IN THE HIGH COURT OF MANIPUR
AT IMPHAL
W.A. No. 47 of 2020
1. The State of Manipur, represented by the Chief Secretary,
Government of Manipur, Secretariat, Babupara, P.O. & P.S.
Imphal, Imphal West District, Manipur - 795001.
2. The Commissioner (Power), Government of Manipur, Secretariat,
Babupara, P.O. & P.S. Imphal, Imphal West District,
Manipur - 795001.
3. The Manipur State Power Distribution Company Limited
(MSPDCL), represented by Managing Director, Near 2nd MR,
North A.O.C., Imphal, P.O. Lamlong & P.S. Imphal, Imphal East
District, Manipur - 795001.
Appellants
-Versus1. Baby Khushi Kumari (minor), aged about 6 years, resident of
Senduari Gaj Singh, Muzaffarpur, Bihar – 843111, presently
residing at House No. 3, 2nd Floor Chingmeirong, Khongnang
Anikarak, Dingku Road, Near Classic Grande Hotel, P.S.
Lamphel, P.O. Imphal, Imphal East District, Manipur – 795001.
2. Shri Mukesh Mahto, aged about 30 years, S/o Vilash Mahto,
resident of Senduari Gaj Singh, Muzaffarpur, Bihar – 843111,
presently residing at House No. 3, 2nd Floor Chingmeirong,
Khongnang Anikarak, Dingku Road, Near Classic Grande Hotel,
P.S.
Lamphel,
P.O.
Imphal,
Imphal
East
District,
Manipur – 795001.
Respondent No. 1, being a minor, represented by the natural
father (respondent No. 2).
…Respondents
With
MC (W.A.) No. 59 of 2020
1. The State of Manipur, represented by the Chief Secretary,
Government of Manipur, Secretariat, Babupara, P.O. & P.S.
Imphal, Imphal West District, Manipur - 795001.
2. The Commissioner (Power), Government of Manipur, Secretariat,
Babupara,
P.O.
&
P.S.
Imphal,
Imphal
West
District,
Manipur - 795001.
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 1
3. The
Manipur
State
Power
Distribution
Company
Limited
(MSPDCL), represented by Managing Director, Near 2nd MR,
North A.O.C., Imphal, P.O. Lamlong & P.S. Imphal, Imphal East
District, Manipur - 795001.
Applicants
-Versus1. Baby Khushi Kumari (minor), aged about 6 years, resident of
Senduari Gaj Singh, Muzaffarpur, Bihar – 843111, presently
residing at House No. 3, 2nd Floor Chingmeirong, Khongnang
Anikarak, Dingku Road, Near Classic Grande Hotel, P.S.
Lamphel, P.O. Imphal, Imphal East District, Manipur – 795001.
2. Shri Mukhesh Mahto, aged about 30 years, S/o Vilash Mahto,
resident of Senduari Gaj Singh, Muzaffarpur, Bihar – 843111,
presently residing at House No. 3, 2nd Floor Chingmeirong,
Khongnang Anikarak, Dingku Road, Near Classic Grande Hotel,
P.S. Lamphel, P.O. Imphal, Imphal East District, Manipur –
795001.
Respondent No. 1, being a minor, represented by the natural
father (respondent No. 2).
…Respondents
BEFORE
HON’BLE THE CHIEF JUSTICE MR. SANJAY KUMAR
HON’BLE MR. JUSTICE MV MURALIDARAN
For the appellants/applicants
: Mr. S. Nepolean, Government Advocate
For the respondents
: Mr. Tungrei Ngakang, Advocate
Judgment reserved on
: 11.10.2022
Judgment pronounced on
: 03.11.2022
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 2
JUDGMENT & ORDER (CAV)
Sanjay Kumar (C.J.):
[1]
The State of Manipur; the Commissioner (Power), Government of
Manipur; and the Manipur State Power Distribution Company Limited (MSPDCL)
are in appeal against the judgment and order dated 19.03.2020 passed by a
learned Judge of this Court in W.P. (C) No. 167 of 2019. They also filed
MC (W.A.) No. 59 of 2020 seeking stay of operation of the said order, pending
disposal of this appeal. By the order under appeal, the learned Judge allowed the
writ petition and directed the appellants to pay compensation of ₹.10,00,000/- to
the writ petitioners within 60 days, after deducting the amount, if any, already
paid to them. In the event the amount was not paid within that time frame,
interest was to accrue thereon @ 6% per annum and the amount of
₹. 10,00,000/- along with interest was to be paid within 60 days from the date of
expiry of the earlier period of 60 days. The learned Judge also left it open to the
petitioners to seek more compensation by approaching the concerned Civil Court.
