Page |1
IN THE HIGH COURT OF MANIPUR
AT IMPHAL
WP(C) No. 878 of 2017
1. Shri H. Ngauning, aged about 34 years, son of
Birang, Headman and resident of Sangkongmai
Village, P.O. Karong, P.S. Mao, District Senapati,
Manipur-795106.
2. Shri L. Rangbe, aged about 40 years, son of Late
Lapi, Headman and resident of Willong Khullen,
P.O. Karong, P.S. Mao, District Senapati, Manipur795106.
3. Shri Heichounoing, aged about 67 years, son of
Late Rangwang, Headman and resident of Konelo
Village, P.O. Karong, P.S. Mao, District Senapati,
Manipur-795106.
4. Shri Heizeting, aged about 36 years, son of Late
Halerong, Headman and resident of Yangkhullen
Village, P.O. Karong, P.S. Mao, District Senapati,
Manipur-795106.
5. Shri Ekeheing, aged about 29 years, son of Late
Kompoing, Headman and resident of Bendramai
Village, P.O. Karong, P.S. Mao, District Senapati,
Manipur-795106.
6. Shri Erechong, aged about 57 years, son of Late
Peisongbe, Headman and resident of Yengkhunou
Village, P.O. Karong, P.S. Mao, District Senapati,
Manipur-795106.
…….Petitioners
-Versus1. The State of Manipur represented by the
Commissioner/Secretary (Revenue), Government of
Manipur, Secretariat, Imphal.
2. The Deputy Commissioner/Collector (LA), Senapati
District, Government of Manipur, Senapati.
WP(C) No. 878 of 2017
Page |2
3. The Union of India represented by the Secretary,
Ministry of Road Transport and Highways,
Government of India, New Delhi-110001.
4. The Director General, Border Road Organisation
(BRO), Seema Sadak Bhawan, Ring Road Naraina,
Delhi Cantonment, New Delhi- 110010.
5. The Commander, 15 BRTF (GREF), Pin- 930015,
C/O 99 APO.
… Respondents
BEFORE
HON’BLE MR. JUSTICE M.V. MURALIDARAN
For the Petitioners
::
Mr. A. Bimol, Sr. Advocate,
Mr. S. Sasi, Advocate,
Mr. H. Prabirkumar, Advocate,
Mr. A. Golly, Advocate,
Mr. H. Suraj, Advocate,
Mr. A. Peter, Advocate,
Mr. A. Leonid, Advocate.
For the Respondents
::
Mr. M. Rarry, Addl. AG,
Mr. S. Samarjeet, CGC
Date Hearing
Date of Judgment &
Order
::
26.09.2019
::
23.10.2019
JUDGMENT AND ORDER
(CAV)
This writ petition has been filed by the petitioners to
quash the impugned order dated 31.5.2017 passed by the fifth
respondent and to direct the respondents to pay to the petitioners
the compensation amount of Rs.37,59,113.25 along with interest
WP(C) No. 878 of 2017
Page |3
for the damage of horticulture plants, crops etc., caused during the
construction of Maram-Peren Road.
2.
Brief facts are as follows:
The petitioners are Headmen of their respective
villages and are representing themselves as well as the villagers
of their respective villages whose standing crops, farms,
building/structure, orchards, forest, etc., have been affected by the
construction of Maram-Peren Road. The construction of MaramPeren Road was commenced by 84 RCC (GREF) during
September 1991 and completed in 1996 and the construction of
the said road was later handed over to 15 BRTF. Later the said
road was further widened when the work for double laning of the
road commenced with effect from December 2006.
3.
The villagers of the petitioners villages were affected
by the construction of the said road and being aggrieved, they
through the President, Zeliangrong Nagar Union, submitted a
representation to the Deputy Commissioner for verification with
regard to the damage to the standing horticulture plants and crops
etc. On 09.05.1994, the office of the Deputy Commissioner,
Senapati, directed the Sub Divisional Officer, Tadubi to conduct a
detailed joint spot enquiry with the representatives of BRTF and
the claimants to establish the ownership as well as the
WP(C) No. 878 of 2017
Page |4
status/value of the standing properties and furnish a factual report
of the same at an early date.
4.
