IN THE HIGH COURT OF ANDHRA PRADESH
AT AMARAVATI
APHC010391142026
I.A. No.1 of 2026
IN/AND
WRIT APPEAL NOs: 916, 917, 918, 919, 920 and
1007 of 2026
The Andhra Pradesh Building and Other Construction ...Appellant
Workers Welfare Board,
Vs.
SMS India Pvt Ltd., and Others
...Respondent(s)
**********
CORAM : THE CHIEF JUSTICE LISA GILL
SRI JUSTICE CHALLA GUNARANJAN
DATE
: 24th September 2026
Present:
Advocate for Appellant:
GP FOR LABOUR
Advocate(s) for Respondent(s): D S SIVADARSHAN, rep. by
Mr.AVINASH DESAI,
SENIOR COUNSEL
V SUBRAHMANYAM
COMMON JUDGMENT: (per Hon’ble Sri Justice Challa Gunaranjan)
Present writ appeals are preferred under Clause 15 of
Letters Patent assailing common order dated 23.08.2004 in W.P.
Nos.13555, 13492, 13546, 13581, 13583 of 2022 and W.P.
Bench Sr.No:-5
[3584]
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
No.26376 of 2023, whereby learned Single Judge, while allowing
the writ petitions, has set aside the impugned demands issued
under the provisions of Building and other Construction Workers’
Welfare Cess Act, 1966 (herein after, for short ‘Cess Act’) and
Building
and
Other
Constructions
Works
(Regulation
of
Employment and Condition of Service) Act, 1996 (herein after, for
short ‘BOCW Act’) and with further direction to refund the labour
cess deducted from the writ petitioner's bills through its Principal.
2.
As the issues raised in all these appeals are one and the
same, with the consent of counsel appearing, the appeals are
taken up for consideration and disposed by way of common order.
3.
(a)
1st respondent/writ petitioner preferred writ petitions
challenging the action of respondents 2 to 4 herein in deducting
cess under the Cess Act and BOCW Act at the instance of writ
appellant, despite authoritative pronouncement of the Hon'ble
Apex Court in the matter of Utta Pradesh Power Transmission
Corporation Limited v. C.G. Power and Industrial Solutions
Limited1, to be illegal, arbitrary, and without jurisdiction.
(b)
2nd respondent - Rashtriya Ispat Nigam Limited (RINL),
Visakhapatnam
Steel
AIR 2021 SUPREME COURT 2411
Plant,
executed
a
contract
with
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
1st respondent and two other consortium members for establishing
Basic Oxygen Furnace Complex. The said contract dated
23.03.2013 envisaged Design, supply, erection, testing, and
commissioning the plant, Equipment and Machinery for Basic
Oxygen Furnace Complex comprising BOF CONVERTER-3,
Primary Gas Cleaning Plant, Secondary Fume Extraction System
& Auxiliaries. The composite contract also envisaged RINL to
enter into individual contracts separately with each consortium
member qua defining the specific scope of work. Accordingly, three
agreements, even dated 23.03.2013, were entered into for the
purpose of design contract, supply contract and conveyance
contract respectively.
(c)
SMS Siemag Aktiengesellschaft, the principal contractor,
was entrusted with the contract for imported supply and services,
the consortium member SMS India Private Limited was entrusted
with contract for indigenous supply and services and M/s.Bridge &
Roof Co. (India) Limited, with contract for indigenous services
dealing with construction and civil works.
(d)
Insofar as the first contract is concerned, no labour cess was
levied. First contract merely being for supply of imported designs,
engineering, drawings, deputation of foreign technicians etc.,
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
rightly no cess was levied, however, for the other two contracts,
cess was imposed. Since the contract for indigenous services with
M/s.Bridge & Roof Co. (India) Limited encompassed civil and other
construction activities, cess was paid in terms of the provisions of
the Act. Though the contract for indigenous supply and services
entered into with the 1st respondent was merely for supply of
designs, engineering, drawings, ocean freight, customs clearance,
etc., which did not have any element of construction or civil works,
cess was levied and deducted from its bills. Thus, challenging the
imposition of cess, 1st respondent/writ petitioner preferred writ
petitions.
(e)
RINL filed counter justifying its stand in deducting cess from
the bills of writ petitioner.
(f)
Learned Single Judge, after considering respective stands
pleaded and argued by parties, allowed writ petitions by declaring
the action of RINL in issuing impugned demand and deducting the
cess amount to be illegal, arbitrary and without jurisdiction and
further, directed it to take steps for refund of cess. Furthermore, the
Commissioner of Labour, AP Building and Other Construction
Workers Welfare Board, has been directed to refund the amount of
cess within two months from the date of receipt of communication
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
from RINL, and the writ petitioner was given liberty to approach the
appropriate authority for claiming interest.
