Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
Page - 1 of 15
HIGH COURT OF TRIPURA
_A_G_A_R_T_A_L_A_
RFA No.27/2017
1. Airport Authority of India
Rajib Gandhi Bhawan, Safdarjung, New Delhi
through the General Manager.
2. Airport Director, Agartala Airport, Agartala,
P.O. Bimanghar, P.S. Airport, West Tripura.
……….. Appellants.
Vrs.
1.
Sri Sanatan Das, S/o Late Naider Chand Das,
2.
Sri Mohan Lal Das, S/o Late Sudhir Das,
3.
Sri Tapan Sarkar, S/o Late Hari Dhan Sarkar,
4.
Sri Kishore Nag, S/o Sri Umesh Nag,
5.
Sri Ajit Das, S/o Late Sudhir Das,
6.
Sri Biru Lal Das, S/o Late Sudhir Das,
7.
Sri Santosh Das, S/o Late Sudhir Das,
8.
Sri Sukumar Deb, S/o Late Sadhu Charan Deb,
9.
Sri Ashish Sarkar, S/o Late Prabhat Chandra Sarkar,
10. Sri Debashish Sarkar, S/o Late Prabhat Chandra Sarkar,
11. Smt. Anjana Sarkar, W/o Late Gour Dhan Sarkar,
12. Sri Sankar Chandra Deb, S/o Late Sadhu Charan Deb,
13. Sri Satya Gopal alias Satya Ranjan Roy, S/o Late Kunja Behari Roy,
14. Sri Nani Gopal Roy, S/o Late Kunja Behari Roy,
15. Sri Dhirendra Das, S/o Late Surendra Das,
16. Smt. Laxmi Dhar, W/o Late Suddhadhan Dhar,
17. Sri Kali Charan Das, S/o Late Baishnab Chandra Das,
18. Sri Jagadish Roy, S/o Late Raj Kumar Roy,
19. Sri Prafulla Chandra Roy, S/o Late Dinabandhu Roy,
20. Smt. Usha Rani Roy, W/o Late Bipain Chandra Roy,
21. Sri Dhirendra Bhowmik, S/o Late Kshetra Mohan Bhowmik,
22. Sri Amal Das, S/o Late Nirdhan Das,
23. Sri Sadhan Biswas, S/o Late Jagabandhu Biswas,
24. Sri Matilal Bardhan, S/o Late Amar Chandra Bardhan,
Page - 2 of 15
All are residents of Village – North Narayanpur, P.O. Bimanghar,
P.S. Airport, District – West Tripura.
……….. Respondents.
25. The Sub-Divisional Magistrate, Sadar, Agartala, P.O. Agartala,
P.S. West Agartala, District – West Tripura.
26. District Magistrate & Collector, P.O. Agartala, P.S. West
Agartala, West Tripura, Agartala.
27. The State of Tripura, represented by the Secretary, Revenue
Department, Government of Tripura, P.O. Kunjaban, P.S.
Capital Complex, Agartala, District – West Tripura.
……….. Pro-Respondents.
_B_E_F_O_R_E_
HON’BLE THE CHIEF JUSTICE MR. SANJAY KAROL
THE HON’BLE MR. JUSTICE S TALAPATRA
For Appellant(s) :
Mr. Sankar Kr. Deb, Sr. Advocate,
Mr. P K Pal, Advocate.
For Respondents :
Mr. A K Bhowmik, Sr. Advocate,
Mr. Karnajit De, Addl. Govt. Advocate,
Mr. R Datta, Advocate.
: 31st July, 2019.
Date of hearing
Date of Judgment : 12th September, 2019.
Whether fit for reporting
:
Yes
√
No
×
JUDGMENT
( Sanjay Karol, C.J. )
In the instant appeal preferred under Section 9C of the
Aircraft Act, 1934 (hereinafter referred to as the ‘Aircraft Act’), the
Airport
Authority
‘Authority’)
of
India(hereinafter
referred
to
as
the
lays challenge to the award dated 28th March, 2016
passed by Mr. Suresh Chandra, sole Arbitrator, Joint Secretary &
Legal Advisor, Government of India, Ministry of Law & Justice,
New Delhi in awarding certain amount of compensation in favour
of the claimants.
Page - 3 of 15
[2]
The brief background leading to the filing of the instant
appeal being that:
Land
owners
of
certain
lands
situate
in
Village
–
Narayanpur abutting and adjoining the Airport at Agartala, State
of Tripura, were asked to prune/downsize the trees/vegetative
growth over their respective lands. The said land owners laid
challenge to such notice dated 23rd September, 2009 by way of
writ petition, [WP(C) No.307/2009 titled as Sonatan Das and
Ors. Vrs. The Airport Authority of India and Ors.] which was
disposed of vide order dated 15th September, 2010 in the
following terms :
“Heard
Mr.
