S Shantikumar Singh vs State Of Manipur and 3 Ors

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Manipur High Court
Date
14 November 2019
Case No.
WP(C) 470/2016
Result
Allowed
Bench
Mv Muralidaran
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

32. In the result, (i) The writ petition is allowed. (ii) The enquiry report of the fourth respondent dated 30.7.2015, forwarded through letter dated 4.6.2016, is quashed on the ground of delay. (iii) The respondent authorities are directed to release all the retirement benefits, if not already released. (iv) The concerned respondent is directed to prepare pension papers of the petitioner and forward the same to the authority concerned for grant of regular pension. WP(C) No. 470 of 2016 P a g e | 21 (v) The said exercise is directed to be completed by the respondent authorities within a period of four weeks from the date of receipt of a copy of this order. (vi) Till sanction of regular pension, the payment of provisional pension to the petitioner shall continue to meet his livelihood. (vii) There is no order as to costs. FR/NFR Sushil -08'00' WP(C) No. 470 of 2016

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

Page |1 IN THE HIGH COURT OF MANIPUR AT IMPHAL WP(C) No. 470 of 2016 S. Shantikumar Singh, aged about 63 years old, S/O (L) S. Manikchand Singh, a resident of Keishampat Keisham Leikai, Imphal West, Manipur State. ……. Petitioner -Versus1. The State of Manipur represented by the Principal Secretary/Commissioner/Secretary (Veterinary and Animal Husbandry), Government of Manipur, Imphal-795001, Manipur. 2. The Director, Veterinary and Animal Husbandry, Government of Manipur, Imphal-795001. 3. The Commissioner Manipur. (DE), Government of 4. Mr. J.C. Ramthanga, IAS presently functioning as Principal Secretary, RD&PR, Government of Manipur. … Respondents BEFORE HON’BLE MR. JUSTICE M.V. MURALIDARAN For the Petitioner :: Mr. H.S. Paonam, Sr. Advocate, Mr. S. Dijeshwor, Advocate, Mr. L. Ashinikumar, Advocate, Mr. N. Bipin, Advocate, Ms. Ksh. Harichhaya, Advocate, Mr. S. Gunabanta, Advocate, Mr. A. Arunkumar, Advocate, For the Respondents :: Mr. S. Nepolean, GA. WP(C) No. 470 of 2016 Page |2 Mr. K. Rabei, Advocate. Date Hearing Date of Judgment & Order :: 23.10.2019 :: 14.11.2019 JUDGMENT AND ORDER (CAV) This writ petition has been filed by the petitioner to issue a writ of certiorari calling for the records relating to the letter dated 4.6.2016 and the enquiry report dated 30.7.2015, which was received by the State Government on 24.5.2016 and quash the same and also to direct the concerned respondent to close the departmental enquiry. 2. Brief facts of the case are that the petitioner has initially joined service of the State Government in 1979 as Dairy Engineer in Veterinary and Animal Husbandry Department, Government of Manipur, and discharged his duties to the satisfaction of all concerned. Subsequently, he was appointed as Ex-Officio Managing Director of Manipur Milk Producers Union Limited. With the appointment of the petitioner as Managing Director of Manipur Milk Producers Union Limited, there has been a considerable development in the field of Milk Production and the WP(C) No. 470 of 2016 Page |3 Centrally Sponsored Integrated Dairy Development Project came to be implemented successfully in the State of Manipur. 3. While functioning as Managing Director and just about one month before attaining the age of superannuation, the petitioner was suspended on 16.2.2013 in contemplation of a departmental proceedings. Challenging the same, the petitioner has filed W.P.(C) No.131 of 2013. On 22.2.2013, the State Government issued Memorandum for initiating Departmental Enquiry against the petitioner in terms of the Article of Charges. Challenging the Memorandum dated 22.2.2013, the petitioner has filed W.P.(C) No.263 of 2013 and during pendency of the writ petition, the petitioner was allowed to retire from service vide order dated 16.3.2013 and the payment of retirement benefit was subject to obtaining Vigilance clearance, no due certificate from the department. The outcome of the departmental enquiry being held against the petitioner. 4. On 12.10.2015, W.P.(C) No. 263 of 2013 was disposed of with a direction that the departmental enquiry be completed within a period of four months. After expiry of four months, since the State Government remained silent in releasing the retirement benefits of the petitioner, he had submitted a representation on 17.2.2016. Since the State Government had WP(C) No. 470 of 2016 Page |4 failed to dispose of the representation dated 17.2.2016, the petitioner filed W.P.