IN THE HIGH COURT OF MANIPUR
AT IMPHAL
(1)
WP(C) No. 427 of 2021
M/s Nezone Pipes & Structures, registered
address at Extended EPIP Lower Bralian
Ri-Bhoi District, Byrnihat, Meghalaya-793101
correspondence address at DD Tower, 5th
Floor, G.S.Road, Christian Basti, Guwahati
Assam 791005 through its authorized person
Shri Rajesh Chetri, DGM Marketing, s/o
Gopal Chetri, a resident of House No.24, Nizora
Path, Guwahati, Assam 781018.
... Petitioner
-Versus1.
The State of Manipur through the
Commissioner/Secretary, PHED, Government
of Manipur Secretariat Building, Babupara,
Imphal West, PO & PS Imphal,
Manipur 795001.
2.
The Joint Secretary (PHE), Government
of Manipur, Secretariat Building, Babupara,
Imphal West, PO & PS Imphal, Manipur 795001.
3.
The Chief Engineer, PHED, Government
of Manipur, Khuyathong, PO & PS Imphal,
Imphal West, Manipur 795001.
4.
M/s BST Infratech Ltd having its
registered office at 1 No.R.N.Mukherjee Road,
2nd Floor, Kolkata 700001 through its
authorized person Shri Tapan Banerjee, s/o
(L) Mohit Mohan Banerjee, a resident of 34
Sunit Banerjee Road Sodepuri Ghola,
Kolkata 700111.
5.
M/s Vishal Pipes Limited, having its
registered office at 32, Nishant Kunji Kohat Enclave
Pitampura, Delhi 110034 through its authorized
person Ms.Vivek Mundhra, a resident of
Ashoka Enclave, Faridabad 121003.
....Respondents
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
(2)
WP(C) No. 454 of 2021
M/s Nezone Pipes & Structures, registered
address at Extended EPIP Lower Bralian
Ri-Bhoi District, Byrnihat, Meghalaya-793101
correspondence address at DD Tower, 5th
Floor, G.S.Road, Christian Basti, Guwahati
Assam 791005 through its authorized person
Shri Rajesh Chetri, DGM Marketing, s/o
Gopal Chetri, a resident of House No.24, Nizora
Path, Guwahati, Assam 781018.
... Petitioner
Vs
1.
The State of Manipur through the
Commissioner/Secretary, PHED, Government
of Manipur Secretariat Building, Babupara,
Imphal West, PO & PS Imphal,
Manipur 795001.
2.
The Joint Secretary (PHE), Government
of Manipur, Secretariat Building, Babupara,
Imphal West, PO & PS Imphal, Manipur 795001.
3.
The Chief Engineer, PHED, Government
of Manipur, Khuyathong, PO & PS Imphal,
Imphal West, Manipur 795001.
4.
M/s BST Infratech Ltd having its
registered office at 1 No.R.N.Mukherjee Road,
2nd Floor, Kolkata 700001 through its
authorized person Shri Tapan Banerjee, s/o
(L) Mohit Mohan Banerjee, a resident of 34
Sunit Banerjee Road Sodepuri Ghola,
Kolkata 700111.
5.
M/s Vishal Pipes Limited, having its
registered office at 32, Nishant Kunji Kohat Enclave
Pitampura, Delhi 110034 through its authorized
person Ms.Vivek Mundhra, a resident of
Ashoka Enclave, Faridabad 121003.
....Respondents
(3)
WP(C) No. 490 of 2021
M/s Nezone Pipes & Structures, registered
address at Extended EPIP Lower Bralian
Ri-Bhoi District, Byrnihat, Meghalaya-793101
correspondence address at DD Tower, 5th
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
Floor, G.S.Road, Christian Basti, Guwahati
Assam 791005 through its authorized person
Shri Rajesh Chetri, DGM Marketing, s/o
Gopal Chetri, a resident of House No.24, Nizora
Path, Guwahati, Assam 781018.
... Petitioner
Vs
1.
The State of Manipur through the
Commissioner/Secretary, PHED, Government
of Manipur Secretariat Building, Babupara,
Imphal West, PO & PS Imphal,
Manipur 795001.
2.
The Joint Secretary (PHE), Government
of Manipur, Secretariat Building, Babupara,
Imphal West, PO & PS Imphal, Manipur 795001.
3.
The Chief Engineer, PHED, Government
of Manipur, Khuyathong, PO & PS Imphal,
Imphal West, Manipur 795001.
4.
The Superintending Engineer, Planning and
Monitoring Circle, PHED, Government of Manipur
Khoyathong, PO & PS Imphal, Imphal West,
Manipur 795001.
5.
M/s BST Infratech Ltd having its
registered office at 1 No.R.N.Mukherjee Road,
2nd Floor, Kolkata 700001 through its
authorized person Shri Tapan Banerjee, s/o
(L) Mohit Mohan Banerjee, a resident of 34
Sunit Banerjee Road Sodepuri Ghola,
Kolkata 700111.
6.
M/s Vishal Pipes Limited, having its
registered office at 32, Nishant Kunji Kohat Enclave
Pitampura, Delhi 110034 through its authorized
person Ms.Vivek Mundhra, a resident of
Ashoka Enclave, Faridabad 121003.
....Respondents
HON’BLE MR. JUSTICE LANUSUNGKUM JAMIR
For the petitioners ::
Mr.I.Dening, Advocate
For the respondents::
Mr.N.Kumarjit, Advocate General, Manipur,
Mr.H.S.Paonam, Sr.Advocate,
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
Mr.Pradip Kumar Tarafder, Advocate &
Mr.Rajiv Malik, Advocate
Dates of hearing
::
10.08.2021 & 11.08.2021
Date of judgment/
order
::
16.08.2021
JUDGMENT AND ORDER
(C A V)
The Chief Engineer, Public Health Engineering Department
(PHED), Government of Manipur issued Invitation For Bids vide NIT
No.CE/PHE/2P(R)/2021/4354 dated 26.03.2021 inviting online rate quotation
from reputed manufacturers of G.I Pipe (Class Medium/Heavy) having
necessary valid ISI Certificate or BIS license for procurement of GI Pipes,
Class Medium/Heavy (Supply, delivery and stacking of GI Pipes) F.O.RImphal, Manipur.
Para 7 of the Invitation For Bids dated 26.03.2021 provided that
bids must be submitted online w.e.f. 15.00 Hrs of 26.03.2021 and shall be
accepted upto 12.00 Hrs of 21.04.2021 and Technical Bids will be opened at
13.00 Hrs of 21.04.2021 and opening of Financial Bids (for Technically
qualified bidders only) will be notified later.