Pursuant
to
the
direction
of
the
Deputy
Commissioner, Senapati, the Sub Divisional Official, Tadubi
informed the Commander, 25-BRTF to depute one of his staff to
participate in the joint spot enquiry to be held on 30.5.1994.
Accordingly, a joint spot enquiry was conducted on 30.5.1994 with
representatives from BRTF, SDO, Tadubi and representatives of
the affected villages. After verification of the damages caused to
the crops, farms, orchards, forest, etc., due to the construction of
Maram-Peren road in respect of the petitioners villages viz., (i)
Sangkhogmai; (ii) WiIong; (iii) Kinelo; (iv) Yangkhullen; (v)
Bendramai and (vi) Yangkhunou, a detailed verification report was
submitted by the SDO, Tadubi for further action.
5.
After the receipt of the report of the SDO, Tadubi, on
22.6.1994, the Deputy Commissioner, Senapti, requested the
Director (Horticulture & Soil Conservation) to furnish rate for the
plants/fruits for the purpose of fixing/determining the rate for
compensation.
On
23.6.1994,
the
Additional
Director
(Horticulture), Manipur, furnished the formula for evaluation of the
rates for the fruit plants for both bearing and non-bearing.
Thereafter, on 27.7.1994, the Deputy Commissioner, Senapati,
WP(C) No. 878 of 2017
Page |5
assessed a sum of Rs.37,59,113.25 as compensation for the
damage of fruit bearing trees/plants and the same had been
communicated to the Officer Commanding, 84 RCC (GREF).
Despite assessment of the compensation by the Deputy
Commissioner, the authorities of BRTF are refusing to pay the
compensation.
6.
Aggrieved by the refusal, the petitioners, through
Zeliangrong Nagar Union, earlier approached the Gauhati High
Court by filing Civil Rule No.517 of 1995 and the Gauhati High
Court, vide order dated 6.6.2001, was pleased to dispose of the
case by directing the Deputy Commissioner, Senapati, to decide
the matter as and when the occasion arises after hearing the
beneficiaries and the respondents. Since after the lapse of more
than 10 years, no compensation was paid by the authorities, the
Villagers of the affected villages conducted general body meeting
on 15.9.2005 wherein the Chief/Headman of the six affected
villages were authorised to liaison the office relating to the
activities/process with the Government and financial operation of
the bank to withdraw money from the relevant department.
7.
On behalf of the affected villages, the Chairman and
the Secretary of Maram Peren Road Development Committee
(MPRDC) submitted an application on 20.10.2010 to the Deputy
WP(C) No. 878 of 2017
Page |6
Commissioner, Senapati, requesting payment of Rs.37,59,113.25
with interest and the Deputy Commissioner, in turn, addressed to
the Commander, 25 BRTF, to look into the matter and do the Since
no action was taken, again on 5.11.2013, the needful. Chairman
and Secretary of MPRDC submitted a join representation to the
Deputy Commissioner, Senapati, claiming compensation for the
standing properties. The said representation was forwarded to the
Commander, 15 BRTF(GREF), however, the Commander, 15
BRTF (GREF), the fifth respondent herein, informed the Deputy
Commissioner, Senapati that no compensation is admissible as
certain villagers have given ‘no damage certificate’ to the standing
crops and standing horticulture plants.
8.
Thereafter, on 4.6.2014, a joint meeting was he\d at
the office of the Deputy Commissioner with representatives of 15
BRTF and concerned village Headmen/Secretaries, wherein the
Chairman/Secretary of MPRDC’s explanation was sought as to if
the certificates had already been submitted why the dam has been
again made to the office after a lapse of so many years. Again on
7.6.2014, a joint representation was submitted that the eight
certificates produced by the BRTF are bogus and unauthorised.
On 11.8.2014, the Deputy Commissioner, Senapati, addressed a
letter to the fifth respondent requesting them to decide the matter
WP(C) No. 878 of 2017
Page |7
after properly perusing all relevant documents. On 5.12.2014, the
Deputy Commissioner, Senapati again requested the fifth
respondent to pay the compensation amount along with the
interest after calculation of the permissible interest rate.
9.
Since the fifth respondent has failed to pay the
compensation, the petitioners again approached this Court by
filing W.P.(C) No.573 of 2015 seeking direction on the
respondents to pay compensation amount along with interest. By
an order dated 30.11.2016, the said writ petition came to be
disposed of by directing the respondents to examine the claims of
the petitioners for payment of compensation within a period of
three months from the date of receipt of a copy of the order.
