Judgments
LegalFirms.in Judgments · legalfirms.in/judgments/amit-agarwal-vs-southern-power-distribution-company-of-telangana-limited-20260720/ · Printed 25 Nov 2026
Civil

Amit Agarwal vs Southern Power Distribution Company of Telangana Limited

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Telangana High Court
Date
20 July 2026
Case No.
WA 306/2026
Result
Allowed
Bench
Aparesh Kumar Singh, G.m. Mohiuddin
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

49. It is to be noted that the Electricity Act contemplates distinct remedies for distinct situations' While a distribution licensee is entitled to recover its dues by adopting the remedies available in law, including proceedings under the Revenue Recovery Act or other permissible modes of recovery, the power to disconnect electricity supply is specilically governed by Section 56 of the Electricity Act and can be exercised only upon fulhlment of the conditions prescribed therein. In the present case' the respondents had already initiated proceedings for recovery of the outstanding dues relating to the erstwhile HT service connection' Those proceedings ' (2008) 17 scc 491 ll are independent of, and distinct from, the power of disconnection under Section 56 of the Electricit-v Act. 50, As noted hereinbefore, the appellant was not in default of paymcnt of anv electricity charges in respect of either of his LT sen'ice connections. [n the absence of anlz amount due from the appellant in respect of the electricily supplied to him, the statutory pre-condition for invoking the power of disconnection under Section 56 of the Electricirv .{ct \\'as not satished. Therefore, the power of disconnection cannot be invoked as a substitute for, or as an aid to, the recovery of dues unless the statutory conditions governing its exercise are fulfilled. The remedy of recovery and the power of disconnec…

52. Accordingly, the W.A.Nos.306 and 325 are allowed. The common order dated 21.01.2026 passed by the. learned Single Judge in W.P.No.37524 of 2O2l and W.P.No. 16757 of 2025 is set aside. As a consequence, the action of the respondents in disconnecting, on 14. 10.2021, the electricity supply pertaining to the sanctioned LT supply of 1 No. 3 Phase, 25 KW Domestic Load sanctioned uide Lr. No. DE / OP/ IBRAHIMBAGH / F .N o. 17 a / 2O2 l -22, D.No.1398, daled, 17.O9.2O21, is declared illegal. The respondents are directed to restore the said electricity supply within four (04) weeks fronl the date of receipt of a copy of this judgment. Further, the action of the respondents in disconnecting, on 76.06.2025, the appellant's electricity service connection bearing SC No. 120701682 under Category-2(B\, is declared illegal. The respondents are directed to restore the said service connection within four (04) weeks from the date of receipt of a copy of this judgment. Consequently, miscellaneous petitions pending if any shall stand closed. No costs. SD/- K.SRINIVASA RAO //TRUE COPY// To (A Government Southern Power Distribution Company of Telangana L tmr ted, of of Telangana Undertaking) (Formerly Central Power D istribution ComPanY A.P Ltd.) Corporate Officey 6-1-50, Mint Compound, Hyderabad- 5000063 Rep by its Managing Director'

Filed under

Code of Civil Procedure, 1908 Electricity Act, 2003 Section 56, Electricity Act, 2003

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

IN THE HIGH COURT FOR THE STATE OF TELANGANA AT HYDERABAD [ 3488 ] MONDAY, THE TWENTIETH DAY OF ruLY TWO THOUSAND AND TWENTY SIX PRESENT THE HONOURABLE THE CHIEF JUSTICE SRI APARESH KUMAR SINGH AND THE HONOURABLE SRI JUSTICE G.M. MOHIUDDIN WA.Nos.306 AND 325 OF 2026 WA.NO: 306 OF 2026 Writ Appeal under clause '1 5 of the Letters Patent preferred Against Order Daled 21 lO1 126 in WP. No37524 of 2021 on the file of the High Court. Between: Amit Agarwal, S/o Sri Munnalal Agandat, Aged about 40 years, Occupation Business, R/o. E7, Mayur Kushal Complex, Gunfoundry, Hyderabad_ ...APPELLANT/PETITIONER AND 1. Southern Power Distribution Company of Telangana Limited, (A Government of Telangana Undertaking) (Formerly Central power Distribution Company of A.P. Ltd.) Corporate Office # 6-1-50, Mint Compound, Hyderabad_ 5000d63. Rep. by its Managing Director. 2. The Divisional Engineer, Operation, lbrahimbagh Division, TSSpDCL, Cybercity 3. The Superintendent Engineer, Operation Circle, Cybercity, TSSpDCL, Nanal Nagar'X' Roads, Rethibowli, Hyderabad-28 4. The Assistant Divisionar Engineer, operation, rbrahimbagh Sub-Division, TSSPDCL, Cybercity. ...RESPONDENTS/RESPONDENTS l.A. NO: 1 OF 2026 Petition under section 151 cpc praying that in the circumstances affidavit filed in support of the petition, the High court may stated in the be preased to restrain the respondents from disconnecting the appelrant petitioner erectricity SC No. 120701682, pending determination of the Writ Appeat. connection vide l.A. NO: 2OF 2026 Petition under Section 1 51 cPC praying that in the circumstances stated in the affidavit filed in support of the petition, the High Court may be pleased to direct the respondents lo restore the of electricity connection of the a ppella nVpetitioner vide SC No. 120701682, pending determinatron of the Writ Appea No. 306 of 2026. Cou nse I for the Appellant: SRI ANAND KUMAR KAPOOR Cou n se I for the Respondents: SRI N.SREEDHAR REDDY, SC FOR TGSPDCL WA NO: 325 OF 2026 Wflt Appea under clause 15 of the Letters Patent preferred against the Order daled21l0112026 passed in W P No. 37524 of 2021 on the f le of the High Court. Between: Amit Agarwal. S/o Sri Munnalal Aganval, Aged about zl4 years, Occupation Business. R/o. E7, l\,4ayur Kushal Complex, Gunfoundry, Hyderabad. ...APPELLANTiPETITIONER AND 1. Southern Power Distribution Company of Telangana Llmited, (A Government of Telangana Undertak ng) (Formerly Central Power D stribution Company of A. P Ltd. ) Corporate Office 6-1 -50 Mint Compound, Hyderabad -500 063. Rep by its l\4anaging Director 2. The Divisiona! Engineer. Operatron, lbrahimbagh Division. TSSPDCL, Cybercity 3 The Superintendent Engineer. Operation Circle, Cyberr;ity, TSSPDCL, Nanal Nagar X Roads. Rethibowli. Hyderabad -28. 4 The Assistant Div sionai Engineer, Operation, lbrah mbagh Sub-Division, TSSPDCL. Cybercity. ...RESPONDE NTS/RESPONDENTS l.A. NO: 1 OF 2026 Petition under Section 15.1 CPC praying that in the circunrstances stated in the affidavit filed in support of the petition, the High Court may be pleased to restrain the respondents from disconnecting the appella nt/petitioner elect.icity connection vide SC No. 120701682 pendlng determination of the Writ Appeal. Counsel for the Appellant: SRI ANAND KUMAR KAPOOR Counsel for the Respondents: SRI N.SREEDHAR REDDY, SC FOR TGSPDCL The Court made the following: COMMON JUDGMENT IN THE HIGH COI'RT FIOR THE STATE OF TELTNGANA AT ITYDERABAI) THE HON'BLE THE CHIEF JUSf,ICE SRI A.PARESH KT'MAR SINGH AND THE HON'BLE SRI JUSTICE G.M.MOHIUDDIN WRIT APPEAL Nos.3O6 and 325 of 2o26 DATE:90 .07.20.26 W.A.No.3O6 of 2o26 Between: Arnit Agamal ....Appellant And Southern Pou'er Distribution Companlr of Telangana Limited and 3 others ,... Respondents W.A.No.325 of 2o26 Between: Amit Aganval ....Appellant And Southern Porver Distribution Companv of Telang:rna Limited and 3 others ....Respondents COMMON WDGMENT Sincr: the issues that arise in the above wlt appeals are integralh'one ancl the samc, the \r'rit appeals are being disposed of bv this Common .Judgment. 2. 'I'hese tri'o u'nt appeals arise out of a common order dated 21.O1.2026 pzrssed bv t he learned Single Judge in W.i,.Nos.37524 of 2021 and L6757 of 2025. By the said common order, the learned Single Judge dismissed both the Writ Petitions hled,by the appellant herein, thereby' upholding the actions of the respondents in disconnecting the electricity supply to the appellant's agricultural larrd on two separate occasions i.e', on 14.lO.2O2l, in respect of a second connection sanctioned and installed on 25-O9.2021; and on 16.06.2025, in respect of the first connection bearing Service Connection (S.C.) No.120701682, which had been subsisting since 2014. 