Sri Srinivasa Constructions vs The State of Telangana

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Telangana High Court
Date
19 February 2026
Case No.
WP 3709/2026
Result
Dismissed
Bench
Laxmi Narayana Alishetty
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

Filed under

Code of Civil Procedure, 1908 Section 151, Code of Civil Procedure, 1908

The sections, explained

The law this judgment cites

Opens the section on Law Maker (lawmaker.in), our sister site for law students.

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

| ..- [ 3383 ] IN THE HIGH COURT FOR THE STATE OF TELANGANA AT HYDERABAD (Special Originat Jurisdiction) THURSDAY, THE NINETEENTH DAY OF FEBRUARY TWO THOUSAND AND TWENTY SIX PRESENT THE HONOURABLE SRI JUSTICE LAXMI NARAYANA ALISHETTY WRIT PETITION NO: 37 09 0F 2026 Between: Sn Srinivasa Constructions, H.No.9-4-358/1. Saothaoiri - Colony, Karimnagar, Karimnagar District, Rep.by its Managing partner, Sri S/o.Narayana Reddy, Aged a6out 52 years]Odc. Business. A.Dasharathareddy, ....PETITIONER AND The State of Telangana, Rep.by its Principal Secretary, Department of Roads and Buildings, Dr,B.R.Ambedkar Telangana State Secretariat, Hyderabad. The Commissioner of Tenders, Government of Telangana, Chinthala Bhasthi, Khairathabad, Hyderabad. The Chief Engineer.(R AND B), Central Road lnfrastructure Fund (CRIF), Erramanzil, Hyderabad. The Superintending Engineer (R AND B), Karimnagar Town and District ...RESPONDENTS Petition Under Article 226 of the Constitution of lndia praying that in the circumstances stated in the affidavit filed therewith, the High Court may be pleased to issue a writ order or direction, more particularly one in the nature of writ of MANDAMUS, declaring the action of the respondents (a) in issuing the fresh tender notifications vid6 NtT No.05/DSE/sEK/Rand B/KMNRy2025-26/ciF/05, dated 24-O1-2026 and NIT No.06/DSE/SEt(Rand B/KMNRy2O25-26/CRF/06, daled 27 -O1-2026 for the works viz., (1) widening and strengthening of single tane to double land road from Arnakonda Village of Chppadandi Mandat to Mallial X road from Km. 0/0 to 35/00 via Giopalraopet Village of Ramadugu Mandal in Kariminagar District and (2) for the works of widening and strengthening of Vemulawada to Sirikonda road from Km. 10/0 to 2Bl2 in Rajanna Sircilla District, { iI I (b) not considering the case of the petitioner for awari rg the contract works pursuant to the Tender Notification vide Nlr No.o2IDSE/S: (/Rand B/KMNR/2024- 25/cRF/o2, dated 1 5-1 1-202s and render Notification vidr: r,llr No.03/DSE/SEtvR and B/KMNR/2024- 25tcRFl03, dated '15-1 1-2o2s as illel i 1, arbitrary, viotative of principles of naturar justice and arso suffer from mara ide intention and for extraneous reasons apart from being viorative of Articres 1 -, 21 and 300-A of the constitution of rndia and consequentry (c) set aside the npugned fresh tender notifications vide Ntr No.05/DSE/SEK/R AND B/KMNR/2 )25-26lcRF/05, dated 24-01-2026 and NIT No.06/DSE/SEK/R and B/KMNR/2)}) z}rcRF106, dared zr- 01-2026, (D) further consequently direct the respondents t consider the case of the petitioner for awarding the works viz., (1) widening and trengthening of single lane to double land road from Arnakonda Viflage of chppac rndi Mandar to Ma iar X road from Km. 0/0 to 35/00 via Giopalraopet Village o. lamadugu Mandal in Kariminagar District and (2) for the works of widening tnd strengthening Vemulawada to sirikonda road from Km. 10/0 to 2Bt2 in R rjanna sircila pursuant to the tender notification vide Nlr No.o2lDSE/sE[, ? of District and B/KMNR/2024- 25lcRF/02,dated 15-11-202s and render Notification vide t' rr No.o3/DSE/SEKR and B/KMNR/2o24-ZS|CRFlO3, dated 15_11_2025, in accorcz 1ce with law. l.A.NO:1 OF 202 6 Petition under Section 151 cpc praying that in the cir )umstances stated in the affidavit filed in support of the petition, the High court me z be preased to grant stay of all further proceedings incruding receiving of tender rpprications pursuant to the tender notifications vide NtT No.05/DSE/SEI(R&B/KI\il :N}O2S- 26ICRF/05, dated 24-01'2026 and Nrr No 06/DSE/SE[(R&B/KMNR/202 i-26l cRF/06, dated 27-01-2026 respectivery issued by the 4th respondent, per ling disposar of the above writ petition. l.A.NO:2 OF 2026 Between The Superintending Engineer (R AND B), Karimnagar Town anc District. .....PET|T|ONER/ TESpONDENT No.4 AND . Sri Srinivasa Constructions, H.No-9-4-358/1, Sapthagiri Colony, Karimnagar, Karimnagar District, Rep.by its Managing Partner, Sri A.Dasharathareddy, S/o.Narayana Reddy, Aged about 52 years, Occ. Busrness. .....RESPONDENT/wRIT PETITIONER 2. The State of Telangana, Rep.by its Principal Secretary, Department of Roads and Buildings, Dr.B.R.Ambedkar Telangana State Secretariat, Hyderabad. 