2026:HHC:38547
IN THE HIGH COURT OF HIMACHAL PRADESH, SHIMLA
CWP No. 10203 of 2024
Date of Decision: September 10, 2026
_______________________________________________________
Veena Thakur
…….Petitioner
Versus
HP State Electricity Board and others
… Respondents
______________________________________________________
Coram:
Hon’ble Mr. Justice Sandeep Sharma, Judge.
Whether approved for reporting? 1 Yes.
For the Petitioner:
Mr. Mohit Thakur and Mr. Pawan K. Gautam,
Advocates.
For the Respondents: Ms. Sunita Sharma, Senior Advocate with
Ms. Manisha Kumari and Ms. Harshita
Dogra, Advocates.
_______________________________________________________
Sandeep Sharma, Judge(oral):
By way of present petition filed under Art. 226 of the Constitution of
India, petitioner has prayed for following main relief(s):
“(a) That the Writ in the nature of Mandamus directing the
Respondents to install three phase electricity connection to
the Petitioner which has not been installed/ done despite
lapse of sufficient time and despite the fact that the
respondent Board has received payment way back as desired.
(b)
That the Respondent Board may also be directed to lay
proper wires and poles so that that there is no hindrance/
obstruction
in supply of three phase electricity to the
Petitioner. If the need arises the land for laying such
poles/lines may be acquired. ”
2.
Precisely, the grouse of the petitioner, as has been highlighted in the
petition and further canvassed by Mr. Mohit Thakur and Mr. Pawan K. Gautam, Advocates, appearing for the petitioner is that despite there being ap-
Whether the reporters of the local papers may be allowed to see the judgment?
2026:HHC:38547
plication and necessary compliances as required under Electricity Act,
2003, three-phase electricity connection is not being installed, as a result
whereof, great prejudice is being caused to the petitioner.
3.
Quintessential facts, as emerge from the pleadings adduced on
record by respective parties are that in the year 2018, petitioner made an
application for installation of a three-phase electricity connection and he also deposited an amount of Rs.44,865/-, as was demanded by the respondent Board, however, the fact remains that more than 13 years have
passed but till date, on one pretext or the other, election connection is not
being released/installed, as such, the petitioner is compelled to approach
this Court, in the instant proceedings, for the grant of reliefs, as have been
reproduced herein above.
4.
Pursuant to notices issued in the instant petition, respondent Board
has filed reply, wherein facts, as have been noticed herein above, have not
been disputed, rather an attempt is being made to refute the claim of the
petitioner on the ground that despite there being repeated communications,
petitioner has not been able to remove hindrances in laying electricity wires.
It is averred in the reply that Right of Way (RoW) is to be provided by the
petitioner. It is further averred in the reply that though, after receipt of application as well as request made, an attempt was made to lay power line but
since objection was raised by certain land owners, needful could not be
done.
5.
Ms. Sunita Sharma, learned Senior Counsel duly assisted by Ms.
Manisha Kumari and Ms. Harshita Dogra, Advocates, appearing for the respondent Board, while inviting attention of this Court to the Electricity Manual
submits that it is duty of the consumer to provide Right of Way (RoW),
2026:HHC:38547
through or over any land under his/her control and jurisdiction, as may be
required by the HPSEBL in connection with provision or maintenance of a
service line to the premises of the consumer and subject to the provisions of
Section 67 of the Act to the premises of any other consumer. She also
placed reliance upon certain judgments passed by Hon’ble Apex Court to
state that it is duty of the consumer to cooperate with Electricity Board for
establishment of any infrastructure or power lines including Right of Way
(RoW), which shall be dealt with in later part of this judgment.
6.
Having heard learned counsel for the parties and perused material
available on record, this Court finds that in the year 2013, petitioner made
an application for installation of a three-phase electricity connection but
such prayer of him has not been granted till date, on the pretext that he has
failed to provide Right of Way (RoW). Though, a communication has been
placed on record by respondent Board (Annexure R-2 colly) suggestive of
the fact that certain residents of area raised objection with regard to laying
electricity wire, which is necessary for installation of three-phase electricity
connection in the premises of the petitioner, but having carefully perused
S.43 of the Electricity Act, this Court is persuaded to agree with learned
counsel for the petitioner that it is duty of Electricity Board being the licensee to give supply of electricity on an application made by owner of premises within a period of one month, from the date of receipt of application.