However, by the impugned order dated 31.5.2017, the fifth
respondent declined to pay compensation on the ground that the
concerned village Headman/Chairman has already furnished no
compensation demand certificate to the effect that no villagers
shall claim any compensation for horticulture plants, crops, etc.
Aggrieved by the same, the petitioners have filed the present writ
petition.
10.
Respondent No.2/Deputy Commissioner, Senapati,
filed affidavit-in-opposition stating that on receipt of the
representations and orders of the Hon'ble High Court, they have
WP(C) No. 878 of 2017
Page |8
forwarded the same to the Commander, 25th BRTF and the
Commander, 15th BRTF respectively with a request to look into the
matter and to do the needful at the earliest in order to obviate
further law suit from the interested party.
11.
Respondent Nos.3 to 5 have Filed affidavit-in-
opposition inter alia stating that the petitioners on one hand
alleging that they are being deprived of their legitimate dues and
on the other hand they are giving full support to the Border Roads
Organisation including their free land etc. If the petitioners are
really deprived of their legitimate dues, they would have
demanded the cost of the damaged properties during the initial
construction of Maram-Peren road. Instead they extended their full
co-operation by way of foregoing cost of land free, etc. if any
damage during construction of Maram-Peren road and it proves
that they are aware of the socio-economic development of their
region due to the construction of Maram-Peren road as this is the
life line of Manipur and Nagaland.
12.
It
is
stated
that
though
contingent
bill
for
Rs.37,59,113.25 was received by 84 RCC (GREF), since the
Headmen of the concerned village have already issued no
damage certificate, the contingent bill was returned by the
respondents as giving no damage certificate at the initial stage and
WP(C) No. 878 of 2017
Page |9
later
claiming
compensation
after three
years from
the
commencement of the road construction is against ethics and not
justifiable. It is also stated that if the petitioners are really deprived
of their legitimate dues, they would have demanded the cost of
damaged properties during the initial construction of the MaramPeren road and then give their willingness and full fledged support
to the double Ianing of the road. Instead, they extended their full
co-Operation, which proves that they are well aware of the socioeconomic development of their region due to the construction of
above said road.
13.
The learned counsel for the petitioners submitted that
they have not been paid compensation for the damages caused to
their standing crops/properties due to the construction of MaramPeren Road by the respondent authorities, especially the
authorities of BRTF for the last about 26 years. Due to such
adamant attitude and apathy of the concerned authorities, the
petitioners and their affected villagers have suffered not only
money but also mentally affected. He would submit that the
arbitrary and discriminatory acts on the part of the respondent
authorities refusing to pay compensation due payable to the
petitioners has completely violated the petitioners right to
WP(C) No. 878 of 2017
P a g e | 10
compensation, which is part of the right to property as enshrined
under Article 300A of the Constitution of India.
14.
the
The learned counsel further submitted that despite
Deputy
Commissioner’s
direction
for
payment
of
compensation to the petitioners, the refusal to pay compensation
by the BRTF authorities amounts to violation of petitioners
fundamental right guaranteed under Articles 14 and 21 of the
Constitution of India. Such arbitrary acts of the BRTF authorities
not only caused serious miscarriage of justice as against the
petitioners but also hardship to them.
15.
The learned counsel then argued that the BRTF
authorities have failed to appreciate that it is not just and fair to
deprive the owner of any property without payment of
compensation, especially, when the law provided that the same
shall be paid. He would further submit that the grounds on which
the BRTF authorities have refused to pay compensation are not
sustainable and as such the petitioners and the affected villagers
are entitled to get compensation for the damage caused to their
standing properties along with interest.
16.
The learned counsel next argued that the alleged no
damage certificate to standing crops and standing horticulture
WP(C) No. 878 of 2017
P a g e | 11
plants stated by the fifth respondent are bogus and unauthorized
as the same have not been counter-signed by any civil officer from
Revenue Department. The respondent authorities are relying
upon totally eight certificates, of which, one having the signature
of Sub Divisional Officer, Tadubi and the said certificate cannot be
taken into account as the same was counter-signed by the said
officer on the date of issuance of certificate.
17.
