Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
( 2026:HHC:49139 )
IN THE HIGH COURT OF HIMACHAL PRADESH, SHIMLA
CWP No.4849 of 2025 a/w CWP Nos.4851, 4853, 5160,
5162, 5164, 5172, 5174, 6365, 6367, 6385, 6396, 6397,
6398, 6399, 6400, 6401, 6402, 7403 to 7414, 7416, 7418,
7420, 7422, 7424, 7643, 7944 to 7950 and 16900 of 2025
Reserved on: 14.10.2026
Pronounced on: 06.11.2026
Uploaded on: 06.11.2026
1. CWP No.4849 of 2025
The Chairman Bhakra Beas
Management Board and another
…..Petitioners
Versus
Shri Narotam Ram and another
2. CWP No.4851 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Mangat Ram and another
3. CWP No.4853 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Upender and another
4. CWP No.5160 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Dharam Singh and another
...Respondents
5. CWP No.5162 of 2025
The Chairman Bhakra Beas
Management Board and another
…..Petitioners
Versus
Shri Daulat Ram and another
6. CWP No.5164 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Roshan Lal and another
7. CWP No.5172 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Nand Lal and another
8. CWP No.5174 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Relu Ram and another
9. CWP No.6365 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Chint Ram and another
10. CWP No.6367 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Arjun Singh and another
....Respondents
11. CWP No.6385 of 2025
The Chairman Bhakra Beas
Management Board and another
…..Petitioners
Versus
Shri Bahadur Singh and another
12. CWP No.6396 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Sant Ram and another
13. CWP No.6397 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Brestu Ram and another
14. CWP No.6398 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Khub Ram and another
15. CWP No.6399 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Maghu Ram and another
16. CWP No.6400 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Dharam Singh and another
....Respondents
17. CWP No.6401 of 2025
The Chairman Bhakra Beas
Management Board and another
…..Petitioners
Versus
Shri Maghu Ram and another
18. CWP No.6402 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Bhagat Ram and another
19. CWP No.7403 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Chuhru Ram and another
20. CWP No.7404 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Jai Ram and another
21. CWP No.7405 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Parsu Ram and another
22. CWP No.7406 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Hem Raj and another
....Respondents
23. CWP No.7407 of 2025
The Chairman Bhakra Beas
Management Board and another
…..Petitioners
Versus
Shri Ram Singh and another
24. CWP No.7408 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Mangloo Ram and another
25. CWP No.7409 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Dharam Singh and another
26.CWP No.7410 of 2025
The Chairman Bhakra Beas
Management Board and another
Versus
....Respondents
Shri Daulat Ram and another
27. CWP No.7411 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
…..Petitioners
Versus
Shri Tara Chand and another
28. CWP No.7412 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Ram Ditta and another
....Respondents
29. CWP No.7413 of 2025
The Chairman Bhakra Beas
Management Board and another
…..Petitioners
Versus
Shri Dharam Singh and another
30. CWP No.7414 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Basakhi Ram and another
31. CWP No.7416 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Gian Singh and another
32. CWP No.7418 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Bhagat Ram and another
33. CWP No.7420 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Biri Singh and another
34. CWP No.7422 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Mohan Lal and another
....Respondents
35. CWP No.7424 of 2025
The Chairman Bhakra Beas
Management Board and another
…..Petitioners
Versus
Sh. Sohan Singh and another
36. CWP No.7943 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Sh. Chet Ram (deceased)
through LRs and Others
37. CWP No.7944 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Basakhu Ram and another
38. CWP No.7945 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Shyam Lal and another
39. CWP No.7946 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Shri Hem Prabh (deceased) through
LRs
40. CWP No.7947 of 2025
The Chairman Bhakra Beas
Management Board and another
Versus
...Respondents
…..Petitioners
Shri Lalit Kumar and another
41. CWP No.7948 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Narpat Ram and another
42. CWP No.7949 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
ShriChunni Lal and Others
43. CWP No.7950 of 2025
The Chairman Bhakra Beas
Management Board and another
....Respondents
…..Petitioners
Versus
Shri Niaz Mohammad and Others
44. CWP No.16900 of 2025
The Chairman Bhakra Beas
Management Board and another
...Respondents
…..Petitioners
Versus
Smt. Giano Devi and Others
Coram:
...Respondents
The Hon'ble Mr. Justice G.S. Sandhawalia, Chief Justice.
The Hon’ble Mr. Justice Bipin Chander Negi, Judge.
Whether approved for reporting? Yes.
For the Petitioner(s):
Mr. Aman Sood, Advocate, in all the
petitions.
For the Respondent(s): Ms. Suchitra Thakur and Mr. Krishan
Chand Chauhan, Advocates, for the
respondents, in all the petitions, except in
CWP No.16900 of 2025 and for the LRs
of respondent No.1 in CWP No.7946 of
2025.
Mr. Ajay Kumar Dhiman, Advocate, for
the respondents, in CWP No.16900 of
2025.
G.S. Sandhawalia, Chief Justice.
The present judgment shall dispose of 44 writ
petitions, the details of which are given above, filed by the
petitioner-Board
against
the
Awards
dated
15.07.2024,
18.07.2024 and 19.07.2024 (Annexure(s) P-1), passed by the
Presiding Officer, Central Government Industrial Tribunal-cumLabour Court, Chandigarh and details are being taken from
Reference Case No.116/2005, titled as Narotam Ram Vs. BBMB
and Another.
2.
