2026:HHC:47220
IN THE HIGH COURT OF HIMACHAL PRADESH, SHIMLA.
CWP No. 14444 of 2024 with CWP
Nos. 14445, 14446, 14447,14448,
14171, 14172, 14182, 14424, 14434,
14435, 14436, 14437, 14439, 14449 of
2024, 31, 1948, 1949 and 1950 of 2025,
Decided on: 28.10.2026
________________________________________________________
1. CWP No. 14444 of 2024
Vasu Dev
………..Petitioner
Versus
State of Himachal Pradesh & others.
….Respondents
2. CWP No. 14445 of 2024
Krishan Lal and others
………..Petitioner
Versus
State of Himachal Pradesh & others.
….Respondents
3. CWP No. 14446 of 2024
Vijay Kumar
………..Petitioner
Versus
State of Himachal Pradesh & others.
….Respondents
4. CWP No. 14447 of 2024
Jagdish
………..Petitioner
Versus
State of Himachal Pradesh & others.
5. CWP No. 14171of 2024
Budhi Ram & others
….Respondents
………..Petitioners
Versus
State of Himachal Pradesh & others.
….Respondents
________________________________________________________
6. CWP No. 14172 of 2024
Daya Ram and others
………..Petitioners
Versus
State of Himachal Pradesh & others.
….Respondents
2026:HHC:47220
7. CWP No. 14182 of 2024
Ram Chand
………..Petitioner
Versus
State of Himachal Pradesh & others.
….Respondents
8. CWP No. 14424 of 2024
Ram Pal
………..Petitioner
Versus
State of Himachal Pradesh & others.
9. CWP No. 14434 of 2024
Kamal Dev & others
….Respondents
………..Petitioners
Versus
State of Himachal Pradesh & others.
10. CWP No. 14435 of 2024
Kansi Ram & others
….Respondents
………..Petitioners
Versus
State of Himachal Pradesh & others.
11. CWP No. 14436 of 2024
Karam Chand & others
….Respondents
………..Petitioners
Versus
State of Himachal Pradesh & others.
12. CWP No. 14437 of 2024
Raj Kumar & others
….Respondents
………..Petitioners
Versus
State of Himachal Pradesh & others.
….Respondents
13. CWP No. 14439 of 2024
Kunj Ram
………..Petitioner
Versus
State of Himachal Pradesh & others.
….Respondents
2026:HHC:47220
14. CWP No. 14449 of 2024
Kuldeep & others
………..Petitioners
Versus
State of Himachal Pradesh & others.
….Respondents
15. CWP No. 31 of 2025
Balak Ram
………..Petitioner
Versus
State of Himachal Pradesh & others.
16. CWP No. 1949 of 2025
Jeeva Nand and another
….Respondents
………..Petitioners
Versus
State of Himachal Pradesh & others.
17. CWP No. 14448 of 2024
Dhani Ram & others
….Respondents
………..Petitioners
Versus
State of Himachal Pradesh & others.
….Respondents
18. CWP No. 1948 of 2025
Mast Ram
………..Petitioner
Versus
State of Himachal Pradesh & others.
….Respondents
19. CWP No. 1950 of 2025
Ram Lal
………..Petitioner
Versus
State of Himachal Pradesh & others.
….Respondents
________________________________________________________
Coram:
Hon’ble Mr. Justice Sandeep Sharma, Judge.
Whether approved for reporting?
For the Petitioner(s)
:
Mr. Vinod Chauhan, Ms. Aanchal
Singh and Ms. Nandita, Advocates.
For the Respondents
:
Mr. Anup Rattan, advocate General
with Mr. Rajan Kahol, Additional
2026:HHC:47220
Advocate General and Mr. Ravi
Chauhan & Mr. Anish Banshtu,
Deputy Advocates General.
________________________________________________________
Sandeep Sharma, Judge (oral):
Since common question of facts and law are involved
in both the above captioned cases, this Court, after having
clubbed the same, heard them together and now being disposed
of vide common judgment.
2.
For the sake of brevity, facts of CWP No. 14444 of
2024 are being discussed herein below:3.