3. The Commissioner of Tenders, Government of Telangana, Chinthala Bhasthi, Khairathabad, Hyderabad. 4. The Chief Engineer (R AND B), Central Road lnfrastructure Fund (CRIF), Erramanzil, Hyderabad. ...RESPONDENTS Petition Under Section 151 CPC praying that in the circumstances stated in the affidavrt filed in support of the petition, the High Court may be pleased to vacate the interim orders dt.06-O2-2026 passed in LA.No.1 of 2O26 in W.P.No.3709 of 2026 and dismiss the writ petition as devoid of merits. Counsel for the Petitioner : SRI ALLADI RAVINDER, SENIOR COUNSEL FOR SRI KRISHNA KISHORE KOWURI Counsel for the Respondents : SRI T.RAJINIKANTH REDDY, ADDL ADVOCATE GENERAL The Court made the following ORDER J LNA, J ll/P.No-3709 oJ 2026 II IN THE HIGH COURT FOR THE STATE O[ IELANCANA AT HYDERABAD I i ! HON'BLE SRI JUSTICE LAXMT NARAYANz\ ALISHETTY WP.No.3709 o12026 Dated:19.02.2026 Between: Sr i Sr i nivas a Co ns t ruc t ion, Karimnagar. repld by its Managing P ar tn er-A. Da.s ha ra t hareddy . . Petitioner And: : The State of Telangana, reptd., by its Principal Secretaty, Department of Roads and Buildings, Hyderabad and !hree others i I .. . Respondents I ORDER: This Writ Petition is tlted seeking the fbllcving subsranrive relief: ".-. to issltc ttn order or direction ntore particulu- v one in lhe nature of v;rit of Mandomus declaring tlrc octi ,n of the respondents-(i) in issuing the fresh tender notifirat ons vide NIT No 05/DSE/SEK/R&B/ KA,{NR/2025-26/CRI./ 5 datect 24 01.2026 und NIT No 06/DSE/SEK/R&B/KM\ R/2025- 26/CRF/06. dared 27.01.2026 for the work^s., viz., o widening und strengthening oJ single lane to tlo,, tle land road fronz Arnakonda Village of Choppadandi Al ntdal to Mollial X roatl fi.om Km 0/0 to 35/00 via Go,.; rlraopet I LNA' J wP.No.3709 of 2026 District and Village of Rttmadugu Mandal in Kartmnagar of the works of widening and strengthening (ii) for Km 10/0 to 28/2 in Vemulowada to Sirikonda road from considering rhe case of Rajanna Sircilla Dislrict, (iii) not pursuant to av'arcling llrc conftacl works tlle petitioner for tlrc Tcnder Noti/ication vitle NIT No 02/DSE/SEK/R& B/KMNR/2024-25/CRF/02 tlated t5 t1 2025 and Tender N o t i li c a t io rt v ide N IT N o' EI(/ R& B/ K MN R/ 2 0 2 I - 0 3 / DS E/S 25/CRF/03 dated 15 1 1 2025 as illegat' arbitrary' violative also suffers from of principles of natural justice and reasons' apart "from malaJide intenlion and for extraneous 300A of rhe violarive of Articles 14' 21 and being Constitution of India and consequenlly (iv) to set aside tlrc impugned .fi'esh tender notirtcations vide NIT dated No.05/DSE/SEK/R&B/KMNR/2025-26/CRF/05' 24.01.2026 and NIT No 06/DSE/SEK/R&B/KMNR/2025' 26/CRF/06dated270l'2026ond'(v)further'consequently of lhe b clirect llrc respottdents lo consider the cose viz ' (i) widening and pelitioner for awarding the works lane to double land toad from stre rtgtltett ing of sittgle Mandal rc Mallial X Arnakoncla Village of Choppadandi via Gopalraopet Vitlage of roatl front Km 0/0 to 35/00 I RamaduguMandalinKarimnagarDislrictand(ii)forthe works of tt idening and slrcngthening Sirikonda road ft'ont Km 10/0 of Vemulawada to to 28/2 in Rajaruto Sircilla Districl putsuant to the tender notilication I DS E/S E K/ R& B/ K MN R/ 2 O 2 4 2 5 /C RF/O 2' and Tender NotiJicatiort vide S E K/ R & B / K MN BJ 2 O 2 4 2 5 / C R F/ O 3 accordance v) ith law -+;;.8:-irtta: " vide NIT No'02/ dated 15.11.2025 NIT No 03/DSE/ dated 15.11.2025 in Y I-NA, J tl'P.No.3709 of 2026 Heard Sri Alladi Ravinder, learned senior counr ,l appearing for Sri Krishna Kishore Kovvuri, learned counsel-or- ecord lor the petitioner, and Sri T.Rajinikanth Reddy, leamed Addrr onal Advocate General appearing lor respondents. 3. Learned senior counsel appearing lor petitioner submitted that initially, respondent No.4 issued notificarion NIT \r .02/DSE/SEK/ R&B/KMNR/2024-25|CRF|02 (for shorr, hereinafte. r.eferred ro as 'NIT No.02') dated 15.11.2025 for widening and st engrhening of single lane to double lane road from Arnakor< a Village of Choppadandi Mandal to Mallial X road tiom KM 0/ ) to 35/00 via Gopalraopet Village, Ramadugu Mandal, Karirnnas: ' District and respondent No.4 also issued another tender notiflcatir n NIT No.03/ DSE/SEK/R&I]/KMNR/2024-25/CRFlO3, (for shor, hereinafter referred to as 'NIT No.03') dated 15.11.2025 lor .r,idcning and strengthening of Vemulawada to Sirikonda road lro r KM I 0i0 to 2812 in Rajanna Sircilla Dish.ict, inviting bids r n or befbre 01 .12.2025. The time lirnit for completion of the ccr tract work in respect of notification NI'l' No.02 was l8 lnonths an, the contract value was Rs.34,91,86,193/-, whereas the period for ompletion of work in respect of NIT No.03 was l5 months and the ontract value was Rs. 15,41,86,000/- ! LNA, J WP.No.3709 oJ 2026 3.1. In pursuance of the said tender notifications, the petitioner submitted bids and the same werc accepted by respondent No.4 vide confirmation ID No.3325239 dated 29.11.2025 for NIT No.02 and confirmation tD No.3325378 dated 29.11.2025 for NIT No.03. 