3. Heard Mr. Anand Kumar Kapoor, learned counsel for the appellants; and Mr.N.Sreedhar Reddy, learned Standing Counsel for Telangana Southern Power Distribution Company Limited, appearing for the respondents and perused the record. Factual matrix 4, The appellant is the owner and possessor of agricultural land admeasuring Ac.2-25 Gts in Sy'No.2la/B of Janwada Village, Shankarpally Mandal, Ranga Reddy District. The appellant purchased the said property under a registered Sale Deed dated 2 i.05.2OO8, whereupon his name was mutated in the revenue records and Pattadar Pass Books were issued in his favour' According to the appellant, the property has remained an open agricultural land enclosed by a compound wall, without any industrial structure or electricity installation existing thereon' -! 5. In the year 20 14, the appellant applied for and was granted an LT agricultural electricity service connection bearing S.C.No.120701682 under Category 2-B by the respondentCorporation. The appellant claims to have been reguLlarly paying the consumption charges in respect of the said service connection and asserts that no arrears \r,ere outstanding against it. In support thereof, reliance is placed upon the No Dues C:ertificate dated 22.10.2O2O issued bv the Assistant Accounts Offict:r (Ex.P4), apart from the electriciw bills and payment receipts. 6. On 16.08.2019, the 3rd respondent issued a notice (Ex.PS) informing the appellant that HT Service Connection No.CBC353 (O1d S.C. No.RRD353), originally standing in the name of M/s. Gindhar Ispat and subsequently transferred ,o M/s. Airan Comptrax Towers Pvt. Ltd-, was in arrears to the extent of Rs.6,58,94,7647' as on 31.07.2017. By the said notice, the appellant was r:alleC upon to pay the aforesaid amount rvithin fifteen days, failing r,r'hich the respondents proposed to disconnect the appellant's service connection bearing S.C. No.12070\682 and initiate recovcry procr:edings under the Revenue Rec,rvery Act. 7. The appellant submitted a detailed reply dated 28.12.2019 (Ex.P6), disputing any liabiliry towards the dues pertaining to the aforesaid H'I sen'ice r:onnection. The said reply dated 2g.12.2019 is extracted hert:under Ltr ready reference: I am in receipt of the letter in the reference cited from gour good offce u-there in a demand of Rs.6,58,94,764/ - is made from me to utards C. Charges anears of H.T- SC No.CBC353 (Old S.C.No.RRD.353) of Mr. Giidhar Ispot and Subseqtentlg of M/ s Airan Complex Towers pnuote Limited Sir. I am at loss to und.erstand as to lanu I am liable for the arrears of Giidhar Ispat or M/ s Airan Comptrax Towers P Ltd I am no uaA connected with the aboue soid companies or tlrc seruice connection H.T. S.C. No. CBC 353. Sir I purchosed Ac.2-25 gts of open Agicultural land in S7.NO.214/ B of Jamuada Village, Shankarpallg Mondol' Ranga Reddy Distict, from one Mr. Rajendr Prasad Gogal under a registered sale Deed dated 25 O8-2O09' The said uendor was holding the said agia turol land under Regi.stered Agreement of sale cum GPA dated 10-04-2003' Therefore bg 1O-O4-2O03 itself the land uas agiaituraL There ruas no factory or ang H.T Seruice connection to the land bg 20O3. If there uas onA foctory and it uas hauing H T Serutce Connection then tLTeA uere liable for any arrears of C.C. bilts ctnd I am not liable to pag the an'rears of the companies who obtained the H.T Seruice and utilized the pouer, pior to the gear 2003. Sir afier my purclwse of tLe land in 2O09 I applied to the Department for potuer supptg for watchmen quarters and after inspection of the site the seruice uith NO.S.C'No' 120701682 under category 2-B tttas sanction and I haue been paying the biLls regularlg and there are no arrears on the sentice l therefore bing to the notice of gour good self that tLrc threat of disconnection of power supplg to mg seruice is unjust and unrea.sonable. Therefore I request your good self to uithdrau the demand from me. According to the appellant, no further action was taken by the respondents pursuant to the said notice. 8. Subsequently, in the year 2021, the appellant applied for another electricity connection. By proceedings dated 1a'O3'2O21 (Ex.P7), the respondents accorded permission for erection of three electricity poles subject to payment of an amount of Rs'25,913/-, w-hich was clulv remitted bv the appellant (Ex. p8, . Thereafter, by proceedings dated 17 .O9.2021 (Ex.P9), the 2nd respondent sanctioned t,T suppI1. of one 3 phase 25 KW domestic connection in favour of thc appeliant subject to payment of Rs.89,837/-. The said amount u,as paid bv the appellant on 20.O9 .2021 (Ex. p 1 0), whereLrpon an zlcknowledgment was issued by the respondents on the same clay (Ex. P 1 1 ). 9. On 25.09.202 1, rhe respondents insta-lled a r.ransformer and completecl the infrastructure required for the saicl connection by connecting it to the pou,er line (Exs.Pl2 and p13). ,\ccording to the appellant, on la.1O.2021, the respondents disconnected the power supplv to thc transformer u,ithout issuing any prior notice or initiating an-r' proceedrngs. 10. Aggrievcd thereb-v, the appellant instituted W.p. No.37524 of 2O21 challenging the said action. During tht: pendency of W.P.No.37.52-l of 2O27, the respondents disconnected the appellant s cxisring LT agricultural service connection bearing S.C.No.1207O1682 on 16.06.2025, which, acc,rrding to the appellant, was also done u.ithout issuing any ltrior notice or initiating anr proceedings. Challenging the sard action, the appellarrt file d W. p.No. 1675T of 2025. In the counter affidavit hled in W'P' No'37524 of 2O2l' justihed the impugned actron, inter alia, on tl:,e the 11. respondents following grounds: Clause 10 of Regulation No'7 of 2O13 (Second Amendment to Regulation No.5 of 2OO4) empowered the respondents to disconnect the suPPlY; ii. The aPPellant had submitted a reply dated 2a.l2 2Ol9 disputing liability for the outstanding HT dues; Upon inspection of the site ot 14 'lO '2021 ' the officials noticed that substantial arrears were outstanding in respect of HT S.C.No'CBC353 and' therefore' the connecting equipment was removed; 1V. Clause 5.9.6 of the General Terms and Conditions (GTCS) empowered the respondents to of Supply dismantle the service line; v. Clause 8.4 of the GTCS entitled the respondents to refuse grant of a fresh service connection; vi. The decision of the Hon'ble Supreme Court in TGSPI)GL v' Srtgdhaa Beueragesr governed the issue; and vii. The respondents were entitled to withhold electricity until the outstanding dues were discharged' t (zo2ol 6 scc 404 supply L2, The appellant filed a repiy affidavit dated 17.O3.2022, traversing each of the aforesaid contentions raised in the counter afhdavit and asserting that the respondents had nc, authority in law eithe r to disconnect the existing service connection or to deny electricity supply on account of the dues allegedllz payable by the previous HT consumer. 13. Upon hearing the parties, the learned Single Judge, by the common order dated 2I.O1.2026, dismissed W.p. No.3752 4 of 2O2l and W.P.No. 16757 ol' 2025. The portion of the said common order in so far as it is relevant lor adjudication of the matters at hand is extracted hereunder lor readv reference: 6. lt s the specific case of Respond.ents that in the, uery same propertu i.e. lancl admeasuring Acs.2.25 Wntas in Surueg No. 2 1 a / B of ,Jantt acla Vi_ age, Shonkarpally Mandal, Ranga ReddA Distict, therc tuas earlier HT Seruice Connection No. ( BC 3.53 (Otd SC'Nir. RRD 353,) and the name of M/ s Giidhar Ispat initiollA and thereafi.er in tIrc name of M/ s Airan (:omptra-y Put. Limted. 1t is also contend.ed that father of petitioner u.'as the Managing Director of the said t)ompanles. 7'his fact s not speciji.caltg denied bA petitiot),er, except uaguelt1 stating that the said contentl.on ts tt|tlnut ang euidenr:e. 7. l.urther, the documents Jited. bg petitioner in both the Writ P_etitions shotu tltat he purchased. the propertg from one Rajendro Prasad Cioyal uho is in not the olu,ner oJ the fact propertA. The contents of Sale Deed. dated 21.05.2t)0g shows that one Rachui pentaiah and. Rachuri Malloiah utere absohtte ot,ners of the Lancl admeasuing Acs. 1 . 