-1HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
IN THE HIGH COURT OF KARNATAKA AT BENGALURU
DATED THIS THE 07TH DAY OF SEPTEMBER, 2026
BEFORE
THE HON'BLE MR. JUSTICE E.S.INDIRESH
WRIT PETITION NO.32565 OF 2025 (KLR-RES)
C/W
WRIT PETITION NO.15964 OF 2025 (GM-RES)
IN WP No. 32565/2025
BETWEEN:
Digitally signed
by CHAYA S A
Location: HIGH
COURT OF
KARNATAKA
1.
SRI. MOHAN
S/O. KURIKAMANNA,
AGED ABOUT 55 YEARS,
R/AT NO.18, BHAVANI NAGAR,
SY. NO.85/2,
DODDABIDARAKALLU VILLAGE,
YESHWANTHPURA HOBLI,
BENGALURU - 560 073.
2.
SRI. ASHOKE @ ASHOKAN
S/O NATARAJAN
AGED ABOUT 60 YEARS,
R/AT SITE NO.10, BHAVANI NAGAR,
SY. NO.85/3,
DODDABIDARAKALLU VILLAGE,
YESHWANTHPURA HOBLI,
BENGALURU - 560 073.
3.
SMT. RENUKA
D/O NARAYANAPPA,
-2HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
AGED ABOUT 42 YEARS,
R/AT SITE NO.6, BHAVANI NAGAR,
DODDABIDARAKALLU VILLAGE,
YESHWANTHPURA HOBLI,
BENGALURU - 560 073.
4.
SMT. NETRAVATHI
W/O KUSHAL H.
AGED ABOUT 41 YEARS,
R/AT SITE NO.15, BHAVANI NAGAR,
SY. NO.85/2,
DODDABIDARAKALLU VILLAGE,
YESHWANTHPURA HOBLI,
BENGALURU 560 073.
5.
SRI. HARISH
S/O KEMPAIAH,
AGED ABOUT 38 YEARS,
R/AT SITE NO. 14 A,
BHAVANI NAGAR,
SY NO.85/2,
DODDABIDARAKALLU VILLAGE,
YESHWANTHPURA HOBLI,
BENGALURU-560 073.
6.
SRI. RAMADAS,
S/O. DATHTRAIAH,
AGED ABOUT 50 YEARS,
NO. 2666, 12TGH MAIN ‘E’ BLOCK,
2ND STAGE, RAJAJINAGARA,
BENGALURU-560 010.
7.
SMT. SIDDAGANGAMMA
W/O. RENUKAPRASAD,
-3HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
AGED ABOUT 54 YEARS,
SY. NO. 85/2, BHAVANINAGARA,
NAGASANDRA POST,
BENGALURU-560073.
8.
SMT. GEETHA
AGED ABOUT 61 YEARS,
W/O. NARASIMHAMURTHY,
NO.2, 2ND MAIN,
PALACE GUTTAHALLI, MALLESHWARAM
BENGALURU-560 003.
…PETITIONERS
(BY SRI. K.G. SADASHIVAIAH, ADVOCATE)
AND:
1.
THE STATE OF KARNATAKA
REPRESENTED BY ITS SECRETARY,
DEPARTMENT OF REVENUE,
BENGALURU 560001.
2.
THE DEPUTY COMMISSIONER
BENGALURU URBAN,
KANDAYA BHAVANA,
K.G. ROAD, BENGALURU 560001.
3.
THE ASSISTANT COMMISSIONER
BENGALURU NORTH SUB-DIVISON,
KANDAYA BHAVANA,
K.G. ROAD, BENGALURU-560001.
-4HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
4.
THE TAHSILDAR
BENGALURU NORTH TALUK,
KANDAYA BHAVANA,
K.G. ROAD, BENGALURU 560001.
5.
SRI. RAMACHANDRAN K.
R/AT NO.7/1, 12TH
’K’ MAIN ROAD.
MUTHYALANAGARA,
BENGALURU - 560 054.
6.
SRI. PUTTAIAH
S/O HANUMAIAH,
AGED: MAJOR.
7.
