GAHC010280642025
2026:GAU-AS:3528
THE GAUHATI HIGH COURT
(THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM & ARUNACHAL PRADESH)
Review Petition no. 16/2026
In W.P.[C.]/4705/2013
1. M/s Royal Coal Products, Address – Tirap
Gaon, Sail Line, Ledo, Margherita Sub-Division,
P.O.- Ledo, P.S. Margherita, District – Tinsukia,
Assam, Pin – 786182, Represented by its sole
proprietor
Sri
Khitish
Debnath.
2. Sri Khitish Debnath, S/o Sri Sarat Debnath,
R/o
Ledo
Road
Gaon,
P.O.-
Ledo,
P.S.-
Margherita, District – Tinsukia, Assam, Pin –
786182.
……………… Review Petitioners
-Versus1. The State of Assam, Represented by its Chief
Secretary,
Government
of
Assam,
Dispur,
Guwahati - 6, Assam.
2. The Deputy Commissioner, Tinsukia, District
Tinsukia, PIN - 786125.
Page No. 2/19
3. The Sub-Divisional Officer, Civil, Margherita
Sub-Division, Margherita, District - Tinsukia,
Assam, Pin - 786181.
4. The Circle Officer, Margherita Revenue Circle,
Margherita, District - Tinsukia, Assam, Pin 786181.
5. The Circle Inspector, Digboi Sub-Division,
Margherita, District - Tinsukia, Assam, Pin786171.
6. The Officer In-Charge, Margherita Police
Station, P.O.- Margherita, Margherita, District Tinsukia, Assam, Pin-786181.
7. The Officer In-Charge, Ledo Out Post,
Margherita Police Station, Margherita, District Tinsukia, PIN - 786182.
8.
The
General
Manager,
North
Eastern
Coalfields, Coal India Limited, Margherita, District
- Tinsukia, Pin - 786181.
9. The Manager, North Eastern Coalfields, Coal
India Limited, Margherita, District - Tinsukia, Pin
- 786181.
10. The Manager, Ledo Open Casting Production,
North Eastern Coalfields, Coal India Limited,
Margherita, District - Tinsukia, Pin - 786182.
11. The Manager Personnel, Coal India Limited,
Tirap Colliery Agent Office, P.O. Ledo, District –
Tinsukia, Pin - 786182.
12. The Mining Officer, North Eastern Coalfields,
Coal
India
Limited,
Tinsukia, Pin - 786182.
Margherita,
District
–
Page No. 3/19
13. The General Manager, District Industries and
Commerce Center, Tinsukia, Government of
Assam, District – Tinsukia, Pin – 786125.
14. The Regional Executive Engineer, Pollution
Control
Board,
Assam,
Regional
Office,
Dibrugarh, District - Dibrugarh, Assam, Pin 786003.
……………….Respondents
Advocates :
Review Petitioners
: Mr. A.K. Choudhury, Advocate
Respondent nos. 1 – 7
: Ms. U. Das, Additional Senior Government
Advocate, Assam.
Date on which judgment is reserved
: NA
Date of pronouncement of Judgment
: 09.03.2026
Whether the pronouncement is of the operative part of the judgment ? : No
Whether the full judgment has been pronounced ? : Yes
BEFORE
HON’BLE MR. JUSTICE MANISH CHOUDHURY
JUDGMENT
This review petition under Section 114 read with Order XLVII, Rule 1,
Code of Civil Procedure, 1908 [‘CPC’ or ‘the Code’, for short] is
preferred seeking review of a Judgment and Order dated 13.11.2025
passed in a writ petition, W.P.[C] no. 4705/2013.
Page No. 4/19
2.
The petitioners had instituted the writ petition, W.P.[C] no. 4705/2013
under Article 226 of the Constitution of India seeking inter alia a
direction to declare that the demolition exercise carried out in the
business premises of the petitioner/review petitioner no. 1 firm was
illegal and unauthorized. The petitioners had also sought for a direction
to the respondent authorities to pay adequate compensation to the
petitioners to the extent of Rupees Two Crores for the alleged arbitrary
and unauthorized action of the respondent authorities towards
demolition of the petitioner/review petitioner no. 1 firm’s business
premises. A direction was also sought for to register a case against the
respondents, named as accused, in a First Information Report [FIR]
lodged by the petitioner/review petitioner no. 2 before the respondent
no. 7.