2.
The petitioner firm being eligible and qualified submitted its bid
on 20.04.2021 under Bid No.4523. Similarly, the respondent No.4, M/s BST
Infratech Limited, respondent No.5, M/s Vishal Pipes Limited and Swastik
Pipes Limited also submitted their bids against the Invitation For Bids dated
26.03.2021.
3.
On 21.04.2021, the Chief Engineer, PHED, Government of
Manipur issued an Office Memorandum indicating that the Technical Bid for
procurement of GI Pipe, class Medium/Heavy, (Supply, delivery and stacking
of GI Pipes) F.O.R Imphal, Manipur has been opened by the Tender Opening
Committee and is under evaluation. Thereafter, another Office Memorandum
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
dated 5.5.2021 was issued by the Chief Engineer (PHED), Government of
Manipur stating that consequent upon the evaluation of Technical Bid by the
e-tender Opening and Evaluation Committee, the Financial Bid for the
technically qualified bidders of the e-tender for “Procurement of GI Pipes,
class Medium/Heavy (supply, delivery and stacking) of GI Pipes, F.O.R,
Imphal, Manipur” will be opened on 6.5.2021 at 11.30 AM.
A letter dated 5.5.2021 was also sent to the petitioner’s firm by
4.
email informing that the petitioner’s bid for the tender has been rejected
during Technical evaluation by the duly constituted committee for the reason
Technically not qualified. The petitioner’s firm thereafter wrote a letter dated
6.5.2021 by email to the concerned authority requesting to clarify the specific
reason
for
the
rejection
of
the
petitioner’s
bid
for
Tender
ID:2021_PHED_1337_1 at the earliest. However, the petitioner’s firm did not
receive any reply to the said request.
5.
Being aggrieved, the petitioner approached this Court by filing
WP(C) No.410 of 2021 with the following prayers:
“i.
to quash and set aside the Self-generated Email or
Official letter dated 05.05.2021 (Annexure A/6) addressed to
the petitioner’s firm/Tender ID received by the petitioner’s firm
via e-mail, to do justice;
ii)
to direct the respondents/authorities to process, perform
and conduct such tender matter as per the instructions, terms
and conditions of the Notification/Invitation for Bids dated
26.03.2021 under NIT CE/PHE/2P(R)/2021/4354. In other
words, to abide by the terms and conditions of the tender
process;
iii)
to direct the respondents/authorities to award the work
contract as per the applicable terms and conditions of the
Notification/Invitation For Bids dated 26.03.2021 under NIT
CE/PHE/2P(R)/2021/4354 to do justice;
iv)
to call for the relevant files or records which are under
the custody of the respondents;
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
v)
in the interim to direct the respondents not to proceed
with the tender process in connection with the
Notification/Invitation For Bids dated 26.03.2021 under NIT
CE/PHE/2P(R)/2021/4354 and not to give effect to the Selfgenerated Email or Official letter dated 05.05.2021 during the
pendency of the present writ petitions; Or in case, to stay the
execution of work in pursuance to such Notification/Invitation
for Bids dated 26.03.2021;
vi)
to pass any appropriate order (s) or direction (s) which
the Hon’ble Court may deem fit, proper and just in the nature
of the present case.”
6.
During pendency of the WP(C) No.410 of 2021, the present
petitioner received a letter dated 1.6.2021 from the Joint Secretary, PHE,
Government of Manipur informing that the petitioner’s bid was rejected as the
Auditor’s report for the Financial Year 2017-18 and for the Financial Year
2018-19 do not show turnovers separately for the product under
consideration for tender and whereas Auditor’s report for the Financial Year
2019-2020 shows turnover for the product under consideration as Rs.109.92
crores. Therefore, average turnover for the Financial Year is 36.64 crores.
Accordingly, the petitioner preferred Miscellaneous Application
being MC (WP(C)) No.113 of 2021 in WP(C) No.410 of 2021 challenging the
said letter dated 1.6.2021.
This Court, by an order dated 8.6.2021 dismissed the WP(C)
No.410 of 2021 and MC (WP(C)) No.113 of 2021 with the following
observations.
“
Given the aforesaid sequence of events, this Court is of
the opinion that it would be appropriate for the petitioner firm to
file a case afresh, if it is aggrieved by the communication dated
01.06.2021. No doubt, the said communication emanated from
an interim order passed in this case but the same gives rise to
a fresh cause of action. The pleadings in the writ petition, as
they stand presently, do not support a challenge to the said
communication and, as such, there is no prayer in the main writ
petition relating thereto.
WP(C) No.410 of 2021 and MC (WP(C)) No.113 of 2021
are accordingly dismissed on this short ground. It is left open to
the petitioner firm to file a fresh case, if it so chooses, in
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
accordance with law and due procedure. It would be open to
the petitioner firm to raise all the grounds urged in the present
writ petition therein.”
7.
Thereafter, the petitioner filed WP(C) No.427 of 2021
challenging the letter dated 1.6.2021 with the following prayers:
“i)
to quash and set aside the Official communication dated
01.06.2021 issued by the Joint Secretary (PHE), Government
of Manipur (Annexure A/10) to do justice.
ii)
to direct the respondents/authorities to process, perform
and conduct such tender matter as per the instructions, terms
and conditions of the Notification/Invitation For Bids dated
26.03.2021 under NIT CE/PHE/2)(R)/2021/4354. In other
words, to abide by the terms and conditions of the tender
process;
iii)
to direct the respondents/authorities to award the work
contract for those items to which the petitioner’s firm was the
lowest bidder or to award the work contract as per the
applicable terms and conditions of the Notification/Invitation
For
Bids
dated
26.03.2021
under
NIT
CE/PHE/2)(R)/2021/4354 or to do justice.
iv)
to call for the relevant files or records which are under
the custody of the respondents.”
8.
During pendency of the WP(C) No.427 of 2021, the Joint
Secretary (PHE), Government of Manipur wrote a letter dated 24.05.2021
addressed to the Chief Engineer, PHED, Manipur stating that the proposal
for procurement of GI Pipes, (class Medium/Heavy) and supply, delivery and
stacking of GI Pipes, (F.O.R, Imphal), was placed before the Higher Tender
Committee meeting held on 24.05.2021. The proceeding of the HTC was
enclosed for taking up further necessary action as per the recommendation
of the HTC.