SRI. T.N. GOVINDAGOWDA
FATHER NAME NOT KNOWN
AGED: MAJOR.
8.
SRI. BAIRAPPA,
FATHER NAME NOT KNOWN
AGED: MAJOR.
9.
SRI. B. VEERABHADRAIAH
FATHER NAME NOT KNOWN
AGED: MAJOR.
10. SRI. KRISHNADESAI,
S/O APPARAO
AGED: MAJOR.
11. SRI. BALARAM
FATHER NAME NOT KNOWN
AGED: MAJOR,
-5HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
RESPONDENTS NO.6 TO 11 ARE
R/AT DODDABIDRAKALLU VILLAGE,
YESHWANTHPURA HOBLI,
BENGALURU - 560073.
…RESPONDENTS
(BY SRI. ADITYA DIWAKARA, AGA FOR R1 TO R4;
SRI. SHIVASWAMY, ADVOCATE FOR R5;
NOTICE TO R6 TO R11 IS DISPENSED WITH)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226
AND 227 OF THE CONSTITUTION OF INDIA, PRAYING TO
QUASH THE ORDER PASSED BY THE 2ND
RESPONDENT IN
CASE
21.08.2025
BEARING
LND/6/2024,
DATED
ANNEXURE -A TO THE WRIT PETITION; AND ETC.
IN WP NO. 15964/2025
BETWEEN:
1.
P. K. RAMACHANDRAN
AGED ABOUT 61 YEARS,
S/O SHREEDHARAN NAMOODHARY
R/AT NO. 7/1, 12TH 'K' MAIN ROAD
MUTHYANA NAGARA,
BENGALURU - 560 054.
...PETITIONER
(BY SRI. SHIVASWAMY, ADVOCATE)
AT
-6HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
AND:
1.
MOHAN
S/O KURIKAMANNA
R/A DODDABIDAKALLU VILLAGE
YESHWANTPUR, HOBLI
BENGALURU- 75.
2.
STATE OF KARNATAKA
REPRESENTED BY IT'S SECRETARY
REVENUE DEPARTMENT,
MS BUILDING
BENGALURU -560001.
3.
ASSISTANT COMMSISSIONER
BENGALURU NORTH
KANDAYA BHAVAN,
K G ROAD,
BENGALURU -560001.
4.
TASHILDAR
BENGALURU NORTH
KANDAYA BHAVAN, K G ROAD,
BENGALURU -560001.
5.
DEPUTY TASHILDAR
NADAKACHERI, BAGALAGUNTE,
BBMP BUILDING,
BASEMENT,
BENGALURU-560001.
...RESPONDENTS
(BY SRI. K.G. SADASHIVAIAH, ADVOCATE FOR R1;
-7HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
SRI. SHAMANTH NAIK, AGA FOR R2 TO R5)
THIS WRIT PETITION IS FILED UNDER ARTICLES 226
AND 227 OF THE CONSTITUTION OF INDIA, PRAYING TO
DIRECT
THE
RESPONDENTS
TO
CLEAR
THE
ENCROACHMENT AND ALLOW THE PETITIONERS TO USE
THE CART ROAD ANNEXURE-B.
THESE
PETITIONS,
COMING
ON
FOR
PRELIMINARY
HEARING IN 'B' GROUP, THIS DAY, ORDER WAS MADE
THEREIN AS UNDER:
CORAM:
HON'BLE MR. JUSTICE E.S.INDIRESH
ORAL ORDER
In W.P.No.32565 of 2025, the petitioners have
challenged the order dated 21.08.2025, produced as
Annexure-A, the order dated 23.07.2024, produced as
Annexure-B,
and
produced
Annexure-C,
as
the
order
dated
passed
by
11.01.2023,
respondent
Nos.2, 3 and 4 respectively.
2.
In W.P.No.15964 of 2025, the petitioner..
has sought for direction to the respondents to clear
-8HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
the encroachment and allow the petitioner to use the
cart road.
3.