13 giuntas in Suruey No. 2 1 1/ .1/ A and Acs. l 12 guntas ,i Su_"g No.2 j 4/ 3/ B of Janu,,ada VilLage and t"ne!, sold the satd. proptjrtA to M/ s Gtnclhar lsr th h .:o t e De, d o,,i 0"|"","i',' Resistered ,r utae t)oc. ?iu."1 ?1s i!i1',11,: No. 4gS2 o1. l9gS. In _ turn, the said Giidhnr Ispot Put. Ltd. sotd tle propertg to M/ s Airon Comptrox Toluers Put. Ltd through Regi'sterd Sale Deed doted 04.O8.2OOO uide Doc. No. 6323 of 2000' It is seen that M/s Airan Comtrax Touters Put. Ltd' represented bg its Managing Director, Agaru-tol M.L. (father of petitioner) entered into in Agreement of Sale and GPA dated- 10'O4'2OO3 uith one Rajender Prasad Gogal in respect of the aboue propertA ond that the said d'oanment utas ualidoted bA tlle Di'stict Registrar & Collector under Indion Stamp Act, Ronga Reddg lzistlrct on 28.10.2006 in File No. 9815/AR/06' Si Rajender Prasad. Gogal utho tuas onlg a GPA Holder sold the propertg in dated fauour of petitioner uide Registered Sole Deedbecome 21.05.2008 ttlhich ctearlg sLaws that petitioner had ouner of the properlg tuhich lnd etecticitg dues' Tlerefore' this Court rb safisTted that the propertA claimed bA petitioner haang purchased through Registered Sale Deed dated 21.5.2OO8 hod earlier H? SC No CBC 353 (Otd No' RRD 353/ uhich hqd dues of Rs. 7,34,16,264/ - as on 31'7'2022' Petitioner, haang purchased the said propertg, is liabte to pay tle dues of preuious ou)ners. Therefore, Respondents haue the right to deng pouer supplg to the uery same property rtLhich Lwd. dues bg preuious otuners. Also, this Court is conuinced that petitioner and his fatlLer, in order to auoid dues, seems to hnue transferred tLrc property in the name of petitioner and haue cland.estinelg obtoined tr? SC No' 1207O1682 for the uery some propertA. 8. The Hon'bte Supreme Court in K.C' Ninnan's case uhile refening to earlier judgment in Hgderabad Wanaspathg Limited-, hetd at Para 78 that euen under Indian ElecticitA Supptg Act, 1948, there is an obligation on the neu ou)ner to clear the arrears of preuous ou)ner, o-s a pre-condition to auoil etecticitg supplg uthich houe statutory character' At poro 89' uhtle rifering to earlier judgment in Paschimanchal Vidgut Vitharai Nigam, the Hon'ble Apex Court reiterated that distibution licensees can insist for clearonce I orrears of electicitg dues of preuious cortsumer before resuming electriciig supplg to the premises, tt'thich is ualid and permissibte under Electicitg Act, 2003- At Para 95 it utas held that Electicitg Suppty Code requiring paAment of electicitg dues of prewous ou)ners as a condition for grant of etecticity connections haue a cleor nexus to the scheme of the parent legislations and the objectiues sought to be achieued and it is the iust ona reasonable for distribution licensees to specifA conditions of supplg reqtiring the subsequent ou)ners or ocal.piers of prrzmlses to paA the electicitg dues of prbaous oLuner or occupier as a pre condition for grant cf electicitg connection to protect their commercial interest as u.tell as uefurc oJ consLtmers of electicilg. 9. Also, Clauses 5.9.6 and 8.4 of General Terms tV, Conditions of Supplg abundantlg make it clear that no neut Seruice Conne,<:tiorr shall be prouided to the premises unless the eisting dues are cleared. As petitioner is the owner of propertA uthich had electicitA dues of preuious ou)ner, he ls Liable to pcLg the same. In uieut of the oboue disrr.rssion, thjs Court see.s no grounds to interfere tuith disconnecti.on of pou.ser suppht to the properlA of petitioner. No grounds a.e made out for grantinq the relief as sought in ttrc Wit petition:;. 14. Aggrieved bv the said common order, th() appellant has preferred thc present u'rit appeals Submissions on behalf of the appellant 15. Learncd counsel appearing for the appellant, advanced his submissions arssailing the impugned commorl order dated 2\.O1 .2026 as under: i) That the impugned common order commences its discussion $,ith the case of the respondents without firs: setting out the appellant s case, formulating the issue s arising for consideralion, or examining the appellalt's tleadings. Such an approach is contrary to the settled prinr:iples governing juclic ial adjudication. i, Thar rhe learneri Single Judge neither recorded considercd the submissions advanced nor on behalf of the l0 appellant. Placing reliance upon Stcte of Karnataka a. Antn Kumat Agarutal2, learned counsel submitted that a judgment which merely notices the rival positions without analysing the petitioner,s grievalce or recording reasons on the issues arising for determination is legally unsustainable. It was further submitted that the absence of any discussion of the submissions advanced across the Bar reflects non_ application of mind and renders the adjudication vulnerable. iii) That the learned Single Judge erroneously applied the principles governing grant of fresh electricity connections reconnections to or a case concerning disconnection of subsisting electricity supply. According to the learned counsel, the legal principles governing grant of a fresh connection or reconnection are distinct from those regulating disconnection of an existing supply. It is contended that where the controversy pertains to disconnection of a subsisting service connection, the principles applicable to grant of a fresh connection cannot be imported. iv) That the appellant's lirst LT Service Connection bearing S.C.No. 120701682 lnad been subsisting since the yeat 2Ol4 and no dues were outstanding against the said connection. Likewise, the second LT connection was sanctioned on ' (2ooo) 1 scc 210 l1 1.7.O9.2021, thrr requisite charges were paid, rhe transformer u,,as installed on 25.O9 .2021, and the connection was completed. Both service connections, therefore, were existing and operative when they came to be disconnected. Consequently, r-he principles applicable to frt'sh connections or reconnections, particularly in relation to ci':arance of dues ol previous consumers, had no application to the facts of the present case. v) Reliance u'as placed upon Section 56 of the Electricity Act, 2003 (for short 'Electricity ActJ, contending ttrat the power of disconnection under the said provision is a special statutory power which can be exercised only in accordance u'ith the conditrons prescribed therein. In this regarrl, reliance was placed upon Prem Cottex a. Uttar Haryana Biili Vitran Nigann Ltd.3, and K.C. Nina,n u. Kerala State Electricitu Boarda. vi) That Section 56(1) of the Electricity Acl contemplates disconnectron onl-v u'here the person concerned neglects to pay charges lor electricity or any other sum due from him. Likeri.ise, t he embargo contained in Section 56(2) is relatable onlv to such dues. Therefore, the statutory scireme makes the ' (2O21) 20 SCC 2OO ' (2023) 1q scc .+3 l l2 liability personal to the consumer who has defaulted in payment. vii) That admittedly no dues were outstanding against the appellant in respect of LT S.C.No 1207016A2' The alleged arrears pertained exclusively to the erstwhile HT S.C.No.CBC353, which, according to the respondents' own case, stood disconnected long prior thereto and whose HT agreement had already been terminated. Consequently, the respondents had no statutory authority to disconnect the appellant's subsisting service connections by invoking Section 56 of the Electricity Act. viii) That every action of a statutory authority must be traceable to a statutory source of power. While the Electricity Act provides different remedies for different situations, the respondents could not invoke the power of disconnection where the statutory preconditions for its exercise were absent ix) That although the respondents were pursuing recovery of the alleged HT dues through proceedings under the Revenue Recovery Act, they simultaneously proceeded to disconnect the appellant's existing electricity supply despite there being no dues payable by him. Such action, according to the Iearned counsel, was wholly without authority of law' 1l x) That a subsequent purchaser does not autonlatically become liablc for elect ricir_v- dues payable by an errrlier consumer merelv by reason of purchase of the property. Liability under the Electncity Act is attached to the consumer and not to the owncrship of the prt-mises. xi) That the appellant never sought reconnection of the erstwhile HT service. The appellant had an independenr, LT agricultural service connection granted in the year 2014, whereas the second LT connection was independently sanctioned in September, 2021. The earlier HT service r:onnection had ceased to cxist much earlier upon rts disr;onnection and terminatron. In this regard reiiance was placed upon K.C. JVinan's case (supra 4), u'herein the Hon'ble Supreme Court held that supply of electrtcity is made to the consumer and not ro rhe prcmises and that liability for paymt:nt of electricity dues rests upon the consumer alone. xii) That the learned Single Judge erred in placing reliance upon Clauses 5.9.6 and 8.4 of the GTCS. That Clause 5.9.6 becomes applicable only after termination or' an LT or HT agrcement under