THE HON’BLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
WRIT PETITION No.35483 OF 2025
ORDER:
1.
This writ petition is filed under Article 226 of the Constitution to
issue writ of mandamus declaring the action of the respondents, more
particularly Respondent Nos.2 to 4 in selecting the unofficial
Respondent Nos.6 to 8 as the Successful Bidders with respect to the
Tender Notification Rc.No.1142/E1 GGH/2020-25 dated 23.09.2025
for awarding contract for supply of diet to in-patients and duty doctors
in Government General Hospital (GGH), Ongole, disregarding the
complaint dated 10.12.2025 and representation dated 16.12.2025
submitted by the petitioner as illegal, arbitrary and consequently to
set-aside the selection/allotment of the tender contract to unofficial
Respondent Nos.6 to 8 with respect to Tender Notification dated
23.09.2025 and direct the respondents to consider the complaint
dated 10.12.2025 and representation dated 16.12.2025 submitted by
the petitioner.
2.
The brief facts of the case are that, the petitioner is an
association registered under the Societies Registration Act, 1860,
engaged in the business of supply of diet services to patients and
NV,J
WP_35483_2025
duty doctors in Hospitals, providing diet supply services to inpatients
and duty doctors in Government General Hospital, Ongole, since
2010.
Respondent No.1 had issued orders in G.O.Ms.No.325
HM&FW (M1) Department dated 01.11.2011 and G.O.Ms.No.309
HM&FW (M1) Department dated 02.12.2022, streamlining the
ongoing system of management of diet supply to the inpatients. In
accordance with the said G.Os, Respondent No.2 issued Tender
Notification Rc.No.1142/E1 GGH/2020-25 dated 23.09.2025 in
e-procurement portal inviting tenders for supply of diet to in-patients
and duty doctors in GGH, Ongole, for a contract period of two years.
In pursuance of the tender notifications, the six bidders were
participated in the tender process including the petitioner. Though
opening of the tenders has been postponed initially, the bids were
opened on 16.12.2025 where the petitioner was qualified in the
technical and financial bids and emerged as one of the five qualified
bidders. While so, during the evaluation of the bids, the petitioner
raised certain complaints based on the uploaded documents in eprocurement portal against the participating bidders pointing out the
major deviations from the prescribed tender conditions before
Respondent No.2. In view of the same, Respondent Nos.3 & 4 vide
NV,J
WP_35483_2025
letter dated 04.12.2025 directed the petitioner to submit the complaint
furnishing complete information along with documentary evidences in
support of the allegations on or before 11.12.2025, as such, the
petitioner had submitted complaint dated 10.12.2025 to Respondent
Nos.2 to 4, pointing out certain deviations identified by it. However, no
consideration had been given to the aforesaid complaint nor any
response or action had been taken in consideration of the same by
the respondent authorities. Subsequently, the petitioner submitted a
letter dated 16.12.2025 to Respondent No.2 reminding about the
complaints previously submitted for conducting fair and impartial
enquiry in accordance with law and also objecting to adopt the lottery
system or equal sharing method for deciding the successful bidders.
To the surprise of the petitioner, on 16.12.2025, the respondent
authorities have proceeded to adopt both the lottery system and then
equal sharing method, wherein the work and contract period had
been divided among the unofficial Respondent Nos.6 to 8 out of five
qualified bidders including the petitioner who were selected through
the lottery system. Aggrieved by the said action of the respondents in
evaluation, finalization and selection of the successful bidders for
NV,J
WP_35483_2025
allotment of the tender contract, the present writ petition is filed by the
petitioner.
3.
