HIGH COURT OF CHHATTISGARH AT BILASPUR
WA No. 786 of 2026
Vikas Tank S/o Late Dilip Bhai Tank Aged About 46 Years Proprietor M/s
Shriram Wires, R/o Beside Amit Sales, T.V. Showroom, Street No. 1,
Near Chandak Bada, Fafadih, Raipur Chhattisgarh
... Appellant(s)
versus
1 - Executive Engineer City Division (North), Chhattisgarh State Power
Distribution Company Limited City Division Office, Gudhiyari, Raipur
Chhattisgarh
-
Electricity
Commission
Ombudsman
Premises,
Chhattisgarh
Irrigation
Colony,
Electricity
Shanti
Regulatory
Nagar,
Raipur
Chhattisgarh
... Respondent(s)
For Appellant(s)
: Mr. Manoj Paranjpe, Sr. Adv. Along with Ms.
Apoorva Ghore, Advocate
For Respondent(s) : Mr. Varun Sharma, Advocate
Hon'ble Shri Ramesh Sinha, Chief Justice
Hon'ble Shri Ravindra Kumar Agrawal, Judge
Judgment on Board
Per Ramesh Sinha, Chief Justice
21.08.2026
1.
Heard Mr. Manoj Paranjpe, learned Senior Advocate along with
Ms. Apoorva Ghore, learned counsel for appellant. Also heard Mr.
Varun Sharma, learned counsel for the respondents.
2.
By way of this writ appeal, appellant has prayed for following
relief(s):“It is, therefore, most humbly prayed that this
Hon'ble Court may kindly be pleased to allow
the instant appeal and set aside the judgment
dated 03.07.2026 passed in W.P.(C) No.
2291/2020 by the Learned Single Judge of this
Hon'ble Court (Annexure A/1). The writ appeal
filed by the Appellant may kindly be allowed, in
the interest of justice.”
3.
The present intra Court appeal has been filed against the order
dated 03.07.2026 passed by the learned Single Judge in WPC
No.2291/2020 (Executive Engineer City Division (North) vs.
Electricity
Ombudsman
Chhattisgarh
Electiricity
Regulatory
Commission Premises and Another), whereby the writ petition
filed by the writ petitioner/respondent No.1 herein was allowed by
the learned Single Judge.
4.
Brief facts of the case are that the appellant, proprietor of M/s
Shriram Wires and a consumer of the Chhattisgarh State Power
Distribution Company Limited (CSPDCL) having Connection No.
1002108243 with sanctioned load of 90 HP, challenges the
judgment dated 03.07.2026 passed in W.P.(C) No. 2291/2020,
whereby the learned Single Judge allowed the writ petition
preferred by CSPDCL and set aside the order dated 18.02.2020
passed by the Electricity Ombudsman, affirming the order dated
09.10.2019 of the Electricity Consumer Grievance Redressal
Forum, Raipur. A 200/5 Ampere Current Transformer was installed
at the appellant’s premises on 16.06.2008 and the meter was
subsequently
replaced
on
13.04.2011.
During
a
surprise
inspection conducted on 03.04.2017, CSPDCL alleged that the
electricity consumption had been billed by applying an incorrect
Multiplying Factor of 1 instead of 2, resulting in under-recording of
consumption, and consequently raised a supplementary demand
of
₹26,88,265/-.
After
prolonged
proceedings
before
the
authorities, the Grievance Redressal Forum and the Electricity
Ombudsman, the Ombudsman, vide order dated 18.02.2020,
partly allowed the appellant’s claim by holding that, in view of
Section 56(2) of the Electricity Act, 2003, recovery of the
supplementary demand could not extend beyond two years
preceding the date of the supplementary bill. Aggrieved, CSPDCL
approached this Court by W.P.(C) No. 2291/2020, which was
allowed by the learned Single Judge by relying upon the decisions
of the Supreme Court in Assistant Engineer (D1), Ajmer Vidyut
Vitran Nigam Limited v. Rahamatullah Khan @ Rahamjulla,
(2020) 4 SCC 650 and Prem Cottex v. Uttar Haryana Bijli
Vitran Nigam Limited, (2021) 20 SCC 200, holding that Section
56(2) of the Electricity Act, 2003 has no application to
supplementary demands. The appellant contends that the present
case is distinguishable from the aforesaid decisions as the alleged
discrepancy in the Multiplying Factor occurred on account of the
respondent’s failure to correctly apply the applicable factor and to
undertake periodic inspection and verification of the metering
equipment as required under the Chhattisgarh Electricity Supply
Code, 2011, and that the appellant, having acted upon the regular
bills raised by the respondent for several years, ought not to be
saddled with the entire supplementary demand arising from the
respondent’s own lapse. Hence, the present appeal has been
preferred challenging the judgment dated 03.07.2026.