Clauses 5.9.3.2 and 5.9.4.1. ilince neither of rhe appellant's LT agreements had been terminated, invoc:rtion of Clause 5.9.6 was wholly misconceived. t4 xiii) Likewise, Clause 8.4 deals with refusal to grant a fresh service connection where outstanding dues remain unpaid by ttre seller. According to the learned counsel, the appellant purchased only open agricultural land from Mr'Rajender Prasad Goyal; no electricity connection existed in the name of the vendor at the time of purchase; the appellant's frrst LT connection was independently granted it 2Ol4; arrd the second LT connection was independently sanctioned in September, 2021. Hence, Ciause 8.4 had no application' xiv) That both the disconnections, namely on l4-1O.2O21 and on 16.06.2025, were effected without issuance of any prior notice or affording the appellant an opportunity of hearing. Such action, according to the learned counsel, violated the principles of natural justice and also offended Articles 14, 19, 21 and 3OO-A of the Constitution of India. xv) That the impugned common order incorrectly recorded that the District Collector had initiated proceedings under the Revenue Recovery Act and issued a distraint notice According to the record, what had actually transpired was that the respondents addressed a communication dated 25'11'2019 requesting the Collector to initiate proceedings by issuance of Form-C under the Revenue Recovery Act, and that the impugned order referred to alleged communications addressed to various authorities, including the Tahsildar, HMDA and Pollution Control Board, although no such plea formed pitrt of the respondents' counter affidavit. xvi) That rccoven' of electricity dues and <tisconnection of electricitr supplv operate in different frr:lds. While the respondents may be entitled to recover dues through 1egally permissible modes, such power does not automatically authorise disconnection of an existing se:wice connection where no dues are payable by the concerned consumer. According to the Iearned counse[, since proceedings for recovery I'rad already been initiated against the consumer of the HT connection under the Revenue Recovery Act, the respondents could not simultaneously resort to disconnection of the appellant's LT connection in [he absence of statutorv authoritv xvii) That liabiliq' under the Electricitv Act is personal and statutorv. Merely because the appellant s fathr:r was alleged to have bccn associated rvith M/s. Airan Comp.trax Tou,ers pvt. Ltd., the appellant could not be fastened witL liability for the dues allcgedlv pay'able by the said company. That the respondents proceeded on an erroneous assumption that liabilitr' cr>uld be imposed by reason of fam.ly relationship, t6 though no statutory provision contemplated such vicarious liability. xviii) That the finding recorded by the learned Single Judge that the appellant had "clandestinely" obtained LT Service Connection No.120701682 is unsupported either by the pleadings of the respondents or by any material available on record' The appellant had applied for the service connection through the prescribed procedure, whereafter the respondents themselves sanctioned the connection. xix) That the respondents' never intimated the appellant about the outstanding liability of the previous consumer at the premlses. xx) That the erstwhile HT S.C'No.CBC353 had already been disconnected in the year 2OO2 and the corresponding HT agreement stood terminated. The appellant's LT service connection granted in the year 2O14 was wholly independent and had no nexus whatsoever with the earlier HT servicePlacing reliance upon X.C. jWncn's case (supra 4), learned counsel reiterated that electricity supply is made to the consumer and not to the premises and, therefore, the existbnce of the earlier HT service connection had no Iegai bearing upon the appellant's independent LT service connection. t7 Submissions on behalf of the respondents 16. Learnt:d Standing Counsel appearing for the respondents supported the rmpr-rgned common order and cor tended that the same does not warrant interference and advanced the submissions as under: i) That the properry in which the appellant,s LT service connection u,as subsequently obtained originally belonged to M/ s. Giridhar Ispat and was covered by HT S.C.No.CBC3S3 (Old S.C.No.RRD353). The said HT connecticn was thereafter transferred in the records of the respondenls to M/s. Airan Comptrax Towers pvt. Ltd. That the HT serwice connection came to be clisconnected on account of non_payment of substzrntiitl electriciw arrears and that the outstanding dues continued to remain unpaid. i1) That rhe Managing Director of the aforesaid companies, namel,,' M/s. Giridhar Ispat and M/s. Airan Comptrax Towers F/t. Lrd., rs one Sri Munnalal Agarwal, who is the father of the appell:rnt. According to the respondents, the subject property u,as thereafter transferred in the name of the appellant and shor,r.n as agricultural land r.r,ith the objr:ct of avoiding payment of the outstanding electricitl. dues,. Reliance u,as placerd u pon Cllauses 5.9.6 and 8.4 of the GTCS, which l8 prohibit grant of a fresh service connection to premises in respect of which electricity dues remain unpaid' Since the premises carried outstanding dues relating to the earlier HT service connection, the appellant was liable to clear the same before seeking electricity supply. iii) Reliance was placed upon the decision of the Hon'ble Supreme Court in K.C. llincn's case (supra 4), wherein it was held that electricity utilities are entitled to prescribe, by statutory terms and conditions of supply, payment of arrears of the previous consumer as a pre-condition for grant of electricity connection to a subsequent owner or occupier' iv) Reliance was also placed upon Srtgdlua Beuercges's case (supra 1), wherein the Hon'ble Supreme Court held that electricity dues, being statutory in character and governed by the terms and conditions of supply, cannot be treated as purely contractual liabilities and that the distribution licensee is entitled to insist upon clearance of such dues before granting supply to the premises. On the strength of the aforesaid decisions, it was submitted that the appellant cannot claim supply to the premises without first discharging the outstanding dues relating to the earlier HT connection' v) That Clause 10 of Regulation No'7 of 2013 (Second Amendment to Regulation No.5 of 2OO4) empowers the l9 distribution lit:ensee to disconnect power sultply to all or any other serviccs of a consumer who is in default of payment of electricitr arrcars u'ithin the area of suppl) of the licensee. According to the respondents, the appellrrnt,s LT service connection constituted a "link service" connected q,ith the premises in respect of which the earlier HT dues were outstanding and, therefore, the respondents were entitled to invoke the pou'er of disconnection under the said regulation. v4 That the reply affidavit filed by the appellant was Iargely repetitive of the averments contained in the rvrit affidavit and did not specifically rebut the factual and legal contentions raised in the counter afhdavit. vii) 'lhat no legal or fundamental right of the apltellant had been r.iolated so as ro lvarrant interference under Article 226 of the Constrtution of India. According to the r,lspondents, the appellant obtalned the service connection wr thout disclosing t he subsisting dues relating to the earlier H1' consumer and, therefore, was not entitled to equitable re[ef. viii) 'l'hat the appellant's predecessor-in-interes t, Sri Ra.lender Prasad Qol,al, ,"r.as only a General power of Attorney (GpA) holder and not rhe absolute owner of the lrroperty. It was alleged rhat the sale transaction was strl-tctured disctosing rhe companv to which the without ]and originally belonged, with the intention of avoiding liability for electricity dues' According to the respondents, the vendor and vendee' who were stated to be associated in business activities' had executed transactions designed to defeat recovery of electricity dues payable to the distribution licensee' ix) That the respondents had already initiated proceedings for recovery of the outstanding dues under the Revenue Recovery Act and that a communication dated 25 1 1 '2019 had been addressed to the District Collector seeking initiation of recovery proceedings in respect of the subject property' That the recovery proceedings were independent of the action taken by