(C) No.223 of 2016 for a direction to release his retirement benefits. By an order dated 18.3.2016, the said writ petition came to be disposed of by directing the authorities to consider and dispose of the representation dated 17.2.2016 within a period of two months. However, by the order dated 25.4.2016, the State Government, rejected the representation of the petitioner. 5. On 4.6.2016, the impugned letter was forwarded to the petitioner annexing the enquiry report with a direction to submit written representation within 15 days under Rule 15(2) of CCS (CCA) Rules, 1965. Upon receipt of the impugned letter dated 4.6.2016, the petitioner has submitted a detailed representation to the respondent authorities for dropping the charges levelled against the petitioner. However, till date the State Government has not taken any action either accepting the enquiry report or rejecting it. During pendency of the departmental enquiry for the last about three years, the petitioner was denied even the entitled provisional pension in terms of Rule 69 of CCS (Pension) Rules. Hence, the petitioner has filed the present writ petition. 6. The first and second respondents filed affidavit-in- opposition stating that the petitioner has made a wrong claim that there is no adverse remark against him in respect of vigilance WP(C) No. 470 of 2016 Page |5 clearance and information was received from the Directorate of Vigilance that a vigilance case was found pending against him. It is stated that the delay in preparation of the Inquiry Report and submission to the Administrative Department will be best explained by the Inquiring Authority and there may be no illegality due to the delay, which could be due to dislocation in working of the Inquiring Authority, as the petitioner was relieved of the charge of departmental enquiry in between. 7. It is further stated that since interim order has been granted by this Court on 1.7.2016 not to take any action on the Inquiry Report, the matter has not been considered or acted upon further. It will be against the interest of justice if the petitioner is granted provisional pension before the departmental enquiry is concluded, as the Inquiring Authority has found that the charge of misutilised fund allocated in the Annual Plan and Approved Work Programme for Dairy Development for the year 2012-2013. Though W.P.(C) No.263 of 2016 disposed of with a direction to complete the departmental enquiry, the order in the said writ petition was received by the respondents only on 7.4.2016. Hence, the period of four months granted by this Court, when counted from the date of receipt of certified copy of the order was not yet over when the Inquiry Report was received by the Department. Therefore, there is WP(C) No. 470 of 2016 Page |6 no ground for quashing the Inquiry Report. The departmental enquiry has been completed within the time frame granted by this Court. The mala fide intention alleged by the petitioner are based solely on the alleged delay in the enquiry process and not on the merits of the case. Hence, prayed for dismissal of the writ petition. 8. Respondent No.4/Inquiry Officer filed affidavit-in- opposition stating that he was appointed as Inquiry Officer to inquire into the charges framed against the petitioner and enquiry had been started on and from 7.8.2013 and concluded on 16.4.2014. After conclusion of the enquiry, the Presenting Officer and Defence Assistant had also submitted their respective written briefs on 22.4.2014 and 28.4.2014 respectively and thereafter, the fourth respondent submitted the Inquiry Report to the first respondent on 30.7.2015 one day before relieving from the Commissioner/Departmental Enquiry and thereafter, the fourth respondent has no knowledge when the Department of Veterinary had furnished the enquiry report to the petitioner. The delay in submitting the enquiry report was not intended by any other reason but due to non-availability of adequate staff of Enquiry Authority, besides, the Enquiring Authority holding charge of other departments. WP(C) No. 470 of 2016 Page |7 9. Assailing the impugned enquiry report of the fourth respondent, the learned counsel for the petitioner submitted that the enquiry report which was purportedly signed on 30.7.2015 by the fourth respondent and which was received by the respondent State on 24.5.2016 well after respondent No.4 was relieved from being Commissioner (DE) ls smacked of male fide and arbitrary exercise of power In as much as the process leading to the submission of the enquiry report flouted the order dated 12.10.2015 passed ln W.P.