Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
CGHC010193322024
2026:CGHC:35821
AFR
HIGH COURT OF CHHATTISGARH AT BILASPUR
AVINASH
SHARMA
Digitally
signed by
AVINASH
SHARMA
Date:
2026.08.14
17:36:35
+0530
WPS No. 3145 of 2024
Judgment Reserved On : 13.07.2026.
Judgment Delivered On : 13.08.2026
Suresh Singh Bhupal S/o Late Shri Shatruhan Singh Bhupal Aged About 56 Years
R/o E/4, Nutan Colony, New Sarkanda, Bilaspur, Chhattisgarh. Presently Working
As Superintending Engineer, Public Works Department (E And M), Bilaspur Circle,
Bilaspur, Chhattisgarh.
--- Petitioner(s)
versus
1 - State Of Chhattisgarh Through Secretary, Public Works Department Mahanadi
Bhawan, Naya Raipur, District Raipur C.G
2 - Engineer In Chief Public Work Department, Nirman Bhawan, Naya Raipur, Dist Raipur, Chhattisgarh.
3 - T.R. Kunjam Superintending Engineer, Public Works Department (E And M),
Raipur Circle, Sirpur, Bhavan, Near Kali Mandir, Behind Akashvani, Civil Lines
Raipur, Chhattisgarh.
--- Respondent(s)
WPS No. 3757 of 2023
Suresh Singh Bhupal S/o Late Shri Shatruhan Singh Bhupal Aged About 55 Years
R/o E/4, Nutan Colony, New Sarkanda, Bilaspur Chhattisgarh Presently Working
As Superintending Engineer, Public Works Department (E And M), Bilaspur Circle,
Bilaspur Chhattisgarh.
---Petitioner(s)
Versus
1 - State Of Chhattisgarh Through Secretary, Public Work Department, Mahanadi
Bhawan, Naya Raipur, District Raipur Chhattisgarh
2 - Engineer In Chief, Public Work Department, Nirman Bhawan, Naya Raipur,
Dist.-Raipur Chhattisgarh
3 - T.R. Kunjam, Superintending Engineer, Public Works Department (E And M),
Raipur Circle, Sirpur Bhavan, Near Kali Mandir, Behind Akashvani, Civil Lines
Raipur Chhattisgarh
--- Respondent(s)
WPS No. 3640 of 2024
Suresh Singh Bhupal S/o Late Shri Shatruhan Singh Bhupal, Aged About 56 Years
R/o E/4, Nutan Colony New Sarkanda, Bilaspur (C.G.). Presently Working As
Superintending Engineer, Public Works Department (E And M), Bilaspur Circle,
Bilaspur (C.G.)
---Petitioner(s)
Versus
1 - State Of Chhattisgarh, Through Secretary, Public Works Department Mahanadi
Bhawan, Naya Raipur District Raipur C.G.
2 - Engineer In Chief, Public Work Department, Nirman Bhawan, Naya Raipur,
District-Raipur (C.G.)
3 - T.R. Kunjam, Superintending Engineer, Public Works Department (E And M),
Raipur Circle, Sirpur Bhavan, Near Kali Mandir, Behind Akashvani, Civil Lines
Raipur (C.G.)
--- Respondent(s)
WPS No. 3184 of 2024
N. K. Lal S/o Late Banshi Lal Aged About 58 Years Working As Superintendent
Engineer (E And M), P.W.D. At Office Of Chief Engineer, E And M Zone, Sirpur
Bhawan, Raipur (C.G.)
---Petitioner(s)
Versus
1 - State Of Chhattisgarh through its Principal Secretary, Department of Public
Works Department, Mantralaya, Mahanadi Bhawan, Mantralaya, Naya Raipur, Atal
Nagar, District Raipur C.G.
2 - State Of Chhattisgarh Through Its Secretary, Department Of Public Works
Department, Mantralaya, Mahanadi Bhawan, Mantralaya, Naya Raipur, Atal Nagar,
District Raipur (C.G.)
3 - Engineer In Chief Public Works Department, Nirman Bhawan, North Block,
Sector-19, Naya Raipur, Atal Nagar, District Raipur (C.G.)
4 - Suresh Singh Bhupal S/o Late Shatruhan Singh Bhupal Aged About 56 Years
R/o E/4, Nutan Colony, New Sarkanda, Bilaspur, Presently Working As
Superintendent Engineer, Public Works Department (E And M), Bilaspur Circle,
District Bilaspur (C.G.)
--- Respondent(s)
WPS No. 1721 of 2025
N.K. Lal S/o Late Banshi Lal Aged About 59 Years Working As Superintendent
Engineer, At Public Works, Department (E/ M), Bilaspur Circle, District- Bilaspur
(C.G.)
---Petitioner(s)
Versus
1 - State Of Chhattisgarh through its Principal Secretary, Department of Public
Works Department, Mantralaya, Mahanadi Bhawan, Mantralaya, Naya Raipur, Atal
Nagar, District Raipur C.G.
2 - State Of Chhattisgarh Through Its Secretary, Department Of Public Works
Department, Mantralaya, Mahanadi Bhawan, Mantralaya, Naya Raipur, Atal Nagar,
District- Raipur (C.G.)
3 - Engineer In Chief Public Work Department, Nirman Bhawan, North Block,
Sector-19, Naya Raipur, Atal Nagar, District- Raipur (C.G.)
4 - Suresh Singh Bhupal S/o Late Shatruhan Singh Bhupal Aged About 56 Years
R/o- E/4, Nutan Colony, New Sarkanda, Bilaspur, (C.G.) Presently Working As
Superintendent Engineer, E/m Circle, Raipur Public Works Department, Raipur
(C.G.)
5 - T. R. Kunjam, Chief Engineer, Public Works Department (E/ M), Zone No. 1,
Raipur, Sirpur Bhawan Raipur (C.G.)
--- Respondent(s)
WPS No. 2566 of 2025
Suresh Singh Bhupal S/o Late Shri Shatruhan Singh Bhupal Aged About 57 Years
Presently Posted And Working As Superintending Engineer, Public Works
Department (E And M), Raipur Circle, Raipur Chhattisgarh R/o E/4, Nutan Colony,
New Sarkanda, Bilaspur Chhattisgarh
---Petitioner(s)
Versus
1 - State Of Chhattisgarh Through Secretary, Public Works Department, Mahanadi
Bhawan, Mantralaya, Atal Nagar, Raipur Chhattisgarh
2 - Engineer-In-Chief Public Work Department, Nirman Bhawan, Naya Raipur,
District - Raipur Chhattisgarh
3 - T.R. Kunjam Chief Engineer, Public Works Department (E And M), Raipur
Circle, Sirpur Bhavan, Near Kali Mandir, Behind Akashvani, Civil Lines Raipur
Chhattisgarh
4 - N.K. Lal S/o Late Banshi Lal Aged About 59 Years Working As Superintendent
Engineer, At Public Works Department (E/m), Bilaspur Cirlce, Dist. - Bilaspur
Chhattisgarh
--- Respondent(s)
For respective Petitioner(s) :
For State/respondent
For respective
Respondents
:
:
Shri Rajeev Shrivastava, Senior Advocate
assisted by Shri Akash Agrawal, Ms. Richa Patel,
Shri Kaif Ali Rizvi, Ms. Samidha Karamelkar and
Shri Neeraj Choubey, Shri Avinash K Mishra,
Advocates.
Shri Anand Dadariya, Deputy Advocate General.
Shri Sunil Otwani, Senior Advocate with Shri
Hemant Tolani, Advocates.
Hon’ble Mr. Justice Amitendra Kishore Prasad
C A V Order
1. The aforesaid Writ Petitions were heard analogously and are being
decided by this common order as in all these writ petitions, there is dispute
in respect of promotion to the post of Superintending Engineer between
Suresh Singh Bhupal, TR Kunjam and NK Lal in respect of seniority and
consequential service benefits thereof.
2. Necessary facts of the case are that Suresh Singh Bhupal was appointed
on 07.06.1993 as an Assistant Engineer, Public Works Department in the
esrtwhile State of Madhya Pradesh. Similarly, TR Kunjam was also
appointed as an Assistant Engineer in the said Department on 10.07.1992
1992. Shri NK Lal was also appointed as an Assistant Engineer in the said
department on 10.07.1992. On 10.01.2018, a Departmental Promotion
Committee (DPC) was convened for promotion from the post of Executive
Engineer to the one post of Superintending Engineer in which, Suresh
Singh Bhupal was found fit to be promoted and as such, the DPC
recommended the name of SS Bhupal for promotion to the post of
Superintending Engineer, PWD (E & M) who was promoted to the said
post of Superintending Engineer. TR Kunjam and Shri NK Lal was also in
zone of consideration for promotion but only one post was available,
therefore, Suresh Singh Bhupal was recommended. Thereafter, on
07.10.2022, DPC was convened wherein, T.R. Kunjam was recommended
to be promoted from Executive Engineer to Superintendent Engineer. It is
noteworthy to mention that T.R. Kunjam had earlier filed a writ petition
bearing No. W.P.S. No. 3736/2018 before this Court challenging grading in
his Annual Confidential Report (ACR) for the year, 2012 onwards, which
was disposed of on 17.05.2018 by this Court with a direction to the
competent authority to consider the pending representation of the T.R.
Kunjam. In compliance of the order of this Court dated 17.05.2018, the
State Government vide order dated 14.05.2020 has corrected the grading
of the (ACR) of TR Kunjam from 26.07.2012 to 31.03.2013 and 01.04.2013
to 31.03.2014 from very good (A) to Excellent (A+) and mentioned that the
ACR for the period 01.04.2014 to 31.03.2015, 01.04.2015 to 10.08.2015
and 12.08.2015 to 14.03.2016 do not warrant any change and as such,
they are termed as Very Good. Thereafter, T.R. Kunjam again approached
this Court by way of writ petition bearing W.P.S. No. 4612/2020 for
consideration of para 5 of the order passed on his representation and this
Court vide order dated 02.12.2020 directed the competent authority to
consider the representation of the T.R. Kunjam with respect to correction
of para-5 of order passed on his earlier representation. In compliance of
the order passed by this Hon'ble Court, the State Government passed the
order dated 09.11.2021 whereby, the grading in respect of TR Kunjam in
para-5 for the period 01.04.2014 to 31.03.2015, 01.04.2015 to 10.08.2015
and 12.08.2015 to 14.03.2016 was changed from Very Good (A) to
Excellent (A+). After correction in the gradation of his ACR, T.R. Kunjam
has made an application for review DPC of DPC dated 10.01.2018 and
same was allowed and review DPC was convened on 10.06.2024 and T.R.
Kunjam was promoted to the post of Superintending Engineer with
retrospective effect from 15.01.2018 and Suresh Singh Bhupal has been
demoted vide order dated 25.06.2024, which has been challenged by
Suresh Singh Bhupal in W.P.S. No. 3640/2024. In WPS No.3145 of 2024,
Suresh Singh Bhupal has challenged the proceeding of review DPC dated
07.06.2024 which culminated into order dated 25.06.2024. In WPS
No.2566 of 2025, Suresh Singh Bhupal has challenged the order dated
18.10.2024 as vide that order, he was promoted to the post of
Superintending Engineer but from 21.12.2020. In WPS No.3757 of 2023,
Suresh Singh Bhupal has challenged the order dated 09.11.2021 wherein
ACR of TR Kunjam for the periods ranging between 01.04.201431.03.2015, 01.04.2015-10.08.2015 and 12.08.2015-14.03.2016 has been
upgraded. N.K. Lal has challenged order dated 20.10.2022 in W.P.S. No.
3184/2024 by which his representation challenging promotion of Suresh
Singh Bhupal from Executive Engineer to Superintending Engineer has
been rejected. NK Lal by way of W.P.S. No. 1721/2025 has challenged
promotion order dated 18.10.2024 of Suresh Singh Bhupal from Executive
Engineer to Superintending Engineer by virtue of which he was demoted
from Superintending Engineer to Executive Engineer and has also
challenged order dated 26.11.2024 which is promotion order of T.R.
Kunjam from the post of Superintending Engineer to Chief Engineer.
3. Learned counsel for the petitioner Suresh Singh Bhupal submits that this
court has given a direction to decide a representation and has not given
any findings on merits, therefore, the matter has to be decided by overall
assessment/comparative merits of the Suresh Singh Bhupal and TR
Kunjam, wherein also Suresh Singh Bhupal has been found more
meritorious. TR Kunjam has not challenged the DPC dated 10.01.2018 at
any point of time and made representation only on the ground of noncommunication of ACR and TR Kunjam has accepted his promotion vide
DPC dated 07.10.2022 as also order of promotion dated 21.10.2022 and
then after accepting the same, he made representation on 20.04.2023
after considerable delay, which is not permissible. The main contention of
TR Kunjam as well as respondent State revolves around the upgradation
in the ACR of TR Kunjam but they have failed to establish on what
reasons/ground or merits his grade has been upgraded, therefore, mere
upgradation in ACR will not make him more meritorious than Suresh Singh
Bhupal. Also the contention that after upgradation of merits of the TR
Kunjam, they have become equal on merits and now as per seniority, TRKunjam is liable to be promoted does not satisfy the spirit of promotion
through DPC. TR Kunjam and the respondent State counsel raised
objection of delay on part of Suresh Singh Bhupal in approaching before
this Court also does not hold the ground as the cause of action for Suresh
Singh Bhupal arose when the promotion order based on order dated
09.11.2021 has came into effect on 31.05.2023, therefore there is no
delay. The locus to challenge the review DPC has been questioned which
cannot be entertained as held by Hon'ble Supreme Court that the person
affected by the DPC has substantive locus to challenge the same. TR
Kunjam also raised the contention that he has not been communicated
with the ACR, therefore he could not challenge the same, but as per his
own pleadings also, there is no record to show that even after knowledge
of such ACR, he has challenged the same or the ACR of Suresh Singh
Bhupal. Mere upgradation/correction in ACR of T.R. Kunjam will not make
him more meritorious than the other candidates/Suresh singh Bhupal
under the zone of consideration. (Overall factors have to be taken into
consideration). There has to be a reason to upgrade the grading and no
reason has been mentioned in TR Kunjam's ACR for its upgradation.
Gradation cannot be altered without altering the adverse remark. If the law
prescribes an order to be in a particular procedure, it has to be done in that
procedure. If for any work or order, there is a reason required, then the
reason must be given. Principles of natural justice have not been followed.
