Sl. No. 22 & 23
IN THE HIGH COURT OF MANIPUR
AT IMPHAL
W.A. No. 52 of 2025
State of Manipur; & Ors.
Appellants
Vs.
Md. Abdul Kashim (Sanayaima)
Respondent
Clubbed with
MC (W.A.) No. 110 of 2025
BEFORE
HON’BLE THE CHIEF JUSTICE MR. M. SUNDAR
HON'BLE MR. JUSTICE AHANTHEM BIMOL SINGH
(ORDER)
(Order of the Court was made by M. Sundar, CJ)
20.11.2025
[1]
This order will now dispose of the captioned Writ Appeal and the
captioned Miscellaneous Case thereat.
[2]
In the hearing today, Mr. Lenin Hijam, learned Advocate General
for State of Manipur instructed by Ms. Thanyomi Keishing, learned State counsel
for appellants and Mr. M. Devananda, learned senior counsel instructed by Ms.
Jyotsana, learned counsel on record for sole respondent are before this Court.
[3]
In the listing of the captioned matter on 06.11.2025, the following
proceedings were made:
‘06.11.2025
[1]
Captioned main ‘Writ Appeal’ (‘WA' for the sake of brevity)
is an intra-court appeal assailing an ‘order dated 26.09.2025 made by a
Hon’ble Single Bench in W.P. (C) No. 763 of 2025 with MC [W.P. (C)] No.
707 of 2025 thereat’ (hereinafter ‘impugned order’ for the sake of
convenience and clarity).
[2]
Short facts are that the ‘Minor Irrigation Department of
Government of Manipur’ (hereinafter ‘MI’ for the sake of brevity,
convenience and clarity) issued two Notices Inviting Tenders both dated
18.07.2025, one bearing Reference No. N0:CE/MID/NIT(SASCI)/202425/1 and another bearing Reference No. N0:CE/MID/NIT(SASCI)/202425/2; that these ‘two Notices Inviting Tenders’ shall be referred to as
‘NITs’ collectively and ‘1st NIT’ and ‘2nd NIT’ independently, for the sake
of convenience and clarity; that the work qua 1st NIT is ‘Construction of
Floor, Protection Wall, Downstream Glacis, Slab, Culvert and Lined Canal
for Mini Barrage at Kumbi Uyunghoubi’; that the work qua 2nd NIT is
‘Construction of RCC Canal and Regulator with Extension of Protection of
Wall for MI Weir at Sekmai, Imphal West’; that one ‘Md. Abdul Kashim
(Sanayaima)’ {hereinafter ‘writ petitioner’ for the sake of conveniences}
responded to both NITs and submitted bids; that the tender process is by
way of usual two part tender i.e., technical bid followed by financial bid;
that the technical bids were opened on 08.08.2025; that evaluation was
done on 11.09.2025; that writ petitioner was rejected qua the technical
bid; that thereafter the financial bids were opened on 12.09.2025; that
after the opening of the financial bids on 12.09.2025, writ petitioner after
sending a representation dated 15.09.2025 filed W.P. (C) No. 763 of 2025
on 23.09.2025; that in this writ petition, writ petitioner inter alia sought
writ of certiorari to quash his rejection qua the tender process and a
further directive by way of a mandamus to consider writ petitioner’s bid;
that on 25.09.2025, Hon’ble Single Bench granted an interim order
directing status quo to be maintained till 26.09.2025; that on 26.09.2025,
Hon’ble Single Bench made the impugned order inter alia directing MI to
include the bids of writ petitioner while considering the financial
appreciation of the bids and holding that the interim order dated
25.09.2025 merges with the final order; that assailing the impugned
order, State is before this Court vide captioned intra-court appeal i.e. WA
before this Court.
[3]
In the WA, Mr. Lenin Hijam, learned Advocate General and
senior advocate, appears on behalf of Mr. O. Ratan Kumar, learned
counsel on record for ‘MI’ (also referred to as ‘State’ for convenience);
that writ petitioner, Mr. Md. Abdul Kashim (Sanayaima) is on caveat,
caveator counsel, Ms. N. Jyotsana is before this Court and Mr. M.