The petitioner, therefore, again filed WP(C) No.454 of 2021
challenging the letter dated 24.05.2021 with the following prayers:
“i)
to quash and set aside the Official letter dated
24.05.2021 addressed to the Chief Engineer, PHED, Manipur
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
and its connected document (s) in connection with the
Notification/Invitation
for
Bids
Nit
No.CE/PHE/2P(R)/2021/4354 dated 26.03.2021;
ii)
to direct the concerned respondents to award the work
to the petitioner as the petitioner is the lowest bidder in 11
(eleven) items or to re-tender the said Notification/Invitation for
Bids NIT No.CE/PHE/2P(R)/2021/4354 dated 26.03.2021;
iii)
to call for the relevant files or records which are under
the custody of the respondents;
iv)
to tag the present writ petition with WP(C) No.427 of
2021 which is pending before the Hon’ble High Court.
v)
in the interim to stay the execution of work in connection
with the NIT.No.CE/PHE/2P(R)/2021/4354 dated 26.03.2021 in
the interest of justice;
vi)
to pass any appropriate order(s) or direction(s) which
the Hon’ble Court may deem fit, proper and just in the nature
of the present case.”
9.
This Court passed an interim order dated 15.07.2021 in WP(C)
No.427 of 2021 along with WP(C) No.454 of 2021 directing that there shall
accordingly be stay of all further proceedings, including execution of the
awarded contracts, if any, for supply of GI Pipes pursuant to the Tender
bearing NIT No.CE/PHE/2P(R)/2021/4354 dated 26.03.2021 until the next
date of hearing.
10.
Again, the petitioner filed WP(C) No.490 of 2021 on the ground
that in MC (WP(C)) No.132 of 2021 and MC (WP(C)) No.133 of 2021 filed by
M/s BST Infratech Limited as well as in the affidavit in opposition filed by M/s
Vishal Pipes Limited, the petitioner came to learn that two letters both dated
31.05.2021 written by the Superintending Engineer, Planning & Monitoring
Circle PHED, Government of Manipur and addressed to the M/s BST
Infratech Limited, Kolkata and Vishal Pipes Limited, Delhi conveyed approval
of the rates of GI Pipes. Further, in response to the said letters dated
31.05.2021, the successful bidders i.e. M/s BST Infratech Limited and M/s
Vishal Pipes Limited have submitted their letter of acceptance both dated
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
1.6.2021. The petitioner, therefore, has filed WP(C) No.490 of 2021 assailing
the official letters both dated 31.05.2021 and the letter of acceptance (s)
dated 1.6.2021 with the following prayers:
“i)
to quash and set aside the official letters dated
31.05.2021 addressed to M/s BST Infratech Limited and M/s
Vishal Pipes Limited (Annexure A/18 and A/19) written by the
Superintending Engineer, Planning and Monitoring Circle,
PHED, Government of Manipur.
ii)
to quash and set aside the letter of Acceptance dated
01.06.2021 addressed to the Chief Engineer, Public Health
Department, Government of Manipur and submitted by the M/s
BST Infratech Limited and M/s Vishal Pipes Limited (Annexure
A/20 & A/21);
iii)
to call for the relevant files or records which are under
the custody of the respondents.
iv)
to tag the present writ petition with WP(C) No.427 of
2021 and WP(C) No.454 of 2021 which is pending before this
Hon’ble Court;
v)
in the interim, to stay the official letters dated 31.05.2021
and the Letters of Acceptance dated 01.06.2021 during the
pendency of writ petition in the interest of justice;
vi)
to pass any appropriate order (s) or direction (s) which
the Hon’ble Court may deem fit, proper and just in the nature
of the present case.”
11.
As all the 3 (three) writ petitions are interrelated relating to the
Invitation of Bids dated 26.03.2021 by which the petitioner’s technical bid was
rejected and works were awarded to the respondent Nos.4 and 5 in WP(C)
No.427 of 2021 and WP(C) No.454 of 2021 and who are also respondent
Nos.5 and 6 in WP(C) No.490 of 2021, the same are being disposed of by
this common judgment and order.
12.
Heard Mr.I.Dening, learned counsel for the petitioners in all the
writ petitions. Also heard Mr.N.Kumarjit, learned Advocate General, Manipur,
for the State of Manipur in all the three writ petitions, Mr.H.S.Paonam,
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
learned senior Advocate along with Mr.Pradip Kumar Tarafder, learned
counsel for respondent No.4 in WP(C) No.427 of 2021 and 454 of 2021 and
respondent No.5 in WP(C) No.490 of 2021, Mr.Rajiv Malik, learned counsel
for respondent No.5 in WP(C) No.427 of 2021 and 454 of 2021 and
respondent No.6 in WP(C) No.490 of 2021.
13.
Mr.I.Dening, learned counsel for the petitioner submits that the
petitioner’s firm had complied with all the terms and conditions of the NIT
dated 26.03.2021 inasmuch as they have submitted all the relevant
documents provided under Section-II, C 2 of the Bidding documents. He
submits that under sub-clause C 2.1, Part-I with regard to Technical Bid a
bidder has to upload complete with all technical details as provided under
Section-IV.
A certificate, with regard to average turnover, as required under
Appendix 4 issued by a Chartered Accountant is to be submitted by the
bidder certifying that the average turnover for the last three financial years
for the GI Pipes is more than 40 crores. To that effect, the petitioner has
submitted Appendix-4 showing Total Turnover and Galvanized Iron Pipes (GI
Pipes) turnover of the petitioner’s firm for the last three completed financial
years from 2017-18 to 2019-20 indicating an average turnover of Rs.110.61
with regard to GI Pipes. Further, the bidder is also required under Section-III
of Clause A.1 of the NIT to submit audited financial statements for the last
three financial years along with turnover certificate issued by the Chartered
Accountant as per Appendix-4. The petitioner has submitted all these
relevant documents which are required to determine the eligibility criteria for
the bidders including GST report and Income Tax Report for the said relevant
three years apart from other required documents. He also submits that the
stand of the respondents that the Auditor’s report for the financial year 201718 and financial year 2018-19 did not show the turnover separately for the
product under consideration of the tender is misconceived inasmuch as there
is no such terms and conditions in the bidding document that the bidders
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
ought to submit the turnover separately for the product under consideration
of the tender for the financial year 2017-18 to financial year 2019-20.