3.2. As per the tender schedule, the bids were proposed to be opened on 02.12.2025, however, the same was not done and surprisingly, respondent No.4 issued fresh tender notification vide NIT No.05,DSE/SEK/R&B/KMNW2025-26lCRFl05, (For short, hereinalter referred to as 'NIT No.05') dated 24.01.2026 insofar as work under earlier tender notification NIT No.02 is concemed and the contract value was increased to Rs.35,7 1,4 1,9301-, however the time for completion of work was reduced to 12 months from 18 months' Respondent No.4 has also issued another tender notification NIT No.06/DSE/SEK,{{&B/KMNN2025-261CRF 106, (For short, hereinafter referred to as 'NIT No.06') dated 27.01.2026 in respect of the same work as that of earlier tender notification NIT No.03, and the value of contract was increased to Rs. I6,45,43 ,2811-, and the tenure for completion of work was reduced to six months fiom 15 months' 3.3. Learned senior counsel further submitted that the eligibility criteria for executing the works depends upon the time period stipulated for completion of work and as per Clause-S of tender ' LNA'J I l'. h'o..1709 oI2026 notification, the available bid capacity is calculat: I as per the principle ol 2AN-B, where 'A' stands lor highest tr'liover in one financial year in any of the l0 financial years and N' stands lor number ol years lor completion of work lor which ten' rrs are invited and 'B' stands for updated value of all existing commirr rr'nts' 3.4. Learned senior counsel further submitted that t e pctitioner is duty quatified lor the tender notifications initialtf is 'ued i.e, NIT No.02 and NIl' No.03, however, in view of increase of contract value and reduction in tenure for completion of work, the pc ioner is put to disadvantageous position. He further submitted that rt': pondent No'4, without assigning any reason and without infor r ration to the petitioner, cancelled the earlier tender notifications '[-f No.02 and No.03, onty to exclude the petitioner and therefore, he subsequent tender notifications i.e., NIT No.05 and NIT No.06 ar: illegal and the same were issued with a mala fide intention an( lhe petitioner submitted a representation dated 04.02.2026. He lir lrer submitted that the last date for submission of tender is 09.02.20.1 ' and technical bids witl be opened on the same day and in the eve I , the technical bids are opened on 09.02.2026, third party rights r,'ct ld accrue and therefore, the present Writ Petition is hled seeking inc rlgence of this CoUrt** LNA, J 4. WP.No.3709 of 2026 Leamed senior counsel for petitioner in support of his contentions, relied upon the judgments of the Hon'ble Supreme Court in Banshidhar Construction Private Limited Vs. Bharal Coking Coat Limited antl olherst and Shanti Construction Private Limitett Vs. State of Odisha and others2 and prayed to allow the Writ Petition 5. In Shanti Construction Pvt. Limited's case (cited supra), it is held as follows:"A public tender is nol a privote bargain. It is inslrument of governonce, a mechanism througlt which the State discharges its solemn duty as trustee of publtc wealth. Its purpose is not rnerely procedural compliance, but maximisation of public valtte through a process i.e. fair, transporent and competitive. The obligation of the Tendering Authority is therefore rwo fold, namely, to interpret its own terms with consistency and to ensure that such interpretation advances. not defeats, the object of tender. The court musl intervene in a case of demonstrable misconstruction of a tender condition or itationality which affects lhe pubLic interest. When an interpretation of a tender condition narrovrs competition and excludes the highest bidder on a ground ttnsupported by law, the decision making process is vitiated. The interpretation of the terms of tender must, therefore, serve the obiect and purpose of the tender mainly lo maximise the revenue to the State, when it deals with o natural resource. " (zoz+) ro scc zz: H' mzs icc ontine sc 2368 \z LNA, J 6. I l'.to.3 7l)9 oI2026 ln Banshidhar Construction Pvt. Limited's ca; : (cited supra), it is held as follows:"Government bodies being public authorities at.c t :pec ted to uphold fairness, equality and public interest (\t- t v ltile deoling wilh contructual matters. Right to equall. wtler Article l4 abhors arbitrariness. Public authoritit,: ?ove lo ensure lhut rut bias, favouritism or arbitrariness Lu.t shown during the bidding process and that the enlir,' tidding process is corried out in absolutely transparenl m(t,, (r.' 7. Per contra, Sri T.Rajinikanth Reddy, lear.r :d Additional Advocate General appearing for respondent Nt,. 