By interim order dated 11.12.2020, this Court granted stay of the
order under appeal, subject to deposit of a sum of ₹.5,00,000/- by the appellants
with the Registry of this Court. The appellants deposited the said amount under
SBI Cheque dated 06.01.2021. Earlier, pursuant to the interim order dated
13.03.2019 passed in the writ petition, a sum of ₹.50,000/- was paid by the
appellants to the writ petitioners.
[2]
Heard Mr. S. Nepolean, learned Government Advocate, appearing
for the appellants/applicants; and Mr. Tungrei Ngakang, learned counsel,
appearing for the respondents/writ petitioners.
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 3
[3]
On 17.12.2017, petitioner No. 1, a child aged about 5 years, was
playing in the verandah of the first floor of the building, where she and her family
were staying on rent, and she came in contact with a 11 KV electrical overhead
line which passed adjacent to the building. In consequence, she sustained serious
injuries resulting in amputation of both her arms at the shoulder level. Her
disability was quantified as 90%.
[4]
Entreaties for compensation by petitioner No. 2, her father, fell on
deaf ears, leading to institution of the writ petition. His claim therein was that
artificial limbs for the child would cost about ₹.7,00,000/- and that apart, the
child’s future was severely impacted by the loss of her limbs. The prayer for
compensation of ₹.1,62,97,800/- was founded on the violation of the child’s
fundamental rights under Articles 14, 21 and 300 of the Constitution apart from
an action in tort on the principles of res ipsa loquitur, strict liability and restitutio
in integrum. The assertion of the child’s father was that the authorities concerned
failed to abide by the statutory norms in relation to installation and maintenance
of the overhead line, which resulted in his young daughter being maimed for life.
[5]
The stand of the Commissioner (Power), Government of Manipur,
who was the only respondent who filed a reply in the writ petition, was that no
negligence was attributable to the MSPDCL. According to the Under Secretary
(Power), Government of Manipur, who deposed on his behalf, the child suffered
electrocution owing to construction of a staircase very near to the overhead line.
She pointed out that the building in question was constructed in the year 2009
without a staircase and the distance at that time from the 11KV line was about
1.9 metres, which was permissible as the minimum horizontal clearance required
under the rules was only 1.2 metres. According to her, the staircase was
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 4
constructed in the year 2014 without obtaining necessary permission and without
notice to the electricity authorities and thereby, the distance from the 11 KV line
to the staircase was reduced to just about 1.5 feet. She placed reliance on Rule
82 of the Indian Electricity Rules, 1956 (for brevity, ‘the Rules of 1956’), and
asserted that no liability could be attached to the MSPDCL. According to her, the
authorities were abiding by all the measures prescribed under law and, therefore,
they could not be mulcted with liability to pay compensation to the petitioners.
[6]
Mr. S. Nepolean, learned Government Advocate, would reiterate
that the clear violation of Rule 82 of the Rules of 1956 would divest the MSPDCL
of any responsibility for the accident and, therefore, the learned Judge was not
justified and correct in directing payment of compensation to the writ petitioners.
[7]
Before considering the issue on merits, it would be appropriate to
take note of the statutory scheme relating to the responsibility of the authorities
under the electricity laws. Section 2(20) of the Electricity Act, 2003 (for brevity,
‘the Act of 2003’) defines ‘electric line’ to mean any line which is used for carrying
electricity for any purpose. Section 2(48) of the Act of 2003 defines ‘overhead
line’ to mean an electric line which is placed above the ground and in the open
air, but does not include live rails of a traction system. Section 53 of the Act of
2003 makes provision for the Central Electrical Authority, in consultation with the
State Government, to specify suitable measures for protecting the public from
dangers arising from generation, transmission or distribution of electricity, or use
of electricity supplied, or installation, maintenance or use of any electric plant.