It is further contended that there is no dispute with regard to the
CA Certificate as per the Appendix-4 of the bidding document and Auditor’s
financial statement for the financial year 2019-20 submitted by the
petitioners. The figure reflected in the CA Certificate as per Appendix 4 is
based on the Book of Accounts of the petitioner’s firm and such figures are
also scrutinized as per the relevant provisions of law such as income tax and
GST. As the respondents have conveniently relied only on the Auditor’s
financial statement with regard to financial year, 2019-20 by giving a finding
that the Auditor’s report for the financial year 2017-18 and financial year
2018-19 did not show the turnover separately for the product under
consideration of the tender, the rejection of the bid of the petitioner was illegal
without appreciating relevant documents of the petitioner. He, therefore,
submits that the respondents have acted in an arbitrary and discriminatory
manner while rejecting the bid of the petitioner and the same deserves to be
interfered by this Court.
14.
Addressing WP(C) No.454 of 2021, learned counsel for the
petitioner submits that the respondents have failed to analyze or inspect the
documents submitted by the bidders and further allowed their choice of
supplier who had failed to comply with the terms and conditions of the bidding
document as responsive bidders. The said action of the respondents is bias,
arbitrary, irrational and whimsical. He also submits that the respondents have
intentionally and willfully concealed all relevant documents beyond the reach
of the petitioner despite all steps being taken by the petitioner to obtain such
documents with regard to the NIT dated 26.03.2021. Referring to the
additional affidavit filed by the petitioner in WP(C) No.454 of 2021 he submits
that the respondent No.4, i.e. M/s BST Infratech Ltd had failed to submit
Audited Financial statement for the financial year 2017-18 to 2019-20 thereby
violating the terms and conditions of the NIT dated 26.03.2021. Therefore,
respondent No.4 should have been declared as a non-responsive bidder.
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
However, the official respondents had proceeded by accepting the bid of
respondent No.4, which is highly illegal.
Learned counsel for the petitioner submits that Appendix-6
(Performance Certificate) submitted by the respondent No.4, M/s BST
Infratec Ltd was also defective as it did not conform to the requirements of
the NIT. However, the official respondents instead of rejecting the bid of
respondent No.4 had written a letter dated 22.4.2021 to the respondent No.4
to submit the supply order/work order for verification. This very action also
demonstrates that the official respondents had clear intention of helping the
respondent No.4 as a responsive bidder which is highly illegal.
15.
As regards respondent No.5, i.e. M/s Vishal Pipes Ltd, it is
submitted that the respondent No.5 has been blacklisted by the concerned
authorities of the Zilla Parishad Body, Rural Water Supply Division,
Aurangabad. However, respondent No.5 has filed a false affidavit as per
Appendix-7 of the bidding documents before the concerned authority.
However, the officials have accepted the bid of respondent No.5 as
successful bidder which would show connivance of the official respondents
with some of the bidders and proceeded to pick their choice of suppliers in
violation of the terms and conditions of the bidding documents. As the
respondents have failed to act transparently while considering the technical
bid of the bidders, the letter dated 24.05.2021 which is impugned in WP(C)
No.454 of 2021 requires interference by this Court.
16.
Mr.I.Dening, learned counsel for the petitioner in WP(C)
No.490 of 2021 submits that as the official respondents have failed to
proceed in terms of of the NIT dated 26.03.2021, the whole proceedings
stand vitiated due to manipulative action of the official respondents and,
accordingly, the whole proceedings requires to be set aside and a direction
be issued to the respondents to have a reconsideration of the matter and
declare the petitioner’s firm as a successful bidder. Accordingly, he submits
that the official letters both dated 31.05.2021 and acceptance letter of
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
respondent Nos.5 and 6, both dated 1.6.2021 be set aside and quashed. He
also placed reliance in the case of Mohinder Singh Gill & Anr Vs The Chief
Election Commissioner, New Delhi & Ors reported in (1978) 1 SCC 405
and in a Judgment dated 29.04.2021 of the Gauhati High Court passed in
WP(C) No.612 of 2015 : (Bharatiya Shivan JV Vs State of Assam & 4 Ors.
17.
Mr.N.Kumarjit, learned Advocate General, Manipur, appearing
on behalf of the official respondents in all the three Writ Petitions submits that
the Government of India, Ministry of Jal Shakti, Department of Drinking Water
and Sanitation, has launched JAL JEEVAN MISSION (JJM) in 2018-19 for
providing “Functional Household Tap Connection (FHTC)” to every
household by the year 2024. During the financial year 2019-20, the
Government of India, Ministry of Jal Shakti allocated a sum of Rs.56.41
crores to the State of Manipur out of which a sum of Rs.28.20 crores has
been released as first instalment. The State of Manipur through the Public
Health Engineering Department, Government of Manipur is implementing the
scheme and out of the said sum of Rs.28.20 crore released as first instalment
an amount of Rs.25 crores has been allocated for purchase/procurement of
GI Pipes. Accordingly, the NIT dated 26.03.2021 has been issued consisting
of two components i.e. Technical Bid and Financial Bid.
Learned Advocate General submits that Appendix-4 submitted
by the petitioner pertains to total turnover and not concerned with the GI
Pipes alone which is not in consonance with the terms and conditions of the
NIT dated 26.03.2021, particularly Sl.No.4 of Clause A.1 under Section-III of
the NIT. He also submits that the Auditor’s financial statement as submitted
by the petitioner’s firm which is annexed as Annexure A/12 does not conform
to the requirement of the NIT. He submits that for the financial year 2017-18
there is no indication of turnover for GI Pipes, which is contrary to the
Appendix 4 submitted by the petitioner. As regards the financial year, 201819 there is also no indication of any turnover with regard to GI Pipes and the
same is also contrary to the Appendix-4 submitted by the petitioner. Further,
with regard to the financial year, 2019-20, the turnover of GI Pipes for the
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
year ending 31.03.2019 is indicated as Rs.1,149,568,350/-. However, on a
comparison with the audited financial statement for the year 2018-19 the
same does not indicate the turnover of GI Pipes. Accordingly, the Appendix4 which is a certificate of the Chartered Accountant submitted by the
petitioner’s firm was found to be doubtful as the Auditor’s report for the
financial year 2017-18 to financial year 2019-20 does not show the turnover
separately for the product under consideration of the tender i.e. GI Pipes.
The figures indicated in the Appendix-4 submitted by the petitioner’s firm
were not found anywhere in the documents submitted by the petitioner
accept in the Auditor’s report of financial year 2019-20. Accordingly, the
technical bid of the petitioner was rejected inasmuch as it does not conform
to the terms and conditions of the NIT.
