IN THE HIGH COURT OF ANDHRA PRADESH
AT AMARAVATI
[3311]
(Special Original Jurisdiction)
Thursday, the seventeenth day of September, two thousand and twenty six
Present
The Honourable Ms. Justice B. S. Bhanumathi
Writ Petition No.20429 of 2026
Between:
Vizianagaram Mandal Praja Parishad, Vizianagaram
Vizianagaram mandal,
Vizianagaram district, rep. by its President, Mamidi Appala Naidu,
R/o. Sarika village, Vizianagram mandal & district.
…Petitioner
And
1.
The State of Andhra Pradesh, Panchayat Raj department,
Secretariat buildings, Velagapudi, Amaravati.
2.
The Commissioner, Panchayat Raj & Rural Development (PR &
RD), Tadepalli, Guntur district,
3.
The District Collector (PR), Vizianagaram district, Vizianagaram,
Andhra Pradesh.
4.
The Chief Executive Officer, Zilla Parishad office, Vizianagaram.
5.
The Mandal Parishad Development Officer, Vizianagram mandal,
Vizianagaram.
….Respondents
BSB, J
W.P. No. 20429 of 2026
Counsel for the petitioner:
1. Taddi Sowmya Naidu
Counsel for the respondents:
1. G.P. for Panchayat Raj & Rural Dev.
2. Yarraguntla Koteswara Rao, Standing Counsel for Zilla Praja
Parishads, Mandal Praja Parishads and Gram Panchayats
The Court made the following:
BSB, J
W.P. No. 20429 of 2026
ORDER:
This writ petition under Article 226 of the Constitution of India is
filed seeking the following relief:“…to issue a writ of Mandamus or any other appropriate
writ or direction declaring the inaction of the respondent
No.5 in implementing the resolutions passed the Mandal
Praja Parishad, Vizianagram Mandal, dated 05.06.2026,
as illegal, arbitrary, in violation of Section 167 of the A.P.
Panchayat Raj Act, 1994 and Rules thereunder and
consequently direct the respondent No.5 to implement
the resolutions passed by the Mandal Praja Parishad,
Vizianagaram mandal, dated 05.06.2026, and pass such
other or further orders as the Court deems fit and proper
in the facts and circumstances of the case.”
2.
The case of the petitioner, briefly stated, is as follows:-
a.
The petitioner, Mamidi Appala Naidu, is the President of the
Mandal Praja Parishad, Vizianagaram mandal, having been elected in
accordance with the provisions of the Andhra Pradesh Panchayat Raj
Act, 1994 (for short, ‘the 1994 Act’) and the rules framed thereunder.
The petitioner was initially elected and served as a Sarpanch of Sarika
Gram Panchayat for the years 1995-2000, 2000-2005. In the year 20052011, he was also elected as M.P.T.C. of Sarika Gram Panchayat. He
was again elected as M.P.T.C. of Sarika village on 24.09.2021 and
thereafter as President of the Mandal Praja Parishad of Vizianagaram
mandal.
He has been rendering services as President of M.P.P.
Vizianagaram to the satisfaction of the people of Vizianagaram mandal.
BSB, J
W.P. No. 20429 of 2026
The respondent No. 5 has been implementing the resolutions of the
gram panchayat as per the 1994 Act and the rules made thereunder.
b.
While
things
stood
thus,
the
Mandal
Praja
Parishad,
Vizianagaram, in its meeting, dated 05.06.2026, passed several
resolutions unanimously on various developmental and administrative
matters pertaining to the Vizianagaram mandal. The petitioner, in his
capacity as President, forwarded the copies of the resolutions to the
respondent No.5, Mandal Parishad Development Officer, Vizianagaram,
for implementation in accordance with the provisions of the Act.
However, the respondent No.5 failed and neglected to implement the
resolutions, despite lapse of considerable period. The inaction of the
respondent No.5 in implementing the resolutions, dated 05.06.2026,
passed by the Mandal Praja Parishad, Vizianagaram, is illegal, arbitrary
and in violation of Sections 165 and 167 of the A.P. Panchayat Raj Act.
Hence, this writ petition was filed.
3.
The respondents Nos.4 & 5 filed a counter affidavit opposing the
writ petition and stating briefly, as follows:
A majority of the elected members of the general body have
expressed, through a representation to the respondent No.5, that there
was no approval for the unilateral resolutions passed by the petitioner
and that they were strongly opposed. These respondents cannot
implement the resolutions unless and until there is approval of the
majority of members of the general body in the meeting. The items
proposed by the petitioner were written with his own handwriting in the
minutes book even though there is no proposal for these subjects in the
main agenda which was actually communicated to all the members.
The agenda items shall be approved by all the members of the general
BSB, J
W.P. No. 20429 of 2026
body who attended physically and he / she shall put signature in the
minutes book by confirming the willingness / unwillingness of the work /
item proposed by the petitioner. As a majority of the members of the
general body had not approved, the respondent No.5 expressed inability
to implement the resolutions. The petitioner alone is not competent and
empowered to direct these respondents to implement the resolutions by
force unless they are on agenda and the agenda items are approved by
the majority of members of the general body.