1. principally contended that due to administrative exigencies, the sc.. re of work has been revised and additional provisions of site drair : and d rainage facility at Matlail X Road are included in rhe rv.: 'li, wh ich are essential to overcome flooding and to ensure good c a i rlge f'ac ility at Mamidipally Vitlage and to avoid damages to roa, j antl as such, respondent No.4 had to issue fresh tender notifications r t:., NI'l No.05 and NIT No.06. He further submitted that as per cnder Clause No.28.2, the authority has right to cancel the tendcr., nd exercising such power, the earlier notifications i.e., NIT Nos.02 rl d No.03 were cancelled because of exigencies and there is no mala 1i Ie intention or extraneous reason for cancellation of the carlier tenrl: notifications, as Ytleged by the petitioner. I{e further submitted that rsolhr as NIT / lo LNA, t l(P.No'3709 oJ 2026 No.02 is concemed, the work period was reduced taking into consideration the fast approaching Godavari Pushkaralu to be held in July, 2021 and to facilitate lree movement of vehicular movement during Pushkaralu. 7.1. He further submitted that all the tender participants received the information through online e-procurement portal and the modifications, conigendums, addendums, notifications of tender are published on CPP portal and would be automatically notified to all bidders through their registered emai[/sms, thereflore, the contention of the petitioner that it was unaware of the same is factually incorrect. He further submitted that the earlier tenders were cancelled because of revision in the scope of work and to incorporate additional works and for smooth and unintenupted vehicular lnovements during Godavari pushkaralu. Therefore, there is no illegatity or arbitrariness on the part of respondent No.4 in cancelling the earlier tender notifications and the petitioner is at liberty to participate in the subsequent tender notifications. He further submitted that the petitioner has not participated in the subsequent tender notifications, therefore, he has no locus standi to file the present Writ Petition and as such, the Writ Petition, being misconceived, is liable to be dismissed' ./ I] L,\A, J u/P.n\tJ709 of 2026 Learned Additional Advocate General furthc. submitted that tender conditions empower respondent No.4 to cance i enders without assigning any reason. The petitioner having agreed tr the terms and couditions rnentioned in the tender notifications, canr< t challenge the action of respondent No.4 in cancelling the tender r ctifications on untenable grounds. 8.1. He lurther vocilerously submitted that in tenri .r. rrratters, the scope of interf'erence by the Courts is very limited ar u if the present writ Petition is allowed and the impugned tender rLr tificarions are cancelled, it will have cascading effect on the Sr rre exchequer including escalation of contract value of works be; des depriving citizens the benefits of infrastructure and accordirl ly, prayed to dismiss the Writ Petition. 8.2. Leamed Additionat Advocate General for resp.: rdent No.4 in support of his contentions, has relied upon the follor,,,inr .judgrnenrs:_ t unt, 2 Order dated 03.10.2024 in Writ petition No.IgS4 j oJ' 2024 trnd I . Stote of Jarkhond ond ors Vs. CWE-SOMA Consltr batch. J. N. G. Projects limited Vs, Vinotl Kumar Jsin and ors 4. Shinmit Utsch Indio pvt.ltd Vs. ll/est Ben;i rl Transport Infrostructure Developmenl Corporation limited and o ss I20to 1r+1 scc rzz zozz 1a1 scc tzt r .12 LNA' J H'P.No.3709 of 2026 g.