Respondent No.4 – Superintendent, Government General
Hospital, Ongole filed detailed counter affidavit, denying the
allegations. It is submitted that;
a. The Tender Notification vide Rc.No.1142/E1/GGH/202025 dated 22.09.2025 was issued in the e-procurement
portal, in compliance with G.O.Ms.No.325 HM&FW (M1)
Department dated 01.11.2011. As per the terms of
notification, the last date for submission of bids was fixed
as 07.10.2025 and opening of bids was scheduled on
08.10.2025. A Pre-Bid meeting was duly notified and
scheduled on 27.09.2025 at 11:00 A.M specifically to
enable prospective bidders to seek clarifications, raise
queries or express any objections with regard to the
tender conditions. However, no bidder, including the
petitioner chose to attend the Pre-Bid Meeting.
b. In response to the tender notification, a total of six
bidders have participated in the tender process by duly
NV,J
WP_35483_2025
submitting their technical and financial bids. The 2nd
respondent, in strict compliance with the terms of the
tender document opened the bids on 08.10.2025 in the
presence of all the bidders, including the petitioner. Upon
evaluation of the bids, five bidders were qualified and the
petitioner is one among the qualified bidders.
c. The
petitioner
has
knowingly
and
materially
misrepresented facts before this Hon’ble Court by
alleging that the bids pursuant to the tender notification
were opened on 16.12.2025, which is false and
misleading. The bids were opened on 08.10.2025 in the
presence of all the bidders, including the petitioner herein.
d. The petitioner filed W.P.No.27573 of 2025 challenging
the same tender notification, which was dismissed by the
Court vide order dated 14.10.2025, directing the
respondents
to
pass
appropriate
orders
on
the
representation of the petitioner dated 23.09.2025 in view
of the fact that the tender process has already been
commenced and bids have already been opened.
NV,J
WP_35483_2025
e. The petitioner, having approached this Court with
unclean hands is not entitled to any discretionary or
equitable relief, as such the writ petition is therefore liable
to be dismissed.
f. The decision to adopt the lottery system and to engage
more than one bidder was not unilateral or arbitrary. The
same was decided in a duly convened meeting of the
District Diet Management Committee held on 16.12.2025
in which all the five qualified bidders including the
petitioner were present. The decision to limit the contract
period to eight months and to select three bidders was
taken based on the majority opinion of the bidders
present in the meeting in the interest of smooth service
delivery and administrative convenience. The petitioner
did not raise any objection at that stage. The decision to
adopt the lottery system, to split the tender and to curtail
the contract period was made after detailed discussion in
the District Diet Management Committee meeting held on
16.12.2025.
NV,J
WP_35483_2025
g. The entire selection process was conducted in a
transparent manner as per the tender conditions. The
petitioner was fully aware of the process and participated
without objection and the present challenge is motivated
solely by dissatisfaction with the outcome.
4.
Respondent No.6 – Authorized Signatory of M/s. Krishna
Constructions filed counter affidavit. It is stated that the writ pe-tition
is liable to be dismissed in limini on the sole ground of suppression of
material facts. The petitioner deliberately concealed the fact that it
had earlier filed W.P.No.27573 of 2025 challenging the very same
tender notification which was dismissed by this Court on 14.10.2025
with a categorical observation that the tender process had already
commenced and bids were opened. A litigant who approaches the
Court with such unclean hands is not entitled to any discretionary
relief. The petitioner having earlier challenged the tender process and
having suffered an adverse order, is barred by the principles of res
judicata and constructive res judicata from re-agitating the very same
issues under the guise of a fresh cause of action. The present writ
petition is nothing but a second round of litigation, which is
impermissible under law. The petitioner has knowingly and falsely
NV,J
WP_35483_2025
pleaded that the bids were opened on 16.12.2025 which is untrue, but
the bids were opened on 08.10.2025 in the presence of all bidders,
including the petitioner. The petitioner was physically present at the
time of opening of the technical bids and raised no objection
whatsoever. Having acquiesced in the process, the petitioner stopped
from subsequently questioning the same after realizing that the
outcome
was
unfavourable.
The
allegations
made
against
Respondent No.6 regarding alleged disqualification, past issues,
purported irregularities are incorrect and legally untenable. The
competent authorities, after due verification, considered all relevant
material including the matters sought to be re-agitated by the
petitioner. The petitioner’s challenge to the adoption of draw of lots
method is wholly misconceived. The petitioner has no vested or
enforceable right to demand award of contract in a particular manner.
The decision was taken by the competent committee in the presence
of bidders based on majority consensus and in transparent manner.
