Judgments
LegalFirms.in Judgments · legalfirms.in/judgments/patanjali-foods-limited-vs-department-of-horticulture-20260108/ · Printed 24 Nov 2026
Constitutional

Patanjali Foods Limited vs Department of Horticulture

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Telangana High Court
Date
8 January 2026
Case No.
WP 9604/2025
Result
Dismissed
Bench
T.madhavi Devi
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

30. cancelration of the specified in clauses (5) and writ petition. The writ Petition is accordingry dismissed. No order as to costs. 3I. Pending miscellaneous petitions, if dfry, in this writ Petition shall stand closed. SD/.P. PONNA KRISHNA //TRUE COPY// To,

Filed under

Constitution of India Code of Civil Procedure, 1908 Indian Contract Act, 1872 Article 226, Constitution of India Section 151, Code of Civil Procedure, 1908 Article 14, Constitution of India Article 19, Constitution of India Section 55, Indian Contract Act, 1872

The sections, explained

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

[ 321e 1 IN THE HIGH COURT FOR THE STATE OF TELANGANA AT HYDERABAD (Special Original Jurisdiction) THURSDAY, THE EIGHTH DAY OF JANUARY TWO THOUSAND AND TWENTY SIX , PRESENT THE HONOURABLE SMT JUSTICE T.MADHAVI DEVI WRIT NO:9604 oF 2025 Between: Pataniali Foods Limited. (Formerlv known as Ruchi Soya lndustries Limited) Represented by Mr. Poold Mallesham, Aged about qO ygaF' Occupation Vice Prdsident (Palft Plantation) R/o. Plot No 320/A, MLA Colony' Ro--ad No-12' Baniara Hilis, Hyderabad-500034, Telangana Having its-registered office at 61.6' Tuls'iani Chamb6rs, Nariman Point, Mumbai 4OO O21, Maharashtra Also at Plot No. 764, PJ Reddy Pearl, 3rd Floor, Road No. 39, Jubilee Hills, Hyderabad- ' 5ooo37' ...PETrroNER D 1. Department of Horticulture, Represented by Directolof Horticulture Public Gardens, Nampally, Hyderabad -500 004. Deoartment of Aoriculture and Cooperation, (Horti and Seri) Represented by -2. Ap'C anO Secret5ry, Agriculture and Co-operbtion 4th Floor, C-Block, BRK Bhawan, Secretariat, Hyderabad -500 063 3. - The state of Telangana, Represented by the Dtipartment of Horticulture. Tel n6preidnted bylis"Secietary, Secretariat Buildings, Hyderabad, 4_ Telanoana cooperative oil seeds Growers Federation Limited, (Also known iJTdoitt"ois[h 16or, Parishram Bhavan, Basheerbagh, Hyderabad 500 " RESPONDENTS t!?t the !n Petition under Article 226 of the Constitution of lndia OraVinO th; High court may be circumstances'stated in the affidavit filed therewith, particularly one in pleased to issue an appropriate writ, order or dirbctibn more thehatureofmandamusbya)Declaringtheactionofcancellationofthefactory dated 15 March 2025 by zone of Suryapet District vide G'O' Ms' No' 13 RespondentNos.land2asillegal'arbitrary'violativeoftheprinciplesofnatural justice, without jurisdiction and violative of of Articles 14' 19' 21 I i i I I and 300-A of the :.I Constitution of lndia. b)Declaring action of the re-allocation of the Factory Zone to Respondent Nc.4 vide G.O. Ms. No. 14 also dated 15 March 2025 issued by Respondent No. 1 as illegal, arbitrary, violative of the principles of natural justice, without jurisdi,:tion and also violative of Articles 14, 19, 21 and 300A of the Constitution o" lndia. c)Consequently, also declare the lmpugned Letters Nos. 1 and 2 both being Lr. No. OP/89/2020 dated 20 March 2025 issued by Respondent No. 1 as illegerl and violative of principles of natural justicd. Petition under Section 151 CPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High Court may be pleased to suspend the operation of G.O. Ms. No. 13 and G.O. Ms. No. 14 dated 15 March 2025 issued by Respondent No.2 and the consequential lmpugned Letters Nos. 1 and 2 both being Lr. No. OP18912020 dated 20 March 2025 issued by Respondent No. 1 pending disposal of main writ petition in the interest of justice. IAN Petition under Section 151 CPC praying that in the circumstances stated in the affidavil filed in support of the petition, the High Court may be.pleased to grant interim directions to the Respondents, particularly Respondent Nos. 1 to 3 to specifically not forfeit the Ernest Money Deposit or take any coercive stepl against the Petitioner pending disposal of the writ petition. BETWEEN a 1. Department of Horticulture, Represented by Director of Horticulture public Ganlens, Nampally, Hyderabad -5OO OO4. 2, and Seri ) 4th F loor, lock, 3' Jhe st,te of rerangana, Represented by the Department of Horticurture. -secretarEt Rep,rgssn1.6 by itJsecietar!, iiiilii-,igt,'Hioeid6;;,'i;i*'" .........Petitioner/ Respondents AND l I l 1. Patanjali Foods Limited, (Formerly known as Ruchi Soya lndustries Limited.) Represented by Mr. Poola Mallesham, Aged about 56 years, Occupation Vice President (Palm Plantation) R/o. Plot No 3201A, MLA Colony, Road No 12, Banjara Hills, Hyderabad-500034, Telangana Having its registered office at 616, Tulsiani Chambers, Nariman Point, Mumbai - 400 021, Maharashtra Also at Plot No. 764, PJ Reddy Pearl, 3rd Floor, Road No. 39, Jubilee Hills, Hyderabad- 500037' .... . ....Respondenupetitioner .' 2. Telangana Cooperative Oil Seeds Growers Federation Limited, (Also known as TG Oilfed) 9th Floor, Parishram Bhavan, Basheerbagh, Hyderabad 500 . Respondents/Respondents Petition under Section 151 CPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High Court may be pleased to vacate the interim orders dated:28.03.2025 in lA.No.1 t2025 in WP.No.g6O4t2O25 and dismiss the writ petition and pass such other order or orders. Gounsel for the Petitioner:SRl. M/S TATVA LEGAL HYDERABAD Counselfor the Respondents No 1 to 3: GP FOR AGRICULTURE Counsel for the Respondent No 4: SRI LOHIT. S, STANDING COUNSEL The Court made the following: ORDER \ a : :,.:-.::r:,.....'-.i -,. tr "'i' iij.,:.:. - -'i.a-. . . ::?:..J:tA'_::,.i i!r.' :.r t !:l':., : i.{ ...-,' ; i ...'}.il,}#l*.r' i,', .''. :'t1t'.,'i.' : . = IN THE HTGH COURT FOR THE STATE OF TELAIIGANA AT HYDERABAI) THE ]TIONOURABLE SMT. JUSTTCE T. MADHAVI DEVI WRIT PETITION NO.96O4 OF 2025 DATED : 08.01.2026 Between: Patanjali Fc,ods Limited (Formerly known as Ruchi Sc,ya Industries Limited) ... Petitioner AND Department of Horticulture represented by Director of Horticulture, Hyderabad and 3 others Respondents ORDER In ttris writ Petition, the petitioner is seeking a writ of Mandamus by declaring (a) the action of cancellation of the factory zone of Suryapet District vide G.O.Ms.No.13 dated 15.03.2025 by respondents No.I and 2 as illegal, arbitrary and unconstitutional; I -- I W.P.No.9604 of2025 (b) the action of the re-allocation of the factory zone to respondent No.4 vide G.O.Ms.No.l4 dated 15.03.2025 issued by respondent No.l as illegal, arbitrary and violative of principles of natural justice and unconstitutional; (c) consequently to also declare the impugned letters No.l and 2 both being Lr.No.OPl89l2020 dated 20.03.2025 issued by respondent No.l as illegal and violative of principles of naturaljustice; and (d) to pass such other order or orders. 2. Brief facts leading to the filing of the present Writ Petition are that to boost palm oil production, the Government of India launched a scheme namely the National Mission of Edible Oils-Oil Palm (NMEO- OP) and under the said scheme, oil palm growing States were identified and it wa.s decided that for the said purposes, appropriate funding/assistance is to be provided by both the Central and the a respective State Governments. The State of Telangana is one of the States identified under the scheme. ) I 3. A company by name Ruchi Soya Industries Limited has been \ c$ltivating palm oil in the united State of Andhra Pradesh since the year 2009 under the name and style of MAC Oil Palm Limited and the said /i <t W.P.No.9604 of2025 cofiipor! waS allotted factory zones of four mandals in Nalgonda District and one mandal in Krishna District of the erstwhile combined State of An,Jhra Pradesh. A Memorandum of Agreement (MoA) dated 16th April, :1010 was entered into between the Govemment of Andhra Pradesh, initially with a company by name MAC Oil Palm, which later in the year 2012, got amalgamated with Ruchi Soya Industries Limited and the change in the name was acknowledged by Government of Andhra Pradesh vide G.O.Rt.No.347 dated 3'd April, 2Ol2 and accordinglr,, a Memorandum of Understanding was entered into by the Govemment of Combined State of Andhra Pradesh and Ruchi Soya Industries Limited on 25'h April, 2012. Ruchi Soya Industries Limited became Patanjali Foods Limited (petitioner herein) subsequently. 4. In the year 2015, some of the mandals. were allotted to a company by name liaradb Yelishala Agrotech India Private Limited operating in Nalgonda District were re-allotted to Ruchi Soya Industries Limited vide LT.No.RKVY/OP|73/ 2014 dated 6th October,2015 and the same was confirme<l vide Memo. No.3256lH&S/2015 dated 9'h January, 2017. Thus, as of the year 2017, Ruchi Soya Industries Limited operated 1 I mandals in Nalgonda District. In the year 2020, an Office Memorandum dated 12"h June, 2o2o was issued by the Ministry of Agriculture and \ \ ( \ I +! tr W.P.No.9604 of2025 Farmer Wetfare of the Government of India for expansion of oil palm cultivation in Telan ganastate and the potential area of cultivation of oil palm was increased to 3,09,431 hectares and in fumherance of the increased area of cultivation, the Government of Lr.No.NFSI,I/89/2020 dated 18th June, 2O2O called for fresh applications to operate the newly designated areas. Ruchi Soya was allott ed 7,738 hectares in Nalgonda District Suryapet District (except the mandals that under respondent No.4) vide G.O.Ms.No.60 relangana, vide Industries Limited and 1 1,300 hectares in were already operational dated 16'h December, 2020 and thereafter, vide G.O.Ms.No.24 dated 10th June, 2021, four mandals which were operated by respondent No.4, were atf6cated to Ruchi Soya Industries Limited. The detaits of the mandals which were allotted to Ruchi soya Industries Limited in Nalgonda and Suryapet are as follows: Ruchi # lndusfries Li m ited Nr Su Anumula Nidamanur Thri Mellachaeruvu Kodada L V M N Neredcherla \ 'l W.P.No.9604 of 2025 In furtherancr: of G.O.Ms.N o.24, an affidavit dated 28th June, 2021 was executed by Government of Telanganarundertaking to adhere to the Memorandunr of Agreement (MoA) dated 15ft March, 2Ol7 for the extended are;l of Nalgonda and Suryapet Districts and it also contained the area proposed for cultivation under the said Districts. As per the second Memorandum of Agreement (MoA), the petitioner was required to set up a processing mitl to meet the processing/crushing needs of the factory zone and in furtherance thereof, the petitioner, vide letter dated [3'h Novemtrer, 2021, requested the District Collector, Suryapet District to aliot 50 a,;res of land to it for the proeessing mill. It is stated that the petitioner did not receive any reply for the same and the petitioner was also on the lookout to purchase land suitable for its needs. In the year 2022, the pe,titioner was facing a shortage of seedlings and seed sprouts (planting mateiial) due to various factors such as severe scarcity and drought cornbined with increased demand in the international market and yet the petitioner managed to work and promote the objectives of the NMEO-OP scheme and the petitioner was constantty in contact with the office of respondent No.1 for updates and that respondent No.1 was well aware of the on-ground conditions in which the petitioner was working to implement the scheme. _/ \, \ { ,/ i W.P.No.9604 of2025 5. On 12th December, 2022, the petitioner received a show-cause notice from the office of respondent No.l as to why the allotment of factory zone at Suryapet should not be cancelled since the petitioner was not able to meet the targets as agreed upon vtde e-mail dated 7ft April, 2022 for the year 2022-23 as the planting material available with the petitioner was not sufficient and as the petitioner has not established the processing mill as undertaken under the second MoA and therefore, the petitioner was in breach of clauses of second MoA. Vide letter dated 17th December,2022, the petitioner replied explaining the steps that will be taken by it to meet the'targets; Thereafter, no action was taken by the respondents. 6. Again, in the year 2023, the second show-cause notice dated [9'h Decembe r, 1.023 was issued reiterating the allegations mentioned in the first show-cause notice. The petitioner, vide reply dated 22"d December, 2023, narrated the difficulties being faced by it in the area of expansion due to deficit rainfall and price fluctuations and it reassured that they would be meeting the targets as set out by the Government along with procuring the planting material. It was also informed that the petitioner has identified land in Nalgonda District for setting up the palm oil \r -/ a . W.P.No.9604 ofz02s factory as roquired under the second MoA. The petitioner is stated to have been making efforts to secure the land for establishment of processing rnitl and in this process, the petitioner sent a letter dated 9th September, 2024 to the Telangana Industrial Infrastructure Corporation Limited with a request to allot a suitable piece of land and the petitioner also reache,d out to the Director of the Telangana Food Processing Society for consideration of the request for land allotment vide'letter dated 8th Crctober,2024. However, there was no response from any of the parties. 