|nCWE-SIMAConsorlium,scase(citedsupra),theHon'bie Supreme Court observed as follows:- ,,Incaseofatencler,lhereisnoobligationontlrcparto.fthe lenders or nolice to occept any of the person issuing tender on tender is called for and a After rcnder' lowest the even who have status of the conftaclors seeing tlte rates or lhe given tenders that there is no competition' lhe person issuing b enter ittb any conlracl and thereby rcnder may decide not bid hos settled that so long as lhe well is It tender' the cancel no vcsted right highest biclder acqLtires not been accepted' the " his b have the auction concluded in favour' Intheorderdated03'10.2024passedinW.P.No.l8543of2024 10. and batch, it is held as hereunder:- " .... In view of the preceding anall'sis and judiciaL pronouncements,thisCourtdeemsitappropriatellutthcreis on the parl of thc tendering no arbitrariness or malafide lo cancellatiott of tender process' authorities lTith regdrd tloes nol preclude the cancellation said the However, parlies lo participarc in petilioner os well os olher interested near lhat may be Jloated in the notification tender the fresh fulure. " I 1. In N.G Proiecls limited's CASC Supreme Court held as follows:- s I 2616 15) SCc 303 (cited suPra), the Hon'ble ,] LNA, J U'P.No.3709 of 2026 "In vie,,- of the above judgments of this Court, the vrit court should ref-ain itself from imposing its decisirtn over lhe decision oJ tlte employer as to vthether or nol tt) t ccept the bid of a lenderer. The Court does not have lhe () )erttse lo exatnine the lerms and conditions of the present tla_, zcononic actit,itie.s oJ the State and this limitation should t e kept in vieu'. Courts should be even more reluctanl irt t tterJbring with contrdcls involving technical issues as tl :re is a re(luirement of tlrc rtecessary experlise to adjudi, ote Ltpon such issues. The opproach of the Court should be r ct to Jind faulr w h tnagnifiing glass in its hands, rather he Court shoultl erunine as lo whether the decision-making u oce.ss is after contplying with the procedure contempldte I bv the tender conditions. If the Court finds that thet t is lotal arbilroriness or that lhe lender has been granted I a mala fide manner, still the Court should refrain from intt -fering in the grant of tender bul instead relegale the part't s lo seek damages.for tlrc wrongful exclusion rather lhan to i yuncl the execution Of the contracl. The injunction or inteil trence in lhe lendcr leads to additionol costs on the Stale tt, d is also against public inlerest. Therefore, lhe State and i,; citizens su,(.[e r lu ic'e. firstly bv paying escalation cosls atttt secondly, by being deprived of the infrastructure for which ,l 2 present day Governments are expected to work. " 12. ln Shimnit Ulsch India Private Limiled's cas : (cited supra), the Supreme Court held that the Government has disc- tion to aclopt a different policy or alter or change its policy to serv: public interest una iruT" it more ef'fective in the context of tender corr, itions. t4 LNA, J Consideration: 13. LI/P.No.3709 of 2026 The petitioner principally submirted rhat respondenr No.4 cancelled the earlier tender, without assigning any reasons, only to exclude the petitioner. However, the petitioner failed to explain as to how he is affected or put to disadvantageous position because of increase in value of contract work and decrease in tcnure lor completion of work in the subsequent tender notifications. The petitioner failed to place on record any material to substantiate the said contention. Further, the petitioner has not participated in the lresh tender notifications issued by respondent No.4, therelore, the aforesaid judgments relied upon by learned counsel lor the petitioner have no application to the present case. 14. In the counter filed on behalf of respondent No.4, reasons for. cancellation of earlier tender notifications and issuance of lresh tender notifications have been explained, as per which, the value ol work in NIT No.2 was increased because of inclusion of additional works and insofar as decrease ol tenure for completion of work in NIT No.3 is concemed, the same became necessary for ensuring free vehicular movement during the fast approaching Godavari pushkaralu scheduled to be held in luly, 2027 . ) I,NA, J I P.No.3709 of 2026 5. Learned Additional Advocate General sub r itted that the scope of review by this Court in tender matters is r t ry limited and that, this Court cannot go into the technical aspects lf tenders and cannot enteftain writ petition unless malafides or gl'e\ e in'egularities are pointed out and established. 16. ln the instant case, according to respondent N: 5' cancellation of tender notiflcations, NIT Nos.2 and 3 was necessi'r ted becatrse of exigencies and subsequent developments and therefor: the contention of the petitioner that the same are cancelled only to , xclude it from participating in the subsequent tenders is untenable irr the absence of any material on record. . Here, it is appropriate to refer to Clause-28. 