by him. In
order to counter the said averments made by the petitioner, a reply
affidavit dated 19-08-2019 was filed on behalf of the respondent No.1
wherein it has been stated that the show cause notice dated 12-01-2017
was sent in person by the then Section Officer, Sub-Division-V,
Tamenglong Division on the same day at his place / flat at Paona Bazar,
Imphal and the same was received by the family members of the
petitioner. No action was taken against him because the petitioner failed to
start the execution of the work and thereafter, the second reminder i.e., the
second show cause notice dated 19-07-2019 was served upon him. Even
W.P. (C) No. 248 of 2018
[10]
after the receipt of the said two show cause notices, the petitioner had
failed to start the execution of the work. In fact, he could not start the work
till 16-09-2017. A reply affidavit was also filed by the respondent No.4 and
the stand taken by it, is similar to that of the respondent No.1 and it has
been stated that the fact that no action was taken against the petitioner
despite the show cause notices being served upon him, shows that an
opportunity was given to him to start the execution of the work but since he
failed to execute the work, the writ petition is not maintainable. In the
rejoinder affidavit filed by the petitioner, it has been stated that the second
show cause notice dated 19-07-2019 suffered from various defects as only
three days time was given for a reply which is totally against the Clause 3
of the General Conditions of Contract for PWD, Government of Manipur.
[9]
The issues which call for consideration by this Court, are as to
whether the termination of the contract, entered into between the petitioner
and the State respondents, vide letter dated 27-12-2017 was in violation of
the principle of natural justice and whether the restricted tender floated by
the State respondents was in accordance with law ?
[10]
Before considering the issues as mentioned above, this Court
proposes to deal with the preliminary issue raised by the respondents
during the course of proceedings as regards the maintainability of the writ
petition. It has been submitted by the counsel appearing for the
respondents that since the issue involved herein relates to the termination
of a contract, this Court ought not to interfere with it and moreover, in view
W.P. (C) No. 248 of 2018
[11]
of the arbitration clause contained in the agreement, the petitioner ought to
have exhausted the alternative remedy before approaching this Court
under Article 226 of the Constitution of India. They have relied upon the
decisions rendered by the Hon‟ble Supreme Court in Sterling Computer
Ltd. Vs. M/S M & N Publication Ltd & ors, AIR 1996 SC 51; Asia
Foundation & Construction Ltd Vs. Trafalgar House Construction (I)
Ltd., (1997) 1 SCC 738; Raunag International Ltd. Vs. IVR
Construction Ltd. & ors, AIR 1999 SC 393; Kishan Sahkari Chini Mills
Limited Vs. Vardan Linkers & ors, (2008) 12 SCC 500. On the other
hand, it has been submitted by the counsel appearing for the petitioner that
there is no averment in their affidavits as regards the maintainability of the
writ petition and in the absence of such a pleading about it, it shall not be
entertained by this Court, for which he has relied upon the decision
rendered by the Hon‟ble Supreme Court in Bharat Singh & ors Vs. State
of Haryana, AIR 1988 SC 2181. Relying upon the decision of the Hon‟ble
Supreme Court in Harbanslal Sahnia Vs. Oil India Corporation Ltd.,
(2003) 2 SCC 107, it has been submitted by him that the rule of exclusion
of writ jurisdiction by availability of an alternative remedy is a rule of
discretion and not one of compulsion. The contention of the learned
counsel appearing for the petitioner is not fully correct for the reason that in
the affidavit filed by the respondent No.4, it has been stated that the writ
petition is not maintainable, as the petitioner has no locus standi because
he has not participated in the re-tender. It cannot be said that there is no
pleading at all as regards the maintainability of the writ petition and
W.P. (C) No. 248 of 2018
[12]
therefore, the law laid down in Bharat Singh case (supra) will have no
application to the facts of the present case. As regards the contention of
the counsel appearing for the respondents that the petitioner has not
exhausted his alternative remedy, it may be correct but that itself shall not
preclude this Court from entertaining the writ petition. In M/S Niraj Cement
Structurels Vs. Union of India & ors, WP(C) No.1219 of 2018, this Court