(g)
Aggrieved by the same, the present appeals are preferred.
4.
All these appeals, since are preferred with a delay of 671
days, therefore, learned Counsel for the appellant made
submissions regarding the aspect of delay before addressing on
the merits.
5.
We have heard learned Government Pleader for Labour,
appearing for appellant and Mr.Avinash Desai, learned Senior
Counsel, representing Mr.D.S.Sivadarshan, learned counsel for
1st respondent/writ petitioner.
6.
(a)
Learned counsel for appellant, at the outset,
submitted that after disposal of the writ petitions vide common
order dated 23.08.2024, copy of the same was dispatched by the
Registry on 12.11.2024. Further, in terms of the aforesaid order,
though RINL had to communicate the substance of order and
request for refund of the amount, the same was submitted only on
31.12.2025 as required in Form I, thus, the appellant thereafter
sought legal opinion from Government Pleader and on further
advice to prefer appeal, the appellant had to gather required
material, which took considerable time.
(b)
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
It is also stated that Commissioner of Labour, designated
officer, was assigned election duties during the general elections
in the State of West Bengal from 18.03.2026 to 04.05.2026, thus,
there was further delay in approaching office of Government
Pleader for preparing and finalizing writ appeals.
(c)
In view of aforesaid administrative reasons, appeals were
filed with a delay of 671 days, which is neither deliberate, wilful nor
wanton, but occurred solely on account of reasons mentioned
above, thus, pleaded to condone the delay.
7.
(a)
Learned Counsel for 1st respondent/writ petitioner, on
the other hand, raised a serious objection to condoning the delay.
By referring to counter filed in opposition to the applications for
condoning the delay, it is stated that the reasons assigned in the
application do not constitute sufficient cause for condonation of
such inordinate delay. Except for vague and general averments
that appellant had to collect necessary documents and obtain legal
opinion, no specific details have been pleaded explaining the delay
to the satisfaction of the Court, thus, inordinate delay of 671 days
should not be condoned.
(b)
It is also stated that though the appellant, being a party to
the writ proceedings, when there was a specific direction to
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
process the refund and pay the same in a time-bound manner,
least expected was to take appropriate immediate steps to file an
appeal in case the appellant was serious about the same, merely
to drag on the proceedings, an attempt is being made by filing
these appeals, therefore, it is urged to dismiss appeals for
unexplained and inordinate delay.
8.
(a)
Insofar as merits of the matter are concerned, learned
counsel for appellant, by placing reliance on the judgment of
Coordinate Bench of the Composite High Court in Government of
Andhra Pradesh and others v. Lakamsani Samba Siva Rao2,
would contend that even the supply of designs, engineering,
drawings, supply of indigenous plant, machinery and equipment
with auxiliaries, ocean freight, marine insurance, etc., since
constitute part and parcel of the principal umbrella contract, cess
is leviable on all components, which learned Single Judge failed to
appreciate.
(b)
Learned Counsel for 1st respondent/writ petitioner, on the
other hand, sought to rely on the judgment of Hon'ble Apex Court
in case of C.G.Power and Industrial Solutions Limited1 to
contend that the provisions of the BOCW Act are made applicable
MANU/AP/0694/2015
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
in respect of contracts which cover mere civil works and other
contracts covering works other than civil works, particularly supply
and other components not involving construction would not attract
cess, therefore, learned Single Judge rightly decided the issue
following ratio laid down by Hon'ble Apex Court, which does not
call for any interference.
9.
We have given anxious consideration to the submissions
made above and perused the record. We are convinced that these
appeals deserve to be dismissed both on the aspect of delay as
well as merits. The explanation given by appellant for condoning
delay is as under:
“8. It is humbly submitted that this Hon'ble High Court
passed common orders in WP No.13492 of 2022 and batch
of 23.08.2024 and the said copy of the order was
dispatched on 12.11.2024. The respondent Nos.2 to 4 has
to communicate the substance of the order of this Hon'ble
Court and requested to refund the remitted amount.
However the appellant not submitted Form I within time and
finally submitted on 31.12.2025. The respondent not
submitted the said Form I with accurate information, as
required under the provisions of the BOCW Act, Cess Act
and Rules making reasonable assessment till to date. After
31.12.2025 the appellant collected all the necessary
documents and approached the Government Pleader office
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
for legal opinion and thereafter obtained permission from
the government to file the present appeal. Basing on advice
of the learned Government Pleader this appellant gathers
all the required materials for filing the present appeal which
took
sufficient
considerable
time.