A
K
Bhowmick,
learned
senior
counsel, for the petitioners. Also heard Mr. Adhikary,
learned Advocate General, Tripura, appearing for the
respondent Nos.3 to 5 and Mr. S Deb, learned senior
counsel for the respondent Nos.1 & 2.
The petitioners have filed the present petition
with the following prayer :
“It is, therefore, humbly prayed that Your
Lordships would graciously be pleased to issue
Rule upon the Respondents to show cause as to
why the Respondents should not transmit all
records relating to the case of the petitioners:
And
As to why a Writ in the nature of certiorari should
not be issued quashing the notices issued by the
Respondents
No.3
vide
No.2986-3036/
F.No.4(88)SDM/SDR/REV/A-1/09
dated
23rd
September, 09 directing the petitioners to
downsize and prune the standing trees above 7½
feet within 7 days;
And
As to why a writ in the nature of mandamus
should not be issued directing the Respondents
Page - 4 of 15
either to acquire the lands of the petitioners lying
within 70 meters from the boundary of Agartala
Airport under the provisions of Land Acquisition
Act or to make inventory of the trees required to
be cut down through a joint survey recording
description and size of the trees, to assess
compensation for the same and to pay
compensation for the loss and damage before
cutting the trees of the petitioners;
And
As to why a writ in the nature of prohibition
should not be issued directing the Respondents
not to give effect the notices dated 23rd
September, 2009 issued by the Respondent No.3
before preparation of inventory of the trees
required to be cut down through a joint survey
recording the description and size of the trees
and assessment of compensation and payment
thereof to the petitioners.”
Learned senior counsel for the petitioners, at the
outset, submits that though
the
petitioners have
challenged the notice dated 23rd September, 2009
issued by Sub-Divisional Magistrate, Sadar, Agartala
requiring the petitioners to cut down their trees up-to
the level of eight-and-one-half feet and prayed for
compensation, they have no objection if the writ
petition is disposed of with a direction to prepare an
inventory
in
their
presence
and
in
presence
of
representatives of Airport Authority of India and SubDivisional Magistrate, Sadar, Agartala (SDM), and if
step for assessment of compensation under Section
9(B) of the Aircraft Act, 1934 is taken.
Learned senior
counsel for
the
respondent
Airports Authority submits that while the Authority is
not averse to the idea of preparing inventory in
presence of the representatives of the petitioners,
Airport
Authority
Magistrate,
Sadar,
of
India
Agartala
and
(SDM),
Sub-Divisional
they
are
not
agreeable to the claim of the petitioners that they are
entitled to compensation under Section 9(B) of the Act.
Page - 5 of 15
Learned Advocate General* Tripura, submits
that the State is agreeable to making an inventory in
presence of the petitioners, representatives of the
Airports Authority of India and the Sub-Divisional
Magistrate,
Sadar,
Agartala,
but
the
question
of
entitlement of compensation to the petitioners is to be
decided by the authority under Section 9(B) of the Act.
Since the preparation of inventory in presence
of the representatives of the petitioners, Airports
Authority of India and the Sub-Divisional Magistrate is
agreed upon by learned counsel for the parties to the
present
proceeding
and
as
submitted
by
learned
counsel for the petitioners that they do not press the
prayer
for
setting
aside
the
notice
dated
23rd
September, 2009, the present writ petition is disposed
of with the following directions:
(i)
The petitioners, from 18th September
2010, would start cutting down the
required
trees
in
presence
of
representatives of the Airport Authority of
India and the Sub-Divisional Magistrate,
Sadar, Agartala;
(ii) An inventory relating to trees cut on each
day shall be prepared, which shall be
signed by the parties concerned, that is,
the representatives of the petitioners
concerned, the Airport Authority of India
and Sub-Divisional Magistrate, Sadar,
Agartala.
(iii) The said process is to be completed with
the outer limit of 6 days from 18th
September 2010.
(iv)
The
question
of
entitlement
and
assessment of compensation shall be
decided by arbitrator to be appointed by
Government of India in the Ministry of Civil
Aviation as required under Section 9(B) of
the Aircraft Act, 1934, in view of the
dispute relating to the entitlement and
payment of compensation. The arbitrator
shall go into the question of entitlement of
compensation by the petitioners and pass
Page - 6 of 15
necessary
awards
thereafter.