Since despite utilization of land of the petitioners for
the construction of “Bharoli Kalan Jejwin Salwar Marotan road”,
no steps were taken by the respondents for acquisition of the land
of the petitioners and no compensation was paid to the
petitioners, they were compelled to approach this Court in the
instant proceedings under Articles 226 of the Constitution of
India, praying therein for following main relief:“i) that writ in the nature of mandamus may kindly be issued to
the respondents and they may be directed to initiate acquisition
proceedings qua the land of the petitioners utilized by the
respondents situated in Khata Khatauni No.33/29 min, Khasra
No.435, 436 and 660 measuring 00-11-00,00-09-00 & 00-15-00
bighas respectively, situate in VPO Marotan, Tehsil Jhandutta,
District Bilaspur, Himachal Pradesh as per jamabandi for the year
2020-21 and conclude the same in terms time bound manner and
thereafter pay due and admissible compensation in accordance
with rehabilitation and fair compensation Act.”
2026:HHC:47220
4.
Precisely, the facts of the case, as emerge from the
record, are that in 1994-95, respondent-State constructed
“Bharoli Kalan Jejwin Salwar Marotan road.” Though, for the
construction of aforesaid road, land of petitioners came to be
utilized by the respondent-State, but the petitioners were not paid
any compensation. As per petitioners, though some of persons,
whose land was acquired for construction of road from “Bharoli
Kalan Jejwin Salwar Marotan” have been paid compensation, but
same has not been paid to the petitioners, for their land utilized
for the construction of road from “Bharoli Kalan Jejwin Salwar
Marotan road.”
5.
initiate
Petitioners repeatedly requested the respondents to
acquisition
proceedings
qua
their
land
used
for
construction of road in question, but in vain as such, they have
approached this court in the instant proceedings, praying therein
for the reliefs, as have been reproduced herein above.
6.
Pursuant to the notices issued in the instant
proceedings, respondents have filed reply, under the signatures
of Superintending Engineer, 10th
Circle, Himachal Pradesh
Public Works Department, Bilaspur, District Bilaspur, Himachal
Pradesh, wherein facts as have been noticed herein above, have
not been disputed rather stand admitted.
7.
Claim of the petitioners for compensation raised in
the instant petitions has been sought to be refuted by the
2026:HHC:47220
respondents on the ground of delay and laches. Besides above, it
has been stated in reply that while the road was being
constructed, petitioners and similarly situate persons never raised
objection, rather voluntarily donated land for construction of the
road.
8.
Mr. Rajan Kahol, learned Additional Advocate
General, while making this Court peruse pleadings adduced on
record vehemently argued that there is no written document
suggestive of the fact that land was ever donated, but definitely
there is implied consent of the villagers for the construction of the
road. He submitted that the very fact that the petitioners remained
silent for more than 25 years is sufficient to establish factum with
regard to implied consent of the petitioners for construction of
road in question without there being any compensation.
9.
While making this Court peruse judgment passed by
this Court in Shankar Dass v. State of Himachal Pradesh in CWP
No. 1966 of 2010, Mr. Rajan Kahol, learned Additional Advocate
General submitted that otherwise also appropriate remedy for the
petitioners is to approach a civil court by way of civil suit. He
further submitted that Hon'ble Apex Court in State of Maharashtra
v. Digambar, (1995) 4 SCC 683 has categorically held that the
claim being highly stale, deserves outright rejection.
10.
To the contrary, Mr. Vinod Chauhan, learned counsel
for the petitioners strenuously argued that at no point of time,
2026:HHC:47220
consent, if any, was given by the petitioners for the construction
of road, without compensation. He submitted that once the
respondents themselves have admitted factum of passing of
award in case of some of land owners, such plea raised by the
respondents, that there was oral consent on behalf of the
petitioners for construction of road through their land, without
payment of compensation, falls to the ground.
11.
He submitted that otherwise also Hon'ble Apex Court
in Vidya Devi v. State of Himachal Pradesh and others, (2020) 2
SCC 569 and Sukh Dutt Ratra v. State of Himachal Pradesh and
others, (2022) 7 SCC 508, has categorically held that plea of
delay and laches cannot be raised in the case of continuing
cause of action, especially in land acquisition matters. He also
invited attention of this court to judgment dated 27.7.2023 passed
in CWP No. 5928 of 2022 in Vir Sain v. State of Himachal
Pradesh and Ors,, wherein, admittedly, this Court, having taken
note of the judgments passed in Vidya Devi and Sukh Dutt Ratra,
supra, negated the plea of delay and laches raised by the
respondent-State.
12.