In sum and substance, the Labour Court had
concluded that the workmen, who had completed five years of
service would be entitled to Rs. 50,000/- along with interest @ 9%
per annum as compensation from the date of filing the application
till realization of the amount. This was on account of noncompliance with Rules 77 and 78 of the Industrial Disputes Act,
1947 (hereinafter referred to as ‘the Act of 1947’), resulting in
violation of provisions of Section 25H of ‘the Act of 1947’, as the
previously retrenched workmen were not offered re-employment
and held a preferential right over other persons employed by the
petitioners-Board. Similarly, the workmen who had completed less
than five years but more than one year of service, were held
entitled to Rs.25,000/- along with interest @ 9% per annum from
the date of filing the application(s) till realization of the amount,
whereas those employees who had not completed one year of
service, were not held entitled to any compensation.
3.
The facts are identical and consensus was arrived at
between the counsels and the details have been taken from the
lead case, i.e. CWP No.4849 of 2025, titled as The Chairman,
Bhakra Beas Management Board and another Vs. Narotam
Ram and another, filed by the petitioner-Board against the
workman-Narotam Ram.
4.
The Tribunal had thus rejected the prayer raised by
the petitioner-Board, namely, that the work-charged employees
were employees of the ‘Beas Construction Board’ rather than the
‘Bhakra
Beas
Management
Board’
(hereinafter
known
as
“B.B.M.B.”) while placing reliance upon the celebrated judgment of
the Apex Court in Jaswant Singh and another Vs. Union of
India and another (1979) 4 SCC 440, whrein the rights of the
work-charged employees of B.B.M.B. were left open by the Apex
Court to be agitated under the provisions of the ‘the Act of 1947’
Furthermore, they were held bound firstly by an Award dated
15.05.1974 and a subsequent settlement arrived at on 28.06.1977,
which had been not produced by the Management despite being
given an opportunity. Thus, an adverse inference was drawn
against the petitioner-Board.
5.
Taking into consideration the observations made in
the Award dated 15.05.1974 in Reference No.2-C of 1971
concerning the work-charged employees of the Beas Sutlej Link
Project, Sundernagar, the Tribunal concluded that the petitionerBoard had made no efforts to provide employment after the
workmen were retrenched. Since the Board was duty-bound to
rehabilitate the work-charged employees and restore a congenial
atmosphere, compensation was awarded. This decision accounted
for the multiple rounds of litigation inter se the parties and
reinstatement or re-employment was no longer possible at the time
of the award. Finally, the issue of limitation was rejected on the
ground that there was no specific time period prescribed for filing a
Reference.
6.
It was in this background while issuing notice, this
Court had directed the deposit of the said amount along with up-todate interest, and the Award remained stayed. The needful has
been done over a period of time, therefore, the amount is secured
to be disbursed to the successful party.
Arguments of Counsel for the petitioner-Board:7.
Counsel for the petitioner-Board has again raised the
issue of delay on the part of the workmen, noting that the
Reference
was
made
only
on
07.07.2025,
whereas
the
retrenchment and discharge took place way back on 29.11.1978.
The additional ground on which the award has been challenged,
primarily asserts that the petitioner-Board has been wrongly foisted
with liabilities belonging to the ‘Beas Construction Board’, which
was the actual employer at that point of time. The workman's
enrollment had occurred on 31.10.1971, while the Board was
constituted on 01.11.1966, initially as the ‘Bhakra Management
Board’ (B.M.B.) and later renamed as the ‘Bhakra Beas
Management Board’ (B.B.M.B.) on 15.05.1976.
8.
Reliance
is
also
placed
upon
the
Discharge
Certificate. In this context, it is pointed out that the Discharge
Certificate was issued by the Sub-Divisional Officer, Mechanical
Division, Sundernagar, Himachal Pradesh and does not co-relate
to the petitioner-Board, with the stated reason for discharge being
reduction in strength. Furthermore, it is argued that the onus was
on the workmen to prove a violation of the provisions of Section
25H of ‘the Act of 1947’ along with the relevant Rules, and that the
Tribunal as such had wrongly put the onus upon the petitionerBoard.
Arguments of Counsel for the respondents:9.
Counsel for the respondents, on the other hand, has
submitted that following the discharge on 29.11.1978, the matter
was brought before the Apex Court and was subsequently decided
on 29.08.1979 in the case of Jaswant Singh’s (supra). At that
point of time, the right was crystallized, establishing that ‘the Act of
1947’, was the appropriate remedy for work-charged employees. It
is further submitted that the Management's recruitment process
was brought to light, during which various posts were filled up,
however, an upper age limit of 45 years and additional merit-based
qualifications were imposed for re-employment. Resultantly,
hundreds of fresh applications were filed without giving an
opportunity to the existing workmen, which led to the filing of CWP
No.403/1996, titled as Sant Ram and 89 Others Vs. BBMB,
before this Court. Due to the emergence of disputed questions of
fact, that matter had to be withdrawn. Because of these disputed
facts, the writ petition was withdrawn, leading to the institution of a
Civil Suit at Sundernagar on 21.01.1997. This suit was decided on
05.07.2022, whereby the plaints were returned to the workmen to
enable them to present the matter before the competent authority,
which was an action that initiated the current proceedings.
10.
The necessary demand notice was issued on
21.11.2003, leading to a reference order passed by the Central
Government on 07.07.2005. This reference was challenged
through CWP No.3100 of 2006, titled as Bhakra Beas
Management Board Vs. Union of India and Others, along with
69 other writ petitions, all of which were eventually dismissed by
the Punjab and Haryana High Court on 07.05.2007. Thereafter, the
matter was taken to the Apex Court, where Special Leave
Petition Nos.16939-17007 of 2007, titled as Bhakra Beas
Management Board Vs. Biri Singh & Others, were also
dismissed on 08.07.2014. Liberty was granted to agitate the matter
before the Industrial Tribunal-cum-Labour Court by the Apex
Court, ultimately leading to the adjudication of this matter along
with connected matters.