(C) No.263 of 2013, wherein the first respondent State was directed to complete the departmental enquiry within four months, failing which the departmental enquiry shall be considered to have been deemed that the authorities are not inclined to proceed with the departmental enquiry which will then stands closed against the petitioner. He would submit that since the departmental proceedings continued after the conditional time frame, the same is bad in law and therefore, the same is liable to be quashed. 10. The learned counsel further submitted that the mala fide intent of the respondent authorities to take action against the petitioner on the basis of the enquiry report submitted by the fourth respondent illegally on one hand and purposefully denying the retirement benefits of the petitioner at the fake end of his career on the other hand have seriously prejudice and cause great financial WP(C) No. 470 of 2016 Page |8 hardship to the petitioner. Hence, he prayed for quashing of the impugned enquiry report and direction on the respondents to grant retirement benefits including pension. 11. On the other hand, the learned Government Advocate appearing for the respondents submitted that the petitioner cannot solely rely upon the delay in submitting the enquiry report by the fourth respondent and in fact, the fourth respondent has explained the reason for the delay. He would submit that since an interim order was granted by this Court on 1.7.2016 directing the respondents not to take any action on the inquiry report, the matter has not been considered and acted upon further. 12. The learned Government Advocate further submitted that since serious charge of misappropriation was levelled against the petitioner, which was also proved by way of enquiry, the fund which was misutilised by the petitioner will have to be recovered from him. According to the learned Government Advocate, though this Court directed to complete the departmental enquiry within a period of four months in W.P. (C) No.263 of 2016, the order copy was received by the respondents only on 7.4.2016 and the period of four months granted by this Court when counted from the date of receipt of’ the order copy, the period was not yet over. Therefore, there is no ground for quashing the enquiry report. WP(C) No. 470 of 2016 Page |9 13. This Court considered the submissions made by the learned counsel appearing on either side and also perused the materials available on record. 14. The petitioner, who is Dairy Engineer of the State of Manipur, while functioning as Managing Director of Manipur Milk Producers Union Limited and just one month before attaining the age of superannuation, was placed under suspension vide order dated 16.2.2013 in contemplation of departmental proceedings. Assailing the suspension order, the petitioner has filed W.P.(C) No.131 of 2013. On 22.2.2013, the first respondent issued a Memorandum for initiating departmental enquiry against the petitioner in terms of the following charges: “Article I : Shri S.Shantikumar Singh, Dairy Engineer (Vety & AH), who is also working as in-charge Dy. Director (Dairy), Vety & AH Department, and is also deputed to work as the Managing Director of Manipur Milk Producers’ Cooperative Union, submitted a Detailed Project Report (DPR) for implementation of Intensive Dairy Development Project IV (IDDP-IV) to the Government of India through the State Cooperation Department without routing it through the Veterinary and Animal Husbandry Department, which is the Department WP(C) No. 470 of 2016 concerned to deal with Dairy P a g e | 10 Development matters, in contravention of the Business of the Govt. of Manipur (Allocation) Rules, 2009. Article II: Shri S.Shantikumar Singh, Dairy Engineer (Vety & AH), i/c Dy. Director (Dairy) misutilised hind allocated in the Annual Plan and the Approved Work Programme of Veterinary & Animal Husbandry Department for Dairy Development for the year 201213.” 15. Challenging the Memorandum dated 22.2.2013, the petitioner has filed W.P.(C) No.263 of 2013 and during pendency of the said writ petition, the petitioner was allowed to retire from service vide order dated 16.3.2013. In the order dated 16.3.2013, it has been stated that the petitioner was allowed to retire with effect from 28.2.2013 AN on attaining the age of superannuation, subject to payment of his retirement benefits after obtaining vigilance clearance, no due certificates from all departments and the outcome of the departmental enquiry being held against him. 16. By an order dated 12.10.2015, W.P.