3.
After consideration of the submissions of the learned counsel for the
parties and upon going through the materials brought on record by the
parties through their pleadings, the writ petition was disposed of by the
Judgment and Order dated 13.11.2025.
4.
In the Judgment and Order dated 13.11.2025, a finding was recorded
to the effect that the act of demolition of the coke manufacturing unit
installed at the subject-plot, carried out on 26.07.2013, was without
following due procedure and was in violation of the principle of natural
justice as no prior opportunity was afforded to the petitioners prior to
26.07.2013. It has been further recorded that the liability, however,
cannot be affixed specifically on any of the respondent authorities in
the District Administration, Tinsukia and M/s Coal India Limited,
arraigned as party-respondents in the writ petition, as those
respondents had taken stands which were at variance to each other,
Page No. 5/19
shifting the liability of demolition from them. It was further observed
that no direction could be made for making payment of any amount as
losses suffered by the petitioners, for the reasons recorded. In the
Judgment and Order dated 13.11.2025, it was observed that from the
materials on record, it had emerged that on 26.07.2013, no exercise for
eviction of the petitioners from the subject-plot was carried out.
5.
The subject-plot is a plot of land measuring 2 Bighas 1 Katha 4 Lessas,
covered by Dag no. 160 & Periodic Patta no. 2 [new], situate at Village
– Ledo Tikok, No. 2 NLR, Mouza – Makum, Sub-Division – Margherita,
District – Tinsukia, Assam. The petitioners had claimed that a coke
manufacturing unit was installed on the subject-plot by the petitioners
and a demolition drive carried out on 26.07.2013 by the respondent
authorities in M/s Coal India Limited with the assistance of the
respondent authorities in the District Administration, Tinsukia.
6.
In the present review petition, the review petitioners have stated that
the petitioners’ business premises situated within the subject-plot was
unauthorizedly demolished by the respondent nos. 8, 9, 10, 11 & 13,
who are authorities in M/s Coal India Limited. It has been asserted that
on 09.07.2013, a Meeting was held at Dehing Guests House, Margherita
and the said Meeting was presided over by the Minister of Power,
Industries and Commerce, Assam. In that Meeting, it was proposed and
decided to carry out the demolition exercise by the respondent
authorities in M/s Coal India Limited. After a request of the respondent
no. 8, the respondent no. 2 vide an Office Order dated 18.07.2013
informed the respondent no. 8 about detailment of an Executive
Magistrate, Margherita for law and order duty during the proposed
demolition exercise. It is further stated that the demolition exercise was
carried out as per an Office Order dated 23.07.2013 of the respondent
Page No. 6/19
no. 2 and accordingly, Police personnel assisted to maintain law and
order and to provide security. The review petitioners have further
asserted that the Management of M/s Coal India Limited provided the
machineries required during the process of demolition and their
personnels were present on 26.07.2013 to ensure safe and proper
functioning of the machineries and the operators so deployed.
7.
With the above projections, the review petitioners have stated that the
afore-stated documents and the events had clearly amplified the
objectives sought to be achieved and it was evident that those
communications were exchanged prior to undertaking the demolition
exercise on 26.07.2013 in the premises of the petitioners at the
subject-plot. The review petitioners have stated that it was an admitted
fact that the demolition was carried out on 26.07.2013.
8.
In the present review petition, the review petitioners have canvassed
that in view of such admitted fact situation, there could not have been
a different conclusion of the events preceding and occurring on
26.07.2013, as observed in the Judgment and Order dated 13.11.2025,
to the effect that the liability could not be affixed specifically on any of
the respondent authorities in the District Administration, Tinsukia and
M/s Coal India Limited. Rather, the liability could be affixed based on
the facts and circumstances emerged from the materials on record.
9.
In this review petition, the review petitioners have specifically referred
to the Meeting held on 09.07.2013 and two Office Orders, dated
18.07.2013 & dated 23.07.2013, issued subsequent to the Meeting and
prior to the demolition exercise which was carried out on 26.07.2013.
By making reference to them, the review petitioners have sought recall
of the Judgment and Order dated 13.11.2025 by asserting that from
Page No. 7/19
such materials on record, a finding can be conclusively arrived at to the
effect that the demolition exercise was initiated and carried out by the
authorities of M/s Coal India Limited to oust the petitioners from the
subject-plot belonging to M/s Coal India Limited.