(Procedural irregularities). Subjective satisfaction has to be based on
objective consideration. On law points, the rule 7(9) of Promotion Rules
2003, states that the “merit-cum-seniority" has to be the criteria for
promotion and that Suresh Singh Bhupal is more meritorious than TR
Kunjam as per ACR with reasoning. Learned counsel further submits that
so far as why the ACR of T.R.Kunjam for the year 26.07.2012 to
31.03.2013 and 01.04.2013 to 31.03.2014, 01.04.2014 to 31.03.2015,
01.04.2015 to 10.08.2015 and 12:08.2015 to 14.03.2016 could not have
been upgraded from 'A' to 'A+', as per the proforma of the ACR, special
reasons are required to be recorded, as 'A+' could not have been awarded
because Outstanding grade cannot be given until exceptional merit and
execution of work was not seen, also the reason/basis should also be
recorded for the same. Further, T.R.Kunjam neither in his representation
nor in his pleading has assigned any iota, not a single line, that how he is
entitled for 'A+' and assignment of 'A' is incorrect. Even the order passed
by the authority of upgrading the ACR does not give any reason that on
what ground ACR is upgraded, not only this, in the order dated 14.5.2020,
the Authority specifically written that there is no ground to-upgrade. In the
note sheet of the department, it is stated that the ACR has been upgraded
as per the order of this Court whereas, there was no order of this Court for
upgradation of ACR, the Court only ordered to decide the representation.
The DPC dated 10.01.2018 could not be reviewed at the instance of T.R.
Kunjam because the proceeding of the DPC specifically writes that the
DPC has made the overall assessment though,
T.R.Kunjam has
submitted that petitioner/Suresh Singh Bhupal was classified as
outstanding because he was graded as outstanding in the ACR. This
submission is contrary to the record of the DPC and there is no such
pleading by T.R.Kunjam or State that "That the record of DPC is incorrect
and petitioner Suresh Singh Bhupal, N.K.Lal and T.R.Kunjam was graded
by the DPC only on the basis of the Grading Officer". The criteria for
promotion was "MERIT-CUM-SENIORITY" assessed by the DPC which
has never been challenged by T.R.Kunjam. Merit as assessed by the DPC
was never challenged by T.R.Kunjam or Petitioner Suresh Singh Bhupal.
Suresh Singh Bhupal has placed on record the ACR of T.R.Kunjam and
his own to show, that he is above in the merit to T.R.Kunjam and that has
not been contradicted. Thus, merit as considered by the DPC has never
been challenged. As per the note sheet (page No. 55, 56) DPC could have
been commenced on 5 situations mentioned as below: a) where eligible
persons were omitted to be considered; or b) where ineligible persons are
considered by mistake; or c) where the seniority of a person is revised with
retrospective effect resulting in a variance of the seniority list placed before
the DPC; or d) where some procedural irregularity was committed by a
DPC; or e) where adverse remarks in the ACRs were toned down or
expunged after the DPC had considered the case of the officer. As per
T.R. Kunjam, review DPC was called on the basis of Point e), whereas as
per record there is no adverse remark toned down, this DPC recorded that
there is no adverse remark against T.R.Kunjam if there would have been
adverse remark, T.R. Kunjam would not even have been considered.
Therefore, overall consideration is the requirement. T.R.Kunjam has never
raised voice in the Year 2020, 2021 or 2022, but after accepting
promotion, made request for correction of ACR. And after order of
correction of ACR dated 09.11.2021, he did not make representation of
review DPC and he remained silent. There is delay and latches on part of
T.R. Kunjam in making the claim for review DPC which has not been
justified.
4. Learned counsel for petitioner Suresh Singh Bhupal in support of his case
relies on the judgment in the matter of Lakhi Ram vs. State of Haryana
reported in {(1981) 2 SCC 674 }, wherein, the Hon’ble Supreme Court
observed in paragraph 1 & 2, which reads as under:-
1. The only ground on which the writ petition filed by the
appellant has been dismissed by the High Court is that the
appellant has no locus standi to maintain the writ petition.
The appellant filed the writ petition challenging the action of
the government expunging the adverse remarks made in the
annual confidential report of Respondent 6. The High Court
took the view that the appellant was not entitled to complain
against the expungement of adverse remarks made in the
confidential report of another officer. But this view is, in our
opinion, erroneous because the effect of expungement of
adverse remarks in the confidential report of Respondent 6
is to prejudice the chances of promotion of the appellant and
if the appellant is able to show that the expungement of the
remarks was illegal and invalid, the adverse remarks would
continue to remain in the confidential report of Respondent
6 and that would improve the chances of promotion of the
appellant vis-à-vis Respondent 6. The appellant was,
therefore, clearly entitled to show that the government acted
beyond the scope of its power in expunging the adverse
remarks in the confidential report of Respondent 6 and that
the expungement of the adverse remarks should be
cancelled. The appellant had, in the circumstances, locus
standi to maintain the writ petition and the High Court was in
error in rejecting it on the ground that the appellant was not
entitled to maintain the writ petition.
2. This was the reason why we allowed the appeal and,
setting aside the order of dismissal passed by the High
Court, remanded the writ petition to the High Court for
disposal on merits.
5. He would also place reliance in the matter of Union of India v. S.K. Goel,
(2007) 14 SCC 641, wherein the Hon’ble Supreme Court observed in
paragraphs 23 to 28, which reads as under:-
23. We have carefully considered the rival submissions with
reference to the records placed and material placed before
us and the judgment of the Tribunal and that of the High
Court. We heard extensive arguments from both sides. The
only question that arises for consideration in the instant
case is as to whether the High Court has erred in its
failure/omission to take into consideration the government
instructions for regulating recording of ACRs which provide
for only communication of adverse remarks in ACRs.
24. In the instant case, Respondent 1 had received no
adverse remarks and had rather been graded at the level of
the prescribed benchmark of “above average”, therefore, as
rightly pointed out by the learned Additional Solicitor
General, there was neither any onus nor requirement upon
the appellant to have communicated the ACR entry to
Respondent 1.
25. At the time of hearing, the original record was placed
before us. We have carefully perused the same. DPC, in our
view, followed the prescribed norms as also applied its
discretion vested in it to determine the comparative merit of
the eligible officers and thereafter made recommendations
in order of merit. There was thus no occasion or justification
for interference in the order passed by the appellants, as
upheld by the Tribunal.
26. Learned Senior Counsel appearing for Respondent 1
placed strong reliance on the judgment of this Court in U.P.
Jal Nigam [(1996) 2 SCC 363 : 1996 SCC (L&S) 519 : AIR
1996 SC 1661] . In our opinion, the said decision is entirely
distinguishable on the facts and circumstances from the
case on hand and is wrongly been relied upon by the High
Court. In U.P. Jal Nigam case [(1996) 2 SCC 363 : 1996
SCC (L&S) 519 : AIR 1996 SC 1661] , the officer concerned
Shri P.C. Jain had been downgraded at a certain point of
time. Before the High Court, it had been alleged that
downgrading of entry could not be termed as adverse and
that the same should be communicated. The U.P. Jal Nigam
Service Rules provided for communication of adverse
entries. In this case, downgrading had been done by
comparison and there appears to be no reason recorded for
such downgrading. However, in the instant case, the
downgrading still meets the benchmark and therefore,
merely because certain persons have been assessed by
DPC to be better than the respondent, did not imply that he
should have been communicated his grading.
27. In our opinion, the judgment of the Tribunal does not call
for any interference inasmuch as it followed the well-settled
dictum of service jurisprudence that there will ordinarily be
no interference by the courts of law in the proceedings and
recommendations of DPC unless such DPC meetings are
held illegally or in gross violation of the rules or there is
misgrading of confidential reports. In the present case, DPC
had made an overall assessment of all the relevant
confidential reports of the eligible officers who were being
considered. DPC considered the remarks of the reviewing
officers. There was clear application of mind. Respondent 1
did fulfil the benchmark. Hence, the impugned direction of
the High Court ought not to have been issued as the same
will have the impact of causing utter confusion and chaos in
the cadre of the Indian Revenue Service and the Customs
and Central Excise Service.
28. It was also argued by the learned Senior Counsel
appearing for Respondent 1 that the entries for the period
had an element of adverse reflection and for that purpose
the seniority of Respondent 1 was downgraded and,
therefore, ACR ought to have been communicated to
Respondent 1. In our opinion, the observations of the High
Court are wholly unjustified inasmuch as the post of the
Commissioner of Customs and Central Excise is a post
required to be filled up on selection made strictly on the
basis of merit. No judicial review of the DPC proceedings,
which are ordinarily conducted in accordance with the
standing government instructions and rules is warranted.
The norms and procedure for DPC are prescribed in OM
dated 10-4-1989. It is thus seen that the decision taken by
the appellants has been as per the instructions issued on
the subject that only adverse entries and remarks are to be
communicated and there is no provision to communicate the
downgrading of ACR to a government employee. The
decision of the Central Government is in strict accordance
with the prevailing rules and government instructions. In the
absence of any violation, the impugned order of the High
Court while undertaking a judicial review under Article 226
of the Constitution of India, is wholly unjustified. Since the
matter of seniority has been well settled and this Court in a
plethora of cases has held that the seniority/promotion
granted on the strength of DPC selection should not be
unsettled after a lapse of time. Therefore, in the facts and
circumstances of the present case, where there are no
adverse remarks whatsoever against Respondent 1, the
High Court ought not to have interfered with and passed the
impugned direction. This apart, as per the instructions
contained
in
Para
6.21
of
DOP&T
Order
No.
22011/5/86/Estt. D dated 19-4-1981, as amended, DPC is
not required to be guided merely by the overall grading, if
any, that may be recorded in CRs but to make its own
assessment on the basis of the entries in CRs. DPC
enjoyed full discretion to devise its method and procedure
for objective assessment of suitability and merit of the
candidate being considered by it. Hence, the impugned
order of the High Court, in our opinion, is liable to be set
aside.
6. In support of case of Suresh Singh Bhupal, counsel would also place
reliance in the matter of Rani Lakshmi Bai Kshetriya Gramin Bank vs.
Jagdish Sharan Varshney {(2009) 4 SCC 240}, Amit Shandilya vs. State of
Chhattisgarh {WPS No.3033/2023}, SK Tigga vs. State of Chhattisgarh
{WA No.265 of 2026}, Chandragupta IFS vs. Secretary, Government of
India {(AIR 1995 SC 44)}, Gaurishankar and others vs. Union of India with
Suresh Gupta {AIR 1995 SC 55}, M.V. Thimmaiah and Others vs. UPSC
{(2008) 2 SCC 119}, B.V. Sivaiah and others vs. K. Addanki Babu {AIR
1998 SC 2565}.
7. Learned counsel for the private respondent namely TR Kunjam submits
that Suresh Singh Bhupal has assailed the order dated 25.06.2024, by
virtue of which TR Kunjam was notionally promoted to the post of
Superintendent Engineer with effect from 10.01.2018. The order dated
25.06.2024 was passed pursuant to the proceedings of the Review
Departmental Promotion Committee (DPC) dated 10.06.2024, whereby it
was recommended by the committee that TR Kunjam be promoted to the
post of Superintendent Engineer. It is further submitted that on 10.01.2018,
the DPC was convened for the purpose of promotion from the post of
Executive Engineer to the post of Superintending Engineer. It is an
admitted position that as per the gradation list of the Executive Engineer
for the year 2016, TR Kunjam was senior to Suresh Singh Bhupal. The
criterion for the promotion from the post of EE to SE was merit-cumseniority. Taking into consideration Rule 7 (9) of The Chhattisgarh Public
Services (Promotion) Rules 2003, Suresh Singh Bhupal was promoted as
he was having 5 years ACR as Excellent whereas TR Kunjam was not
having 5 years ACR as Excellent. It is pertinent to mention here that ACR
for the period starting from 26.07.2012 to 31.03.2016 were never
communicated to TR Kunjam, as a result of which, he could not make
representation for the upgradation of ACR. TR Kunjam moved an
application under Right To Information Act and in pursuance of the
application, the copy of ACR were furnished on him. The representation
was made by TR Kunjam for the upgradation of ACR but unfortunately no
decision
was
taken
by
the
competent
authority
to
decide
the
representation of TR Kunjam. Thereafter, TR Kunjam preferred a Writ
Petition bearing WPS/ 3736/2018, which was disposed off by this court
vide order dated 17.05.2018 directing to take decision on the
representation of TR Kunjam. The respondent No.1 acted upon
representation of TR Kunjam and by the communication dated 17.01.2019,
the ACR was upgraded from very good to Excellent i.e., A to A+. The
foundation of correction of the ACR from A to A+ was on the basis of
grading given by the Engineer-in-Chief who was the reviewing authority.
TR Kunjam again preferred a Writ Petition before this Court for issuance of
suitable direction for reconsideration of ACR for the period 01.04.2014
13.04.2016. On 05.10.2021, the communication was made by the then
Chief Secretary, who was the accepting authority from 01.04.2014 to
31.03.2016 to the Secretary of Public Works Department and by virtue of
which, the ACR were upgraded from very good to Excellent i.e., A to A+. In
pursuance of communication dated 05.10.2021, further communication
dated 09.11.2021 was made by the Secretary, Public Works Department
intimating TR Kunjam that the ACR are being upgraded by the then
accepting authority. lt is further reiterated by TR Kunjam that the
communication dated 05.10.2021 was made taking into account the
opinion and the grading given by the Engineer-in-Chief who was the
reviewing authority and was having technical qualification to assess the
working capacity and knowledge of all subordinates, which includes
Suresh Singh Bhupal and TR Kunjam. The aforesaid facts categorically
establish that the upgradation of TR Kunjam's ACRs was not a mechanical
or arbitrary exercise, but was a considered decision taken by the highest
authorities in the State Government as per the settled principle of law that
every ACR should be communicated to the employee even if it is not
adverse. In service jurisprudence, the adverse entry and adverse remarks
are altogether different concept. In the case in hand, though TR Kunjam
was graded very good, but no adverse remarks were recorded in any of
the ACR of TR Kunjam by any authority which include reporting, reviewing
and accepting. In the year 2020, one post of Superintendent Engineer was
lying vacant as a result of which the DPC was convened by virtue of which
Mr. N.K.Lal was promoted to the post of Superintendent Engineer. In the
year 2022, again one post of Superintendent Engineer was vacant as
result of which the DPC was again convened and the TR Kunjam was
promoted to the post of Superintendent Engineer. In the year 2022, Suresh
Singh Bhupal, TR Kunjam as well as Mr. N.K.Lal , all were holding the
substantive post of Superintendent Engineer. Since TR Kunjam was senior
to Suresh Singh Bhupal and his ACR's were upgraded from very good to
Excellent i.e. A to A+. Therefore, he made a representation for review
DPC so that he can get promotion with effect from 10.01.2018. The
respondent No. 1 acted upon the representation of TR Kunjam and has
prepared a note sheet. Even, the opinion was sought from the department
of general administration and vide note sheet dated 13.3.2024, the GAD
had opined under what conditions the review DPC could be convened.