Section 162 of the Act of 2003 empowers the appropriate Government to appoint
qualified persons to be Electrical Inspectors who would be required to exercise
such powers and perform such functions as may be prescribed in respect of such
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 5
class of works and electric installations and subject to such restrictions as the
appropriate Government may direct. Section 185 of the Act of 2003 is titled
‘Repeal and Saving’ and provides that the Indian Electricity Rules, 1956, made
under Section 37 of the repealed Indian Electricity Act, 1910, shall continue to be
in force till Regulations are made under Section 53 of the Act of 2003. As no such
Regulations have been made till date, the Rules of 1956 still continue to operate.
Rule 2(y) of the Rules of 1956 defines ‘installation’ to mean any composite
electrical unit used for the purpose of generating, transforming, transmitting,
converting, distributing or utilizing energy. Rule 2(ai) of the Rule of 1956 defines
‘overhead line’ to mean any electric supply line which is placed above the ground
and in the open air. Significantly, an entire chapter in the Rule of 1956, viz,
Chapter IV, is devoted to ‘General Safety Requirements’. Rule 29(1) in Chapter IV
provides that all electric supply lines shall be of sufficient insulation and shall be
constructed, installed, protected, worked and maintained in such a manner as to
ensure safety of human beings, animals and property. Rule 46 in Chapter IV deals
with ‘periodical inspection and testing of installation’ and Rule 46(1)(a) provides
that where an installation is already connected to the supply system, every such
installation shall be periodically inspected and tested at intervals not exceeding
five years, either by the Electrical Inspector or any officer appointed to assist the
Inspector or by the suppliers as may be directed by the Government concerned.
Rule 46(1)(c) provides that the forms of inspection report contained in Annexure
(IX A), subject to the approval of the Inspector, may be used for the purposes of
this sub-rule. Rule 46(2)(c) states that in the event of failure of the owner of an
installation to rectify the defects in the installation pointed out by the Inspector
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 6
within time, such installation would be liable to be disconnected under the
directions of the Electrical Inspector as per due procedure.
[8]
Perusal of the photographs placed on record reflects that the
overhead line in question passes very close to the staircase of the building where
the incident occurred. The building is situated on a busy thoroughfare, as is
evident from the photographs. Had periodical inspections been undertaken as
mandated by Rule 46 of the Rules of 1956, this incident could, perhaps, have
been prevented. It may also be noted that in a congested city with narrow lanes,
such as Imphal, it is the responsibility of the MSPCL to see that proper insulation
is provided to overhead electrical lines which pass in close proximity to the living
quarters of citizens. In the case on hand, it is clear that the 11 KV line had no
protective insulation, as required under Rule 29(1) of the Rules of 1956.
[9]
Rule 79 of the Rule of 1956 prescribes the clearances to be
maintained between buildings and low/medium voltage lines. It reads to the
effect that so far as low and medium voltage lines and service lines are
concerned, the minimum horizontal clearance from any accessible point when the
line passes adjacent to a building shall be 1.2 metres from the nearest point.
Presently, it is an admitted fact that the addition of the staircase to the building in
question took place only in the year 2014 and there is no evidence of compliance
with Rule 82 of the Rules of 1956 by the owner of the building. There is, thus,
clear violation by the owner of the building, in so far as Rule 82 is concerned.
However, such violation would not be sufficient, in itself, to exempt the MSPDCL
from responsibility, as maintenance of safety standards and periodic inspection of
all installations and overhead lines is a statutory duty cast upon it under Rules 29
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 7
and 46 of the Rules of 1956. Failure of the MSPDCL to abide by its mandatory
duties would outweigh the violation by the building owner under Rule 82. The
statutory responsibility weighing upon the MSPDCL, as the distributor of electrical
energy, is far higher and sacrosanct than the narrow responsibility resting upon
an individual building owner. This is clear from the fact that Rule 140 of the Rules
of 1956 levies only the meagre penalty of fine on such errant building owner.
Further, it is not open to the MSPDCL, which undertakes supply and distribution
of hazardous electrical energy to wash its hands off statutory measures put in
place to ensure public safety and claim that individual building owners, who
violate the mandate of Rule 82, would be at fault and, consequently, absolve it of
all liability. Further, though the Under Secretary (Power), Government of Manipur,
attempted to project the weak financial condition of the MSPDCL as a reason to
absolve it of liability from paying compensation, the same needs mention only to
be rejected. As a State instrumentality, the MSPDCL cannot escape its liability for
failure to abide by statutory norms. More so, when such norms pertained to the
measures to be taken for ensuring public safety and the victim of such failure is a
young child whose future lies in ruin as a result thereof.