has the occasion to examine a similar issue as regards the maintainability
of the writ petition. In M/S Radhakrishna Agarwal & ors. Vs. State of
Bihar & ors, (1977) 3 SCC 457, the Hon‟ble Supreme Court held:
“10. It is thus clear that the Erusian Equipment & Chemicals Ltd’s
case (supra) involved discrimination at the very threshold or at
the time of entry into the field of consideration of persons with
whom the Government could contract at all. At this stage, no
doubt, the State acts purely in its executive capacity and is
bound by the obligations which dealings of the State with the
individual citizens import into every transaction entered into in
exercise of its constitutional powers. But, after the State or its
agents have entered into the field of ordinary contract, the
relations are no longer governed by the constitutions provisions
but by the legally valid contract which determines rights and
obligations of the parties inter se. No questions arises for
violation of Article 14 or of any other constitutional provision
when the State or its agents, purporting to act within this field,
perform any act. In this sphere, they can only claim rights
conferred upon them by contract and are bound by the terms of
the contract only unless some statute steps in an confers some
special statutory power or obligation on the State in the
contractual field which is apart from contract.”
W.P. (C) No. 248 of 2018
[13]
In Smt. Rukmanibai Gupta Vs. Collector, Jabalpur & ors,
(1980) 4 SCC 556, the Hon‟ble Supreme Court held:
“10. Arbitration Act, 1940, is a self-contained and exhaustive code. It
provides for filing arbitration agreement to the jurisdiction of
court, appointment and removal of arbitrator by court, making
award a rule of court, remitting or setting aside an award etc.
Where the arbitrator has made an award it can be questioned
under Section 33. Section 32 bars a suit on any ground
whatsoever for contesting an award and further provides that no
award shall be enforced, set aside, amended, modified or in any
way affected otherwise than as provided in the Arbitration Act
itself. Thus, Arbitration Act, 1940, is a self-contained exhaustive
code. Relief sought by the appellant by involving extraordinary
jurisdiction of the High Court under Article 226 could have been
obtained by proceeding in accordance with the relevant
provisions of the Arbitration Act. In this situation, if the High Court
declined to entertain the writ petition, no exception can be taken
to it. Further the indenture of lease constitutes a contract
between the parties. Right to excavate limestone from leased
area and obligation to pay royalty under the relevant Minor
Mineral Rules arise from the contract. The contract provided for
resolution of dispute arising out of the carrying out of contract.
The writ jurisdiction of the High Court under Article 226 of the
Constitution is not intended to facilitate avoidance of obligation
voluntarily incurred, (see Har Shankar v. Dy. Excise & Taxation
Commissioner).”
In Whirlpool Corporation Vs. Registrar of Trade Marks,
Mumbai & ors., (1998) 8 SCC 1, the Hon‟ble Supreme Court held:
W.P. (C) No. 248 of 2018
[14]
“14. The power to issue prerogative writs under Article 226 of the
Constitution is plenary in nature and is not limited by any other
provision of the Constitution. This power can be exercised by
the High Court not only for issuing writs in the nature of habeas
corpus, mandamus, prohibition, quo warranto and certiorari for
the enforcement of any of the Fundamental Rights contained in
Part III of the Constitution but also for “any other purpose”.
15. Under Article 226 of the Constitution, the High Court, having
regard to the facts of the case, has a discretion to entertain or
not to entertain a writ petition. But the High Court has imposed
upon itself certain restrictions one of which is that if an effective
and efficacious remedy is available, the High Court would not
normally exercise its jurisdiction. But the alternative remedy has
been consistently held by this Court not to operate as a bar in at
least three contingencies, namely, where the writ petition has
been filed for the enforcement of any of the Fundamental Rights
or where there has been a violation of the principle of natural
justice or where the order or proceedings are wholly without
jurisdiction or the vires of an Act is challenged. There is a
plethora of case-law on this point but to cut down this circle of
forensic whirlpool, we would rely on some old decisions of the
evolutionary era of the constitutional law as they still hold the
field.”