10.
In order to appreciate such grounds advanced by the review petitioners
seeking review, a revisit at the Judgment and Order dated 13.11.2025
is ineluctable to find out whether during the course of deliberation the
Court had taken note of the Meeting held on 09.07.2013 and the Office
Orders dated 18.07.2013 & dated 23.07.2013 and the events
associated with them or not.
11.
Upon perusal of the Judgment and Order dated 13.11.2025, it is
noticed that during the course of deliberation, the same were taken into
consideration in the following manner :-
21.
In the affidavits-in-opposition filed by the respondent no.
2 and the respondent no. 3 respectively, it is stated that a
Letter detailing one Magistrate was issued to the respondent
no. 8 in response to his request for providing the service of a
Magistrate during demolition operation contemplated by the
NEC, CIL in the leasehold area of Tirap Colliery, NEC,
Margherita. The respondent no. 2 by an Office Order dated
18.07.2013 detailed an Executive Magistrate, Margherita for
maintaining law and order during the time of demolition
exercise of two coke manufacturing units including the one
belonging to the petitioners, on 26.07.2013. On the basis of the
Order dated 18.07.2013 of the respondent no. 2, the
respondent no. 3 issued an Office Order dated 23.07.2013
Page No. 8/19
detailing the same Executive Magistrate, Margherita to
maintain law and order during the time of operation on
26.07.2013 and also requested the Sub-Divisional Police
Officer [SDPO], Margherita for deployment of adequate force.
It is averred that the demolition was proposed and carried out
by the NEC, CIL authorities as decided in a Meeting presided
over by the Hon’ble Minister of Power, Industries & Commerce,
Assam on 09.07.2013. It has been averred that the Magistrate
was detailed from Civil Administration only for maintaining law
and order during the time of demolition of coke manufacturing
units.
22.
In the affidavit-in-opposition filed by the respondent nos.
8–12, it is asserted that the subject-plot belongs to the
respondent M/s Coal India Limited authorities as per the
provisions of the Act, 1973. It is averred that as the subject-plot
was in unauthorised occupation of the petitioner no. 2 and he
had constructed a coke manufacturing unit on it, an FIR was
lodged at Ledo Out Post on 22.05.2012. Subsequently on
26.09.2012, a Legal Notice was also issued to the petitioner
no. 2 to vacate the subject-plot and the said legal notice was
duly received by the petitioner no. 2 on 01.10.2012. The copies
of the FIR dated 22.05.2012, the Legal Notice dated
26.09.2012 and the Acknowledgement Card have been
annexed to the affidavit-in-opposition as Annexure - E1, E2 and
E3 respectively. But the petitioner no. 2 did not show any
intention
to
vacate
the
illegal/unauthorized occupation.
subject-plot
despite
his
Page No. 9/19
23.
The respondent nos. 8–12 have taken a stand in the
affidavit-in-opposition that a Meeting was held on 09.07.2013
at
Margherita
between
the
officials
of
the
District
Administration, District Police and other departments of the
State Government with the officials of the respondent M/s Coal
India Limited. In the Meeting, which was presided over by the
Hon’ble Minister of Power, Industries & Commerce, Assam, a
decision was arrived at to demolish two coke manufacturing
units operating from leasehold areas exclusively belonging to
the respondent M/s Coal India Limited. A stand has been taken
that pursuant to the decision taken in the Meeting dated
09.07.2013, the Management of M/s Coal India Limited
provided the machineries required during the process of
demolition and its personnel were present there to ensure safe
and proper functioning of the machineries and the operators of
the machineries so deployed. The respondent nos. 8–12 have,
thus, denied that the demolition of the coke manufacturing unit
was carried out by them.
24.
A copy of the Judgment delivered by the Court of
learned Judicial Magistrate, First Class, Margherita on
08.10.2018 in G.R. Case no. 555 of 2013 has been placed
before the Court. From the Judgment dated 08.10.2018, it is
noticed that G.R. Case no. 555 of 2013 arose out of the FIR,
lodged by the petitioner no. 2, registered as Margherita Police
Station Case no. 181 of 2013. After completing investigation
into the case, Margherita Police Station Case no. 181 of 2013,
the Investigating Officer [I.O.] of the case submitted a chargesheet against four nos. of accused persons, who were officials
Page No. 10/19
of M/s Coal India Limited, finding a prima facie case of
committing the offences under Section 447 and Section 427 of
the IPC read with Section 34, IPC. After hearing the parties,
the Trial Court framed charges under Section 447, Section 427
and Section 384 of the IPC against the accused persons.