Having heard learned counsel for the parties and
perused material available on record this Court finds that there is
no dispute qua the fact that the land of the petitioners was utilized
for construction of road in question. It is also not in dispute that
some of land owners were paid compensation after initiation of
2026:HHC:47220
acquisition proceedings under Land Acquisition Act in vogue at
the relevant time. Plea of delay and laches sought to be raised by
respondents may not be available on account of judgment
rendered in Vidya Devi and Sukh Dutt Ratra (supra), wherein it
has been categorically held that plea of delay and laches cannot
be raised in case of continuous cause of action or if the
circumstances shock the judicial conscience of the court, it can
always condone the delay to do the substantial justice. While
holding that condonation of delay is a matter of judicial discretion,
which must be exercised judiciously and reasonably in the facts
and circumstances of a case, Hon'ble Apex Court further held that
there is no period of limitation prescribed for the courts to
exercise their constitutional jurisdiction to do substantial justice. It
has been further held that forcible dispossession of a person of
his private property without following due process of law, is
violative of both, human right and constitutional right, guaranteed
under Art. 300-A of the Constitution of India. It would be apt to
take note of following paras of Vidya Devi, supra:
“10.1. The Appellant was forcibly expropriated of her property in 1967,
when the right to property was a fundamental right guaranteed by
Article 31 in Part III of the Constitution.
Article 31 guaranteed the right to private property 1, which could not
be deprived without due process of law and upon just and fair
compensation.
10.2. The right to property ceased to be a fundamental right by the
Constitution (Forty Fourth Amendment) Act, 1978, however, it
2026:HHC:47220
continued to be a human right 2 in a welfare State, and a
Constitutional right under Article 300 A of the Constitution. Article 300
A provides that no person shall be deprived of his property save by
authority of law. The State cannot dispossess a citizen of his property
except in accordance with the procedure established by law. The
obligation to pay compensation, though not expressly included in
Article 300 A, can be inferred in that Article.
To forcibly dispossess a person of his private property, without
following due process of law, would be violative of a human right, as
also the constitutional right under Article 300 A of the Constitution.
Reliance is placed on the judgment in Hindustan Petroleum
Corporation Ltd. v. Darius Shapur Chenai, wherein this Court held
that:
“ 6. … Having regard to the provisions contained in Article
300A of the Constitution, the State in exercise of its power of
"eminent domain" may interfere with the right of property of a
person by acquiring the same but the same must be for a
public purpose and reasonable compensation therefor must be
paid.” (emphasis supplied)
In N. Padmamma v. S. Ramakrishna Reddy, this Court held that:
“21. If the right of property is a human right as also a
constitutional right, the same cannot be taken away except in
accordance with law. Article 300A of the Constitution protects
such right. The provisions of the Act seeking to divest such
right, keeping in view of the provisions of Article 300A of the
Constitution of India, must be strictly construed.” (emphasis
supplied)
In Delhi Airtech Services Pvt. Ltd. & Ors. v. State of U.P.& Ors.,
this Court recognized the right to property as a basic human right in
the following words:
“30. It is accepted in every jurisprudence and by different
political thinkers that some amount of property right is an
indispensable safeguard against tyranny and economic
oppression of the Government. Jefferson was of the view that
liberty cannot long subsist without the support of
property."Property must be secured, else liberty cannot
subsist" was the opinion of John Adams. Indeed the view that
property itself is the seed bed which must be conserved if
other constitutional values are to flourish is the consensus
among political thinkers and jurists.” (emphasis supplied)
2026:HHC:47220
In Jilubhai Nanbhai Khachar v. State of Gujarat this Court held as
follows :
“48. …In other words, Article 300A only limits the powers of the
State that no person shall be deprived of his property save by
authority of law. There has to be no deprivation without any
sanction of law. Deprivation by any other mode is not
acquisition or taking possession under Article 300A. In other
words, if there is no law, there is no deprivation.” (emphasis
supplied)
10.3. In this case, the Appellant could not have been forcibly
dispossessed of her property without any legal sanction, and without
following due process of law, and depriving her payment of just
compensation, being a fundamental right on the date of forcible
dispossession in 1967.
10.4. The contention of the State that the Appellant or her
predecessors had “orally” consented to the acquisition is completely
baseless. We find complete lack of authority and legal sanction in
compulsorily divesting the Appellant of her property by the State.
10.5. In a democratic polity governed by the rule of law, the State
could not have deprived a citizen of their property without the sanction
of law. Reliance is placed on the judgment of this Court in Tukaram
Kana Joshi & Ors. v. M.I.D.C. & Ors.8 wherein it was held that the
State must comply with the procedure for acquisition, requisition, or
any other permissible statutory mode. The State being a welfare State
governed by the rule of law cannot arrogate to itself a status beyond
what is provided by the Constitution.
This Court in State of Haryana v. Mukesh Kumar held that the right to
property is now considered to be not only a constitutional or statutory
right, but also a human right. Human rights have been considered in
the realm of individual rights such as right to shelter, livelihood, health,
employment, etc. Human rights have gained a multifaceted dimension.