5.
Learned counsel for the appellant would submit that the learned
Single Judge failed to appreciate the statutory obligation cast
upon the respondent-Distribution Licensee under Regulation 8.18
of the Chhattisgarh Electricity Supply Code, 2011, which
mandates periodical testing of meters and metering equipment
and specifically requires HT and EHT meters to be tested once
every year. It is contended that although the metering equipment
was installed in 2008 and the meter was replaced in 2011, the
respondent did not conduct any periodical inspection or testing for
nearly nine years and detected the alleged discrepancy in the
Multiplying Factor only during the inspection dated 03.04.2017.
Learned counsel submits that the Multiplying Factor was
determined, recorded and applied by the respondent itself and the
entire metering, testing and billing system remained within its
exclusive control. The inspection report itself recorded that the
meter and display were functioning properly and contained no
allegation of tampering, broken seals, dishonest abstraction,
unauthorized interference or any fraudulent act on the part of the
appellant. It is therefore submitted that the respondent cannot
retrospectively assume that the alleged discrepancy existed
continuously from 2008 till 2017, particularly in the absence of any
meter-testing report, calibration report, programming record,
laboratory analysis or other technical evidence establishing the
same.
6.
Learned counsel would further submit that the present case is
materially distinguishable from Assistant Engineer (D1), Ajmer
Vidyut Vitran Nigam Limited v. Rahamatullah Khan @
Rahamjulla, (2020) 4 SCC 650 and Prem Cottex v. Uttar
Haryana Bijli Vitran Nigam Limited, (2021) 20 SCC 200, relied
upon by the learned Single Judge. According to him, the present
case does not involve a mere bona fide billing mistake but a
prolonged failure of the respondent to discharge its statutory duty
of inspection and testing. A mistake and negligence are distinct
concepts, and the respondent’s failure to undertake mandatory
annual testing for nine consecutive years amounts to statutory
negligence and cannot be permitted to operate to the prejudice of
the consumer. Reliance is placed upon M/s Bajaj Trading
Company v. Union of India, wherein, with reference to Rajkot
Municipal Corporation v. Manjulben Jayantilal Nakum, (1997)
9 SCC 552, the Supreme Court explained negligence as including
careless conduct or omission involving breach of a recognised
duty of care. It is thus argued that the respondent cannot take
advantage of its own omission and recover from the appellant the
financial consequences arising from its failure to detect the
alleged discrepancy within the prescribed period. Relevant paras
of the M/s Bajaj Trading Company (supra) is reproduced
hereinbelow:
“12.5 In Rajkot Municipal Corpn. v. Manjulben
Jayantilal Nakum, the concept of negligence was
explained in detail, as follows:
"14. Negligence has been viewed in three ways.
Firstly, involving a careless state of mind;
secondly, a careless conduct; and thirdly, a tort in
itself. Every case giving rise to tortious liability,
consists of injury and damage done due to
negligence. Injury and damage may be found due
to breach of contract or tort. We are concerned in
this case with the injury and damage in tort.
Therefore, it is necessary to dwell, in depth, on
strict liability, absolute liability or special liability. In
the present case, the omission alleged is to take
care of periodical check-up of the condition of the
trees. The degree of liability depends upon the
degree of mental element. The elements of tort of
negligence, therefore, consist in (a) duty of care;
(b) duty owed to the plaintiff; and (c) it has been
carelessly breached. Negligence does not give
rise to liability unless the law fastens the duty of
care in given circumstances. Duty is an obligation
recognised by law to avoid conduct brought with
unreasonable risk of damage to another. The
question whether duty consists in a particular
situation involves determination as a question of
law.
15. Negligence would include both acts and
omissions involving unreasonable risk of having
done harm to another. The breach of duty must
cause damage. How much of the damage to be
compensated
by
the
defendant
should
be
attributed to his wilful conduct and how much to
his wilful negligence or careless conduct or
remissness in performance of duty, are all
relevant facts to be considered in a given act or
omission in adjudging duty of care. The element
of carelessness or the breach of duty and whether
that duty is towards the plaintiff or the class of
persons to which the plaintiff belongs are
important components in tort of negligence.