Devananda, learned senior advocate appears on behalf of caveator
counsel.
[4]
Learned Advocate General at the outset pointed out that
it is incorrect to say that the two bids of writ petitioners were rejected on
the sole ground that he is not empaneled as Special Class Contractor in
MI department. Learned Advocate General submitted that the rejection
was on other grounds. It was also submitted by learned Advocate General
that writ petitioner was fully aware of his rejection in the technical bid
itself as well as the opening of financial bids as all of them were
communicated to writ petitioners by way of Short Messaging Services
(SMSs) vide NIC e-procurement portal services and in spite of being
aware of the same, writ petitioner came to Court suppressing the material
which were will within his knowledge.
[5]
Issue notice.
[6]
Ms. N. Jyotsana, learned counsel who is on caveat, accepts
notice for sole respondent and as already alluded to supra, Mr. M.
Devananda, learned senior advocate, appears on her behalf.
[7]
At the outset, this Court noticed that in the captioned
intra-court appeal, MI/State has vide grounds 2.9 and 2.10 taken the
stand that sufficient time was not granted to MI as the main writ petition
was taken up on 26.09.2025 itself after passing an interim order on
25.09.2025 (to be noted, it was emphasized that writ petition was filed
only on 23.09.2025). It was pointed out that if sufficient opportunity had
been given to MI/State, various points including the points that the
rejection of writ petitioner’s bids were on grounds and not on the ground
that he is not a Special Class Contractor qua MI could have been placed
and material to demonstrate that writ petitioner was aware of the
rejection in the technical bids stage itself as well as the opening of the
financial bids could have been brought to the notice of the Hon’ble Single
Bench.
[8]
In the aforesaid backdrop, this Bench gave the option to
learned Advocate General as well as learned senior counsel on the other
side that an order of remand leaving open all questions can be made so
that the matter can be heard out by the Hon’le Single Bench qua all points
which can be thrashed out legally. Learned Advocate General readily
agreed to this course but learned senior counsel for respondent,
submitted that post impugned order, MI/State has held a review meeting,
made proceedings and held that the bids of writ petitioner, Md. Abdul
Kashim (Sanayaima) and another bidder, RK Fortune Developers Private
Limited are found to be non-responsive and therefore these two review
proceedings have to be set aside before remanding the matter.
[9]
As there was no consensus on an unconditional remand,
the option of having the main WA heard out was given to learned counsel
on both sides, learned counsel on record on both sides and on their
instructions, learned Advocate General and learned senior counsel very
fairly agreed/consented to have the main WA heard out. This submission
made by both sides is recorded.
[10]
Learned Advocate General submitted that an affidavit has
been filed by State counsel on record today to bring on record some
documents which are imperative for having the main WA heard out.
Though learned counsel on record for respondent has been favored with
advance copies, on instructions from learned counsel on record for
respondent, learned senior counsel Mr. M. Devananda submitted that it is
necessary for her to get instructions from respondent for having the main
WA heard out but agreed to have the main WA heard out on Monday,
i.e., on 10.11.2025. If respondent wants to file objections to the affidavit
of the State, which brings on record some documents, it is open to
respondent to do so and learned senior counsel on instructions from
learned counsel on record for respondent, very fairly submits that
advance copy of the objections (if any) will be furnished to the State
counsel by noon on Saturday (08.11.2025) so that there can be a
productive hearing in the next listing on Monday.
[11]
List the captioned WA and MC thereat under the caption
‘FOR HEARING/PART-HEARD’.
[12]
[4]
List on 10.11.2025.’
Learned counsel on both sides, adverting to the aforesaid
06.11.2025 proceedings, submitted that facts as well as the trajectory the matter
has taken thus far have been correctly captured. The afore-referred 06.11.2025
proceedings shall now be read as an integral part and parcel of instant order.
This also means that short forms, abbreviations and short references used in the
06.11.2025 proceedings shall continue to be used in the instant order.
