IN THE HIGH COURT OF DELHI AT NEW DELHI
+
RSA 92/2024
SEWA SINGH
.....Appellant
Through:
Mr. Amit Kumar, Adv.
versus
BSES RAJDHANI POWER LTD.
Through:
.....Respondent
Ms. Kirti Garg and Mr. Sharique
Hussain, Advocates.
%
CORAM:
HON'BLE MS. JUSTICE NEENA BANSAL KRISHNA
ORDER
13.01.2026
1.
Second Appeal under Section 100 read with Order XLII of C.P.C. has
been filed on behalf of the Appellant Sewa Singh against judgment dated
06.02.2024 whereby the learned ADJ-01, New Delhi upheld the judgment of
learned Civil Judge rejecting the Plaint of the Plaintiff / Appellant under
Order VII Rule 11 of C.P.C.
2.
Brief facts are that Plaintiff / Appellant was in possession property
bearing No.38, Summan Bazar, Jungpura, Bhogal, New Delhi. Due to
fluctuations in electric current and also high-low voltage in different phases,
some personnel of the Defendant / Respondent BSES Rajdhani Power
Limited came to his residence for checking his Electricity Meter bearing
No.23765120 having the connection No.2540C7111019. It was noted that
the Meter reading was 3248. The Meter was replaced with a new meter and
previous Meter was sent to laboratory.
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
3.
Appellant was given one page Meter Change Report, four pages of
Inspection Report, three pages of Form of Assessment of connected load and
one page of Corporate Legal and Enforcement Cell. Appellant being an
uneducated person came to know about the nature of these papers when he
contacted some other person.
4.
It was asserted by the Appellant that as per allegations of the officials
of Respondent, the Meter was showing current date 16.12.2001 and time
18:16:19 whereas the actual date was 25.04.2011 and actual time was 12:16.
It was thus concluded by BSES, that Real Time Cloak (RTC) of the Meter
had failed. It was also alleged that the Meter was found being used for
commercial purpose, though it was allotted for the domestic purpose; it was
concluded as the case of S/DAE +UuE.
5.
Thereafter, an Inspection Report dated 25.05.2011, officials of
Respondent BSES passed a speaking Order dated 21.07.2011, stating that
the meter was showing reading of 3248 and defect was found on terminal
block of the Meter and it was declared to be a tampered meter. The Meter
was sent for testing. It was found to be a case of tampering of meter.
6.
The Plaintiff / Appellant gave his Reply vide Application dated
27.07.2011, but Defendant / Respondent concluded that the Meter was used
for the commercial purpose and raised a bill in the sum of Rs.46,945/-. A
legal Notice dated 06.03.2011 was sent to the Appellant on account of direct
theft and for use of meter for commercial purpose.
7.
Plaintiff approached the Office of Defendant several times, but he was
directed to deposit the demanded amount, despite him showing various Bills
to show the consumption pattern and also the billing of new Meter. Despite
several requests, the Meter No.24327540 was disconnected and Bill of
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
Rs.2330/- was issued, with the due date of 23.03.2014. Plaintiff claimed that
he made the payment despite which he was being harassed for the act which
were never committed by him.
8.
Thereafter, he filed Civil Suit No. 75/12, but was dismissed on
14.10.2013 for lack of jurisdiction. Plaintiff, thereafter, approached District
Consumer Forum where he was given liberty to file the Civil Suit. Thus, he
filed Civil Suit, but the same also got rejected by the learned Trial Court
under Order VII Rule 11 of C.P.C. vide Order dated 21.12.2022. RCA
DJ7/23 was thus, filed before learned ADJ, but the same also got dismissed
on 06.02.2024, for the reason that the civil court has no jurisdiction over
matters concerning electricity.
9.
Aggrieved by the rejection, Appellant has challenged the impugned
Order dated 06.02.2024 in present Second Appeal on the grounds that
learned ADJ has dismissed the Appeal with cryptic Order. In the case of
Santosh Hazari Vs. Purushottm Tiwari (Deceased) by Lrs., (2001) 3 SCC
179; Madhukar and others Vs Sangram and Others, (2001) 4 SCC 756; B.