All the bidders quoted the same price so as to clear the confusion and
conflict in the tender authorities after due consultation with all the
bidders decided to opt lucky draw method for selection. The lucky
draw was performed in the presence of the petitioner who is one of
NV,J
WP_35483_2025
the five successful bidders. After becoming successful bidder and
winner in the lucky draw, Respondent No.6 was awarded the work
contract to commence work from 21.12.2025. The petitioner has no
locus standi to seek any relief against Respondent No.6, particularly
when no illegality is attributable. The petitioner is attempting to
convert a contractual and administrative matter into a constitutional
issue which is impermissible. The writ petition is projected under the
garb of public interest, whereas it is a purely private commercial
dispute driven by the petitioner’s intention to continue monopoly over
the contract. The petitioner has failed to make out even a prima facie
case warranting interference. The conduct of the petitioner in filing
successive
petitions,
suppressing
material
facts
and
making
allegations against the successful bidders clearly establishes
malafides and requested to dismiss the writ petition.
5.
The petitioner filed reply to the counter affidavits filed by
Respondent Nos.4 & 6, denying material allegations. It is submitted
that, the petitioner never disputed that the tender process
commenced and technical bids were opened on 08.10.2025. The
action of selection and the adoption of lottery/splitting were
undertaken on 16.12.2025. W.P.No.27573 of 2025 was filed by the
NV,J
WP_35483_2025
petitioner on materially different cause of action challenging the
notification
dated
23.09.2025
and
seeking
consideration
of
representation dated 23.09.2025 for extension by one year. Though
the said writ petition was dismissed on the ground that tender process
had already commenced, technical bids had been opened and the
petitioner had participated in the tender process. The dismissal of writ
petition did not adjudicate the subsequent illegality committed on
16.12.2025 (lottery/splitting/curtailment), which arose after the earlier
writ was dismissed. Therefore, dismissal of earlier writ petition is
neither a bar nor a ground to non-sue the petitioner in the present writ
petition. A plea of ‘unclean hands’ cannot be used as a shield to
immunize the violation of tender conditions, particularly in matters
involving public procurement and patient care in a Government
hospital.
6.
During the course of hearing, Sri O. Manohar Reddy, learned
Senior Counsel appearing on behalf of Sri Javvaji Sarath Chandra,
learned counsel for the petitioner, submitted that the tendering
authority, namely the District Diet Management Committee (DDMC),
is
attempting
to
award
the
contract
in
favour
of
three
qualified/successful bidders by dividing the tender period of two years,
NV,J
WP_35483_2025
which is contrary to the terms and conditions of the tender. It was
further contended that the tendering authority adopted the method of
drawal of lots for selection of the successful bidder, which is
impermissible and in violation of the tender conditions.The tendering
authority, in deviation from the tender document, accepted certain
mandatory documents, namely the GST Registration Certificate of the
firm and the Experience Certificate, through offline mode after the
date of opening of bids, which amounts to arbitrariness on the part of
the tender committee. He further submitted that pursuant to the
tender notification, six bidders, including the petitioner, participated in
the process, out of which five bidders were found technically qualified
and were permitted to participate in the financial bid. As per the terms
of the tender, the highest and lowest rates of supply were required to
fall within the notified rates. In the present case, all the five qualified
bidders quoted the same rate for supply of materials. Once all bidders
stood on an equal footing, the tendering authority ought to have
evaluated the bidders based on the marks awarded during technical
evaluation. Instead, the tendering authority proposed to conduct
drawal of lots, in which the petitioner did not participate. Contrary to
the terms of the tender, and under the guise of obtaining consent
NV,J
WP_35483_2025
from all qualified bidders, the tender committee awarded the contract
in favour of Respondent Nos. 6, 7, and 8 by splitting the contract
period into three equal terms of eight months each, which is not only
contrary to the tender conditions but also violative of settled principles
of law. It was further asserted that it is well-established law that the
tendering authority cannot alter the terms and conditions of a tender
midstream, i.e., from the date of issuance of the tender notification till
the selection of the successful bidder and award of contract. However,
in the present case, the tender committee changed the rules during
the tender process and proposed to award the contract in favour of
three bidders, which is illegal and arbitrary. It was further submitted
that Respondent No. 6, who has been declared as one of the
successful bidders, was blacklisted by the very same department.