In Harbanslal Sahnia & anr. Vs. Indian Oil Corporation Ltd &
ors., (2003) 2 SCC 107, the Hon‟ble Supreme Court held:
“7. So far as the view taken by the High Court that the remedy by
way of recourse to arbitration clause was available to the
appellants and therefore the writ petition filed by the appellants
was liable to be dismissed is concerned, suffice it to observe
that the rule of exclusion of writ jurisdiction by availability of an
W.P. (C) No. 248 of 2018
[15]
alternative remedy is a rule of discretion and not one of
compulsion. In an appropriate case, in spite of availability of the
alternative remedy, the High Court may still exercise its writ
jurisdiction in at least three contingencies: (i) where the writ
petition seeks enforcement of any of the fundamental rights; (ii)
where there is failure of principles of natural justice; or (iii) where
the orders or proceedings are wholly without jurisdiction or the
vires of an Act is challenged. (See Whirlpool Corpn. v. Registrar
of Trade Marks) The present case attracts applicability of the
first two contingencies. Moreover, as noted, the petitioners’
dealership, which is their bread and butter, came to be
terminated for an irrelevant and non-existent cause. In such
circumstances, we feel that the appellants should have been
allowed relief by the High Court itself instead of driving them to
the need of initiating arbitration proceedings.
In Empire Jute Company Ltd. & ors. Vs. Jute Corporation of
India Ltd. & anr., (2007) 14 SCC 680, the Hon‟ble Supreme Court held:
“14. Construction of the contract entered into by and between the
parties is in question before us. There exists an arbitration
agreement. The arbitration agreement is of wide amplitude; by
reason whereof not only the dispute relating to quality of the jute
sought to be supplied by Respondent 1 may be gone into, the
construction, meaning and operation and effect of the contract
or breach thereof, if any, would have also fallen for
determination of an arbitrator.
15. It is not correct to contend that Clause 8.0 provides for procedure
for claim settlement. The said provision in regard to the quality
of jute supplied has in our opinion nothing to do with Clause 9.0.
The arbitration agreement entered into by and between the
W.P. (C) No. 248 of 2018
[16]
parties is independent of Clause 8.0. It is now well settled that
when there exists an arbitration agreement, the writ court
ordinarily would not exercise its discretionary jurisdiction to enter
into the dispute.”
In Union of India & ors. Vs. Tantia Construction Private Ltd.,
(2011) 5 SCC 697 the Hon‟ble Supreme Court held:
“33. Apart from the above, even on the question of maintainability of
the writ petition on account of the arbitration clause included in
the agreement between the parties, it is now well established that
an alternative remedy is not an absolute bar to the invocation of
the writ jurisdiction of the High Court or the Supreme Court and
that without exhausting such alternative remedy, a writ petition
would not be maintainable. The various decisions cited by Mr.
Chakraborty would clearly indicate that the constitutional powers
vested in the High Court or the Supreme Court cannot be
fettered by any alternative remedy available to the authorities.
Injustice, whenever and wherever it takes places, has to be
struck down as an anathema to the rule of law and the provisions
of the constitution.