10.6. We are surprised by the plea taken by the State before the High
Court, that since it has been in continuous possession of the land for
over 42 years, it would tantamount to “adverse” possession. The State
being a welfare State, cannot be permitted to take the plea of adverse
possession, which allows a trespasser i.e. a person guilty of a tort, or
even a crime, to gain legal title over such property for over 12 years.
2026:HHC:47220
The State cannot be permitted to perfect its title over the land by
invoking the doctrine of adverse possession to grab the property of its
own citizens, as has been done in the present case.
10.7. The contention advanced by the State of delay and laches of the
Appellant in moving the Court is also liable to be rejected. Delay and
laches cannot be raised in a case of a continuing cause of action, or if
the circumstances shock the judicial conscience of the Court.
Condonation of delay is a matter of judicial discretion, which must be
exercised judiciously and reasonably in the facts and circumstances of
a case. It will depend upon the breach of fundamental rights, and the
remedy claimed, and when and how the delay arose. There is no
period of limitation prescribed for the courts to exercise their
constitutional jurisdiction to do substantial justice.
In a case where the demand for justice is so compelling, a
constitutional Court would exercise its jurisdiction with a view to
promote justice, and not defeat it.
In Tukaram Kana Joshi & Ors. v. M.I.D.C. & Ors., this Court while
dealing with a similar fact situation, held as follows :
“There are authorities which state that delay and laches
extinguish the right to put forth a claim. Most of these
authorities pertain to service jurisprudence, grant of
compensation for a wrong done to them decades ago,
recovery of statutory dues, claim for educational facilities and
other categories of similar cases, etc. Though, it is true that
there are a few authorities that lay down that delay and laches
debar a citizen from seeking remedy, even if his fundamental
right has been violated, under 32 or 226 of the Constitution,
the case at hand deals with a different scenario altogether.
Functionaries of the State took over possession of the land
belonging to the Appellants without any sanction of law. The
Appellants had asked repeatedly for grant of the benefit of
compensation. The State must either comply with the
procedure laid down for acquisition, or requisition, or any other
permissible statutory mode.” (emphasis supplied)”
13.
Reliance is also placed upon judgment passed by the
Hon’ble Apex Court in Sukhdutt Ratra’s cases (supra).
2026:HHC:47220
“23. This Court, in Vidya Devi (supra) facing an almost identical set of
facts and circumstances – rejected the contention of ‘oral’ consent to
be baseless and outlined the responsibility of the State:
“12.9. In a democratic polity governed by the rule of law, the
State could not have deprived a citizen of their property without
the sanction of law. Reliance is placed on the judgment of this
Court in Tukaram Kana Joshi v. Maharashtra Industrial
Development Corpn., wherein it was held that the State must
comply with the procedure for acquisition, requisition, or any
other permissible statutory mode. The State being a welfare
State governed by the rule of law cannot arrogate to itself a
status beyond what is provided by the Constitution.
12.10. This Court in State of Haryana v. Mukesh Kumar held
that the right to property is now considered to be not only a
constitutional or statutory right, but also a human right. Human
rights have been considered in the realm of individual rights
such as right to shelter, livelihood, health, employment, etc.
Human rights have gained a multifaceted dimension.”
24. And with regards to the contention of delay and laches, this
court went on to hold:
“12.12. The contention advanced by the State of delay and
laches of the appellant in moving the Court is also liable to be
rejected. Delay and laches cannot be raised in a case of a
continuing cause of action, or if the circumstances shock the
judicial conscience of the Court. Condonation of delay is a
matter of judicial discretion, which must be exercised
judiciously and reasonably in the facts and circumstances of a
case. It will depend upon the breach of fundamental rights, and
the remedy claimed, and when and how the delay arose.
There is no period of limitation prescribed for the courts to
exercise their constitutional jurisdiction to do substantial
justice.
12.13 In a case where the demand for justice is so
compelling, a constitutional court would exercise its jurisdiction
with a view to promote justice, and not defeat it.
25. Concluding that the forcible dispossession of a person of
their private property without following due process of law, was
violative of both their human right, and constitutional right
under Article 300-A, this court allowed the appeal. We find that
the approach taken by this court in Vidya Devi (supra) is
squarely applicable to the nearly identical facts before us in the
present case.