The learned counsel further submitted that as per the
customary practices only the village Headmen have the authority
in dealing with the village land matters. Arguing so, the learned
counsel for the petitioners submitted that the impugned order of
the fifth respondent refusing to pay the compensation as claimed
by the petitioner is liable to be set aside and the respondents may
be directed to pay to the petitioners the compensation of
Rs.37,59,113.25 along with interest for the damage of horticulture
plants, crops, etc. caused during the construction of Maram-Peren
Road.
18.
Per contra, the learned Government Advocate
submitted that after submitting no damage certificate at the initial
stage, the petitioners have no right to claim compensation for
damage of horticulture plants, crops, etc. Further, the claim of the
petitioners after three years from the commencement of road
WP(C) No. 878 of 2017
P a g e | 12
construction is against the ethics and the same is also not
justifiable.
19.
The learned Government Advocate further submitted
that pursuant to the direction of this Court in W.P.(C) No.573 of
2015, the matter has been examined and intimated to the
petitioners that they are not entitled for payment of compensation
as
sought
for
by
them
as
the
concerned
village
Headman/Chairman had already furnished no compensation
demand certificate to the effect that no villager shall claim any
compensation for horticulture plants, crops etc. He would further
submit that there is no arbitrariness in passing the impugned order
and thus, prayed for dismissal of the writ petition.
20.
I have considered the submissions made by the
learned counsel appearing on either side and also perused the
materials available on record.
21.
There is no dispute that the villagers of six villages
viz., (a) Sangkhomai; (b) Willong; (c) Kenelu; (d) Yangkhullen; (e)
Yangkhunou and (f) Bendramai, whose lands were affected on the
initial construction of Maram-Peren road for single lane was
commenced
by
Road
Construction
Company
during
September 1991 and the construction of the said road for single
WP(C) No. 878 of 2017
P a g e | 13
lane was completed in 1996. During the aforesaid period, lots of
standing properties were damaged on the construction of the said
road. When on joint verification for damage of standing properties
were carried out on 30.5.1994 in the presence of SDO, Tadubi,
Officers of 25 BRTF and villagers, the six villagers had claimed
compensation for the affected standing properties at the time of
construction of the said road.
22.
The grievance of the petitioners is that from the very
beginning of the construction of Maram-Peren road, the villagers
had been claiming compensation for the damaged standing
properties such as paddy fields, buildings, farms, orchards etc.,
which took place when the first construction of the road during the
period 1991 to 1994. But the petitioners had abandoned the claim
for payment of land compensation in respect of the double lane
which took place in the year 2006 in the interest of the other
villages for connecting their inter village road.
23.
It appears that this is the second round of litigation
claiming compensation in respect of the damages caused to the
horticulture plants, crops etc. during the construction of MaramPeren Road. Earlier, the very same petitioners have approached
this Court by filing W.P.(C) No.573 of 2015. By an order dated
WP(C) No. 878 of 2017
P a g e | 14
30.11.2016, the said writ petition came to be disposed of by this
Court with the following direction:
“4. Accordingly, the present writ petition is
disposed of with a direction to the respondents,
more particularly, the respondent Nos.4 to 7 to
examine the claim of the petitioners and other
claimants for payment of compensation which
exercise shall be undertaken by the authorities
within a period of three months from the date
of receipt of a certified copy of this order.”
24.
While issuing the aforesaid direction, this Court, in
W.P.(C) No.573 of 2015, in paragraph 3, observed as under:
“3. Be that as it may, since the fact remains that
the Maram-Peren road was constructed and
widened, the authorities will examine the claim
of the petitioners/affected villagers and do the
needful for payment of compensation for the
damages
suffered
by
the
villagers
for
construction of the Maram-Peren road for which
the authorities will also take into account the
letter written by the Deputy Commissioner,
Senapati District on 11.8.2014 as the Deputy
Commissioner was authorised by an order
passed by the Hon'ble Gauhati High Court,
Imphal Bench in Civil Rule No.517 of 1995 on
06.6.2001 to consider the matter as regards
payment of compensation.”
WP(C) No. 878 of 2017
P a g e | 15
25.
The aforesaid observation of this Court in the earlier
round of litigation clearly stipulates direction to do the needful for
payment of compensation for the damages suffered by the
villagers for construction of the Maram-Peren road, for which also
the authorities are directed to take into account the letter of the
Deputy Commissioner, Senapati, dated 11.8.2014.