11.
Reliance is also placed upon the judgment of the
Apex Court in Ajaib Singh Vs. Sirhind Cooperative Marketingcum-Processing Service Society Ltd. [AIR 1999 SC 1351;
(1999) 6 SCC 82], to contend that there is no period of limitation to
seek a reference.
Accordingly, it is argued that the findings
recorded by the Industrial Tribunal were well justified. It is pointed
out that there is limited jurisdiction under Article 226 of the
Constitution of India to interfere with the Awards of the Labour
Court and the Court exercises an extraordinary jurisdiction. Only, if
there is a patent illegality apparent on the face of the record, it
would be exercised and it does not sit as an Appellate Court.
Resultantly, it is contended that the findings are well justified.
12.
The workmen had rendered labour for the construction
of projects envisaged under the then Prime Minister, Pandit
Jawaharlal Nehru. Keeping in view their length of service, the
compensation granted on account of the delay is in line with the
settled principles of law, and thus, the Awards are liable to be
upheld.
13.
It is submitted that, as per the relevant provisions of
the Punjab Re-organisation Act, 1966 (hereinafter referred to as
‘the Act, 1966’), specifically Section 79(4), protection is extended
under the first proviso. This proviso mandates that every person
who, immediately before the constitution of the said Board, was
engaged in the construction, maintenance, or operation of the
works referred to in sub-section (1), shall continue to be so
employed under the Board. Such employment shall remain on the
same terms and conditions of service as were applicable to them
before the Board's constitution, until the Central Government by
order, directs otherwise.
14.
The cross-examination of the Management witness
affidavit in evidence would go on to show that all appointments
were made strictly in accordance with the Class III & IV
(Recruitment and Conditions of Service) Regulations, 1994.
Furthermore, it was admitted that the Board was under no
obligation to re-employ the petitioner under the provisions of ‘the
Act of 1947’.
During the cross-examination, the witness also
stated that, pursuant to the bye-laws, it was the petitioner's duty to
apply and participate in the selection process, as advertised from
time to time.
15.
In the light of these admissions, Counsel for the
respondents has justified the Award. However, the counsel further
claims an enhancement and submits that the petitioner's claim is
arbitrary, even though no separate writ petitions or cross-appeals
have been filed against the Award in question.
16.
Keeping in view the contentions raised above, we are
of the considered opinion that the following questions arise for
consideration and decision by this Court:(i)
Whether the claim as such of the workmen was
time-barred and should have been non-suited
due to the delay in raising the Reference.
(ii)
Whether
the
Labour
Court
incorrectly
determined that the petitioners were employees
of the B.B.M.B. and that the petitioner-Board
had liability to pay the amounts; and whether, in
the absence of the employer-Beas Construction
Board, the Reference is bad.
(iii)
Whether there was a violation of the provisions
of Section 25H of ‘the Act, 1947’, whether the
workman was successful in proving said
violations and the relevant Rules providing for
re-employment preference, and whether there is
admission made by the Management regarding
this aspect.
Issue for consideration:(i)
17.
Whether the claim as such of the workmen
was time-barred and should have been nonsuited due to the delay in raising the
Reference.
While dealing with the first issue under consideration,
this Court is of the considered opinion that the facts of the case
clearly would go on to show that the delay on the part of the
workmen in seeking their remedy would not stand in their way,
in view of the law laid down by the Apex Court in Ajaib Singh’s
case (supra), wherein no limitation period is prescribed for
workmen to raise a demand seeking the reference of industrial
disputes to the Labour Court; however, the Court may mould the
relief in the facts and circumstances. These observations were
made while repelling a Full Bench judgment of the Punjab and
Haryana High Court, which had ruled otherwise. The Apex Court
concluded that the High Court was not justified in prescribing a
limitation period for obtaining a reference, as it is not the
function of the Court to prescribe a limitation period where the
Legislature, in its wisdom, chose not to do so. Resultantly, the
Award of the Labour Court directing reinstatement was upheld,
but the back-wages were reduced to 60% because the demand
was raised in the year 1981, even though the termination had
occurred much earlier on 16.07.1974. It is apparent that the
Apex Court as such also kept in view that the Act as such is a
beneficial piece of legislation enacted to protect the rights of
workmen and it was the battle against the unequals and would
result in frustration for the purpose of the enactment merely on
account of technicalities of law.
18.
In Assistant Engineer, Rajasthan State Agriculture
Marketing Board, Sub-Division Kota Vs. Mohan Lal (2013)
14 SCC 543, a similar view was taken.
19.
In Raghubir Singh Vs. General Manager, Haryana
Roadways, Hissar (2014) 10 SCC 301, the Apex Court
followed the said view and held that the delay in raising an
industrial dispute could be molded by the Labour Court.
Resultantly, the Apex Court had set aside the concurrent
findings recorded by the Labour Court and the High Court. It
concluded that the termination order was disproportionate and
that the workman was entitled to reinstatement with back-wages
effective from the date, the industrial dispute arose, i.e.,
02.03.2005. This was ordered despite the fact that the
termination had occurred much earlier, on 21.10.1994, due to
his implication in criminal cases from which he was ultimately
acquitted on 11.07.2002.
20.
The said judgments have been constantly followed.
Recently, a learned Single Judge of this Court reached a similar
conclusion in Yog Raj Vs. The Senior Executive Engineer,
HPSEB (2026:HHC:29786), while applying the law laid down by
the Apex Court in Special Leave Petition (C) No. 444 of 2024,
titled as State of Uttar Pradesh Vs. Krishna Murari Sharma,
decided on 17.12.2025.
21.