It is submitted that the case of the petitioner is not supported
by its own documents and under such circumstance, the official respondents
had to reject the bid of the petitioner. Drawing the attention of this Court to
the minutes of the Higher Tender Committee meeting held on 24.05.2021
which is annexed as Annexure R/1 to the counter affidavit filed by the State
respondents in WP(C) No.427 of 2021, he submits that with regard to
Technical Bid indicated at Para 2 (vi), the reasons for rejecting the bid of the
petitioner’s firm has been indicated that as the Auditor’s report for the
financial year 2017-18 and financial year 2018-19 do not show the turnover
separately for the product under consideration of the tender whereas the
Auditor’s report for the financial year 2019-20 shows turnover for the product
under consideration as Rs.109.92 crores. Therefore, the average turnover
for three years is Rs.36.64 crores. He also submits that in respect of all the
other three bidders namely M/s BST Infratech Ltd, Swastik Pipes Ltd and M/s
Vishal Pipes Ltd, they had submitted the bid as per the NIT. The minutes
would indicate that consideration was done in a very transparent manner
without any foul play which was headed by the Chief Secretary (Finance),
Government of Manipur.
Refuting the allegation made by the learned counsel for the
petitioner, with regard to issuance of letter dated 22.04.2021, learned A.G.,
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
Manipur submits that the Public Health Engineering Department had issued
the letter dated 22.04.2021 in order to clarify the performance certificate
submitted by the respondent No.4. Accordingly, respondent No.4 had
submitted the supply/work orders to the PHE Department and on perusal of
the same it was confirmed that the respondent had the credential of supply
for a minimum value of Rs.40 crores only for GI Pipes in one year to any
Government Department as required by the NIT dated 26.03.2021. He
submits that the official respondents had the source of power to write the
letter dated 22.04.2021 in terms of clause D 2.1 of Section-II of the NIT dated
26.03.2021 and therefore the action of the respondents cannot be said to be
illegal. He further submits that the work orders which have been issued to the
respondent Nos.4 and 5 i.e. M/s BST Infratech Ltd, Kolkata and M/s Vishal
Pipes Ltd, are not challenged in any of the writ petitions and on this ground
too, the writ petition deserves to be dismissed. Further submission has been
made that the respondent No.4 has also furnished the Audited financial
reports for the financial year 2017-18 to financial year 2019-20
18.
With regard to the allegation that the respondent No.5 is a
blacklisted bidder, he submits that the same is not correct inasmuch as the
respondents had considered the documents submitted by respondent No.5
and had thereafter found the said respondent to be a responsive bidder.
Therefore, he submits that there is no merit in the writ petition and,
accordingly, the same deserves to be dismissed. He has also placed reliance
in the cases of: (1) Montecarlo Ltd Vs National Thermal Power
Corporation Ltd reported in (2016) 15 SCC 272, (2) Reliance Telecom Ltd
& Anr Vs Union of India & Anr reported in (2017) 4 SCC 269 and (3) Meerut
Development Authority Vs Association of Management Studies & Anr
reported in (2009) 6 SCC 171.
19.
Mr.H.S.Paonam,
learned
senior
counsel appearing
for
respondent No.4 in WP(C) Nos.427 and 454 of 2021 and respondent No.5 in
WP(C) No.490 of 2021, while endorsing the submission made by the learned
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
A.G, Manipur, further submits that the rejection of the bid of the petitioner’s
firm at the Technical stage is not disputed. He submits that the email letter
addressed to the petitioner’s firm indicating that their tender has been
rejected during the technical evaluation is not under challenge. He also
submits that the submission of the Auditor’s financial statement of all the
bidders is a requirement under the terms and conditions of the NIT dated
26.03.2021. The audited financial statement of the petitioner’s firm with
regard to the year 2017-18 to 2019-20 were found to be defective inasmuch
as there is no indication of any turnover with regard to GI Pipes. As the
petitioner’s firm failed to satisfy the terms and conditions of the NIT dated
26.03.2021, the bid of the petitioner’s firm was rejected at the technical stage.
He also submits that the petitioner has challenged the letter dated 1.6.2021
which is only the reasons given for rejecting his bid by the official
respondents. As the petitioner has failed to challenge the basic order
rejecting his bid at the technical stage, the writ petition being not
maintainable, deserves to be dismissed.
20.
With regard to WP(C) No.454 of 2021, learned senior counsel
submits that no other ground against respondent No.4 has been taken except
ground No.L which pertains to non-submission of relevant documents
required as per the terms and conditions of the bidding documents. He
submits that the respondent No.4 has submitted the audited financial
statement for the financial year 2017-18 to 2019-20 while submitting bid and,
therefore, the allegation made by the petitioner is without any basis and is
making a false statement before this Court. He also submits that the minutes
of the HTC meeting held on 24.05.2021 would clearly indicate that the
respondent No.4 has submitted the tender documents as per the NIT as
indicated in Para-2 (vi) of the said minutes. This clearly indicates that the
petitioner’s firm is only trying to delay the matter for successful
implementation of the NIT dated 26.03.2021. He further submits that as the
petitioner’s firm has been found to be non-responsive bidder at the technical
stage, they have no locus to question the further proceedings with regard to
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
the financial bid or final result of the bid as well as the award of work order
and acceptance of the work by respondent No.4. As the respondent No.4
was found to be a responsive bidder and having qualified in terms of the
conditions made in the NIT dated 26.03.2021, the official respondents had
issued orders dated 5.6.2021, 6.6.2021 and 7.6.2021 requesting for
procurement of GI Pipes for the purpose of JAL JEEVAN MISSION (JJM) as
envisaged by the NIT dated 26.03.2021. In terms of the orders dated
5.6.2021, 6.6.2021 and 7.6.2021, the respondent No.4 has also
supplied/shipped the manufactured GI Pipes with the logo provided on the
GI Pipes as “PHE GOM” for supply to the different divisions of the PHED,
Manipur. The petitioner had overlooked all these steps taken by the official
respondents as well as by the respondent No.4 and has approached this
Court without challenging any of these orders and in absence of such
challenge, the survival of this writ petition does not arise. He submits that the
contract is a commercial transaction and principles of equity and natural
justice stay at a distance. If a decision relating to award of contract is bonafide
and is in public interest, the Court would not interfere in exercise of its power
under judicial review even if there is procedural aberration or error in
assessment or prejudice to a tenderer is made out.