7. It is stated that the third show:cause notice dated 56 October, 2024 was issued and the petitioner vide letter dated l4th October,2024 replied, reiterating its earlier explanation. The petitioner sought extension of three months time for setting qp of the processing mill and responderrt No.l, thereafter, issued a notice for personal hearing on 19ft Decembei:, 2024 and directed the petitioner to be present before ' respondent No.l on 30th December,2024 and at the personal hearing, responde:rt No.l has enquired about the status of setting up of the processing mill and the petitioner replied that due steps are being taken and suitable land has been identified. The petitioner claims to have informecL respondent No. l, vide letters dated 22"d January,2025 and 19th -- -z-^, \ IL; \ '/\ \ \.. \ W.P.No.9604 of2025 March, 2025, that they have purchased the land admeasuring Ac.16-24 guntas at Yacharam Vitlage, Anumula Mandal, Nalgonda District for seffing up the processing unit. It is stated that in spite of the above steps being taken by the petitioner to ensure regular cultivation, procurement of planting material, setting up of nurseries and procurement of suitable land for setting up of a processing mill as per the second MoA, the petitioner received letter No.OP/8912020 dated 20th March, 2025, wherein, it was stated thatvide G.O.Ms.No.l3 dated 15th March, 2025, petitioner's allotment of factory zone of Suryapet District was cancelled and vide G.O.Ms.No.l4 dated 15th March, 2025, the said cancelled factory zone of Suryapet District was allotted to respondent No.4. Chatlenging the same, the present Writ Petition has been filed. 8. Learned Senior Counsel appearing for the petitioner explained the operational background of the petitioner and submitted that the planting *i material required for cultivation of oil palm is sourced from other countries such as Malaysia, Costa Rica, Singapore and Thailand and is imported into tndia and they are maintained by the petitioner for 12 to 18 months in a nursery before the Government certification and the nursery establishment itself costs around INR 75,00,000/- to INR 1 Crore and that the petitioner has also undertaken extensive activities, 5\ \'/ \ -,^:---:. W.P.No.9604 of2025 i.e., encouraging the farmers who are cultivating switch to oit palm and lbr this purpose, the workforce 'f crops such as paddy to petitioner recruited a large Field officers and Managers, who visit farmers in the District anrl explain the advantages of growing oil palm and once a farmer agr€)es to switch to oil palm, the petitioner provides the seedlings for planting and visits the farmers for adoption of practices fcr crop improvement. [t is stated that best management the petitioner assists the farmers in managing the crops by offering guidance on crop managemr:nt and providing inputs and the fruit of a particular sapling becomes available only after 36 months of planting and that the plant remains 'iable for 30 years and after 36 month cycle, the petitioner up coller:tion centres where farmers can bring their sets harvested crops knownasFreshFruitBunches(FFBs)andtheyarepurchasedfromthe farmers at the price f,rxed by the Government' price is not negotiable under the second MoA It is submitted that the and that the petitioner has a fulfilled this duty without \ \ breach in decades of operation' It is stated that the secgnd MoA required the petitioner to establish a processing unit within']re allocated factory zone and if the processing mill is not set up' the pet:.tioner has to purchase all the FFBs from the farmers in its factory zone and undertake the processing at its cost. It is submitted that the W.P.No.9604 of 2025 processing unit would become viable only after approximately 5 to 6 years and the total cost for setting up of 5 MT per hour capacity processing mill is around INR 30 Crores. It is stated that the petitioner has made all efforts to identifu and procure the land for setting up of factory zone and also entered into agreements of sale for the said procurement. The details of the sale deeds and agreements of sale are also filed before this Court. 9. It is submitted that as per the MoA dated 15th March2OlT,the petitioner was required to establish a processing mill in the factory zone ,., t and that time is not the essence of the contract-"It is stated that the delay in procuring appropriate land is not due to any fault attributable to the petitioner and that the petitioner has received no assistance from respondent No.l in this regard. It is submitted that the petitioner has responded to each of the show-cause notices issued by the respondent No.2 explaining the challenges faced by it, including shortage of planting material, drought conditions and difficulties in land procurement, but without considering the sarrre, respondent No.l has issued a notice for personal hearing and that the petitioner attended the same and explained that it was in process of acquiring the land and that steps were being taken to set up processing mill Leamed Senior \ / '-l:-r- a W.P.No.9604 of2D5 tl Counsel for the petitioner has also drawn the attention of this Court to the sale deeds filed along with the writ papers and also the application submitted by the petitioner for conversion of agricultural land into non- agricultural land and also the application submitted under the TS-iPass system to obtain all necessary requisite permissions for setting up the processing nrill with a budget cost of Rs.4,265.00 lakhs. According to the leamed llenior Counsel for the petitioner, the reason provided for cancellation in the impugned G.Os., is not recognized as a ground for cancellation in the second MoA. He submitted that under Clause 15 of the second Ir4oA dated 15th March,2OlT,the only consequence for not seffing up of processing mill is the obligation to purchase FFBs from the farmers at Government fixed rates with procurement, transportation and processing of FFBs being the petitioner's responsibility and that the petitioner h;ls consistently fulfilled this obligation by processing its FFBs at its ,{mlapuram factory in Andhra Pradesh without causing any a loss to the farmers. It is submitted that the second MoA specifies only one ground in Clause 13, i.e., failure to submit required documents and information and that the petitioner has been consistently providing all the require<l information and documents and therefore, there is no \ breach of this clause of the agreement. It is submitted that respondents \ W.P.No.9604 of2025 No.l to 3 have impermissibly modified grounds for cancellation and introduced new grounds altogether in the counter affidavit. He placed reliance upon the decisions of the Hon'ble Supreme Court in the case of (i) Mohinder Singh Gitl Vs. Chief Election Commissionerrl (ii) Commissioner of Central Excise, Chandigarh Vs. Shital lnternational2; (iii) Commissioner of Customs, Mumbai Vs. Toyo Engineering India Ltd.3 in support of his contention that the impugned order has to give the reasons for the same and the counter affidavit cannot supplement or supplant the same and further that rules of the game cannot be changed after the game has begun. It is submitted that if poor performance is a valid ground for cancellation, the impugned action of cancellation would be in violation of Article 14 of the Constitution of India and also the principles of natural justice. It is submitted that the respondents have provided no data to substantiate this claim of poor performance by the petitioner and that the petitioner ranks 4th out of 14 companies under NMEO-OP scheme despite having only two Districts, while companies like respondent No.4 have achieved only 50Yo of targets despite operating tRtR tgz8 sc 85t lzotr; r scc lo9 \ lzooo; z scc s92 W.P.No.9604 of2025 l3 longer and having more Districts. He further submitted that the respondents' own documents indicate that the targets were tentative and not mandatory. He submitted that since respondents No.l to 3 have offered no justification for the selective and discriminatory treatment meted out to the petitioner, the impugned orders are liable to be set aside. 10. Leanred Government Pleader for Cooperation has supported the impugned order and confirmed that G.O.Ms.No.24 dated 1,0.06-2021 was issued allotting entire Nalgonda and Suryapet Districts (including the mandals earlier allotted to respondent No.4) to IWs. Ruchi Soya Industries Limited and that IWs. Ruchi Soya lndustries Limited (presently Patanjali Foods Limited) has submitted an affidavit dated 28.06.2021 stating that they will adhere to the provisions of the Memoran,Ium of Agreement executed for'taking up Area Expansion Programnre for Oil Palm Development in potential area notified in Nalgonda and Suryapet Districts as indicated in G.O.Ms.No-24 dated 10.06.20'.r.1 and has agreed to cover an area of 1,22,595 acres under oil palm in Frve years period. tt is submitted that notices were issued to IWs. Ruchi Soya Industries Limited on 03.11.2021 and 29.07.2022 seeking r:xplanation tbr their failure to procure required number of seed \ \ W.P.No.9604 of 2025 t4 sprouts and non-achievement of targets and in reply, the company has informed that they have done the best possibte without any slackness and that any unfulfilled targets in the financial year 2022-23 will be covered in2023-24 positively. It is submitted that the District Collector, Suryapet, vide letter dated 02.08.2022, has informed respondent No'l that as against the target of 8490 acres allotted for 2022-23, 4724 acres were identified by the Horticulture Officers by continuous awareness, study tours and training programmes in Rythu Vedikas and general farmer meetings and in the review meeting held on 02.08.2022, the DGM, IWs. Ruchi Soya Industries Limited has expressed inability to supply required plants and stated that they may supply plant material tn June, 2023 to Suryapet District. The District collector therefore growing expressed apprehension that the farmers who were interested in oit patm may now revert back to paddy and hence requested to reallot the targeted area from IWs. Ruchi Soya Industries Limited to IWs. TG Oilfed who have raised sufficient plant material and vide letters dated 16.08.202) and 21.08.2022, the Government was requested to issue suitable orders in this regard and accordingly, the Govemment has requested the Director of Horticulture, vide letter dated 12'12'2022, to issue show-cause notice to M/s. Ruchi soya Industries Limited for \ \ ,/ ,l --*1.^y':----:ri=**;^ I W.P.No.9604 of2025 cancellation of factory zone consisting of Suryapet District and accordingly on 12.12.2022, the show-cause notice was issued. It is submitted that the petitioner replied on 17.12.2022 asking for the action to be dropped and also gave assurance that they will achieve any leftover area coverage of current year in the upcoming year along with that of yearly target. However, since there was no improvement in the area under operation of'the petitioner, a notice dated 19.12.2023 was issued, to which the petitioner replied on 22.12.2023 reiterating its earlier stanrl. It is stated that a review meeting was held at Government level on 19.08.2024, wherein it was directed that alt the companies should conrplete procurement of land for establishment of factory by the end of Sep':ember,2024 without fail and furnish the copies of documents to the Director of Horticulture and the minutes of the meeting were communicated .to all the companies on ll.og.zo24 and thereafter, second show-cause notice was issued to the petitioner company on 05.10.202.4 as to why the factory zones of Nalgonda and Suryapet allotted to them shall not be cancelled and their deposit forfeited for their failure to comply with the directions issued in the review meeting held on L9-08.2024. It is stated that the petitioner, vide letter dated I 14.10.202,4, assured that a suitable land would be acquired for J --- W.P.No.96M of2025 t6 processing mill within a period of three months and therefore, in response thereto, a personal hearing notice dated 19.12.2024 was issued, wherein also the petitioner assured that they would continue their sincere efforts to align with Government's vision. However, since the commitment was not adhered to, vide G.O.Ms.No.13, Agri. & Coop. Dept., dated 15.03.2025, the allotment of factory zone of Suryapet District to the petitioner was cancelled and the same was allotted to respondent No.4 herein. Therefore, according to the learned Government Pleader for Cooperation, more than sufficient opportunities were given to the petitioner for compliance with the requirements of the agreement and that the petitioner failed to comply with the same but was moving FFBs to neighbouring State for milling resulting in payment of ' GST in the State of Andhra Pradesh resulting in a loss to the State. It is further subrnitted that even if the petitioner has purchased land in Nalgonda as claimed by the petitioner, it would not be a loss to the petitioner as the factory can still be established to cater to the farmers of Nalgonda District. It is submitted that the petitioner has communicated the fact of purchase of land by enclosing the copy of sale deed, on 19.03.2025, i.e;, after cancellation of the allotment vide G.O.Ms.No.l3 dated 15.03.2025. Thus, the learned Government Pleader for ' l i I t t W.P.No.9604 of 2025 t7 Cooperation justified cancellation of the allotment and re-allotment of land in Suryapet District to respondent No.4. 