In S.J.S Business Enterprises (P) Ltd Vs. State of Bihar &
ors., (2004) 7 SCC 166, the Hon‟ble Supreme Court held that the
existence of an adequate or suitable alternative remedy available to a
litigant is a factor which a court entertaining an application under Article
226 of the Constitution will consider for exercising the discretion to issue a
writ under Article 226. But the existence of such remedy does not impinge
upon the jurisdiction of the High Court to deal with the matter itself, if it is in
apposition to do so on the basis of the affidavits filed. In L. Chandrakumar
W.P. (C) No. 248 of 2018
[17]
Vs. Union of India & ors., (1997) 3 SCC 261, the Hon‟ble Supreme Court
held that the jurisdiction conferred upon the High Courts under Articles
226/ 227 and upon the Supreme Court under Article 32 of the Constitution
is a part of the inviolable basis structure of our constitution. While this
jurisdiction cannot be ousted, other courts and tribunals may perform a
supplemental role in discharging the powers conferred by articles 226/227
and 32 of the Constitution. In Asia Foundation & Construction Ltd. Vs.
Trafalgar House Construction (I) Ltd. & ors., (1997) 1 SCC 738, the
Hon‟ble Supreme Court held that though the principle of judicial review
cannot be denied so far as exercise of contractual powers of government
bodies are concerned, it is intended to prevent arbitrariness or favouritism
and it is exercised in the larger public interest or if it is brought to the notice
of the court that in the matter of award of a contract, power has been
exercised for any collateral purpose.
In Noble Resources Ltd. Vs. State of Orissa & ors., (2006) 10
SCC 236, the Hon‟ble Supreme Court held:
“15. It is trite that if an action on the part of the State is violative of
the equality clause contained in Article 14 of the Constitution of
India, a writ petition would be maintainable even in the
contractual field. A distinction indisputably must be made
between a matter which is at the threshold of a contract and a
breach of contract; whereas in the former the court’s scrutiny
would be more intrusive, in the latter the court may not ordinarily
exercise its discretionary jurisdiction of judicial review, unless it
is found to be violative of Article 14 of the Constitution. While
W.P. (C) No. 248 of 2018
[18]
exercising contractual powers also, the government bodies may
be subjected to judicial review in order to prevent arbitrariness
or favouritism on their part. Indisputably, inherent limitations
exist, but it would not be correct to opine that under no
circumstances a writ will lie only because it involves a
contractual matter.
18. It may, however, be true that where serious disputed questions
of fact are raised requiring appreciation of evidence, and, thus,
for determination thereof, examination of witnesses would be
necessary; it may not be convenient to decide the dispute in a
proceeding under Article 226 of the Constitution of India.
27. Contractual matters are, thus, not beyond the realm of judicial
review. Its application may, however, be limited.”
In Shriram City Union Finance Corporation Ltd. Vs. Rama
Mishra, (2002) 9 SCC 613, the Hon‟ble Supreme Court held that a party is
bound either by provisions of the Constitution, statutory provisions or any
rule or under the terms of any contract which is not against public policy. It
is open for a party for his convenience to fix the jurisdiction of any
competent court to have their disputes adjudicated by that court alone. In
other words, if one or more courts have the jurisdiction to try any suit, it is
open for the parties to choose anyone of the two competent courts to
decide their disputes. In case parties under their own agreement expressly
agree that their dispute shall be tried by onely one of them, then the parties
can only file the suit in that court alone to which they have so agreed. The
said decision has been followed in New Moga Transport Co. Vs. United
India Insurance Co. Ltd & ors., (2004) 4 SCC 677. In Indus Mobile
W.P. (C) No. 248 of 2018
[19]
Distribution Private Limited Vs. Datawind Innovations Private Limited
& ors., (2017) 7 SCC 678, the Hon‟ble Supreme Court held:
“20. It is well settled that where more than one court has jurisdiction,
it is open for the parties to exclude all other courts. For an
exhaustive analysis of the case law, see Swastik Gases (P) Ltd.
v. Indian Oil Corpn. Ltd. This was followed in a recent judgment
in B.E. Simoese Von Staraburg Niedenthal v. Chhattisgarh
Investment Ltd. Having regard to the above, it is clear that
Mumbai courts alone have jurisdiction to the exclusion of all
other courts in the country, as the juridical seat of arbitration is
at Mumbai. This being the case, the impugned judgment is set
aside. The injunction confirmed by the impugned judgment will
continue for a period of four weeks from the date of
pronouncement of this judgment, so that the respondents may
take necessary steps under Section 9 in the Mumbai Court. The
appeals are disposed of accordingly.”