the respondents in relation to electricity supply and that the , existence of such proceedings demonstrated the continuing liability attached to the earlier HT dues' x) That the HT agreement between the previous consumer and TSSPDCL had been terminated in accordance with the relevant provisions of the GTCS. According to the respondents, once an HT agreement is terminated, any subsequent request for supply to the same premises has to be treated as a fresh application and supply can be granted only upon clearance of all outstalding dues relating to the previous service connection' Since the dues pertaining to HT l1 S.C.No.CBC353 rcmained unpaid, the appellant was not entitled to obtarn supply to the same premises. xi) That the c:ondition requiring clearance of previous electricity dues is intended to protect the commercial viability of the distribution licensee and the interests of thr, entire body of consumers. lt !r'as contended that electricity sirpplv is a public utilin' scn,ice involving substantial investment in infrastructure and distribution netw.orks. If consumers are permrtted to obtain supply through transfers of property q ithout clearing existing dues, the recov()ry mechanism available to rhe utilitl' would be seriously undermined, therebl' affecting the hnancial heaith and effic:ent functioning of the distribution svstem. 17. We have taken note of the respective submissions urged and the material placed on record. Consideration by this Court Structural Infirmitres in the Impusned Order 18. On per.rsai of rhe record, it is evident that the learned Single Judge commenced the analysis by considering th,: stand of the respondents vrithout first delineating the appellant,s Case lormuiating the issues arising for adjudication in The common order, aftcr merely or the writ petitions. recording the appgarance of the learned counsel for the parties, proceeds to examine the respondents' contentions without identifying .the appellalt's principal grievance requiring determination. In our considered view, a judgment is expected to Iirst set out the rival cases, identify the issues arising for consideration, and thereafter, proceed to analyse the same. The absence of such an approach in the impugned order lends considerable force to the appellant's grievance that the adjudication suffers from structural infrrmity. 19. \n Attn Kumat Agaruats case (supra 2), the Hon'ble Supreme Court observed that a judgment which merely reproduces the case of one party, without examining the case of the other party or recording findings on the issues arising for consideration, cannot be regarded as a reasoned adjudication. The Court held: 16. ......We think . the Hiqh Cou rt hos aone too far. We would not LToue mctde this com ment at all had the Hiq h Court qiuen rties. The due ueiqht to the rtuol submtssions mode bu tte hbu Hiah Court l:,ns not at al I analused the con tentions Dut either part u Hard lu anll reaso ns are forthcominq in the order. What is stated bu the utnt peti tioners and the res ndents is summarised. When the Hiolt Court steers i tself clear o f anu oplnton one u)au or the other euen as to exores whether a orima facie case erlsts g r not and uhether there is a reasonable suspicion o f anu cime ha ulnq been committed, it the Hiqh Court. is difficult to acceot the uieu tokeq (Emphasi.s suPPlied) 2o. It is pertinent to note that a reasoned order/judgment must reflect that the Court has considered the rival pleadings, the submissio4s advanced by the parties and the material placed on -) record before recording its conclusions. Such an exercise enables the parties to understand the reasons which weighed with the Court and also facilitates r.ffective appellate scrutiny. ln 1.he present case, the appellan t filed a detailed reply affidavit dzrted IT .O3 .2022 traversing the counter affidavit filed by the respondents. The reply aflldavit specifically dealt with the alleged incorrect reliance upon Clause l0 o[ Regularion No.7 of 2013, Clauses 5.9.6 and 8.4 of the GTCS; the applicability of Srlgdhaa Betnrages's case (supra 1); the alleged liabilitl arising out of HT S.C.No.CB(1353; and the respondents asserted power to refuse electricity supply. 2L. I t is also pertinent to note that the record d:.scloses that the appellant addressed each of the principal grouncs urged by the respondenrs by vr.ay of a structured and point-wise rebuttal. The learnecl Single Judgc, however, observed that in the reply affidavit 'petitioner almost reiterated the auerments in the uit affid auit,. Having compared rhe reply affidavit with the counter affidavit, we find that thc said observation is not borne out by the record. Equall-1 , the impugned common order does nct indicate any consideratton of thc specific rebuttals advanced by the appellant to the respondents' principal contentions. The absence of any discussion on those aspects gives rise to the appellant's grievance rhar rhe m.rteriar placed on record has not received consiricration due 22. In view of the above, it is to be noted that the impugned common order does not adequately consider the appellant's case or the submissions advanced on his behalf. The failure to formulate the issues in controversy and examine the appellant's principal contentions reflects non-consideration of the relevant pleadings and has materially vitiated the adjudicatory process' Applicability of th e Princioles Governin q Fresh Connections to Cases of Disconnection 2g. The principal grievance of the appellant is that the learned Single Judge failed to appreciate the distinction between the legal principles governing the grant of a fresh electricity connection or reconnection and those applicable to the disconnection of an existing electricity supply. According to the appellant, the controversy before the learned Single Judge pertained exclusively to disconnection of subsisting service connections and not to the grant of a fresh connection. However, on perusai of the record it indicates that the learned Single Judge relied upon principles governing grant of fresh electricity connections, particularly those relating to liability for clearance of previous e Iectricity dues, while examining the legality of the respondents' action in disconnecting the appellant's existing service connections. l) 24. [t is to be not(]d that the legal considerations governing grant of a fresh connection or reconnection are distinct from those applicable to disconnection of an existing supply. While the former concerns the condit_ions subject to which electri,:ity supply may initiallv be granted or restored, the latter concerns the. legalify of discontinuing an existing and subsisting supply already extended to a consumer. The statutory considerations applicable to these two situations cannor be treated as interchangeable. 25. It is a settled principle of public law that every action of a statutor]. authorit]' firust be supported by the sourc,: of power under which it is exercised. Consequently, where the validity of an order of disr:onnection is questioned, the action must be tested with reference to the statutorl' provisions and condjtions governing disconnection and not by importing principles applicable_ to grant of a fresh connection. 