2026:HHC:47220
26. In view of the above discussion, in view of this court’s
extraordinary jurisdiction under Article 136 and 142 of the
Constitution, the State is hereby directed to treat the subject
lands as a deemed acquisition and appropriately disburse
compensation to the appellants in the same terms as the order
of the reference court dated 04.10.2005 in Land Ref. Petition
No. 10-LAC/4 of 2004 (and consolidated matters). The
Respondent-State is directed, consequently to ensure that the
appropriate
Land
Acquisition
Collector
computes
the
compensation, and disburses it to the appellants, within four
months from today. The appellants would also be entitled to
consequential benefits of solatium, and interest on all sums
payable under law w.e.f 16.10.2001 (i.e. date of issuance of
notification under Section 4 of the Act), till the date of the
impugned judgment, i.e. 12.09.2013.”
14.
In the aforesaid judgments, Hon’ble Apex Court has
categorically held that contention advanced by the State of delay
and laches of the appellant in moving the Court is liable to be
rejected, especially when, it is not in dispute that petitioner is
suffering continuous loss, coupled with the fact that he repeatedly
requested the authorities to initiate acquisition proceedings.
15.
If the aforesaid judgments are read in their entirety, it
clearly emerges that land owners cannot be deprived of their
land, without following due process of law. If it is so, ground
raised by the respondents that petitioners have made their land
available with consent, is of no consequence rather, this Court,
having taken note of the fact that the land of petitioners stands
utilized for the construction of road in question, is compelled to
agree with the submission of learned counsel for the petitioner
2026:HHC:47220
that his clients are entitled for compensation qua the land utilized
by respondents for construction of road in question.
16.
Though at this stage, Mr. Rajan Kahol, learned
Additional Advocate General, while making this court peruse
judgment dated 24.2.2023 passed by Hon'ble Apex Court in Civil
Appeal No. 1278 of 2023, titled State of Himachal Pradesh and
Ors v. Rajiv and others, attempted to argue that the relief as
sought in the instant petitions, cannot be allowed on the ground of
delay and laches, but having perused judgment supra, in its
entirety, this Court finds that it never came to be held in the
aforesaid judgment that the claim of the land owner after an
inordinate delay, cannot be considered, rather, in the aforesaid
case, claimants were not held entitled to the interest under the
Land Acquisition Act from the date of Notification under Section 4
of Land Acquisition Act till the filing of the writ petition. Since, no
Notification under Section 4 of Land Acquisition Act, 1894 ever
came to be issued in the case of petitioners, ruling, if any, given
in the aforesaid judgment, is of no relevance.
17.
Admittedly, land of the petitioners stands utilized for
construction of road more than two decades back but till date,
petitioners have not been paid any amount, which action of the
respondent-State certainly amounts to forcible dispossession of
the petitioner from his land, which is violative of provision
contained under Art. 300-A of the Constitution of India.
2026:HHC:47220
18.
In case titled, State of Himachal Pradesh v. Umed
Ram Sharma (1986) 2 SCC 68, Hon’ble Apex Court has held that
entire State of Himachal Pradesh is a hilly area and without
workable roads, no communication is possible; every person is
entitled to life as enjoined in Article 21 of the Constitution of India;
every person has right under Article 19 (1) (b) of the Constitution
of India to move freely, throughout the territory of India; for the
residents of hilly areas, access to road is access to life itself.
Stand taken by the respondents that there was a policy for
providing roads on demand of residents as a favour to them on
conditions that they would not claim compensation, cannot be
sustained because such stand is violative of Article 300A of the
Constitution of India.
19.
In case titled Hari Krishna Mandir Trust v. State of
Maharashtra and others, 2020 9 SCC 356, Hon’ble Apex Court
has held that though right to property is not a fundamental right,
but it is still a constitutional right under Article 300A of the
Constitution of India and also a human right; in view of the
mandate of Article 300A, no person can be deprived of his
property save by the authority of law. No doubt, State possesses
the power to take or control the property of the owner of the land
for the benefit of public, but at the same time, it is obliged to
compensate the injury by making just compensation.
2026:HHC:47220
20.
Consequently, in view of the detailed discussion
made herein above as well as law taken into consideration, this
Court finds merit in the present petitions and accordingly same
are allowed with direction to the respondents to initiate acquisition
proceedings within six weeks under the relevant statute vis-à-vis
land of the petitioners used for construction of road in question
and thereafter, just and fair compensation qua the same be
awarded to the petitioners. Since petitioners have been fighting
for their rightful claim for so long, this Court hopes and trusts that
authority
concerned
would
do
the
needful
expeditiously,
preferably, within six months. In the aforesaid terms, present
petitions are disposed of alongwith pending applications, if any.
October 28, 2026
(shankar)
(Sandeep Sharma)
Judge
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review