In ABL International Ltd & anr. Vs. Export Credit Guarantee
Corporation of India Ltd & ors., (2004) 3 SCC 553, the Hon‟ble Supreme
Court held:
“23. It is clear from the above observations of this Court, once the
State or an instrumentality of the State is a party of the contract,
it has an obligation in law to act fairly, justly and reasonably
which is the requirement of Article 14 of the Constitution of
India. Therefore, if by the impugned repudiation of the claim of
the appellants the first respondent as an instrumentality of the
State has acted in contravention of the abovesaid requirement
of Article 14, then we have no hesitation in holding that a writ
court can issue suitable directions to set right the arbitrary
actions of the first respondent. In this context, we may note that
W.P. (C) No. 248 of 2018
[20]
though the first respondent is a company registered under the
Companies Act, it is wholly owned by the Government of India.
The total subscribed share capital of this Company is 2,50,000
shares out of which 2,49,998 shares are held by the President
of India while one share each is held by the Joint Secretary,
Ministry of Commerce and Industry and Officer on Special Duty,
Ministry of Commerce and Industry respectively. The objects
enumerated in the memorandum of association of the first
respondent at para 10 read:
“To undertake such functions as may be entrusted to it by the
Government from time to time, including grant of credits and
guarantees in foreign currency for the purpose of facilitating
the import of raw materials and semi-finished goods for
manufacture or processing goods for export.”
Para 11 of the said object reads thus:
“To act as agent of the Government, or with the sanction of
the Government on its own account, to give the guarantees,
undertake such responsibilities and discharge such functions
as are considered by the Government as necessary in
national interest.”
In Municipal Corporation, Ujjain & anr. Vs. BVG India Limited
& ors., (2018) 5 SCC 462, the Hon‟ble Supreme Court held:
“9. The principles which have to be applied in judicial review of
administrative decisions, especially those relating to acceptance
of tender and award of contract, have been considered in great
detail by this Court in Tata Cellular v. Union of India, wherein this
Court observed that the principles of judicial review would apply
to the exercise of contractual powers by government bodies in
W.P. (C) No. 248 of 2018
[21]
order to prevent arbitrariness or favouritism. However, there are
inherent limitations in exercise of that power of judicial review.
The Government is the guardian of the finances of the State. It is
expected to protect the financial interest of the State. The right to
refuse the lowest or any other tender is always available to the
Government. But, the principles laid down in Article 14 of the
Constitution have to be kept in view while accepting or refusing a
tender. There can be no question of infringement of Article 14 if
the Government tries to get the best person or the best
quotation. The right to choose cannot be considered to be an
arbitrary power. Of course, if the said power is exercised for any
collateral purpose, the exercise of that power will be struck down.
10. The modern trend points to judicial restraint in administrative
action. The Court does not sit as a court of appeal but merely
reviews the manner in which the decision was made. The Court
does not have the expertise to correct the administrative
decision. If a review of the administrative decision is permitted, it
will be substituting its own decision without the necessary
expertise which itself may be fallible. The Government must
have freedom of contract. In other words, a fair play in the joints
is a necessary concomitant for an administrative body
functioning in an administrative sphere or a quasi-administrative
sphere. However, the decision must not only be tested by the
application of the Wednesbury principle of reasonableness, but
must also be free from arbitrariness and not affected by bias or
actuated by mala fides. [See the judgment in Master Marine
Services (P) Ltd. v. Metcalfe & Hodgkinson (P) Ltd.]