Even the parties herein was intimated vide communication dated
03.07.2024 reason for convening of review DPC. On a conspectus of the
aforesaid facts, two positions stand conclusively established: firstly, that
TR Kunjam was, at all material times, senior to Suresh Singh Bhupal; and
second that upon correction of his ACRs, TR Kunjam possessed Excellent'
ACRs for the entire intervening period of five years. In terms of the
applicable provisions of the 2003 Rules, TR Kunjam was, therefore,
entitled to be promoted to the post of Superintending Engineer with effect
from 10.1.2018. The representation of TR Kunjam came to be considered
by Respondent No. 1 in a fair and objective manner, and a decision was
accordingly taken to convene a Review DPC so as to settle the legitimate
claim of TR Kunjam. The Review DPC was duly convened on 10.06.2024
and recommended the promotion of TR Kunjam to the post of
Superintending Engineer with effect from 10.01.2018, being the date on
which he would have been promoted, but for the delay and error in the
recording and communication of his ACRs, have been denied promotion.
In the aforesaid circumstances, the contention of Suresh Singh Bhupal that
he has been wrongly prejudiced by the impugned order is wholly fallacious
and misconceived. The promotion of TR Kunjam has occasioned no
prejudice whatsoever to Suresh Singh Bhupal, whose own promotion
remains wholly undisturbed; the impugned order merely restores TR
Kunjam to the position to which he was, in law and on merits, and was
always entitled.
8. In support of this case, learned counsel representing TR Kunjam places
reliance in the matter of Abhijit Ghosh Dastidar vs. Union of India and
Others {(2009) 16 SCC 146} wherein Hon’ble Supreme Court has
observed in paragraph Nos.5, 8 & 10 as under:-
5. According to the appellant, the adverse entries, namely,
“good” were not communicated. The said aspect ought not
to have been considered while considering his promotion. In
support of the above claim, he relied on the decision of this
Court in Dev Dutt v. Union of India [(2008) 8 SCC 725 :
(2008) 2 SCC (L&S) 771 : (2008) 7 Scale 403] .
8. Coming to the second aspect, that though the benchmark
“very good” is required for being considered for promotion,
admittedly the entry of “good” was not communicated to the
appellant.
The
entry
of
“good”
should
have
been
communicated to him as he was having “very good” in the
previous year. In those circumstances, in our opinion, noncommunication of entries in the annual confidential report of
a public servant whether he is in civil, judicial, police or any
other service (other than the armed forces), it has civil
consequences because it may affect his chances of
promotion or getting other benefits. Hence, such noncommunication would be arbitrary, and as such violative of
Article 14 of the Constitution. The same view has been
reiterated in the abovereferred decision (Dev Dutt case
[(2008) 8 SCC 725 : (2008) 2 SCC (L&S) 771 : (2008) 7
Scale 403] , SCC p. 738, para 41) relied on by the appellant.
Therefore, the entries “good” if at all granted to the
appellant, the same should not have been taken into
consideration for being considered for promotion to the
higher grade. The respondent has no case that the
appellant had ever been informed of the nature of the
grading given to him.
10. Since the appellant had retired from service, we make it
clear that he is not entitled to any pay or allowances for the
period for which he had not worked in the Higher
Administrative Grade Group A, but his retrospective
promotion from 28-8-2000 shall be considered for the
benefit of refixation of his pension and other retiral benefits
as per rules.
9. Further, he would place reliance upon the judgment passed by the Hon’ble
Supreme Court in the matter of Union of India and Others vs. G.R.
Meghwal reported in {(2022) SCC OnLine SC 1291} in which following has
been observed in paragraphs 1, 6, 10, 12 and 30:1. Feeling aggrieved and dissatisfied with the impugned
judgment and order passed by the High Court of Judicature
for Rajasthan at Jaipur in DBCWP No. 740 of 2016 by which
the High Court has dismissed the said writ petition preferred
by the appellants and has confirmed the judgment and order
passed by the learned Tribunal allowing the O.A. No. 430 of
2011 by directing the Department to call for a review
meeting of the Screening Committee to re-assess his
suitability for the purpose of grant of SAG and while doing
so to exclude the ACR of 2007-2008, Union of India and
others have preferred the present appeal.
6. The Tribunal opined that the remarks entered for the year
2007-2008
were
clearly
adverse,
which
warranted
communication to the officer concerned within the time limit
prescribed. This was to enable him to submit his
representation but no such opportunity was given to the
officer. Considering the fact that in the earlier two years his
ACRs were found to be “Very Good” and the subsequent
ACR for the year 2007-2008 though was by the same
reporting officer, the same was “Good”, the same was
arbitrary. The Tribunal hence set aside the rejection of the
representation and directed to review the case of the
respondent ignoring the below benchmark “Good” for the
year 2007-2008 and to reconsider the case of the
respondent accordingly.
10. It is submitted that in that view of the matter and when
the respondent was having below benchmark ACR, i.e.,
“Good” in the year 2007-2008, which was considered by the
DPC, the respondent was rightly denied the functional
upgradation in the SAG of ITS Group-A in the pay band-4 of
Rs. 37,400-67,000 with grade pay of Rs. 10,000/-.
12. It is submitted that in the present case, the subsequent
representation
against
the
below
benchmark
was
considered by a duly constituted committee consisting of
expertise on the subject. It is submitted that after
considering the grading of 2007-2008 and material on
record, the Committee rejected the representation of the
respondent herein. Reliance was placed upon the decision
of this Court in the case of Dalpat Abasaheb Solunke v. Dr.
B.S. Mahajan, (1990) 1 SCC 305 : AIR 1990 SC 434. It is
submitted that as held by this Court whether a particular
candidate is fit for a particular post or not, has to be decided
by the duly constituted committee, which has expertise on
the subject. It is submitted that as observed, the Court has
no such expertise and the decision of the selection
committee can be interfered with only on limited grounds,
such as illegality or patent material irregularity in the
constitution of the committee or its procedure vitiating the
selection or proved mala-fides affecting the selection etc.
30. Therefore, in view of the above and in the facts and
circumstances of the case and considering the fact that
though the respondent was graded as “Very Good” in the
ACRs for the years 2005-2006 and 2006-2007 and was
graded only “Good” in the ACR for the year 2007-2008 by
the very same reporting and reviewing officer, despite the
fact that specifically the respondent was given the
opportunity against the ACR for the year 2007-2008.
However, no valid reasons are given for rejecting the
representation, we are of the opinion that in view of the
aforesaid facts and circumstances, the learned Tribunal and
the High Court have not committed any error in directing the
Department to call for a review meeting of the Screening
Committee to re-assess the suitability of the respondent for
the purpose of grant of SAG and while doing so to exclude
the ACR for the year 2007-2008. Therefore, in the facts and
circumstances of the case, no interference of this Court is
called for.
10. Reliance has also been placed by him in the case of Union of India & Ors.
vs. SP Nayyar {(2014) 14 SCC 370}, Sukhdev Singh vs. Union of India
{(2019) 9 SCC 566}, Devdutt vs. Union of India {AIR 2008 SC 2513},
Yogendra Babu Sharma vs. Union of India & Ors. {2023 SCC OnLine Chh
4450}, Amit Shandilya vs. State of C.G. & Ors. {WPS No.3033/2023, C.G.
High Court}, Pushpa Kiram Bhagat vs. State of C.G. {2025 SCC OnLine
Chh 13914}, SS Tigga vs. State of CG and Others {WA No.265 of 2026,
CG High Court}.
11. Learned counsel for the petitioner NK Lal submits that it is not in dispute
that the NK Lal is the most senior than other private respondent and
initially when the meeting of the D.P.C. was convened by the respondent
State on 23.03.11 for promotion on the post of Superintending Engineer,
the private respondents were not in the zone of consideration for
promotion, therefore the case of NK Lal along with another candidate was
considered by the D.P.C. and denied the promotion for the reason some
adverse remark made by the then Principal Secretary in the ACR of NK Lal
for the year of 2009 & 2010. The above adverse remark made by then
Principal Secretary on 22.03.2011 and in very next day on 23.03.2011 he
was sitting in the meeting of the D.P.C. as member of the D.P.C. and
showing his biasness against NK Lal. Further, no opportunity was given by
the state to NK Lal regarding his adverse ACR, nor was justified by the
respondent State. Furthermore, from perusal of record it is apparent that,
the ACR reporting authority given the grade "A" to NK Lal which was
downgraded by the then Principal Secretary on 22.03.2011 just before one
day of the meeting of the D.P.C., no explanation or reply has been filed by
the respondent state in this aspect. Whereas the same is not permissible
under the eyes of law, therefore when NK Lal gathered the information and
copies of the ACR under right to information act 2005, he filed W.P.S. No.
3184/2024 before this Court and the same is deserved to be allowed on
the basis of the ground raised by NK Lal in that writ petition. It is also not
disputed facts, as after 7 years of time, the meeting of the D.P.C. for
promotion on the post of Superintending Engineer was convened in which
the respondent state illegally given the weightage to the Suresh Singh
Bhupal in the promotion while considering his ACR of last five years,
whereas according to the information of NK Lal, the private respondent
was facing with some inquiry in the year of 2016-17, therefore his ACR of
2017 was deliberately not tabulated, when the grading was made by the
D.P.C. in his meeting dated 10.01.2018 and through the undisclosed /
unfair method, the committee declared the private respondent ACR as
excellent, whereas no such material in this regard is available in the D.P.C.
Proceeding, and through the illegal method/ process, the respondent
authority had allowed Suresh Singh Bhupal to supersede NK Lal. Looking
into the illegality in the D.P.C. proceeding, vide order dated 20.06.2024,
this Court directed the respondent to produce the record of the D.P.C.
dated 10.01.2018. After giving the undue benefit to Suresh Singh Bhupal,
in the year of 2020 the meeting of the D.P.C. was convened and thereafter
case of NK Lal was considered and vide order dated 21.12.2020 the
respondent authority promoted
NK Lal as superintending Engineer.
However, for considering the claim of the TR Kunjam alone, the review
D.P.C. was convened by the respondent state for the years of 2018 and
promoted TR Kunjam as superintending Engineer, in the result, the
respondent authority further reviewed the D.P.C. of 2020 for giving the
benefit to Suresh Singh Bhupal, and cancelled the promotion order of NK
Lal on 18.10.2024 and promoted Suresh Singh Bhupal as superintending
Engineer ( once again allowed them to supersede NK Lal) and vide order
dated 26.11.2024 promoted TR Kunjam as Chief Engineer, which is also
under challenged before this Court. Case of NK Lal was not considered
suitable for promotion to S.E. in the year of 2011 due to some adverse
entries, made by the then principal secretary during the D.P.C. , however,
the same were not communicated to him. This Court (in WPS No.
7053/2016) has also held that, if the adverse ACR was not communicated
within relevant time, the same has lost his existence, and the same cannot
be taken on account by the D.P.C., however in the instant case, when the
D.P.C. convened by the respondent state in the year of 2011, the
respondent had failed to do so and illegally deprived NK Lal from
promotion and the same thing was again repeated in different way in the
subsequent D.P.C. by allowing the junior person to supersede NK Lal and
no justification in this regard has been given by the respondent State.
Whereas it is also well settled that the ACR(s) of employee (in the instant
case 2009/2010) were not communicated to him, at any point of time by
the Committee, which was contrary to the law laid down by the Supreme
Court in Dev Dutt vs. Union of India, reported in (2008) 8 SCC 725. It is
well settled law, as the D.P.C./Selection Committee will go through the
records of the eligible officers and make their assessment after
deliberating on the quality of the officer as indicated in the various columns
recorded by the Reporting/Reviewing officer/Accepting Authority in the
ACRs for different years and then finally arrive at the classification to be
assigned to each officer. The Selection Committee would take into account
orders regarding appreciation for the meritorious work done by the
concerned officers. Similarly, it would also keep in view orders awarding
penalties or any adverse remarks communicated to the officer, which, even
after due consideration of his representation, have not been completely
expunged." However, no any material in this aspect was placed by the
respondent state in the matter. Respondent state has not placed the entire
record of the any of the D.P.C. The above facts show that, the respondent
state is trying to hide some facts, as to how the D.P.C. determined the
grading of the candidates and on which basis, the DPC found the excellent
performance of the private respondent by making the recommendation.