11. Learned Senior Counsel appearing for respondent No.4 supported the impugned G.Os., and submitted that the said G.Os., were issued in view of the continuous failure of the petitioner to comply with the obligations ,rf bringing about the targeted area under oil palm cultivation within its atlotted factory zones, supplying the required seedlings and ptanting meLterial to farmers and establishing the oil palm processing unit. The learned Senior Counsel raised a ground about the maintainability of the Writ Petition. He submitted that the scope of judicial re'yiew is limited over executive decisions relating to commercial/contractual aspects and they cannot be interfered with unless they suffer from arbitrariness, mala fides or manifest unreasonabiendss. It is submitted that under Article 226 of the Constitutiott of India, this Hon'ble Court cannot sit in appeal over the commerciallcontractual and administrative decisions of the parties as held by the Hon'ble Supreme Court in the case of Asif Hameed & Ors. \ Vs. State 1lf Jammu and Kashmira. He submitted that the petitioner t \ t \ a 1989 Supp (2) SCC 364 W.P.No.9604 of2025 has not demonstrated any arbitrary action on the part of respondents No. t to 3 for interference by this Court. It is submitted that the impugned action has been taken against the petitioner only on the ground that the petitioner has failed to fulfil the obligations under the agreement and there is no illegal, arbitrary or biased action in cancelling and allotting the area to respondent No.4 which is a company being run by the Govemment itself. 12. In response to the above objection, the learned Senior Counsel for the petitioner relied upon the following judgments on the maintainability of the Writ Petition: (i) ABL International Vs. Export Credit Guarantee Corporation of India Ltd.s (iD Subodh Kumar Singh Rathour Vs. The CEO6 (iii) Popatrao Vyankatrao Patil Vs. State of MaharashtraT (i") Zonal Managero Central Bank of India Vs. Devi Ispat Ltd.8 t \ u 1zou13 scc ss3 RtR 2oz+ sc 3284 7'7zozo119 scc 241 I W.P.No.9604 of2025 t9 13. He further submitted that this Writ Petition is maintainable because it is founded on a violation of (a) Article 14 and 19 (1) (g) of the Constitution of [ndia, (b) Principles of natural justice, (") the impugned G,Cs being arbitrary and (d) absence of a efficacious remedy to the Petitioner; He suomitted that this Writ Petition is maintainable under Article 226 ofthe Oonstitution as it pertains to a contractual dispute involving state instrunrentality and for the reasons stated above and further as the petitioner vt,as left with no efficacious alternative remedy other than approaching; this Hon'ble Court by way of the Writ Petition as the cancellation of the Petitioner's factory zone was simultaneously accompanied by the reallocation of the sulme to Respondent No.4. 14. On the decisions relied upon by the Leamed Senior Counsel for the petitioner about the maintainability of the Writ Petition rn contractual matters, the learned Senior Counsel submitted that they are atl distinguishable on facts. On the other hand, he placed reliance on the judgment of the Hon'ble Supreme Court in the case of BPCL Ltd vs. N.R Vair:rmani reported in 2004 (7) Supreme 126 that caution has to '1zoro; u sc3 186 \ \ ) a W.P.No.9604 of 2025 be exercised by this Court while considering precedents and that disposal of cases by blindly placing reliance on a decision is not proper. 15. Having regard to the rival contentions and the material on record, this Court finds that the first and foremost issue to be decided is the maintainability of the Writ Petition. The petitioner is challenging G.O.Ms.No. 1 3, Agriculture and Cooperation (Horti.&Seri) Department, dated 15.03.2025 cancelling the factory zone of Suryapet District allotted to the petitioner and G.O.Ms.No.l4, Agriculture and Cooperation (Horti.&Seri) Department, dated 15.03.2025 realloting the factory zone of Suryapet District to respondent No.4 and these two G.Os., are issued allegedly consequent to the non-fulfilment of the conditions mentioned in the Memorandum of Agreement made with respondent No.l by the petitioner. Therefore, it is a contractual matter. As held by the Courts in a catena of judgments even if a contract is .l between the Govemment or an instrumentality of Government and a private party, such matters cannot be agitated under Anicle 226 of the Constitntion of India unless the executive decision is arbitrary, biased or mala fide. In this case, except for stating that Clause 15 of the Memorandum of Agreement dated 15.03.2017 does not call for cancellation of the agreement, but requires the petitioner to purchase the \ W.P.No.9604 of2025 fresh fruit bunches from the farmers at the rates fixed by the Government and further that the conditions mentioned in Clause 13 of the second I\{oA for cancellation of the factory zone are not fulfilled, the petitioner has not brought out any action of arbitrariness in its Writ Petition. Th,e decisions relied upon by the petitioner for maintainability of the Writ lletition are as under: (1)ABL International Vs. Bxport Credit Guarantee Corporation of India Ltd (5 supra) (2)Subodh Kumar Singh Rathour Vs. The CEO (6 supra) (3)Popatrao Vyankatrao Patil Vs. State of Maharashtra (7 supra) (4)Zonal Manager, Central Bank of India Vs. Devi Ispat Ltd. (8 supra) 16. The relevant paragraphs in the case of ABL International Vs. Export Credit Guarantee Corporation of India Ltd. (5 supra) relied upon by the petitioner are reproduced as under: "27. From the above discussion of ours, the followtng legal principles emerge as to the maintainability of awrit petitton: (a) In an appropriate case, a writ petition as against a State or an instrumentality qf a State arising out of a contractual obligation is \ \ maintainable. .? \ \ :\ ,^ ,1 W.P.No.9604 of2025 (b) Merely because some disputed questions of fact arise for consideration, same cannot be a ground to refuse to entertatn o writ petition in all cases as a matter of rule. (c) A writ petition involvtng a consequential relief of monetary claim is also maintainable." "28. However, while entertaining an objection as to the maintainobility of a wrtt petition under Article 226 of the Constitution of Indta, the court should bear in mind the fact that the power to issue prerogative wrtts under Article 226 of the Constitution is plenary in nature and is not limited by any other provisions of the Constitution. The High Court having regard to the facts of the case, has a discretion to entertain or not to entertain a writ petition. The Court has imposed upon itself certain restrictions in the exercise of this power. (See Whirlpool Corpn. v. Registrar of Trade Marlcs [(1998) B SCC U .) And this plenaqy right of thg, High Cou.rt to issue a prerogative writ will not normally be exercised by the Court to the exclusion of other avatlable remedies unless such action of the State or its instrumentality is arbitrary and unreasonable so os to violate lhe constituttonal mandate of Arttcle 14 or for other valtd and legitimate reasons, for which the Court thinl<s it necessary to exercise the said jurisdiction. " a u52. On the basis of the above conclusion of ours, the question still remains why should we grant the reliefs sought for by the appellants in a wrtt petitton when a suitable effcacious alternate remedy is available by way of a suit. The answer to this question, in our opinion, lies squarely in the decision of this Court tn the case of Shrilekho Vidyarthi [(1991) I SCC 2]2 : 1991 SCC (L&S) 742J wherein this Court held: (SCC pp. 235-37, paras 20-22 & 24) W.P.No.9604 of2025 The requtrement of Article I4 should extend even in the sphere of contractual matter,s for regulating the conduct of the State activity. Applicobitity of Article 14 to all executive actions of the State being settled and.for the same reason its applicability at the threshold to the makinl| of a contract in exercise of the executive power being beyond dispute:, the State c'annot thereafter cast off its personality and exercit,e unbridled power unfettered by the requirements of Article l4 in the sphere of contractual matters and claim to be governed therein only b.v private low principlis applicable to private individuals whose rights flow only from the terms of the contract without anything more. The personality of the State, requiring regulatton of its conduct in all sphertts by requtrements of Article 14, does not undergo such a radiccl change after the making of a contract merely because some contructuol rights accrue to the other party in addition. It is not as if the requirements of Article l4 and contractual obligattons are alien conceuts, which cannot coexist. The Constitution does not envisage or permit unfairness or unreasonableness in State actions in any sphere of its activity contrary to the professed ideals in the preambleThere'fore, total exclusion of Articte t 4 basic to rule of lau' - non-arbitrariness which is - from State actions in contractual field is not justiJted. This is more so when the modern trend is also to examine the unreusonableness of a term in such contracts where the bargaining power is unequal so that these are not negotiated contracts but stanclard form contracts between unequals. Unlike the private parties the State while exercising its powers and ,lischarging its functions, acts indubitably, as is expected of it, for public good and in public interest. The impact of every State action is also on public interest. It is really the nature of its personality as State which is significant and must characterize all its actions, tn whatever field, and not the nqture offunction, contractual or otherwise, which is decisive of the nature of suuttny permitted for examining \ \ a W.P.No.9604 of 2025 validtty of its act. The requirement of Article 14 being the duty to act fairly, justly and reasonably, there is nothtng which milttates against the concept of requiring the State always to so act, even in contractual matters. Thts factor alone is srfficient to import at least the minimal requirements of public law obligations and impress with this character the controcts made by the State or its instrumentality. It is a different matter that the scope ofjudicial review tn respect of disputes falling within the domain of contractual obligations may be more limited and in doubtful cases the parties may be relegated to adjudication of their rights by resort to remedies provided for adjudication of purely contractilal disputes. However, to the extent, challenge is made on the ground of violation of Article I4 by alleging that the impugned act is arbitrary, unfair or unreasonable, the fact that the dispute also falls within the domain of contractual obligations would not relieve the State of its obligation to comply with the basic requirements of Article 14. To this extent, the obligation ts of a public character invariably in every case irrespective of there being any other right or obligatton in addition thereto. An oddtttonal contractual obligation cannot divest the clqimant of the guarantee under Article 14 of non-arbitrariness at the hands of the State in any of its actions. " 17. The relevant paragraphs relied upon in the case of Subodh Kumar Singh Rathour Vs. The CEO (6 supra) are reproduced as under: "56. What can be discerned from the above ts that there has been a considerable shift in the scope of judicial review of the court when it comes to contractual disputes where one of the parties is the State or its instrumentalities. In view of the law laid down by this a W.P.No.9604 of2025 Power Court itt ABL (supra), Joshi Technologies $upra) and tn M'P' (supra), it is dfficult to accept the contention of the Respondent that the writ petttion filed by the Appellant before the High court was not by the maintainable and the relief prayed for was rightly declined is High Court in exercise of its Writ jurisdiction. llhere State action challenged on the ground ofbeing arbitrary, unfair or unreasonable, the stctte would be under an obligatton to comply with the basic in an requtretments of Article 14 of the Constitutton and not act arbitrary, unfair and unreasonable manner. This is the constituttonal timit c,f their aurhority. There is a jural postulate of good faith tn business relations ond undertakings which is given effect to by preventing arbitrary exercise of powers by the public functionaries in contrcrctual matters with private individuals. With the rise of the sociai service state more and more public-private partnerships contirtue to emerge, which makes it all the more imperative for the court,; to protect the sanctity of such relations' " u57. It ts needless to stdte that in matters concerning specific modcrlities of the contract' such as required work, execution methods, mate,ial quolity, timeframe, supervision standards, and other aspects impacting the tender's purpose the court usually refrains from inter.ference.stateauthorities,likeprivcileindividuals,havea consensual element in contract formation. The stipulations or terms in the underlying contract purpose are parl of the consensual aspect, jurisdiction and whit:h need not be entertained by the courts in writ the ,car-ties may be relegated to ordinary private low remedy' Judicial review does not extend to fixing contract stipulations but ensures that public authorities act within their authority to prevent the arbitrariness. " ,r58. Thus, the demarcation between a private law element and pultlic law element in the context of contractual disputes if any, may \ be assessed by ascertaining v'hether the dispute or the controversy \ i ) I a W.P.No.9604 of 2025 pertains to the consetwual aspect of the contract or tender in questton or not. Judicial review is permissible to prevent arbitrariness of public authorities and to ensure that they do not exceed or abuse their powers in contractual transactions and requires overseeing the administrative power of public authorities to award or cancel contracts or any of its stipulations." "59. Therefore, what can be culled out from the above is that although disputes arising purely out of contracts are not amenable to writ jurisdiction yet keeping in mind the obligation of the State to act fairly and not arbitrarily or capriciously, it is now well settled that when contractual power is being used for public purpose, it is certainly amenable to judicial review." 60..... 61...... "62. Thus, the present dispute even if related to a tender, cannot be termed as a pure contractual dispute, as the dtspute involves a public law element. Although there is no dtscharge of a public function by the Respondent towards the Appellant yet there is a right to public law action vested in him against the Respondent in terms of Article l4 of the Constitution. This is because the exerctse of the executive power by it in the contractual domain i.e., the cancelling of the tender carries a corresponding public duty to act in a reasonable and rationale manner. Thus, we find that the writ petition filed by the Respondent was maintainable and the relief prayed for coul_d have been considered by the High Court in exercise of its writ jurisdtction." 18. The relevarfi paragraphs relied upon in the case of Popatrao Vyankatrao Patil Vs. The State of Maharashtra and Others (7 supra) are reproduced as under: \ # W.P.No.9604 of2025 n9. No doubt that, normally, when a petition involves disputed questic,ns of fact and law, the High Court would be slow in enterta,ining the petition under Article 226 of the Constitutton of India. However, it is a rule of self-restraint and not a hard-and-fast rule. In any c,xs€, this Court in ABL International Ltd. v. Export Credit Guarantee Corpn. of India Ltd. [ABL International Ltd. v. Export Credtt Guarantee C'orpn. of India Ltd-, (2004) 3 SCC 553J has observed thus : (SCC pp. 568-69, para l9) "19. Therefore, it is clear ftom the above enunciotion of law that merely because one of the parties to the litigation raises a dispute in regard to the facts of the case, the court entertaining such petition under Article 226 o/ the Constitution is not always bound to relegate the pa,rties to a suit. In the above case of Gunwant Kaur [Gunwant Kaurv.Municipal Oommittee, Bhatinda, (1969) 3 SCC 7691 this Court even went to lhe extent of holding that in a writ petition, if the shows that facts require, even oral evtdence can be taken. This clearly in an ,zppropriate case, the writ court has the jurisdiction to entertain a writ' petition involving disputed questions of fact and there is no absolute bar for entertaining a writ petition even if the same arises out a.f a contractual obligation and/or involves some disputed questions offact." ulL. while summing up the conclusions in the aforesaid case, this court concluded thus : (ABL International case [ABL International Ltd. v. Export Credit Guarantee Corpn. of Indta Ltd., (2004) 3 SCC 553J , SCC p. 572, paras 27-28) "27. From rhe above discussion of ours, the following legal princ,iples emerge as to the maintainabitity of a writ petition: (a) In an appropriate case, a writ petition as against a state or an in;;trumentality of a State arising out of a contractual obligatton is mainrainable. e -?' W.P.No.9604 of 2025 (b) Merely because some disputed questtons of fact arise for consideration, same cannot be a ground to refuse to entertain a writ petitton in all pases as a matter of rule. (c) A writ petitton involving a consequential relief of monetary claim ts also maintainable. 28. However, while entertaining an objection as to the maintainability of a writ petition under Article 226 of the Constitution of Indta, the court should bear in mind the fact that the power to issue prerogative writs under Article 226 of the Constitution is plenary in nature and is not limited by any .other provisions of the Constttution. The High Court having regard to the facts of the case, has a discretion to entertain or not to entertain a writ petition. The Court has imposed upon itself certain restrictions in the exercise of this power. (See Whirlpool Corpn. v. Registrar of Trade Marl<s [Whirlpool Corpn. v. Registrar of Trade Marl<s, (1998) 8 SCC lJ .) And this plenary right of the High Court to issue a prerogative writ will not normally be exercised by the Court to the excluston of other ayailable remedtes unless such actton of the State or its instrumentality is arbitrary and unreasonable so os to violate the constitutional mandate of Article 14 or for other valid and legitimate reasons, for which the Court thinks it necessory to exercise the said jurisdiction. " "11. It could thus be seen, that even if there are disputed questions offact whichfallfor consideration but tf they do not require elaborate evidence to be adduced, the High Court is not precluded frorn entertaining a petition under Article 226 of the Constitution. However, such a plenary power has to be exercised by the High Court tn exceptional circumstances. The High Court would be justified in exercising such a power to the excluston of other available remedies only when it finds that the action of the State or its instrumentality is arbitrary and unreasonable and, as such, violative of Arttcle 14 of the \ \ I I ! I l t c W.P.No.9604 of2025 Consfihrtion of India. In any case, in the present case, we find that there are hardly any disputed questions offacts." 12...... 13..... " 14. This Court, has time and again held, that the State should act as a model litigant. In this respect, we con gainfully refer to the foltowing observations made by this Court in Urban Improvement Trust, Bikaner v. Mohan Lal [Urban Improvement Trust, Biknnerv. MohanLal, (2010) I SCC 512: (2010) I SCC (Civ) 163 : (2010) t SCC (Cri) stp: (2010) t SCC (LES) t78J : (SCC pp.5t516, paras 6-9) "6. This Court has repeatedly expressed the view that Govern'ments and statutory authorities should be model or ideal litigants and should not put forth false, frivolous, vexatious, technical (but unjust) contentions to obstruct the path of iustice- We may refer to some of the decisions in this behalf, 7. In Dilbagh Rai Jarry v. Union of India [Dilbagh Rai Jarryt,. (Jnionof India, (1974) 3 SCC 554: 1974SCC (L&S) 89J this Court extracted with approval the following statement [from an earlier decision of the Kerala High Court (P.P. Abubacker case [tid. :P.P. Abubackerv. Union of India, 1971 SCC OnLine Ker 7t : AiR 1972 Ker 103 : ILR(1971) 2 Ker 490: l97l KIJ 723J , AIR a pp. l0'.t-08, para 5)J : 6CC p. 562, para 25) '25. ... "5. ... The State, under our Constitution, undertakes economic activities in a vast and widening public sector and inevitably gets involved in disputes with private individuals. But it must be remembered that the State is no ordinory party trying to win a case a'gainst one of its own citizens by hook or by crook; for the State's interest is to meet honest claims, vindtcate a substontial defence and never to score a'technical point or overreach a weaker \ \, \e -a- W.P.No.9604 of2025 party to avoid a just liability or secure on unfair advantage, simply because legal devices provide such an opportunity. The State is a virtuous litigant and looks with unconcern on immoral forensic successes so that if on the merits the case is weak, Government shows a willtngness to settle the dispute regardless of presttge and other lesser motivations which move private parties to fight tn court. The layout on litigation costs and executive time by the State and its agencies is so staggering these days because of the large amount of Ittigation in which it is involved that a positive and wholesome poltcy of cutting back on.the volume of law suits by the twin methods of not being tempted into forensic showdowns where a reasonable adjustment is feasible and ever offering to extinguish a pending proceeding on just terms, giving the legal mentors of Government some initiative and authority in this behatf. I am not indulging in any judtcial homtly but only echoing the dynamic national policy on State litigation evolved at a Conference of Law Ministers of Indta way back in 1957." ' 8. In Madras Port Trust v. Hymanshu International [Madras Port Trustv. Hymanshu International, (1979) I SCC l76J this Court held : (SCC p. 177, para 2) .'2. ... k is high time that Governments and public authorities adopt the practice of not relying upon technical pleas for the purpose of defeating legitimate claims of cittzens and do what ts fair and just to the citizens. Of course, d a Government or a public authority takes up a technical plea, the Court has to decide it and if the plea is well founded, it has to be upheld by the court, but what we feel is that such a plea should not ordinarily be taken up by a Government or a public authority, unless of course the claim is not well founded and by reason of delay in filing it, the evidence for the purpose of resisting such a claim has become unavailable.' \ \ . h-!r .r a W.P.No.9604 of2025 9. In a three-Judge Bench judgment of Bhag Stngh v. State (JT of Chandtgarh) [Bhag Stnghv. State Qf of Chandigarh), (1985) 3 SCC 7:t7J this Court held: (SCC p. 741, para 3) '3. ... The State Government must do what isfair and just to the cihzen and should not, as far as possible, except in cases where tox or revenue is received or recovered without protest or where the State tlovernment would otherwise be irretrtevably be prejudiced, take 4t a technical plea to defeat the legittmate and just claim of the citizen "' 19. The relevant paragraphs relied upon in the case of Zonal Manager, l3entral Bank of India Vs. Devi Ispat Ltd. And Ors., (8 supra) are r,:produced as under: "22. In ABL International Ltd. v. Export Credit Guarantee Corpn. of India Ltd. [(2004) 3 SCC 553J Santosh Hegde, J. has exhaustively dealt with the maintoinability of writ petition under Article 226 in contractual matters. In the said case, contract of insuronce was executed between ABL International Ltd. and another and lixport Credit Guarantee Corporation of India Ltd. and others. Having failed to persuade the first respondent therein, to adhere to the contract of insurance between it and the appellant, the appellant filed a writ petition before a learned Single Judge of the Calcutta High Court, tnter alia, prqying for quashing of the letters of repudiation issued by the first respondent. It also consequentially prayttd for a direction to the first respondent to make payment of the dues to it under the contract of insurance. The learned Single Judge, after hearing the parties, came to the conclusion that though the dispute between lhe parties arose out of a contract, the first respondent being "State" for the purpose of Article 12, was bound by ,, \= \<r I a c) W.P.No.9604 of 2025 the terms of the contract, therefore, for such non-performance, a writ was matntatnable and after considering the arguments of the parties in regard to the liability under the contract of insurance, allowed the writ petttion and issued the writ and dtrections os prayed for by the appellants in the writ petition." 