Negligence would, therefore, mean careless
conduct in commission or omission of an act,
whereby another to whom the plaintiff owed duty
of care has suffered damage. The duty of care is
crucial in understanding the nature and scope of
tort of negligence. The question in each case is
whether the defendant has been negligent in the
performance
of
duty
or
omission
thereof.
Determination of duty of care also involves action
which requires detailedstatutory examination..."
7.
Learned counsel would also submit that the appellant had
regularly paid the electricity bills raised by the respondent and had
structured its electricity consumption, production costs and pricing
of finished goods on the basis thereof. Had the respondent
performed its statutory duty of periodic inspection, the alleged
discrepancy would have been detected at the earliest and the
appellant could have regulated its consumption and financial
affairs accordingly. It is contended that even if Section 56(2) of the
Electricity Act, 2003 is held inapplicable to supplementary
demands, the respondent’s claim cannot escape the ordinary law
of limitation and, in the absence of fraud or any mistake incapable
of discovery despite due diligence, Section 17 of the Limitation
Act, 1963 cannot be invoked to save a claim arising after nearly
nine years. The alleged discrepancy was neither concealed by the
appellant nor incapable of detection by the respondent, whose
statutory duty was precisely to inspect and test the metering
equipment periodically. Learned counsel therefore submits that
the respondent cannot be permitted to take advantage of its own
negligence, particularly when the appellant was not found to have
tampered with the meter or adopted any illegal means of
consumption, and that the impugned judgment, having failed to
consider these material aspects and having permitted recovery of
the entire retrospective demand, deserves to be set aside and the
order passed by the Electricity Ombudsman restored
8.
On the other hand, learned counsel appearing for the respondentDistribution Licensee would support the impugned judgment and
submit that the learned Single Judge has rightly allowed W.P.(C)
No. 2291/2020 and set aside the order dated 18.02.2020 passed
by the Electricity Ombudsman. It is contended that during the
inspection conducted on 03.04.2017, it was found that the
appellant’s electricity consumption had been billed by applying an
incorrect Multiplying Factor of 1 instead of 2, resulting in underrecording
of
the
actual
consumption.
Consequently,
the
supplementary demand was rightly raised towards the differential
units which had not been billed earlier. Learned counsel would
submit that the liability of the appellant arises from the actual
electricity consumed and that mere payment of the bills raised
earlier cannot absolve the consumer from payment of the
electricity charges actually payable.
9.
Learned counsel would further submit that the judgments of the
Supreme Court in Assistant Engineer (D1), Ajmer Vidyut Vitran
Nigam Limited (supra) and Prem Cottex (supra), squarely govern
the controversy and make it clear that Section 56(2) of the
Electricity Act, 2003 does not extinguish the licensee’s right to
recover charges which had not been correctly billed earlier and
that
the
provision
primarily
operates
in
the
context
of
disconnection of supply. According to learned counsel, the
supplementary demand represents charges for electricity actually
consumed by the appellant but not billed due to application of an
incorrect Multiplying Factor and, therefore, cannot be treated as a
demand barred merely on account of the passage of time. It is
also submitted that the appellant cannot derive any benefit from
the alleged failure to detect the discrepancy earlier, as the
subsequent inspection brought the correct billing position to light
and the respondent is legally entitled to recover the amount
corresponding to the actual consumption.
10.
Learned counsel would lastly submit that there is no material to
establish any mala fide, fraud or deliberate inaction on the part of
the respondent and that the appellant cannot claim immunity from
payment of legitimate electricity dues merely because the
discrepancy was detected subsequently. The provisions of the
Chhattisgarh Electricity Supply Code relating to periodic testing of
meters do not extinguish the respondent’s substantive right to
recover charges for electricity actually consumed, nor do they
confer upon the consumer a right to receive electricity at an
erroneously calculated rate. It is therefore contended that the
learned Single Judge, after considering the applicable statutory
provisions and the binding judgments of the Supreme Court,
rightly interfered with the order of the Electricity Ombudsman, and
the present appeal, being devoid of merit, deserves to be
dismissed.
11.
Learned counsel for the appellant also placed reliance upon the
judgment passed by the Hon’ble Supreme Court in the matter of
Prem Cottex Vs. Uttar Haryana Bijli Vitran Nigam Limited and
Others, reported in (2021) 20 SCC 200, wherein the scope of
Section 56(2) of the Electricity Act, 2003 was considered in detail.