Mere suspension of the blacklist proceedings pursuant to orders of
this Court does not render Respondent No. 6 eligible to participate in
the tender process, much less to be selected as a successful bidder.
With regard to Respondent No. 7, it was contended that the said
respondent failed to submit the firm registration certificate as
mandated under the tender conditions. As far as Respondent No. 8 is
concerned, it was submitted that mandatory documents were
NV,J
WP_35483_2025
submitted through offline mode, which is expressly prohibited under
the terms of the tender. In this backdrop, the petitioner submitted a
detailed representation dated 10.12.2025 pointing out the ineligibility
and disqualification of Respondent Nos. 6, 7, and 8, contending that
they were neither technically nor financially qualified, and therefore
not eligible for selection as successful bidders. However, the said
representation was neither considered nor disposed of prior to the
selection of the successful bidders. Therefore, it was contended that
the selection of the successful bidders and the consequent award of
contract are in clear deviation from the terms and conditions of the
tender and are vitiated by arbitrariness, non-application of mind, and
violation of due process of law. Accordingly, the tender notification,
along with all consequential proceedings, is liable to be set aside. In
support of his contentions, learned Senior Counsel placed reliance on
unreported judgment of the High Court of Telangana in L.G. Traders
vs. The State of Telangana [W.P.No.25983 of 2025 dated
31.10.2025] and judgment of High Court of Madhya Pradesh in
Maihar Cement Pipe Industries vs. Union of India [W.P.No.14843
of 2024 dated 22.10.2024]
7.
NV,J
WP_35483_2025
On the other hand, the learned Government Pleader for
Medical and Health vehemently contended that the petitioner not only
suppressed material facts but also misled this Hon’ble Court in order
to secure an interim order in his favour. As per the tender notification,
the last date for opening of tenders was 18.10.2025. However, in
paragraph No. 4 of the affidavit filed in support of the writ petition, the
petitioner stated that the tenders were opened on 16.12.2025 and
that the writ petition was filed on 18.12.2025, thereby creating a false
impression that the tender process had not been finalized as on
16.12.2025. Contrary to the said assertion, the tender was in fact
opened on 08.10.2025. Thereafter, the tender committee conducted
post-bid meetings with the qualified bidders, including the petitioner,
for the purpose of selection of the successful bidders. After due
deliberations and with the consent of the qualified bidders, except the
petitioner, Respondent Nos. 6, 7, and 8 were selected as successful
bidders. With the consent of the majority of the qualified bidders, the
tender period was equally divided and the contracts were awarded in
their favour.
8.
NV,J
WP_35483_2025
It was further submitted by the learned Government Pleader
that it is a settled principle of law that where all bidders are found to
be qualified and stand on an equal footing after finalization of the
tender process, the tendering authority is empowered to select the
successful bidder either by adopting the well-recognized method of
drawal of lots or by obtaining the consent of the qualified bidders. In
the present case, with the consent of the majority of bidders, except
the petitioner, the tender was awarded in favour of Respondent Nos.
6, 7, and 8 by equally splitting the tender period. The learned
Government
Pleader further submitted that,
contrary to the
allegations made by the petitioner, the tendering authority neither
reduced the tender period nor awarded the contract to any person
other than the qualified bidders, and therefore, there was no deviation
from the terms of the tender. It was also asserted that the petitioner
had earlier filed a writ petition challenging the very same tender
notification and obtained orders therein even after submitting his bid.
However, the said fact was not disclosed in the present writ petition,
which clearly amounts to suppression of material facts. It was
contended that the petitioner, having participated in the tender
process with a malafide intention to stall the proceedings and to
NV,J
WP_35483_2025
continue the existing contract, approached this Court with unclean
hands and by misleading the facts.
9.