23...... 24...... "25. The following discussion and conclusion are apt and relevant for our purpose. They are: (ABL International Ltd. case [(2004) 3 SCC 553J , SCC pp. 564-69, paras 9-19) "9. In our'opinion this question is no morc res integra and is settled by a large number of judicial pronouncements of this Court. InK.N.Guruswamyv. State of Mysore IAIR 1954 SC 592J this Court held: (AIR pp. 595-96, para 20) '20. The next question is whether the appellant can complain of this by way of a writ. In our opinion, he could have done so in an ordinary case. The appellant is tnterested in these contracts and has a right under the laws of the State to receive the same treatment and be given the same chance as onybody else. ... We would therefore in the ordinary course have given the appellant the writ he seel<s. But, owing'to the time which this matter has tairen to reach us (a consequence for which the appellant is in no way to blame, for he has done all he could to have an early hearing), there is barely a fortnight of the contract left to go. ... A writ would therefore be ineffecttve and as it is not our practice to issue medningless writs we must dismtss thts appeal and leave the appellant content with an enunciation of the law.' 10. It is clearfrom the above observations of this Court tn the said case, though a writ was not issued on the facts of that case, this Court has held that on a given set of facts if a State acts in an i i a W.P.No.9604 of2025 arbitra,y manner even in a matter of contract, an aggrieved party can approach the court by way of writ under Article 226 of the Constitution and the court dependtng on facts of the said case is empowered to grant the relief. This judgment in K.N. Gurusuamy v. Stote of Mysore IAIR 1954 SC 592J was followed subsequently by this Court inDFOv. Ram Sanehi Singh [(1971) 3 SCC 864J wherein this Court held: (SCC p. 865, para 4) '4. . By that order he has deprived the respondent of a valuable right. We are unable to hold that merely because the source of the right which the respondent claims was initially in a contract, for obtaining relief against any arbitrary and unlawful action on the part of a ptyfil;s authorit,v he must resort to a sutt and not to a petition by way of a writ. In view of the judgment of this Court in K-N. Guruswamy case [AIR 1954 SC 592J there can be no doubt that the petition was maintctinable, even if the right to relief arose out of an alleged breach of contract, where the action challenged was of a public authority invested with statutory power.' (emphasis in original) t t. In Gujorat State Financial Corpn. v. Lotus Hotels (P) Ltd. [(t953) 3 SCC 379J this Court following an earlier judgment in Ramana Dayaram Shetty v. International Airport Authority of India [(1979) 3 SCC 489] held: [Lotus Hotels (P) Ltd. case [(1983) 3 SCC 37eJ , SCC p. s80J 'The instrumentality of the State which would be "other aut,kority" under Article 12 cannot commit breach of a solemn uncl.ertaking to the prejudice of the other party which acted on that unclertoking or promise and put itself in a disadvantageous position. Thtz appellant ()orporation, created under the State Financial Corporations Act, falls within the expression of "other authority" in Ar,.icle 12 and tf it bacl<s out from such a promise, it cannot be said \ \ \ W.P.No.9604 of 2025 '::::,;:,:::::*;r::,,::n** spectfic performance of the ,onrr),o'o'ot t 2. The reny-n-, ^ however, ,uu: ''o'ned ,102. counsel compel the suins f.r corporationfor unaer at trcte ; '<rricle 226' ' for the Jirst respondent' thar this ;:'*'* in LIC r. ,r"o!,"*o (scc p,rr, pa*y w.u,d be ;:';/';;' :::':;,),,!"*,,",r:3::, ;; ... rf il,o action ^^.,^ obrigations o, ,I.the ordinar,y r*o*'ru"*''ns 'ne attached b it. B of the state is reratud arising out of the il unless the action b contractuar tort, the court has some publtc may not law character stateir,rro)io,l,!l',o-;:;:r::,;:,:,::,,:r:;i,:;:::;,:: examining them tf they pertain b will lie in demarcating the private raw thefrontier between and the rtne with precision b attempt it The quesstio* each case with reference fu the particurar action, the snte or the instrumenturity performing the action, araa"a in the auiviry in which raw character of rhe rerevant ctrcumstances. an instrumentarity of the state purchases the shares of ;;;,'i) of the smte is engaged when the pubric raw or private action and a host of other /ierd. The dfficurty the pubric raw cromain /ierd. It is tmposstble to draw and we do not want I the private taw wen the state or ventures tnto the corporate worrd and a company, it assumes to itself the role of a sharehorder, and dons the rights ava,abre to such the robes of a sharehorder, with a shareholder. There is no stsle os a sharehorder shourd be seelrs to change the management, ordtnary a, reason why the expected to stote tts reasons when by a resorutton of the company, it rike any other shareholder.' (emphasis in original) 13' we do not thinkthis court in the above manner' departedfrom the'view expressed I \- \, case has, in any in the earlier judgments in + W.PNo.9604 of2D25 the casecited hereinabove' proceeded on the t""" "t ''ot LIC t0g86) 1 SCC This Court in case and held that a relief by way of a writpetitionma!notordinarilybeanappropriafurernedy.This of contract the a rule in maffers judgruent does not laydown that as exarnine it court'siurisdictionunderArticle226oftheConstitutionisousted'On may not ordinarily 'court words the useof the ccntrary' the to rt' rtself charactur attached law public has some unle:;s the action indicatesthatinagivencase,ontheexistenceoftherequiredfactual will be 226 of the Constitution Article under matrix a remedy available.Thelearnedcounselthenreliedonanotherjudgmentofthis (India) Ltd' t0996) 6 co. Roof & Bridge v. Cotrt in state of u.p. 21) Court held: (SCC p' il'para SC': 221 wherein thii in question contains a clause by reference to inter alia for settlement of disputes '21' "' [F-urther' the] contract providing arbitration.Thearbitratorscandecidebothquestionsoffactaswell asquestionsoflaw.Whenthecontractitselfprovidesforarnodeof the contract' there is no reason settlement of disputes arising from whythepartiesshouldnotfollowandadoptthatremedyandinvoke theextraordinatyjurisdictionoftheHighCourtunderArticle226. Theexistenceofanffictivealternativeremedy-inthiscase, tho oouvt to provided in the conffact itseft$ u good. 5'o**d fo" decline to exercise its extraordinary jurisdiction under Article 226'.', the Jirst 14. This judgment again, in our opinion, does not help on its behalf that in contractual . respondent in the argument advanced does not lie' It is r,natters remedy under Article 226 of the Constitution seenfrom the above extract that in that case because of an arbitratton under <:lause in the contract, the court refused to invoke the remedy Article 226 of the Constitution. We have specifically inquiredfrom the I parties to trte present appear before theys 1, no such arbitrotion well known that us and we have been clause in tord trtat , if the parties., , Orrr'::r';::::rrr:Or:::::;:;"r; ---. l.'. a W.P.No.9604 of dispute by arbitration courts w,r not permil and if there is an agreement in that recourse b any regard, the other remedy without invoking of arbitration, unress of course both the parties to the dispute agree on another node of dispute resorution. since that is not the case in the instant appear, the observafions of this Court in the said case ofBridge & Roof co. (rgg6) 6 scc 22J are of no assistance fu the /irst respondent in its contention that in contractuar matters, writ petition is not matnfuinable. 15' The rearned counser then contending that this court w,r not entertain a writ petition tnvorving disputed questtons offact reriee{ on a iudgment of this Court in smte of Bihar v. Jain plasttcs and Chemtcars Ltd' [(2002) r scc 2t6J wherein this court hetd; (scc p. the remedy by way 218, para 7) '7. In our view, High court is, on the tt is apparent that the order passed by the face of it, ilregar and erroneous. It is true that many matters courd be decided after referring to the contentions raised tn the affdavits and counter-ffidavtts, but that wourd hardty be a ground for exercise of extraordinary jurtsdiction under Arficle 226 of the constitution tn case of areged breach of contracr. wether the alleged non-suppry of rood permtts by th, app)ilonts wourd justify breach'of contract by the respondent wourd depend upon facts and eitidence and is not required to be decided or deart with in a writ petition' such seriousry disputed questtons or rivar craims of the parties with regard to breach of contract are to be investigated and de-termined on the basis of evidence whtch may be red by the parties in a properly instituted civil suit rather than by a court exercising prerogative of issuing writs.' 16' A perusal of this judgment though petition involving serious disputed questions shows that a writ of facts which requires consideration of evidence which is not on record, wiil not normaily be entertained by a court in the exercise of its jurisdtctton under Arttcle I \ \ \ .t W.P.No.96M of2D5 226 of the Constitution decision of India' This again' in our opinion' doesnotlaydownanabsoluterulethatinallcasesinvolvingdisputed quesfionsoffactthepartiesshouldberelegatednacivilsuit.Inthis view o1' ours' ":':'::-?urir,t":;:::; ;[r *''')" comm Kaur v- Municipal r:; ::U ions of fact of disputed quest situati a such with 7691 where dealing -on paras 14-16) held: (SCC p' 774' Court tiis in a writ petrtron not determine in Gunrvant will observed that they '14' The High Court were in petition' But what facts writ a in quesfion oJ'fact after an only be dercrmined could admitted were dispute and what however' The High Court' Srute' the by was filed not ffidavit in reply The High Court is limine' in petition the proceeded to dismiss under Article 226 entertain a petition tu deprived of itsiurisdiction disputzd merelybecauseinconsideringthepetitioner.srighttoreliefquestions 226 the In a petition under Article determined' be tu of fact may fall both of fact and law' tu try issues Higlt Court has iurisdiction disuetionary' but the true' is it is' jurisdiction Exerctse of the disc,retionrnustbeexercisedonsoundjudicialprinciples.Iilhenthe may for of a complex nature' which of fact questions petition raises and on that evidence tu be taken' oral require their determinattttn not view tiat the dispute may the of is Court High account try Court may decline a writ petition' the High ap,cropriately be tried in normally be a petition in limine will to try a petition' Rejection of view that the petition is the High Court is of the where iustified, fr|volousorbecauseofthenatureoftheclaimmadedisputesoughtto relief against the party against whom petition the that or agitated, bt: is is ctaimed is not maintainable or that the dispute raised thweby I such that it would be inappropriate to try it in the writ jurisdiction, or fot' analogous reasons. \ i I 15. From the avermenb app'ellanb it is mode *t petition /ited ctear fiat inproofofa,o'' U the rrge number ofathgatons ilte I t I :"', a A W.P.No.9604 of 2025 appellants relied upon documentary evidence and the only matter in respect of whtch con/ltct offacts may possibly arise related to the due publicatton of the notification under Section 4 by the Collector. 