(C) No.263 of 2013 came to be disposed of by this Court and the order passed in the said writ petition reads thus: “Heard Mr.H.S.Paonam, learned senior counsel appearing for the petitioner. WP(C) No. 470 of 2016 P a g e | 11 The learned counsel for the petitioner submits that the petitioner has already retired from service in 2013, yet, the departmental enquiry initiated against him in 2013 is still continuing without any end in sight and prays that a direction may be issued to the respondents to complete the departmental enquiry against him within a reasonable time, which he submit that can be done within a period of two months. On the other hand, Mr. Ngongo, learned counsel appearing for the respondent Nos. 1 and 2 and Mr. Bimol, learned counsel for the proforma respondent submit that they may be allowed to complete within a period of four months. In view of the above submission, let the departmental enquiry be completed within a period of four months, failing which it will be deemed that the authorities are not inclined to proceed with the departmental enquiry which will then stands closed against the petitioner. With the above direction, the writ petition stands disposed of.” 17. Since the respondent State has not taken steps to complete the enquiry within the period stipulated by this Court, on WP(C) No. 470 of 2016 P a g e | 12 17.2.2016, the petitioner has submitted a representation for releasing the arrears pay and pension. Though the respondent authorities have received the said representation of the petitioners, they have not taken action on the said representation. Hence, the petitioner filed W.P.(C) No. 223 of 2016 for a direction to release his retirement benefits. This Court, vide order dated 18.3.2016, disposed of the said petition, directing the first respondent therein to dispose of the representation dated 17.2.2016 within a period of two months from the date of receipt of a copy of the order. However, by the order dated 25.4.2016, the first respondent, rejected the representation of the petitioner dated 17.2.2016. 18. When the above is the factual scenario, the petitioner contended that he has received letter dated 4.6.2016 with enquiry report dated 30.7.2015, wherein the enquiry officer i.e., the fourth respondent, held that the charges levelled against him were found proved. According to the petitioner, the enquiry report is vitiated as the same was not in terms of the order passed by this Court in W.P.(C) No.263 of 2013, dated 12.10.2015. There is some force in the aforesaid contention of the petitioner. 19. It is well settled that once a competent Court fixes an outer time limit to complete the enquiry and pass final orders, the parties to the proceedings viz., the department/management are WP(C) No. 470 of 2016 P a g e | 13 bound to strictly adhere to the time granted to comply with the said order. If on any reason the time fixed by the competent Court is unable to be adhered to and the proceedings are unable to be finalised, the department/management to the proceedings can approach the very same Court seeking extension of time stating sufficient reasons and once valid reasons are given, normally the Court would extend the time, depending upon the facts and circumstances of the case. Admittedly, the said procedure has not been followed in this case and the department has chosen to ignore the direction given by the Court in W.P.(C) No.263 of 2013, which is binding on them. 20. In the instant case, the outer time limit of four months to complete the enquiry against the petitioner was fixed by this Court in an earlier occasion in W.P.(C) No.263 of 2013, only based on the submission made by the learned counsel for the respondent State. Therefore, the respondent authorities are bound to obey the order of this Court and ought to have complete the departmental enquiry within the period of four months. 21. At this juncture, the learned Government Advocate submitted that though the order was passed on 12.10.2015, they have received the certified copy only on 7.4.2016 and therefore, the period of four months time granted by this Court will have to be WP(C) No. 470 of 2016 P a g e | 14 counted from the date of receipt of the certified copy i.e., from 7.4.2016 and if we taken that date, the period was not yet over when the enquiry report was received by the department. The said submission of the learned Government Advocate cannot be countenanced. The fact remains that while disposing of W.P.(C) No.263 of 2013, this Court had given direction to complete the departmental enquiry within a period of four months, failing which it will be deemed that the authorities are not inclined to proceed with the departmental enquiry which will then stands closed against the petitioner. Therefore, the four months period granted by this Court starts from 12.10.2015 and will be ended on 11.02.2016. Since the respondent authorities have failed to challenge the said order, the order passed in W.P.