Since something is fishy, therefore when NK Lal sought the information
under Right to information act 2005, regarding the entire document of the
D.P.C. in respect of the private respondent, the respondent state refused
to disclosed the relevant information and in the first appeal stage, some
documents were disclosed after hiding some part. Why the respondent
state tried to protect the illegality which were committed by the respondent
authority for giving the undue advantage to the private respondents. It is
submitted that, if the performance of the private respondent was found
"excellent" then, it has been required to disclosed/displaced the relevant
facts regarding the excellent performance of the candidate, so that, the
other candidates can be motivated and develop their performance, in this
aspect, it is also required to disclosed the relevant ACR, which were found
excellent by the committee for maintaining the free, fair and transparent
process of the Departmental promotion committee, however the
respondent state had failed to do so. It is submitted that, what emerges
from the above submission is that fairness is an essential ingredient of all
administrative actions including a selection process. In the matter of
National Institute of Mental Health and Neuro Sciences-vs-Dr. K. Kalyana
Raman and Others, reported in (1992) Supp (2) SCC 481, wherein it has
been held that the function, performed by a Selection Committee, is
administrative in nature. In the instant case the respondent state had failed
to do so. For protecting the illegality committed by the respondent state
during the DPC and for harassment of NK Lal, the entire exercise has
been done by the respondent. It is submitted that, the DPC held on dated
10/01/2018 the ACR's of last preceding years were considered such as
(03/2013 to 03/2017) and Suresh Singh Bhupal was selected on the basis
of excellent grading. When the ACR of 03/2017 is not available then how it
was possible to recommend and promoted Suresh Singh Bhupal in the
said DPC on 10/01/2018. It is a case of violation of the promotion rules
and the respondent authority deliberately suppressed the material in the
DPC minutes of meeting for promotion of the E.E to S.E. Dated
10/01/2018, 07/12/2020, 07/10/2022 and their review DPC on dated
10/08/2024, 16/08/2024, 13/11/2024 as such not mentioned anywhere to
select the excellent grading candidates. Whereas from perusal of the DPC
minutes of meeting for promotion S.E to C.E held on dated 20/08/2010clearly mentioned the chief engineer are the HOD of department hence
preference would be Excellent grading. It is submitted that, as per
knowledge of NK Lal, Mr. G. S. Mandavi (colleague of the petitioner) who
is holding the post of chief Engineer PWD (E&M) Bilaspur is going to
retirement after six months on dated 30th September 2026, and NK Lal
who is holding the post of Superintending Engineer E&M Bilaspur is going
to be retire after one year on 30th September 2027, whereas TR Kunjam
who holding the post of chief engineer pwd E&M Raipur going to retire on
30th November 2031, and respondent No.4 who holding the post of
Superintending Engineer E&M Raipur going to retirement on dated 30th
may 2031 and they are depriving the petitioner of his right by managing
the higher authority of the state. It is submitted that, the entire exercise has
been done by the respondent only for avoiding the legal right of NK LAL. It
is well settled law that two unequal positions of employee cannot be
treated as equal as since the private respondents neither fulfilled the
minimum requisite criteria for promotion in the year 2011, therefore, they
cannot be treated equivalent to NK Lal in the year of 2011. Further, no
DPC was convened by the respondent till 2018, however, the respondent
deliberately committed illegality in the promotion for closing the vacancy of
promotion to NK Lal during the seven years. It is submitted that,
consideration for promotion is the rights of the employee. The promotion is
a statuary right as regards the condition of service applicable to the
petitioner at the time when he entered in the service of the respondent
authority and the condition of service could not be altered to his
disadvantage. However, the respondent authority had mala-fidely deprived
NK Lal for promotion on the higher post and blocked the chance of the
promotion of NK Lal by way of illegality committed by them. Being a State
within the meaning of Article 12 of the Constitution, the respondent
authority is duty bound to create the promotional avenues for the petitioner
having regard to its constitutional obligations adumbrated in Articles 14
and 16 of the Constitution of India. Despite its constitutional obligations,
the respondent authority deliberately through the arbitrary manner has
seized the fundamental/legal right of the petitioner. The entire promotion
proceeding suffered with the unfairness, favoritism, arbitrary and
discriminatory act of the respondents and the D.P.C. proceeding is also
against the C.G. Civil Services promotion rules 2003 as well as the service
rules mentioned in the writ petition. It is well settled law that a person
whose name appears in the select list has no right of appointment on the
post. Though denial of appointment for an arbitrary, unreasonable or
malafide reason is also not permissible and the Court have power to quash
the impugned proceeding which is suffered with the arbitrariness,
discrimination, biasness of the authority and the above facts is clearly
established in the present matter. Discretionary power vested in any
authority could not be exercised arbitrarily, in a high- handed manner,
actuated with mala fide intentions and flown from some biasness to
achieve some extraneous goal. The action of the respondent's prima-facie
seems to be discriminatory and violative of fundamental rights of the NK
Lal. It is well settled law that the country is governed with the rules of law,
not by the whims of the respondents' officials, however, in the instant case,
the respondents failed to comply with the provision of law. From perusal of
the record, it has appeared that, the impugned act of the respondents is
discriminatory and violative of the well settled provision of law. Whereas
the discretionary power vested in any statutory authority could not be
exercised arbitrarily, in a high-handed manner. From perusal of the facts of
the instant case, the biasness, arbitrariness & discrimination of the public
authority is clearly established, thus the instant writ petition is deserving to
be allowed, and the impugned order is required to be quashed by the High
Court. The entire act and actions on the part of the respondent's authority
are discriminatory and violation of the well settled principles of law and its
wholly arbitrary, discriminatory and suppressing the statutory right of the
petitioner-NK Lal.
12. In support of his case, counsel for the petitioner namely NK Lal would
place reliance in the matter of Gurdial Singh Fiji vs. State of Punjab,
reported in (1979) 2 SCC 368, wherein the Hon’ble Apex Court held that
the non-consideration of the appellant's representation as illegal and
directed
reconsideration
of
the
appellant's
case
by
taking
into
consideration the Govt. decision on his representation and his service
records up to date. He also places reliance in the matter of UPSC vs.
Hiranyalal Dev {AIR 1988 SC 1069}, Union of India vs. AK Narula {(2007)
11 SCC 10}. Pradeep Kumar Biswas vs. Indian Institute of Chemical
Biology {(2002) 5 SCC 111}.
13. Learned counsel for the State so far as WPS No.3757 of 2023 is
concerned would submit that the present petition utterly suffers from the
delay and latches, for which no explanation at all has been given by the
present petitioner. The order impugned in the present petition is
09.11.2021 (annexure P/1) whereas the present petition is preferred on
19.06.2023 and no explanation has been offered in this regard. Therefore,
this petition is deserves to be dismissed on the ground of delay and
latches solely. Further, by way of this petition petitioner seeks to challenge
the upgradation of the ACR's of private respondent Shri T.R.Kunjam, as
such the petitioner has no locus at all to challenge the impugned order
dated 09.11.2021 (annexure P/1) as no legal right of the petitioner has
been violated by the said order. In the absence of any legal injury, the
petitioner has no locus to challenge the impugned order dated 09.11.2021
(annexure P/1) and therefore the petition is not at all maintainable. The
petitioner has failed to demonstrate the existence of any legal right in his
favour for the enforcement of which a writ may be issued by this Hon'ble
Court. In order to exercise the writ jurisdiction under Article 226 of
Constitution of India, the precondition is the existence of a legal right in
favour of the petitioner, which is totally absent in the present petition and
for this reason, the petition is liable to be dismissed. It is equally well
settled law that review of adverse ACR's are exclusive domain of the
employer/authority and the petitioner has no say to it. If a jurisdiction is
vested in a authority by virtue of law, it will always up to the authority to
exercise the power within it's jurisdiction and it cannot be directed to act in
a particular manner. Therefore, the petition preferred by the petitioner is
merely on the basis of the apprehension and as of now the petitioner has
not suffered any legal injury directly or indirectly by virtue of the impugned
order. Therefore, the petition is liable to be dismissed in this ground only.
14. Learned State counse in respect of WPS No.3145 of 2024 submits that
during the pendency of the present Writ Petition the petitioner filed a
subsequent petition i.e., WPS no. 3640/2024 challenging the order dated
25.06.2024, whereby, the review DPC of the DPC held on 10.01.2018 was
convened and TR Kunjam has been promoted to the post of
Superintending Engineer with effect from 10.01.2018 and by the same
order Suresh Singh Bhupal has been demoted to the post of Executive
Engineer as such the instant petition had become infructous. It is thus
respectfully submitted by the answering respondent that the present
petition has now become infructuous as the petitioner has challenged the
outcome of the review DPC and the order dated 25.06.2024 has been
passed.
15. Learned counsel for the State in respect of WPS No.3640 of 2024 would
submit that order dated 25/06/2024 (Annexure P/1) was issued as an
outcome of the review DPC dated 10.06.2024 of the original DPC
10/01/2018. It is pertinent to mention here that in the DPC dt. 10.01.2018,
overall assessment/valuation of the last five years was done which
ultimately formed the basis for recommendation of promotion. Pursuant to
the representation made by Shri T.R.Kunjam dated 20.04.2023, the matter
was considered at the departmental level and after seeking necessary
approval decision was taken for holding review DPC of the original DPC dt.
10.01.2018. During consideration of the case it was found that the
respondent no. 03/T.R.Kunjam is entitled for reconsideration after
upgradation in the ACR as it was on 10/01/2018 and therefore, during the
DPC proceedings on overall assessment/valuation of the last five year, it
was found that respondent no. 03 is entitled to be promoted against the
post of Superintendent Engineer as on date when the DPC was
constituted on 10/01/2018 considering his upgraded ACR's. During the
proceeding it was found that Suresh Singh Bhupal and respondent no. 03
they both were within the zone of consideration and was having Excellent
grading but the respondent no. 03/TR Kunjam being senior in the list and
being
more
meritorious,
therefore,
the
respondent
No.
was
recommended for promotion against the post of Superintendent Engineer.
It is further pertinent to mention here that at the relevant point of time there
was only one vacant post of Superintending Engineer as such, the case of
the petitioner was not recommended as there was no vacancy left for
considering his name, therefore, no recommendation was made. From the
entire proceeding that has been done in the light of the review DPC held
on 10/06/2024, nowhere, the authorities have observed that Suresh Singh
Bhupal was subject to any departmental inquiry for which he has been
punished with major penalty. It may be seen that the review DPC has been
constituted and after the case of the respondent no. 03 was considered
finding him eligible for next promotional post and thereafter, only one post
was left for Superintendent Engineer, the respondent authorities were left
with no other option except to pass the order of demotion. In the complete
scenario, it may be seen that on the basis of the order dated 25/06/2024
giving rise to a consideration for the name of the respondent no. 03 for
promotion against the post of Superintendent Engineer was not arbitrary
and unreasonable it is an administrative procedure that has to be followed
and it is settled laws that as and when review DPC is conducted the
person whose name has to be considered in review DPC would be entitled
for the next promotional post and if the prejudice is caused to the
respondent no. 3 that can always be rectified in the review DPC in the light
of upgraded ACR's. Therefore, the say of the petitioner that before issuing
the order of demotion he would have been afforded opportunity of hearing
is baseless, the respondent authorities have no occasion for calling upon
the petitioner to explain his conduct he may be punished which even
otherwise would have been merely empty formality. The petitioner is
himself judging the order dated 25/06/2024 accepting this to be the
petitioner an order of punishment. However, misconstrued the legal
aspects and the procedures provided under Rule 14 of Rules, 1966, he
may reconsider and realize that he has not been punished, rather the
order dated 25/06/2024 by which he has been demoted is outcome of a
review DPC. It is further submitted, that the respondent no. 03, who was
awarded with the lesser grade in his ACR had filed Writ Petitions before
the Court on two of the occasions this Court has directed the respondent
authorities to consider his representation in accordance with law and when
the representation of and grievances of respondent no. 03 was considered
by the respondent authorities, they found that it appropriate to upgrade the
earlier grades that have been awarded to the respondent no. 03. It is not in
dispute that earlier when the committee was constituted on 10/01/2018
have given thought to the ACRs of the petitioner as "Excellent" and the
remark that has been given to one Shri NK Lal and respondent no. 03 as
"Very Good", but under the changed circumstances the earlier remarks
would not be made applicable for the very reason that the review DPC has
been constituted to consider the revisited/ upgraded ACR's and other
things, therefore, the committee which was considering the case of the
respondent No. 3 on the term of review DPC has to evaluate by
conducting overall assessment/valuation of the last five years upgraded
ACR placed before them. It is humbly submitted that the very concept of
review DPC is to provide justice to an employee who has been left over for
one or the other reason and has been deprived of the promotion at the
time of earlier DPC, by way of the review DPC the same can be corrected
and can be made good and it is the duty of the authorities to take into
consideration that the employees may not suffer. It is a settled law that a
review DPC can be convened under the following circumstances:- i. When
the eligible persons have been left out from being considered. ii. When the
ineligible persons has been wrongly considered. iii. When a person has
been given seniority with retrospective effect, thereby affecting the
gradation list. iv. When the DPC has committed procedural irrgularity. v.
When adverse entry of any employee has been expunged or modified. As
is clear from above, the Administrative Department is competent to hold a
review meeting of the Departmental Promotion Committee meeting held on
10.01.2018; the opinion of the General Administration Department is not
required for the same. In continuation of the letter referred to under the
above subject, it is informed as per the instructions that in relation to the
representation submitted by Shri T.R. Kujam, Superintending Engineer
(E/M), for review of the meeting of the Departmental Promotion Committee
held on 10.01.2018 for promotion from Executive Engineer to the post of
Superintending Engineer (E/M), on the basis of the opinion received from
the General Administration Department, administrative decision was taken
to review the said meeting and a proposal was sent to the Public Service
Commission. Regarding the said proposal, a review meeting of the
Departmental Promotion Committee was held on 10.06.2024. Based on
the decision taken by the Departmental Promotion Committee in the said
meeting, departmental order dated 25.06.2024 has been issued. In the
instant case since the earlier ACRs which were graded as "Very Good"
had resulted in taking away the right of promotion of the respondent no. 3,
as such, it had all the right to question the same for its appropriate
upgradation. Thereafter, when the same his upgraded, grading him
"Excellent" he has all the right to be considered for promotion with effect
from the date he has been left out which in the instant case is 10.01.2018.
Thus, it is respectfully submitted that there is no illegality or irregularity in
promoting the respondent No. 3 with effect from 10.01.2018 by convening
a review DPC and since there was only 1 post of Superintending Engineer
laying vacant at the relevant point of time, as such the petitioner was
rightly demoted, as against one vacant post two persons could not be
promoted.
16. Learned State counsel in respect of WPS No.2566 of 2025 submits that
respondent no. 3 Shri T.R. Kunjam preferred a writ petition bearing WPS
NO.3736/2018 before this Hon'ble Court and the same was disposed of
vide order dated 17/05/2018 directing the respondent authorities to
consider the representation of the respondent no. 3 with respect to upgradation of his ACR. It is respectfully submitted that in compliance of the
order dated 17/05/2018 passed in WPS No. 3736/2018, the representation
of the respondent no. 3 Shri T.R. Kunjam was considered and an order
was passed on 14/05/2020 (Annexure P/7) by which the ACR of the
respondent no. 3 were upgraded. It is most respectfully submitted that
being aggrieved by the part of the order dated 14/05/2020 (Annexure P/7)
by which the ACR for some period was not up-graded, the respondent no.
3 again preferred writ petition before this Hon'ble Court which was
registered as WPS NO. 4612/2020 and the said writ petition was dispose
of on 02.12.2020 (P/8) with direction to the respondent authorities to
consider and decide the representation of the respondent No. 3 in
accordance with law. At this juncture, it is necessary to mention that a DPC
was convened on 07/12/2020 for promotion from the post of EE (E&M) to
the post of SE (E&M) and in the said DPC, the name of Shri N.K. Lal was
recommended for promotion and pursuant to which he was granted
promotion to the post of SE (E&M) from the post of EE (E&M). It is
respectfully submitted that the State Government, Department of Public
Works, pursuant to the order dated 02/12/2020 passed in WPS No.