The
appointment of arbitrator shall be made
within 45 days from today by the
appropriate authority of the Government
of India.
This order is passed in presence of Mr. A Lodh,
learned Addl. Solicitor General of India.
The writ petition is accordingly disposed of. No
costs. It is needless to say that interim order, if any,
passed earlier stands vacated, in terms of this order.
A copy of this order be furnished to learned
Asstt. SGI for onward transmission to the Ministry of
Civil Aviation, Government of India, for compliance.
A copy of this order shall also be furnished to
learned counsel for the parties.”
( Emphasis supplied ).
*
Here we clarify that when this order was passed Mr. Nisith
Adhikary was the Advocate General, Tripura, representing the
State-respondents.
[3]
Undisputedly, thereafter all consequential action was
taken and eventually the issue of compensation adjudicated by
the sole Arbitrator in terms of the award subject matter of
challenge in the present appeal.
[4]
Noticeably, pursuant to order referred to(supra) an
inventory was prepared, termed as the Joint Inventory Report
(JIR), with the concurrence and in the presence of all concerned.
Significantly, there was never any dispute with regard to its
existence or correctness of its contents. Also such a plea cannot
be allowed to be taken in the present appeal for none laid
challenge thereto. The only contention being that it was neither
Page - 7 of 15
placed on the record nor prayed in accordance with law. Well we
are not able to accept such a submission on behalf of an
instrumentality of a State who is duty bound to pay compensation
which is just & fair. The Arbitrator noticed its existence and rightly
considered the same.
[5]
the
Simply while not fully accepting the claims set up by
claimants,
the
Arbitrator
has awarded certain
reduced
amounts as compensation with respect to the trees(number wise
and category wise). The amount claimed and the sum awarded
with respect to each one of the claimants is indicated in a
tabulated form herein below:
Sl
No
Claimants
Amount
claimed
Awarded
amount
1.
Sri Sanatan Das (Claimant No.1)
and Sri Dhirendra Ch. Das
(Claimant No.15).
trees/plants
₹14,49,873
₹11,24,857
2.
Sri Mohanlal Das (Claimant
No.2), Sri Ajit Das (Claimant
No.5), Sri Birulal Das(Claimant
No.6) and Sri Santosh Das
(Claimant No.7).
450 bamboos,
50 other trees
&
3 coconut
trees.
₹7,34,545
₹4,58,745
3.
Sri Tapan Sarkar (Claimant
No.3),
Sri
Ashish
Sarkar,
(Claimant No.9), Sri Debashish
Sarkar (Claimant No.10) and
Smt. Anjana Sarkar (Claimant
No.11).
151 trees
&
1012 bamboos.
₹15,44,683
₹11,24,877
4.
Sri Kishore Nag (Claimant No.4).
1220 bamboo,
125 betel nut
&
46 other trees.
₹6,56,721
₹4,47,521
5.
Sri Sukumar
No.8)
280 betel nut,
14 coconut
&
200 bamboos.
₹14,02,679
₹8,42,279
6.
Sri
Sankar
Chandra
(Claimant No.12)
Deb
7 trees
&
41 betel nut.
₹1,44,092
₹87,692
7.
Sri Satya Gopal Roy (Claimant
No.13 and Sri Nani Gopal Roy
(Claimant No.14).
34 betel nut,
340 bamboos
&
49 trees.
₹21,20,025
₹14,53,325
Deb
Trees/plant
per JIR.
(Claimant
as
Page - 8 of 15
8.
Smt. Laxmi
No.16).
Dhar
(Claimant
93 trees
400 bamboos
30 betel nut
2 Coconut.
₹7,24,150
₹5,50,950
9.
Sri Kalicharan
No.17).
Das
(Claimant
34 trees
₹4,42,650
₹2,37,853
10.
Sri Jagadish
No.18).
Roy
(Claimant
3 trees.
₹84,355
₹54,355
11.
Sri
Prafulla
Chandra
(Claimant No.19).
7 fruit bearing
trees
& 3 non-fruit
bearing.
₹1,61,871
₹1,42,882
12.
Smt. Usha Rani Roy (Claimant
No.20).
6 trees.
₹22,556
₹16, 056
13.
Sri
Dhirendra
(Claimant No.21).
Bhowmik
70 trees
&
100 bamboos.
₹6,78,911
₹4,01,711
14.
Sri Amal Das (Claimant No.22).
450 bamboos
32 trees.
₹3,67,227
₹2,28,027
15.
Sri Sadhan
No.23).
Biswas
69 trees,
3 betel nut
1 coconut.
₹5,48,002
₹4,32,402
16.
Sri Suman
No.24).