M. Narayana Gowda Vs Shanthamma (Dead) by Lrs. and Anothers, (2011)
15 SCC 476; H. K. N. Swami Vs Irshad Basith (Dead) By Lrs., (2005) 10
SCC 243; M/s Sri Raja Lakshmi Dyeing Works Vs Rangaswamy Chettiar,
(1980) 4 SCC 259; Vinod Kumar Vs. Gangadhar, (2015) 1 SCC 391; and
Malluru Mallappa (D) Thr. LRs. Vs. Kuruvathappa & Ors, decided on
12.02.2020, it has been held that the Appellate Court must display conscious
application of mind and record findings supported by reasons on all issues
and contentions.
10.
It is further claimed that the Judgment dated 18.09.2019 passed by
learned Trial Court was bad in law and contrary to the facts and
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
circumstances of the case, and that learned ADJ has committed serious error
of law and fact by dismissing the Appeal without appreciating that no points
of determination was framed by learned ADJ, which could reflect the
conscious application of mind.
11.
Correct law under Order VII Rule 11 of C.P.C. has been ignored, for
which reliance has been placed on Sau Rajani Vs. Sau Smita & Anr., 2022
LiveLaw (SC) 702. It is claimed that Suit of Plaintiff could not have been
rejected under Order VII Rule 11 of C.P.C.
12.
The jurisdiction of Civil Court to try the Suit of civil nature is
extensive, as has been held in the case of Dhulabhai vs. State of Madhya
Pradesh, AIR 1969 SC 78 and Ramesh Gobindram vs. Sugra Humayun
Mirza, (2010) 8 SCC 726.
13.
The Application under Order VII Rule 11 of C.P.C. has been decided
on the issues, which, in fact, require trial. The Reliefs claimed in the Suit,
were beyond the scope of Electricity Act and the Suit was maintainable
before the Civil Court.
14.
It is further claimed that reliance has been wrongly placed on B. L.
Kantroo vs. BSES Rajdhani Power Ltd., 2008 Law Suit (Del) 1967, by
learned ADJ.
15.
It is thus, submitted that impugned Order 06.02.2024 be set aside and
the Suit be referred for trial on merits.
Submissions heard and record perused.
16.
Plaintiff / Appellant had filed Suit for Declaration and Injunction and
reliefs claimed are as under :
<(i)
Declare the bill for the sun of Rs.46,945/- and
Rs.2330/- as null and void;
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
17.
(ii)
Direct the defendant to either withdraw the
electricity meter installed in the name of the
plaintiff or from raising any bill contrary to law or
harassing the plaintiff;
(iii)
Direct the defendant to reinstall the electricity
meter no. 24327540, which was taken by the
official of the defendant;
(iv)
A compensation of Rs.15000/- be awarded to the
plaintiff for harassment and mental agony along
with sum of Rs.7500/- towards cost of litigation.=
Respondent / Defendant had taken a preliminary objection that the
Suit was barred under Section 145 of the Electricity Act, 2003. It was
claimed that on inspection, it was found that the Meter was showing wrong
date and time. The meter was seized and sent for laboratory testing. A load
of 0.90 KW for non-domestic purpose was found connected against the
sanctioned load of 1.000 KW under the domestic category.
18.
As per the Energy Meter Test Report No. BRPL/11/14711 dated
03.06.2011, there were by-pass marks were found on the terminal block of
the meter, which indicated that the meter had been by passed via neutral to
neutral and phase to phase, by installation of shunt wires for the purpose of
manipulating the consumption; and consumption was found to be nonuniform and laboratory declared that the meter was found tampered.
19.
It was found to be a case of theft of Energy under Sections 135 and
138 of the Electricity Act, 2003 and a speaking Order dated 21.07.2011 was
made. A total bill of Rs.46,945/- with payment due date 24.10.2011, was
raised.
20.