Having heard the learned counsel appearing
for the parties and on careful consideration of the
impugned orders, it is evident that the petitioners
have formed the layout without there being any order
of conversion of the agricultural land and has also
encroached upon the cart road. Even in the present
writ petition, the petitioners have not produced a copy
of the conversion order before this Court.
4.
In that view of the matter, following the
declaration of law made by the Hon'ble Supreme Court
in the case of Rajendra Kumar Barjatya and
another v. U.P. Avas Evam Vikas Parishad and
others reported in 2024 SCC OnLine SC 3767,
particularly, paragraphs 19 and 20, which read as
under:
-9HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
"19. In
a
catena
of
decisions,
this
categorically
held
that
illegally
of
construction
cannot
be
perpetuated.
If
the
construction
is
in
contravention
of
the
made
Court
has
unauthorized
Acts/Rules, it would be construed as illegal and
unauthorized
construction,
which
has
to
be
necessarily demolished. It cannot be legitimized or
protected solely under the ruse of the passage of
time or citing inaction of the authorities or by taking
recourse to the excuse that substantial money has
been spent on the said construction. The following
decisions are of relevance and hence cited herein
below to drive home the point that unauthorized
constructions must be dealt with, with an iron hand
and not kid gloves.
(i) In K. Ramadas Shenoy v. Chief Officers, Town
Municipal
Council,
after
having
found
that
the
impugned resolution sanctioning plan for conversion
of building into a cinema was in violation of the Town
Planning
Scheme
and
hence,
it
has
no
legal
foundation, this Court held that the High Court was
wrong in not quashing the resolution on the surmise
that money might have been spent. The relevant
passage reads as follows:
“29. The Court enforces the performance of statutory
duty by public bodies as obligation to rate payers
who have a legal right to demand compliance by a
- 10 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
local authority with its duty to observe statutory
rights alone. The scheme here is for the benefit of
the
public.
There
is
special
interest
in
the
performance of the duty. All the residents in the area
have their personal interest in the performance of
the duty. The special and substantial interest of the
residents in the area is injured by the illegal
construction.
30. The High Court was not correct in holding that
though the impeached resolution sanctioning plan for
conversion of building into a cinema was in violation
of the Town Planning Scheme yet it could not be
disturbed because Respondent No. 3 is likely to have
spent money. An excess of statutory power cannot
be validated by acquiescence in or by the operation
of an estoppel. The Court declines to interfere for the
assistance of persons who seek its aid to relieve
them
against
express
statutory
provision.
Lord
Selborne in Maddison v. Alderson, [L.R.] 8 App. Cas.
467 said that courts of equity would not permit the
statute to be made an instrument of fraud. The
impeached resolution of the Municipality has no legal
foundation. The High Court was wrong in not
quashing the resolution on the surmise that money
might have been spent. Illegality is incurable.
31.
For
the
foregoing
reasons,
the
appeal
is
accepted. The order of the High Court leaving
- 11 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
resolution dated 19 June, 1970 being Annexure ‘D’ to
the petition undisturbed is set aside. The resolution
dated 19 June, 1970 being Annexure ‘D’ to the
petition before the High Court is quashed. The
parties will pay and bear their own costs.”
(ii) Dr.
G.N.
Khajuria v. Delhi
Development
Authority, in which, the Authority concerned misused
the power and allotted the plot earmarked for park
for
a
nursery
school.
This
Court
vehemently
condemned the same and ordered for cancellation of
the said allotment, besides recommending penal
action against the authority concerned. The relevant
paragraphs are extracted below:
“8. We, therefore, hold that the land which was
allotted to Respondent 2 was part of a park. We
further hold that it was not open to the DDA to carve
out any space meant for park for a nursery school.
We are of the considered view that the allotment in
favour of Respondent 2 was misuse of power, for
reasons which need not be adverted. It is, therefore,
a fit case, according to us, where the allotment in
favour of Respondent 2 should be cancelled and we
order accordingly. The fact that Respondent 2 has
put up some structure stated to be permanent by his
counsel is not relevant, as the same has been done
on a plot of land allotted to it in contravention of law.