7.
At this stage, it would be apt to take note of S.43 of the Act, which
reads as under:
“43.
Duty to supply on request (1) Every distribution licensee, shall,
on an application by the owner or occupier of any premises, give
supply of electricity to such premises, within one month after receipt
of the application requiring such supply;
2026:HHC:38547
Provided that where such supply requires extension of distribution
mains, or commissioning of new sub-stations, the distribution
licensee shall supply the electricity to such premises immediately
after such extension or commissioning or within such period as may
be specified by the Appropriate Commission.
Provided further that in case of a village or hamlet or area, wherein
no provision for supply of electricity exists, the Appropriate
Commission may extend the said period as it may consider
necessary for electrification of such village or hamlet or area.
(2)
It shall be the duty of every distribution licensee to provide, if
required, electric plant or electric line for giving electric supply to the
premises specified in sub-section 91);
Provided that no person shall be entitled to demand, or to continue to
receive, from a licensee a supply of electricity for any premises
having a separate supply unless he has agreed with the licensee to
pay to him such price as determined by the Appropriate Commission.
(3)
If distribution licensee fails to supply the electricity within the
period specified in sub-section (1), he shall be liable to a penalty
which may extend to one thousand rupees for each day of default. ”
8.
Careful perusal of aforesaid provision of law though specifically talks
about duty of Electricity Board to provide electricity connection but it nowhere suggests that in that regard, Right of Way (RoW), if any, is to be provided by the applicant. It is also apt to take note of S.67 of Act, which reads
as under:
“67.
(1)
A licensee may, from time to time but subject always to
the terms and conditions of his licence, within his area of supply or
transmission or when permitted by the terms of his licence to lay
down or place electric supply lines without the area of supply, without
that area carry out works such as –
(a)
To open and break up the soil and pavement of any street,
railway or tramway;
2026:HHC:38547
(b)
To open and break up any sewer, drain or tunnel in or under
any street, railway or tramway;
(c)
To alter the position of any line or works or pipes, other than a
main sewer pipe;
(d)
To lay down and place electric lines, electrical plaint and other
works;
(e)
To repair, alter or remove the same;
(f)
To do all other acts necessary for transmission or supply of
electricity
(2)
The Appropriate Government may, by roles made by it in this
behalf, specify;
(a)
the cases and circumstances in which the consent in writing of
the appropriate government local authority, owner or occupier,
as the case may be, shall be required for carrying gout works;
(b)
The authority which may grant permission in the circumstances where the owner or occupier objects to the carrying out
of works;
(c)
The nature and period of notice to be given by the licensee before carrying out works;
(d)
The procedure and manner of consideration of objections and
suggestion received in accordance with the notice referred to
in clause ©;
(e)
The determination and payment of compensation or rent to the
persons affected by works under this section;
(f)
The repairs and works to be carried out when emergency exists;
(g)
The right of the owner or occupier to carry out certain works
under this section and the payment of expenses therefor
(h)
The procedure for carrying out other works near sewers, pipes
or other electric lines or works;
(i)
The procedure for alteration of the position of pips, electric
lines, electrical plant, telegraph lines, sewer lines, tunnels,
drains, etc.;
(j)
The procedure for fencing, guarding, lighting and other safety
measures relating to works on streets, railways, tramways,
2026:HHC:38547
sewers, drains or tunnels and immediate reinstatement thereof.
(k)
The avoidance of public nuisance, environmental damage and
unnecessary damage to the public and private property by
such works
(l)
The procedure for undertaking works which are not reparable
by the appropriate Government licensee or local authority;
(m)
The manner of deposit of mount required for restoration of any
railways, tramways, waterways, etc.
(n)
The manner of restoration of property affected by such works
and maintenance thereof;
(o)
The procedure for deposit of compensation payable by the licensee and furnishing of security; and
(p)
Such other matters as are incidental or consequential to the
construction and maintenance of works under this section.
(3)
A licensee shall, in exercise of any of the powers conferred by
or under this section and the rules made thereunder, caus as little
damage, detriment and inconvenience as may be, and shall make
full compensation for any damage detriment or inconvenience
caused by him or by any one employed by him.
