Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
!"#
#$%&% '(
)
*
State Transport Appellate Tribunal, Punjab and Others
+(
, - +.
.
!
/
"
$ #
.
# $
%
&
'
(
)
#
*
+
% ,
-
$
/
*
.
/
1.
.
-
The present writ petition under Articles 226/227 of the
Constitution of India seeks quashing of the order dated 04.01.2022
(Annexure P-3), whereby the petitioner's application for grant of a stage
carriage permit on the Bathinda-Sardulgarh route via Talwandi Rori was
rejected by respondent No.3, as well as the appellate order dated 29.09.2025
(Annexure P-4), whereby respondent No.1 dismissed the appeal preferred by
the petitioner as time-barred. The petitioner has also sought a writ of
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
mandamus directing the respondents to grant her one stage carriage permit
involving two return trips on the aforesaid route.
2.
Briefly stated, the pleaded case of the petitioner is that pursuant
to public notice dated 12.11.2021, applications were invited for grant of five
stage carriage permits involving ten return trips on the Bathinda-Sardulgarh
route. The petitioner applied for one permit involving two return trips.
However, respondent No.3, vide order dated 04.01.2022, ultimately granted
nine permits involving eighteen return trips. According to the petitioner, the
number of permits could not have been increased from five to nine without
issuance of any corrigendum or fresh public notice and without conducting
any fresh survey or assessment for the additional permits. It is, therefore,
contended that the action of respondent No.3 travelled beyond the scope of
the public notice and was arbitrary and violative of Article 14 of the
Constitution of India.
3.
Learned counsel for the petitioner, inter alia, contends that
respondent No.3 acted beyond the scope of the public notice by granting
nine permits when applications had been invited only for five permits. It is
submitted that enlargement of the number of permits materially altered the
basis on which applications had been invited and, therefore, could not have
been undertaken without issuance of a fresh notice giving prospective
applicants an opportunity to compete for the additional permits. It is further
contended that no fresh survey or proper exercise for determining the
requirement of the additional permits was undertaken before the number of
permits was increased. Learned counsel further contends that respondent
No.3 failed to comply with Rule 122 of the Punjab Motor Vehicles Rules,
1989, inasmuch as the proceedings culminating in the order dated
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
04.01.2022 were conducted in the absence of the Chairman of the Regional
Transport Authority and without a valid delegation of powers. According to
learned counsel, the defect goes to the root of the competence of the
authority which passed the order and consequently renders the order dated
04.01.2022 without jurisdiction. Reliance has also been placed upon the
judgment in Ekta Cooperative Transport Society Limited v. State
Transport Controller and others, CWP-11364-2005, decided on 4.4.2006.
4.
Learned counsel also contends that the inter-se merits of the
applicants were not properly considered by respondent No.3 and that no
adequate reasons were assigned for rejecting the petitioner's application. It is
submitted that the order dated 04.01.2022 does not disclose a proper
comparative assessment of the competing applicants or explain why the
petitioner was not found suitable for grant of a permit. According to learned
counsel, the order is consequently non-speaking and contrary to the
requirement of Section 80(2) of the Motor Vehicles Act, 1988. Learned
counsel submits that the petitioner is a young and educated woman holding
an M.Com degree and had made arrangements for a new bus for operating
the proposed service. It is contended that these circumstances demonstrated
her suitability and capacity to operate the route and that she was
comparatively more deserving than some of the applicants in whose favour
permits were ultimately granted. It is thus submitted that her candidature
was not properly evaluated vis-a-vis the successful applicants.
5.
Learned counsel for the petitioner further challenges the
appellate order dated 29.09.2025 and submits that the delay in filing the
appeal had already been condoned by respondent No.1 vide order dated
05.09.2023, subject to costs, and the appeal had been directed to be
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
registered. It is contended that the said order of condonation was never
recalled, reviewed or set aside and, therefore, the Appellate Tribunal could
not subsequently dismiss the appeal on the very ground of limitation.