Therefore, keeping in view the above, the judgments
relied upon by the counsel for the petitioners-Board are not
liable to be accepted, such as Chief Engineer, Ranjit Sagar
Dam and another Vs. Shyam Lal (2006) 9 SCC 124. In that
case, the alleged date of termination was 13.11.1990, and the
workman had only worked for a period of one year, having
joined in November, 1989. The demand for making a reference
was made on 15.12.1999, which was after a prolonged period of
about nine years. Resultantly, a finding was arrived at that there
was no proof or receipt showing that the workman had, in fact,
worked for 240 days in a year. The Apex Court was persuaded
on that account, holding that the mere filing of an affidavit would
not suffice in the absence of any proof of receipt of salary or
wages for 240 days, or any order or record of appointment or
engagement produced by the workman for this period. In such
circumstances, the aspect of delay also rendered the claim exfacie bad, and thus, the said judgment would not be applicable
here.
22.
It is to be noticed that the period of employment spans
from 31.10.1971 to 29.11.1978, and the discharge was based
on the lack of work and a reduction in strength.
23.
It is a matter of record that, in this specific case of the
workmen, a petition was filed under Article 32 of the Constitution
of India before the Apex Court in Jaswant Singh’s case
(supra). In that case, one group comprised various types of
regular employees, including Engineers, Overseers, Teachers,
Sub-divisional Clerks, Clerks, Accounts Clerks, Time-keepers,
Research
Assistants,
Store-Keepers,
Meter
Readers,
Draughtsmen, Tracers, and Steno-Typists, while the other group
consisted of work-charged employees. Both groups sought relief
against proposed or executed retrenchment orders, claiming
that the provisions of Articles 14 and 16 of the Constitution of
India were violated. They also claimed parity with deputationists
belonging to the service cadres of other State Governments
whose services had been lent for the projects in question.
These projects began with the construction of the Beas
Construction Project in the year 1960, and employment was
initially handled by the Beas Control Board. Following the
enforcement of ‘the Act, 1966’ on 01.11.1966, the ‘Beas
Construction
Board’
was
constituted,
and
the
‘Bhakra
Management Board’ was set up (later renamed the ‘Bhakra
Beas Management Board’). A separate chapter, Part VIII, was
the subject of consideration before the Apex Court regarding as
to how the rights of these employees should be governed. The
judgment was pronounced on 29.08.1979, holding that the rights
of the 36,000 work-charged establishment working in the Beas
Project Management were governed primarily by the Award
dated 15.07.1974, in Reference No.2-C of 1971, as well as the
subsequent settlement dated 28.06.1977.
24.
The case of the workmen, as noticed earlier, is that
their services were terminated through retrenchment without
prior intimation or opportunity, violating Rules 77 and 78, as well
as the provisions of Section 25H of ‘the Act of 1947’. This led to
the first round of litigation in CWP No. 403/1996, titled as Sant
Ram and 89 Others Vs. BBMB, before this Court. Due to the
disputed issues raised, the matter was referred for adjudication.
A Civil Suit was subsequently filed on 21.01.1997, but the
plaints were eventually rejected and returned on 05.07.2022.
This led to a demand notice dated 21.11.2003, with the
reference being made on 07.07.2005.
25.
The said reference was challenged by the B.B.M.B. in
CWP No. 3100 of 2006, titled as Bhakra Beas Management
Board Vs. Union of India and Others, before the Punjab and
Haryana High Court at Chandigarh. This bunch of cases was
disposed of on 07.05.2007. Thereafter, the matter remained
pending before the Apex Court till the disposal of Special Leave
Petition Nos. 16939-17007 of 2007, titled as Bhakra Beas
Management Board Vs. Biri Singh & Others on 08.07.2014,
wherein liability was given to raise all the contentions before the
Labour Court, ultimately culminating in the Awards dated
15.07.2024, 18.07.2024 and 19.07.2024 (Annexure(s) P-1).
26.
Keeping in view the above, this Court is of the
considered opinion that the issue of limitation would not stand in
the way of the workmen obtaining relief. The relief has been
accordingly moulded by the grant of compensation, in
accordance with the settled principles of law laid down by the
Apex Court in Incharge Officer & Another Vs. Shankar Shetty
(2010) 9 SCC 126 and Assistant Engineer, Rajasthan
Development Corporation & Another Vs. Gitam Singh (2013)
5 SCC 136. The Apex Court in the said case had noticed that
the engagement of the daily wager was for about 7 years
intermittently
between 1978
to 1985,
while at the time of
decision, it was 25 years earlier and resultantly, it was held that
reinstatement
could
not
be
justified
and
monetary
compensation of Rs. 1,00,000/- was granted.
27.
Similarly, in Gitam Singh’s case (supra), it was
noticed that consequential reliefs would depend on host of
factors, namely, manner and method of appointment, nature of
employment and length of service, and it was thus held that
where the length of engagement of a daily wager has not been
long, reinstatement should not be followed and compensation
should be directed to be paid.
While drawing a distinction
between a daily wager and an employee holding a regular post,
the work period having been only for eight months, it was
accordingly held that compensation of Rs.50,000/- would suffice
to meet the ends of justice.
(ii) Whether the Labour Court incorrectly
determined that the petitioners were
employees of the B.B.M.B. and that the
petitioner-Board had liability to pay the
amounts; and whether, in the absence of the
employer-Beas Construction Board, the
Reference is bad.
&
(iii) Whether there was a violation of the
provisions of Section 25H of ‘the Act, 1947’,
whether the workman was successful in
proving said violations and the relevant
Rules
providing
for
re-employment
preference, and whether there is admission
made by the Management regarding this
aspect.
28.
These issues are being decided together, as they are
inter-linked.
29.