Lastly, he submits that the respondent No.4 has also submitted
his performance certificate as per Appendix-6 indicating that the respondent
No.4 had supplied various sizes of pipes amounting to Rs.40.25 crores in the
Public Health Engineering Department, Government of Manipur during the
financial year 2020-2021. The respondent No.4 had also submitted
Appendix-4 as required by the NIT dated 26.03.2021 and on comparison with
the Auditor’s financial report for the financial year 2017-18 to financial year
2019-20, the same was found to be correct and, accordingly, respondent
No.4 was declared as responsive bidder. Accordingly, he submits that there
is no merit in the writ petition and the same deserves to be dismissed. He
also places reliance in the cases of (1) Rashmi Metaliks Limited & Anr Vs
Kolkata Metropolitan Dev Authority & Ors reported in (2013) 10 SCC 95,
(2) Central Coalfields Ltd & Anr Vs SLL-SML (Joint Venture Consortium)
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
& Ors reported in (2016) 8 SCC 622, (3) Tata Cellular Vs Union of India
reported in (1994) 6 SCC 651 (4) AIR India Ltd Vs Cochin International
Airport Ltd & Ors reported in (2000) 2 SCC 617, (5) Jagdish Mandal Vs
State of Orissa & Ors reported in (2007) 14 SCC 517 (6) Central Coalfields
Ltd & Anr Vs SLL-SML (Joint Venture consortium) & Ors reported in
(2016) 8 SCC 622 and (7) Master Marine Services (P) Ltd Vs Metcalfe &
Hodgkinson (P) Ltd & Anr reported in (2005) 6 SCC 138.
21.
Mr.Rajiv Malik, learned counsel appearing for respondent No.5
in WP(C) No.427 of 2021 and 454 of 2021 and respondent No.6 in WP(C)
No.490 of 2021 submits that the only allegation against respondent No.5 is
that the respondent No.5 is a blacklisted bidder and, therefore, the
respondent No.5 does not qualify to be considered in the Technical bid. It is
submitted that the respondent No.5 was blacklisted by the authorities of Zilla
Parishad Body, Rural Water Supply Division, Aurangabad, by letter dated
14.07.2015 for supply of Hand Pump Sets. He also submits that the
blacklisting of the respondent No.5 was for a period upto 31.03.2016 only.
Further, he submits that the terms and conditions of the NIT dated
26.03.2021 require that the bidder should not be blacklisted for participation
in any tender for GI Pipe supply. As the respondent No.5 was not blacklisted
for supply of GI Pipes, he had participated in the bid and, was found
successful. Further, as the blacklisting of the respondent No.5 for supply of
hand pump sets was only up to 31.03.2016, the allegation of the petitioner
that the respondent No.5 is a blacklisted bidder and the case of the
respondent No.5 should have been rejected is misconceived and misleading.
22.
As there is a specific allegation made by the petitioner that the
respondent No.4 had not furnished the audited financial report for the
financial year 2017-18 to financial year 2019-20, this court had directed the
learned A.G, Manipur to produce the records. The records have been
produced before this Court and this Court has perused the same.
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
23.
The terms and conditions as contained in the NIT dated
26.03.2021 has been considered by this Court. Clause C.2 of Section-II of
the NIT dated 26.03.2021 reads as under:
“C.2
Documents Comprising the Bid
C 2.1 The Bid shall comprise the following:
1)
PART-I: TECHNICAL BID
To be uploaded, complete with all technical details along
with all other required documents, mentioned in the
Bidding Documents/Bidding Forms as specified in
Section-IV.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
II)
Covering Letter (Appendix-1)
Power of Attorney (Appendix-2)
Details of applicant (Appendix-3)
Average Turnover Certificate (Appendix-4)
Evidence of access to or availability of credit/
facilities (Appendix-5)
Performance Certificate (Appendix-6)
Non Blacklist Affidavit (Appendix-7)
Current contract commitment (Appendix-8)
Declaration by the Manufacturer (Appendix-10)
Resolution of the firm to participate in the
Bidding (Appendix-11)
Undertaking regarding validity of Bid for 90 days.
Scan copy of Tender Fee (PDF)
Format for submitting Bid-Securing Declaration
(Appendix-12)
Signed copy by authorised signatory of NIT
document and any other corrigendum issued
by the employer.
PART-II: FINANCIAL BID
Financial Bid should contain only the prices, without any
condition whatsoever.
(a)
Duly filled Schedule of Items (Appendix-9) (Price
to be quoted only in the BOQ of the e-tender portal and
not in Appendix-9)
(b)
Any other documents required in the BDS.
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
C.2.2 All duties, taxes, and other levies payable by the
Contractor under the Contract, or for any other cause, as of the
date 28 days prior to the deadline for submission of bids, shall
be included in the rates and prices and the total Bid Prices
submitted by the Bidder.”
24.
The relevant portion of Clause A.1 under Section-III of the NIT
dated 26.03.2021 are also reproduced hereunder:
“A.1
TECHNICAL CRITERIA
Manufacturers should upload the following authenticated documents
enclosed in the Technical Terms and non-compliance of the same
shall be considered as non-responsive and shall be liable for
rejection outright. The manufacturer should have the following
eligibility criteria & submit the necessary documents while submitting
the tender.
Sl.No. Criteria
Documents required
3.
Performance Certificate issued
by an officer not below the rank
of Executive Engineer shall be
submitted as per Appendix-6.
4.
The
manufacturer
should have credential
of supply for a minimum
value of Rs.40.00 Crore
(Rupees forty crore)
only in one year to any
Government
Department during the
last five financial years
from FY 2015-16 to FY
2019-20
The
manufacturer
should
submit
the
audited
financial
statements for the last 3
(three) financial years
from FY 2017-18 to FY
2019-20
to
demonstrate
the
current soundness of
the bidders’ financial
position showing a
minimum
average
turnover of not less than
Rs.40.00
Crore
(Rupees forty crore) for
the
product
under
consideration in the
tender
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
Audited Financial Statements
for last 3 financial years along
with Turnover Certificate issued
by Chartered Accountant as per
Appendix-4.
CAV
25.
Sl.No.6 of Clause A.1 under Section-III of the NIT dated
26.03.2021 provides that Appendix-7 should be submitted as per the format
stating clearly that on the date of submission of the tender, the applicant is
not debarred/delisted/disallowed/having no pending enquiry/blacklisted for
participation in any tender for GI Pipe supply by any Government
Department/Government Undertaking/Statutory Body/Municipality/Municipal
Corporation etc.
26.
The main issue revolving around WP(C) No.427 of 2021 is
whether the rejection of the bid of the petitioner’s firm was arbitrary,
whimsical, illegal and discriminatory. As regards this issue, consideration of
Appendix-4, Appendix-6 and Sl.No.3 and 4 of Clause A.1 under Section-III
of the NIT dated 26.03.2021 becomes crucial.
27.