The Hon’ble Supreme Court, while referring to its earlier decision
in Rahamatullah Khan, observed that although the liability to pay
electricity charges arises upon consumption, the obligation to pay
arises when the bill is raised by the licensee and, therefore, the
charges become “first due” only upon issuance of the bill. The
Court further clarified that Section 56(2) operates not merely as a
restriction upon disconnection of electricity supply but also
expressly bars recovery of a sum due from a consumer after
expiry of two years from the date on which such sum first became
due. It was, however, observed that the licensee may raise an
additional or supplementary demand after expiry of the said
period where the case falls within the recognised exception of a
mistake or bona fide error. Relying upon the aforesaid principle,
learned counsel for the appellant submits that the respondent
cannot seek to recover the supplementary demand for the entire
period of nearly nine years merely by describing the incorrect
application of the Multiplying Factor as a mistake, particularly
when the alleged error remained undetected despite the statutory
obligation of the licensee to periodically inspect and test the
metering equipment. According to learned counsel, the benefit of
the exception recognised in Prem Cottex is available only where
the supplementary demand genuinely arises from a mistake or
bona fide error and cannot be invoked to legitimise recovery
resulting from the respondent’s own prolonged failure to discharge
its statutory duties. Relevant paras of the judgment are quoted
hereinbelow:
“11. On the first two issues, this Court held that though the
liability to pay arises on the consumption of electricity, the
obligation to pay would arise only when the bill is raised by
the licensee and that, therefore, electricity charges would
become "first due" only after the bill is issued, even though
the liability would have arisen on consumption. On the
third issue, this Court held in Rahamatullah Khan³, that
"the period of limitation of two years would commence
from the date on which the electricity charges became first
due under Section 56(2)". This Court also held that
Section 56(2) does not preclude the licensee from raising
an additional or supplementary demand after the expiry of
the period of limitation in the case of a mistake or bona
fide error. To come to such a conclusion, this Court also
referred to Section 17(1)(c) of the Limitation Act, 1963 and
the decision of this Court in Mahabir Kishore v. State of
M.P.4
12. Despite holding that electricity charges would become
first due only after the bill is issued to the consumer (para
6.9 of the SCC Report of Rahamatulla Khan³) and despite
holding that Section 56(2) does not preclude the licensee
from raising an additional or supplementary demand after
the expiry of the period of limitation prescribed therein in
the case of a mistake or bona fide error (para 9.1 of the
SCC Report of Rahamatulla Khan³), this Court came to the
conclusion that what is barred under Section 56(2) is only
the disconnection of supply of electricity. In other words, it
was held by this Court in the penultimate paragraph that
the licensee may take recourse to any remedy available in
law for the recovery of the additional demand, but is
barred from taking recourse to disconnection of supply
under Section 56(2).
13. But a careful reading of Section 56(2) would show that
the bar contained therein is not merely with respect to
disconnection of supply but also with respect to recovery. If
sub-section (2) of Section 56 is dissected into two parts it
will read as follows:
(i) No sum due from any consumer under this section
shall be recoverable after the period of two years from
the date when such sum became first due; and
(ii) the licensee shall not cut off the supply of
electricity.
Therefore, the bar actually operates on two distinct rights
of the licensee, namely, (i) the right to recover; and (ii) the
right to disconnect. The bar with reference to the
enforcement of the right to disconnect, is actually an
exception to the law of limitation. Under the law of
limitation, what is extinguished is the remedy and not the
right. To be precise, what is extinguished by the law of
limitation, is the remedy through a court of law and not a
remedy available, if any, dehors through a court of law.
However, Section 56(2) bars not merely the normal
remedy of recovery but also bars the remedy of
disconnection. This is why we think that the second part of
Section 56(2) is an exception to the law of limitation.”
12.
We have heard learned counsel for the parties and perused the
impugned judgment passed by the learned Single Judge and the
pleadings and documents placed on record.
13.
From perusal of the impugned judgment, it transpires that the
learned Single Judge allowed the writ petition primarily on the
ground that the finding recorded by the Electricity Consumer
Grievance Redressal Forum regarding irregularity in the use of
electricity by the appellant had not been challenged before the
Ombudsman and, therefore, remained undisturbed. The learned
Single Judge further held, relying upon Assistant Engineer (D1),
Ajmer Vidyut Vitran Nigam Limited v. Rahamatullah Khan @
Rahamjulla and Prem Cottex v. Uttar Haryana Bijli Vitran Nigam
Limited, that Section 56(2) of the Electricity Act, 2003 had no
application to the supplementary demand and that the respondent
was entitled to recover the differential amount for the entire period
from installation of the meter. The contention of the appellant that
the respondent had failed to conduct periodic inspection of the
metering equipment was consequently not accepted, and the
order of the Electricity Ombudsman restricting recovery to a
period of two years was set aside, while the order of the Forum
was affirmed.
