The court's order
The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.
10. Having considered the claim of the petitioner, this Court had directed Page No.# 7/7 for verification of the claim in the facts and circumstances of the case. Accordingly, verification was conducted and carried out. The verification having been done in the presence of the petitioner and other stake holders, as well as considering that the verification report clearly reflects that a distance of one metre and two metres at some point from the CC Road constructed by PWD is found to exist and the no damage could be found on the boulder boundary wall of the petitioner which was rather already in a dilapidated condition and no CC drain have been constructed by the petitioner, I am of the considered views that no relief can be granted to the petitioner in the exercise of the writ jurisdiction of this Court in the present proceedings.
11. Accordingly, the writ petition stands dismissed being devoid of merit. Comparing Assistant by TAGE BUNYI Date: 2026.09.18 18:52:57 +05'30'
Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
Page No.# 1/7
GAHC040004802023
THE GAUHATI HIGH COURT
(HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)
(ITANAGAR BENCH)
Case No. : WP(C)/181/2023
Agur Nangu
S/o Late Ebey Nangu,
R/o Vill Ramsing, PO/PS Jengging, Dist. Upper Siang, Arunachal Pradesh. 791002
Mobile No. 9402750101
VERSUS
THE STATE OF AP and 3 Ors.
Represented by the Commissioner and Secretary, PWD to the Govt. of Arunachal
Pradesh, Itanagar.
2:The Chief Executive Engineer
Age: 0
Occupation :
PWD Division Yingkiong
District Upper Siang
Yingkiong
Arunachal Pradesh.
3:The Deputy Commissioner
Age: 0
Occupation :
Upper Siang District
Yingkiong
Arunachal Pradesh.
4:The Extra Assistant Commissioner
Age: 0
Occupation :
Upper Siang District
Jengging
Upper Siang
Arunachal Pradesh
Advocate for the Petitioner
: C Ering, B Taba
Page No.# 2/7
Advocate for the Respondent : GA (AP),
BEFORE
HONOURABLE MR. JUSTICE KARDAK ETE
ORDER
Date : 18.09.2026
Heard Mr. S. D. Roy, learned counsel for the petitioner. Also heard Ms
R. Basar, learned State counsel for the respondents.
2.
By filing this petition, the petitioner has prayed for the following
reliefs: “To issue a mandamas directing the Respondent No.3 to consider
the applications of the Petitioner dated 25/04/2022, 01/08/2022,
19/03/2023 for verification of damaged done by the PWD, Yingkiong and
consequential relief in a time bound manner;
And also to re-direct the Extra-Assistant Commissioner of the Upper
Siang district to conduct an enquiry and to submit a report on the
Complaint filed by the petitioner and upon the report of such enquiry to
provide adequate compensation for damages caused by the Respondent
Authorities as per the provisions of laws and/or be pleased to pass such
other or further order/orders as your Lordship may deem fit and proper.”
3.
The petitioner, who claims to be the local resident of Ramsing village
having an ancestral private land measuring about 3000 Sq.mt situated at
Yoyi area, has filed this writ petition claiming for compensation on account
of damages caused to the boulder boundary wall by the respondents while
constructing CC road between Byorung Bridge to Ramsing Village
executed by the Yingkiong PWD Division, PWD, Arunachal Pradesh. The
Page No.# 3/7
petitioner claims that his ancestral land is used for cultivation of crops, and
there are standing and fruit bearing trees including orange, Toko Patta,
Tasat plants, Bamboo plants, Betel nut plants and other seasonal fruits as
well as vegetables from which the petitioner earns considerable amount of
income for livelihood of his family. The petitioner has a boundary boulder
wall since 1995 which was constructed by his father to protect the crops
including the standing trees and other fruit bearing plants.
4.
The Public Works Department, Yingkiong Division, Upper Siang
District issued tender for construction of 3 Nos of RCC Bridges including
improvement of road from Yingkiong to BRTF Road to VKV near Ramsing.
The said construction was successfully executed. It is projected that
problem has arisen, when the work order for road extension between
Byorung bridge to Ramsing village by the Public Work Department,
Yingkiong Division, was issued as the land of the petitioner was found to
be badly affected as the same passes through the private land of the
petitioner. The petitioner approached the Executive Engineer, Public Work
Department, Yingkiong Division on 16.11.2021 that, in case the road
construction work encroaches upon the primary land, the same would
cause damage to the boundary wall, which in turn will affect and damage
the valuable crops and trees standing on the said land. However, no
consideration was made by the respondent authorities. The respondent
authorities had proceeded to execute the work by damaging the boundary
boulder wall constructed by the petitioner which in turn caused heavy
damages to the land as well as the standing trees and other fruit bearing
plants of the petitioner. Under such circumstances, the petitioner
approached this Court by this present petition seeking a direction
Page No.# 4/7
essentially for payment of compensation on account of damage of his
boulder boundary wall and the standing crops and trees on the land.
5.