26. In the present case, the hrst LT S.C. No.12O7l16g2 had been subsisting sincc the year 2Ol4 and, admittedly, no dues were outstanding against the said connection. The seconl LT connection had also been s:rnr-ti<>ned on 17.O9.2021, the requis;ite charges had been paicl, the translbrmer had been installed on 25.09.202 1 and rhe sr:ppl-y infrasr,ucture had been complet(id before the responclents disconnected the same on l4.lO.2O2l. 27. It is pertinent to note that the power distribution company never disclosed or notihed previous arrears or the past outstanding tiability of the previous consumer of the premises at the time of granting the new LT connection and has granted LT connection' 2A, Further, the controversy before the learned Single Judge was not whether the appellant was entitled to a fresh electricity connection or reconnection, but whether the respondents were justified in disconnecting the appellant's subsisting service connections by relying upon the outstanding dues relating to an earlier HT consumer. In this regard, it becomes evident that the principles governing refusal of a fresh connection or reconnection cannot, without more, be invoked to sustain the disconnection of an existing eiectricity supply. The legality of the respondents' action necessarily has to be examined and evaluated with reference to the provisions loverning disconnection' 29. The learned Single Judge erred in applying the principles governing fresh connections and reconnections while adjudicating upon the legality of the impugned disconnections' The validity of the respondents' action ought to have been examined independently with reference to the statutory provisions governing disconnection of an existing suPPlY. )1 Lesalitv of the Dis connection of the Aooe llant's ElectriciW Suppiv under Section 56 of the Electrici rvAcr, 2003 30. Before examining the issue under cons;deration, it is necessary to refer to the provisions of Section 56 of the Electricity Act. The said provision is extracted hereunder for ready reference: 56. IEsconnection oJ supplg tn deJault oJ pagment. (1) Where ana pe'rson neglects to paA anA charge for eLecticity or anu sum other than a charge for electicitg due.from him to a Licensee or the qenerating compang in respect of supply, lransmlsslon or distibution or wheeling of electrititg to him, the licensee or t]1e generating companA mag, afier giuing not less than ftjleen. clear dags' notice in uiting, to such person and tuithout prejurl ice to his rights to recouer suclt charge or other sum by sutt, cut off the supply of electncity ond for that purpose ant or disconnect onA electic supply lir,,e or other uorlts being the propertg of such licensee or the generating comparu..t through tuLtich electricitg mag houe been supplied., transmttted. distibuted or uheeled and mag disatntinue the supplg untiL such charge or other surn^ together tuith any expetses inanned bg him in antting off and recontecting the supplg, are paid, but no longer: Prouided that the supply of electicitg shall not b,z, ant off if such pe:rson deposits. under protest,la.) an arnount eqLLal to the surn claimed from him, or (b) the electicitq charges due from him for euch month cctlculated on the basis of auerage charge for elec:ricity paid bg him duing the preceding six months, u-:hicheuer is less. pending disposal of any d_ispute betu..een htm and the licensee. (2) Nottuithstanding angthing contai.ned tn ong other latu for the tinte being in jorc:e, no sum due from onA consumer, und_er lhis secrion sholl be recoueroble ofier the peiod. of tuo geors Jiom the date uhen such sum became first due unless such .sum ira.s been shtnun con.tinuouslg as recouerable as aneor of ch.ar91es for electn.citll supplied and. the licensee shdll not cut oJfthe supptA of ttrc electicity. 31. The scope and ambit of Section 56 have been explained by the Hon'ble Supreme Court in Prern Cottels case (supra 3) wherein it was heid as under: 21. Coming to the second aspect, namelg, the impoct of subsection (1) on sub section (2) of Section 56, it is seen that the bottom line of sub-section (1) is the negligence of ang person to poA anA charge for electicitg. Sub-section (1) starts utith the uords "ruhere anA person neglects to paA ang charge for electicitg or anA some other thon a clnrge for electicity due from him'. 22. Sub-section (2) uses the tuords "no sum due from ang cotLsumer under this section'. Tlerefore, the bar under sub section (2) i^s relatable to the sum due under Section 56. This naturallg takes us to sub-section (1) ruhich deals specificallg utith the negligence on the part of a person to pay any chnrge for electricitg or anA sum other than a charge for electricitg. What is auered by Section 56, under sub-section (1), i.s the negligence on the part of a person to pag for etecticitg and not anything else nor ang negligence on the part of the licensee. 32. The aforesaid principie has also been reiterated in I(. C. Ntncn's case (supra 4), wherein the Hon'b1e Supreme Court observed that supply of electricity is made to the consumer and not to the premises and that liability for payment of electricity dues is that of the consumer concerned. Tested on the above principles, the action of the respondents cannot be sustained. 33. It is not the case of the respondents that anY electricity charges were due from the appellant in resPect of LT S.C.No.12O7O 1682 On the contrary, the appellant relies upon the No Dues Certiltcate dated 22.10.2020 to demonstrate that the electricity charges relating to the said service connection had been )9 regularly paid. Likewise, insofar as the second [,T connection is concerneC, the sanclioned charges had already been remitted before thc respondents proceeded to disconnect the stLpply. The dues sought to be reliecl upon by the respondents admittedly pertain to the erstu,hile HT S.C.No.CBC353, which stood in the name of M/s. Giridhar Ispat and thereafter M/s. Airan Comptrax Towers Pvt. Ltd. The appellant \\'as not the consumer in respect of the said HT service connection. The respondents have also pleaded that the HT agreement stood terminaled. Consequently, the orrtstanding dues relied upon bv the respondents were not dues payable by the appellant in respect of the electricity supplied to hirrL. 34. Moreover, in the absence of any amount due from the appellant in relation to the electricity supplied to him, the essential j urisdictional fact required for invoking Section 56 r>f the Electricity Act rx-as absent. The statutory power of disconnection under Section 56 of the Electricitv Act could not, therefore, have been exercised against the appcllant's subsisting LT service connec.tions merely on the basis of arrears allegedly payable by a different consumer. 35. Apart lrom the above, Section 56(1) of the Electricity Act expressly mandatcs rssuance of prior notice not lt:ss than hfteen clear davs befort, disconnection of supply. However, the material record docs not clisclose rhat any djsconnection r:lfected on such norice prec,_.ded either 14.10.2021 on the or tht: subsequent disconnection on 76.06.2025. The statutory requirement been complied with, the impugned action having not cannot be sustained on of the appellant's this ground as well. Thus, the disconnection urith Section 56 of the electricity supply was not in conformity Electricity Act and is unsustainable' Liabili tvofaS ubsequent Purchas er for th e Electrici w Dues of an Earlier HT Consumer that 36. The impugned common order proceeds on the premise burdened with the appeliant became the owner of a property electricity dues. However, the material on record indicates that the dues relied upon by the respondents relate to HT S C No'CBC353' whichadmittedlystoodinthenameofM/s.Giridharlspatand Ltd' It is also the thereafter M / s. Airan Comptrax Towers Pvt respondents' case that the said HT agreement appellant, _on stood terminated The the other hand, purchased open agricultural land granted an under a registered sale deed and was subsequently due processing by the independent LT S'C. No'120701682 after respondents. The subsequent LT connection and the earlier HT service connection constitute distinct consumer accounts governed by separate contractual and statutory relationships assumes significance since the impugned The distinction disconnections relate to the appellant's subsisting LT service connections' whereas the l1 outstanding dtres relied upon by the respondenr_s pertain to an earlier HT consumer 37. [n regard to the observation that the appellant and his father had clandestint:ly obtained LT S.C.No. 120701682 n order to avoid payment of the outstanding dues is concerned, it is unsustainable. A perusal of the pleadings does not disclose any specific allegation that the appe[ant had clandestinely obtained the LT service connection. On the contrary, the material placed on record indicates that the appcllant applied for the connection through the prescribed procedure, the respondents processed the application, collected the requisite charges and sanctioned the service connection. In the absence of an1'pleading or material to support su(th a conclusion, the finding rer:orded by the learned Single Jtidge cannot be sustained. 