The entire contention of
the petitioner is based upon incorrect facts and therefore, the writ
petition is liable to be dismissed.
4.
A copy of the written instructions, dated 25.07.2026, of
respondent No.5 were also placed on record, wherein it was mainly
stated as follows:“The general body meeting of the Mandal Praja Parishad,
Vizianagaram mandal, was convened on 05.06.2026.
Subsequent
to
the
said
meeting,
a
detailed
representation, dated 10.06.2026, submitted by the
member of the Legislative Assembly constituency along
with seven elected members of the Mandal Parishad was
received by this respondent.
It was requested in the
representation that implementation of certain resolutions
recorded in the minutes of the meeting be deferred until
the issues raised therein were examined by the
competent authority.
… .. … ..
Upon receipt of the above representation, this office
examined the issues brought to its notice along with the
available records.
Since the representation raised
BSB, J
W.P. No. 20429 of 2026
matters relating to the proceedings of the General Body
meeting, the minutes book and matters involving
utilization of public funds, this respondent considered it
appropriate to place the matter before the competent
authority for examination and appropriate instructions
before taking any further administrative action in respect
of the disputed resolutions. Accordingly, the issue was
forwarded to the competent authority for consideration.
While the matter was under examination, the
President,
Mandal
Praja
Parishad,
Vizianagaram,
instituted the above writ petition before this Court.
In
view of the pendency of the matter before this Court and
the representation already received by the office of this
respondent, it has become necessary to place the
complete factual background and the connected records
before higher authorities to facilitate consideration of the
matter and to enable appropriate administrative action in
accordance with law.
During examination of the records relating to the
General Body meeting held on 05.06.2026, it was noticed
that proposals for developmental works aggregating to
approximately
Rs.2
Crores
were
placed
for
consideration, of which works valued at approximately
Rs.1 Crore pertained to Sarika Gram Panchayat, the
native village of the President of the Mandal Praja
Parishad.
The records also indicate that certain
members raised concerns regarding the manner of
BSB, J
W.P. No. 20429 of 2026
allocation of the proposed works and requested that the
distribution
of
available
funds
be
examined
with
reference to the needs of all Gram Panchayats and the
applicable financial norms and government guidelines
before implementation.”
5.
The M.P.D.O. produced the resolution book (from 24.09.2021)
and the attendance register of the respondent No.5 / Mandal Parishad
Development Office, Vizianagaram.
6.
Heard the learned counsel for the parties and perused the record
produced.
7.
Since the participating members in the meeting of the Mandal
Parishad, dated 05.06.2026, raised their dissent in respect of the
impugned resolutions, it was contended by the petitioner that, if at all
any dissent is raised by any participating member, the same shall be
recorded, but no such dissent was recorded, and therefore, now such a
dissent cannot be subsequently raised and accepted. In this regard, the
learned counsel for the petitioner referred to the Rules for the Conduct
of Business at the Meeting of Mandal Parishad, Zilla Parishad and
Standing Committees of Zilla Parishad (for short, ‘the Rules’) formulated
under the G.O.Ms. No. 218, Panchayat Raj, Rural Development and
Relief (Mdl-II), dated 31.03.1995, by exercising powers under 268(1)
read with Section 160, 187 and 190 of the 1994 Act. Rule 16(6) states
that any member present at the meeting and wishing to submit his
minute of dissent shall do so in respect of the proceedings immediately
after conclusion of discussion on the subject and that the minute of
dissent shall form part of the proceedings of the meeting. It is also
pertinent to mention here Rule 12 which stipulates that, in case of any
BSB, J
W.P. No. 20429 of 2026
resolution not carried out unanimously, the names of the members who
vote for and against shall be recorded.
8.
The minutes in the register of minutes were handwritten by the
petitioner and signed by him alone. Rule 16(2)(i) of the Rules speaks of
maintenance of register of minutes and it further states that it shall be
signed by the President of the Mandal Praja Parishad. The Rules do not
require all members present to sign the minutes recorded in the register
or the minutes to be separately drawn and signed by them. Therefore,
record of register of minutes is duly signed by the petitioner. The entire
register
was
maintained
likewise
and
those
resolutions
were
undisputedly executed. There is no mention of any dissent in the
minutes of the meeting, dated 05.06.2026.
A separate register
regarding the presence of the members in the meeting is maintained as
per Rule 16(3). In the register of attendance, the members present
merely signed without expressing any dissent.
9.
The main contention of the dissenting members is that the
minutes of the resolution contained the impugned resolution on the
subjects which were not in the agenda circulated.
The petitioner
contends that any subject at the discretion of the President can be
discussed in the meeting and the same also was mentioned in the
agenda and therefore, it cannot be contended that the resolutions
cannot be implemented merely because they were not in the original
agenda circulated. Admittedly, the impugned resolutions are in respect
of the subjects which were not in the original agenda.
As per the
agenda circulated and also as per Section 5, the President is given
authority to discuss any subject even without agenda. Therefore, on the
ground that these subjects are not in the original agenda, the impugned
resolutions cannot be challenged about their legality.
10.
BSB, J
W.P. No. 20429 of 2026
Nextly, it is to be seen whether the subjects relating to the
impugned resolutions were discussed in the meeting or not?
11.
If at all they were discussed and the members have objections, if
any, they shall be recorded as per Rule 16(6) as noted above. In this
regard, an examination of the representation of dissent submitted by
some of the members of the Parishad is relevant.
Nowhere, it is
mentioned that these subjects were not discussed in the meeting. On
the other hand, the primary contention of the members now objecting is
that these subjects were not in the agenda circulated, and therefore,
they had no sufficient time to deliberate and had no knowledge to
discuss them thoroughly. As such, the relevant portion of the
representation of dissent given to the Mandal Parishad Development
Officer is apt to be noted here below:“2.
At the commencement of the General Body Meeting
held on 05.06.2026 itself, the Member of the Legislative
Assembly questioned
the
President regarding
the
absence of any substantive agenda items requiring
discussion and decision by the General Body.
It was
pointed out that except for a general review meeting, no
agenda containing proposed resolutions had been
circulated to the members. When questioned as to the
purpose of convening the meeting without notifying any
agenda items, no satisfactory explanation was furnished.
Instead, the discussion was diverted to matters which
were never included in the agenda circulated to the
members.
3.
We
further
submit
that
several
resolutions
subsequently incorporated in the Minutes Book were
BSB, J
W.P. No. 20429 of 2026
never included in the agenda circulated before the
meeting. The members were therefore deprived of an
opportunity to examine the proposals, obtain relevant
information, seek clarification and participate in an
informal discussion. Matters not included in the notified
agenda ought not to have been treated as resolutions of
the General Body without following the procedure
prescribed under the 1994 Act and the rules framed
thereunder.
5.
We further submit that the decision of the Mandal
Praja Parishad is the collective decision of the elected
members
taken
after
meaningful
discussion
and
deliberation. The decision of the President alone cannot
be treated as the decision of the Mandal Praja Parishad.
Any matter that was neither included in the agenda, nor
discussed before the General Body, nor approved by the
majority of the members, cannot legally become a
resolution of the Mandal Praja Parishad merely because
it has been entered in the Minutes Book.
6. to 11. xxx xxx xxx xxx
12. We respectfully submit that as the Executive Officer
of the Mandal Praja Parishad, you are responsible for
implementing lawful resolutions passed by the General
Body. At the same time, being a Government servant
entrusted with administration of public funds, you are
equally duty-bound to ensure that implementation is
undertaken strictly in accordance with law.
Where
serious objections have been raised by the MLA and a
substantial number of elected members regarding the
BSB, J
W.P. No. 20429 of 2026
legality and procedural validity of certain resolutions,
immediate implementation without verification would not
be in consonance with the principles of legality,
transparency, financial discipline and administrative
accountability.
In view of the foregoing facts and circumstances,
we respectfully submit that
1.
The disputed resolutions recorded in the minutes of
the General Body Meeting, dated 05.06.2026, shall not
be implemented.
2.
kept
Implementation of all disputed resolutions shall be
in
abeyance
until
their
legality,
procedural
compliance and authenticity are duly verified by the
competent authority.
3.
No public funds shall be released nor any
administrative action be taken pursuant to the disputed
resolutions until the above issues are examined and
appropriate orders are passed.
4.
Necessary action may be initiated in accordance
with the provisions of the Andhra Pradesh Panchayat Raj
Act, 1994, the Rules framed thereunder and the
applicable government orders.”
Therefore, the above minutes clearly indicates that these subjects were
discussed.
12.
At the cost of repetition, it is to be noted that the members who
submitted the representation have grievance that these subjects were
not in the agenda circulated. Rule 16(6) or any other provision of law
BSB, J
W.P. No. 20429 of 2026
does not permit a dissenting member to express dissent after
conclusion of the meeting and preparation of minutes.
13.
In the case on hand, the members allegedly submitted their
representation on 10.06.2026, five (5) days after conclusion of the
meeting held on 05.06.2026. Such a procedure is not contemplated
under law.
14.
As per Rule 16(5), the M.P.D.O. / C.E.O., who is the respondent
No.5 herein, shall forward a copy of the minutes of the proceedings of
each meeting of the Mandal Parishad etc., within seven (7) days of each
meeting. Since there are objections raised even before expiry of seven
days from the date of the meeting, inspite of forwarding the copy of the
minutes as mandated in Rule 16(5), may be along with a copy of
representation expressing dissent on some of the resolutions, the
respondent No.5 had not forwarded the minutes of the proceedings to
the Commissioner, Panchayatraj. He merely forwarded a copy of the
representation vide his letter Ref. No. 15 / 2023 /SA, dated 18.07.2026,
to the Commissioner, Panchayat Raj & Rural Development, Vijayawada,
a copy of which was filed before this Court through a memo, dated
15.09.2026.