The respondent authorities in response to the claim of the petitioner,
has filed an affidavit. Referring to the affidavit, Ms. R. Basar, learned State
counsel for the respondents submits that as per the report received from
the Political Interpreter, Jengging, the petitioner has not been cooperating
with the inquiry process and has failed to make himself available by citing
excuses for not being present in the station and therefore, the inquiry
could not be conducted as per the direction of this Court. However, finally,
the respondent No. 3 has brought on record the report of the Political
Interpreter dated 02.01.2025 whereby, it is reflected that on verification,
the entire stretch of the CC Road constructed by the PWD was at a
distance of at least 1 meter from the stone boulder wall and the gap
between the road and the stone boulder wall at few locations were up to 2
meters and at no point of entire stretch of road was found to touch the
stone boulder wall. She submits that the Head Goan Bura of Ramsing
village in which the petitioner belongs, had clearly stated that the stone
boulder wall was already in a dilapidated condition and was damaged at a
few locations and the CC drain claimed to have been constructed by the
petitioner was nowhere visible at the location and even the Goan Bura had
stated that he had not seen any drain at the location.
6.
Mr. S. D. Roy, learned counsel for the petitioner in response to the
stand of the State respondents by relying on the affidavit-in-reply filed
today, made a vain attempt to rebut to the effect that the village Headman
of the Ramsing village has made a false statements due to personal
Page No.# 5/7
enmity with the petitioner and some local people of the said village
wanted to communicate with the respondent authority so as to reveal the
truth however, they were not given a chance to place the facts of the
matter, resulting in causing a huge loss to the petitioner.
7.
I have considered the submissions of the learned counsel for the
parties and also perused the material available on record.
8.
The petitioner appears to have land adjacent to the CC Road
constructed by the PWD having old and dilapidated boundary wall
constructed for protection of his land which is claimed to be used for
cultivation of crops and raising of valuable trees on the land. As per the
direction of this Court on 15.04.2023, eventually a verification was carried
out by the concerned authorities on 17.12.2024. Accordingly, the
verification report was submitted by the Political Interpreter, Jengging, on
being entrusted, which is reproduced herein below:
“ENQUIRY REPORT
The undersigned visited the garden of Shri. Agur Nangu, at Ramsing
village on 17/12/2024 for verification of complaint regarding demolition of stone
boulder wall and fencing. Shri Agur Nangu, AE & JE PWD Yingkiong Division and
Sri. Alo Pangkam, HGB of Ramsing village were present at the location.
On verification, the entire stretch of the CC road constructed by PWD was
found to be at a distance of atleast 1(one) Mtr from the stone boulder wall. The
gap between the CC road and stone boulder wall at few locations were upto
2(two) metres. At no point of the entire stretch the road was found to touch the
stone boulder wall.
AS per Head Gaon Burah (HGB) of Ramsing village, the stone boulder
wall was already in dilapidated condition and was already damaged at few
Page No.# 6/7
locations. Further, the CC drain claimed to have been constructed by Agur
Nangu, was nowhere visible at the location. The HGB also said that he had not
seen any drain at that location.
Shri. Anong Nokar
P.I, Jengging
Upper Siang District
Arunachal Pradesh”
9.
Perusal of the aforesaid report shows that the verification was
conducted in the presence of the petitioner, Assistant Engineer and Junior
Engineer, Public Work Department, Yingkiong Division and one Shri Alo
Pangkam, Head Gaon Burah of the Ramsing village. It is reflected clearly
that the entire stretch of the CC Road constructed by the PWD was found
to be at a distance of at least 1 metre from the stone boulder wall of the
petitioner and the gap between the CC road and the stone boulder wall at
few locations were up to 2 metres and at no point of entire stretch of road
was found to touch the stone boulder wall of the petitioner. It further
reflects that as per the Head Goan Burah of Ramsing village the stone
boulder wall was already in dilapidated condition and was already
damaged at few locations and clarified that the CC drain claimed to have
been constructed by the petitioner was nowhere visible at the location and
the Goan Burah had also not seen any drain at the location. Thus, it is
clear as noonday that there is no encroachment much less damage to the
land or boulder boundary wall of the petitioner which stands at a distance
of one metre and two metres at some point from the CC Road constructed
by the PWD. Therefore, the claim of damage of the boulder boundary wall
of the petitioner, would not arise.
10. Having considered the claim of the petitioner, this Court had directed
Page No.# 7/7
for verification of the claim in the facts and circumstances of the case.
Accordingly, verification was conducted and carried out. The verification
having been done in the presence of the petitioner and other stake
holders, as well as considering that the verification report clearly reflects
that a distance of one metre and two metres at some point from the CC
Road constructed by PWD is found to exist and the no damage could be
found on the boulder boundary wall of the petitioner which was rather
already in a dilapidated condition and no CC drain have been constructed
by the petitioner, I am of the considered views that no relief can be
granted to the petitioner in the exercise of the writ jurisdiction of this
Court in the present proceedings.
11. Accordingly, the writ petition stands dismissed being devoid of merit.
JUDGE
Comparing Assistant
Digitally signed
by TAGE BUNYI
Date:
2026.09.18
18:52:57 +05'30'
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review