[5]
Be it noted that main WA was taken up and heard out with the
consent of both sides.
[6]
Adverting to paragraph 10 of the earlier proceedings dated
06.11.2025, it was submitted that an additional affidavit dated 06.11.2025 is on
Board today, this additional affidavit has been filed along with annexures
including a hard copy of the download from e-procurement system, Government
of Manipur portal and this is tender summary reports. This Court is informed that
the portal is managed by National Informatics Centre (NIC).
[7]
Before this Court ploughs into the matter, it is deemed appropriate
to remind itself of the scope of judicial review in tender matters. The lead case
in this regard is Tata Cellular Vs. Union of India reported in (1994) 6 SCC
651. To be noted, Tata Cellular continues to be good law and has been
reiterated by Hon’ble Supreme Court recently on 09.07.2024 in AL-Can Export
Private Limited Vs. Prestige H.M. Polycontainers Limited and others
reported in (2024) 9 SCC 94 which also arises out of tender process. As regards
judicial review, six postulates as set out in Tata Cellular are as follows:
‘(1) The modern trend points to judicial restraint in administrative action.
(2) The court does not sit as a court of appeal but merely reviews the
manner in which the decision was made.
(3) The court does not have the expertise to correct the administrative
action. If a review of the administrative decision is permitted it will
be substituting its own decision, without the necessary expertise
which itself may be fallible.
(4) The terms of the invitation to tender cannot be open to judicial
scrutiny because the invitation to tender is in the realm of contract.
Normally speaking, the decision to accept the tender or award the
contract is reached by process of negotiations through several tiers.
More often than not, such decisions are made qualitatively by
experts.
(5) The Government must have freedom of contract. In other words, a
fair play in the joints is a necessary concomitant for an administrative
body functioning in an administrative sphere or quasi-administrative
sphere. However, the decision must not only be tested by the
application of Wednesbury principle of reasonableness (including its
other facts pointed out above) but must be free from arbitrariness
not affected by bias or actuated by mala fides.
(6) Quashing decisions may impose heavy administrative burden on the
administration and lead to increased and unbudgeted expenditure.’
[8]
The afore-referred six postulates as regards tender matters, more
particularly, where State is the authority inviting tenders and State is a
contracting party are instructive and this Court has respectfully applied the same
as touch stone for testing the issues and writing the dispositive reasoning infra
in the instant order.
[9]
Learned Advocate General appearing on behalf of counsel on
record for appellants State adverting to the afore-referred download from the
portal, submitted that the technical bids were opened on 08.08.2025 and
thereafter the evaluation summary details were uploaded on 11.09.2025 making
it clear that financial bid opening date is 12.09.2025, ultimately, the financial bid
was also opened on 12.09.2025. It is reiterated that the technical bids of the
respondent were not rejected on the ground that he is not a Special Class
Contractor qua MI and that it was other grounds. It was emphasized that writ
petitioner (to be noted, we are referring to ‘sole respondent’ before us as ‘writ
petitioner’ continuing the reference as in our earlier proceedings dated
06.11.2025) was fully aware of his rejection in the technical bids as well as
opening of the financial bids but had chosen to file the writ petition on 23.09.2025
by making an averment to the contrary and not disclosing the facts and
developments qua NITs which were well within the knowledge of writ petitioner.
It was also submitted that writ petitioner has filed a contempt petition being
CONT. CAS (C) No. 147 of 2025 alleging violation of Hon’ble Single Bench order
and in the contempt petition, the submission made by the State was that the
orders dated 01.10.2025 made by the Executive Engineer was in terms of
paragraph 16 of the 26.09.2025 order of the Hon’ble Single Bench. What is
referred to as 01.10.2025 orders is actually two communications, the same have
been placed before us as Annexure-X/1 and X/2 and they are communications to
the writ petitioner communicating that his bids were non-responsive qua ITB.