The learned Government Pleader further submitted that it is
well settled law that the conduct of the tender process pursuant to the
tender notification lies within the exclusive domain of the tender
committee or the tendering authority. In the absence of specific
provisions in the tender conditions to address a particular exigency,
the tender committee is the best judge to adopt a well-recognized and
fair method for selection of the successful bidder. Accordingly, in the
present case, the tender authority adopted the procedure of selection
with the consent of the majority of the qualified bidders, which cannot
be faulted.
10.
Sri N. Subba Rao, learned Senior Counsel appearing for
Respondent No. 8, submitted that the petitioner, admittedly, has
neither alleged nor pleaded anywhere in the affidavit or reply affidavit
any bias, mala fides, or ulterior motive on the part of the tendering
authority. It was further contended that the petitioner has also not
pleaded that his bid was improperly considered or arbitrarily rejected.
In the absence of any specific averment attributing bias, mala fides,
NV,J
WP_35483_2025
or arbitrariness in the rejection of any tender, it was argued that the
Constitutional Courts cannot substitute their own opinion in place of
the decision taken by the experts and the tendering authority, which is
the owner of the tender. This principle, according to the learned
Senior Counsel, is well settled and has been consistently affirmed by
the Hon’ble Supreme Court in several decisions.
11.
It was further submitted that in the present case, the petitioner
has merely alleged deviations on the ground that certain documents
were received from the unofficial respondents through offline mode
instead of online mode, allegedly in violation of the tender conditions.
However, the tender document itself contained a specific note
permitting the submission of documents not only through online mode
but also through offline mode. In view of the said express provision,
the contention of the petitioner that the tender of one of the
successful bidders ought to be rejected solely on the ground that
mandatory documents were submitted offline is wholly untenable and
devoid of merit.
12.
The learned Senior Counsel further submitted that, on the one
hand, the petitioner participated in the tender process and was found
NV,J
WP_35483_2025
qualified, and on the other hand, he has been attempting to stall the
entire tender process and the selection of successful bidders by filing
successive writ petitions, which is contrary to the settled principles of
law. It was contended that a bidder who is a competitor in the same
tender process cannot be permitted to challenge the selection by
alleging deviations on the part of the tendering authority, particularly
in the absence of any mala fides or arbitrariness. It was further
submitted that it is a settled proposition of law that the tendering
authority or the tender committee, being an expert body, is vested
with the exclusive authority to assess the requirements of the tender
and to frame tender conditions to meet the necessities and
exigencies of the process. Since the tendering authority is the best
judge of its requirements and the manner of fulfillment thereof, the
selection of Respondent Nos. 6 to 8 (unofficial respondents) cannot
be said to be contrary to the terms of the tender or based on any
unknown or impermissible procedure. Accordingly, it was contended
that the writ petition is devoid of merit and is liable to be dismissed. In
support of his contentions, learned Senior Counsel placed reliance
upon the judgments of the Hon’ble Apex Court in Tata Motors
Limited vs. The Brihan Mumbai Electric Supply & Transport
NV,J
WP_35483_2025
Undertaking and others 1 , Agmatel India Private Limited vs.
Resoursys Telecom and Others 2 , Balaji Ventures Pvt. Ltd vs.
Maharashtra State Power Generation Company Ltd3, M/s. Utkal
Suppliers vs. M/s. Maa Kanak Durga Enterprises4 and BTL EPC
Ltd vs. Macawber Beekay Pvt Ltd5.
13.
In reply to the submissions of the learned Government Pleader,
Sri O. Manohar Reddy, learned Senior Counsel appearing for the
petitioner, contended that the petitioner’s failure to mention the
particulars of the earlier writ petition, which challenged the very same
tender notification, does not amount to suppression of material facts.
It was submitted that the earlier writ petition was filed seeking a
distinct and independent relief, namely, clarification of the tender
conditions in favour of the petitioner as an existing contractor.