4612/2020, considered the representation of the respondent no. 3 Shri
T.R. Kunjam and passed a detailed order on 09/11/2021 by which the ACR
of the respondent no.3 for the period from 01/04/2014 to 31/03/2015, from
01/04/2015 10/08/2015 and from 12/08/2015 to 14/03/2016 were upgraded
from A to A+ (excellent).
It is submitted that after issuance of the order
dated 09/11/2021 Respondent no. 3 preferred representation with a prayer
that since his ACR for the period from 2012 to 2016 has been corrected /
up-graded, he is entitled to be promoted to the post of SE from the post of
EE with effect from 15/01/2018. It is respectfully submitted that admittedly
in the DPC dated 10/01/2018 the name of the respondent no. 3 was also
considered alongwith the petitioner and other candidates. However, the
ACR of the petitioner was excellent and applying the principle of merit cum
seniority, the name of the petitioner was recommended, but, since the
ACR of the respondent no. 3 was up-graded at the later stage review DPC
of DPC dated 10/01/2018 and as a natural consequences, the review DPC
of DPC dated 10/01/2018 was convened on 10/06/2024 and the DPC
recommended the name of respondent no. 3 Shri T.R. Kunjam for
promotion with effect from 15/01/2018 to the post of SE and further
recommended for demotion of the petitioner as on the date of original
DPC, only 1 post was available. It is respectfully submitted that vide order
dated 25/06/2024 the respondent no. 3 was granted promotion with effect
from 15/01/2018 and the petitioner was demoted from the post of SE to the
post of EE and the name of the respondent no. 3 was deleted from the
gradation list of EE which was published earlier and the name of the
petitioner was included and as a result, vide order dated 10/07/2024,
separate gradation list as on 01/04/2018, 01/04/2019 and 01/04/2020
including the name of the petitioner were published. It is submitted that
after demotion of the petitioner, his name was included in the gradation list
of EE and thereafter, he was promoted as per the order. it is respectfully
submitted that the petitioner has been given promotion to the post of SE
with effect from 21/12/2020 which is strictly in accordance with law and
there is no illegality in the same. In view of the aforesaid submissions
made herein, it is respectfully submitted that, the entire petition as framed
and filed by the petitioner is devoid of merit and substance and accordingly
is liable to be dismissed being sans merit.
17. Learned counsel for the State in respect of WPS No.3184 of 2024 submits
that it is respectfully submitted that the present petition has been filed after
a long delay of 14 years and therefore the present petition is liable to be
dismissed on this ground alone, therefore, the petition is not maintainable
and is devoid of merits and is liable to be dismissed. It is respectfully
submitted that, the Departmental Promotion Committee was conducted on
23/03/2011 with respect to granting promotion to the petitioner on the post
of Superintending Engineer. It is respectfully submitted that, two
candidates were considered for promotion from the post of Executive
Engineer to post of Superintending Engineer in the year 2011 namely;
Shri. G.S. Mandavi and Shri. N.K. Lal (the present petitioner). It is
respectfully submitted that, the Annual Confidential Reports (ACRs) of the
last five years was considered by the Departmental Promotion Committee
and based on the remarks and grade provided in the ACR of last five
years, the Departmental Promotion Committee found Shri. G.S. Mandavi,
suitable for promotion on the post of Superintending Engineer, because he
had received "Very Good" in the remark column. However, in the ACR of
the petitioner of the year 2009 and 2010, there was some adverse entries
and therefore the petitioner was not found suitable for the purpose of
promotion on the post of Superintending Engineer. Therefore, the
petitioner was found "not suitable" thus could not be promoted in the year
2011. It is respectfully submitted that, for the second time, the petitioner
was considered for promotion on the post of Superintending Engineer from
the post of Executive Engineer in the Departmental Promotion Committee
dated 10/01/2018. It is respectfully submitted that, in the Departmental
Promotion Committee dated 10/01/2018, five persons were considered for
promotion on the post of Superintending Engineer in which the present
petitioner Shri. N.K. Lal, Engineer in received "Very Good" remark on the
basis of valuation of his last five years of ACRs. However, only one post
was available for promotion and therefore Shri. S.S. Bhupal, who had
received "Excellent" remark on the basis of consideration of his last five
years of ACR, has been found suitable for giving promotion on the post of
Superintending Engineer. It is respectfully submitted that the case of the
petitioner for promotion on the post of Superintending Engineer was
considered for the third time in the DPC meeting held on 07.12.2020 and
the DPC found the petitioner suitable for promotion the post of
Superintending Engineer and therefore, the DPC in its meeting dated
07.12.2020 recommended the name of the petitioner for promotion on the
post of Superintending Engineer.There is no material left in this petition
and hence the petition is liable to be dismissed.
18. Learned counsel for the State in respect of WPS No.1721 of 2025 submits
that that the petitioner/NK Lal was given promotion on the post of
Superintending Engineer vide order dated 21.12.2020 however, due to the
subsequent development again a fresh order was passed on 02.12.2024
giving the promotion to the petitioner Shri N.K. Lal on the post of
Superintending Engineer w.e.f. 21.10.2022. However, the order dated
02.12.2024 has not been challenged by the petitioner, therefore, the
present writ petition is not maintainable and is liable to be dismissed on
this ground alone. It is further respectfully submitted that the petitioner had
pleaded that, at the same time one identical situation, in the case of the
respondent No. 5, T.R. Kunjam has been accepted by the respondent
authority and upgraded his adverse ACR and by way of Review D.P.C.
had promoted him as Superintendent Engineer with effect from 15.01.2018
and once again ignored the claim of the petitioner. The respondent No. 4/
Shri S.S. Bhupal was given promotion on the post of Superintending
Engineer in the year 2020 and in the review DPC dated 13.11.2024 the
petitioner Shri N.K. Lal was found fit and his name was recommended for
promotion on the post of Superintending Engineer from the year 2022. It is
submitted that, pursuant to the recommendation of the review DPC dated
13.11.2024 order dated 02.12.2024 was passed promoting the petitioner
on the post of Superintending Engineer w.e.f 21.10.2022. It is submitted
that, the order dated 02.12.2024 has not been challenged by the petitioner
in the present writ petition and as such the present writ petition is liable to
be dismissed. It is necessary to mention that a DPC was convened on
07/12/2020 for promotion from the post of EE (E&M) to the post of SE
(E&M) and in the said DPC, the name of petitioner Shri N.K. Lal was
recommended for promotion and pursuant to which he was granted
promotion to the post of SE (E&M) from the post of EE (E&M). It is
respectfully submitted that, pursuant to the order dated 02/12/2020 passed
in WPS No. 4612/2020, considered the representation of the respondent
no. 5 Shri T.R. Kunjam and passed a detailed order on 09/11/2021 by
which the ACR of the respondent no. 5 for the period from 01/04/2014 to
31/03/2015, from 01/04/2015 to 10/08/2015 and from 12/08/2015 to
14/03/2016 were upgraded from A to A+ (excellent). It is respectfully
submitted that, in the review DPC dated 16.08.2024, the name of Shri S.S.
Bhupal respondent No. 4 was recommended for promotion on the principle
of merit cum seniority. Pursuant to the recommendation made by the
review DPC dated 16.08.2024, Shri S.S. Bhupal was given promotion on
the post of Superintending Engineer w.e.f. 21.12.2020 vide order dated
18.10.2024. It is submitted that, vide order dated 18.10.2024 itself
petitioner was demoted back to the post of Executive Engineer. It is
submitted that, as the respondent No. 5 T.R. Kunjam was given
retrospective promotion on the post of Superintending Engineer w.e.f.
15.01.2018, Shri S.S. Bhupal has been demoted on the post of Executive
Engineer and he was given promotion on the post of Superintending
Engineer w.e.f. 21.12.2020. Due to the promotion given to the respondent
no. 4 Shri S.S. Bhupal w.e.f. 21.12.2020 no post was vacant for the
petitioner Shri N.K. Lal to be given promotion w.e.f. 21.12.2020 and
therefore, the petitioner Shri N.K. Lal has been given promotion on the
post of Superintending Engineer w.e.f. 21.10.2022 vide order dated
02.12.2024, pursuant to the recommendation made by the review DPC in
its meeting dated 13.11.2024. In view of the above, it is respectfully
submitted that, the answering respondent have acted in accordance with
law and the case of the petitioner is being devoid of merit and liable to be
dismissed.
19. I have heard learned counsel for the parties and perused the documents
annexed with the petition carefully.
20. From the perusal of the documents annexed with the petitions as well as
from the pleadings of the parties, it appears that the parties namely Suresh
Singh Bhupal, TR Kunjam and NK Lal were Executive Engineers and their
names were in zone for consideration in the Departmental Promotion
Committee of promotion on the post of Superintending Engineer according
to Chhattisgarh Public Works Engineering {Gazetted } Service Recruitment
Rules, 2015 read with Chhattisgarh Public Service Promotion Rules, 2003,
the criteria which has been fixed for consideration of their names for the
DPC is Merit-cum-Seniority. Integrity of the concerned employee should be
beyond doubtful and their five years ACR should be in Very Good category
and in that period altogether no adverse remark (D) should have been
passed against them. Details of immovable property was also on the
criteria for consideration for promotion.
21. Upon these grounds, the DPC has considered the name of the parties as
well as two other Executive Engineers on 10.01.2018 and on collective
evaluation of five years ACR of the parties, Suresh Singh Bhupal was
found to be in Excellent grading and his name was accordingly
recommended for promotion to the post of Superintending Engineer, other
persons were not recommended for the reason that no post was vacant
otherwise also, both TR Kunjam and NK Lal were placed in Very Good
category.
Suresh
Singh
Bhupal
was
promoted
to
the
post
of
Superintending Engineer vide order dated 15.01.2018.
22. TR Kunjam thereafter filed a WPS bearing No.3736/18 before this Court
raising his grievance that his ACR for the year, 2012- 2016 requires
reconsideration as the same has not been communicated timely, this Court
vide order dated 17.05.2018 directed the Secretary, PWD to consider the
case of TR Kunjam and to pass appropriate orders in respect of his
representation for correction of his grade. On the basis of that order of this
Court, representation of TR Kunjam was considered and on 14.05.2020,
the Additional Secretary PWD has improved the grading of the ACR of TR
Kunjam from very good (A) to Excellent (A+). From the order dated
14.05.2020, it transpires that the Chief Engineer who looks after the work
of TR Kunjam has given him excellent grading for the period from
26.07.2012-31.3.2013, 01.04.2013-31.03.2014, and Accepting Authority
i.e. Principal Secretary has concurred with the grading given by Reporting
Authority i.e. Chief Engineer and accordingly grading of TR Kunjam was
stated to be Excellent for the said period. However, for the period ranging
between 01.04.2014-31.03.2015, 01.04.2015-10.08.2015 and 12.08.201514.03.2016 was categorized as Very Good. Being aggrieved with this, TR
Kunjam filed another Writ Petition bearing No.WPS/4612/2020 challenging
the contents in para 5 of the order dated 14.05.2020 and this Court vide
order dated 02.12.2020 directed the respondent authorities therein to
consider the representation of the petitioner in that regard. Thereafter, vide
order dated 09.11.2021, Additional Secretary, PWD Department, after
approval of accepting authority, upgraded the ACR of TR Kunjam ranging
from year 03/2015 and 03/2016, 01.04.2014-31.03.2015, 01.04.201510.08.2015 and 12.08.2015-14.03.2016 from Very Good to Excellent. In
the meanwhile, NK LAL was promoted in pursuance of DPC dated
07.12.2020 as Superintending Engineer with effect from 21.12.2020 and
TR Kunjam was recommended by the DPC as there was no post vacant.
Thereafter, in the DPC meeting dated 07.10.2022, TR Kunjam was
recommended to be promoted to the post of Superintending Engineer
based upon the fact that his previous ACRs for five years were made very
good (A) to Excellent (A+) as such, TR Kunjam was promoted to the post
of Superintending Engineer vide order dated 21.10.2022. Thereafter, TR
Kunjam made a representation dated 20.04.2023 to the Secretary (PWD)
for convening review DPC which was held all the way back on 10.01.2018
stating that after reconsideration of his ACR, he has been awarded
Excellent in 5 years , as such, DPC held on 10.01.18 is required to be
reconsidered and review DPC is required to be conducted for
consideration of his name. The application for review DPC filed by TR
Kunjam was objected by Suresh Singh Bhupal stating that application of
TR Kunjam for review DPC is not in accordance with law as under the
rules, if the grading of ACR were corrected and improved later on, the said
ACR cannot be given effect to retrospectively as the DPC was conducted
way back on 10.01.2018 and TR Kunjam has been promoted on
21.10.2022 based on correction of his grading in the ACR as on
10.01.2018, when the DPC was held, TR Kunjam was not recommended
for the post of Superintending Engineer at that point of time and after a
lapse of about 4 years, review DPC of DPC dated 10.01.2018 would not
be in accordance with law which is purely a futile exercise and as such,
application for review DPC of TR Kunjam is required to be rejected.
23. However, application of TR Kunjam for review DPC was allowed and
review DPC proceeding was initiated which culminated into passing of
impugned order dated 25.06.2024 issued by the State Government by
which, TR Kunjam was promoted to the post of Superintending Engineer
with effect from 15.01.2018 on the basis of ‘No Work No Pay’ (It is to be
noted that before review DPC, he was promoted with effect from
21.10.2022) while considering his gradation in the ACRs which was
rectified later on, however, while promoting TR Kunjam, Suresh Singh
Bhupal was demoted with effect from 15.01.2018 from the post of
Superintending Engineer to the post of Executive Engineer, however, no
recovery was directed to be issued against him. This gave cause of action
to Suresh Singh Bhupal to file present writ petition, in which, TR Kunjam
was arrayed as Respondent No.3.
24. It would be apt to note here that on the basis of order dated 25.06.2024
passed on application of review DPC, TR Kunjam was promoted to the
post of Superintending Engineer whereas, he was granted notional
promotion from 10.01.2018. Now, challenge is to the order dated
25.06.2024 by which as stated above, TR Kunjam was promoted to the
post of Superintending Engineer on the one hand and on the other, Suresh
Singh Bhupal was demoted to the post of Executive Engineer.
25. The moot questions for consideration before this Court is whether review
DPC can be allowed on the strength of subsequent rectification of ACR of
an employee by the competent officer and even if it is allowed whether any
order such as the nature of impugned order dated 25.06.2024 can be
passed ?