According to learned counsel, once the delay had been condoned and the
appeal directed to be registered, the subsequent dismissal of the appeal on
limitation was legally unsustainable. Learned counsel further submits that
the order dated 04.01.2022 was not communicated to the petitioner and that
she received its certified copy only on 29.04.2022 after applying for the
same on 21.03.2022. It is, therefore, contended that limitation could not have
commenced before the petitioner acquired actual or constructive knowledge
of the order. Learned counsel places reliance upon the Full Bench judgment
in Jagtar Singh v. State Transport Appellate Tribunal and others. 2009
(1) RCR (Civil) 928, to contend that where an order has not been formally
communicated, the question of commencement of limitation has to be
examined with reference to the date of actual or constructive knowledge.
6.
Learned counsel submits that the appeal was thereafter filed on
27.06.2022 and that the Appellate Tribunal failed to properly appreciate the
petitioner's explanation regarding the date of knowledge as well as the
earlier order dated 05.09.2023 condoning the delay. It is accordingly
contended that the appellate order dated 29.09.2025 is liable to be set aside
and the appeal deserves to be considered on merits.
7.
Per contra, learned State counsel as well as learned counsel
appearing for respondents No.3, 4, 6 and 9 submit that the impugned orders
are well reasoned and call for no interference in exercise of the writ
jurisdiction of this Court.
8.
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
Learned counsel for respondents No.5 & 8 submits that the
Regional Transport Authority passed the order dated 04.01.2022 after
hearing the concerned parties and in accordance with law. It is contended
that the petitioner filed the appeal beyond the prescribed period and that
respondent No.1 rightly dismissed the same as time-barred. Learned counsel
submits that the petitioner had knowledge of the order and obtained its
certified copy on 29.04.2022; therefore, limitation cannot be claimed to run
only from the date of receipt of the certified copy. Learned counsel for
respondent No.5 further submits that Rule 129 of the Punjab Motor Vehicles
Rules, 1989 is not applicable in the manner contended by the petitioner. It is
also submitted that respondent No.3 was competent to grant the permits
under Section 68 of the Motor Vehicles Act, 1988 and that Rule 122 has no
application in the absence of any delegation of powers. Learned counsel
submits that the Transport Scheme, 2018 does not fix the number of permits
or require a prior assessment of passenger demand in the manner suggested
by the petitioner. The competent authority was, therefore, entitled to
determine the number of permits having regard to the requirement of the
route and the interest of the travelling public.
9.
Learned counsel for respondent No.5 further submits that the
permits were granted after consideration of the inter-se merits of the
concerned applicants and that no infirmity has been pointed out in the
comparative assessment undertaken by the Regional Transport Authority. It
is also submitted that respondent No.5 has obtained the permit, purchased
the bus and is operating the route without any complaint.
10.
I have heard learned counsel for the parties and perused the
record with their able assistance.
11.
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
The first issue which arises for consideration is the petitioner's
challenge to the order dated 04.01.2022 on the ground that applications had
been invited for five permits involving ten return trips, whereas respondent
No.3 ultimately granted nine permits involving eighteen return trips. A
perusal of material on record reveals that the public notice invited
applications for five stage carriage permits involving ten return trips on the
Bathinda-Sardulgarh route. However, the petitioner has not been able to
point out any provision of the applicable Transport Scheme or any statutory
notification which fixed five as the maximum permissible number of permits
on the route. The mere number mentioned in the public notice, in the
absence of a statutory or scheme-based ceiling, cannot by itself be treated as
an immutable limit beyond which the competent authority was precluded
from assessing the requirement of the route.
12.