34. The fir-rding of the learned Single Judge that the appellant, by virtue of being the subsequent purchaser of the property, became liable for thc electricitr. dues of the earlier HT con sumer does not commend acceptance, on account of the fact tha t the appellant neither sought restoration of the earlier HT service connection nor claimed anv right flo,"ving therefrom. The appellant,s case throughout has been that he was granted an independent LT connccrion in rhe year 20l4 and that the second srrbsecrienr.h sancrionecl in service LT connectiOn WaS the year 2O21 inaccorda:tce with law. 39. The settled legal position is that an electricity connection is granted to the consumer and not to the property itself' The Supreme Court in K.C. J\Encn's case (supra 4) has held Hon'ble as under: ,,s il sta that 52. The de nition o toaco nsumer. The said definition mea tlrc sole o elect ls uls -d-uis tlle does n.ot indicate that suoolu o fe lectici premtses of the co nsurLer. Consideing the ouerall schem.e of and the 2OO3 Act, the supptg of electicitg is to the consumer not tlTe premises. 56. Sbction 56 P roudes thnt it b the liabilitu of tLe cott'sumer tn res Dect of the suDollt of to pa he charqe for electi electicitu. under Section 56, the dutg of effecting the Pagment sumer. of clwrges for electricitg is on a person, thot is' the con Further, Section 56(2) speciftcatty contains the expression "no sum due from ang consumer" ' Section 126 also uses the or onA u-tords "the electicitA charges pagable bg such person the ouerall scheme oth.er person beneftted bg such use". T?tt-Ls, can be of the 2O03 Act makes it euident that onlu a consumer hetd liob le fo r defau It in po u ment of elec triatu dues or ut charoes. 2 SCC AZ tn rcno Marbtes flsha Marbles u' Bilwr SEB' (1995) 6481, a threeJudge premtses ts to opptication for suPPlg of electrtcitg to tlle same interpreting be regarded as o reconnedio n. This Court, uthile on the the proutsDns of the 1910 Act, goue its reasoning resPect to assumption thot the suPPlg of electicitg is ttLith has premises and not the consumer' HouLeuer, the 2OO3 Act statutoilg cloified the Posttion that supPlg of electicitg uith respect to tLLe consumer. It necessailg follotus that u.then 1S or tn o the 43o o the the ht s r o lication uith e tecticit reuLous An the electici tu con be cot eoonsed as reannectio n onltl ulrcn alreadu a same ou)ner or occu oler o f the Dremls es, u) ho uas to the th res o e lectici SU lies consumer, same lses rn case the electrici tu suoolu is disco nnected (Emphasis suPPtied) J.' In the pre sent case, the outstanding dues admittedly relate to the earlier HT consumer. The appellant was neither the consumer under the saicl HT service connection nor a party to the HT agreement. Consequently, any liability arising out of that service conner:tion cannot erutomatically be fastened upon the appellant merely because he subsequently purchased the property. 4o. Further, thc decisions relied upon by the learned Single Judge are distinguishable on facts and do not govern the controversy involved in the present case, for the follc,wing reasons i) In K.C. JVinan's case (supra 4) the Hon'ble Supreme Court considered the validity of the Conditions of Supply and the Electricity Supply Codes requiring a subsequent purchaser or occupier to clear the outstanding dues of the previous consumer as a pre_condition for gralt of a lresh electricity connection. Upholding the validity of such conditions, the Apex Court held that a distribution licensee r_^tay insist upon clearance of the previous dues before granting a fresh connection. The present case, however, does not concern the grant of a fresh connection or reconnection, but the chsconnection of the appellan[,s existing and subsisting servlce connections, against which no dues outstanding. LT are admittedly ii) Likewise, Srigdhaa Bet*rages's case (supra 1) arose out of the purchase of property in an auction conducted under the provisisns of the SARFAESI Act, where the auction notice specihcally disclosed the outstanding electricity dues and the property was sold on an 'as is where is' basis' The auction notice expressly notified the purchaser of the existing statutory liabilities, including electricity dues' In the present case; the appellant is not an auction purchaser but a purchaser under a registered sale deed in respect of open agricultural 1and. The sale deed contains no stipulation fastening liability for the outstanding electricity dues of the earlier HT consumer. More importantly, while Srlgdlva Betrerages's case (supra 1) concerned the grant of a fresh electriciry connection, the controversy in the present case relates to the disconnection of subsisting service connections' 4L. Further, considerable emphasis was placed by the respondentsonthefactthattheappellant'sfatherwasassociated with M/s. Airan Comptrax Towers Pvt' Ltd lt is to be noted that mere existence of a familial relationship cannot, by itself, furnish a legal basis to fasten upon the appellant the statutory or contractual liabilities of a company. A company is a distinct juristic entity' and its liabilities remain governed by the applicable statutory provisions and the contractual relationship between the licensee and the i5 consumer. In the abscnce of any statutory provision creating such Iiability, the appellant cannot be made personally liable solely on account of his relat.ionship with the persons associated u,ith the earlier consumer. Thus, the appellant as a subsequent purchaser lvho obtained independent LT service connections, cannot be fastened with liabiliw lor the electricity dues pertaining to an earlier HT consumer merelv on the basis of ownership ol' the property or hrs relationship u'ith the persons connected wil h the erstwhile consumer Applicabili tv of Clauscs 5.9.6 and 8.4 of the Gerreral Terms and Conditions of Supplv 42. The respondents and the learned Single Judge sought to j ustifv the impugned disconnections by placing reliance upon Clauses 5.9.6 and 8.4 of the GTCS. It is, therefore, necessary to extract the releYant clauses hereunder for ready reference: Clause 5.9.6 of the GTCS Dismantlement o-f Seruice Line afier Termination of Agreement: On the terntination of the LT or HT Agreement, the :ompang is entitled tct dismantle the service line and remoue the mateials, Meter, cut out etc. Afier terminotion of the Agreement, the consumer shall be treated as a fresh appticant for the purpose o-f giuing supplg to the same premises uhen appliea for bg Ltim prouided. there ar<: no dues against the preuious seruice connectiott. A plain reading of the said clause makes is attracred onl-y pp6yl rcrmination it evident tlLat its operation of the agreemen governing the service connection in question. In the present case, neither of the appellant's LT service connections had been terminated prior to their disconnection. The first LT service connection (SC No' l2}7ol6a2l had been subsisting since the year 2014, while the second LT connection had been sanctioned and completed on 25.O}.2O2L and disconnected on 14.10.2021 i'e., within 19 days' Although the respondents contend that the earlier HT agreement for SC No. CBC353 stood terminated in the yeat 2OO2, the appellant was admittedly not a party to that agreement. Therefore, Clause 5.9.6 cannot be invoked to justify the disconnection of the appellant's subsisting LT service connections. Clau se 8.4 of the GTCS Tronsfer of Seruice Connectnn The setler of the propertg should clear all the dues to the Compang before selling such propertg. If tlrc seller did not clear the dues as mentioned aboue, the Compang may refuse to supplg electicity to the premises through the alreadg eisting connection or refuse to giue a neu connection to the premises titl oll dues to the CompanA are cleared' The power -contemplated under Clause 8'4 is one relating to refusal of electricity supply. The clause does not expressly confer power uponthelicenseetodisconnectanexistingarrdsubsistingservice connection which is in operation. In the present case, the appellant purchased open agricultural land under a registered sale deed' Thereafter, an independent first LT service connection was granted in his favour in the year 2Ol4 arrd, remained in existence for several )7 vears. Subsequently, the respondents themselves sanctioned the second LT connection b1' proceedings dated 17.O9.2O21, accepted the requisite charges, installed the transformer and completed the supply infrastructur€r. Once the respondents had granted the appellant independent LT service connecl-ions and those connections had become operational, the question was no longer one of refusing supply under Clause 8.4, but of disconnecting an existing supply. Such action could onl]' be justified w'ith reference to the statutory provisions and the applicable conditions governing disconnection and not by invokrng a provision intended to regulate' refusal of supply al the threshold. Therefore, neither Clause I;.9.6 nor Clause 8.4 of the GTCS furnishes the respondents with the authority to disconnect the appellant's subsisting LT service cornections in the facts ol lhe presenl case. Com liance with Section 56 1 of the Electrici Act and the Principles of Natural Justrce 43. It is a settled pnnciple of administrative law that where the exercise of statuton' pouer entails civil cclnsequences, the person likely to be altectecl must ordinarily be afforded prLor notice and a reasonable opportunit\.