(C) No.263 of 2013 attained finality. 22. That apart, on a perusal of the enquiry report of the fourth respondent, it is seen that the said report is dated 30.7.2015. At the time of disposal of W.P.(C) No.263 of 2013 on 12.10.2015, the respondent State submitted that they will complete the departmental enquiry within four months. When such being the submission of the respondent State, how it could be possible for the fourth respondent to submit his report on 30.7.2015. The said factual aspect has not been clarified by the respondent State. Assuming that the report of the fourth respondent is dated WP(C) No. 470 of 2016 P a g e | 15 30.7.2015, what prevented the fourth respondent in sending the enquiry report to the respondents 1 and 2 immediately is a million dollar question. On the other hand, it is the say of the respondents 1 and 2 that they have received the enquiry report on 24.6.2016, after a lapse of nearly 11 months and thereafter, a copy of the enquiry report was forwarded to the petitioner vide impugned letter dated 04.6.2016. This Court finds some doubt over the enquiry report of the fourth respondent and the said doubt has not been answered and/or clarified by the respondent State. 23. The fourth respondent, in his affidavit-in-opposition, stated that the enquiry had been started on and from 7.8.2013 and concluded on 16.4.2014. Assuming that the report of the fourth respondent is dated 30.7.2015, no convincing reason was assigned by the fourth respondent for the delay of nearly 14 months in preparing the enquiry report. Moreover, nothing has been stated in the enquiry report qua delay in preparing the report, however, the report contains the date of starting and conclusion of the enquiry on 16.4.2014. Further, the enquiry report is stated to have been prepared by the fourth respondent one day before his relieving from the post of Commissioner/DE in hurried manner. 24. Though the enquiry report was dated 30.7.2015, the same was communicated to the petitioner only on 4.6.2016. Thus, WP(C) No. 470 of 2016 P a g e | 16 this Court finds that there is a delay in preparation of the enquiry report by the fourth respondent and also delay in sending copy of the enquiry report to the petitioner. The reason for the delay attributed by the fourth respondent that there was no adequate staff, is not acceptable. This Court is of the view that the said reason stated by the fourth respondent is only to meet the delay and the reason for the delay is not bona fide one. Moreover, if we accept the enquiry report of the fourth respondent, the same would be contrary to the directions issued by this Court in W.P.(C) No.263 of 2013, wherein this Court granted four months time to complete the departmental enquiry. It was also directed that failure on the part of the respondents in completing the departmental enquiry within four months, it will be deemed that the authorities are not inclined to proceed with the departmental enquiry which will then stands closed against the petitioner. As stated supra, by the time the said order was passed in W.P.(C) No.263 of 2013, the fourth respondent said to have completed the enquiry, however, he has prepared his report on 30.7.2015. The aforesaid would clearly indicate that respondent authorities have misled the Court while passing orders in W.P.(C) No.263 of 2013 on 12.10.2015. 25. It is not the case of the respondents that the petitioner had knowledge about the enquiry report of the fourth respondent WP(C) No. 470 of 2016 P a g e | 17 when W.P.(C) No.263 of 2013 was disposed of. If really, the fourth respondent prepared his enquiry report on 30.7.2015 and the same was forwarded to the respondents 1 and 2 and the petitioner, the respondent authorities would have definitely informed the Court while passing orders in W.P.(C) No.263 of 2013 on 12.10.2015. Since this Court doubting the enquiry report of the fourth respondent and the petitioner also challenged the said enquiry report in this writ petition, there is no other alternative except to hold that the enquiry report of the fourth respondent dated 30.7.2015 is vitiated on the ground of delay, as the fourth respondent is stated to have forwarded the enquiry report to the State Government only on 24.5.2016 with enormous delay. Moreover, the genuinity of the enquiry report of the fourth respondent is highly doubted, as the fourth respondent is said to have prepared the same one day before relieving him from the post of Commissioner/DE, which was admitted by the fourth respondent in his affidavit-in-opposition filed in the writ petition. In view of the above, this Court is of the considered view that there is a delay in preparing the enquiry report by the fourth respondent and also delay in communicating the same to the respondent State as well as the petitioner. 