16. In the present case, in our judgment, the High Court was not justified in dismissing the petition on the ground that it will not determine dtsputed questton of fact. The High Court has jurisdiction to determine questions of fact, even if they are in dispute and the present, in our judgment, is a case in which in the interests of both the parties the High Court should have entertained the petitton and called for an affidavit-in-reply from the respondents, and should have proceeded to try the petition instead of relegating the appellants to a separate suit.' 17. The above judgment of Gunwant Kaur [(]969) 3 SCC 7691 in century spg. and finds support from another judgment of this court Mfg. Co. Ltd. v. [Jlhasnagar Municipal Council [(1970) I SCC 582J wherein this Court held: (SCC p. 587, para I j) '13. -.. Merely because a question of fact is raised' the High Courtwillnotbejustifiedinrequiringthepartytoseekreliefbythe a civil suit lengthy, dilatory and expensive process by somewhat againstapublicbody.Thequestionsoffactraisedbythepetitionin this case are elementarY.' ' t8. This observation of the court was made while negating a contentionadvancedonbehalfoftherespondentMunicipalitywhich Company therein thar the petition filed by the appellant contended argument of the which apparentlY raised que'stions of fact Court hotding that such High the by accepted was MuniciPalitY in the exercise of the questions of fact cannot be tried disputed Article 226 of the extraordinary j urisdiction under Constitution' But this Court held otherwise' \ \ :l r^'. W.P.No.9604 of2025 19' Therefore, tt is crear from the qbove enunciation of raw that merely because one of the parties to the ritigatton raises a dispute in regard to the facts of the case, the court entertaining such petttion under Article 226 of the constitution ts not always bound to reregate the pc'rttes to a suit. In the above case ofGunwant Kaur t0g6g) 3 scc 769J this court even went to the extent of hording petitton, f the facts require, even orar evidence can be taken. This clearly shows that in an appropriate juriscliction to entertain a writ of for entertaintng a writ petitton even if the same arises out of a contractual obligation and/or involves some t. "26' After hordtng (ABI, Internattonal Ltd. case, the writ court has the petition invorving disputed questions fact cmd there is no absorute bar dispt te d q ue s t ions offac that in a writ so, this court has concruded case te004) _? SCC 553J 53) "53' From the above, of th'e stote octs contrary as under: , SCC p. 5g0, para it is crear that when an instrumenturity rc public good and public interest, unfairly, unjustry and unreasonably, in its contractuar, constitutionar or stotittory obrigations, it reary acts contrary b the constitutionar gua'antee found in Arficle r 4 0f the Constitution. Thus tf we appry the above principre oJ'appricabitity of Articre r4 b thefacts o1f this case, then we notice that the first respondent being an irnr)*"rrrr,,* State and o monopoly contputsion to cover motrcy as premium that the terms of by iB export ,,,r ;;:;:;:'i|r;:::ettants the risk of the apperants seeking all required of the body had n be t ce covering was issued by the information and exceeding Rs. t6 the policy do not /irst respondent after ,tr; ;:;::::7":;rI giv< ':;,:::;:::;:;:e/irs,resp.nden;;]::;:;;':::;;: when the defautt \4. under the poticy ;';':::::::',resp,ondent 'red qnd arose thereaffer when the i ) W.P.No.9604 of2025 Kazalrhstan Government faited to fulfil tts guarantee. There is no allegation that the contracts in question were obtained either byfraud or by misrepresentatio-n. In such factual situation, we are of the opinion, the facts of this case do not and should not inhibit the High Court or this court from granttng the relief sought for by the petitioner. " "27. In a recent decision in Karnatalra state Forest Industries corpn.v. Indian Rocl<s tQ009) I SCC t50l , while considering the similar issue, S.B. Sinha, J. speaking for the Bench reiterated thus: (SCC pp. 166-67, Paras 38-39) ,,38. Although ordinarily a superior court tn exercise of its writ jurisdiction would not enforce the terms of a contract qua contract, it is trite thaf when an action of the State is arbitrary or discriminatory and, thus, violative of Article l4 of the Constitution of India, a writ petition would be maintainable. (See ABL International Ltd. v. Export Credit Guarantee corpn. of India Ltd. [(2004) 3 scc 5s3l ) 39. There cannot be any doubt whatsoever that a writ of mandamus can be issued only when there exists a legal right in the writ petition and a coruesponding tegal duty on the part of the State, but then ,f any action on the part of the State is wholly unfair or arbitrary, the superior courts are not powerless'" ,,28. a It is clear that (a) in the contract if there is a clause for arbitration, normally, a writ court should not invoke its jurisdiction; (b) the existence of effective alternative remedy provided in the contract itself is a good ground to decline to exercise its extraordinary jurisdiction under Article 226; and (c) f the instrumentality of the state acts conffary to the public good, public interest, unfairly, unjustly, unreasonably discriminatory and violative of Article 14 of the Constitution of Indta in its contractual or statutory obligation, \? .n-.'--.-r"-'-'....-'\*-. i rl-/ & W.P.No.9604 of2025 4t writ petttionwould be maintainable. However, a legal right must extst and cc,rrespondtng legal duty on the part of the State and rf any action on the part of the State is wholly unfair or arbitrary, writ courts can exerci,se their power. ln the light of the legal position, writ petition is maintuinable even in contractual matters, in the circumstances mentictned in the earlier paragraphs." 20. The decision relied upon by the leamed Senior Counsel for respondent No.4 about the non-maintainability of the writ petition is the case of Asif Hameed & Ors. Vs. State of Jammu and Kashmir (4 supra). The relevant paragraphs therein are reproduced as under: " 17. Before adverting to the controversy directly involved in these ,zppeals we may have a fresh look on the inter se functioning of the th,"ee organs of democracy under our Constitution. Although the doctrine of separation of powers has not been recognised under the Constitution in its absolute rigidity but the Constitution makers have metiailously definecl the functions of various organs of the State. legisluture, executive and judiciary hove to function within their own spheres demarcated under the Constitution.-No organ can usurp the functions msigned to another. The Constitution trusts to the judgment of these organs to function and exercise their discretion by strictly follov'ing the procedure prescribed therein. The functioning of democracy depends upon the strength and independence of each of its organs. legislature and executive, the two facets of people's will, they have oll the powers including that offinance. Judiciary has no power over sword or the purse nonetheless it has power to ensure that the aforesaid two main organs of State function withtn the constitutional limits. It is the sentinel of democracy. Judicial review is a powerful \ l ( a W.P.No.9604 of2025 weapon to restrain unconstitutional exercise of power by the legislature and executive. The expanding horizon of judicial review has talren in its fold the concept of soctal and economic justice. While exercise of powers by the legislature and executive is subject to judicial restraint, the only check on our own exercise of power is the s e lf- i mp o s e d d i s c ip I i ne ofj ud i c ia I r e s tr o tnt. 18... ..... 19. When a State action is challenged, thefunction of the court is to examine the action in accordance with law and to determine whether the legisla.ture or the executive has acted within the powers and functions assigned under thte Constitution and if not, the court must strike down the action. While doing so the court must remain wtthin its self-imposed limits. The court sits in judgment on the action of a coordinate branch of the Government. While exercising power of judicial revtew of administrative action, the court is not an Appellate Authority. The Constitution does not permit the court to direct or advise the executive in matters of policy or to sermonize qua any matter which under the Constitution lies within the sphere of legislature or executive, provided these authorities do not transgress their constituttonal limtts or statutory pouters. " 21. hfter going through the above decisions, this Court is of the opinion that the decisions relied upon by the learned Senior Counsel for respondent No.4 is distinguishable on facts and that the issue before this Court is squarely covered by the decisions relied upon by the learned Senior Counsel for the petitioner and therefore, this writ petition is maintainable. After upholding the maintainability of this writ petition, \ \ & W.P.No.9604 of2025 this Court is required to see whether the action of the respondents is in accordance 'rith the contractual agreement between the parties. 22. Coming to the merits of the case, it is noticed that the reasons givr:n by the respondent No.l and 2 for cancellation of the atlotted fact(1ry zone area are the poor performance and not setting up of the processing mill in the factory zone. The petitioner was allotted land in NalgondzL, and Suryapet and the petitioner has achieved the target in Nalgonda, but there is a shortfall in reaching the target in Suryapet District only. However, from the targets and achievements under oil palm area oxpansion programme and the performance of respondent No.4 in other Districts which have been carved out from Nalgonda, i.e., Yadadri-Bhongir is concerned, it is around 16.33% as against L6.38Yo of the petitioner, but overall performance seems to be 67.89Yo, whereas the overall perf,crmince of the petitioner is only 29.57Yo and the petitioner's percentage comes down due to poor perforrnance in Suryapet. It is the duty of the 'Government to evaluate as to whether the petitioner has been able to perform in the prevailing geographical conditions and the petitioner has explained the reasons for poor performance in Suryapet District. It is not denied by the petitioner also that its performance is \ below the target and in such circumstances, the State is within its .-Z'-'*'"'"-" t W.P.No.9604 of 2025 powers to take a decision whether to continue to retain Suryapet under the petitioner or to allot it to some other company. The second reason for cancellation of the allotment is that 23. the petitioner has not set up the processing unit in the Districts of Nalgonda and Suryapet. The petitioner has taken the ground that time is not the essence of the contract and hence cancelling of the allotment of area in Suryapet for not setting up of processing unit cannot be a valid ground. 24. The decisions relied upon by the petitioner on the issue of time being the essence of contract based on conduct of parties and clauses of the contract are as under: (l)I\rUs. Hind Construction Contractors by its Sole Proprietor Bhikamchand Mulchand Jain (pead) by Lrs. Vs. State of Maharashtrae (2) Welspun Specialty Solutions Limited Vs. Oil and Natural Gas ,t Corporation Limitedlo (3)Arosan Enterprises Ltd. Vs. Union of India and anotherrl n (tstg)2scc7o to 1zozz12scc382 " lteely 9 scc 449 b\ .tx W.P.No.9604 of2025 25. The relevant paragraphs in the case of IWs. Hind Construction Contractors by its Sole Proprietor Bhikamchand Mulchand Jain (Dead) by Lrs. Vs. State of Maharashtra (9 supra) are reproduced as under: "7. The first question that arises for our constderation, therelore, is whether time was of the essence of the contract that was execured between the parties on July 12, 1955 (Ex 3Q It cannot be dispuled that question whether or not time was of the essence of the contract would essentially be a question of the intention of the parties to be gathered from the terms of the contract. The contract in the instant case is for the constructton of an aqueduct across the Alandi River at Mile 2 of the Nasik Left Bank Canal and unquestionably 12 months' period commencingfrom the date of the commencement of the work had been specified within which the construction had to be completed by the appellant-plaintiff, Indisputably, in the work order dated July 2, 1955 the Executtve Engineer had directed the appellant- plaintiff to commence the work by July 5, 1955 intimating in clear terms that the stipulated date for starting the.work would be reckoned from.Iuly 5, ;,955. Both the trtal court as well as the High Court have found that mentioning of July 5, 1955 as the date for starting the work was not nomtnal but was real date tntended to be acted upon by the parties. It is, therefore, clear that 12 months'period mentionedfor the compietion of the work was to expire on July 4, 1956. The question is whether this period of 12 months so specified in the contract was of the essence of the contract or not? On the one hand, counsel for the appel,lant-plaintiff contended that the contract being onalogous to a building controct the period of l2 months would not ordtnarily be of the es,rence of the contract os the subject-matter thereof was not such I a ,n W.P.No.9604 of 2025 as to mokp completion to ttme essential, that an agreement to complete it within reasonable time would be implied and that reasonable time for completion would be allowed. on the other hand, counsel for the respondent-defendant contended that time had been expressly made of the essence of the contract and tn that behalf reliance was placed upon clause (2) of the "Conditions of Contract" where not only time was stated to be of the essence of the contract on the part of the contractor but even for completion of proportionate worlrs specified pertods had been spectfied and, therefore, the appellant-plaintiffs failure to complete the work withtn the stipulated period entitled the respondent-defendant to rescind it. In the latest 4th Edn. of Halsbury,', Low of England in regard to building and engineering contracts the statement of law is to be found in Vol. 4, para I179, which runs thus: "ll79. Where time is of the essence of the contract.