26. From the entire facts, it is quite vivid that so far as case of Suresh Singh
Bhupal is concerned, there is no any infirmity in his ACRs and it was up to
the mark as excellent (A+). When the first DPC dated 10.01.2018 was
convened, there is nothing on record to show that Suresh Singh Bhupal
was not fit for promotion to the post of Superintending Engineer as his
ACRs were excellent. Criteria of last five years ACRs to be very good and
submission of immovable property details were also fulfilled and he was fit
for promotion in all respect and accordingly, he was promoted to the post
of Superintending Engineer. So far as case of TR Kunjam is concerned,
when first DPC was convened on 10.01.2018, his ACR was not excellent
(A+) though he was found fit in the DPC as his ACR was Very Good (A).
Likewise, case of NK Lal though on the basis of other aspects, he was
worth consideration, however, his ACR was not excellent and was Very
Good. Since there being no post vacant, neither TR Kunjam nor NK Lal
was recommended for promotion to the post of Superintending Engineer.
27. However, subsequent events followed when TR Kunjam filed WPS No.
3736/2018 seeking reconsideration of his 2012 ACR on the ground that it
had not been communicated in time. Pursuant to the High Court's order
dated 17.05.2018, the PWD reconsidered his case and, by order dated
14.05.2020, upgraded his ACR grading from Very Good (A) to Excellent
(A+) for the periods 26.07.2012–31.03.2013 and 01.04.2013–31.03.2014,
while retaining Very Good for subsequent years. Aggrieved, TR Kunjam
filed WPS No. 4612/2020, following which the High Court directed
reconsideration. Consequently, by order dated 09.11.2021, his remaining
ACRs for 2014–2016 were also upgraded from Very Good to Excellent.
28. Meanwhile,
the
DPC
dated
07.12.2020
promoted
NK
Lal
as
Superintending Engineer, while TR Kunjam was only recommended due to
non-availability of vacancies. Based on his revised ACRs, the DPC dated
07.10.2022 recommended TR Kunjam for promotion, and he was
promoted as Superintending Engineer on 21.10.2022. Thereafter, TR
Kunjam sought a review DPC of the 10.01.2018 DPC, contending that his
upgraded ACRs entitled him to promotion from that date. Suresh Singh
Bhupal objected, arguing that subsequently revised ACRs could not be
applied retrospectively and that reopening the 2018 DPC after four years
was legally impermissible. Despite the objection, the State Government
convened a review DPC and, by the impugned order dated 25.06.2024,
granted TR Kunjam retrospective promotion as Superintending Engineer
with effect from 15.01.2018 on a "No Work No Pay" basis. As a
consequence, Suresh Singh Bhupal was retrospectively reverted from
Superintending
Engineer
to
Executive
Engineer
with
effect
from
15.01.2018, though no recovery of salary or benefits was ordered against
him.
29. Firstly, this Court deems it appropriate to advert to the Chhattisgarh Public
Services (Promotion) Rules, 2003, and in particular Rule 7, which governs
promotion on the basis of merit- cum-seniority. For proper appreciation of
the controversy, sub- rule (6), (7) and (9) of Rule 7, which lays down the
manner in which the Departmental Promotion Committee is required to
assess the comparative merit of candidates, is reproduced hereunder:—
7. Promotion on the basis of merit-cum- seniority-
(6) The Departmental Promotion/screening committee shall
assess the suitability of the public servants for promotion
on the bases of their service record and with particular
reference to the Annual Confidential Reports (ACRs) for 5
preceding years, However, in cases where the required
qualifying service is more than 5 years, the Departmental
promotion/screening committee shall see the record with
particular reference to the ACRs for the years equal to the
require qualifying service.
(7) When one or more ACRs are not available for any
reason
for
the
relevant
period,
the
Departmental
promotion/screening committee shall consider the ACRs of
the years preceding the period in question.
***
(9) The Departmental promotion/screening committee shall
make a relative/comparative assessment of the merits of
public servants who are within the zone of consideration
and make an overall grading of the public servants merit on
the basis of their service records and place them in the
categories as " Outstanding", Very-Good", "Average" and
"Poor" as the case may be However, only those public
servants who are graded as "Very-Good" and above will be
included in the select list, by placing the public servants
graded as "Outstanding" on top followed by those graded
as "Very-Good", subject to availability of vacancies, with
the public servants with the same grading maintaining their
inter-se-seniority in the feeder cadre/part of the service/pay
scales of the post.”
30. From the perusal of the aforesaid rule, it is quite vivid that the promotion
should be based on merit-cum-seniority, merit would be governing factor
and seniority only acts a tie breaker where candidates are otherwise found
to be approximately equal in merit.
31. Now this Court would proceed to deal with the first question that whether
review DPC can be allowed on the strength of subsequent rectification of
ACR?
32. The Hon’ble Supreme Court in the matter of Dev Dutt v. Union of India ,
(2008) 8 SCC 725 has held in paragraph 44 which reads as under:-
44. We, therefore, direct that the “good” entry be
communicated to the appellant within a period of two
months from the date of receipt of the copy of this judgment.
On being communicated, the appellant may make the
representation, if he so chooses, against the said entry
within two months thereafter and the said representation will
be decided within two months thereafter. If his entry is
upgraded the appellant shall be considered for promotion
retrospectively by the Departmental Promotion Committee
(DPC) within three months thereafter and if the appellant
gets selected for promotion retrospectively, he should be
given higher pension with arrears of pay and interest @ 8%
per annum till the date of payment.
33. Thereafter, the Division Bench of High Court of Delhi at New Delhi in the
matter of Guriqbal Singh vs. Union of India and Another reported in {2024
SCC OnLine Del 2353 } held in paragraph Nos.32 to 37 which reads as
under:-
32. The plea of the respondents that only future DPC shall
consider the upgraded ACRs, is unsustainable. We agree
with the submission of Dr. Hooda that, in view of the
judgment of the Supreme Court in the case of Dev Dutt
(supra), which is of the year 2008, specifically contemplates
that, if on a representation the ACRs grading are upgraded,
then the case of such an employee need to be considered
by review DPC, paragraph 43 of which reads as under:
“43. We are informed that the appellant has
already retired from service. However, if his
representation for upgradation of the “good”
entry is allowed, he may benefit in his pension
and get some arrears. Hence we direct that
the
“good”
entry
of
1993-1994
be
communicated to the appellant forthwith and
he
should
be
permitted
to
make
a
representation against the same praying for its
upgradation. If the upgradation is allowed, the
appellant should be considered forthwith for
promotion
as
Superintending
Engineer
retrospectively and if he is promoted he will
get the benefit of higher pension and the
balance of arrears of pay along with 8% per
annum interest.”
33. The ratio of the judgment is squarely applicable to the
case of the petitioner inasmuch as the ACRs having been
upgraded, the case of the petitioner need to be considered
through the review DPC for promotion from the date his
immediate junior have been promoted as Commandant.
34. The petitioner has relied upon the case of the one Lala
Krishan Kumar Lal to state that, on the upgrading the ACR,
the review DPC was held for considering Lala Krishan
Kumar Lal case for promotion to the next higher post,
retrospectively. The justification given by the respondents is
that the ACR of Lala Krishan Kumar Lal was of the year
2008-2009, whereas the ACRs of the petitioner were of the
years 2005-2006 and 2007-2008 and there is no provision
for communication of ACRs of the period prior to 2008-2009.
But this stand of the respondents is overlooking the fact
that, when the DPC was held on March 15, 2010, the
judgment of Dev Dutt (Supra) was already holding the field.
The respondents were required to communicate the below
benchmark ACRs to the petitioner to enable him to submit a
representation and if the gradings are upgraded, then to
hold review DPC. So, in that sense, they cannot rely upon
the OM dated April 13, 2010 to state that DPCs after April
13, 2010 would consider the below benchmark ACRs, which
have been later upgraded on the representation made by a
government employee. It is to state that, Lala Krishan
Kumar Lal being junior to the petitioner got the benefit of the
OM dated April 10, 2013 and also promoted as
Commandant whereas the petitioner whose ACRs were of
the year 2005-2006 and 2007-2008 and not 2008-2009, was
denied the benefit though his ACRs were upgraded, which
according to us is discriminatory, as such violative of Article
14 of the Constitution.
35. We may also state here that the respondents have also
taken a stand that the petitioner was found unfit because of
DG's displeasure. We say nothing on this stand, as it is a
fact that the grading in the ACRs having been upgraded on
a representation made by the petitioner. The effect of
upgrading of the ACRs and also the effect of the displeasure
shall be seen/considered/looked into by the review DPC.
36. Mr. Tiwari has relied upon the judgments in the case of
G.R. Meghwal (supra), Dr. Krashnendra Singh (supra) and
Mukul Kumar Misra (supra). The same have no applicability
to the issue which arose for consideration and decided by
this Court in this order.
37. In view of our above discussion, we are of the view that
the impugned order dated February 12, 2015 is liable to be
quashed. It is ordered accordingly. The case of the
petitioner shall be considered for promotion to the post of
Commandant w.e.f. the date his immediate junior was
promoted to the post of Commandant by taking into
consideration the upgraded ACRs of the period 2005-2006
and 2007-2008 and other records of the petitioner in
accordance with law. If the petitioner is found fit for
promotion, his promotion shall relate back to the date of
promotion of his immediate junior. Though the same shall
be on notional basis till the date when the petitioner was
actually promoted as a Commandant, however, the
petitioner shall be given actual and consequential benefits.
The respondent shall accordingly carry out the aforesaid
exercise within a period of eight weeks from today.
34. The principles emerging from Dev Dutt v. Union of India, (2008) 8 SCC
725 and Guriqbal Singh v. Union of India, 2024 SCC OnLine Del 2353 are
that where an ACR entry having a bearing on promotion was not
communicated to the employee and is subsequently upgraded upon
representation, such upgradation cannot be rendered ineffective merely
because the original DPC has already been held. In such circumstances,
the employee is entitled to have his case reconsidered by a Review DPC
with retrospective effect, and if, on consideration of the upgraded ACRs
and other relevant service records, he is found fit, his promotion may relate
back to the date on which his junior was promoted. However, the
subsequent upgradation of ACR by itself does not confer an automatic
right to promotion; the Review DPC is still required to undertake an
objective and comparative assessment of the candidates in accordance
with the applicable promotion rules.
35. Applying the aforesaid principles in the case at hand, convening a review
DPC seem sustainable in the eyes of law. The grievance of respondent
T.R. Kunjam was not founded upon a mere subsequent change of his ACR
at his own instance without any basis. His grievance with regard to noncommunication and incorrect grading of his ACRs had already been
brought before this Court in WPS No.3736/2018 and thereafter in WPS
No.4612/2020. Pursuant to the directions issued by this Court, the
competent authorities considered his representations and ultimately
upgraded the ACRs for the relevant period from "Very Good" to
"Excellent". Thus, the subsequent correction of the ACRs was not an
afterthought or a unilateral alteration made merely for the purpose of
securing promotion, but was the consequence of consideration of his
grievance by the competent authorities pursuant to the orders passed by
this Court.
36. Once the competent authority had corrected and upgraded the ACRs
pertaining to the period which was relevant for consideration by the DPC
dated 10.01.2018, the said corrected service record could not be rendered
meaningless merely on the ground that the original DPC had already been
convened. If such a view is accepted, an employee whose ACR was
subsequently found to have been incorrectly recorded or whose
representation against an uncommunicated ACR was accepted would
permanently lose the benefit of such correction merely because the DPC
had taken place before the correction. Such an interpretation would defeat
the very purpose of permitting representation against an ACR and the
consequential correction thereof.
37. The object of a Review DPC is precisely to cure such a situation. A Review
DPC does not constitute a fresh selection process unrelated to the original
DPC; rather, it is a mechanism to reconsider the case of an eligible
employee in the light of the corrected or subsequently available material
which ought to have been before the original DPC. The relevant date for
determining the entitlement of the employee remains the date on which the
original DPC was convened, while the service record, as validly corrected
thereafter, is required to be placed before the Review DPC for the purpose
of determining what the result of the original DPC would have been had
the corrected record been available at that time.
38. In the present case, the subsequent upgradation of the ACRs of T.R.
Kunjam had a direct bearing upon his eligibility for comparative
assessment under Rule 7(9) of the 2003 Rules. The original DPC dated
10.01.2018 had considered the five preceding years' ACRs and had
assessed respondent T.R. Kunjam on the basis of the then existing
grading of "Very Good". Subsequently, the competent authority upgraded
the relevant ACRs and thereby altered an important component of the
service record which was required to be considered by the DPC.
Therefore, the subsequent correction of the ACRs created a legitimate
occasion for reconsideration of the assessment made by the original DPC.
39. It is also relevant that respondent T.R. Kunjam had not remained silent in
respect of his ACRs. He had approached this Court at the earliest stage by
filing WPS No.3736/2018, wherein this Court directed the competent
authority to consider his representation. When part of his grievance
remained unresolved, he again approached this Court in WPS
No.4612/2020 and obtained a further direction for consideration of his
representation. The subsequent orders dated 14.05.2020 and 09.11.2021
were passed in consequence of the aforesaid proceedings. Therefore, the
subsequent correction of the ACRs cannot be treated as a belated attempt
solely intended to reopen a concluded promotion process.
40. The contention of the petitioner Suresh Singh Bhupal that the original DPC
dated 10.01.2018 had attained finality and, therefore, could not be
reopened merely because the ACRs of another candidate were
subsequently upgraded, cannot be accepted in absolute terms. Finality of
a DPC cannot operate to defeat a legitimate claim arising from a
subsequent lawful correction of the very service record which was required
to be considered by the DPC. If the corrected ACR is legally required to be
taken into consideration, the only effective method of determining its
impact upon the earlier promotional exercise is to place the matter before
a Review DPC.
41. At the same time, it needs to be clarified that the Court is not holding that
every subsequent alteration in an ACR would, as a matter of course,
require reopening of every earlier DPC. The entitlement to a Review DPC
would depend upon the nature of the correction, the period to which the
ACR relates, the relevance of such ACR to the original DPC and the
manner in which the correction was brought about. The present case
stands on a different footing because the ACRs in question relate directly
to the five-year period which was considered by the original DPC, and the
correction
thereof
was
made
by
the
competent
authority
after
consideration of the employee's representations pursuant to directions
issued by this Court.
42. Therefore, the convening of the Review DPC dated 10.06.2024 cannot, by
itself, be held to be without jurisdiction or contrary to the applicable
promotion rules. On the contrary, once the ACRs of T.R. Kunjam for the
relevant period stood validly upgraded, the authorities were justified in
examining whether such corrected ACRs would have altered the result of
the DPC dated 10.01.2018. The Review DPC was thus a permissible and
appropriate procedural mechanism for determining the consequential
effect of the corrected ACRs.