As to the submission that dislocation from the
- 12 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
present site would cause difficulty to the tiny tots, we
would observe that the same has been advanced
only to get sympathy from the Court inasmuch as
children, for whom the nursery school is meant,
would travel to any other nearby place where such a
school would be set up either by Respondent 2 or by
any other body.
9. The appeal is, therefore, allowed by ordering the
cancellation
of
allotment
made
in
favour
of
Respondent 2. It would be open to this respondent to
continue to run the school at this site for a period of
six months to enable it to make such alternative
arrangements as it thinks fit to shift the school, so
that the children are not put to any disadvantageous
position suddenly.
10. Before parting, we have an observation to make.
The same is that a feeling is gathering ground that
where unauthorised constructions are demolished on
the force of the order of courts, the illegality is not
taken care of fully inasmuch as the officers of the
statutory body who had allowed the unauthorised
construction to be made or make illegal allotments
go scot free. This should not, however, have happen
for two reasons. First, it is the illegal action/order of
the officer which lies at the root of the unlawful act
of the citizen concerned, because of which the officer
is more to be blamed than the recipient of the illegal
- 13 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
benefit. It is thus imperative, according to us, that
while undoing the mischief which would require the
demolition of the unauthorised construction, the
delinquent
officer
has
also
accordance
with
law.
This,
to
be
punished
however,
in
seldom
happens. Secondly, to take care of the injustice
completely, the officer who had misused his power
has also to be properly punished. Otherwise, what
happens is that the officer, who made the hay when
the sun shined, retains the hay, which tempts others
to do the same. This really gives fillip to the
commission of tainted acts, whereas the aim should
be opposite.”
(iii) In M.I. Builders (P) Ltd. v. Radhey Shyam Sahu,
this court in clear terms, held that there is no
alternative to the construction which is unauthorised
and illegal to be dismantled. The relevant paragraphs
read thus:
“13. There is no alternative to the construction which
is unauthorised and illegal to be dismantled. The
whole structure built is in contravention of the
provisions of law as contained in the Development
Act.
The
decision
to
award
contract
and
the
agreement itself was unreasonable. The construction
of the underground shopping complex, if allowed to
stand, would perpetuate an illegality. Mahapalika
could not be allowed to benefit from the illegality. A
- 14 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
decision of this Court in Seth Badri Prasad v. Seth
Nagarmal, (1959 Supp (1) SCR 769 at 774) was
referred to, to contend that the court could not
exclude from its consideration a public statute and
since the construction of the underground shopping
complex was wholly illegal it had to be dismantled.
No question of moulding a relief can arise as the
builder made construction on the basis of the interim
order of this Court and at its own risk.”
“73. The High Court has directed dismantling of the
whole project and for restoration of the park to its
original condition. This Court in numerous decisions
has held that no consideration should be shown to
the builder or any other person where construction is
unauthorised. This dicta is now almost bordering the
rule of law. Stress was laid by the appellant and the
prospective allottees of the shops to exercise judicial
discretion in moulding the relief. Such a discretion
cannot be exercised which encourages illegality or
perpetuates an illegality. Unauthorised construction,
if it is illegal and cannot be compounded, has to be
demolished. There is no way out. Judicial discretion
cannot be guided by expediency. Courts are not free
from statutory fetters. Justice is to be rendered in
accordance with law. Judges are not entitled to
exercise discretion wearing the robes of judicial
discretion and pass orders based solely on their
- 15 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
personal
predilections
and
peculiar
dispositions.
Judicial discretion wherever it is required to be
exercised has to be in accordance with law and set
legal principles. As will be seen in moulding the relief
in the present case and allowing one of the blocks
meant for parking to stand, we have been guided by
the obligatory duties of the Mahapalika to construct
and maintain parking lots.”
“81. A number of cases come to this Court pointing
to unauthorised constructions taking place at many
places in the country by builders in connivance with
the corporation/municipal officials. In a series of
cases,
this
Court
has
directed
demolition
of
unauthorised constructions. This does not appear to
have any salutary effect in cases of unauthorised
construction coming to this Court. While directing
demolition of unauthorised construction, the court
should
also
direct
an
enquiry
as
to
how
the
unauthorised construction came about and to bring
the offenders to book. It is not enough to direct
demolition of unauthorised construction, where there
is clear defiance of law. In the present case, but for
the observation of the High Court, we would certainly
have directed an enquiry to be made as to how the
project was conceived and how the agreement dated
4-11-1993 came to be executed.”