Further, the order shows that the Regional Transport Authority
considered the route requirement, public convenience, the applications
received and the inter-se merits of the applicants before taking a decision
regarding grant of permits. The Authority, having regard to the requirement
of the travelling public and the circumstances noticed by it, considered it
appropriate to increase the number of permits from five to nine involving
eighteen return trips. The decision, therefore, cannot be characterised as an
unexplained departure from the public notice. The petitioner has not
demonstrated any provision of the governing statutory framework which
prohibited the Regional Transport Authority from undertaking such an
assessment while considering the applications. In the absence of any
demonstrated statutory ceiling of five permits, the mere fact that the public
notice initially mentioned five permits cannot, by itself, render the
subsequent determination illegal. Nor has the petitioner established that the
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
increase was wholly unsupported by the requirement of the travelling public
or was based upon considerations extraneous to the statutory purpose.
13.
As regards the contention concerning the comparative merits of
the applicants, the order dated 04.01.2022 reflects consideration of the
applicants and their relative suitability for providing the transport service.
The petitioner seeks to place reliance upon her age, educational qualification
and preparedness to arrange a new vehicle. These circumstances may be
relevant factors, but they do not confer an indefeasible right to the grant of a
permit.
14.
The statutory authority entrusted with the grant of permits is
required to assess the competing claims in the light of the applicable
statutory framework and the requirement of the route. This Court, exercising
jurisdiction under Articles 226/227 of the Constitution, does not sit as an
appellate authority to substitute its own assessment of comparative
suitability for that of the competent authority. Interference would be
warranted where the decision is shown to be perverse, based on irrelevant
considerations, arrived at by ignoring material considerations or contrary to
a mandatory statutory requirement. No such infirmity has been demonstrated
in the present case. The petitioner has not been able to show that her
candidature was ignored altogether, that an irrelevant criterion was adopted,
or that the successful applicants were selected on a basis wholly alien to the
statutory purpose. Merely because the petitioner considers herself more
qualified or more deserving cannot furnish a ground for this Court to
undertake a fresh comparative assessment.
15.
The contention that the order dated 04.01.2022 is non-speaking
also does not merit acceptance. The order records the considerations which
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
weighed with the Authority while determining the requirement of the route
and considering the applicants. The requirement of recording reasons under
Section 80(2) of the Motor Vehicles Act is not to be understood as requiring
the authority to reproduce an elaborate judgment while deciding an
application for permit. What is required is that the applicant should be able
to ascertain the basis on which the application has been dealt with. The order
in the present case sufficiently discloses the basis of the decision.
16.
The challenge based upon Rule 122 of the Punjab Motor
Vehicles Rules, 1989 also does not persuade this Court. Rule 122 concerns
delegation of powers by the State Transport Authority and the Regional
Transport Authority. The petitioner has not placed sufficient material to
establish that the order dated 04.01.2022 was passed by an officer wholly
lacking statutory authority or that the Regional Transport Authority itself
was not competent to consider the applications.The reliance upon Ekta
Cooperative Transport Society Limited v. State Transport Controller
and others (supra) also does not advance the petitioner's case in the absence
of material demonstrating that the factual and statutory circumstances
considered therein are identical to those obtaining in the present matter. The
challenge to the order dated 04.01.2022, therefore, fails.
17.
As far as the challenge to the appellate order dated 29.09.2025
is concerned, Section 89 of the Motor Vehicles Act provides a statutory
appeal against specified orders of the State or Regional Transport Authority,
including refusal to grant a permit. Rule 85 of the Punjab Motor Vehicles
Rules, 1989 prescribes a period of thirty days from the receipt of the order
for filing such appeal. The Full Bench of this Court in Jagtar Singh v. State
Transport Appellate Tribunal and ors.(supra) considered the question as to
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
when limitation under Rule 85 commences where there has been no formal
communication of the order. The Full Bench held that the statutory scheme
contemplates communication of the order and that limitation ordinarily runs
from receipt thereof; at the same time, a person who has acquired actual or
constructive knowledge of the making of the order cannot indefinitely
postpone the remedy merely because formal communication has not taken
place. Whether such actual or constructive knowledge existed is a question
to be determined on the facts of each case.