Therefore, the said proceedings were not required to be disclosed in
the present writ petition, which is founded on a separate cause of
action. Consequently, the non-disclosure of the earlier writ petition
2023 Livelaw (SC) 467
(2022) 5 SCC 362
2022 Livelaw (SC) 295
Civil Appeal Nos.1517-1518 of 2021 dated09.04.2021
2023 Livelaw (SC) 834
NV,J
WP_35483_2025
cannot be construed as deliberate suppression or misrepresentation
of facts before this Court.
14.
Heard Sri O. Manohar Reddy, learned Senior Counsel for the
petitioner, learned Government Pleader for Medical & Health and
Sri N. Subba Rao, learned Senior Counsel for Respondent No.8 and
perused the material available on record.
15.
The fact remains that the present tender notification was issued
in accordance with G.O.Ms.No. 325, HM&FW (M1) Department,
dated 01.11.2011. The tender notification clearly and categorically
stipulated the conditions governing the tender, including that the
duration of the contract shall be for a period of two years. Admittedly,
the tender conditions do not provide any specific mechanism for
selection of the successful bidder in the event that all qualified
bidders stand on an equal footing.
16.
It is a settled principle of law that the tendering authority is the
master of the tender and is empowered to frame additional or
supplementary conditions during the process of finalization of the
tender, if such measures are necessitated to meet exigencies or to
serve public interest, so long as the same do not violate the
NV,J
WP_35483_2025
fundamental terms of the tender. In the present case, the tender
authority/tender committee adopted a procedure of obtaining the
consent of the majority of the qualified bidders for selection of the
successful bidders. Accordingly, the tendering authority selected the
unofficial respondents, namely Respondent Nos. 6, 7, and 8, as
successful bidders and awarded the contract by splitting the original
tender period of two years into three equal terms of eight months
each. The said selection and award of contract were completed prior
to the filing of the present writ petition.
17.
As contended by the learned Government Pleader, it appears
that the petitioner approached this Court with unclean hands and
suppressed material facts and tried to mislead this Court. Paragraph
No.4 of the affidavit filed by the petitioner, reads as follows:
“4. In pursuance of the tender notifications, the
petitioner, being eligible tenderer, had submitted its bid.
It is humbly submitted that six (6) bidders have
participated in the subject tender process including the
petitioner. However, opening of the tenders has been
postponed initially. It is humbly submitted that the bids
have been opened on 16.12.2025, wherein the
petitioner had been qualified in the technical and
NV,J
WP_35483_2025
financial bid and had emerged as one of the five (5)
qualified bidders.”
18.
It is stated that the tender was opened on 16.12.2025; however,
in fact, the tender was opened on 08.10.2025, and the work orders
were issued in favour of the successful bidders even prior to the filing
of the present writ petition.
19.
In fact, the petitioner had earlier filed a writ petition, after
submission of his bid, challenging the very same tender notification
on the ground of seeking consideration of his representation for
extension of the tender period. The said writ petition was disposed of
by this Court earlier. However, the petitioner did not bring the said
fact to the notice of this Court while filing the present writ petition.
Though the relief sought in the present writ petition is stated to be
different from that claimed in the earlier writ petition, the nondisclosure of the earlier proceedings appears to be an attempt to veil
the suppression of material facts on the part of the petitioner.
20.
On perusal of filing of the writ petition one after the other, it
clearly indicates that the petitioner is attempting to stall the tender
process, having participated and qualified in the tender, with a
NV,J
WP_35483_2025
malafide intention to continue in existing contract, without finalizing
the fresh tender. It is evident that the petitioner secured an interim
order by suppressing the material facts, misquoting and misleading
the Court, particularly, by stating that the tender was opened on
16.12.2025, instead of 08.10.2025. It is settled proposition of law that
if any person approaches this Court with unclean hands and by
suppressing the material facts, they are not entitled for any relief,
muchless, the relief as prayed in the writ petitions. The factum of said
suppression is a matter of serious concern. An application under
Article 226 would be refuted without a hearing on the merits or a rule
nisi discharged, if it appears that the applicant has made a deliberate
concealment of material facts, with a view to mislead the Court.
21.
In Welcome Hotel v. State of A.P 6 , an interim order was
obtained from court alleging the price fixed by government for
foodstuffs was too low and uneconomical. But the real fact was that
the price was fixed on agreement, which was suppressed. The Court
dismissed the writ petition as also vacated the interim orders.