- 16 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
(iv) In Esha Ekta Apartments Coop Housing Society
Limited v. Municipal Corporation of Mumbai, it was
observed by this Court that the courts are expected
to refrain from exercising equitable jurisdiction for
regularisation
of
illegal
and
unauthorised
constructions and the relevant passage of the said
decision is extracted below:
“1. In the last five decades, the provisions contained
in various municipal laws for planned development of
the areas to which such laws are applicable have
been violated with impunity in all the cities, big or
small, and those entrusted with the task of ensuring
implementation
of
the
master
plan,
etc.
have
miserably failed to perform their duties. It is highly
regrettable that this is so despite the fact that this
Court has, keeping in view the imperatives of
preserving the ecology and environment of the area
and protecting the rights of the citizens, repeatedly
cautioned the authorities concerned against arbitrary
regularisation of illegal construction
by way of
compounding and otherwise.”
“8. At the outset, we would like to observe that by
rejecting the prayer for regularisation of the floors
constructed in wanton violation of the sanctioned
plan, the Deputy Chief Engineer and the appellate
authority have demonstrated their determination to
ensure planned development of the commercial
- 17 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
capital of the country and the orders passed by them
have given a hope to the law-abiding citizens that
someone in the hierarchy of administration will not
allow unscrupulous developers/builders to take law
into their own hands and get away with it.”
“56. We would like to reiterate that no authority
administrating municipal laws and other similar laws
can encourage violation of the sanctioned plan. The
courts are also expected to refrain from exercising
equitable jurisdiction for regularisation of illegal and
unauthorised constructions else it would encourage
violators of the planning laws and destroy the very
idea and concept of planned development of urban
as well as rural areas.”
(v) The aforesaid view was reiterated in Supertech
Limited v. Emerald Court Owner Resident Welfare
Association by holding that illegal constructions have
to be dealt with strictly to ensure compliance with
rule of law. The relevant paragraphs read as under:
“159.
The
rampant
increase
in
unauthorised
constructions across urban areas, particularly in
metropolitan cities where soaring values of land
place a premium on dubious dealings has been
noticed in several decisions of this Court. This state
of affairs has often come to pass in no small a
measure
because
of
the
collusion
developers and planning authorities.
between
- 18 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
160.
From
commencement
to
completion,
the
process of construction by developers is regulated
within
the
framework
of
law.
The
regulatory
framework encompasses all stages of construction,
including allocation of land, sanctioning of the plan
for construction, regulation of the structural integrity
of
the
structures
under
construction,
obtaining
clearances from the different departments (fire,
garden, sewage etc.,) and the issuance of occupation
and completion certificates. While the availability of
housing stock, especially in metropolitan cities, is
necessary to accommodate the constant influx of
people, it has to be balanced with two crucial
considerations - the protection of the environment
and the well-being and safety of those who occupy
these constructions. The regulation of the entire
process is intended to ensure that constructions
which will have a severe negative environmental
impact are not sanctioned. Hence, when these
regulations are brazenly violated by developers,
more
often
than
not
with
the
connivance
of
regulatory authorities, it strikes at the very core of
urban planning, thereby directly resulting in an
increased harm to the environment and a dilution of
safety standards. Hence, illegal construction has to
be dealt with strictly to ensure compliance with the
rule of law.
- 19 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
161. The judgments of this Court spanning the last
four decades emphasise the duty of planning bodies,
while
sanctioning
building
plans
and
enforcing
building regulations and bye-laws to conform to the
norms by which they are governed. A breach of the
planning
authority
of
its
obligation
to
ensure
compliance with building regulations is actionable at
the instance of residents whose rights are infringed
by the violation of law. Their quality of life is directly
affected by the failure of the planning authority to
enforce compliance. Unfortunately, the diverse and
unseen group of flat buyers suffers the impact of the
unholy nexus between builders and planners. Their
quality of life is affected the most. Yet, confronted
with the economic might of developers and the might
of legal authority wielded by planning bodies, the few
who raise their voices have to pursue a long and
expensive battle for rights with little certainty of
outcomes. As this case demonstrates, they are
denied access to information and are victims of
misinformation. Hence, the law must step in to
protect their legitimate concerns.”