The specific case of the petitioners-workmen was that
they had been employed by the Central Government through
various Boards. The construction of the Beas Sutlej Link began
in the year 1962 under the Beas Construction Board, while its
maintenance and operation fell under the Beas Control Board
within the Bhakra Beas Management Board (BBMB), utilizing
the project agency at Una. By virtue of Section 79 and Section
80 of ‘the Act, 1966’, these workers became employees of the
Central Government effective 15.05.1976, when the BBMB was
formally renamed. Following a reduction in strength due to the
partial completion of the Beas Sutlej Link, the workmen were
retrenched, and re-employment certificates were issued from
Sundernagar in accordance with ‘the Act of 1947’.
30.
In response to the petition filed by these work-charged
employees, the petitioner-Board contended in its defense that
the workmen were exclusively employed and retrenched by the
Beas Construction Board. The Board argued that because the
two Boards are distinct and separate legal entities, it bears no
liability, as no master-servant relationship ever existed between
the Board and the workmen.
31.
In the replication filed by the petitioners-Board, the
workmen had taken the same stand regarding the amalgamation
of the Board due to the reorganization of the State of Punjab.
They contended that it was the Board's statutory duty, under the
master-servant relationship and applicable service Rules, to
inform the applicant via registered post about the intended
employment, in compliance with Section 25H and Rules 77 and
78 of ‘the Act of 1947’ which the Board had failed to do.
32.
The Labour Court has reproduced the protection
granted in Reference No.2-C of 1971 between the workmen of
the Beas Sutlej Project. This reference concerned the
regularization of work-charged employees, whereby upon the
completion of a six-month transition period following the
project's maintenance phase, employment offers had to be
made to the said employees in order of seniority, provided they
had completed ten years of continuous service under the Board.
The observations were also made that the Central Government,
along with the State Governments that are beneficiaries of the
project, would make every reasonable effort to ensure their reemployment at other projects or works, either within these
States or in any other part of the country where a need exists
for workmen of those specific trades. While the relevant Section
has already been excerpted by the Labour Court, the effective
portions of the Award dated 15.05.1974 are reproduced below
for ease of reference:“In such circumstances stated above I would
have directed that the services of those of the
workman who have been continuously
employed for more than 10 years should be
regularized. But the other problems arising
from such a direction including financial impact
on the employer cannot be lost sight of The
Central Government through the board is only
managing on behalf of the state of Punjab,
Rajasthan, Haryana and Himachal Pradesh
who are partners in the venture. Several
aspects of the question were discussed with
the workmen and the management in the
course of arguments and a formula evolved to
which the workman virtually agreed and I feel
that such a solution as stated hereunder is
quite just to all the parties provided it is work
out, honestly stated.
No doubt, what is
referred to me is the matter of regularization of
the services of work charge employees, but the
directions that I am issuing in my opinion,
amount to only granting lesser relief than
claimed by the workmen. The management
can also have no grievance if it wants industrial
peace and is anxious to secure employment to
the work-charged employees after the
completion of the work. It is accordingly,
directed that at the time of completion of the
Project or at any other time within six months
thereof for the maintenance staff for the Project
or any of its Works if it is required to be
recruited or transferred from any department of
the State Governments or of the Central
Government, the offer shall first be made to the
work-charged employees in order of their
seniority who have put in 10 years’ continuous
service or more under the Board in that
category or trade where the vacancy occurs
subject to the medical fitness of such
workmen. The scale of wages as applicable to
the workmen will not, however, be disturbed to
their prejudice nor their continuity of service
affected. The workmen have expressed an
apprehension that near the completion of the
Project trades of some of them might be
changed so that it could be said that a suitable
workman needed for a particular job was not
available and outsider was therefore necessary
to be employed. To protect the workmen
against this possible denial of their rights it is
further directed that category or trade of no
workman shall be changed within one year
preceding the completion of the Project without
his consent in writing and that if any such
change without consent is made it will have no
consequence inasmuch as such a workman
will be entitled to the job of his earlier trade
provided the vacancy relates to that trade. As
regards those of the workmen cannot be
absorbed on the regular maintenance staff. I
have no reason to doubt that the State
Government who are beneficiaries under the
Project and also the Central Government will
make every reasonable effort to get them reemployed at any other Project or work whether
in any one of these States or in any other part
of the country where there is a need for
workmen
33.
of
those
trades.”
Though the actual settlement between the Conciliation
Officer and the Regional Labour Commissioner (Central), New
Delhi, had not been produced before the Labour Court, wherein it
is apparent that the termination of the work-charged staff was
inevitable. This settlement is binding for a period of three years
and provides that preference be given to suitable retrenched
employees
when
filling
future
vacancies
across
various
departments and projects. Counsel for the B.B.M.B. produced the
Settlement dated 28.06.1977. The terms of the settlement read as
under:“Short Recital of the Case
The work on the Beas Project is nearing completion
and consequently, a large number of workmen have
been rendered surplus, and the management is
required to retrench them in a phased manner.
Accordingly, retrenchment notices were issued
around end March to those who were due to be
retrenched. On representation from the affected
workmen, it was decided to postpone implementation
of the retrenched orders to 30.6.77 in the phase.
The Unions of the workmen working in the project
have raised certain demands in connection with the
proposed retrenchment. At the request of the parties,
the demands were taken up in conciliation and
discussed at length with the representatives of the
union and the management. After protracted
discussions the following settlements is arrived at:TERMS OF SETTLEMENT
1. It is realised by both the parties that on the
completion of the works, the termination of the
workcharged staff rendered surplus is inevitable. The
Management promised that they would, however,
continue their efforts to help the retrenched workmen
to get jobs elsewhere both in private and Government
undertakings. Management have also assured to
request the partner States to give preference to the
suitable retrenchees in filling future vacancies in their
various Department and Projects.