Further,
the
Commissioner of Labour, A.P., Vijayawada, who is kept
Secretary & CEO, APBOCW Welfare Board was assigned
to look after Election duties during the General Elections in
the year of 2026 in the state of West Bengal from the period
18.03.2026 to 04.05.2026. For this reasons as well
occurred some delay in approaching the Government
Pleader Office to prepare & finalize the writ appeal. The
appellant also assigned several other administrative works
to prepare and file the present appeal.”
10.
The final order in the writ petitions was passed on
23.08.2024, with certain directions. The appellant states that copy
of order was dispatched on 12.11.2024 and thereafter, RINL had
made application in Form I seeking refund on 31.12.2025.
Absolutely, there is no explanation or justification as to what steps
were initiated by appellant in the interregnum, when it is also a
party to those writ petitions. When we inquired from learned
counsel for appellant as to whether any application was submitted
for certified copy of the common order, we were informed that no
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
such application was ever made, the appellant merely awaited for
copy to be communicated from the Registry of the Court.
11.
The limitation for filing appeal would commence from the
date of passing of the order in the writ petition, of course, the period
between the date of application for certified copy and issuance
thereafter to be excluded. In the present case, no attempt was ever
made to even apply for certified copy, leave about any steps being
initiated to file appeal. Even as per the explanation given above,
nearly after more than a year, the appellant approached
Government Pleader for opinion and the specific details/dates as
to when such opinion was furnished and what steps were taken
thereafter are conspicuously absent. All appeals came to be
preferred only on 27.07.2026.
12.
In Thirunagalingam v. Lingeswaran and another3, the
Hon’ble Apex Court held as follows at paragraph Nos.31 and 32:
“31. It is a well-stated law that while considering the plea
for condonation of delay, the first and foremost duty of
the court is to first ascertain the bona fides of the
explanation offered by the party seeking condonation
rather than starting with the merits of the main matter.
Only when sufficient cause or reasons given for the delay
by the litigant and the opposition of the other side is
2025 SCC OnLine SC 1093
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
equally balanced or stand on equal footing, the court may
consider the merits of the main matter for the purpose of
condoning the delay.
32. Further, this Court has repeatedly emphasized in
several cases that delay should not be condoned merely
as an act of generosity. The pursuit of substantial justice
must not come at the cost of causing prejudice to the
opposing party. In the present case, the respondents/
defendants have failed to demonstrate reasonable
grounds of delay in pursuing the matter, and this crucial
requirement for condoning the delay remains unmet.”
13.
Though learned counsel for appellant relied on judgments of
Hon’ble Apex Court in Collector, Land Acquisition, Anantnag
and another v. Mst.Katiji and others4 and The State of Odisha
& Others v. Saroj Kumar Pradhan5, as the reasons explained to
condone the delay are definitely not sufficient, in view of the above
settled expression of Hon’ble Apex Court, we are not inclined to
persuade ourselves to condone inordinate delay of 671 days.
14.
Even on the merits of the matter, the issue raised in these
appeals is no longer res integra. In the judgment of C.G. Power
and Industrial Solutions Limited1, the Hon'ble Apex Court
dealing with a similar kind of frame work agreement entered into
1987 (2) SCC 107
SLP (C) No.25212/2024, dated 17.11.2025
HCJ & CGR, J
W.A. Nos.916 of 2026 & batch
between C.G. Power and Industrial Solutions Limited and Uttar
Pradesh Power Transmission Corporation Limited, which had
defined the scope of work which encompassed three independent
contracts: one covering works related to design, engineering,
manufacturing, supply, etc.; the second covering unloading,
handling, erection, testing, and commissioning; and the third
covering civil works including material to complete the scope of
commissioning and handover of the sub-station, considering the
scope and nature of works falling under three different contracts, it
was held that cess is payable only in respect of contract covering
civil and related works and insofar as other contracts, which do not
involve any construction do not attract cess.
15.
The ratio laid down above in all fours applies to the case on
hand. We, therefore, find no merit in these appeals. Accordingly,
the same are hereby dismissed both on the count of delay as well
as on merits. No costs.
As a sequel, miscellaneous petitions pending consideration,
if any, in this case shall stand closed.
LISA GILL, CJ
CHALLA GUNARANJAN, J
SS
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review