26.
In the letter dated 11.8.2014 addressed to the fifth
respondent, the Deputy Commissioner, Senapati, has stated as
under :
“In this regard it may mention here that the
concerned 6 (six) villages Headmen/Chairmen
had
furnished
no
compensation
Demand
Certificates to the effect that no other villager
shall claim any compensation for the horticulture
plants/crops
affected/damaged
during
the
construction of the road except the claim already
made by the right claimants duly verified by the
joint spot enquiry team on 30.5.1994 (Copies
enclosed as Annexure-F). After analysing the
said documents, in case no damage certificate
had been signed as mentioned by BRTF, then a
joint enquiry by the concerned SDO, BRTF and
affected land owners as mentioned in Annexure
“A” may not have been done.
WP(C) No. 878 of 2017
P a g e | 16
Therefore, you are requested to do the needful
for payment of compensation and settle this long
pending issue.”
27.
Thereafter,
on
05.12.2014,
the
Deputy
Commissioner, Senapati, written a letter to the fifth respondent
stating as under:
“With reference to the subject cited above and in
continuation
of
letter
No.
DC
(SPT)
6/82
(MPR)/94/219 dated 27.07.1994 had assessed a
contingent bill for a sum of Rs.37,59,113.25
(Rupees thirty seven Iakh fifty nine thousand one
hundred thirteen and paise twenty five) only as
compensation
of
the
damaged
fruit
bearing
trees/plants as per the joint spot enquiry conducted
by SDO, Tadubi along with representatives of BRTF
and
the
affected
villagers.
Therefore
compensation may be paid accordingly after
calculation of the permissible interest rate till
date. Further the list of standing crops affected
damaged by the construction of Maram-Peren
road as per records maintained by this office is
enclosed for further necessary action.”
(emphasis supplied)
28.
Thus, it is clear that the concerned official viz., the
Deputy Commissioner, Senapati, directed to settle this long
pending issue and also directed the fifth respondent to pay
WP(C) No. 878 of 2017
P a g e | 17
compensation with permissible interest. However, the fifth
respondent, issued the impugned order rejecting the claim of the
petitioners stating as under:
"7. Now therefore, the petitioners and other
claimants
are
hereby
informed
that
in
accordance with directions of Hon’ble High
Court of Manipur at Imphal vide order dated 30
Nov 2016 in WP (C) No.573 of 2015, the matter
of payment of compensation against damages
of standing properties on Maram-Peren road
due to construction of Maram-Peren Road has
been
examined
and
intimated
that
the
petitioners are not entitled for payment of
compensation as sought vide WP (Civ) 573 of
2015, as concerned village Headmen/Chairman
had already furnished no compensation demand
certificate to the effect that no villager shall claim
any compensation for horticulture plants, crops
etc affected/damaged during the construction of
road and also non production of joint spot
enquiry report dated 30 May 1994 duly verified
by SDO Tadubi.”
29.
The fifth respondent mainly relied upon the no
compensation demand certificates issued by some of the village
Headmen. On the contrary, the petitioners contended that the
eight no compensation demand certificates relied upon by the fifth
WP(C) No. 878 of 2017
P a g e | 18
respondent are all forged and unauthenticated ones as no
counter-sign has been put up by any of the competent civil officer,
who is dealing with the matter like Sub Divisional Officer and even
the Deputy Commissioner, Senapati.
30.
On a perusal of the alleged eight no compensation
demand certificates, it is seen that none of the signatures of
Headman/Chairman were identified by any of the Gazetted officer
to prove that the signatures of the Headman/Chairman as correct
and genuine. Admittedly, the alleged no compensation demand
certificates do not contain the date of execution. Almost all the
certificates contain same recital. It is useful to extract the contents
in the no compensation demand certificate in respect village Peren
Dist-Kohima, which reads as under:
“We, The Village Authorities of village PEREN
Distt. KOHIMA (NAGALAND) hereby Certify that
there has not been any damage made by The
“GREF” while construction of MARAM-PEREN
road to any standing craps and Horticulture
plants belong to our village.”