(vi) In Kerala
State
Costal
Zone
Management
Authority v. Maradu Municipality, it was once again
reiterated that illegal and unauthorised constructions
put up with brazen immunity, cannot be permitted to
- 20 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
remain. The relevant passage of the said decision is
quoted below:
“107. At this stage, we must deal with the argument
raised before us by the company. It is submitted that
a world class resort has been put up which will
promote tourism in a State like Kerala which does
not have any industries as such and where tourism
has immense potential and jobs will be created. It is
submitted that the Court may bear in mind that the
company is eco-friendly and if at all the Court is
inclined to find against the company, the Court may,
in the facts of this case, give direction to the
company and the company will strictly abide by any
safeguards
essential
for
the
preservation
of
environment.
108. We do not think that this Court should be
detained by such an argument. The Notification
issued under the Environment (Protection) Act is
meant to protect the environment and bring about
sustainable development. It is the law of the land. It
is meant to be obeyed and enforced. As held by the
Apex Court, construction in violation of the Coastal
Regulation Zone Regulations is not to be viewed
lightly and he who breaches its terms does so at his
own peril. The fait accompli of constructions being
made which are in the teeth of the Notification
cannot present, but a highly vulnerable argument.
- 21 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
We find that the view taken by the Kerala High Court
in
aforesaid
decision
is
appropriate.
Permission
granted by the Panchayat was illegal and void. No
such development activity could have taken place. In
view of the findings of the Enquiry, Committee, let all
the structures be removed forthwith within a period
of one month from today and compliance be reported
to this Court.”
(vii) In State of Haryana v. Satpal, it was held that
the High Court committed a very serious error in
directing to legalise the unauthorized occupation and
possession made by the original writ petitioners on
payment of market price and hence, it deserved to
be quashed. The operative portion of the judgment is
reproduced below:
“19. Under the circumstances, the High Court has
committed a very serious error in directing to legalise
the unauthorised occupation and possession made by
the original writ petitioners on payment of market
price. Even the other directions issued by the High
Court are not capable of being implemented, namely,
to segregate the vacant land from the residential
house and which can be separated and utilised for
earmarked
purpose
i.e.
school
premises.
The
unauthorised construction is in such a manner and
even some areas are not used for residential purpose
and some of the area is covered by vegetation and
- 22 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
therefore,
it
is
not
possible
to
segregate
and
separate the same, which can be used for school
premises. There is no other panchayati land and/or
other land, which is available, which can be used as
school
premises/playground.
The
adjacent
land
belongs to some private persons and they are not
ready to part with their land to be used as school
premises/playground.
20. In view of the above and for the reasons stated
above, the impugned judgment and order passed by
the High Court and the directions issued (reproduced
hereinabove) directing to legalise the unauthorised
occupation and possession made by the original writ
petitioners on the land, which is earmarked for
school premises/playground is unsustainable and the
same deserves to be quashed and set aside and is
accordingly quashed and set aside. However, the
original writ petitioners are granted 12 months' time
to vacate the land, which is occupied by them
unauthorisedly and if within one year from today,
they do not vacate the lands in question, the
appropriate authority is directed to remove their
unauthorised and illegal occupation and possession.”