-The expression time is of the essence means that a breach of the condition as to the time for performance will entitle the innocent party to constder the breach as a repudiation of the contract. Exceptionally, the completion of the work by a specified date may be a condition precedent to the contractor's right to claim p6yment. The parties may expressly. provide that time is of the essence of the contract and where there is power to determine the contract on a failure to complete by the speciJted date, the stipulation as to time will be fundamental. Other provisions of the $ controct may, on the construction of the contract, exclude an that the completion of the works by a particular date is lnference fundamcntal: time is not of the essence where a sum is payable for each week that the work remains incomplete after the date frxed, nor where the parties contemplate a postponement of completion. \ \ :i it W.P.No.9604 of2025 Wheretimehasnotbeenmadeoftheessenceofthe contract or, by reason of waiver' applicable, the ernployer may the time Jixed has ceased to be by notice fix a reasonable time for dismiss the contractor on the completion of the work and date so ftxed"' failrre to complete by the 8. It will be clear from the aforesaid a (EmPhasis suPPlied) statement of law that even where'|hepartieshaveexpresslyprovtdedthattimeisoftheessence ofthec:ontractsuchastipulationwillhavetobereadalongwithother such other provisions may' on provisions of the c:ontract and constrilctionofthectlntract,excludetheinferencethatthecompletion was intended to be fundamental; for of the work by a particular date to include clauses providtng for instan:e, i.l' the contrad were or of contingencies or for payment fine extension of time in certain penalryfor every dalt or week the work undertaken remains unfinished onthtlexpiryofthetimeprovidedinthecontractsuchclauseswould beconstruedasrenderinginffictivetheexpressprovisionrelatingto thettmebeingoftheessenceofcontract.Theemphasisedportionof is based on Lamprell v' Billericay the ctforesaid statement of law Webbv' Hughes t0570) LR l0 Eq Uniott t(184g) 3 Exch 283' 3081' I KB 616 : 28ll andCharles Rickards Ltd' v'Oppenheimt!g50) in light of the aforesaid position in (1950) t All ER 420 (CA)J ' It is lawthatwewillhavetoconsidertheseveralclausesofthecontract Ext.34inthecase.Thematerialclausesinthisbehalfareclauses2 and 6 of the "Conclitions of Contract" which run as follows: Clause 2'-The time allowed for carrying out the work as enteredinthelendershnllbestrictlyobservedbythecontractor the date on which the order to and shall be reckoned from to the contractor' The work shall commence work is given of the contract be proceeded throughout the stipulated period \ i \ a W.P.No.9604 of 2025 wtth, with all due dtligence (time being deemed to be of the essence of the contract on the part of the contractor) and the contractor shall pay as compensation an amount equal to one per cent or such smaller amount as the Superintending Engineer (whose decision in wr:iting shall be final) may decide, of the amount of the estimated cost of the whole work as shown by the tender for every day that the work remains unro**"rced, or un/intshed, after the proper dates. And further to ensure good progress during the execution of the work, the contractor shalt be bound in all cases in which the time allowed for any work exceeds one month, to complete l/4 of the work in l/4 of the time l/2-do-l/2-do3/4- do - 3/4- do- Clause 6.--7lf the contractor shall desire an extension of the time for completion of the work on the ground of his havtng been unavoidably hindered in its executton or on any other ground, he shall apply in writing to the Executive Engineer before the expiry of the period stipulated in the tender or before expiry of 30 days from the date on which he 'was hindered as aforesaid or on which the cause for askingfor extenston occurred, whichever is earlier, and the Executive Engineer, may tf tn his opinion there are reosonable grounds for gronting an extension, grant such extension as he thinks necessary or proper- The decision of the Executtve Engineer in thts matter shall be final. Two aspects emerge very clearly from the aforesaid two clauses. In the first place under clause 6 power was conferred upon the Executive Engineer to grant extension of time for completion of the work on reasonable grounds on an application betng made by the contractor ..t W.P.No.9604 of2025 (appellant-plaintffi in that behalf; in other words, in certain contingencies parties had contemplated that extension of time would be a'nilable to the: contractor. Such a provision would clearly be incorl.sistent with parties intending to treat the stipulated period of l2 months in clause 2 as fundamental. Similarly, in clause 2 itself provision was made: for levying and recovering penalty/compensation the appellant-plaintiff at specified rates during the period the from work shall remain unfinished after the exptry of the fard date. Such provision also excludes the inference that time (12 months period) was tntended fo be o/'the essence oJ-the contract. Further with regard to th"- provision that 'is to be found in clause 2 whereunder a time schedule for proportionate work had been set out (namely l/4 of the work in l/4 of the time, l/4 of the work in l/4 of the time and 3/4 of the work in 3/4 of the time), the evidence of the Superintending Engi,teer, Pondit (DW 1) is very eloquent. Inpara I j of his deposition this is what he has stated: In the agreement (Ex. 34) the rate' of work is based on the valuatton. one fourth ttme mentioned means one fourth in 12 months. The suit contract is for Rs 1,07,000' One fourth v,ork means the work of about Rs 27,000 It is not possible to do the work of Rs 27,000 in one foirth time as the days were rainy. This'wqs not reasonable. The .uitness in paru I2 of his deposition has also given the following admission: It is not specifically mentioned in the agreement (Ex' 34), that the suit work was urgent and that it was to be completed within l2 months. In this agreement (Ex. 34) there are the clauses of imposing a penalty and extension of time. g. Having regard to the aforesaid material on record, particularly the clauses in the agreement pertaintng to imposition of \ I W.P.No.9604 of2025 penalty and extension of time it seems to us clear that time (12 months period) was never intended by the parties to be of the essence of the contract. Further .from the correspondence on the record, particularly, the letter (Ex. 78) by which the contract was rescinded it does appear that the stipulation of 12 montlu' period was waived, the contractor having been allowed to do some more work after the expiry of the period, albeit at his risk, by making the rescission effective from August 16, 1956. 10. Once either of the aforesatd conclusions is reached it would be dfficult to accept the High Court's finding that the rescission of the contract on the part of the respondent-defendant was proper and justtfied on the basis that the same was neither shown to be mala fide nor unreasonable. It must be observed that it was never the case of the appellant-plaintiff that the rescission of the contract on the part of the respondent-defendant was mala fide. Counsel for the appellant-plaintifffurther pointed out and, in our view, rightly that the five or stx factors, namely, (1) the contract having been given at the threshold of monsoon, the period of monsoon (4 months) ought not to have been reclaned, (2) absence of proper road and approach to the work site during the rainy season and a.couple of months thereafter (3) unreasonable rejectton by the government fficers of materiol brought on the site, which material was later on allowed to be used, t @) dfficulty in procuring labour due to malarious climate at the site, (5) delay in issuing quarry permit, and (6) extra time taken for doing extra work that was entrusted ought to have been tal<en into account - were put forward by the appellant-plaintiff merely for the purpose of showing that the refusal to extend the time by the Superintending Engineer although recommended by the SDO and Executive Engineer was unreasonable and not for showing that the rescission of the contract was unre(Nonable. or unjustified. In our view, the question u,ould not be whether the rescission of the contract was unreosonable a \ /a' \ ". ..-r W.P.No.9604 of2025 and, rherefore, unjustified but whether the rescission of the contract tn the circumstances of the case was wrongful and illegal. If time was not o.f the essence of the contract or if the stipulation as to the time fixed for completion had, by reason of waiver, ceased to be applicable then ihe only course open to the respondent-defendant was to fix some time making it the essence and d within the time so fixed the appet'lant-plaintiff had failed io complete the work the respondentdefendant could hove rescinded the contract. The High Court has taken the view that the contract was rightly rescinded by the respondent-defendant because by about July 21, 1956 (vide letter Ext. 74) the appellant-plaintiff had done work of the value of Rs 35,000 as again'st the tender value of Rs 1,07,000, that is to say, only one-third of the total work had been completed and, therefore, even though time was not of the essence of the contract, the appellant-plaintiff, tn the circu,nstances, could not have completed the work even within the next three months. In our view, this approach adopted by the respondent-defendant and upheld by the High Court is not correct. Long before the expiry of the period of 12 months the appellantplaintiff had by his letter dated June 6, 1956 (Ex. 68) requested for exten.sion of period of completion up to the end of December, 1956; this request was repeated by another letter'dated June 23, 1956 (Ex. 69). )Vaybe the rea.sons or grounds on which the request was made may not have appealed to the Superintending Engineer but some reasonable time making it the essence sought to have been granted. In this behalf it may be stated thot the SDO by his letter (Ex. 69) had recontmended extension up to December 1956 as sought while by his letter dated June 23, 1956 (Ex. 70) addressed to the Superintending Engin'eer, the Executive Engineer had recommended that extension of time up to october 30, 1956 may be granted to the appellant-plaintiff with clear intimation that if he foiled to complete the work by then, ihe maxinnum penalty allowable under clause 2, namely, 10% of the \E Eap ,9!-t, (^) W.P.No.9604 of 2025 of the work will be inJlicted on htm, but the recommendation did not receive approval of the Supertntending Engineer. It oppears that the appellant-plaintiff had an intervtew with the Superintending Engineer on August 24, 1956 when a written representation (Ex. 99) was handed over and the whole position was sought to be explained to the Superintending Engineer but within three days of the interview by the letter dated August 27, 1956 (Ex. 78), the contract was rescinded and the futt security deposit was forfeited to Government. It will thus appear clear that though time was not of the essence of the contract, the respondent-defendant did not fix any further period making time the essence directing the appellant-plaintiff to complete the work within such period; instead it rescinded the contract straightaway by letter dated August 27, 1956. Such rescission on the part of the respondent-defendant was clearly illegal and wronglful and thereby lhe respondent-defendant commttted a breach of contract, with the result that there could be no forfeiture of the security deposit. In our view, therefore, the trial court wos right in comtng to the conclusion that the appellant-plaintiff was entitled to a refund of their full security deposit of Rs 4936 as also to Rs 5845 being the balance of their Bill 1253 dated September 20, 1956 for work actually done by them and not paidfor and nominal damages of Rs 120. The appellant- plaintiff was also entttled to interest on the aforesaid sums ond costs of suit as directed by the trial Court." 26. The relevant paragraphs in the case of Welspun Specialty Solutions Limited Vs. Oil and Natural Gas Corporation Limited (10 supra) are reproduced as under: "32. In order to examine whether the delayed execution of contract by the Remi Metals was liablefor compensation, the Tribunal ... --:t W.P.No.9604 of2025 examined whether ttme wos of the essence in the contracL In our consiclered opinion, "time not being the essence of the contract", as determined by the Arbitral Tribunal, was beyond reproach. Reliance on the' contracluol conditions and conduct of parties to conclude that existence of extension clause dilutes time being the essence of the contruct, was in accordance with rules of contractual interpretation. 