[10]
As regards writ petitioner, learned senior counsel adverting to the
proceedings made by the contempt Court on 16.10.2025 submitted that the State
having made a submission that it is complying with the order, cannot now assail
the order. According to learned senior counsel, this amounts to approbating and
reprobating. In support of his contention that this is not permissible, learned
senior counsel pressed into service WORKMEN through the Joint Secretary
(Welfare), Food Corporation of India, Executive Staff Union vs.
Employer In Relation To The Management Of The Food Corporation of
India and another reported in (2023) 8 SCC 116 and Union of India an
others vs N. Murugesan and others reported in (2022) 2 SCC 25.
[11]
At the outset, we carefully considered if it is a case of changing
positions or doing a U-turn qua State. This court finds that the submission in the
contempt court was only to the effect that the 01.10.2025 communications are
in accordance with paragraph 16 and we are unable to persuade ourselves to
accept the argument that State had submitted before the Contempt Court that it
is complying with the order. Be that as it may, as regards FCI Workmen case,
that was a case of reinstatement and the management had committed itself to
the course of reinstatement and absorption and allowed the situation to continue
for 18 long years. Thereafter, the management took a topsy-turvey position. In
this context, Hon’ble Supreme Court, referring to N. Murugesan held that this
amounts to approbation and reprobation. We find that FCI Workmen case does
not come to the aid of writ petitioner, the reason is declaration of law made by
Hon’ble Supreme Court speaking through a Constitution Bench in Padma
Sundara Rao (dead) and others Vs. State of Tamil Nadu and others
reported in (2002) 3 SCC 533. In Padma Sundara Rao, Constitution Bench
declaration of law the manner in which a case law should be cited and referred
to was set out. On facts, Padma Sundara Rao is a matter which arose qua
land acquisition proceedings under Central Act (1894 Act) and the question as to
whether a fresh period for declaration would be available after quashing of
proceedings arose. In this context and in this factual backdrop, in Padma
Sundara Rao Hon’ble Supreme Court held that there is peril in treating words
of speech or judgments as though they were in a legislative enactment and it
was made clear that judicial utterances are made in the fact setting of a case
and one additional or different fact can make a world of difference between
conclusions in two cases. To be noted, relevant paragraph in Padma Sundara
Rao is paragraph No. 9 and the same reads as follows:
‘9. Courts should not place reliance on decisions without discussing
as to how the factual situation fits in with the fact situation of the
decision on which reliance is placed. There is always peril in treating
the words of a speech or judgment as though they are words in a
legislative enactment, and it is to be remembered that judicial
utterances are made in the setting of the facts of a particular case,
said Lord Morris in Herrington v. British Railways Board.
Circumstantial flexibility, one additional or different fact may make
a world of difference between conclusions in two cases.’
[12]
Reverting to the rejection of technical bids, it is seen that the same
is on grounds that writ petitioner (bidder) has not submitted the bid as per the
specified format qua page 65 of ITB and there is misinformation in the degree
certificate, quantity of survey. It was also pointed out that in the affidavit, it is
mentioned he had passed degree in 2019 whereas in the certificate, it is
mentioned that he had passed in 2021. There is also mention about
misrepresentation in equipment ownership details. These grounds have been set
out in the 01.10.2025 communications adverted to supra and the 01.10.2025
communications are from the Executive Engineer of MI to writ petitioner and
scanned reproduction of the same are as follows:
[13]
Reverting to non-compliance qua conditions, we would respectfully
refer to six postulates qua judicial review in tender matters an adumbration of
which has been set out supra. The crux and gravamen, put pithily is, judicial
review can only be on grounds of illegality, irrationality or procedural impropriety.