2 of lnstructions to Tenderers appended to'Iender conditions which rez t s as under:- 'The tentler ac(epting authority reserves the i ,lht to accept or reject any lender or all lenders and lc nncel the tendering process, at any time prior lo the a.t zrd of controcl, without thereby incurring any liabilit.' to tlrc affected tendercr or tenderers or any obligt t r-tn to inform the aJfected tenderer or tenderers of lhe ' osorts r8 for such oction". Thus, the above Clause empowers the l-cr der Accepting Authority to cancel the tender notification withou t assigning any reasons I6 LNA, J tt/P.No.3709 of 2026 19. In the light of the contentions raised by the leamed senior counsel appearing for the petitioner as well as leamed Additional Advocate General, belore proceeding further, it would be useful to reler to the principles and parameters set down in a catena ol decisions by the Hon'ble Supreme Court on the scope and extent of' interference by the Courts in the matters of tenders and contracts. 20. The Hon'ble Apex Court emphasized the need to find a right balance between administrative discretion to decide the matters whether contractual or political in nature or issues ofsocial policy and the unlairness is set right by judicial review. 21. ln Tata Cellulnr vs. Ilnion of India6 it is hetd as under: " The principles deducible from the above are' (t) The modern trend poinls to judicial restraint in adm inis h'ative act ion. (2) The court does not sit as a court of appeal but merely revievs the manner in which the decision was made. (3) The court does not hdve the experlise to correct lhe administrative decision. Il a teview of the administrative decision is perntitled it will be substituling its own decisiott, without the necessary experlise which itself malt be fallible. (4) The terms of the invitation to tender cannot be open to judicial scrutiny because the invitation to tender is in the realm of contracl. Normally speaking, the decision to accepl the tender or award the controct is reoched by process of u &se 1oy scc osr t7 I,NA, J tt/P.No.3709 oI2026 negotiations through several tiers- More often thar tot, such decisions ore made quolitativelv by experts. (5) Thc (iovernmenl must have freedom of a,, troct. In other vrords, a foir plav in the joints is ct e ce s-\arv concontildnt for an administrative body functioni ginan oclministrutive sphere or q uds i-administrath,( Hov'cver, the decision musl tlol only be lesltt sphere. h the opplicatiotr of Wednesbury principle of reastt ableness (including its olher facts pointed out above) but n t t be.free .from arbitrariness not affected by bias or actuate') hy nnla ./ides (6) Quoshing decisions may impose heavy adn t t is lr at ive burdan on the administration and lead to incr,t' 'sed and unbudgeted expenditure. " 22. The Hon'ble Supreme Court in the case of Ju1:,tish Mandd vs. Stale of Orisso o nd OlhersT , observed as under: "Judicial ret,iew of administrotive aclion is intencie t lo prevent arbilrariness, irrationality-, unreasonableness, bia.; ond mala ./ides. Its purpose is to check v,helher choice or deci: t tn is made " luw'fully " und nol lo check whether choice or, 'ecision is "sound". Il'|rc n the polteer o.f judicial review is qvoked in mattars rclating to lenders or award of contra: s, c ertain special Jbutures sltould be borne in ntind. A ctr tracl is o comnterciol lronsdclion. Evulualing tenders and awording conlracls ure essentially contntercial functions. Pr nciples of equity and natural juslice stay at a distance. I;f tl : decision relating lo award of contract is bonafide and ts in public' ' 2oo7 (14) scc s17 LNA, J oI2026 wP.No.3709 of power of judicial review' interest, courts will not' in exercise aberralion or error in assessment interfere even if a procedural made out' The power of iudicial or prejudice to a tenderer' is be invoked to protect private reviev' will ttol be permitted to interest or to decide contractual inlerest al llte cosl of public with a grievance con dispules. The tenderer or controclor court' Atlempls by unsuccessful always seek tlamages in a civil wounded pride and knderers reitll imaglnary grievances' some lo make mountains out of moLehills of business rivalry, technical/proceduralviolationorsomeprejudicetoself,and exercising power of judicial persuade courts lo interfere by review,shouldberesisled.Suchinrerferences,eitherinterimor ond public works for years' or delay relief final, may tnld up projecl millions and may increase the succor to thousands and costmanifold.Tlrcrefore,acourlbeforeinterferingintenderor of power of iudicial review contraclual nlalters in exercise should pose to itself the following questions: made by the (i) Whether tlle process