Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
Page No.# 1/15
GAHC030003352026
THE GAUHATI HIGH COURT
(HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)
Case No. : WP(C)/55/2026
The Northeast Frontier Railway
R/b the General Manager, N.F. Railway,
Maligaon, Guwahati
2: The Deputy Chief Engineer (Con)
N.F. Railway
Aizawl
Mizoram
VERSUS
The State of Mizoram
R/b the Secretary to the Govt. of Mizoram,
Land Revenue and Settlement Department, Aizawl, Mizoram - 796001
2:The District Collector
Kolasib District
Kolasib
Mizoram 0 796081
3:Sh. Beiseia
S/o Rothanga
R/o Kawnpui - 796070
4:Sh. Lalfakzuala
S/o Thangvunga
R/o Kawnpui - 796070
5:Smt. Lalfanzauvi
D/o Ramzauva
R/o Kawnpui - 796070
6:Sh. Hmangaihzuala
Page No.# 2/15
S/o R. Thangvlunga
R/o Kawnpui - 796070
7:Sh. Hmingthanzuala
S/o R. Thangvunga
R/o Kawnpui - 796070
BEFORE
HONOURABLE MR. JUSTICE MRIDUL KUMAR KALITA
For the Petitioners
: Mr. S. K. Medhi,learned CGC
For the Respondents
: Mrs. Vanneihsiami, Govt. Advocate
(for respondent Nos. 1 and 2)
: Mr. Lalfakawma, Advocate
(for respondent Nos. 3 to 7)
Date of Hearing
: 17.11.2026
Date of Judgment
: 27.11.2026
JUDGMENT & ORDER
1.
Heard Mr. S. K. Medhi, the learned Central Government Counsel
appearing for the petitioners. Also heard Mr. Lalfakawma, the learned counsel
for respondent Nos. 3 to 7 as well as Ms. Vanneihsiami, the learned Government
Advocate appearing for the respondent Nos. 1 and 2.
2.
This writ petition under Article 226 of the Constitution of India
has been filed by the Northeast Frontier Railway (petitioners) praying for
issuance of writ in the nature of mandamus/certiorari and/or any other
appropriate writ, order or direction of like nature.
Page No.# 3/15
3.
The petitioners are impugning the letter dated 14.01.2022 issued
by the respondent No. 2, namely, the District Collector, Kolasib District whereby
the petitioners were informed about assessment of statutory interest under
Section 34 of the Land Acquisition Act, 1894 which they are liable to pay to the
private respondents. The plea of the Railways is that it is not liable to pay the
said interest as mentioned in the impugned letter dated 14.01.2022.
4.
The facts relevant for consideration of the instant writ petition, in
brief, are that a portion of land belonging to respondent Nos. 3 to 7 was
acquired by the District Collector, Kolasib at the instance of the petitioners by
invoking the provisions under the Land Acquisition Act, 1894 for development of
railway line from Bairabi to Sairang village of Kolasib District, Mizoram. As
contended by the petitioners in their writ petition, the District Collector, Kolasib
passed the Land Award No. 1 of 2012 (Part-B Kawnpui) giving compensation
only for crops and not for land. The said award was also approved by the
Government
of
Mizoram
and
the
petitioners
paid
an
amount
of
Rs.17,01,51,365/- against Part-B Kawnpui on 31.05.2013. The said amount was
paid by the railway authorities before taking possession of the acquired land.
5.
It is further contended by the petitioners that respondent Nos. 3
to 7 had filed an application under Section 18 of the Land Acquisition Act, 1894
to the District Collector, Kolasib. However, the said respondents were not
permitted to submit their reference application as a complaint was lodged in this
regard and Anti-Corruption Bureau personnel conducted an inquiry in the
matter. Thereafter, respondent Nos. 3 to 7 filed a joint reference application
under the relevant provisions of the Land Acquisition Act praying for referring
their matter to the Principal Civil Court. However, the District Collector, Kolasib
Page No.# 4/15
refused to refer the said matter to the Principal Civil Court on account of
inordinate delay in filing the same.
6.