During the trial, the prosecution side examined seven nos. of
prosecution witnesses. Before the Trial Court, points arose for
determination inter-alia were : [i] whether the accused persons
on 26.07.2013 at about 08-30 a.m. criminally trespassed into
the campus of the informant with intent to commit an offence?;
[ii] whether the accused persons on the same date, time and
place committed mischief by destroying the factory of the
informant? After evaluation of the materials/evidence on
record, the Trial Court reached a view in the Judgment dated
08.10.2018 that the prosecution side failed to prove the guilt of
the accused persons beyond all reasonable doubt. Answering
the points in negative, the accused persons were acquitted
from the charges. On a query made by this Court, the learned
counsel for the parties have submitted that no appeal has been
preferred against the Judgment dated 08.10.2018, meaning
thereby, the Judgment dated 08.10.2018 resulting in acquittal
of the accused persons had attained finality. Such subsequent
events can be definitely looked at to advance the cause, more
so, when such events have a bearing on the nature of the
relief, as originally sought for.
25.
In the affidavits-in-opposition of the respondent
authorities in the Tinsukia District Administration and of the
respondent authorities in M/s Coal India Limited, it has been
Page No. 11/19
admitted that on 26.07.2013, demolition of the coke
manufacturing unit installed on the subject-plot was carried
out. However, the respondent authorities in the Tinsukia
District Administration and the respondent authorities in M/s
Coal India Limited in their respective affidavit-in-opposition
have made denial of their involvement in the demolition by
attributing the act on each other. As the officials of the
respondent M/s Coal India Limited authorities were already
acquitted by the Trial Court vide the Judgment dated
08.10.2018 and the Judgment having attained finality, it is
difficult to affix the liability to any of these respondents for the
act of demolition of the coke manufacturing unit on 26.07.2013
in the present writ proceedings where the adjudication is made
only on the basis of the pleadings of the parties.
35.
In so far as the direction to register a case against the
respondents, named as accused, in the First Information
Report [FIR] lodged by the petitioner no. 2 is concerned, it is
already found from the discussion made above that the FIR
was registered as Margherita Police Station Case no.
181/2013 and the same resulted in a charge-sheet against a
nos. of officials of M/s Coal India Limited. The charge-sheeted
accused persons faced the trial and the Trial Court had
acquitted them from the charges vide its Judgment dated
08.10.2018. The relief so sought for by the petitioner has,
therefore, become obsolete.
36.
Summing up, it has emerged from the discussion that
the act of demolition of the coke manufacturing unit installed at
Page No. 12/19
the subject-plot, carried out on 26.07.2013, was without
following due procedure and was in violation of the principle of
natural justice as no prior opportunity was afforded to the
petitioners prior to 26.07.2013. But the liability cannot be
affixed specifically on any of the respondent authorities in the
Tinsukia District Administration and M/s Coal India Limited in
the instant writ proceedings, as these respondents have taken
stands which are at variance to each other, shifting the liability
of demolition from them. No direction can be made for making
payment of any amount as losses suffered by the petitioners,
for the reasons recorded. It has also emerged that on
26.07.2013, no exercise for eviction of the petitioners from the
subject-plot was carried out. The petitioners have themselves
admitted that as on date, they are operating the coke
manufacturing unit from the subject-plot.
37.
Resultantly, the writ petition is disposed of with the
observation that the petitioners can only be evicted from the
subject-plot only after following due procedure and in
compliance of the principles of natural justice, that is, by
affording a prior and reasonable opportunity of being heard.
There shall, however, be no order as to cost.
12.
Mr. A.K. Choudhury, learned counsel appearing for the review
petitioners has submitted that the findings recorded in the Judgment
and Order dated 13.11.2025 could not have been reached in the
manner it had been reached. There were ample materials on record to
draw a conclusion different from the conclusion drawn by the court that
no liability could be affixed specifically on any of the respondent
Page No. 13/19
authorities in the District Administration, Tinsukia and M/s Coal India
Limited for the act of demolition. Absolving the respondent authorities
in the District Administration, Tinsukia and M/s Coal India Limited is in
conflict with the pleaded stand of the respondent authorities and thus
situated, the Judgment and Order dated 13.11.2025 is liable to be
reviewed and recalled in the interest of justice.