adopted or decision aulhorittt is mala J"ide or intended Or Whether the process adopred and irrationol that lhe Court to favour someone; or decision made is so arbitrary can say: ,,Thedecisionissuchthatnoresponsibleaulhorityacling with relevant law could havc reasonably and in accordance reached (ii) Weother public interest is affected " 23. The law regarding government contracts nature and scope of its or auctions and the judicial review is well settled' l9 LNA, J tlP..No.3709 of 2026 24. In M/s Michigan Rubber (I) Ltd. vs. Slate ol lfurnalaka and orsE, the Hon'ble Supreme Court observed as under: "From lhe abctve decisions, thefollowing, principle: tnerge: (a) The basic requirentenl of Article l4 is fairnes: i action by the Stale. and non-arb itrar iness in essence and sub; tncc is the heartbeat of fair play These actions dre omen(.5\e lo the judiciat review only to the extent that lhc Slate mu:l ctct validly for a discernible reason ctnd not whimsically for t. t.v trherior purpose. II the State acts within the bounds of rea. , nableness, it would be legilimate lo lake into consideration tt (' ndtional priorilies: (b) Fixation of a value of the tender is entirelv vilhin lhe purview o.f the executive and the courts hardly hav,' tny role to play in this process except for striking dou'n such ,t lion of the executive as is proved to be arbitrary or unreaso t 'ble. If the Government acts in conformity with cerlain healtl') standards and nornts such os awarding of contracls by invitin '-, lenclers, irt those circtttnslances, the interference by courts is "'t t t lintited; (c) In the motter of formulating conditions ('t a lender documenl and awarding a contract, greoler latitud,' ts retluiretl to be conceded to the State authorities unless lhe Lr' lion of the tendering atrthorilt is found to be malicious and u t isuse o.f its statutory po\rers, interference by courls i.\ not v)arr 1 t/ed, (d) Cerlain precondilions or qualirtcotions for ten'| rs have to be laid down to ensure that lhe conlractor has the ,', pacity and the resources to successfully execute the work; an,7 (e) If the Slttle or its instrumentalities act reasonahtl .fait ly and in public interest in awarding conlract, here again' i terlbrencc \- 8+012 (8) scc 216 .20 LNA' J tlP.No.3709 by court is velar reslriclive since fundamental right oJ 2026 no person cdn cldim a " rttith the Government to carrv on business the Hon'ble 25. In Montecarlo Lld' v' NTPC Llde'' observed that the tender inviting understand and appreciate Apex Coutt authority is the best person to its requirement in the tender documents' It has further obserwed as follows:- is manifestly in ..... Wltere a decisiort is laken that of tlrc tender document or consottance with the langttage subserves lhe purpose for v'hich the tender is Jloated' the of restraint' Technical court should folLow tlte principle the court would be evaluation or cttmparison by to scan and The principle that is applied impermissible relatable to controcl in understand an ordinary instrument differently than interpreling other spheres has to be treated relating to technical and appreciating tender documents speciol skills' The owner should works artd projects requiring purpose be allowed lo corn' out the and there has to be allowance offi'ee ptaf in tlrc 'ioints"' 26. ln Silppi Conslructions Contractors obserued that Ors'0., the Hon'bte Apex Court v' (Jnion of Indiu antl the Courts must realize which needless their limitations and the havoc' commercial matters could cause' ln contracts involving technical be even more issues, the Courts should e ()oL6\ 15 SCC 272 ,o'iotg€cc ot'luNE sc 1133 interference in reluctant because most ol us in 2t - ,rp.,r".tzoc!llizl6 judges' robes do not have the necessary expertise tc idjudicate upon technical issues beyond our domain. In flact, the Cotrr t must give "fair play in the joints" to the govemment and public sectc I undertakings in matters of contract. Coufis must also not inter i re where such interference would cause unnecessary loss to the publi : exchequer. The Apex Court lurther held that unless t: ) action of the 27. tendering authority is found to be malicious and misus : of its statutory powers, tender conditions are unassailable 28. The Hon'ble Supreme Court in Balaji l', ntures Privale Limited vs. Maharashtro Stale Power Generr''ion Company t Limitedt held as under: Owner should always have the freedont to rovide the eligibility criteria and/or the terms and condititt,t of rhe bid unless it is found to be arbitrary,, mala Jide andhtt uilor made. " The bidder/tenderer cannot he permitled to chal,t rye rlte bid cond ilion/clause whiclt might nol suit him and./ot' ': ,nvenient lo him. As per the settled proposilion of lavt as suclt it , an offer lo the prospeclive bidder/tenderer to compele and sub r ru the tender considering the ternts and conditions mentionecl i. the tender documenl. " 29. ln Jagadish Mandul's case (ciled supra), it ,r rs observed that the power of judiciat leview will not be permitteri t r be invoked to f ib22 SCC online I967 LNA, J WP.No.3709 of 2026 protect the private interest at tlie cost of public interest. In the very paragraph, it was observed by the Supreme Court that the tenderer or contractor who has grievance can always seek damages in the civil court. 