15.
The learned counsel for the petitioner submitted that when once
meeting is concluded and minutes are drawn as per the procedure
enshrined in the Rules or the 1994 Act, the respondent No.5 has no
discretion in any manner to object implementation of the resolutions
passed by the Mandal Parishad and on the other hand, it is his
mandatory duty to implement the resolutions as per Section 165(1)(a) of
the Act, 1994.
16.
BSB, J
W.P. No. 20429 of 2026
Section 165(1)(a) of the Act, 1994 reads as follows:165. Powers and functions of the President and VicePresident:(1)
The President of a Mandal Praja Parishad shall, --
(a)
exercise administrative control over the Mandal
Praja Parishad Development Officer for the purposes of
implementation of the resolution of the Mandal Parishad.
17.
He further submitted that if at all the resolutions are not to be
implemented, it is only the government that has power to cancel /
suspend / modify on the report of the District Collector, etc., as per
Section 246 of the Act, 1994.
18.
Section 246 of the Act, 1994 reads as follows:246. Power to cancel or suspend resolution of a
Gram Panchayat, Mandal Praja Parishad or a Zilla
Praja Parishad:- (1) The Government may either suo
motu or on a reference made to them by the Executive
Authority or Mandal Praja Parishad Development Officer
or as the case may be, the Chief Executive Authority, in
the manner prescribed by order in writing cancel any
resolution passed by a Gram Panchayat,Mandal Praja
Parishad or a Zilla Praja Parishad or any Standing
Committee of a Zilla Praja Parishad if in their opinion
such resolution, -(a)
is not legally passed; or
(b)
is in excess or abuse of the powers conferred
by or under this Act, or any other law; or
(c)
BSB, J
W.P. No. 20429 of 2026
on its execution is likely to cause danger to
human life, health or safety or is likely to lead to riot or
affray.
(2)
The Government shall, before taking action
under sub-section (1), give the Gram Panchayat, Mandal
Praja Parishad or the Zilla Praja Parishad as the case
may be, an opportunity for explanation.
(3)
If in the opinion of the District Collector,
immediate action is necessary to suspend a resolution on
any of the grounds referred to in clause (c) of sub-section
(1), he may make a report to the Government and the
Government may, by order in writing, suspend the
resolution.
19.
On a cumulative reading of the above provisions, it is clear that so
long as the resolutions of the Mandal Parishad remain valid, being not
cancelled or suspended or modified by the government as empowered
under the above provision of law, the respondent No.5 is under an
obligation to discharge his duty of implementing the resolutions passed
by the Mandal Parishad. The respondent No.5, instead of implementing
the same, has adopted a means which is not provided by any provision
of law in waiting for any instruction, though the respondent No.5 is well
aware of the procedure and the obligation of implementing the
resolutions of a Mandal Parishad. As per Rule 16(5), the respondent
No.5 is required only to send a copy of the minutes to the
Commissioner, Panchayat Raj. If at all a decision taken in the matters
connected with law, procedure, standing orders of the government and
the like is not in consonance with the advice rendered at the meeting by
Mandal Parishad Development Officer / Chief Executive Officer, a
BSB, J
W.P. No. 20429 of 2026
record of the advice rendered by him shall form part of the proceedings
as per Rule 16(7). Nothing more or less is the scope of functioning of
the respondent No.5.
As such, the inaction of respondent No.5 in
implementing the resolutions is inappropriate.
20.
The petitioner further contended that the funds granted under the
15th Finance Commission would lapse unless they are utilized and no
fund would be granted in the next Finance Commission unless the funds
granted in the 15th Finance Commission are exhausted and that in this
regard, instructions were also issued by the government of Andhra
Pradesh, vide Memo No. 32923399 / CPR & RD / H / 2026, dated
27.07.2026.
21.
On the other hand, the learned Assistant Government Pleader for
Panchayat Raj & Rural Development submitted that all the funds remain
valid upto 2026-2027 to 2028-2029 and grants can be appropriated at
any time and there is no urgency and that the grants shall be spent for
the benefit of all the villages covered by the Mandal Parishad and
cannot be utilized for the benefit of one particular local area.
22.
In reply, the learned counsel for the petitioner submitted that the
funds can be utilized for the benefit of any area within the jurisdiction of
Mandal Parishad and it is not the rule that funds shall be appropriated
equally to all the local areas covered by the jurisdiction. He further
submitted that the impugned resolutions were intended for the
development of education etc., since the up-gradation of schools
already allowed require financial assistance and in that connection only,
amounts were resolved to be spent and not for any frivolous activities.