14.
In our considered opinion, the learned Single Judge fell into error
in treating the finding regarding alleged irregularity in the meter as
conclusive of the appellant’s liability for the entire period from
installation of the meter. The material question was not merely
whether the respondent could raise a supplementary demand
upon detection of an alleged discrepancy, but whether the
respondent could retrospectively recover the differential amount
for nearly nine years when the alleged discrepancy was
attributable to the Multiplying Factor applied by the licensee itself
and when the licensee had failed to discharge its statutory
obligation of periodic testing of the metering equipment. The
Chhattisgarh State Electricity Supply Code, 2011 specifically casts
responsibility upon the licensee to satisfy itself regarding the
accuracy of the meter before installation and further mandates
periodical testing. In particular, Clause 8.18(c) requires HT and
EHT meters along with metering equipment to be tested once
every year. (India Code) Thus, the statutory scheme itself
recognises that the accuracy of the metering arrangement is a
matter requiring periodic verification by the Distribution Licensee.
15.
In the present case, the respondent has not demonstrated that the
prescribed annual testing of the meter and metering equipment
was undertaken during the period in question. More importantly,
the inspection dated 03.04.2017 did not record any finding of
meter tampering, broken seals, dishonest abstraction of electricity
or any physical interference with the metering apparatus by the
appellant. The inspection report, as placed before us, recorded
the meter and its display to be functioning properly. The alleged
discrepancy was essentially in the application of the Multiplying
Factor. Such factor forms part of the billing and metering
arrangement maintained and controlled by the licensee. In these
circumstances, the mere fact that a subsequent inspection
disclosed an incorrect Multiplying Factor could not, by itself,
establish that the same factor had remained incorrectly applied
throughout the entire period from 2008 till 2017. There ought to
have been cogent material demonstrating that the alleged
discrepancy existed continuously during the entire period for
which the supplementary demand was raised. In the absence of
meter-testing records, calibration records, programming details,
inspection reports or other contemporaneous material establishing
such continuity, the retrospective assessment for the entire period
cannot be sustained merely on the basis of an assumption.
16.
We are also unable to accept the reasoning of the learned Single
Judge that, since the appellant had not challenged the finding of
the Forum regarding irregularity in the use of electricity, the entire
supplementary demand necessarily stood established. The
appellant’s challenge is not confined to the existence of the
discrepancy noticed on 03.04.2017 rather, the principal grievance
is against the retrospective fastening of liability for the entire
preceding period on account of the respondent’s own failure to
undertake the mandatory periodic testing. A finding that an
irregularity existed on the date of inspection cannot automatically
establish that the same irregularity existed continuously for nearly
nine years. The two questions are materially distinct and required
separate consideration. The learned Single Judge, in our view, did
not sufficiently examine this distinction and consequently
proceeded on an assumption which is not borne out from the
inspection material.
17.
The respondent, being the Distribution Licensee, was in control of
the metering arrangement, the application of the Multiplying
Factor and the billing process. The appellant had no authority to
determine what Multiplying Factor was to be incorporated in the
billing system. Once the Supply Code imposed a specific
obligation upon the licensee to periodically test the metering
equipment, failure to undertake such testing for years cannot be
completely
disregarded
while
determining
the
extent
of
retrospective liability. The respondent cannot be permitted to rely
upon its own failure to perform a statutory obligation as a basis for
shifting the entire financial consequence upon the consumer. The
Supreme Court, while explaining the concept of negligence in M/s
Bajaj Trading Company v. Union of India, 2026 INSC 711, has
reiterated that negligence includes failure to take proper care and
omission involving breach of a recognised duty of care, with
reference to the principles laid down in Rajkot Municipal
Corporation v. Manjulben Jayantilal Nakum, (1997) 9 SCC
552. Though the said decision arose in a different statutory
context, the principle that a statutory duty cannot be disregarded
while examining the consequences flowing from an omission is of
relevance to the present controversy.
18.