Bardhan(Claimant
4 trees.
₹92,863
₹66,653
[6]
Roy
(Claimant
Section 9A of the Aircraft Act empowers the Central
Government to restrict the height of a building/structure or any
tree planted over any land within the radius of 20 kilometres from
the
aerodrome
reference
point;
direct
owner
of
such
building/structure/plant to demolish the structure or cut the tree
up to a specified height; issue directions for ensuring that the
plant does not exceed the specified height. By virtue of subsection (4) of the said Section, every person, which in the instant
case would be the claimants/land owners, are bound to comply
with such directions.
Page - 9 of 15
[7]
Sub-section 9B of the Aircraft Act, prescribes various
modes for determination of such compensation which is fair and
reasonable, payable to the claimants. Arbitration is one such
prescribed mode and the factors to be counted for determination
of such compensation being the damage sustained by the person
to be compensated “in his earnings”; diminution of market value
of the land; damage sustained by the person as a result of cutting
or reducing the height of the building/structure or the plant;
and/or dislocation, as a result of such action.
[8]
Significantly, by virtue of sub-section (g) of Section
9B, provisions of Arbitration Act, 1940 (1940 Act) are not made
applicable to the Aircraft Act. The Arbitrator has been conferred
certain powers of civil court insofar as summoning or production of
documents. The appeals assailing the award, as already noticed
(supra), are preferred under Section 9C. Thus, careful reading of
Sections 9A, 9B, 9C and 9D reveals that the Aircraft Act is a selfcontained code in itself and the appeal is to be heard and decided
on the parameters set out therein.
[9]
It is in this backdrop, we are not in agreement with
the submission made by Mr. Sankar Kr. Deb, learned senior
counsel for the appellant that award passed by Arbitrator is
mandatorily assailable
and required to be adjudicated on the
grounds specified under Section 34 of the Arbitration and
Conciliation Act, 1996 (hereafter referred to as ‘the Arbitration
Act’).
Page - 10 of 15
[10]
We may observe that by virtue of the Aircraft Act, the
1940 Act stands repealed but the Arbitration Act does not provide
anything which makes its provisions also applicable to the
proceedings initiated under the Aircraft Act.
[11]
Hence we refrain from viewing the correctness of the
award on the grounds set up under the provisions of the
Arbitration & Conciliation Act, as interpreted by the Apex Court in
Union of India v. A L Rallia Ram, AIT 1963 SC 1685 (3 Judge
Bench); Renusagar Power Co. Ltd. and Ors. Vs General
Electric Co. Ltd., 1994 Supp(1) SCC 644 (3 Judge Bench);
Continental Construction Co. Ltd. Vs. State of Madhya
Pradesh, (1988) 3 SCC 82 (2 Judge Bench); Oil & Natural Gas
Corporation Ltd. Vs. Saw Pipes Ltd., (2003) 5SCC 705(2
Judge
Bench);
McDermott
International
INC
Vs.
Burn
Standard Co. Ltd. and Ors.,(2006) 11 SCC 181 (2 Judge
Bench); Oil and Natural Gas Corporation Ltd. Vs. Western
Geco International Ltd., (2014) 9 SCC 263 (3 Judge Bench)
and
Associate
Builders
Vs.
Delhi
Development
Authority,(2015)3 SCC 49 (2 Judge Bench).
[12]
Nonetheless award stands viewed and tested even on
the said grounds of existence and soundness of reasoning; against
public policy; contrary to statutory provisions of law understood
by the courts.
Page - 11 of 15
[13]
What
necessitated
the
authorities
in
asking
the
claimants to downsize the structures/vegetative growth vide
notice dated 23rd September, 2009 was the safety of the aircraft
flying over the land. Undisputedly, in terms of direction issued by
this Court, claimants subjected and complied with the same. In
adjudicating the claims, the Arbitrator, based on the pleadings of
the parties framed the following issues :
“(A)
Whether
the
claimants/respondents
were
rightly
arrayed.
(B) Whether trees of the description were cut.
(C) Whether claimants had ownership/any compensation
have made to claimants.
(D) Whether the inventories were made.
(E) Whether claimants entitle for compensation.
(F) Quantum, if any.”
[14]
While answering issue Nos.B, C and D, the Arbitrator
observed as under :
“Sri
Sirshendu
Magistrate,
Debbarma,
Mohanpur
17.9.2014submitted
an
Deputy
Collector
and
Revenue
Circle
on
inventory
relating
to
cutting/pruning of trees fallen outside of the boundary
wall of Agartala Airport. An inspection was also made
on 30.7.2012 by arbitrator when both parties were
present
and
the
fact
of
cutting
of
trees
was
corroborated. Thus, the trees of the description is
mentioned in the report are accepted and respondents
could not rebut with presumption and hence the issue
is decided in affirmative and in favour of the claimants.”