43. However, the conclusion that the Review DPC was permissible does not
conclude the controversy.
44. The next and more important question is whether the Review DPC, after
taking the upgraded ACRs of T.R. Kunjam into consideration, was justified
in passing an order of the nature of the impugned order dated 25.06.2024,
whereby T.R. Kunjam was retrospectively promoted to the post of
Superintending Engineer with effect from 15.01.2018 and, as a
consequence thereof, Suresh Singh Bhupal was retrospectively reverted
from the post of Superintending Engineer to the post of Executive
Engineer.
45. At this stage, it is necessary to bear in mind that the exercise undertaken
by the Review DPC was not merely to examine whether the upgraded
ACRs of T.R. Kunjam had brought him within the prescribed benchmark.
The requirement under Rule 7(9) of the 2003 Rules is that the
Departmental Promotion Committee shall make a "relative/comparative
assessment" of the merits of all public servants who are within the zone of
consideration and thereafter make an overall grading of their merit on the
basis of their service records. Therefore, the Review DPC was required to
reconsider the comparative merit of all the candidates who were within the
zone of consideration on the date of the original DPC, particularly Suresh
Singh Bhupal, T.R. Kunjam and N.K. Lal, on the basis of the service record
as it stood after lawful correction of the ACRs.
46. The expression "merit-cum-seniority" occurring in Rule 7 cannot be read to
mean "seniority-cum-merit". The rule requires the DPC first to assess
comparative merit and only where the candidates are found to be
substantially or approximately equal in merit does seniority assume
significance. This position is also apparent from the language of Rule 7(9),
which provides that candidates having the same grading shall maintain
their inter-se seniority in the feeder cadre. Thus, seniority operates as a
determining factor only after the candidates fall within the same category
of merit.
47. In the present case, the original DPC dated 10.01.2018 had undertaken an
overall assessment of the candidates and had found Suresh Singh Bhupal
to be in the Excellent category, whereas T.R. Kunjam and N.K. Lal were
placed in the Very Good category. The only post available at that point of
time was one post of Superintending Engineer. Consequently, Suresh
Singh Bhupal was recommended and was thereafter promoted vide order
dated 15.01.2018.
48. Subsequent to the said DPC, the ACRs of T.R. Kunjam for the relevant
period were upgraded from Very Good to Excellent by the competent
authority. In view of the aforesaid subsequent development, the Review
DPC was undoubtedly entitled to reconsider the case of T.R. Kunjam.
However, it was equally incumbent upon the Review DPC to reconsider
the comparative merit of T.R. Kunjam vis-à-vis Suresh Singh Bhupal on
the basis of the entire service record and not merely on the basis that both
candidates had ultimately acquired the grading of Excellent.
49. The material placed before this Court indicates that the Review DPC dated
10.06.2024 did not proceed on the footing that the mere upgradation of the
ACRs of T.R. Kunjam automatically conferred upon him a right to
promotion. The Review DPC considered the service records and found
that after taking the corrected ACRs into account, T.R. Kunjam was
entitled to be recommended against the solitary vacancy of Superintending
Engineer.
50. The aforesaid approach is consistent with the statutory scheme. Once the
upgraded ACRs are treated as part of the valid service record of T.R.
Kunjam for the relevant period, they cannot be ignored while undertaking
the exercise contemplated by Rule 7. At the same time, the upgraded
ACRs do not, by themselves, operate as an automatic order of promotion.
The DPC continues to retain the duty to undertake comparative
assessment of the candidates. The distinction is important because an
employee's entitlement is to fair consideration by the DPC and not to
automatic promotion merely because an ACR has subsequently been
upgraded.
51. In the present case, this Court finds that the Review DPC was convened
for precisely the aforesaid limited purpose. The original DPC had
considered T.R. Kunjam, but his relevant ACRs were subsequently
corrected pursuant to proceedings initiated by him before this Court. The
Review DPC therefore had jurisdiction to examine what the result of the
original DPC would have been if the corrected ACRs had been available to
it on 10.01.2018.
52. The contention of Suresh Singh Bhupal that the Review DPC could not
have been convened after a lapse of several years, therefore, cannot be
accepted. Delay by itself cannot defeat a right which arises as a
consequence of lawful correction of an ACR, particularly when the
employee concerned had already approached this Court in the year 2018
and thereafter again in the year 2020 and the correction of the ACRs was
ultimately made pursuant to the orders passed by this Court.
53. However, the rights of Suresh Singh Bhupal also cannot be ignored merely
because the Review DPC was otherwise permissible. The original
promotion granted to him on 15.01.2018 was not obtained by fraud,
misrepresentation or suppression of facts. On the date of the original DPC,
he was considered eligible, his service record was taken into consideration
and he was found fit for promotion against the only available vacancy. His
promotion was consequently not an illegal or void appointment.
54. The subsequent review of the DPC has arisen only because the service
record of another candidate, namely T.R. Kunjam, was subsequently
corrected. Therefore, the consequences flowing from the Review DPC
have to be worked out carefully so that the legitimate benefit accruing to
T.R. Kunjam is protected without treating Suresh Singh Bhupal as if he
had obtained his original promotion by any wrongful act.
55. It is well settled that retrospective promotion pursuant to a Review DPC is
ordinarily intended to place the employee in the position in which he would
have been had the error or omission in the original consideration not
occurred. Such retrospective consideration, however, does not necessarily
mean that every consequence flowing from the subsequent review has to
be imposed upon an officer who had earlier been validly promoted and had
discharged duties on the promotional post.
56. The distinction between retrospective promotion and retrospective
reversion is therefore required to be maintained. T.R. Kunjam may be
entitled to consideration for promotion from the date on which he would
have been promoted had his corrected ACRs been before the original
DPC. But the consequential effect upon Suresh Singh Bhupal has to be
determined in accordance with law, keeping in view the fact that his
original promotion was bona fide and was based upon a valid
recommendation of the DPC existing at that point of time.
57. The respondents have contended that since there was only one post
available, both T.R. Kunjam and Suresh Singh Bhupal could not have
been promoted against the same vacancy. There can be no quarrel with
the proposition that one post cannot be occupied by two officers. However,
this fact by itself does not answer the question as to how the consequential
rights of the officer who had actually occupied the post for several years
are to be protected while implementing the result of the Review DPC.
58. The Review DPC was required to determine the position which would have
prevailed on 10.01.2018 after taking into consideration the corrected
ACRs. If, on such comparative assessment, T.R. Kunjam was found
entitled to the solitary post, the State was competent to grant him
retrospective/notional promotion from the date from which his immediate
junior or the officer who had obtained promotion against the relevant
vacancy had been promoted. However, such exercise could not
automatically justify treating the entire service rendered by Suresh Singh
Bhupal on the promotional post for the intervening period as though it had
never existed.
59. It is also significant that Suresh Singh Bhupal had actually discharged the
duties of Superintending Engineer for a considerable period. His promotion
was not pursuant to any interim order or provisional arrangement and
there is no allegation that he had obtained the promotion by practising
fraud or misrepresentation. Therefore, while the seniority position may
have to be reworked pursuant to the Review DPC, the monetary and
service consequences of the retrospective exercise must be regulated so
as to avoid an inequitable result.
60. The order dated 25.06.2024, however, proceeds on the basis that once
T.R. Kunjam was granted retrospective promotion from 15.01.2018,
Suresh Singh Bhupal was required to be retrospectively demoted from the
same date. The order does not demonstrate adequate consideration of the
independent service consequences flowing from such retrospective
demotion, nor does it disclose any reason as to why the period during
which Suresh Singh Bhupal actually worked as Superintending Engineer
should be treated as service rendered on the lower post for all purposes
other than recovery of salary.
61. The principle of "No Work No Pay" cannot, by itself, furnish an answer to
the issue. "No Work No Pay" is ordinarily attracted where an employee
claims monetary benefits for a period during which he did not actually
discharge duties. In the present case, Suresh Singh Bhupal did in fact
discharge duties on the post of Superintending Engineer during the
relevant period pursuant to a valid order of promotion. Therefore, the mere
invocation of the expression "No Work No Pay" cannot retrospectively
erase the service actually rendered by him on the promotional post.
62. At the same time, T.R. Kunjam cannot be denied the benefit of
retrospective consideration merely because Suresh Singh Bhupal has
worked on the post. The appropriate course is therefore to give effect to
the result of the Review DPC for the purpose of determining the correct
date of promotion, seniority and consequential service position of T.R.
Kunjam, while protecting Suresh Singh Bhupal against recovery or punitive
financial consequences for the period during which he actually worked on
the promotional post pursuant to a lawful order Accordingly, the period
from 15.01.2018 to 25.06.2024, during which Suresh Singh Bhupal
rendered services on the promotional post, shall be duly recognized and
reflected in all service-related records by creating a supernumerary post of
Superintending Engineer for the said period.
63. This approach would also be consistent with the principle that an
employee should not suffer for an administrative mistake or for a
subsequent correction of the service record of another employee when the
employee himself was not responsible for the situation. The benefit flowing
from the Review DPC and the protection against unjust consequences to
the already promoted officer can operate simultaneously.
64. Having perused the material placed before this Court, this Court is of the
considered opinion that there is no sufficient basis to hold that the very
convening of the Review DPC was without jurisdiction. The challenge to
the Review DPC on that limited ground therefore fails. The subsequent
upgradation of the ACRs of T.R. Kunjam, being pursuant to consideration
of his representations and the orders passed by this Court, furnished a
valid basis for reconsideration.
65. However, the consequential order dated 25.06.2024 requires interference
to the limited extent that it retrospectively reverts Suresh Singh Bhupal
from the post of Superintending Engineer to Executive Engineer with effect
from 15.01.2018 without adequately safeguarding the service and
monetary consequences arising from the fact that he had actually
discharged duties on the higher post pursuant to a valid promotion order.
66. It is made clear that this Court is not holding that Suresh Singh Bhupal has
an indefeasible right to retain the promotional post contrary to the result of
the Review DPC. Once the Review DPC, upon lawful reconsideration, has
found T.R. Kunjam entitled to promotion against the vacancy relatable to
the DPC dated 10.01.2018, the consequential correction of inter-se
seniority and promotional position is permissible. What is impermissible is
to visit Suresh Singh Bhupal with consequences in the nature of
punishment for an act for which he was not responsible.
67. Now, this Court would accordingly dispose of the reliefs claimed in each of
the writ petitions in the facts and circumstances of the case in consonance
with above findings.
68. WPS No.3640 of 2024 has been filed by Suresh Singh Bhupal seeking
following reliefs:-
10.1 That, this Hon'ble Court may kindly be pleased to call
for the complete records with respect to the passing of the
impugned order.
10.2 That this Hon'ble Court may kindly be pleased to issue
a writ of 'MANDAMUS' and may kindly be pleased to quash
the order dated 25.06.2024 (Annexure P-1).
10.3 That any other relief, which this Hon'ble Court may
deem fit and proper together with cost of the petition.
69. In view of the findings recorded hereinabove, the challenge to the very
basis of the Review DPC cannot be accepted. The Review DPC was
competent to reconsider the matter after the ACRs of T.R. Kunjam had
been lawfully upgraded. The mere lapse of time did not render such
exercise without jurisdiction. So far as merit in respect of Excellent grading
awarded to TR Kunjam by the authority is concerned, it is found that upon
due evaluation the grading of the ACR was corrected, as such, the
contention that the grading was corrected without applying correct
evaluation can’t be accepted. The contention that reporting, receiving and
accepting authority have given different grading without assigning reasons
can’t be accepted at this stage as the grading of ACR of TR Kunjam is not
specifically challenged. Further, the court cannot enter into meticulous
examination of the grading assigned by the authorities as held in in the
matter of Dev Dutt (supra). Moreover, while exercising writ jurisdiction, the
Court does not convert judicial review into an appellate exercise involving
a comparative assessment of merits. Interference is warranted where the
decision-making process is vitiated by mala fides, manifest arbitrariness,
non-application of mind, breach of governing norms, or denial of fair
procedure. This judicial discipline, consistently affirmed by the Hon’ble
Supreme Court, requires that, although the merits of an evaluation
ordinarily remain beyond the scope of judicial review, the recording and
communication of an appraisal must nevertheless conform to the minimum
standards of transparency, fairness, and procedural propriety.
70. At the same time, the consequential effect of the Review DPC upon
Suresh Singh Bhupal cannot be permitted to operate in a manner which
ignores the fact that the Suresh Singh Bhupal was promoted pursuant to
the recommendation of the original DPC dated 10.01.2018 and had
actually discharged the duties of Superintending Engineer for several
years. There is neither any allegation nor any finding of fraud,
misrepresentation or suppression on the part of Suresh Singh Bhupal.
71. Accordingly, WPS No.3640 of 2024 deserves to be partly allowed. The
order dated 25.06.2024 is upheld to the extent it gives effect to the
recommendation of the Review DPC in favour of T.R. Kunjam and
determines his entitlement to retrospective/notional promotion and
consequential seniority in accordance with law. However, the said order by
which Suresh Singh Bhupal was demoted to the post of Executive
Engineer, shall stand modified to the extent it retrospectively treats the
promotion of Suresh Singh Bhupal as if it had never existed and thereby
visits him with adverse service or monetary consequences for the period
during which he actually discharged duties as Superintending Engineer.
The period from 15.01.2018 to 25.06.2024 during which Suresh Singh
Bhupal actually discharged duties on the post of Superintending Engineer
pursuant to the valid promotion order dated 15.01.2018 shall be duly
recognized in his service record. The respondents shall, for this purpose,
create a supernumerary post of Superintending Engineer for the aforesaid
intervening
period,
without
prejudice
to
the
retrospective/notional
promotion and consequential seniority of T.R. Kunjam. It is further directed
that no recovery of salary or other monetary benefits already received by
Suresh Singh Bhupal for the period during which he actually worked on the
post of Superintending Engineer shall be effected merely on account of the
subsequent review of the DPC.
72. It is, however, made clear that such protection shall not confer upon
Suresh Singh Bhupal an indefeasible right to retain the substantive
promotional position contrary to the result of the Review DPC. The inter-se
seniority and substantive promotional position shall be regulated in
accordance with the result of the Review DPC and the observations made
in this judgment.
73. WPS No.3145 of 2024 has been filed by Suresh Singh Bhupal seeking
following reliefs:-
10.1 That, this Hon'ble Court may kindly be pleased to call
for the complete records with respect to the matter.