13.
Ms. U. Das, learned Additional Senior Government Advocate, Assam
appearing for the State respondents has, on the other hand, contended
that the petitioners have failed to create any ground for review. The
grounds on which review is sought for do not come within the scope
and ambit of review jurisdiction. By pointing to the grounds urged in
the review petition, it is contended that the petitioners are trying to
reagitate the grounds which were urged earlier during the writ
proceedings, by merely rephrasing them. It is submitted that the review
petitioners have thereby, tried to do a rehearing. It is contended that
the issues which were already heard and decided during the writ
proceedings, cannot be reagitated again in the name of seeking review.
14.
The learned counsel for the parties have referred to the decisions in
Shivdev Singh & others vs. State of Punjab & others, AIR 1963
SC 1909; Meera Bhanja [Smt] vs. Nirmala Kumari Choudhury
[Smt], [1995] 1 SCC 170; and S. Madhusudhan Reddy vs. V.
Narayana Reddy and others, [2022] 11 SCR 42.
15.
It has been observed in Shivdev Singh [supra] that there is nothing in
Article 226 of the Constitution to preclude a High Court from exercising
the power of review which inheres in every court of plenary jurisdiction
to prevent miscarriage of justice or to correct grave and palpable errors
committed by it.
Page No. 14/19
16.
In Meera Bhanja [supra], it has been observed, following Shivdev
Singh [supra], that the review proceedings are not by way of an appeal
and have to be strictly confined to the scope and ambit of Order XLVII,
Rule 1, CPC. A review petition has to be entertained only on the ground
of error apparent on the face of the record and not on any other
ground. An error apparent on the face of record must be such an error
which must strike one on mere looking at the record and would not
require any long-dawn process of reasoning on points where there may
conceivably be two opinions. The limitation of powers of the court
under Order XLVII Rule 1, CPC is similar to the jurisdiction available to
the High Court while seeking review of the orders under Article 226.
17.
With regard to the scope and ambit of review jurisdiction, a threeJudge Bench of the Hon'ble Supreme Court in S. Madhusudhan Reddy
vs. V. Narayana Reddy and others, [2022] 11 SCR 42 , has observed in
the following manner :-
19. After discussing a series of decisions on review jurisdiction in
Kamlesh Verma vs. Mayawati and Others, [2013] 8 SCC
320, this Court observed that review proceedings have to be strictly
confined to the scope and ambit of Order XLVII Rule 1, CPC. As long
as the point sought to be raised in the review application has already
been dealt with and answered, parties are not entitled to challenge
the impugned judgment only because an alternative view is possible.
The principles for exercising review jurisdiction were succinctly
summarized in the captioned case as below:
Page No. 15/19
20. Thus, in view of the above, the following grounds of review are
maintainable as stipulated by the statute :
20.1. When the review will be maintainable :
[i] Discovery of new and important matter or evidence which, after
the exercise of due diligence, was not within knowledge of the
petitioner or could not be produced by him;
[ii] Mistake or error apparent on the face of the record;
[iii] Any other sufficient reason.
The words ‘any other sufficient reason’ has been interpreted
in Chajju Ram vs. Neki, AIR 1922 PC 112, and approved by this
Court in Moran Mar Basselios Catholicos vs. Most Rev. Mar
Poulose Athanasius & Ors., 1955 SCR 520, to mean ‘a reason
sufficient on grounds at least analogous to those specified in the
rule’. The same principles have been reiterated in Union of India
vs. Sandur Manganese & Iron Ores Ltd. & Ors., [2013] 8
SCC 337.
20.2. When the review will not be maintainable: [i]
A repetition of old and overruled argument is not enough
to reopen concluded adjudications.
[ii]
Minor mistakes of inconsequential import.
[iii]
Review proceedings cannot be equated with the original
hearing of the case.
Page No. 16/19
[iv]
Review is not maintainable unless the material error,
manifest on the face of the order, undermines its
soundness or results in miscarriage of justice.
[v]
A review is by no means an appeal in disguise whereby
an erroneous decision is re-heard and corrected but lies
only for patent error.