We further find that the reliance placed by the learned Single
Judge upon Assistant Engineer (D1), Ajmer Vidyut Vitran Nigam
Limited v. Rahamatullah Khan @ Rahamjulla, (2020) 4 SCC 650
and Prem Cottex v. Uttar Haryana Bijli Vitran Nigam Limited,
(2021) 20 SCC 200, requires reconsideration in the factual setting
of the present case. Those decisions cannot be understood as
laying down that in every case where a supplementary bill is
raised on account of an alleged billing or metering error, the
licensee is automatically entitled to recover the entire differential
amount for an indefinite retrospective period irrespective of its
own statutory obligations and the evidentiary basis for the period
of assessment. The question whether the alleged discrepancy
actually continued throughout the period for which the demand is
raised is a factual question which must be established on the
basis of reliable material. In the present case, the respondent has
failed to establish such continuity and has also failed to explain its
non-compliance with the mandatory periodic testing requirement.
19.
Learned counsel for the appellant has also placed reliance upon
the judgment of the Hon’ble Supreme Court in Prem Cottex v.
Uttar Haryana Bijli Vitran Nigam Limited and Others, (2021)
20 SCC 200, wherein, while considering the scope of Section
56(2) of the Electricity Act, 2003, the Hon’ble Supreme Court held
that the provision contains a bar not merely against disconnection
of electricity supply but also against recovery of a sum due from a
consumer after expiry of two years from the date when such sum
first became due. The Hon’ble Supreme Court, while referring to
its earlier decision in Rahamatullah Khan, also recognised that an
additional or supplementary demand may be raised after expiry of
the prescribed period in a case involving a genuine mistake or
bona fide error. However, in our considered opinion, the aforesaid
exception cannot be construed as conferring an unrestricted right
upon the licensee to recover every belated demand merely by
describing the same as a mistake or bona fide error. In the
present case, the alleged discrepancy in the Multiplying Factor
was admittedly within the metering and billing system controlled
by the respondent-licensee, and there is no material to establish
that the appellant had caused or contributed to such discrepancy.
More importantly, the respondent has failed to establish that the
alleged
incorrect
Multiplying
Factor
continued
to
operate
throughout the entire period of nearly nine years for which the
supplementary demand has been raised. The respondent’s failure
to undertake the mandatory periodic testing of the metering
equipment assumes significance in this regard. Therefore, the
present case cannot mechanically be brought within the exception
of “mistake or bona fide error” recognised in Prem Cottex,
particularly when the alleged error remained undetected for years
on account of the licensee’s own failure to discharge its statutory
obligation. The said judgment, therefore, does not support the
unrestricted retrospective recovery permitted by the learned
Single Judge rather, the principle laid down therein requires the
Court to examine whether the case genuinely falls within the
recognised exception before permitting recovery beyond the
statutory period.
20.
It is equally important that the appellant was not found to have
committed any act of tampering or dishonest abstraction. The
respondent’s case, therefore, cannot be equated with a case
where a consumer deliberately interferes with the metering
system and thereby suppresses actual consumption. Where the
alleged short billing flows from the incorrect Multiplying Factor
maintained or applied by the licensee itself, and there is no
material showing that the consumer caused or manipulated such
error, the consequences of the licensee’s prolonged failure to
detect the discrepancy cannot mechanically be imposed upon the
consumer for the entire preceding period. The appellant had been
receiving regular electricity bills and making payment on the basis
thereof, and there is nothing on record to demonstrate that the
appellant had any reason to know that the Multiplying Factor
applied by the licensee was incorrect.
21.
In view of the aforesaid discussion, we are of the considered
opinion that the learned Single Judge erred in setting aside the
order of the Electricity Ombudsman merely by holding that
Section 56(2) of the Electricity Act, 2003 had no application to the
supplementary demand. Even assuming that the said provision
does not operate as a limitation upon the substantive right to
recover charges for electricity actually consumed, the respondent
must still establish, by cogent material, the period for which the
alleged differential consumption remained unpaid and cannot
claim recovery for a period merely on the basis of a retrospective
assumption. The order of the Ombudsman, restricting the
recovery in the facts and circumstances of the case, therefore,
calls for interference.
22.
Accordingly, the appeal is allowed. The judgment and order dated
03.07.2026 passed by the learned Single Judge in W.P.(C) No.
2291/2020 is set aside. Consequently, the order dated 18.02.2020
passed
by
the
Electricity
Ombudsman
is
restored. Any
consequential demand raised by the respondent shall stand
governed by the said order. No order as to costs.
Sd/(Ravindra Kumar Agrawal)
Judge
Manpreet
Sd/(Ramesh Sinha)
Chief Justice
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review