(viii) Finally, in a recent decision in Re : Directions
in the matter of demolition of structures, while
determining a question whether the executive should
be permitted to take away the shelter of a family or
- 23 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
families as a measure for infliction of penalty on a
person, who is accused in a crime under our
constitutional scheme, this Court has extensively
analysed all the aspects and issued certain directions
to the authorities. The penultimate paragraphs read
as under:
“IX. DIRECTIONS
90. In order to allay the fears in the minds of the
citizens with regard to arbitrary exercise of power by
the officers/officials of the State, we find it necessary
to issue certain directions in exercise of our power
under Article 142 of the Constitution. We are also of
the view that even after orders of demolition are
passed, the affected party needs to be given some
time so as to challenge the order of demolition
before an appropriate forum. We are further of the
view that even in cases of persons who do not wish
to contest the demolition order, sufficient time needs
to be given to them to vacate and arrange their
affairs. It is not a happy sight to see women, children
and aged persons dragged to the streets overnight.
Heavens would not fall on the authorities if they hold
their hands for some period.
91. At the outset, we clarify that these directions will
not
be
applicable
if
there
is
an
unauthorized
structure in any public place such as road, street,
footpath, abutting railway line or any river body or
- 24 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
water bodies and also to cases where there is an
order for demolition made by a Court of law.
A. NOTICE
i. No demolition should be carried out without a prior
show cause notice returnable either in accordance
with the time provided by the local municipal laws or
within 15 days' time from the date of service of such
notice, whichever is later.
ii.
The
notice
shall
owner/occupier
Additionally,
by
the
a
notice
be
served
upon
the
registered
post
A.D.
shall
be
affixed
also
conspicuously on the outer portion of the structure in
question.
iii. The time of 15 days, stated herein above, shall
start from the date of receipt of the said notice.
iv. To prevent any allegation of backdating, we direct
that as soon as the show cause notice is duly served,
intimation thereof shall be sent to the office of
Collector/District Magistrate of the district digitally by
email and an auto generated reply acknowledging
receipt of the mail should also be issued from the
office
of
the
Collector/District
Magistrate.
The
Collector/DM shall designate a nodal officer and also
assign an email address and communicate the same
to all the municipal and other authorities in charge of
- 25 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
building regulations and demolition within one month
from today.
v. The notice shall contain the details regarding:
a. the nature of the unauthorized construction.
b. the details of the specific violation and the
grounds of demolition.
c. a list of documents that the noticee is required to
furnish along with his reply.
d. The notice should also specify the date on which
the personal hearing is fixed and the designated
authority before whom the hearing will take place;
vi. Every municipal/local authority shall assign a
designated digital portal, within 3 months from today
wherein details regarding service/pasting of the
notice, the reply, the show cause notice and the
order passed thereon would be available.
B. PERSONAL HEARING
i. The designated authority shall give an opportunity
of personal hearing to the person concerned.
ii. The minutes of such a hearing shall also be
recorded.
C. FINAL ORDER
i. Upon hearing, the designated authority shall pass a
final order.
ii. The final order shall contain:
- 26 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
a. the
contentions of the
noticee, and if the
designated authority disagrees with the same, the
reasons thereof;
b. as to whether the unauthorized construction is
compoundable, if it is not so, the reasons therefor;
c. if the designated authority finds that only part of
the construction is unauthorized/noncompoundable,
then the details thereof.
d. as to why the extreme step of demolition is the
only
option
available
and
other
options
like
compounding and demolishing only part of the
property are not available.
D.
AN
OPPORTUNITY
OF
APPELLATE
AND
JUDICIAL SCRUTINY OF THE FINAL ORDER.
i. We further direct that if the statute provides for an
appellate opportunity and time for filing the same, or
even if it does not so, the order will not be
implemented for a period of 15 days from the date of
receipt thereof. The order shall also be displayed on
the digital portal as stated above.
ii.
An
opportunity
owner/occupier
to
should
remove
be
the
given
to
the
unauthorized
construction or demolish the same within a period of
15 days. Only after the period of 15 days from the
date of receipt of the notice has expired and the
owner/occupier has not removed/demolished the
- 27 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
unauthorized construction, and if the same is not
stayed by any appellate authority or a court, the
concerned authority shall take steps to demolish the
same. It is only such construction which is found to
be unauthorized and not compoundable shall be
demolished.
iii. Before demolition, a detailed inspection report
shall be prepared by the concerned authority signed
by two Panchas.