- of being heard, unless the statute expressly excluclc's such requirement. In the present case, the material on record cloes not disclose that placed any notice preceded the disconnection of either of the appellant's service connections. The second LT service connection was disconnected on 14 '1O '2021 after ttre respondents had sanctioned the connection, accepted the requisite charges and completed the supply infrastructure' Likewise, the hrst LT service connection, which had been subsisting since 20 14, was disconnected on 16 '06 '2025 without any prior notice or proceedings 44. The respondents have not placed any material to demonstrate compliance with the statutory requirement contained in Section 56( 1) of the Electricity Act before effecLing the impugned disconnections. As already noticed hereinabove, Section 56(1) of the Electricity Act specifically mandates issuance of at ieast lifteen clear days' prior notice before disconnecting electricity supply' The admitted factual position is that no such notice was issued before either of the impugned disconnections' The absence of prior notice and opportunity to the appellant has resulted in denial of procedural fairness. Therefore, the action of the respondents cannot be sustained either on the touchstone of Section 56 of the Eiectricity Act or on the settled principles of natural justice' Accuracv of factual findines and reliance on ma tters bevond the adinss 45. It is appellant's contention that the impugned common order proceeds on certain factual assumptions which are not borne out by the pleadings and the material available on record. In this regard it is apposite to nole that the impugned common order at para 3.1 records that the District Collector had initiated proceedings under the Revenue Recovt:ry Act and issued a distraint notice for sale of the subject property on 25. ll.2ol9. However, ir perusal of the Counter Affidavit discloses that the respondents had merely addressed a communication dated 25.11.2019 requesting the District Collector Lo initiate proceedings undr:r the Revenue Recoven' Act lty rssuing the requisite notice for recovery of the outstanding dues. The record does not indicate that the District Collcctor had, on rhat date, issued any distraint notice br initiated coercive proceedings. Therefore, the observation in the impugned common order does not accord with the pleadings placed on record. 46. The impugned common order further re.cords that the respondents had addressed communications to the Tahsildar, the Distnct Tou,n and Country Planning Officer, the Commissioner, HMDA and the Environmental Engineer of the pollution Control Board requesting them not to grant any permission in respect of the subject propert\. Horvever, a careful perusal of the :ounter affidavit filed irl-the responde:tts reveals that the aforesaid assertions do not form part of therr ple:rdings. 47. It is well setrled rhat adjudication must proceed on the of the pleadings of the parries and the materia.l p]aced basis on record. h BachhoJ lilat:ulr a. Nltlmrz Mandals, the Hon'ble Supreme Court has held that t1"e hndings founded on facts which neither form part of the pleadings nor are supported by the record cannot ordinarily be sustained, as they deprive the affected party of an opportunity to meet such case 48. Since the aforesaid matters do not find place in the respondents' pleadings, the observations made in that regard do not appear to emanate from the pieadings or the materiai placed on record. Therefore, the impugned common order' to that extent' proceeds on certain factual assumptions which are neither supported by the pleadings nor borne out by the record' 49. It is to be noted that the Electricity Act contemplates distinct remedies for distinct situations' While a distribution licensee is entitled to recover its dues by adopting the remedies available in law, including proceedings under the Revenue Recovery Act or other permissible modes of recovery, the power to disconnect electricity supply is specilically governed by Section 56 of the Electricity Act and can be exercised only upon fulhlment of the conditions prescribed therein. In the present case' the respondents had already initiated proceedings for recovery of the outstanding dues relating to the erstwhile HT service connection' Those proceedings ' (2008) 17 scc 491 ll are independent of, and distinct from, the power of disconnection under Section 56 of the Electricit-v Act. 50, As noted hereinbefore, the appellant was not in default of paymcnt of anv electricity charges in respect of either of his LT sen'ice connections. [n the absence of anlz amount due from the appellant in respect of the electricily supplied to him, the statutory pre-condition for invoking the power of disconnection under Section 56 of the Electricirv .{ct \\'as not satished. Therefore, the power of disconnection cannot be invoked as a substitute for, or as an aid to, the recovery of dues unless the statutory conditions governing its exercise are fulfilled. The remedy of recovery and the power of disconneclion operate in distinct fields and cannot be treated as interchangeablc. Conclusion 51, For the foregoing reasons, this Court is of the considered view that the impugned common order dated 21.01.2026 passed by the Iearne d Srngie Judge in W.P.No.37524 of 2O2I and W.P.No.16757 ol ,025 suffers lrom material legal inhrmitres arisirrg out of nonconsideration of relevant aspects, misapphcation of the governing statutory provisions and legal principles, and relizrnce on factual assumptions not borl-re out blr the record, and therefore, warrants interfcrence and is liable to be set aside. 52. Accordingly, the W.A.Nos.306 and 325 are allowed. The common order dated 21.01.2026 passed by the. learned Single Judge in W.P.No.37524 of 2O2l and W.P.No. 16757 of 2025 is set aside. As a consequence, the action of the respondents in disconnecting, on 14. 10.2021, the electricity supply pertaining to the sanctioned LT supply of 1 No. 3 Phase, 25 KW Domestic Load sanctioned uide Lr. No. DE / OP/ IBRAHIMBAGH / F .N o. 17 a / 2O2 l -22, D.No.1398, daled, 17.O9.2O21, is declared illegal. The respondents are directed to restore the said electricity supply within four (04) weeks fronl the date of receipt of a copy of this judgment. Further, the action of the respondents in disconnecting, on 76.06.2025, the appellant's electricity service connection bearing SC No. 120701682 under Category-2(B\, is declared illegal. The respondents are directed to restore the said service connection within four (04) weeks from the date of receipt of a copy of this judgment. Consequently, miscellaneous petitions pending if any shall stand closed. No costs. SD/- K.SRINIVASA RAO JOINT REGISTRAR //TRUE COPY// EC ION OFFICER To (A Government Southern Power Distribution Company of Telangana L tmr ted, of of Telangana Undertaking) (Formerly Central Power D istribution ComPanY A.P Ltd.) Corporate Officey 6-1-50, Mint Compound, Hyderabad- 5000063 Rep by its Managing Director' 2.TheDivisionalEngineer,Operation,lbrahimbaghDivision,TSSPDCL' Cybercity Nanal 3. The Suferintendent Engineer, Operation^Circle' Cvbercitv' TSSPDCL' Naoar'k Roads Rethibow\i' Hyderabad-z8 . Sub-Division' o if,E"'n.."i."-oiui..Ji''Engine"r, op"r"tion, TSSPDCL, CybercitY' lbrahimbagh PSK. TKS 4, One CC to SRI ANAND KUIVAR KAPOOR, Advocate [OPUC] One CC to SRI N.SREEDHAR REDDY, SC FOR TGSPDCL IOPUC] Two CD Copies HIGH COURT DATED: 20107t2026 COMMON JUDGMENT WA.Nos.306 AND 325 OF 2026 s 1ilE 5rA l1 t/ ,,i? r5 t * ALLOWING THE WRIT APPEALS WITHOUT COSTS o ^Jl- s.sl+l'e 0 JUt 2026 ? ( {' Pfi'tCALO-Y 12-'"

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Telangana HC judgments →

Corporate & Commercial advocates near the Telangana High Court

Dealing with a similar matter? Send a free enquiry to advocates who handle it. Fees are agreed with the advocate directly.

All Corporate & Commercial advocates in India