2. While the eligible retrenched person will be paid
retrenchment compensation as provided in the
Industrial Disputes Act, the management agree to
extend the
benefit of retrechment compnesation
even to those persons who are employed in a
supervisory capacity and are drawing wages
exceeding Rs.500 per mensem, in lieu of terminal
benefit.
3. While the retrenched persons who are governed by
the provisions of the Payment of Gratuity Act, 1972
will be paid gratuity as per provisions of the Act, the
management agree as a gesture of goodwill, that an
ex-gratia payment will be made to other retrenched
persons who are not entitled for gratuity under the
Payment of Gratuity Act, 1972.
(a) The ex-gratia payment will be equal to half the
amount of gratuity which would have been
admissible to an employee if he had been covered
under the provisions of the Payment of Gratuity Act,
1972.
(b) The amount of this ex-gratia payment will be
adjusted against the gratuity that may accrue to an
employee subsequently either due to the extension
of the provisions of the Payment of Gratuity Act,
1972 or as a result of any Court or Tribunal decision
or otherwise. Before an employee becomes entitled
to this ex-gratia payment, he will have to give a
written undertaking in the form enclosed, to that
effect.
(c)
Those workcharged employees who have
rendered part service in the factory works and party
in non-factory works, will get gratuity for the period
(c) of service in factory works as admissible under
the Payment of Gratuity Act, 1972.
For the period of service in non-factory works, they
will get ex-gratia payment at half the rate at which
gratuity would have been admissible to them if they
had been covered under the Payment of Gratuity Act,
1972.
4. The Management and the Workmen agree to cooperate with each other in maintaining Industrial
peace and discipline.
5. This settlement would be applicable to those
workmen retrenched, and binding for a period of three
years and would continue to be binding on the parties
after the expiry of said period of three years, until the
expiry of two months from the date on which a notice
in writing of an intention to terminate the settlement
issued to the is/parties to the settlement.”
34.
A perusal of the same would go on to show that the
workmen as such are entitled for preferential employment in terms
of the provisions of Section 25H of ‘the Act of 1947’ and the
Industrial Disputes (Central) Rules, 1957, which reads as under
under:“25H.
Re-employment
of
retrenched
workmen.-Where any workmen are retrenched,
and the employer proposes to take into his employ
any persons, he shall, in such manner as may be
prescribed, give an opportunity 1[to the retrenched
workmen who are citizens of India to offer
themselves for re-employment, and such
retrenched workmen] who offer themselves for reemployment shall have preference over other
persons.
Rules:77. Maintenance of seniority list of workmen.The employer shall prepare a list of all workmen in
the particular category from which retrenchment is
contemplated to be arranged according to the
seniority of their service in that category and cause
a copy thereof to be pasted on a notice board in a
conspicuous place in the premises of the industrial
establishment at least seven days before the
actual date of retrenchment.
78. Re-employment of retrenched workmen. –
(1) At least ten days before the date on which
vacancies are to be filled, the employer shall
arrange for the display on a notice board in a
conspicuous place in the premises of the industrial
establishment details of those vacancies and shall
also give intimation of those vacancies by
registered post to every one of all the retrenched
workmen eligible to be considered therefor, to the
address given by him at the time of retrenchment
or at any time thereafter:
Provided that where the number of such vacancies
is less than the number of retrenched workmen, it
shall be sufficient if intimation is given by the
employer individually to the senior-most retrenched
workmen in the list referred to in rule 77 the
number of such senior-most workmen being
double the number of such vacancies:
Provided further that where the vacancy is of a
duration of less than one month there shall be no
obligation on the employer to send intimation of
such vacancy to individual retrenched workmen:
Provided also that if a retrenched workman,
without sufficient cause being shown in writing to
the employer, does not offer himself for reemployment on the date or dates specified in the
intimation sent to him by the employer under this
sub-rule, the employer may not intimate to him the
vacancies that may be filled on any subsequent
occasion.
(2) Immediately after complying with the provisions
of sub-rule (1), the employer shall also inform the
trade unions connected with the industrial
establishment, of the number of vacancies to be
filled and names of the retrenched workmen to
whom intimation has been sent under that subrule:
Provided that the provisions of this sub-rule need
not be complied with by the employer in any case
where an intimation is sent to every one of the
workmen mentioned in the list prepared under rule
77.”
35.
The judgment in question in the Jaswant Singh’s
case (supra) also notes the provisions of 'the Act, 1966' and the
fact that the proviso to Rule 79(4) provides that every person who,
immediately before the constitution of the said Board, was
engaged in the construction, maintenance, or operation of the
works in sub-section (1) shall continue to be employed under the
Board in connection with the said works on the same terms and
conditions of service. Sections 79(1) and (4) of 'the Act, 1966' read
as under:“79. Bhakra Management Board-(1) The Central
Government shall constitute a Board to be called
the
Bhakra
Management
Board
for
the
administration, maintenance and operation of the
following works namely:(a) Bhakra Dam and
appurtenant thereto;
Reservoir
and
work
(b) Nangal Dam and Nangal-Hydel Channel up to
Kotla Power House;
(c) the irrigation headworks at Rupar, Harike and
Ferozepur;
(d) Bhakra Power Houses:
Provided that the administration, maintenance and
operation by the said Board of the generating unit of
the Right Bank Power House as have not been
commissioned shall commence as and when any
such unit has been commissioned;
(e) Ganguwal and Kotla Power Houses;
(f) Sub-stations at Ganguwal, Ambala, Panipat,
Delhi, Ludhiana, Sanfrul and Hissar and the main
220KV transmission lines connecting the said substations with the power stations specified in clauses
(d) and (e);
and
(g) such other works as the Central Government
may, by notification in the Official Gazette, specify.