Thereafter, the respondent Nos. 3 to 7 approached this Court by
filing writ petition and this Court ordered the matter (reference application) to
be referred to the Principal Civil Court. Thereafter, in due course the Reference
Court i.e., the Court of learned Additional District Judge (Fast Track Court),
Kolasib, by its judgment and award dated 02.05.2019, passed in L.A. Case No. 6
of 2017, directed the District Collector, Kolasib to reassess the compensation
payable to the respondents by making a supplementary award by including the
value of land which is to be calculated at the rate of Rs.25/- per sq. ft., along
with 30% solatium and 12% interest under Section 23(1-A) and 23(2) of the
Land Acquisition Act, 1894 within the period of two months from the date of
receipt of the order. It further directed the railways to make payment of amount
so assessed by the Deputy Collector, Kolasib within two months from the date of
assessment.
7.
Accordingly, the District Collector, Kolasib sent the assessment
letter of compensation of the said lands along with interest under Section 28 of
the Land Acquisition Act, 1894 to the present petitioners. It is contended by the
petitioners that accordingly railways made the payment of the same on
24.09.2020.
8.
However, thereafter, the District Collector, Kolasib by its letter
dated 14.01.2022 sent another assessment letter of statutory interest under
Section 34 of the Land Acquisition Act, 1894. It was contended in the said letter
that though as per the calculation of land value and interest under Section 28 of
Page No.# 5/15
the Land Acquisition Act, 1894 made by the District Collector, Kolasib in terms of
the order passed by the Court of learned Additional District Judge, Fast Track
Court, Kolasib in L.A. Case No. 6/2017 as per award dated 02.05.2019, the
payment for the same has been made on 24.09.2020, however, the calculation
under Section 34 of the said Act was missed out due to some clerical error and
as such calculation of interest under Section 34 of the Land Acquisition Act in
respect of Beiseia and four others was assessed at Rs.1,17,55,908/- and the
petitioners were requested to deposit the same to the District Collector, Kolasib
for disbursement at the earliest.
9.
Mr. S. K. Medhi, the learned Central Government Counsel submits
that the petitioners are not liable to pay interest under Section 34 of the Land
Acquisition Act, 1894 inasmuch as said interest is payable on the original
compensation amount determined by the Collector under Section 11 of the Land
Acquisition Act. He submits that in the instant case, the Railways even prior to
taking possession had deposited the compensation as determined by the Draft
Award No. 1/2012.
10.
He submits that the Railways does not have any grievance against
the judgment and order dated 02.05.2019 passed by the Reference Court in L.A.
Case No. 6/2017. He submits that it is only the assessment dated 14.01.2022
issued by the District Collector, Kolasib which is impugned by the Railways as
the District Collector has wrongly assessed the amount of interest under Section
34 of the Land Acquisition Act, 1894.
11.
The learned Central Government Counsel submits that the interest
under Section 34 of the Land Acquisition Act, 1894 is payable only in case of
Page No.# 6/15
delayed payment of original award. He submits that if the compensation is not
paid or deposited on or before the taking possession of the acquired land, the
Collector may add interest at the prescribed rate on the awarded amount from
the time of taking possession till the payment has been so made or deposited.
However, he submits that since in the instant case the impugned letter itself
mentions that the Railway has already paid the awarded amount along with
interest under Section 28 of the Land Acquisition Act on 24.09.2020, hence, no
interest is payable under Section 34 of the Land Acquisition Act, 1894 and that
the impugned letter dated 14.01.2022 has wrongly calculated the interest
payable by the petitioners under Section 34 of the Land Acquisition Act, 1894.
12.
The learned Central Government Counsel submits that the interest
payable under Section 34 of the Land Acquisition Act cannot be regarded as a
part of the award as the payment of same is required only in case of delayed
payment after taking possession of the acquired land. He submits that since the
assessment of interest under Section 34 of the Land Acquisition Act by the
impugned letter cannot be regarded as an award within the meaning of award
under Section 26 of the Land Acquisition Act, 1894, hence, no appeal under
Section 54 of the said Act is maintainable and the wrong calculation of the
interest under Section 34 of the Land Acquisition Act, 1894 may be assailed by
filing a writ petition under Article 226 of the Constitution of India as has been
rightly done by the present petitioners.
13.