30. ln Michigan Rubber (Indfu) Lltl's case (cited supra), it was inter alia observed that certain preconditions or qualifications for tenderers have to be laid down to ensure that the contractor has the capacity and the resources to successfully execute the work. The interference by the Court has to be very restrictive since no person can claim a fundamental right to carry on business with the government. 31. From the above judicial precedents, it is clear that firstly, the tenderee/employer has discretion and freedom to set the terms and conditions ol bid as well as the eligibitity criteria of bid. 32. Secondly, since the Court lacks technical knowledge, the Courts cannot examine the technical aspects, intricacies of tender including detailed examination olthe terms and conditions of tender' 33. Thirdly, the scope ol judiciat review is limited in tender matters and the Courts shall restrain from interfering with tender matters unless mala fides or grave irregularities, or arbitrariness, or misuse of power or procedural irregularities are established. -- K z \ ,vr.r".:rocli*!izl 34. Fourthly, the Courts should keep in mind, th; cancellation of tenders would have cascading elfect including esc t ation ol project cost and burden on exchequer and depriving citizer: of enjoying the infrastructure. Further, the bidder has alternat I e renredy of approaching the civil Court for damages. 35. In the present case, it is the specific case of 6 :titioner that the value of contract work was increased and the period I lr completion of work was decreased only to exclude petitioner and to put the petitioner in disadvantageous position. However, ') e petitioner has failed to explain as to how it was aft-ected by modil'r ation olterms of the tenders and has failed to place any mate r i I on record to substantiate the same. i6.Thepetitionerhasalsocontendedthatearlie''enderscancelled without any reasons and without inlorming the peL 'ioner' However, as per Clause-28.2 of Instructions to Tenderers wh r h is appended to Notice Inviting Tenders, i'e., NIT Nos'2 and 3, r: pondent No'4 is empowered and entitled to cancel the tender witl t r-rt assigning any reasons. Moreover, admittedly, the petitioner did nt'r participate in the subsequent tenders i.e., NIT Nos.5 and 6. 37. Further, it is the specific contention of resl ondent No'5 that information of tenders is sent to all the biddels/ enderers to their LNA, J Y WP.No.3709 of 2026 registered email/sms, therefore, the contention of the petitioner that it is unaware and is not informed about the cancellation of MT Nos'2 and 3 is factuallY incorrect. Conclusion:- 38. In view of the above discussion and legat position' this Cou( is of considered opinion that the petitioner failed to establish the mala fides or perversity or procedural irregularity on the part ofrespondent No.4 in cancelling NIT Nos.2 and 3 and issuing fi'esh tenders i'e'' NIT Nos.5 and 6. 39. For the foregoing reasons, this Writ Petition fails and the same is liable to be dismissed. 40. Accordingty, this Writ Petition is dismissed' No costs' 41. Miscellaneous petitions pending, if any' shall stand closed' Interim order dated 06.02 '2026 shall stand vacated' No costs' SD/. C.DEEPIKA SSISTANT REGTSTRAR //TRUE COPY// SECTION OFFICER TTY LAXMI NARAYANA ALISHE JUSTICE SRI HON'BLE the One fair copy to Pe rusal) t:o-r.-Hit Lotothi p's Kind t To f. Ministry or ilj,1,&?'r?lretary, Union or rndia, Law, Justice and companv Advocates Association Library' High court . tfl3'3;)3[l-?i[iu"n'"' relansana at Hish court ror the state or GENERAL, , ?*'S33',; #iiliB'8orr J8,u'IJ't"*o KrsHoRE KovvuRr BIl%t* " Advocate [oPUc] o. f*o CD CoPies SA TKS d W ={ffi ffi' ilEwl@' $ HIGH COURT DATED:1910212026 ( oRr l4 a a ?t 'r l .J r-) ,/ .,,t * i)l i:Ftl - ---" :: ORDER WP.No.3709 of 2026 DISMISSING THE W.P WITHOUT COSTS. s. t v )L . ll

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Telangana HC judgments →