18.
In the present case, the petitioner admittedly applied for a
certified copy of the order dated 04.01.2022 on 21.03.2022, received the
same on 29.04.2022 and thereafter filed the appeal on 27.06.2022. The
Appellate Tribunal, while passing the order dated 29.09.2025, considered the
chronology placed before it and found approximately 104 days' delay
beyond the prescribed period, which, according to the Tribunal, had not been
satisfactorily explained. The Tribunal also noticed that the extent of delay
had not been correctly disclosed at the earlier stage.
19.
Learned counsel for the petitioner has placed considerable
reliance upon the earlier order dated 05.09.2023, whereby the delay had
been condoned subject to costs and the appeal had been directed to be
registered. The said order cannot be ignored while examining the subsequent
appellate order. However, the question before this Court is whether, having
regard to the material recorded in the order dated 29.09.2025, the final
conclusion of the Appellate Tribunal suffers from such perversity,
jurisdictional error or manifest illegality as would warrant interference under
Articles 226/227 of the Constitution.
20.
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
The subsequent order records that, upon examination of the
chronology and the material placed before it, the Tribunal found that the
delay had not been correctly disclosed at the earlier stage and that a
substantially
longer
period
remained
unexplained.
The
Tribunal
consequently declined to entertain the appeal on limitation. The petitioner
has not demonstrated that the finding regarding the actual period of delay or
the absence of a satisfactory explanation was based on no material
whatsoever. Nor has she established that the conclusion is so perverse that
no reasonable authority could have arrived at it. The earlier order dated
05.09.2023 condoning the delay is undoubtedly a circumstance which
required consideration. However, the petitioner has not demonstrated before
this Court that the subsequent order dated 29.09.2025 is vitiated merely
because the Tribunal, upon consideration of the complete chronology and
the material relating to the delay, ultimately recorded a different conclusion.
The supervisory jurisdiction of this Court is not intended to substitute its
own assessment of the explanation for delay unless the conclusion reached
by the Tribunal is shown to be legally untenable or perverse.
21.
The petitioner has also not been able to establish that she had no
actual or constructive knowledge of the order dated 04.01.2022 during the
period preceding her application for the certified copy. The principle laid
down in Jagtar Singh does not permit a person having actual or
constructive knowledge of an adverse order to indefinitely defer the
appellate remedy merely by awaiting formal communication.
22.
As regards the reliance upon Rule 129 of the Punjab Motor
Vehicles Rules, 1989, the Rule, by its express terms, deals with the manner
of service of orders of the State or Regional Transport Authority under
Section 103(2). It cannot, therefore, be treated as a general provision
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
governing communication of every order passed by a Regional Transport
Authority. In any event, the absence of formal communication does not, by
itself, conclude the question of limitation where actual or constructive
knowledge of the order is otherwise established.
23.
In the facts of the present case, the petitioner has failed to
demonstrate that the finding recorded by the Appellate Tribunal regarding
limitation is perverse, based on no material or suffers from an error of
jurisdiction warranting interference under Articles 226/227 of the
Constitution. The challenge to the appellate order dated 29.09.2025 on the
ground of limitation, therefore, also fails.
24.
The prayer for a positive direction to grant a stage carriage
permit in favour of the petitioner also cannot be accepted. Grant of a permit
involves consideration by the competent statutory authority, and the
petitioner has failed to establish any enforceable right which would justify
issuance of a mandamus directing grant of a permit in her favour.
25.
For the reasons recorded above, no ground for interference with
either of the impugned orders is made out. The present writ petition is,
accordingly, dismissed.
26.
Pending miscellaneous application(s), if any, shall also stand
disposed of.
/
121&"
*
RITIKA
2026.08.20 17:00
I attest to the accuracy and
integrity of this document
Chandigarh
%4
$
5 4
5 4
.
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review