[10]
It may also be noted that, though Mr. S. Nepolean, learned
Government Advocate, would assert that there was no negligence on the part of
the MSPDCL, the eloquent silence of the MSPDCL, evidenced by its failure to file a
separate affidavit-in-opposition, speaks for itself. No material has been produced
by it in proof of safety standards being maintained, in accordance with Rule 29 of
the Rules of 1956, and periodical inspections having been carried out, in terms of
Rule 46 of the Rules of 1956, at any point of time. Had any such inspection been
made by the authorities concerned, it may have resulted in some safety measures
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 8
being put in place and saved this child from a lifetime of suffering. The
negligence of the MSPDCL is therefore demonstrable and it resulted in tragedy for
this little girl. In this regard, it may also be noted that a Division Bench of this
Court had occasion to deal with increasing incidents of electrocution of citizens in
PIL No. 48 of 2017. By final order dated 11.07.2018 passed therein, the Division
Bench noted that a series of orders had been passed directing the authorities to
ensure proper maintenance of electricity service lines, transformers, etc., so as to
protect the citizens and the Managing Director, MSPDCL, was directed to take
serious action in case of failure on the part of his subordinates. Had proper action
been taken pursuant to this order vis-à-vis the 11 KV line in question, perhaps the
mishap involving this unfortunate child could have been averted altogether.
[11]
That apart, the petitioners maintain their claim for compensation
not only by way of an action in tort but also based on the violation of the
fundamental rights of the child, which is clear and manifest. As rightly noted by
the learned Judge, redressal of such violations, in terms of being compensated
monetarily, is amenable to the writ jurisdiction of this Court under Article 226 of
the Constitution (See Rudul Sah Vs. State of Bihar and others [(1983) 4
SCC 141], Nilabati Behera (Smt) alias Lalita Behera Vs. State of Orissa
and others [(1993) 2 SCC 746], D.K. Basu Vs. State of West Bengal
[(1997) 1 SCC 416] and M.C. Mehta and another Vs. Union of India and
others [(1987) 1 SCC 395].
[12]
Even if it is to be taken that the petitioners are only maintaining a
claim in tort, the negligence on the part of the MSPDCL is writ large. When the
authorities concerned, and more particularity the MSPDCL, were dealing with
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 9
distribution and transmission of a potentially dangerous and hazardous
commodity, viz., electricity, it was incumbent upon them to abide by all the
prescribed statutory norms in the context of safety. The MSPDCL never undertook
any such measures as it seems to have failed to maintain safety standards under
Rule 29 of the Rules of 1956 and carry out periodical inspections, as mandated by
Rule 46 thereof.
[13]
Reliance placed by Mr. S. Nepolean, learned Government Advocate,
on Chairman, Grid Corporation of Orissa Ltd. and others Vs. Smt.
Sukamani [(1999) 7 SCC 298] and SDO, Grid Corporation of Orissa Ltd.
Vs. Timudu Oram [(2005) 6 SCC 156] is of no avail as those were cases
where the Supreme Court held that exercise of jurisdiction under Article 226 was
unsustainable on the ground that negligence was not established on the part of
the electricity authorities. However, as the finding of this Court in the case on
hand is to the contrary and the negligence of the MSPDCL is spelt out in clear
terms, the ratio laid down in these judgments has no application.
[14]
On the above analysis, this Court holds that the learned Judge was
correct and justified in exercising writ jurisdiction and awarding compensation to
the petitioners at least to the tune of ₹.10,00,000/- with interest thereon. No
grounds are made out for interference with the order under appeal.
[15]
The writ appeal is devoid of merit and is accordingly dismissed.
In consequence, the interim order of stay is vacated and MC (W.A.)
No. 59 of 2020 is dismissed.
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 10
The balance of the compensation amount of ₹.10,00,000/-, after
deducting the amount already paid, shall be released to the petitioners along with
interest thereon, as directed by the learned Judge, within one month from today.
The Registry shall forthwith release the sum of ₹.5,00,000/- deposited with it,
along with the standard interest applicable to savings bank accounts in the State
Bank of India for the entire period of such deposit, to petitioner No.2 under
proper acknowledgement.
Though deserving, we refrain from making any order as to costs.
JUDGE
CHIEF JUSTICE
FR
Sandeep
W.A. No.47 of 2020 with MC (W.A.) No. 59 of 2020
Page 11
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review