26. It appears that pursuant to the alleged enquiry report of the fourth respondent, no action was taken by the authorities till WP(C) No. 470 of 2016 P a g e | 18 date. While that being so, this Court on 9.8.2018 directed the learned Government Advocate to ascertain from the department as to whether departmental enquiry against the petitioner was concluded or not and if not the stage of the enquiry to be stated and file necessary affidavit in this regard. 27. Pursuant to the direction of this Court, the Joint Secretary of Veterinary and Animal Husbandry, State of Manipur, has filed an affidavit stating that the departmental enquiry which was conducted to inquire into the charges framed against the writ petitioner, was completed by the Enquiry Officer and submitted his report vide forwarding letter dated 30.05.2015 for taking appropriate action. However, the department could not take any action against the writ petitioner on the basis of the Enquiry report as this Court granted interim order on 1.7.2016 directing the State respondents not to take any action pursuant to the enquiry report dated 30.7.2015. Accordingly, till today, no action has been taken against the writ petitioner pursuant to the enquiry report. 28. If really, the respondents are aggrieved over the order of this Court dated 1.7.2019, they ought to have preferred an appeal. But the same has not been done by the respondent authorities. Since there was doubt over the enquiry report of the fourth respondent dated 30.7.2015, this Court directed not to take WP(C) No. 470 of 2016 P a g e | 19 any action based on the enquiry report dated 30.7.2015. The respondent authorities cannot take advantage of the interim order dated 1.7.2016 passed by this Court as the respondent State only delayed the departmental proceedings against the petitioner, who was a retired employee of the Government. 29. It also appears that on 20.4.2017, the respondent authorities have issued an order under the provisions of Rule 69 of the CC5 (Pension) Rules, 1972, thereby granting provisional pension to the petitioner with effect from 1.3.2013. 30. The petitioner having retired with effect from 28.2.2013, under the garb of departmental enquiry, he has not been paid the retirement benefits and also regular pension and even his pension paper was not prepared till date. To get the departmental proceedings concluded quickly and also granting of pension, earlier the petitioner has filed two writ petitions and this is the third round of litigation. Further, while disposing of W.P.(C) No.263 of 2013, the respondent authorities have not apprised the correct facts before this Court. Since the enquiry report of the fourth respondent dated 30.7.2015 is vitiated due to delay, there is no other option but to direct the respondent authorities to prepare pension papers of the petitioner and proceed further. WP(C) No. 470 of 2016 P a g e | 20 31. For the foregoing reasons, this Court is of the view that the impugned enquiry report of the fourth respondent dated 30.7.2015, which was received by the State Government on 24.5.2016, is vitiated due to delay and runs counter to the specific direction of this Court, and consequently, based on the sand enquiry report, the respondent authorities cannot proceed further now in view of enormous delay on their part having not preferred any appeal against the said time bound order of this Court. 32. In the result, (i) The writ petition is allowed. (ii) The enquiry report of the fourth respondent dated 30.7.2015, forwarded through letter dated 4.6.2016, is quashed on the ground of delay. (iii) The respondent authorities are directed to release all the retirement benefits, if not already released. (iv) The concerned respondent is directed to prepare pension papers of the petitioner and forward the same to the authority concerned for grant of regular pension. WP(C) No. 470 of 2016 P a g e | 21 (v) The said exercise is directed to be completed by the respondent authorities within a period of four weeks from the date of receipt of a copy of this order. (vi) Till sanction of regular pension, the payment of provisional pension to the petitioner shall continue to meet his livelihood. (vii) There is no order as to costs. JUDGE FR/NFR Sushil WAIKHOM TONEN MEITEI WAIKHOM TONEN MEITEI Date: 2019.11.15 10:25:35 -08'00' WP(C) No. 470 of 2016

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Manipur HC judgments →