(4)
Where any difference or dispute (including amount of
compensation under sub-section (3) arises under this under this
section, the matter shall be determined by the
Appropriate
Commission.
(5)
The
Appropriate
Commission,
while
determining
any
difference or dispute arising under this section in addition to any
compensation under sub-section (3) may impose a penalty not
exceeding the amount of compensation payable under that subsection.
9.
In terms of aforesaid provision, an appropriate Government is em-
powered to make rules to give effect to provisions contained under Electricity Act. While exercising power under afore provision of law, Central Gov-
2026:HHC:38547
ernment has framed rules namely Works of Licence Rules, 2006. S.3 of
afore Rules, deals with duty to be carried out by licensee, which reads as
under:
“3. Licensee to carry out works. – (1) A licensee may –
(a) Carry out works, lay down or place any electricity supply line or other works in, through, or against, any building, or on, over or under
any land whereon, wherever or whereunder any electric supply-line
or works has not already been lawfully laid down or placed by such
licensee, with the prior consent of the owner or occupier of any building or land.”
10.
As per aforesaid provision of law, it is duty of licensee to carry out
works, lay down or place any electricity supply line or other works in,
through, or against, any building, or on, over or under any land whereon,
wherever or whereunder any electric supply-line or works has not already
been lawfully laid down or placed by such licensee, with the prior consent of
the owner or occupier of any building or land.
11.
First proviso to rule provides that in case owner, occupier or building/
land raises an objection in respect of work to be carried out by licensee, licensee shall obtain permission in writing from District Magistrate or Commissioner of Police or other officer authorized by State Government for carrying out the work.
12.
Though, Ms. Sharma, learned counsel for the respondent Board,
vehemently argued that it is the duty of the petitioner to provide Right of
Way (RoW) and to ensure that no objection is raised by person, whose land
may come under electricity line, but having perused the rule extracted herein above, this Court is not persuaded to agree with Ms. Sharma, rather is of
2026:HHC:38547
the view that obstruction, if any, caused by any person in laying of electricity
line on the application made by an individual, is to be removed by the licensee i.e. electricity board. Specific provision has been made in the Rules
as provided herein above, to deal with situation where objections are raised
qua laying of electricity line. In the event of objection being raised, licencee
can always approach District Magistrate as well as Commissioner of Police
so that necessary assistance is provided to the licensee for execution of
work on the spot, but certainly, electricity connection cannot be denied to an
individual for the reason that he has not been able to provide Right of Way
(RoW).
13.
Though, clause 30 of Electricity Manual, suggests that consumer will
provide to the HPSEBL, Right of Way (RoW) in, through or over any land
under his/her control and jurisdiction as required by HPSEBL in connection
with provision or maintenance of a service line to the premises of the consumer but rule 3 of afore Rules, castes duty upon licencee Board to get obstruction, if any, caused by land owners removed.
14.
There cannot be any quarrel with the proposition of law laid down by
Hon’ble Apex Court in Power Grid Corporation of India Ltd. v. Century Textiles and Industries Ltd. & Ors. (2017) 5 SCC 143, Haryana Vidyut Prasaran
Nigam Ltd. v. Navin Kumar & Ors. (2008) 16 SCC 282 and Madhya Pradesh Electricity Board v. Shri Basantibai (1988) 1 SCC 23 , which have
been pressed into service by Ms. Sharma, but having perused aforesaid
judgments, this court finds that applicant is only required to provide necessary assistance but certainly, in terms of rules, as discussed herein above,
necessary action qua removal of obstruction, if any, is required to be taken
2026:HHC:38547
by licensee. Hence, aforesaid judgments have no applicability in the given
facts and circumstances of the case.
15.
Consequently, this court finds merit in the petition and same is al-
lowed. Respondent Board is directed to install three-phase electricity connection in the premises of petitioner, pursuant to his having made application in 2013, expeditiously, preferably within a period of six weeks from today.
16.
Needless to say, respondent Board is always at liberty to approach
District Magistrate or Commissioner of Police, for providing adequate assistance in laying power line for installation of three-phase electricity connection in the premises of petitioner.
17.
The petition stands disposed of in afore terms, alongwith all pending
applications.
(Sandeep Sharma),
Judge
September 10, 2026;
(vikrant)
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review