A consideration of the Appendix-4 as furnished by the petitioner
while submitting his bid would indicate that he has submitted the certificate
indicating Total Turnover and the Galvanized Iron Pipes (G.I Pipes) turnover
for the last (3) complete financial years. The turnover of GI Pipes (INR
Crores) is indicated as 106.94 for the financial year 2017-18. For the financial
year 2018-19, it is indicated as 114.96 and for the financial year 2019-20 it is
indicated as 109.92. The audited financial reports submitted by the
petitioner’s firm for the financial year 2017-18 to 2019-2020 clearly indicates
that for the year 2017-18 there is no indication of turnover for GI Pipes under
Schedule ‘I’ Sales. Again for the financial year 2018-19 there is no turnover
indicated for GI Pipes under Schedule-‘H’ sales. However, for the financial
year 2019-2020 the turnover for GI Pipes under Schedule-‘H’ Sales is
indicated as 1,149,568.350 for the financial year ending 31.03.2019 and for
the financial year ending 31.03.2020 it is indicated as 1,099,164.183.
At this stage, it would be pertinent to consider the impugned
letter dated 1.6.2021 written by the Joint Secretary, PHED, Government of
Manipur and addressed to the petitioner’s firm wherein the reason for
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
rejecting the case of the petitioner’s firm is given and the same reads as
under:
“
The Auditor’s reports for the FY 2017-18 and FY 18-19
do not show turnover separately for the product under
consideration of the Tender and whereas the Auditor’s report
for FY 2019-20 shows the turnover from the produce under
consideration as Rs.109.92 crore. Therefore, Average
turnovers for three years is Rs.36.64 crore.”
On a consideration of the reasons given as well as comparison
of the audited financial report for the financial year 2017-18 to financial year
2019-20 as well as Appendix-4 submitted by the petitioner’s firm in the bid
documents, it can be clearly assumed that the reasons given for rejecting the
petitioner’s firm is on the basis of the documents furnished by the petitioner
while submitting the tender bid.
28.
The other allegation made by the petitioner’s firm that the
respondent No.4 did not submit audited financial report for the financial year
2017-18 to financial year 2019-20 is also belied by the records submitted by
the learned A.G, Manipur inasmuch as the respondent No.4 has submitted
the audited financial report for the period under consideration wherein the
turnover for GI Pipes is clearly indicated in the audited financial reports in
respect of GI Pipes for the financial year 2017-18 to financial year 2019-20.
29.
The appendix-6 submitted by the respondent No.4 as provided
under Sl.3 of Clause A.1 under Section III of the NIT dated 26.03.2021 has
also been considered by this Court. Therein, the Superintending Engineer,
Urban Circle PWD, Government of Manipur has certified that the respondent
No.4 firm had submitted various sizes of pipes ranging from 15 mm to 150
mm dia amounting to Rs.40.25 crores in the Public Health Engineering
Department, Government of Manipur during the financial year 2020-21.
There is no doubt that in the said Appendix-6 submitted by the respondent
No.4, the work order and dates were not indicated as required under
Appendix-6 of the NIT dated 26.03.2021. It was in this circumstance that the
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
official respondents had invoked Clause D 2.1 of Section-II seeking for
clarification with regard to Appendix-6 by issuing the letter dated 22.04.2021
addressed to the respondent No.4 stating that it is felt necessary to check
the supply order/work order copies as a supporting document of the
performance certificate submitted by respondent No.4 in the form of
Appendix-6. The said documents were also required to be submitted within
two days from the date of issue of the letter without fail.
In response, the respondent No.4 by letter dated 23.04.2021
addressed to the Chief Engineer, PHED, Government of Manipur forwarded
self-attested copies of 22 numbers of supply orders for GI Pipes for various
consignees as a supporting documents for the performance certificate. The
covering letter dated 23.04.2021 along with work orders are annexed as
Annexures R/3 to the counter affidavit filed by respondent No.4 in WP(C)
No.454 of 2021. Under the circumstances, this Court is unable to find any
fault with the official respondents for issuance of the letter dated 22.04.2021
to the respondent No.4 inasmuch as the official respondents had the source
of power for issuing the letter dated 22.04.2021 under the NIT dated
26.03.2021.
30.
The allegation that the respondent No.5 is a blacklisted bidder
and, therefore, his bid should have been rejected in the Technical bid has
also been considered by this Court.
In the counter affidavit filed by the respondent No.5 in WP(C)
No.454 of 2021, it is clearly shown at Annexure-9 that the respondent No.5
was blacklisted for supply of hand pump sets up to 31.03.2016 by the letter
dated 14.07.2015 issued by the Chief Executive Officer, Zilla Parishad Beed,
Rural Water Supply Division. This would clearly indicate that the blacklisting
of respondent No.5 was for supply of hand pump sets and that too only up to
31.03.2016. Sl.No.6 of clause A.1 under Section-III of the NIT dated
26.03.2021 clearly indicate that Appendix-7 should be submitted in the format
indicating that on the date of submission of the tender the applicant is not
debarred or delisted/ disallowed/having no pending inquiry/ blacklisted for
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
participation in any tender for GI Pipes by any Government Department/
Government undertaking/Statutory Body/Municipality/ Municipal Corporation
etc. The respondent No.5 was blacklisted only for supply of hand pump sets
that too upto a period of 31.03.2016 only. Sl.No.6 of Clause A.1 of SectionIII of the NIT dated 26.03.2021 does not apply to the respondent No.5 and,
accordingly the allegation of the petitioner’s firm fails.
31.
A discretion has to be conceded to the authorities who have to
enter into contract giving them liberty to assess the overall situation for the
purpose of taking a decision as to whom the contract be awarded and at what
terms. It is trite that this Court by way of judicial review cannot examine the
details of terms of the contract which have been entered into by the public
bodies or the State.
32.
In the case of Tata Cellular Vs Union of India reported in
(1994) 6 SCC 651, the Hon’ble Supreme Court, held as under:
“94.
The principles deducible from the above are:
(1)
The modern trend points to judicial restraint in administrative
action.
(2)
The court does not sit as a court of appeal but merely reviews
the manner in which the decision was made.
(3)
The court does not have the expertise to correct the
administrative decision. If a review of the administrative decision is
permitted it will be substituting its own decision, without the
necessary expertise which itself may be fallible.
(4)
The terms of the invitation to tender cannot be open to judicial
scrutiny because the invitation to tender is the realm of contract.
Normally speaking, the decision to accept the tender or award the
contract is reached by process of negotiations through several tiers.
More often than not, such decisions are made qualitatively by
experts.