23.
The non-agenda items and the resolutions passed thereon in the
General Body Meeting are excerpted here below:-
Sl.
No.
BSB, J
W.P. No. 20429 of 2026
Item Number
Item
No.
Resolution
25:
Regarding
the It was proposed to release
provision
of
Outdoor
Play Rs.1,50,000/-
Equipment
and
Indoor
Equipment
to
total
Anganwadi
a
Centres
to
each
Play Anganwadi Centre, amounting
of
22 to a total of Rs.33,00,000/- for
(one all the 22 Gram Panchayats.
Anganwadi Centre for each Gram The matter was reviewed and
Panchayat) pertaining to the 22 approved.
Gram Panchayats in Vizianagaram
Mandal.
Item No. 26: As Smt. Panduri The matter was reviewed and
approved.
Chinna Thalli, who had been
working as a Part-Time Sweepercum-Water Carrier in the MPP
Chamber,
Vizianagaram
Mandal
Parishad, attained old age, approval
was
accorded
Parishad
for
by
the
Mandal
appointing
Kunuku
Lakshmi in her place with effect
from January, 2024. She has been
working from the said date. It was
proposed to pay her salary at the
rate of Rs.18,000/- per month from
the date of her appointment up to
the present. (The expenditure shall
be
met
from
the
15%
Office
Maintenance and Staff Expenditure
fund.)
BSB, J
W.P. No. 20429 of 2026
Item No. 27: Regarding the payment The matter was reviewed and
towards
Hand
Annual
Pumps
Maintenance
in
of approved.
Vizianagaram
Mandal to the Bore Mechanics.
The total amount payable for the
period is Rs.3,76,485/-, with monthwise payments as follows:
November, 2025 December, 2025 January, 2026 February, 2026 March, 2026
April, 2026
May, 2026
Rs.51,765/Rs.55,350/Rs.55,350/Rs.49,815/Rs.55,350/Rs.53,505/Rs.55,350/-
Item No. 28: Regarding the repair of The matter was reviewed and
Hand Pumps within the jurisdiction approved.
of Vizianagaram Mandal Parishad
through
the
(mechanics).
second
The
term
party
of
engagement shall be from June,
to
December,
2026,
and
payment shall be made for a period
of six months to three mechanics
every month as per the estimates of
the
Rural
Water
Sanitation
Supply
and
Department,
Vizianagaram.
Item No. 29: Regarding the payment The matter was reviewed and
of pending vehicle hire charges from approved.
the period in which they became
due up to the present, towards the
vehicle used by the President,
BSB, J
W.P. No. 20429 of 2026
Mandal Parishad, for touring the
Mandal
in
connection
with
administrative matters.
Item No. 30: Regarding the release The matter was reviewed and
of the deposit amount pertaining to approved.
development
works,
worth
Rs.42.86 lakhs, executed under the
15th Finance Commission Funds
and General Funds of the Mandal
Praja Parishad, Vizianagaram, for
which the bills have already been
paid.(Details
of
the
works
are
available in the official records.)
Item No. 31: Regarding undertaking The matter was reviewed and
repairs, and providing furniture and approved.
blackboards to the schools situated
in the 22 Gram Panchayats of
Vizianagaram Mandal, by utılizing
4% contingency expenditure from
the Mandal Parishad Funds.
Item No. 32: Regarding allocation of The matter was reviewed and
the remaining funds available in the approved.
Mandal
Parishad
Funds,
after
meeting the expenditure towards the
salary
of
the
Office
Sweeper-cum-Water
distributing
the
Part-Time
Carrier,
funds
by
equally
between maintenance of schools
and maintenance of the Mandal
Praia Parishad Office.
Item
No.
33:
Regarding
BSB, J
W.P. No. 20429 of 2026
taking The matter was reviewed and
necessary action for implementation approved.
of the administrative decisions taken
in
the
Mandal
Praja
Parishad
General Body Meetings held from
27.09.2024 up to the present, which
have not yet been implemented. In
the event that the MPDO is of the
opinion that such decisions cannot
still be implemented, the MPDO
shall officially certify and furnish the
complete details with reasons to the
Mandal Praja Parishad within three
days.
Item No. 34: Regarding initiation of The matter was reviewed and
action on the ground that the approved.
Mandal
Parishad
Development
Officer (MPDO), Vizianagaram, in
the discharge of his duties and
responsibilities, has acted contrary
to the provisions of Section 167 of
the Andhra Pradesh Panchayat Raj
Act, 1994, G.O. Ms. No. 489, dated
03.12.1996, and other applicable
orders,
and
has
indulged
in
corruption and irregularities.
1. The primary responsibility of
implementing the resolutions of the The matter was reviewed and
Mandal Praja Parishad rests with approved.
the MPDO, and it is the duty of the
MPDO
to
ensure
that
such
BSB, J
W.P. No. 20429 of 2026
resolutions are implemented and
that the benefits thereof reach the
public. However, as most of the
resolutions of the Mandal Praja
Parishad
have
not
been
and
the
intended
implemented
benefits
have
not
reached
the
public, action in this regard was
proposed.