The learned counsel for the petitioners further submits that the
petitioners, i.e., the Railway authorities came to know about issuance of
impugned letter dated 14.01.2022 only on 22.01.2026 when the office of the
petitioner received a copy of execution petition filed by the respondent Nos. 3 to
Page No.# 7/15
7 herein for execution of the judgment and award passed by Reference Court on
02.05.2019, in L.A. Case No. 6/2017 along with the copy of assessment letter
dated 14.01.2022. Hence, he submits that there is no delay in approaching this
Court by filing writ petition under Article 226 of the Constitution of India.
14.
The learned counsel for the petitioners has submitted that the
petitioners are aggrieved mainly by the assessment letter dated 14.01.2022
issued by the District Collector, Kolasib and they are aggrieved mainly with the
wrong calculation of interest made under Section 34 of the Land Acquisition Act,
1894 by the District Collector, Kolasib. Hence, the averments made by the writ
petitioners in paragraphs No. 12 and 13 of the writ petition, where it has stated
that the Railways are not liable to pay interest under Section 34 of the Land
Acquisition Act, 1894 may be accordingly read and appropriate remedy may be
granted to the petitioners as apparently the assessment made by the District
Collector, Kolasib by the impugned letter dated 14.01.2022 is erroneous. The
learned counsel for the petitioners submits that the power to mould relief is an
inherent and intrinsic component of Article 226 of the Constitution of India as
per the demand of the situation so as to remedy the injustice.
15.
The learned counsel for the petitioners submits that similar cases
were filed by some other petitioners wherein the writ petitions were allowed
against the present petitioners, and the present petitioners have preferred
appeal against said orders, and the said appeals are pending before the
Principal Seat of Gauhati High Court, namely, Writ Appeal No. 265/2023, Writ
Appeal No. 320/2023 and Writ Appeal No. 8/2024. He further submits that in all
the writ appeals, the impugned order passed against the present petitioners was
stayed by the Division Bench. In support of his submission, the learned counsel
Page No.# 8/15
for the petitioners has cited the following rulings:
a)
“M/s Mangalagiri Textile Mills Pvt. Ltd. and Anr. Vs. State
Bank of India and Anr.”(Judgment dated 18.02.2022 delivered by the
Apex Court in the Writ Petition No. 30161/2021)
b)
“Rajesh Kumar and Ors. vs. State of Bihar and Ors .”
reported in “(2013) 4 SCC 690”
c)
“B. R. RamabhadriahVs. Secretary, Food and Agriculture
Department, Andhra Pradesh and Ors.” reported in “(1981) 3 SCC 528”
d)
“Roma
Sonkar Vs.
Madhya Pradesh Public Service
Commission and Anr.”(Judgment dated 31 July 2018 of the Apex Court
in Civil Appeal Nos. 7400-7401/2018).
16.
On the other hand, Mr. Lalfakawma, the learned counsel for the
private respondents Nos. 3 to 7 has submitted that the writ petition filed by the
present petitioners after a delay of more than four years in challenging the
impugned letter of assessment dated 14.01.2022 issued by respondent No. 2 is
hit by delay, laches and acquiescenceas the reasons for delay have not
beenproperly explained by the petitioners.
17.
He further submits that the letter dated 14.01.2022 was issued by
the Deputy Collector, Kolasib as a consequence of the direction issued by the
Court of learned Additional District Judge (Fast Track Court) in its judgment and
award dated 02.05.2019, passed in L.A. Case No. 6/2017. However, the said
judgment has not been impugned by the petitioners and without impugning the
Page No.# 9/15
basic order, the petitioners have impugned the consequential order which they
are not permissible to doin view of settled legal proposition that, without
challenging the basic order, on the basis of which the consequential order has
been passed, the later cannot be challenged.
18.
He submits that in a similar writ petition decided by a Co-ordinate
Bench of this Court in WP(C) No. 31/2026 (Northeast Frontier Railways & another
-Vs- State of Mizoram & others) where the issues involved are identical. It was
dismissed, on 18.09.2026, by the Coordinate Bench on the ground that the
petitioner in that writ petition has failed to challenge the principal order on
which the consequential order of assessment was passed by the District
Collector. It was also found to be hit by delay, laches and acquiescence as well
as the petitioners also failed to explain why, inspite of the availability of
statutory remedy of appeal under Section 54 of the Land Acquisition Act, 1894,
the writ jurisdiction should be exercised.
19.