(5)
The Government must have freedom of contract. In other
words, a fair play in the joints is a necessary concomitant for an
administrative body functioning in an administrative sphere or quasiadministrative sphere. However, the decision must not only be tested
by the application of Wednesbury principle of reasonableness
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
(including its other facts pointed out above) but must be free from
arbitrariness not affected by bias or actuated by mala fides.
(6)
Quashing decisions may impose heavy administrative burden
on the administration and lead to increased unbudgeted
expenditure.”
33.
Again in the case of Master Marine Services (P) Ltc Vs
Metcalfe & Hodkinson (P) Ltd & Anr reported in (2005) 6 SCC 138 the
Hon’ble Supreme Court held as under:
“15.
The law relating to award of contract by the State and
public sector corporations was reviewed in Air India Ltd V Cochin
International Airport Ltd (2000) 2 SCC 617 and it was held that the
award of a contract, whether by a private party or by a State, is
essentially a commercial transaction. It can choose its own method
to arrive at a decision and it is free to grant any relaxation for bona
fide reasons, if the tender conditions permit such a relaxation. It was
further held that the State, its corporations, instrumentalities and
agencies have the public duty to be fair to all concerned. Even when
some defect is found in the decision making process, the court must
exercise its discretionary powers under Article 226 with great caution
and should exercise it only in furtherance of public interest and not
merely on the making out of a legal point. The court should always
keep the larger public interest in mind in order to decide whether its
intervention is called for or not. Only when it comes to a conclusion
that overwhelming public interest requires interference, the court
should interfere.”
34.
In
the
case
of
Meerut
Development
Authority
Vs
Association of Management Studies & Anr reported in (2009) 6 SCC 171
the Hon’ble Supreme Court had observed as under:
“39. The law has been succinctly stated by Wade in his treatise,
Administrative Law:
“
The powers of public authorities are therefore essentially
different from those of private persons. A man making his will may,
subject to any rights of his dependants, dispose of his property just
as he may wish. He may act out of malice or a spirit of revenge, but
in law this does not affect his exercise of his power. In the same way
a private person has an absolute power to allow whom he likes to
use his land, to release a debtor, or, where the law permits, to evict
a tenant, regardless of his motives. This is unfettered discretion. But
a public authority may do none of these things unless it acts
reasonably and in good faith and upon lawful and relevant grounds
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
of public interest. So a city council acted unlawfully when it refused
unreasonably to let a local rugby football club use the city’s sports
ground, though a private owner could of course have refused with
impunity. Nor may a local authority arbitrarily release debtors, and if
it evicts tenants, even though in accordance with a contract, it must
act reasonably and ‘within the limits of fair dealing’. The whole
conception of unfettered discretion is inappropriate to a public
authority, which possesses powers solely in order that it may use
them for the public good.
40.
There is no difficulty to hold that the authorities owe a duty to
act fairly but it is equally well settled in judicial review, the court is not
concerned with the merits or correctness of the decision, but with the
manner in which the decision is taken or the order is made. The Court
cannot substitute its own opinion for the opinion of the authority
deciding the matter.
41.
The distinction between appellate power and a judicial review
is well known but needs reiteration. By way of judicial review, the
court cannot examine the details of the terms of the contract which
have inherent limitations on the scope of any such enquiry. If the
contract has been entered into without ignoring the procedure which
can be said to be basic in nature and after an objective consideration
of different options available taking into account the interest of the
State and the public, then the Court cannot act as an appellate court
by substituting its opinion in respect of selection made for entering
into such contract. But at the same time the courts can certainly
examine whether the “decision-making process” was reasonable,
rational, not arbitrary and violative of Article 14. (See Sterling
Computers Ltd V M&N Publications Ltd (1993) 1 SCC 445”.
35.
Further in the case of Central Coalfields Ltd & Anr Vs SLL-
SML (Joint Venture Consortium) & Ors reported in (2016) 8 SCC 622 the
Hon’ble Supreme Court has held as under:
“47.
The result of this discussion is that the issue of the
acceptance or rejection of a bid or a bidder should be looked at not
only from the point of view of the unsuccessful party but also from
the point of view of the employer. As held in Ramana Dayaram
Shetty Vs International Airport Authority of India : (1979) 3 SCC
489 the terms of NIT cannot be ignored as being redundant or
superfluous. They must be given a meaning and the necessary
significance. As pointed out in Tata Cellular Vs Union of India:
(1994) 6 SCC 651 there must be judicial restraint in interfering with
administrative action. Ordinarily, the soundness of the decision taken
by the employer ought not to be questioned but the decision making
process can certainly be subject to judicial review. The soundness of
the decision may be questioned if it is irrational or mala fide or
intended to favour someone or a decision “that no responsible
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
authority acting reasonably and in accordance with relevant law
could have reached” as held in Jagdish Mandal V State of Orissa :
(2007) 14 SCC 517 followed in Michigan Rubber (India) Ltd v.
State of Karnataka: (2012) 8 SCC 216.”
36.
This Court has minutely considered the minutes of the Higher
Tender Committee meeting held on 24.05.2021. On a perusal of the same,
this Court does not find the process adopted or the decision taken by the
Higher Tender Committee as mala fide or intended to favour someone or the
same to be arbitrary and irrational.
37.
This Court has also considered the citations relied upon by the
petitioners counsel, however, in the facts and circumstances of the present
case in hand, the same does not assist the petitioner.
38.
In the facts and circumstances of what has been discussed
hereinabove, there is no merit in the WP(C) No.427 of 2021 and the same is
accordingly dismissed.
39.
WP(C) Nos.454 of 2021 and WP(C) No.490 of 2021 relates to
matters challenging the action of the respondents consequent to the
disqualification of the petitioner’s firm in the technical bid. As WP(C) No.427
of 2021 has been dismissed, consequently WP(C) No.454 of 2021 and
WP(C) No.490 are also dismissed.
The interim order dated 15.07.2021 along with all other
consequential orders extending the interim order stands vacated.
No costs.
Return the records to the learned A.G, Manipur.
JUDGE
FR/NFR
Priyojit
RAJKUMAR
PRIYOJIT
SINGH
DN: c=IN, o=High court of manipur, ou=HIGH
COURT OF MANIPUR,
pseudonym=f4c2dc1e6523287d7191474520f
dea810aea3dbd3892667382727c0bc7feaada,
postalCode=795002, st=MANIPUR,
serialNumber=4b3fb011d5ab7a48771e2ed5a
0b5b95e75ce0a58008f265840361e8df078740f
, cn=RAJKUMAR PRIYOJIT SINGH
Date: 2021.08.19 12:25:19 +05'30'
WP(C) NOS.427 OF 2021 AND ORS (NEZONE)
CAV
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review