In the light of the narrative thus far, we find that these three grounds are not
attracted, they do not aid the writ petitioner and the decision making process
does not smack of irregularity warranting any interference. On the contrary, writ
petitioner coming to this Court by filing a writ petition on 23.09.2025 after the
rejection of technical bids and the reasons as well as the financial bid opening
summary having been uploaded (as is evident form the NIC Management
download) leaves this Court with the impression that writ petitioner has not come
to Court with complete disclosure which obviously has resulted in the impugned
order being made by the Hon’ble Single Bench as it proceeds on the basis that
writ petitioner’s bids have been rejected on the sole ground that writ petitioner
was not empaneled as a Special Class Contractor qua MI. Though the captioned
matter could have been held against writ petitioner on this sole ground, we had
refrained from doing so and this Court has tested the matter on merits by
adverting to the postulates laid down in Tata Cellular which continues to be
good law and which governs the field. Nothing illegal in the process warranting
interference in judicial review drill has been demonstrated. The lone point before
the Hon’ble Single Bench, i.e., the point that writ petitioner’s bids were rejected
on the sole ground that writ petitioner was not empaneled as a special contractor
qua MI, has now become a non-starter as that is not the ground on which writ
petitioner’s bids (technical bids) have been rejected. This means that the
impugned order Hon’ble Single Bench has to be interfered with and dislodged.
As regards the other grounds on which writ petitioner’s bids (technical bids) have
been rejected viz. (a) non-compliance with prescribed bid formats, (b) insufficient
bid capacity as per ITB norms, (c) misrepresentation qua equipment ownership
details and (d) inconsistencies in technical personal declarations, are all NIT (to
be noted, ‘NIT’ denotes ‘Notice Inviting Tender’) which is invitation to tender
terms within the meaning of postulate No. 4 qua Tata cellular supra and they
are in the realm of contract if postulate No. 4 of Tata Cellular supra is applied.
It is also governed by postulate No. 5 of Tata Cellular as it is in the realm of
freedom of Government to contract. This Court will not sit as a court of appeal
and at the highest only the manner in which the decision has been made can be
reviewed (to be noted, this is postulate No. 2 of Tata Cellular). Considering the
facts and circumstances of the case, the nature of the work, the tender quantum
qua this State Exchequer, postulate No. 6 of Tata Cellular which talks about
administrative burden and increased/unbudgeted expenditure also comes into
play. Therefore, seen from any point of view, this Court has no hesitation in
writing that there is absolutely no ground which warrants interference vide the
judicial review drill at hand. This coupled with the position that we have already
held that impugned order of Hon’ble Single Bench has to be interfered with and
dislodged, it is end of the road for writ petitioner and axiomatically State appeal
succeeds.
[14]
Before concluding, for completion of facts and the trajectory the
matter has taken, it is necessary to make it clear that even as on 06.11.2025,
this Bench gave the option of a remand to the Single Bench, as would be evident
from paragraph 7, 8 & 9 of the 06.11.2025 proceedings, while State accepted
the option, writ petitioner contended that there cannot be an unconditional
remand leaving open all questions and remand, if any, should be only by setting
aside the proceedings where it was held that bids of writ petitioner are non
responsive (about which there is allusion supra elsewhere in this order)
thereafter, both sides agreed to have the main WA heard out on merits and it is
in this context that this Bench has now heard out the main WA on merits. In this
scenario, today, in the hearing, this Court is informed that respondent has filed
another writ petition being W.P. (C) No. 911 of 2025 (this writ petition has been
e-filed on 18.11.2025) and in this writ petition, the proceedings rejecting the
technical bids being proceedings dated 11.09.2025 have been assailed. This
Court is informed that this writ petition is pending. This submission is recorded
on the basis of oral submission made by learned senior counsel for writ petitioner
in the Court as we do not have the benefit of papers in W.P. (C) No. 911 of 2025
before us.
[15]
In the light of the narrative, discussion and dispositive reasoning
thus far, this Court is left with the conclusion that the captioned writ appeal
deserves to be allowed and the impugned order being order dated 26.09.2025
made in W.P. (C) No. 763 of 2025 together in MC [W.P. (C)] No. 707 of 2025
thereat deserves to be set aside. We do so.
[16]
Apropos, the sum sequitur is, State appeal succeeds, impugned
order is set aside, writ appeal is allowed. Consequently, captioned MC thereat is
disposed of as closed. We refrained ourselves from imposing costs.
JUDGE
CHIEF JUSTICE
Sandeep
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.