2. The Action Taken Report on the
resolutions passed in the previous The matter was reviewed and
meetings is required to be submitted approved.
in
writing
at
the
subsequent
meeting. However, during the tenure
of the MPP President, such report
was
not
despite
submitted
even
once,
repeated
instructions.
Accordingly, action in this regard
was proposed.
3. Under Section 165(1)(a) of the
Andhra Pradesh Panchayat Raj Act,
1994,
the
MPP
President
administrative
control
MPDO
the
for
implementing
the
over
purpose
has The matter was reviewed and
the approved.
of
resolutions
approved in the meetings of the
Mandal Praja Parishad. However,
despite
repeated
implement
the
directions
resolutions
to
and
despite nomination of works for
execution, the development works
BSB, J
W.P. No. 20429 of 2026
were not carried out. Therefore,
action in this regard was proposed.
4. That, under the head of vehicle
hire
charges,
submitted
false
towards
bills
fuel,
were
driver's
salary and vehicle hire charges, The matter was reviewed and
amounting
approximately approved.
to
Rs.35,000/-per month, despite no
hired vehicle having actually been
used, thereby resulting in corruption
and. financial irregularities involving
several
lakhs
of
rupees.
Accordingly, action in this regard
was proposed.
5. The MPDO did not attend the
meetings
of
the
Parishad
held
27.09.2024,
however,
the
Mandal
Praja
on
08.03.2024,
and
08.12.2024;
records
were The matter was reviewed and
tampered with, to show attendance approved.
at
some
of
those
meetings.
Accordingly, action in this regard
was proposed.
Item No. 35: Regarding furnishing, The matter was reviewed and
within three days, the Revenue and approved.
Gram
Panchayat
information
required for the previous Mandal
Parishad meetings and specifically
called for during those meetings.
Further, regarding taking action on
the irregularities in the Revenue and
Gram
Panchayat
BSB, J
W.P. No. 20429 of 2026
departments
discussed in the previous meetings
and submitting, within three days, a
report containing the discussions
held and the action taken in respect
thereof.
Item No. 35(A): Construction of CC
Road from the house of R. Appala The matter was reviewed and
Narayana to the land of B. Sitaram. approved.
Estimated Cost: Rs.5.00 lakhs.
Item No. 36: Regarding initiation of The matter was reviewed and
action on the ground that the MPDO, approved.
Vizianagaram Mandal, in connection
with Government programmes, has
recently
been
conducting
Gram
Sabhas, training programmes for
Village Secretariat staff through the
Mandal
Praja
Parishad,
and
Government programmes such as
AP Government 2026 Yogandhra
and
other
programmes,
without
furnishing any information to the
Mandal Praja Parishad and by taking
decisions
independently
and
conducting programmes according to
his
own
discretion,
which
was
contrary to law.
Item No. 37: Construction of CC The matter was reviewed and
Road from Bandaru Chinna Demudu approved.
Kallaalu to Lagudu Sivaji Kallaalu at
BSB, J
W.P. No. 20429 of 2026
Korukonda Village. Estimated Cost:
Rs. 1.50 lakhs.
As the work has
been completed, it was proposed to
release the
bill
amount
of
Rs.
1,12,900/-.
Item No. 38: Regarding ratification of The matter was reviewed and
the remittance of Rs.31,000/-, being approved.
the one-third share of the 6% ST
Earmarked Fund from Vizianagaram
Mandal, to the ITDA, Parvathipuram
Manyam District, from the 6% ST
Funds (MPGF).
Item No. 39: Regarding ratification of The matter was reviewed and
the remittance of Rs.77,878l-, being approved.
the one-third share of the 15% SC
Earmarked Fund from Vizianagaram
Mandal, to the Executive Director,
SC Corporation, Vizianagaram, from
the 15% SC Funds (MPGF).
Item No. 40: Regarding ratification of The matter was reviewed and
the earlier resolution for sanction of approved.
the following works:
1. Construction of a Community
Cattle Shed in Korukondapalem
Gram Panchayat,
Vizianagaram
Mandal:
• Wage Component: Rs.48,318/• Material Component: Rs.9,51,682l•
Total
Estimated
Cost:
Rs.10,00,000/1. Comprehensive Development of
Bapani Cheruvu in Dupada Gram
Panchayat:
Material Component: Rs.60,00,000/-
BSB, J
W.P. No. 20429 of 2026
Item No. 41:- Regarding ratification The matter was reviewed and
of
the
expenditure
incurred
for approved.
providing drinking water facility to the
MPDO Office.
Amount: Rs. 1,39,051/. V.R. No. 12,
dated 04.12.2025. (15th Finance).