The learned counsel for the private respondents further submits
that since the judgment of the Coordinate Bench of this Courthas been delivered
under similar facts and circumstances, hence, same is binding on this Court
unless it comes to a different view, in which case the proper course available is
to refer the matter to a larger Bench, this Court has to follow the ratio of the
judgment of the Coordinate Bench of this Court in WP(C) No. 31/2026.
20.
The learned counsel for the private respondents, therefore,
submits that the instant writ petition filed by the writ petitioners is liable to be
dismissed on the ground of delay, laches, and acquiescence, as well as on the
Page No.# 10/15
ground of availability of adequate alternative remedy, as well as on the ground
that the petitioners have assailed the consequential orders of the Collector
without assailing the judgment of the Reference Court on the basis of which the
assessment order dated 14.01.2022 regarding payment of interest under
Section 34 of the Land Acquisition Act, 1894, was passed by the District
Collector, Kolasib. In support of his submissions, the learned counsel for the
private respondents has cited the ruling of the Apex Court in the case of
“Sundar Vs. Union of India” reported in “(2001) 7 SCC 211”.
21.
The learned Government Advocate appearing for the State
respondents has supported as well as adopted the submissions made by the
learned counsels for the private respondents.
22.
I have considered the submissions made by the learned counsel
for both sides and have gone through the materials available on record. I have
also gone through the rulings cited by learned counsel for both sides in support
of their respective submissions.
23.
Though the learned counsel for the private respondents has relied
upon the judgment dated 18.09.2026 passed by a Coordinate Bench of this
Court in WP(C) No. 31/2026 to substantiate the contentions raised by the
private respondents in their affidavit-in-opposition filed in this writ petition,
however, this Court is of considered opinion thatthough in most of the aspects
the facts of both the cases are similar, however, in one vital aspect, the facts of
case involved in the WP(C) 31/2026 are distinguishable from the facts of instant
case, inasmuch as in the said writ petition, the private respondents did not
Page No.# 11/15
approach the Reference Court under Section 18 of the Land Acquisition Act,
1894, but approached the District Collector, Kolasib, by filing an application
under Section 28-A of the Land Acquisition Act, 1894. Hence, this writ petition
will be decided on its own merit.
24.
As regards the contention raised by the learned counsel for the
private respondents that the writ petitioners herein failed to challenge the
judgment dated 02.05.2019 of the Reference Court passed in LA Case No.
6/2017, on the basis of which the impugned letter dated 14.01.2022 assessing
the quantum of interest payable under Section 34 of the Land Acquisition Act,
1894, by the present petitioner was made by the District Collector, Kolasib, is
concerned, this Court is of considered opinion that the writ petitioners have
faulted in not assailing the basic order, that is, the aforesaid judgment, on the
basis of which the consequential order dated 14.01.2022, which is put to
challenge by the present petitioners in this writ appeal, was passed.
25.
It appears that while making oral submissions before this Court,
the learned Central Government Counsel has emphasized that the petitioners
are aggrieved only with the letter dated 14.01.2022 and they don't have any
grievance against the judgment dated 02.05.2019 passed in LA Case No.
6/2017. However, it appears that in Paragraph No. 24 of the judgment dated
02.05.2019 passed by the Court of learned Additional District Judge (Fast Track
Court), Kolasib, in LA Case No. 6/2017, it was categorically observed that the
applicants are entitled to be paid compensation for market value of their land at
the rate of Rs.25 per square feet, along with 30% solatium and 12% interest
under Section 23(1-A) and 23(2) of the Land Acquisition Act, 1894 and also
Page No.# 12/15
interest under Section 28 and 34 of the said Act.
26.
From the said categorical finding of the Reference Court, there
remains no doubt that it is the aforesaid judgment of the Reference Court,
which has given finding that the private respondents are entitled to interest
under Section 34 of the Land Acquisition Act, 1894. Whereas, if we go through
the contentions raised by the writ petitioners in Paragraph Nos. 12 and 13 of the
writ petition, it appears that the clear stand of the writ petitioner is that the
Railways is not liable to pay interest under Section 34 of the Land Acquisition
Act, 1894 and that under the facts and circumstances of this case, the statutory
provisions of Section 34 for interest never attracts.
27.