The fifth respondent cannot rely upon the aforesaid
no compensation demand certificates, as the same do not contain
the date and counter-sign by the competent civil officer. Further,
WP(C) No. 878 of 2017
P a g e | 19
it appears that only to evade payment of compensation to the
villagers, the fifth respondent is relying upon the said certificates.
31.
Earlier, vide letter dated 09.5.1994, the Deputy
Commissioner, Senapati, intimated the SDO, Tadubi to conduct a
joint spot enquiry with the representative of BRTF and the land
owners and to submit report of the standing properties.
Accordingly, joint spot enquiry was conducted on 30.5.1994 and
the team members submitted its report in respect of six villages in
question to the SDO, Tadubi for further action. After getting the
report from the SDO, Tadubi, the Deputy Commissioner, Senapati,
called the rates for certain plant/fruit bearing trees from
Horticulture and Soil Conservation Department on 22.6.1994.
Thereafter, on 11.8.2014, the Deputy Commissioner, Senapati,
directed the fifth respondent to do the needful for payment of
compensation and settle the long pending issue. Despite the
direction of the Deputy Commissioner, the Fifth respondent has
not settled the long pending issue and neglected to pay the
compensation due to the villagers involved in the present petition.
Since this Court doubts the veracity of the alleged no
compensation demand certificates issued by some of the villagers
and held that the said certificates cannot be relied upon by the fifth
respondent, the petitioners are entitled to get compensation
WP(C) No. 878 of 2017
P a g e | 20
quantified by the Deputy Commissioner, Senapati, for the
damages suffered by the villagers for construction of MaramPeren road.
32.
It is pertinent to note that as against the order passed
in W.P.(C) No.573 of 2015, the respondent authorities have not
filed any appeal and the said order attained finality. As stated
supra, since there was a direction to the respondents 4 to 7 in
W.P.(C) No.573 of 2015 to examine the claim of the petitioners
and other claimants for payment of compensation, the fifth
respondent by violating the direction of this Court as well as the
Deputy Commissioner, Senapati, cannot pass the impugned order
rejecting the claim of the petitioners by relying upon the so called
no compensation demand certificates issued by some of the
villagers. Further, nothing has been produced by the official
respondents, particularly, the fifth respondent that the alleged no
compensation demand certificates executed by them are the
affected persons/Iand owners. Therefore, this Court is of the view
that no damage certificates signed by some vested interest
persons on behalf of the villagers are in collision with the
respondent authorities and the same in no way deny the right of
the petitioners to seek compensation for the damages suffered by
them.
WP(C) No. 878 of 2017
P a g e | 21
33.
It
is
reiterated
that
despite
the
Deputy
Commissioner's decision for payment of compensation to the
petitioners, the refusal to pay the compensation by the fifth
respondent amounts to violation of fundamental rights guaranteed
under Articles 14 and 21 of the Constitution. Such an act of the
fifth respondent has also caused serious miscarriage of justice as
against the petitioners by denying them a just and reasonable
compensation for the damage caused to their standing properties
by the authorities. Further, the grounds on which the fifth
respondent has refused to pay compensation are not sustainable
in the eye of law and as such, the petitioners and the affected
villagers are entitled to get compensation of Rs.37,59,113.25 for
the damage caused to their standing properties along with
reasonable interest quantified at 6% per annum from the date
(27.7.1994) on which the Deputy Commissioner, Senapati
assessed a contingent bill for a sum of Rs.37,59,113.25 till the
date of deposit.
34.
In the result,
(a) The writ petition is allowed and the
impugned order dated 31.05.2017 passed
by the Commander, 15 BRTF (GREF), the
fifth respondent herein, is set aside.
WP(C) No. 878 of 2017
P a g e | 22
(b) The 5th respondent is directed to pay a sum
of Rs.37,59,113.25 to the petitioners along
with interest at the rate of 6% per annum
from 27.7.1994 till the date of deposit for
the damage of horticulture plants, crops,
etc. caused during the construction of
Maram-Peren Road.
(c)
The 5th respondent is directed to pay the
said sum within a period of three months
from the date of receipt of a copy of this
Order.
(d) No costs.
JUDGE
FR/NFR
Sushil
WAIKHOM
TONEN MEITEI
WAIKHOM TONEN MEITEI
Date: 2019.10.23
15:39:52 -07'00'
WP(C) No. 878 of 2017
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review