10.2 That this Hon'ble Court may kindly be pleased to issue
a writ of 'MANDAMUS' and may kindly be pleased to quash
the order dated further & 07.06.2024 and the entire further
proceeding of the meeting dated 10.06.2024 (Annexure P1).
and/or
That this Hon'ble Court may kindly be pleased to issue a
writ of MANDAMUS directing the respondent not to pass
any order adversely affecting the promotion and seniority of
the petitioner on the post of Superintending Engineer as
consequence
of
outcome
of
review
D.P.C.
dated
10.06.2024.
10.3 That this Hon'ble Court may kindly be pleased to
restrain the respondent department to interfere with the
seniority of the petitioner.
10.4 That any other relief, which this Hon'ble Court may
deem fit and proper together with cost of the petition.
74. WPS No.3145 of 2024 has been filed by Suresh Singh Bhupal challenging
the order dated 07.06.2024 and the proceedings of the Review DPC dated
10.06.2024 and seeking a direction restraining the respondents from
passing any order adversely affecting his promotion and seniority as a
consequence of the Review DPC.
75. In view of the findings recorded hereinabove, the prayer for quashing the
Review DPC proceedings cannot be accepted. The Review DPC was
convened on a valid basis, namely, the subsequent lawful correction and
upgradation of the ACRs of T.R. Kunjam. The Review DPC was therefore
not without jurisdiction.
76. Suresh Singh Bhupal was undoubtedly entitled to protection against
unjust and punitive consequences arising merely because he had acted
upon a valid promotion order. Such protection, however, does not extend
to nullifying the lawful exercise of comparative assessment undertaken by
the Review DPC.
77. Consequently, the prayer for quashing the order dated 07.06.2024 and the
entire proceedings of the Review DPC dated 10.06.2024 is rejected. The
prayer for restraining the respondents from giving effect to the result of the
Review DPC is also rejected, subject to the safeguards granted to Suresh
Singh Bhupal in WPS No.3640 of 2024 and recorded hereinabove. WPS
No.3145 of 2024 is accordingly disposed of with the aforesaid clarification
and protection.
78. WPS No.3757 of 2023 has been filed by Suresh Singh Bhupal seeking
following reliefs:-
10.1 That, this Hon'ble Court may kindly be pleased to call
for the complete records with respect to the matter.
10.2 That this Hon'ble Court may kindly be pleased the
quash the order dated 09.11.2021 Annexure P-1.
and / or
10.3 That this Hon'ble Court may kindly be pleased to
uphold the DPC dated 10.01.2018 direct the respondents to
maintain the seniority of the petitioner as per the DPC
dated 10.01.2018.
10.4 This Hon'ble Court may kindly be pleased to hold that
the action of the respondents in initiatiating and proceeding
to reviewing the DPC dated 10.01.2018 with respect to
Respondent No.3 and giving him benefit with retrospective
effect is bad in law and illegal.
10.5 This Hon'ble Court may kindly be pleased to direct the
Respondent /State, not to conduct any Review DPC at the
request of the Respondent No.3 for reviewing the DPC
dated 10.01.2018.
10.6 That any other relief, which this Hon'ble Court may
deem fit and proper together with cost of the petition.
79. In WPS No.3757 of 2023, Suresh Singh Bhupal has challenged the order
dated 09.11.2021 and has sought, inter alia, maintenance of the DPC
dated 10.01.2018, protection of his seniority, a declaration that the
decision to review the said DPC at the instance of T.R. Kunjam is illegal,
and a direction restraining the respondents from conducting any Review
DPC.
80. The principal question raised in this petition has already been considered
in detail. The subsequent upgradation of the ACRs of T.R. Kunjam
constituted a legitimate basis for reconsideration of the earlier DPC. The
Review DPC was not convened merely because T.R. Kunjam desired a
second opportunity for promotion; rather, the reconsideration arose from
correction of the very service record which had formed part of the basis of
his original consideration. Once the competent authority had lawfully
corrected the relevant ACRs pursuant to the proceedings initiated by T.R.
Kunjam, it was necessary to examine the effect of such correction upon
the original comparative assessment. Denial of such reconsideration would
itself have resulted in an inequitable situation whereby the corrected
service record would remain without effect for the very promotional
exercise in respect of which the correction had been made.
81. The prayer for maintaining the DPC dated 10.01.2018 as final and for
restraining the respondents from conducting a Review DPC therefore
cannot be granted.
82. However, the rights accrued to Suresh Singh Bhupal pursuant to the
original DPC are not being ignored. As already held, his promotion was
bona fide and was not procured by any wrongful act on his part. His actual
service on the promotional post shall therefore receive the protection
indicated hereinabove.
83. Accordingly, WPS No.3757 of 2023 is dismissed insofar as it seeks
quashing of the proceedings for convening or conducting the Review DPC
and insofar as it seeks a restraint against giving effect to the result thereof.
Suresh Singh Bhupal shall, however, be entitled to the protection in
respect of his actual service and monetary benefits as directed in WPS
No.3640 of 2024.
84. WPS No.2566 of 2025 has been filed by Suresh Singh Bhupal seeking
following reliefs:-
10.1 That, this Hon'ble Court may kindly be pleased to call
for the complete records with respect to the passing of the
impugned order.
10.2 That this Hon'ble Court may kindly be pleased to quash
the order dated 18/10/2024 by which the petitioner has been
given promotion on the post of Superintending Engineer
with effect from 21/12/2020 (ANNEXURE P/1).
10.3 That, this Hon'ble Court may kindly be pleased to direct
the respondents to given seniority to the petitioner on the
post of Superintending Engineer pursuant to the earlier
order dated 15/01/2018.
10.4 Any other relief(s)/ order(s)/ direction(s) in favour of
petitioner. which this Hon'ble Court may deem fit and proper
in the facts and circumstances of the case, in the interest of
justice.
85. WPS No.2566 of 2025 has been filed by Suresh Singh Bhupal challenging
the promotion order dated 18.10.2024 and seeking a direction for grant of
seniority on the post of Superintending Engineer pursuant to the earlier
order dated 15.01.2018.
86. The challenge made in this petition has to be examined in the light of the
Review DPC and the subsequent orders passed pursuant thereto. Once
the Review DPC has validly reconsidered the comparative merit of the
candidates and has found T.R. Kunjam entitled to retrospective/notional
promotion against the vacancy relatable to the DPC dated 10.01.2018,
Suresh Singh Bhupal cannot claim, as an absolute right, substantive
seniority over T.R. Kunjam merely on the basis of the original promotion
order.
87. At the same time, Suresh Singh Bhupal is entitled to have the period
during which he actually discharged duties as Superintending Engineer
protected and duly reflected in the service records. Such protection is
distinct from the question of substantive seniority and shall not be
construed as conferring upon him a right to defeat the result of the Review
DPC.
88. Accordingly, the prayer seeking restoration of the seniority of Suresh Singh
Bhupal in a manner contrary to the result of the Review DPC cannot be
granted. The promotion order dated 18.10.2024 shall operate subject to
the findings and directions contained in this judgment and shall not result
in recovery of any monetary benefits already received by Suresh Singh
Bhupal for the period during which he actually discharged duties on the
promotional post.
89. WPS No.2566 of 2025 is accordingly disposed of in the aforesaid terms.
The respondents shall suitably correct the service records while
maintaining the protection granted to Suresh Singh Bhupal for the actual
service rendered by him.
90. WPS No.1721 of 2025 has been filed by NK Lal seeking following reliefs:-
I. That, this Hon'ble Court may kindly be pleased to issue
appropriate writ (s) /order(s)/ direction(s) and quash the
impugned promotion order dated 18.10.2024 (ANNEXUREP/2) of respondent no. 4, and the Further quash the
promotion order dated 26.11.2024 (Annexure-P/1) of the
respondent No.5, by declaring the both promotion orders
are bad in law.
II. That, the Hon'ble High Court may kindly be pleased to
direct the respondent No.1 to convened the meeting of the
review D.P.C. for firstly considering the claim of the
petitioner for promotion to the next higher post from its due
date strictly in according with law, and thereafter the state
authority may consider the case of the private respondents.
III.
The
Hon'ble
court
may
be
pleased
to
issue
writ'/writs/order/orders/direction/directions/relief/relief's,
which this Hon'ble Court may think fit and proper in the facts
and circumstances of the case.
91. Grievance of NK Lal so far as it relates to order dated 18.10.2024 is similar
with that of Suresh Singh Bhupal who was demoted from Superintending
Engineer to Executive Engineer in view of the review DPC and final order
thereof dated 25.06.2024. By order dated 18.10.2024, it appears that vide
DPC dated 07.12.2020, NK lal was promoted from Executive Engineer to
Superintending Engineer and after review DPC of DPC dated 07.12.2020
which was held on 16.08.2024, the authorities promoted Suresh Singh
Bhupal from the post of Executive Engineer to Superintending Engineer
from 21.12.2020 and demoted NK Lal from the post of Superintending
Engineer to Executive Engineer and for the period i.e. 21.12.2020 (NK Lal
was promoted to SE from EE on this date) till 18.10.2024, no recovery was
ordered from him.
92. The order dated 18.10.2024 is upheld to the extent it gives effect to the
recommendation of the Review DPC in favour of Suresh Singh Bhupal and
determines his entitlement to retrospective/notional promotion and
consequential seniority in accordance with law. However, the said order
shall stand modified to the extent it retrospectively treats the promotion of
NK lal as if it had never existed and thereby visits him with adverse service
consequences for the period during which he actually discharged duties as
Superintending Engineer. The period from 21.12.2020 to 18.10.2024
during which NK Lal actually discharged duties on the post of
Superintending Engineer pursuant to the valid promotion order dated
21.12.2020 shall be duly recognized in his service record. The
respondents shall, for this purpose, create a supernumerary post of
Superintending Engineer for the aforesaid intervening period, without
prejudice to the retrospective/notional promotion and consequential
seniority of Suresh Singh Bhupal. It is further directed that no recovery of
salary or other monetary benefits already received by NK Lal for the period
during which he actually worked on the post of Superintending Engineer
shall be effected merely on account of the subsequent review of the DPC.
93. It is, however, made clear that such protection shall not confer upon NK
Lal an indefeasible right to retain the substantive promotional position
contrary to the result of the Review DPC. The inter-se seniority and
substantive promotional position shall be regulated in accordance with the
result of the Review DPC and the observations made in this judgment.
94. The prayer for directing the respondents to first convene another Review
DPC exclusively for considering the claim of N.K. Lal before considering
the cases of the other candidates also cannot be granted. Such a direction
would amount to directing a fresh promotional exercise without any
established legal basis and would interfere with the comparative
assessment undertaken in accordance with the statutory scheme.
95. Accordingly, WPS No.1721 of 2025 is disposed of with aforesaid
protection in favour of NK Lal.
96. WPS No.3184 of 2024 has been filed by NK Lal seeking following reliefs:-
I. That, this Hon'ble Court may kindly be pleased to issue
appropriate writ (s) /order(s)/ direction(s) and quash the
letter dated 20.10.2022 (Annexure-P/9) and further quash
the entire proceeding of the DPC dated 10.01.2018 by
which the respondent authority allowed the private
respondent to superseded the petitioner and promoted then
as Superintend Engineer.
II. That, the Hon'ble High Court may kindly be pleased to
issue the appropriate writ and hold the adverse remark
made by the then principal secretary in the ACR of 2009 &
2010 are bad in the eyes of law and further direct the
respondent authority to considered the case of the petitioner
for promotion on the post of Superintendent Engineer w.e.f.
10.01.2011 along with all the consequential benefits.
III. That, the Hon'ble High Court may kindly be please also
direct the respondent no.1 to place the petitioner at S. No. 1
in the seniority of the Superintendent Engineer and given all
the consequential benefit to the petitioner strictly in
accordance with law.
IV. The Hon'ble court may be pleased to issue writ/writs /
order / orders/direction/directions/ relief/relief's, which this
Hon'ble Court may think fit and proper in the facts and
circumstances of the case.
97. WPS No.3184 of 2024 has been filed by N.K. Lal seeking quashing of the
letter dated 20.10.2022 and the proceedings of the DPC dated 10.01.2018,
as also a declaration that the adverse remarks made by the then Principal
Secretary in his ACRs for the years 2009 and 2010 were illegal, with a
consequential direction for consideration of his promotion from 10.01.2011
and fixation of his seniority accordingly.
98. NK Lal seeks, in substance, to reopen the original promotional assessment
and to secure retrospective promotion on the basis of the alleged invalidity
of the adverse remarks in his ACRs. The principle governing promotion
under Rule 7 of the 2003 Rules requires an assessment of comparative
merit on the basis of the service record available for consideration. A
candidate cannot claim promotion merely on the ground of seniority when
the applicable rule requires assessment of comparative merit.
99. In the present case, the original DPC dated 10.01.2018 had considered
the service records of the candidates falling within the zone of
consideration and had graded Suresh Singh Bhupal as Excellent and N.K.
Lal as Very Good. The subsequent Review DPC was occasioned by the
specific and lawful correction of the ACRs of T.R. Kunjam. The said
exercise does not, by itself, establish any illegality in the assessment of
N.K. Lal or confer upon him a right to reopen the entire DPC.
100.The
prayer
for
retrospective
promotion
from
10.01.2011
and
consequential fixation of seniority cannot, therefore, be granted in the
present proceedings merely on the basis of the challenge to the original
DPC. The petitioner has not demonstrated any legal basis on which the
result of the original DPC can be substituted by a direction of this Court
granting him retrospective promotion from the claimed date.
101. So far as the challenge to the adverse remarks in the ACRs for the years
2009 and 2010 is concerned, the same also cannot result in an automatic
direction for promotion. Even assuming that the service record requires
correction in accordance with law, the consequence thereof would
ordinarily be reconsideration by the competent authority/DPC and not a
judicial direction granting promotion as a matter of course.
102.Accordingly, WPS No.3184 of 2024 is disposed of, subject, however, to
the observation that if the petitioner has any surviving statutory remedy
against the adverse entries in his ACRs, or if any competent authority is
otherwise required by law to reconsider the same, such remedy shall
remain unaffected by this judgment.
103.With the aforesaid observations/directions, all the writ petitions are
disposed of.
Sd/(Amitendra Kishore Prasad)
Judge
Avinash
The date when the
The date when the
The date when the judgment is
judgment is reserved
judgment is
uploaded on the website
pronounced
13.07.2026
13.08.2026
Operative
Full
------
14.08.2026
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review