15. It is well settled that the award of contract, whether it is by a
private party or by a public body or by the State, is essentially a
commercial transaction. In arriving at a commercial decision, the
W.P. (C) No. 248 of 2018
[22]
considerations
which
are
of
paramount
importance
are
commercial considerations. These would include, inter alia, the
price at which the party is willing to work; whether the goods or
services offered are of the requisite specifications; and whether
the person tendering the bid has the ability to deliver the goods
or services as per the specifications. It is also by now well
settled that the authorities/State can choose its own method to
arrive at a decision and it is free to grant any relaxation for bona
fide reasons, if the tender conditions permit such a relaxation.
16. The State, its corporations, instrumentalities and agencies have a
public duty to be fair to all concerned. Even when some defect is
found in the decision-making process, the court must exercise
its discretionary power under Article 226 with great caution and
should exercise them only in furtherance of public interest and
not merely on the making out of a legal point. The court should
always keep the larger public interest in mind in order to decide
whether its intervention is called for or not. Only when it comes
to a conclusion that overwhelming public interest requires
interference, the court should interfere. (See the judgment in Air
India Ltd. v. Cochin International Airport Ltd.).”
In K.D. Sharma Vs. Steel Authority of India & ors., (2008) 12
SCC 481, the Hon‟ble Supreme Court held:
“34. The jurisdiction of the Supreme Court under Article 32 and of
the High Court under Article 226 of the Constitution is
extraordinary, equitable and discretionary. Prerogative writs
mentioned therein are issued for doing substantial justice. It is,
therefore, of utmost necessity that the petitioner approaching
the writ court must come with clean hands, put forward all the
facts before the court without concealing or suppressing
anything and seek an appropriate relief. If there is no candid
W.P. (C) No. 248 of 2018
[23]
disclosure of relevant and material facts or the petitioner is guilty
of misleading the court, his petition may be dismissed at the
threshold without considering the merits of the claim.”
From the aforesaid decisions rendered by the Hon‟ble Supreme
Court, it is well settled that the alternative remedy has been consistently
held by it not to operate as a bar in at least three contingencies, namely,
where the writ petition has been filed for the enforcement of any of the
Fundamental Rights or where there has been a violation of the principle of
natural justice or where the order or proceedings are wholly without
jurisdiction or the vires of an Act is challenged. In the present case, the
allegation made by the petitioner is that while issuing the letter dated
27-12-2017, the principle of the natural justice has been violated by the
respondents. Therefore, the contention of the counsel appearing for the
respondent as regards the maintainability of the writ petition is not tenable.
[11]
As regards the first issue, it has been submitted by the counsel
appearing for the petitioner that while issuing the letter dated 27-12-2017,
the principle of the natural justice has been violated by the respondents
and therefore, the same is liable to be quashed and set aside. But in the
counter affidavit on behalf of the respondent No.1, it has been stated that
two show cause notices dated 12-01-2017 and 19-07-2017 were issued to
the petitioner prior to the termination of the contract and since the
petitioner failed to respond to them within the stipulated time and his reply
was unsatisfactory, the contract was rescinded by the respondents. The
copies of the said show cause notices have been filed along with the
W.P. (C) No. 248 of 2018
[24]
counter and in addition to that, a copy of the reply dated 16-09-2017 of the
petitioner has also been filed by the respondent No.1. From these
documents, it is evident that the petitioner appears to have not come
before this Court with clean hands. The petitioner‟s allegation that the
principle of natural justice has been violated, is totally incorrect and
baseless because he did file a reply in response to the notice dated 19-072017. This fact has been suppressed by him while filing the writ petition. It
is not clear as to whether the show cause notice dated 12-01-2017 has
been received by the petitioner or not but the same is referred to in the
second show cause notice dated 19-07-2017 and the petitioner in his reply
dated 16-09-2017 has not mentioned anything about the non-receipt
thereof. In compliance with this Court‟s order dated 23-07-2019, an
affidavit has been filed by the petitioner stating that when his relatives
being inquired by him, he was informed that it was not received by them,
while in the affidavit filed on behalf of the State respondent, it has
been stated that the show cause notice dated 12-01-2017 was handed
over to the relatives of the petitioner at his residence, although no
acknowledgment thereof was obtained in writing from them. Be that as it
may, the fact remains that after the receipt of the show cause notice dated
19-07-2017, the petitioner did file his reply dated 16-09-2017. The stand of
the State respondents is that his reply was not submitted in time, nor was it
satisfactory. Therefore, the contention that the principle of natural justice
has been violated, is incorrect and is untenable.