AIR 1983 SC 1015
NV,J
WP_35483_2025
Similarly, in Union of India v. Muneesh Suneja7, the petitioners filed
successive writ petition before different High Courts without disclosing
the filing of earlier petition.
22.
In All India State Bank ‘Officer’s Federation v. Union of
India8, the court strongly disapproved the conduct of the petitioners
infilling writ petition in a different High Court after filing a false
declaration that no writ petition was filed earlier.
23.
By applying the law laid down by the Hon’ble Apex Court in the
judgments referred supra, it is clear and categorical that, when the
petitioners approached this Court claiming writ of mandamus,
suppressing material fact or giving a misstatement of fact in the
affidavit filed along with the writ petition, hence they are debarred to
claim relief of writ of mandamus, which is purely discretionary in
nature under Article 226 of the Constitution of India.
24.
The contention of the learned Senior Counsel for the petitioner
that the tender committee/authority altered the period of the tender in
favour of the successful bidders, contrary to the terms of the tender
AIR 2001 SC 854
1990 (Supp) SCC 336
NV,J
WP_35483_2025
which contemplated a period of two years, is without merit and not
sustainable. The award of the tender to the successful bidders was
indeed for the full period of two years, and the period was not
reduced. But, only an adjustment made was an equal division of the
contract period among the three successful bidders. This course of
action was taken after obtaining the consent of the majority of the
qualified bidders, all of whom, including the petitioner, were found to
be on an equal footing.
25.
The petitioner’s further allegation that, notwithstanding his
representation dated 10.12.2025, the tendering authority proceeded
to award the contract in favour of the unofficial respondents on
16.12.2025 without considering his representation or addressing his
queries, and that such action amounts to arbitrariness and a
colourable exercise of power, is wholly without merit, unreasonable,
and unsustainable in law. The fact remains that the petitioner’s
representation was duly considered and appropriately answered. The
contract was awarded in accordance with the terms and conditions of
the tender, and with the consent of the majority of the qualified
bidders, excluding the petitioner.
26.
NV,J
WP_35483_2025
It is an admitted fact that the petitioner is an existing contractor
in respect of the same tender contract or work and he was previously
selected by the very same tender committee on the basis of drawal of
lots. In the present case, the petitioner is challenging the action of the
tender committee/ tender authority on the ground that the selection of
the successful bidders either by drawal of lots or with the consent of
majority of the qualified tenderers is contrary to the terms of the
tender. Such a contention is unreasonable and untenable. It is wellsettled that, in the absence of specific provisions in the tender
conditions, the tendering authority is empowered to formulate or
adopt well recognized procedures for the finalization and award of the
tender. Therefore, drawal of lots as well as consent of majority of
qualified bidders are the well recognized methods in post tender
selection, if all the bidders are in same footing.
27.
It is a settled proposition of law that a person who approaches
this Court with unclean hands, suppresses material facts, or misleads
the Court to obtain interim orders is not entitled to any relief, much
less the relief sought by the petitioner in the present case.
28.
The contention of the learned counsel for the petitioner that any
contractor who has been blacklisted by a tendering authority is
NV,J
WP_35483_2025
ineligible for consideration in any other tender, and that Respondent
No. 6 cannot be selected merely on the basis of this Court’s order of
suspension, is misconceived. It is a well-settled legal principle that an
order of suspension by this Court certainly restores the status quo
ante with respect to the impugned proceedings. Consequently, in
view of the suspension of the blacklisting proceedings, Respondent
No. 6 was eligible and entitled to be considered and selected as a
successful bidder.
29.
Normally, the Courts cannot give different interpretation to the
tender terms and the duty of this Court is to verify whether the
respondent followed the procedure in processing the tender or not
and the Courts would not interfere with the tenders, interpreting
tender conditions, relaxing any tender conditions, in view of law
declared by the Apex Court in Durgawathi Devi v. Union of India
THR, Its Secretary, Ministry and others9.
30.