Furthermore, since the electricity was found to be used for non-
domestic purpose, penal rate of tariff became applicable for energy
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
consumption, as per provisions of Tariff Schedule and Section 126 of
Electricity Act, 2003.
21.
Defendant filed an Application under Order VII Rule 11 of C.P.C.,
wherein it was contended that the Civil Courts had no jurisdiction to
entertain the suit in terms of Sections 126 and 127 along with Section 145 of
the Electricity Act, 2003.
22.
Learned Trial Court observed that the inspection was done on
25.05.2011 and the Bill for a sum of Rs.46,945/- was consequently raised.
Bare perusal of Section 126 of Electricity Act, 2003 reflects that it provides
the complete mechanism for making an assessment, where the consumer is
found to be indulging in un-authorised use of electricity. Section 127 further
provides that any person aggrieved by a final Order made under Section 126,
may approach the Appellate Authority within thirty days of the said Order.
23.
Section 145 of Electricity Act, 2003 clearly provides that no civil
court shall have jurisdiction to entertain any Suit or proceeding in respect of
any matter which an assessing officer referred to under Section 126 or an
Appellate Authority referred to under Section 127 or the adjudicating officer
appointed under this Act, is empowered to determine and no Injunction shall
be granted by any Court, in regard to any action taken pursuant to the
powers conferred by or under this Act.
24.
This Court in B. L. Kantroo (supra) considered the similar facts as in
hand and held as under:
<28. It is well-settled that the exclusion of jurisdiction of
civil court cannot be readily inferred and the normal rule is
that civil courts have jurisdiction to try all suits of a civil
nature except those of which cognizance by them is either
expressly or impliedly excluded. The scheme of the
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
Electricity Act is complete in itself and thereby the
jurisdiction of the civil court to take cognizance of the
cases under the Act, by necessary implication, stood
barred. The Act provides for the jurisdiction of the
Tribunals and/or appropriate forum and also hierarchy of
appeals or revisions and gives finality to the orders passed
thereunder. This also necessarily implies that the
jurisdiction of the civil court to take cognizance of the suit
of civil nature covered under Electricity Act stands
excluded. Consumer cannot approach civil court without
exhausting alternative remedies provided under Electricity
Act.=
25.
It was thus, observed in B. L. Kantroo (supra) that the jurisdiction of
Civil Court, has been excluded. As a consequence, the Suit filed before the
Civil Court is not maintainable.
26.
In the present case as well, essentially it is the Bill raised on account
of misuse/tampering of the electricity meter, which has been challenged by
way of Civil Suit, while in fact, the same should have been challenged
before the Appellate Authority, as defined under Section 127 of Electricity
Act, 2003.
27.
Learned ASJ had also referred to Sau Rajani (supra), which was
pertaining to dispute arising under Maharashtra Housing Development Act,
1976, which was specifically, in terms of provisions of that Act, held to be
not relevant for the present case.
28.
In Dhulabhai (supra), it was held that though the bar of jurisdiction of
the Civil Court must not be likely interpreted and the test for determination
of the jurisdiction of the Civil Courts is whether the Authority or the
Tribunal, constituted under the statute, has the power to grant relief that
Civil Court would normally give.
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
29.
Applying the aforesaid Test to the present case, it is the Electricity
Bill which has been challenged, for which the Appellate Authority had the
absolute jurisdiction. The Civil Court therefore, has no subject jurisdiction
to entertain the Suit.
30.
It has been further rightly observed by learned ASJ that the relief for
compensation on account of harassment and mental agony is consequential
to the Report and the Bill being found incorrect. There is no such finding till
date by any competent Forum. In these circumstances, the question of
claiming compensation for harassment and mental agony is not
maintainable. Learned ADJ has rightly dismissed the First Appeal.
31.
There is no merit in this Second Appeal and no substantial question of
law has been raised; the Appeal being without merit is dismissed.
32.
Pending Applications, if any, also stand disposed of.
NEENA BANSAL KRISHNA, J.
JANUARY 13, 2026/R
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 31/01/2026 at 14:38:18
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review