E. PROCEEDINGS OF DEMOLITION
i. The proceedings of demolition shall be videographed, and the concerned authority shall prepare a
demolition report giving the list of police officials and
civil personnel that participated in the demolition
process. Video recording to be duly preserved.
ii. The said demolition report should be forwarded to
the Municipal Commissioner by email and shall also
be displayed on the digital portal.
92. Needless to state that the authorities hereinafter
shall strictly comply with the aforesaid directions
issued by us.
93. It will also be informed that violation of any of
the directions would lead to initiation of contempt
proceedings in addition to the prosecution.
94. The officials should also be informed that if the
demolition is found to be in violation of the orders of
- 28 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
this Court, the officer/officers concerned will be held
responsible for restitution of the demolished property
at his/their personal cost in addition to payment of
damages.”
20. In the ultimate analysis, we are of the opinion
that construction(s) put up in violation of or deviation
from
the
authority
building
and
plan
the
approved
by
constructions
the
local
which
are
audaciously put up without any building planning
approval, cannot be encouraged. Each and every
construction must be made scrupulously following
and strictly adhering to the Rules. In the event of
any violation being brought to the notice of the
Courts, it has to be curtailed with iron hands and any
lenience afforded to them would amount to showing
misplaced sympathy. Delay in directing rectification
of
illegalities,
administrative
failure,
regulatory
inefficiency, cost of construction and investment,
negligence and laxity on the part of the authorities
concerned in performing their obligation(s) under the
Act, cannot be used as a shield to defend action
taken against the illegal/unauthorized constructions.
That apart, the State Governments often seek to
enrich
themselves
through
the
process
of
regularisation by condoning/ratifying the violations
and illegalities. The State is unmindful that this gain
- 29 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
is insignificant compared to the long-term damage it
causes
to
the
orderly
urban
development
and
irreversible adverse impact on the environment.
Hence, regularization schemes must be brought out
only in exceptional circumstances and as a onetime
measure for residential houses after a detailed
survey and considering the nature of land, fertility,
usage, impact on the environment, availability and
distribution
of
resources,
proximity
to
water
bodies/rivers and larger public interest. Unauthorised
constructions, apart from posing a threat to the life
of the occupants and the citizens living nearby, also
have an effect on resources like electricity, ground
water and access to roads, which are primarily
designed
to
be
made
available
in
orderly
development and authorized activities. Master plan
or the zonal development cannot be just individual
centric but also must be devised keeping in mind the
larger interest of the public and the environment.
Unless the administration is streamlined and the
persons entrusted with the implementation of the act
are held accountable for their failure in performing
statutory obligations, violations of this nature would
go unchecked and become more rampant. If the
officials are let scot-free, they will be emboldened
and would continue to turn a nelson's eye to all the
illegalities resulting in derailment of all planned
- 30 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
projects and pollution, disorderly traffic, security
risks, etc."
5.
Following the declaration of law made by the
Hon'ble Supreme Court in the aforesaid case, wherein
it
has
been
held
that
any
unauthorised
construction/encroachment in public places, such as
roads, areas abutting railway lines, river bodies, etc.,
cannot be permitted, and also in cases where an order
of conversion has not been passed by the competent
authority, I am of the opinion that the findings
recorded by the respondent authorities are just and
proper and do not call for interference by this Court.
6.
Accordingly, the W.P. No.32565 of 2025 is
dismissed.
7.
In view of the dismissal of Writ Petition
No.32565 of 2025, the prayer made in Writ Petition
No.15964 of 2025 is accordingly accepted. A writ of
- 31 HC-KAR
NC: 2026:KHC:48481
WP No. 32565 of 2025
C/W WP No. 15964 of 2025
CNR: KAHC010688422025
mandamus is issued to respondent Nos.3 to 5 herein
to clear the encroachment, if any, on the cart road,
alleged to have been made by the petitioners in W.P.
No.32565 of 2025, within an outer limit of three
months from the date of receipt of a certified copy of
this order. Accordingly, Writ Petition No.15964 of 2025
stands disposed of.
Sd/-
(E.S.INDIRESH)
JUDGE
SB
List No.: 1 Sl No.: 10
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review