Item No. 42: The Tahsildar, The matter was reviewed and
Vizianagaram Mandal, has not been approved.
attending
the
Mandal
meetings
for
the
meetings.
Parishad
past
Despite
several
repeated
requests, the Tahsildar
has not
furnished the information required for
discussion in the Mandal Parishad
meeting
relating
to
the
alleged
irregularities in the land acquisition
for YSR Colony, Sarika Village,
including lands in Survey No.114/3
(Ac.4.54
cents),
Survey
No.20/4
(Ac.1.08 cents), Ac.0.50 cents, and
other related lands. Failure to furnish
the requested information despite
repeated requests is contrary to law.
Accordingly, it was proposed that
appropriate action be taken and that
a report in this regard be submitted
within one week.
Item
No.
appropriate
43:
Regarding
action
justice in respect
and
of
taking The matter was reviewed and
rendering approved.
the report
submitted pursuant to the complaints
made
through
Grievance
No.
VZM202602025509
02.02.2026
BSB, J
W.P. No. 20429 of 2026
dated
and
Grievance
No.
VZM20260318902 dated 18.03.2026,
as the Mandal Praja Parishad was of
the view that the enquiry report
submitted thereon was a false report.
Item No. 44: Under Section 167 of The matter was reviewed and
the Andhra Pradesh Panchayat Raj approved.
Act, 1994, G.O. Ms. No. 489, dated
03.12.1996, and
other applicable
orders, the Action Taken Report on
the
resolutions
passed
in
the
previous meeting is required to be
submitted in writing to the House and
to the members at the subsequent
meeting. The MPDO is also primarily
responsible
for
implementing
resolutions
of
the
Mandal
the
Praja
Parishad and for ensuring that such
resolutions
are
effectively
implemented so that their benefits
reach the public. It was stated that,
as the resolutions passed in the
previous meetings had not been
implemented,
development
programmes had come to a standstill,
causing
hardship
Accordingly,
to
action
MPDO was proposed.
the
public.
against
the
BSB, J
W.P. No. 20429 of 2026
Item No. 45: Under Section 165(1)(a) The matter was reviewed and
of the Andhra Pradesh Panchayat approved.
Raj Act, 1994, the President of the
Mandal
Praia
Parishad
administrative
control
MPDO
the
for
has
over
the
purpose
of
implementation of the resolutions
passed in the Mandal Praja Parishad
meetings. It was stated that the
resolutions
passed
during
the
previous meetings were deliberately
not implemented, thereby obstructing
the development programmes of the
Mandal
Praja
therefore
Parishad.
resolved
It
was
that
the
resolutions and development works
passed
in
should
be
the
present
meeting
implemented
by
15.06.2026. It was further resolved
that steps should be taken, on
priority, to ensure 100% utilisation of
all funds relating to the Mandal Praja
Parishad.
Failing
such
implementation,
permission
was
accorded to the President, Mandal
Praja
Parishad,
Sri
Appalanaidu,
to
Hon'ble
Court
High
Mamidi
approach
of
the
Andhra
Pradesh for initiating appropriate
legal proceedings.
BSB, J
W.P. No. 20429 of 2026
Item No. 46: Regarding investigation The matter was reviewed and
into
the
alleged
corruption
and approved.
irregularities that occurred during the
past five years in connection with
layouts and building. constructions
arising out of the sale of Panchayat
tanks in Sarika Gram Panchayat,
allegedly
undertaken
without
obtaining the required funds and
permissions and in violation of the
prescribed
rules,
and
regarding
submission of a report within one
week after taking appropriate action.
Item No. 47: Construction of 35 The matter was reviewed and
Borewell Platforms in Vizianagaram approved.
Mandal. [Estimated Cost: Rs.3.40 lakhs.]
Item
No.
winding
48:
and
Regarding
taps
for
motor The matter was reviewed and
the approved.
Protected Drinking Water Supply
Scheme at Gundalapeta Village.
Estimated Cost: Rs.3.50 lakhs.
Item No. 49: It was alleged that Sri The matter was reviewed and
Siripurapu
Suryanarayana,
Satyababu,
of
So approved.
Korukonda
Village, had erected a poultry farm
sheet shed, cement poles, fencing
and iron gates in violation of the
provisions of the Andhra Pradesh
Panchayat Raj Act, 1994, including
Section 119, G.O. Ms. No. 16, dated
BSB, J
W.P. No. 20429 of 2026
10.01.1996, Sections 127 and 199 of
the Act, and G.O.Ms. No. 10, dated
08.10.2020, thereby blocking the
access pathway of the adjoining
farmers. Accordingly, action was
proposed
for
restoration
of
the
access pathway to the affected
farmers.
Item No. 50: It was alleged that the Accordingly, it was resolved
Vizianagaram, has been that departmental action be
MPDO,
acting contrary to public interest, initiated
against
the
Government policies, the provisions officer.