(2) to (3) x x x x x x x x x x
(4) The Bhakra Management Board may employ
such staff as it may consider necessary for the
efficient discharge of its functions under this Act:
Provided that every person who immediately
before the constitution of the said Board was
engaged in the construction, maintenance or
operation of the works in sub-section (1) shall
continue to be so employed under the Board in
connection with the said works on the same terms
and conditions of service as were applicable to him
before such constitution until the Central
Government by order directs otherwise:
Provided further that the said Board may at
any time in consultation with State Government or
the Electricity Board concerned and with the
previous approval of the Central Government return
any such person for service under that Government
or Board.”
36.
In such circumstances, it does not lie in the mouth of
the petitioners-Board to submit that they had no relationship,
rights, or obligations to re-employ the persons whose services
were dispensed with, and who had worked with the Board or its
predecessor. The mere reconstitution and renaming of the Board
would not take away the rights of the workmen, keeping in mind
the true intent of the parties.
37.
It is important to note that the then Prime Minister,
Pandit Jawaharlal Nehru, had appreciated the individuals who
gave their sweat and blood for the construction of the projects on
the Beas, whether through the ‘Beas Control Board’, the ‘Beas
Construction Board’, and later named the ‘Bhakra Management
Board’ and subsequently the ‘Bhakra Beas Management Board’.
The wording of the then Prime Minister, Pandit Jawaharlal Nehru,
on the plaque at the Bhakra Dam, Nangal reads as under:“TO HELL WITH THE MAN WHO CANNOT WALK
FAST. IT SERVES HIM RIGHT IF HE GETS OUT
OF THE RANKS AND FALLS OUT. WE WANT NO
SLUGGARDS. WE WANT NO SLOW PEOPLE
WHO ALWAYS COMPLAINT ABOUT THEIR
SERVICE CONDITIONS AND THEIR TRANSFERS
AND SO ON………...SERVICE CONDITIONS AND
SALARY AND STATUS MAY BE IMPORTANT.
BUT I WANT WORK AND WORK AND
WORK…………..I WANT ACHIEVEMENT. I WANT
MEN WHO WORK AS CRUSADERS. I WANT MEN
WHO ARE GOING TO FIGHT FOR WHAT THEY
THINK IS RIGHT AND NOT SUBMIT HUMBLY TO
WRONG. I WANT YOU TO DO BIG THINGS. I
WANT YOU TO-BUILD UP INDIA. CAN YOU
CONCEIVE OF A BIGGER THING THAN TO
BUILD UP THIS IMMENSE COUNTRY OF OURS?”
38.
In such circumstances, it does not lie in the mouth of
the petitioners-Board to wash off its hands of its legal and statutory
responsibilities towards the workmen, who have put in years of
undisputed service. It is noted that there was no dispute that
mandatory provisions were not adhered to regarding the reduction
of work, the issuance of the requisite notice, and the recall of the
petitioners as specifically pleaded by them. Furthermore, the
Board cannot rely on changed terms and conditions, over-age
status, or newly prescribed qualifications to deny them their
appointments. The relevant part of the affidavit in the affirmative
filed by the workman reads as under:-
“b. Employer is further resorting to unfair labor.
Practices defined in Section 2 (R) A of the I.D. Act,
1947. Defeated the provisions of sec. 25H of the
Act and Rule 77 and 78 of the rules avid:- in the
following manner1) The employer management has filed various
posts falling vacant on the superannuation of
various workmen.
2) By imposing an age limit of 45 for reemployment of the retrenched deponent
establishment although the deponent is
entitled to be re-employed their age of
superannuation.
3) By prescribing additional qualification and
merits equal to the fresh hand for the reemployment of retrenched deponent and
which did not exist at the time of their initial
appointments although the petitioner are
entitled to be re-employed on the same merit
they were first employed.
4) 1122
employees
engaged
on
the
establishment of the employer management
from Ranjeet Sagar Dam Project in July 1993
5) By filling vacant posts by daily wagers of the
employer declare some post as surplus;
retrenches the employees working those
posts; subsequently creates posts on daily
wages to man such posts and recruits persons
of their choice thus circumventing the whole
law.
6) By making promotion from lower cadre to
vacancies which u/c 25H is to be filled by the
retrenched workman.
7) By filling of vacant post from open competition
from numerous employment exchanges, daily
wagers, and ward of B.B.M.B. employees or
from other categories.
8) That there after the general retrenchment of
the workman in 1977-78 and there after 1984
the employer took in to his employee hundreds
of fresh hands without giving opportunity and
intimation to the workman who were eligible
therefore in term of sec 25H of Act and rule 78
as employer ignored the Act, as if no such Act
is in the statute book.”
39.
The cross-examination of the Sub-Divisional Officer
(Personnel Sub-Division, BBMB Sundernagar, Mandi District,
Himachal Pradesh) makes for interesting reading given the stand
and admissions of the petitioners-Board. The relevant portion
reads as under:“7. That the appointments in BBMB of class III
and IV were/are made according to requirement
after following the procedure laid down in this
behalf. It is pertinent to submit here that after
1994 all the appointments are being made strictly
in accordance with the Class III & IV (Recruitment
and Conditions of Service) Regulations, 1994.
The BBMB is/was not under obligation to reemploy the petitioner under the provision of I.D.
Act, 1947 as he was never retrenched by the
BBMB. However, he was free to compete in the
interview/trade test after complying with the
requisite requirement as and when vacancies
are/were advertised.
Statement of Sub-Divisional Officer.
I am posted at Sunder Nagar as Sub-Divisional
Officer since November 2002 on deputation. It is
correct that work of BBMB was initially sponsored
in the name of Beas Control Board. After that, the
Punjab Re-Organization Act, 1966 came into
existence and Beas Construction Board was
constituted for construction.