33. In this context, the award concludes that as time was not the es,sence, liqutdated damages could not be granted, in thefollowing manner: "Since time was not the essence of the contract, the measure of damages specified under clause liquidated damages, which was the essence of the controct, cannot be regarded as appropriate for determining the loss sustained by ONGC. " (emphosis supplied) 34. .... 35, It is now settled that "whether time is of the essence in a contrdct", hos to be culled out from the reading of the entire contract as well as the suruoundtng circumstances. Merely having an explicit clausc may not be sfficient to make time the essence of tle controct. As the. contract was. spread over o long tenure, the intentton of the parties to provide for extensions surely reinforces the fact that timely perfot.mance wqs necessary. The fact that such extensiotns were granted indicates ONGC's effort to uphold the integrity of the contract instead of repudiating the same." 27. The relevant paragraphs in the case of Arosan Enterprises Ltd. Vs. Llnion of tndia and another (11 supra) are reproduced as under: lE \s, (, W.P.No.9604 of2025 "13. These presumptions of the High Court in our view are wholly unwarranted in the contextual facts for the reasons detailed below but before so doing it is to be noted that tn the event the time is the essence of the contract, question of there being any presumption or presumed extension or presumed acceptance of a renewed date would not arise. The extension if there be any, should and ought to be categorical in nature rather than being vague or on the anvil of presumptions. In the event the parties htowingly give a go-by to the stipulation as regards the time - the same may have two several effects: (a) partie.s name o future specific date for delivery, any (b) parties may also agree to the abandonment of the contract - as regards (a) above, there must be a specific date within which delivery has to be effected and in the event there is no such specific date available in the course of conduct of the parties, then and in that event, the courts are not left with any other conclusion b,ut a finding that the parties themselves by their conduct hove given a go-by to the original term of the contract as regards the time being the essence of the contract. Be it recorded that in the event the contract comes within the ambit of Section 55, Contract Act, the remedy is also provided therein. For convenience sake Section 55.reads as below: . "55. l{hen a porty to a contract promises to do a certain thing at or before a specified time, or certain things at a or before specified times, and fails to do any such thing at or before the specified time, the contract, or so much of it as has not been performed, becomes votdable at the option of the promisee, if the intention of the parties was that time should be of the essence of the contract. If it was not the intention of the parties that ttme should \ \ be of the essence of the contract, the contract does not become voidable by the failure to do such thing ot or before the specified time; but the promisee is entitled to compensation ---*z- '" l. !. a. W.P.No.9604 of 2025 from the promtsor for any loss occasioned to htm by such failure. If, in case of a contract voidable on account of the promisor's J-ailure to perform his promise at the time agreed, the promisee accepts performance of such promise at any time other than that agreed, the promisee cannot claim compensationfor any loss occasioned by the non-performance of the promise at the time agreed, unless, at the time of such acceptance, he gives notice to the promisor of his intention to do so. " 14. Incidentally the law is wPll settled on this score on which no further dilation is required in this iudgment to the effect that when the ccntract itself provides for extension of time, the same cannot be termetd to be the essence of the contract and default however, in such a case does not make the contact voidable either. It becomes voidctble provided the matter in issue can be brought withtn the ambit of the first para of Section 55 and it is only in that event that the Government would be entitled to claim damages and not otherwise. 26. If any credence is to be given to. the above-noted passage in Halsbury,s Lqws of England being read with the terms of the contract, we do not find any justification for the Appellate Bench of the )tigh Court to come to a conclusion that in fact time was the essertce of the contract, since the condition precedent had not yet takert place and neither the requirement of appointment of surveyor had been complied with. The contract ought to be reod with the time clause but subject however to certain other conditions. The essential point'is that the seller must be instructed in accordance with the terms of the contract as to the way in which he can perform his duty in terms \ \ of the agreement and ffict delivery upon the goods b,eing put on boarC. In the event the port of discharge is not named - can the -/:.-i. . : -':' W.P.No.9604 of2025 s6 goods be put on board or can the seller be made responsible for his failure to put the goods on board? The answer cannot but be in the negative. In the contextual factq, the goods wqre on the higft seas and to be diverted to the ports of India, shortly, as such nomination of the port, was an essential requirement, in order to makp the seller liable for breach and entitlement of the buyer to claim damages. In this context a passage from Benjomin's Sale of Goods Act (4th Edn.) seems to be rather appropriate. Para 20-040 reads as below: "The essential point ,s that the seller must be instructed, .in accordance with any relevant terms of the contract, as to the way in which he can perform his duty to put the goods on board. If no shipping instructions are given, or if shipping instructions are not given within the time allowed by the contract, the seller is not liable in damages for nondelivery; and the buyer is liable in damages for nonacceptance." . 27. Mere fixation of a period of delivery or a time in regard thereto does not by itself make the time as the essence of the contract, but the agreement shall have to be considered in its enttrety and on proper appreciation of the tntent and purport of the clauses tncorporated therein. The state of facts and the relevant terms of the agreement ought to be noticed in their proper perspective so as to aJ.sess the intent of the parties. The agreement must be read as a whole with corresponding obligations of the parties so as to ascertain the true intent of the parttes. In the instant case, os the port of discharge has not been named neither is the surveyor appointed - without whose certificate, question of any payment would not arise can it still be said that ttme was the essence of the contract? In our view the cannot but be a positive "No". \. \ - -answer W.P.No.9604 of2025 28. However, this Court finds that the above decisions do not come to tire aid of the petitioner. The MoA clearly stipulates that the petitoenr ftas to set up the factory within a period of 24 months after entering into the agreement. Clause (5) and (6) clearly provide the time lines for the said process. Though the learned Senior Counsel for the petitioner submitted that subsequent to issuance of show-cause notices, the petitioner has acquired the land and has executed sale deed on 1Z.O3.ZOZ5 and has also converted the agricultural land into NALA on 17.04.2025, admittedly, the same was not intimated to the Govemment prior to is:;uance of the impugned G.Os. Therefore, the Govemment was within its powers in cancelling the allotment of Suryapet land' As rightly pointed out by the leamed Government Pleader for Cooperation, the petitioner is retaining the factory zorre land of Nalgonda, and by setting up of the unit in the land now purchased, it would not be without any purpose or use. Therefore, this Court does not find any merit in the argument of the learned Senior Counsel for the petitioner that the Governmr:nt is not justified in cancelling the area in Suryapet. 29. \ The further ground raised by the petitioner is that the u$."rn".rr: does not provide for cancellation of the factory zone for nonI I W.P.No.9604 of2025 setting up of the processing unit and that the petitioner is only required to purchase FFBs from farmers. The relevant clauses of the Memorandum of Agreement dated 15.03.2017 are as under: "5) To establish of Oil Palm Processing Units comprising Oil Mill/Refinery/Fractionation (Jnits of s MT/Irr capacity respectively as per the schedule given below. Proposed district for establishing Sl.No. of the 'tn plpcessing.unit I Nalgonda Capacity Year of Ut Commissioning WHour l*r"l*, .** 2018-2019 llndustries f.i*irca a) The allotted Company should deposit an Earnest Money Deposit of Rs.5.00 Lakhs in favour of Commissioner of Horticulture, Govt of Telangana. b) The ollotted Company should establish the processing unit within 24 months after entering into the agreement. The allotted company should bear all the investment at its own cost for purchase of land, sefiing up of processing untt ' obtaining other licences etc. The Department of Horticulture will not provide any loans and subsidies for setting up of processing units. 6) To identify and finalise the stte for locotion of the Processing untt within two years from the date of receipt of final order of allotment zones. 7. 8. 9. ; i \ \ / t W.P.No.9604 of 2025 10... 13) The Occupier of the factory should submit to the Commissioner of Horticulture all the relevant information and doatments called by him from time to time to satisfy himself that the Occupier of thefactory is taking ffictive stepsfor:- (i) Area ExPansion (ii) .Setting uP of NurserY (iiil Setting of Oil Palm Mill (iv) SettinguP of RefinerY Failure to comply with the information, leads to the conclusion that the occupier of the factory is violating the terms and conditions of the MoA maale with the Commissioner of Horticulture, Telanganq and attracts forfeiture of depostt and cancellation of Factory Zone without assigning any reason therefor. t 5) The oc.cupier of the factory zone is responsible for purchase of Fresh Fruit Bunchesfrom the extsting plantations in their factory zone os per thb ratesfixed by the Government of Telanganafrom time to time. In case any occupier of the factory does nol commence processing of oil extraction unit, within the time ltmit, they are supposed to purchase Fresh Fruit Bunches in that factory zone as per the rates fixed by the Government through thetr collection centres and aruange processing l without suffering the farmers produce i.e., loss in weightage of Fresh Fru,tt Bunches. They are responsible for arranging collection centres in , ! their respeclive factory zone and to arrange transportotion of Fresh Fru,,t Bunches from collection centres to nearest processing units at their own costs. " I I q \ (1) {-,i W.P.No.9604 of 2025 A literal reading of the above clauses would show that required to set up proc€ssing unit within a period entering into the agreement and clause 13 the petitioner is of 24 months after only provides that the occupier of the factory zone should submit to the Commissioner of Horticulture all rerevant information also with regard to setting up of oil palm mill and refinery. This crause does have to be submitted but it means that not mean that onry documents the required oil parm milr shourd be set up and thereafter, required information Commissioner of Horticulture. Therefore, this is to be given to the Court is satisfied that the clause 13 of the agreement arso provides for agreement for non-furfilment of conditions (6). Therefore, there is no merit in the 30. cancelration of the specified in clauses (5) and writ petition. The writ Petition is accordingry dismissed. No order as to costs. 3I. Pending miscellaneous petitions, if dfry, in this writ Petition shall stand closed. SD/.P. PONNA KRISHNA ASSISTANT REGISTRAR //TRUE COPY// SECTION OFFICER To, 1. One CC to SRl. M/S TATVA LEGAL HYDERABAD, Advocate [OPUC] 2. Two CCs to Gp FORAGRICULTURE,High Courtforthe Staie of Telangana at Hydererbad . [OUTI 3. One CC to SRI LOHIT.S, STANDING COUNSEL ' IOPUC] 4. Two CD CoPies DAN BS / \ a 'j. : r.. i.-' ' :r41i1 -Y$raIHiii i t HIGH COURT ATED:08/01 12026 t ORDER \ WP.No.9604 of 2025 .\: 'ii . i i'l'a v C) (J 2 2 IAN 202[ .;) I I * DISMISSING THE WRIT PETITION WITHOUTCOSTS t {liiira+x*.Jrt r:}j+-,r;{ .1: t...74r .,. ;ilti5r.l-H,tHua*ii:'ik:r,,1':.",, laA t t't I

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Telangana HC judgments →

Corporate & Commercial advocates near the Telangana High Court

Dealing with a similar matter? Send a free enquiry to advocates who handle it. Fees are agreed with the advocate directly.

All Corporate & Commercial advocates in India