In
alternative,
the
said
of the Andhra Pradesh Panchayat permission was accorded to
Raj Act, and the Constitution, while the President, Mandal Praja
ridiculing the local elected public Parishad,
Sri
Mamidi
representatives more severely than Appalanaidu, to approach the
the present ruling and opposition Hon'ble High Court of Andhra
political parties, and obstructing the Pradesh for taking appropriate
implementation of the administrative legal action.
decisions
of
the
Mandal
Praja
Parishad. It was further alleged that,
during the tenure of the said officer
in Mentada Mandal, the officer had
acquired a reputation for committing
irregularities,
including
alleged
forgery of the signature of the MP
President. It was also alleged that
the officer had been negligent in the
discharge of official duties and had
acted
in
an
insensitive
manner
towards the Mandal Praja Parishad.
24.
BSB, J
W.P. No. 20429 of 2026
The respondents could not point out any direction or rule whereby
the amount is to be spent equally for all the villages covered by the
Mandal Parishad. A fund can be spent for use permitted. Not even a
single item of resolution challenged is shown to be impermissible.
25.
At this juncture, it is relevant to mention the decision relied on by
the learned counsel for the petitioner in Armoor Gram Panchayat rep.
by its Upa-Sarpanch, Armoor, Nizamabad Vs. Government of A.P.,
Panchayat Raj Department and others 1 , wherein it was held at
paragraph Nos.4 & 5 as follows:“5. A Gram Panchayat was conceived as a Unit of
self Government by Article of the Constitution of India.
The State was obliged to take steps to organize Village
Panchayats and endow them with all powers and validity
for the effective functioning as self Government Units.
The entrenchment of such a wish in Part IV of the
Constitution did not fully help realize the dream of the
Constitution makers. Therefore, by the Constitution
(Seventy third Amendment Act, 1992) (for short ‘the
Amendment Act’), Part IX was inserted making it
compulsory for every State to constitute Panchayats at
Village level, intermediate level and District levels. The
constitution, the functioning, the powers and duties of
these constitutionally protected units of self Government
is now governed by Part IX of the Constitution of India as
well as the State Legislature, which is required to be in
2006(2) ALT 225
BSB, J
W.P. No. 20429 of 2026
conformity with the Constitutional provisions. The A.P.
Panchayat Raj Act, 1994 (for short ‘the Act’), which is a
new legislation after coming into force of the Amendment
Act delineates the powers and functions of various
authorities in the Panchayat Raj at Village level,
intermediate
level
and
District
level.
The
Gram
Panchayat is ordained to discharge various duties as
listed in Section 45 of the Act, and Section 46 of the Act
confers power on the Gram Panchayat to achieve the
purposes for which it is constituted. The powers of the
Gram Panchayat also include the power to take all
necessary steps to augment the finances of the Gram
Panchayat to meet various expenses in discharge of 2 its
functions.
6. The above brief legal position is reiterated to
emphasize the utmost autonomous nature of the
functioning of 2 the Gram Panchayat. Indeed the Act has
taken considerable care to bestow the Gram Panchayat
with almost plenary powers. Executive Authority as
defined in Section 2(12) of the Act means the Panchayat
Secretary to each Gram Panchayat, who is assigned the
responsibility of implementing the resolutions of the
Gram Panchayat and the Committees thereof (See
Section 32 of the Act), and exercise all powers and
perform all functions specifically conferred or imposed on
the executive authority under the Act. Under Section 25
of the Act, it shall be within the powers of the Sarpanch
to exercise controlling authority over the Panchayat
BSB, J
W.P. No. 20429 of 2026
Secretary himself starts acting an independent authority
ignoring the Gram Panchayat or acts in such a manner
that he prefers the directions of the District Collector /
Divisional Panchayat Officer to the directions and orders
of the Gram Panchayat, the same would amount to
imposing extra legal authority on the Gram Panchayat,
which is never the intention of the constitutional
amendment or the Act. This Court has strong reason to
hold that the Panchayat Secretary is bound to implement
all the decisions and resolutions of the Gram Panchayat
and he is in no way act as a watchdog at the behest of
the District Collector / Divisional Panchayat Officer. The
absence of disciplinary power vested in the Gram
Panchayat in respect of Panchayat Secretary does not
mean that the Panchayat Secretary can consider himself
as the superior authority to Gram Panchayat.”
26.
In the light of the above discussion and the legal provisions and
the decisions cited, this Court is of the view that there is lapse on the
part of the respondent No.5 in implementing the resolutions of the
meeting, dated 05.06.2026, of the Mandal Parishad.
27.
Accordingly, the writ petition is allowed directing the respondent
No.5 to implement the resolution, dated 05.06.2026, passed by the
Mandal Parishad, Vizianagaram mandal as stipulated under law.
There shall be no order as to costs.
Pending miscellaneous petitions, if any, shall stand closed.
Dt. 17.09.2026
RAR
__________
___
B.S. BHANUMATHI, J
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review