[vi]
The mere possibility of two views on the subject cannot be
a ground for review.
[vii] The error apparent on the face of the record should not be
an error which has to be fished out and searched.
[viii] The appreciation of evidence on record is fully within the
domain of the appellate court, it cannot be permitted to be
advanced in the review petition.
[ix]
Review is not maintainable when the same relief sought at
the time of arguing the main matter had been negatived.
18.
It is well settled that there are limits to the exercise of the power of
review. The power of review may be exercised to the discovery of new
and important matter or evidence which, after the exercise of due
diligence was not within the knowledge of the person seeking the
review or could not be produced by him at the time when the order was
made; it may be exercised where some mistakes or error apparent on
the face of the record is found; it may also be exercised on any
analogous ground. But, the power of review is not to be exercised on
the ground that the decision was erroneous on merits. A review is not
an appeal in disguise whereby an erroneous decision is reheard and
corrected. A power of review is not to be confused with the powers of
an appellate court. An appellate court can correct all manners or errors.
It is also settled that an error which has to be established by a long-
Page No. 17/19
drawn process of reasoning on points where there may conceivably be
two opinions can hardly be said to be an error apparent on the face of
the record.
19.
An error which is not self-evident and has to be detected by a process
of reasoning, is not to be termed an error apparent on the face of the
record justifying the court to exercise its power of review under Order
XLVII Rule 1, CPC. Under Order XLVII Rule 1, CPC, a judgment may be
open to review inter-alia if there is a mistake or an error apparent on
the face of the record. The term, ‘mistake or error apparent’ means an
error which is evident per se from the record of the case and does not
require detailed examination, scrutiny and elucidation either of the facts
or the legal position. If a mistake or an error is not self-evident, it
cannot be treated as a mistake or an error apparent on the face of the
record for the purpose of Order XLVII Rule 1, CPC. In exercise of
review jurisdiction under Order XLVII Rule 1, CPC, it is not permissible
for an erroneous decision to be reheard and corrected.
20.
In the Judgment and Order dated 13.11.2025, the Court in Paragraph
21 to Paragraph 23, as extracted above, had considered the events
arising out of the Meeting held on 09.07.2013 and the actions taken
thereafter vide Office Orders, dated 18.07.2013 & dated 23.07.2013.
After taking notice of such events and the Judgment dated 08.10.2018
passed by the Court of learned Judicial Magistrate, First Class,
Margherita in G.R. Case no. 555 of 2013, as extracted in Paragraph 24,
the Court had arrived at a finding for the reasons assigned in Paragraph
25 that in the obtaining facts and circumstances, it would be difficult for
the writ court to affix the liability to any of the respondents in the
District Administration, Tinsukia and M/s Coal India Limited for the act
of demolition of the coke manufacturing unit on 26.07.2013 as in a writ
Page No. 18/19
proceeding the adjudication can be made only on the basis of the
pleadings of the parties. The Court in a writ proceeding does not
embark on a fact-finding exercise and if the facts are disputed disabling
the writ court to arrive at a definite finding, then the writ court would
not decide such question of fact. If out the materials on record, it was
possible to arrive at two different opinions and the court had taken one
of the two possible views, then also review is not permissible on a plea
that the other possible view ought to have been taken. The Court had,
thereafter, summed up in Paragraph 36 its falling within the scope and
ambit of review jurisdiction.
21.
From the discussion made above, it has emerged that the review
petitioners have sought to urge and repeat the same grounds, as
already urged in the writ petition. The review petitioners on the pretext
of filing a review petition, cannot be permitted to re-agitate and re-urge
the same grounds for which conclusions were already arrived at. A
repetition of the very same grounds, which were earlier urged in the
writ petition culminating in the Judgment and Order dated 13.11.2025,
are not permissible in a review petition. Thus, the grounds which are
urged for review are found not sustainable.
22.
Resultantly, this Court does not find any reason, not to speak of any
good and sufficient reason, to hold that the review petitioners have
made out any case to review the Judgment and Order dated
13.11.2025 passed in the writ petition, W.P.[C] no. 4705/2013. The
review petition is therefore, devoid of any merit. Consequently, the
review petition is dismissed.
Konwar
Date: 2026.03.11 16:18:33
+05'30'
JUDGE
Page No. 19/19
Comparing Assistant
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review