After the
construction of the project it has to be handed
over to the BMB for operation and maintenance
which is re-designated as BBMB. Workman
remained an employee of BCB. It is incorrect that
BCB, BMB eliminated in the BBMB. It is wrong to
say that BCB and BMB were two common boards
run by the Central Government. It is correct that
workman was employed in BCB. It is incorrect
that at the time of retrenchment management has
issued reinstatement card to the workman. It is
wrong to say that at the time of retrenchment
management has assured the workman that he
will be re-employed at the availability of work. It is
correct that further appointment was given as per
the provision of BBMB Service and Recruitment
Rules, 1994. There was no obligation on the part
of the management to call the workman for any
job. As per By-Laws, it was his duty to apply and
participate in selection as per advertisement from
time to time. It is wrong to suggest that workman
approached before the management for his
reinstatement form time to time. It is correct that
Drivers, Beldars, Carpenters, Fitters, Electricians,
Masons and Pump Operators are employed from
time to time as per the provision of BBMB Service
and Recruitment Rules, 1994. It is wrong to say
that claim of workman is knowingly denied by the
management. It is incorrect to suggest that I am
deposing falsely.”
40.
Thus, from the above, it is apparent that the specific
case of the petitioners-Board itself is that it had no obligation to
recall the workmen for any job, arguing instead that it was the duty
of the workmen to apply and participate in the selection process.
This argument contradicts the specific Rule, which provides that
seniority must be maintained by placing it on the notice board, and
that when vacancies are to be filled up, intimation must also be
given by registered post to every retrenched workman eligible to
be considered, which was not done.
41.
The reasoning arrived at by the Labour Court,
whereby compensation was directed to be paid, cannot be faulted
in any manner on account of the violation of the mandatory
provision. Accordingly, the findings recorded that they were
employees of the petitioners-Board on account of the statutory
provision and had wrongly been denied re-employment, in view of
which compensation was directed keeping their years of service in
mind and cannot be faulted. The claim of the workmen asking for
an enhancement of the amounts cannot be granted in the absence
of any cross-writ petitions having been filed or the Awards having
been challenged.
42.
Therefore, the judgment of the Apex Court in Vice-
Chancellor, Lucknow University, Lucknow, Uttar Pradesh Vs.
Akhilesh Kumar Khare and Another (2016) 1 SCC 521 would be
of no help; which was a case where the High Court's order was
modified to award compensation of Rs.4,00,000/- to each
workmen on account of the fact that the workmen were casual
workers with no vested rights and on account of having been in
employment twenty years back.
43.
The limitation of the Writ Court has been noticed by
the Apex Court in Syed Yakoob vs K.S. Radhakrishnan &
Others AIR 1964 SC 477 and the said view was followed in P.G.I.
of Medical Education and Research, Chandigarh v. Raj Kumar
2001 (2) SCC 54,
holding that perversity in the award would
constitute a ground for interference.
44.
The Apex Court in Overseas Bank v. I.O.B. Staff
Canteen Workers Union & Anr 2000 (4) SCC 245 has held that a
finding of fact recorded by the Tribunal would not be liable to be
interferred while exercising writ jurisdiction and the objectivity of
approach adopted and reasonableness of findings recorded, were
found to be unexceptionable.
45.
In Surya Dev Rai vs. Ram Chander Rai and Others
2003 (6) SCC 675, the powers of supervision under Article 227 of
the Constitution of India were the subject matter of considertion
and it was held that writ of certiorari is amenable to correct errors
of fact and law, if the errors are manifest and are based on clear
ignorance or disregard of the provisions of law.
46.
In Management of Madurantakam Co-operative
Sugar Mills Ltd. v. S. Viswanathan 2005 (3) SCC 193, it was
held by the Apex Court that if the finding of the Labour Court is
preverse, being based on no evidence or on evidence which is not
legally acceptable, the Writ Court would interfere and, therefore,
the orders of the Single Judge and the Division Bench of the High
Court were modified and were accordingly upheld.
47.
In Shalini Shyam Shetty and Another Vs. Rajendra
Shankar Patil (2010) 8 SCC 329, the said principles were
re-iterated.
48.
In Ishwarlal Mohanlal Thakkar v. Paschim Gujarat
Vij Company Ltd. and Another 2014 (6) SCC 434, the award of
the Labour Court which had been set aside, was restored and the
dispute was pertained to the date of birth between a birth
certificate issued by the competent authority and a school leaving
certificate, as to which document would prevail by holding that the
Labour Court had not committed any error of jurisdiction, but had
satisfactorily exercised its original jurisdiction and properly
appreciated the facts and legal evidence on record.
49.
Keeping in view the above discussion, this Court is of
the considered opinion that there is no scope for interference in the
well-reasoned
Awards
dated
15.07.2024,
18.07.2024
and
19.07.2024 (Annexure(s) P-1), passed by the Presiding Officer,
Central
Government
Industrial
Tribunal-cum-Labour
Court,
Chandigarh, especially, keeping in view the settled law that under
Articles 226 and 227 of the Constitution of India and in the
absence of any patent illegality, the writ Court will not sit as a
Court of Appeal.
50.
The amount deposited by the Board in favour of the
workmen, in view of the earlier orders will be disbursed to them, on
furnishing their bank account numbers to the Registrar (Judicial) of
this Court, through their counsel.
51.
and
Resultantly, the present petition(s) stand dismissed
disposed
off
accordingly.
Pending
miscellaneous
application(s), if any, shall also stand disposed off.
(G.S. Sandhawalia)
Chief Justice
(Bipin Chander Negi)
Judge
6th November, 2026
(Munish Thakur)
This page is for informational and research purposes only and does not constitute legal advice.