In The Silppi Constructions Contractors vs. The Union of
India and Ors10, the Apex Court reiterated the same principles with
regard to maintainability of writ petition in tender of contractual
Special Leave Petition (c) No.37479 of 2016
10 Special Leave Petition (Civil) Nos.13802-13805 of 2019 dated 21.06.2019
NV,J
WP_35483_2025
matters, relying on the catena of judgments of Supreme Court, more
particularly, Tata Celluar v. Union of India11, wherein the Apex Court
laid down six guidelines which are as follows:
(1) The modern trend points to judicial restraint in
administrative action.
(2) The Court does no sit as a court of appeal but merely
reviews the manner in which the decision was made.
(3) The Court does not have the expertise to correct the
administrative decision. If a review of the administrative
decision is permitted it will be substituting its own decision,
without the necessary expertise which itself may be fallible.
(4) The terms of the invitation to tender cannot be open to
judicial scrutiny because the invitation to tender is in the
realm of contract.
Normally speaking, the decision to accept the tender or
award the contract is reached by process of negotiations
through several tiers. More often than not, such decisions
are made qualitatively by experts.
(1994) 6 SCC 651
NV,J
WP_35483_2025
(5) The Government must have freedom of contract. In
other words, a fair play in the joints is a necessary
concomitant for an administrative body functioning in an
administrative
sphere
or
quasi-administrative
sphere.
However, the decision must not only be tested by the
application of Wednesbury principle of reasonableness
(including its other facts pointed out above) but must be free
arbitrariness not affected by bias or actuated by mala fides.
(6) Quashing decisions may impose heavy administrative
burden on the administration and lead to increased and
unbudgeted expenditure.
31.
The Apex Court also referred to various earlier judgments in
Raunaq International Ltd. V. I.V.R. Construction Ltd12, Air India
Limited v. Cochin International Airport Ltd 13 , Karnataka SIIDC
Ltd v. Cavalet India Ltd 14 , Master Marine Services (P) Ltd v.
Metcalfe & Hodgkinson (P) Ltd15, B.S.N. Joshi & Sons Ltd v. Nair
12 (1999) 1 SCC 492
13 (2000) 2 SCC 617
14 (2005) 4 SCC 456
15 (2005) 6 SCC 138
NV,J
WP_35483_2025
Coal Services Ltd 16 , Jagdish Mandal v. State of Orissa 17 and
Michigan Rubber (India) Ltd. V. State of Karnataka & Ors18 and
finally concluded that the Courts should not normally intervene in the
decision making process for award of contracts, unless blatant
illegality and arbitrariness can be pointed out. The controversy before
this Court is to ascertain whether there was any illegality or
arbitrariness in the decision making process rather than the question
of whether the decision was correct. In the present case, the District
Diet Management Committee discharged its duty of finalizing the diet
contract in faovur of one diet contractor, thus discharged its duty.
Unless, there is blatant illegality and arbitrariness pointed out in
awarding the contract to any of the diet contractor, this Court cannot
interfere into the matter.
32.
In view of the reasons stated above, having participated in the
bidding and after selected as successful bidder and qualified bidder,
the petitioner is not entitled to challenge the selection process of the
tender committee by one writ petition or the other and it is contrary to
the settled principle of law and the petitioner is not entitled to any
16 (2006) 11 SCC 548
17 (2007) 14 SCC 517
18 (2012) 8 SCC 216
NV,J
WP_35483_2025
relief, as claimed in the writ petition, in view of the suppression of
material facts and approaching this Court with unclean hands with
malafide intention to stall the entire tender process, as such the writ
petition is liable to be dismissed.
33.
In the result, writ petition is dismissed. No costs.
34.
Consequently, miscellaneous applications pending if any, shall
stand closed. No costs.
_____________________________________
JUSTICE VENKATESWARLU NIMMAGADDA
Dated: 07.05.2026
SP
NV,J
WP_35483_2025
THE HON’BLE SRI JUSTICE VENKATESWARLU NIMMAGADDA
WRIT PETITION No.35483 OF 2025
Dated: 07.05.2026
W
SP
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review