W.P. (C) No. 248 of 2018
[25]
[12]
After the first issue being decided against the petitioner, there is
no need of going into the second issue but since the counsel appearing for
him has advanced his argument on this issue as well, this Court deems it
appropriate to deal with it. It is the submission of the counsel appearing for
the petitioner that the re-tender as allegedly floated by the respondents,
has not been floated in accordance with law and in other words, if it was a
restricted tender, it ought to have been done in terms of clause 15.6.1 of
the CPWD Manual. Since it has not been done so, it is bad in law.
Combating it, it has been contended by the counsel for the respondents
that the petitioner was not a participant in the process of the said re-tender
and therefore, he has no locus standi to question it. It is not in dispute that
the petitioner has not participated in the re-tender or in other words, he has
not submitted his bids pursuant to the notice issued by the State
respondents. Moreover, it is the petitioner who has failed either to start the
work as alleged by the respondents or has failed to complete the work in
terms of the contract entered into between the petitioner and the State
respondents, because of which the re-tender was to be floated by the
State Government. It is the petitioner who has created the problem for
himself. He got the opportunity to execute the work but he failed to take
the advantage of it. After his being unable to execute the work, he started
questioning the validity and correctness of the re-tender, which is
impermissible. The contention of the State Government appears to be
correct to the extent that the petitioner has no locus standi to challenge the
validity and correctness of the re-tender. After the private respondent‟s bid
W.P. (C) No. 248 of 2018
[26]
having been accepted by the State respondents, he has started executing
the work, for which he is entitled to his payment.
[13]
One aspect which the counsel for the petitioner has emphasised,
is that in respect of the first phase, the petitioner has completed about 70%
of the work and he is entitled to payment for it. Any payment made by the
State respondents in favour of the private respondent for the work done by
him, will be unfair and unreasonable. In this regard, the stand of the State
respondents is that the petitioner had never started the work till the expiry
of 12 months from the date on which he ought to have completed the work.
This being a disputed question of facts, it may not be proper for this Court
to go into it. Moreover, the petitioner has failed to produce materials to
show prima facie case in his favour. He has assigned some reasons in his
reply dated 16-09-2017 as to why he could not complete the execution of
the work in time and accordingly, a request was made to allow him to do
the needful. There is no material on record to show that he had ever
informed the authority concerned of the State Government about the
difficulties being faced by him while executing the work. No request was
made by him to extend the time period as specified in the work order. The
progress of work, if any made by him, was not entered in the measurement
book and assuming that it was not done by the Section Officer or the
Assistant Engineer as the case may be, the petitioner did not lodge any
complain against them. In view of the aforesaid circumstances, this Court
W.P. (C) No. 248 of 2018
[27]
is of the opinion that it may not be appropriate for this Court to go into the
disputed question of facts.
[14]
For the reasons stated hereinabove, the instant writ petition is
dismissed as devoid of any merit with no order as to costs. Interim order, if
any, passed by this Court stands vacated. However, it is open to the
petitioner to approach the appropriate forum for redressal of his grievance
as regards the non-payment of any amount towards the alleged execution
of work by him in part in respect of the first phase.
JUDGE
FR/ NFR
Devananda
WAIKHOM
TONEN MEITEI
WAIKHOM TONEN MEITEI
Date: 2019.11.06 11:16:15
-08'00'
W.P. (C) No. 248 of 2018
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review