(Emphasis supplied).
Page - 12 of 15
[15]
There is nothing on record prompting us to differ with
such findings. In fact parties were ad idem about the preparation
and contents of the joint inventory report. It is in this backdrop,
the
Arbitrator
while
answering
issue
No.F
quantified
the
compensation with respect to each one of the claimants, factoring
the grounds specified in sub-section (g) of Section 9B of the
Aircraft Act.
[16]
It is a matter of record that vide Notification, SO
No.938 dated 5th January, 1988, under Section 9A of the Aircraft
Act, the authority had issued the following directions :
“i. No building or structure shall be constructed or
erected, or no tree shall be planted on any land within
the limits specified in Annexure I to this notification in
respect of Civil and Military Aerodromes existing as
listed in Annexure III to this notification, aerodromes to
be constructed or developed and notified by the
Competent authority in future where there is any
building, structure or tree on such land, the owner or
the person having control of such building, structure or
tree shall demolish such building or structure or, as the
case may be, cut such tree, forthwith but not later than
a period of one month from the date of publication of
this notification in the Official Gazette,
ii. No building or structure higher than the height
specified in Annexure II to this notification shall be
constructed or erected, or no tree which is likely to
grow or ordinarily grows higher than the height
specified in the said Annexure II, shall be planted on
any land within a radius of twenty kilometers from the
aerodrome reference point (ARP) of the aerodromes
listed in Annexure III to this notification excluding the
land covered by Annexure I to this notification or
Page - 13 of 15
aerodromes which would be constructed or developed
and notified by the competent authority from time to
time, where the height of any building or structure or
tree on such land is higher than the height specified in
the said Annexure II, the owner or the person having
control of such building structure, or tree shall forthwith
but not later than a period of one month from the date
of publication of this notification in the Official Gazette,
reduce the height thereof so as not to exceed the
specified height.”
[17]
It is also a matter of record that vide Gazettte
Notification dated 17th February, 1988 issued under Section 9A of
the Aircraft Act, as applicable to Agartala, the authorities had
restricted elevation of any structure up to a height of 14 meters
(47’).
[18]
Inviting attention of these two notifications Mr. Deb,
learned senior counsel, has made two submissions; (a) earlier
claimants already stood compensated for the trees grown over
their lands which were felled/height reduced and (b) claimants
allowed the trees to grow beyond the permissible height and as
such, would not be entitled to get compensation for the same.
[19]
Well there is nothing on record to establish that such
compensation was paid to the claimants with respect to the very
same land or the trees. Also there is nothing on record to indicate
that post 5th January, 1988 notification, claimants planted fresh
trees or allowed the trees to grow beyond the prescribed limit.
According to the claimants, the trees were in existence much prior
Page - 14 of 15
to the issuance of notifications and the respondent-authority
issued notice dated 23rd September, 2009, only when they noticed
issues of safety in carrying out flying operations.
[20]
The Arbitrator does record that some of the trees are
more than 80 years of age. Also it stood observed that the
Director of the Airport Authority, Agartala, had indicated payment
of reasonable compensation for the damage which the land
owners may sustain in undertaking exercise of pruning the trees.
Noticeably, other land owners, or may be the instant claimants
having other lands where such operations took place already
stand compensated, but certainly not with regard to the trees in
question.
[21]
As such, we see no reason as to why the instant
claimants be not reasonably compensated, more so, when they
have been agitating their grievances before different forums since
the year 2009.
[22]
We do not find the exercise carried out by the
Arbitrator,
in
determining
the
compensation
to
be
illegal,
unreasonable or without any reason. Also beyond the material
placed on record or unknown to the parties. The JIR has been
made basis, contents whereof was never in dispute. By virtue of
the Act and directions issued by this Court in Sonatan Das
(supra), the appellant was duty bound to pay compensation to the
land owners, for receipt thereof, is not only a statutory but
Page - 15 of 15
constitutional right. As such, each one of the claimants depending
upon the number of trees, its growth, quality and quantity have
been awarded compensation as per the determined market value.
There is evidence supporting the amount as determined by the
Arbitrator to be just and reasonable.
For all the aforesaid reasons, the appeal being devoid
of merits stands dismissed. No order as to costs. Pending
application(s), if any, also stands disposed of.
(S TALAPATRA),J
Sukhendu
(SANJAY KAROL),CJ.
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review