It appears that during oral arguments also, the contention of the
learned Central Government Counsel was that the interest under Section 34 of
the Land Acquisition Act is payable only in case of delayed payment of original
award passed by the Collector under Section 11 of the Land Acquisition Act,
1894. However, the contention of the petitioners is that the amount of the
original award was paid by the Railways in terms of Draft Award No. 1/2012
even before taking possession of the land in question. As such, the main
contention of the petitioners remains, even in assailing the assessment dated
14.01.2022, that they are not liable to pay any interest under Section 34 of the
Land Acquisition Act, 1894.
28.
For the sake of convenience, the provision contained in Section 34
of the Land Acquisition Act, 1894 is reproduced herein below: “34. Payment of interest
Page No.# 13/15
When the amount of such compensation is not paid or deposited
on or before taking possession of the land, the Collector shall pay
the amount awarded with interest thereon at the rate of [nine
per centum] [Substituted by Act 68 of 1984, Section 20, for " six
per centum" (w.e.f. 24.9.1984).] per annum from the time of so
taking possession until it shall have been so paid or deposited:
[Provided that if such compensation or any part thereof is not
paid or deposited within a period of one year from the date on
which possession is taken, interest at the rate of fifteen per
centum per annum shall be payable from the date of expiry of
the said period of one year on the amount of compensation or
part thereof which has not been paid or deposited before the
date of such expiry.] [Inserted by Act 68 of 1984, Section 20
(w.e.f. 24.9.1984).]”
29.
On a bare perusal of the aforesaid statutory provisions, it appears
that Section 34 may be invoked only if the amount of compensation is not paid
or deposited on or before taking the possession of the land. It postulates
payment of interest at the rate of 9% per annum for the first year from the date
of taking possession only until it is paid or deposited. It carries an enhanced
interest of 15% if the interest remains due even after the lapse of a one-year
period of taking possession of the land. Though it is a mandatory provision,
however, basically, Section 34 provides for the payment of interest in case of
delayed payment after the compensation amount is determined.
30.
In the instant case, since the contention of the petitioners is that
it has paid the compensation amount, which was assessed as per the Draft
Award No. 1 of 2012, even before it took the possession of the land which is
acquired, basically its stand is that it is not liable to pay the interest under
Section 34 of the Land Acquisition Act, 1894, which is contrary to the finding of
Page No.# 14/15
the Reference Court in the judgment dated 02.05.2019 passed in L.A. Case No.
6/2017.
31.
The rulings cited by the learned counsel for the petitioners are of
no help to the petitioners’ side since same relates to the power of this Court to
mould relief. However, in the instant case the stand of the petitioners on the
imposition of interest under Section 34 of the Land Acquisition Act 1894,as
discussed hereinabove, is very clear and categorical.
32.
Since the impugned letter dated 14 January 2022 has been issued
after assessing the interest under Section 34 of the Land Acquisition Act as per
the judgment and award of the Reference Court dated 02.05.2019 passed in
L.A. Case No. 6/2017, hence, this Court is of considered opinion that unless the
said judgment is challenged, the petitioner cannot assail the consequential order
dated 14.01.2022 passed by the District Collector, Kolasib.
33.
The findings of the Reference Court in paragraph No. 24 of the
judgment dated 02.05.2019, in L.A. Case No. 6/2017, to the effect that the
applicants (private respondents herein) are entitled to interest under Section 34
of the Land Acquisition Act, 1894, may be challenged only by way of an appeal
under Section 54 of the Land Acquisition Act, 1894 and not by filing the writ
petition, as the remedy under Section 54 of the Land Acquisition Act is an
alternative adequate remedy, the availability of which bars the exercise of writ
jurisdiction by this Court.
34.
Under the aforementioned circumstances, even if the delay of
Page No.# 15/15
more than four years in filing the instant writ petition is condoned, however, this
writ petition still fails due to availability of an alternative adequate statutory
remedy in the form of an appeal under Section 54 of the Land Acquisition Act,
1894, as well as failure on the part of the petitioners to challenge the judgment
dated 02.05.2019, passed in L.A. Case No. 6/2017, on the basis of which the
assessment order dated 14.01.2022, which has been impugned in this writ
petition, was issued by the Deputy Collector, Kolasib.
35.
In view of the discussions made and reasons stated in the
foregoing paragraphs of this judgment, this writ petition is dismissed.
36.
The parties are left to bear their own costs.
JUDGE
Comparing Assistant
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?