IN THE HIGH COURT OF DELHI AT NEW DELHI
+
W.P.(C) 1918/2017 & CM APPL. 8491/2017
SHRI MADAN AND ORS
.....Petitioners
Through:
Mr. N.S Dalal, Ms. Nidhi Dalal, Mr.
Alok Dalal, Ms. Rachana Dalal,
Advocates.
versus
GOVT OF NCT OF DELHI AND ANR
.....Respondents
Through: Mr. Abhinav Sharma, Mr. Ujjwal
Jain, Advocates.
Mr. Mukesh Neena, Chief Engineer
(R4-PWD)
Mr. Sanjay Kumar Pathak, Standing
Counsel for R-3 with Mr. Sunil
Kumar Jha, Mr. M.S Akhtar, Ms.
Joohu Kumari, Mr. Kushagra Dixit,
Advocates for R-3.
CORAM:
HON'BLE MR. JUSTICE SANJEEV NARULA
ORDER
22.04.2026
%
1.
This petition arises from a narrow but recurring difficulty in the
execution of a public road project. While revenue records describe land in
terms of khasra numbers and acquired areas, the executing agencies proceed
with reference to road width, service lanes, etc. The Petitioners allege that,
in this translation from record to site, their unacquired land on the southern
side of the Narela-Lampur road is being subjected to demolition, even as
encroachment on acquired land on the northern side remains unaddressed.
The Respondents, however, maintain that their actions are confined to
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
acquired public land, and the issue is one of identification and possession.
2.
The Petitioners are residents of Village Bakner. Their case centres on
land forming part of Khasra No. 36/15/1, situated on the southern side of the
road leading from Narela to Lampur. They seek protection from demolition
in respect of approximately 10 biswas which, according to them, has not
been acquired. They also seek removal of encroachment allegedly existing
on the northern side of the road over land acquired under Award Nos. 1177
and 1216, an enquiry into the non-removal of such encroachment, and
completion of the project.
3.
The Petitioners’ case is that the road from Narela to Lampur
originally had a width of 5 gathas. According to them, land was acquired in
the 1960s for widening the road by 3 gathas towards the northern side. They
further plead that, for construction of the Railway Under Bridge [“RUB”], 2
gathas were acquired on each side of the road under Award No. 2/2012-13.
Their grievance is that, instead of removing encroachment from the acquired
land on the northern side, the authorities have attempted demolition towards
the southern side, beyond the extent acquired.
4.
The revenue record relied upon by the Petitioners records Khasra No.
36/15/1 in Village Bakner under Khata/Khatoni No. 6/1, with an area of 015. The recorded bhumidari rights are shown from 1954-55. This document,
at the least, provides a foundation for the Petitioners’ assertion that Khasra
No. 36/15/1 was a recorded holding and that its identity and extent cannot be
assumed without proper demarcation.
5.
The acquisition history is not in serious dispute. Award No. 1177
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
relates to acquisition in Village Bakner1 for construction of a pucca road
from Narela to Lampur. The notification under Section 4 of the Land
Acquisition Act, 1894 [“LA Act”] was issued on 30th November, 1955 and
the declaration under Section 6 followed on 24th May, 1961. The “true area”
under that award is recorded as 8 bighas 19 biswas. The award refers to field
numbers principally in the 37 and 39 series, besides 35/10/1/1 and 106/1.
6.
Award No. 1216 also concerns acquisition in Village Bakner2 for the
same road. It records acquisition of about 7 bighas 11 biswas. Some entries
relate to field numbers in the 36 series as well. The award further records
that “Field No. 36/6 pt. was erroneously notified”, as no such field number
existed, and required deletion from the notification. The land was divided
into blocks for valuation, depending on its proximity to the village abadi.
7.
The later and more relevant award is Award No. 2/2012-13. It
concerns acquisition for construction of the RUB at the “level crossing on
Narela-Lampur road in Narela Zone”. The Section 4 notification was issued
on 3rd February, 2010. The declaration under Section 6 followed on 12 th
February, 2010. Section 17 of the Act was invoked, and the enquiry under
Section 5A was dispensed with. The award covers land in Village Narela
and Village Bakner3, with the total area recorded as 5 bighas 13 biswas 1
biswansi.
8.
For Village Bakner, Award No. 2/2012-13 records acquisition of 2
bighas 7 biswas. The khasra numbers include 106/2, 35//11/1, 36//6/1/1/1,
6/1/1/2, 6/1/2, 6/1/4, 6/1/5, 6/1/7, 7/5, 7/6, 7/7, 13, 14, 15/1, 15/3, 35-36//10
and 60. The entry “15/1” is shown with an area of 0-05-02. This assumes
Mentioned as “Bankner” in the record.
Mentioned as “Bankner” in the record.
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
significance in the context of the Petitioners’ case that only a limited portion
of Khasra No. 36/15/1 stood acquired, leaving approximately 10 biswas.
9.
Award No. 2/2012-13 further records that possession of the notified
land in Village Bakner was taken on 3rd April, 2012, after demolition of
unauthorised structures by the staff of the Land Acquisition Collector
[“LAC”] along with the Tehsildar, Narela, and was thereafter handed over to
Municipal Corporation of Delhi [“MCD”] officials.
10.
Respondent No. 3 i.e., Land & Building Department, through LAC, in
their Counter Affidavit, has taken a substantially similar position. It states
that the super-structures existing on land measuring 2 bighas 7 biswas were
subject to proceedings under Section 11 of the LA Act; that Award No.
2/2012-13 was announced on 7th February, 2013; that demolition of
structures took place between 5th March, 2012 and 3rd April, 2012; and that
the land was handed over to MCD on an “as is where is” basis. It is also
stated that some super-structures could not be demolished at that stage and
were to be removed subsequently.
11.
The stand of Respondent No. 2 i.e., North Delhi Municipal
Corporation (now merged into MCD), however, has not been entirely
consistent with this position. In one of its Affidavits, it states that although
land was acquired for construction of the RUB and service lanes on both
sides, complete possession had not been handed over to it despite requests
made to the LAC. It further states that removal of encroachment in respect
of land forming part of Khasra No. 36/15/1 pertained to the Revenue
Department, as the land had not been handed over to MCD.
12.
In another affidavit, Respondent No. 2 states more specifically that 2
Mentioned as “Bankner” in the record.
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
gathas of land were acquired on each side of the road for construction of the
RUB and service lanes. It accepts that complete possession could not be
granted to it by the LAC, as the handing-over note itself recorded that
certain buildings were yet to be demolished and possession would be handed
over thereafter. According to Respondent No. 2, some part of the land on the
northern side has still not been handed over, and the issue of possession is
pending before the LAC, to be finalised after demarcation. It is for this
reason, according to Respondent No. 2, that encroachment on the northern
side could not be removed.
13.
Respondent No. 2 has also stated that the demolition carried out on
the southern side of the RUB was a limited exercise within the right of way,
and that the encroached portion was removed for construction of a drain. It
is further stated that the drain work has been completed and that the RUB is
fully functional.
14.
The record thus reveals a real administrative disconnect. While the
record of Respondent No. 3 (LAC) indicates that possession of the notified
land in Village Bakner was taken and handed over to Respondent No. 2, the
latter asserts that complete possession, particularly on the northern side, was
not handed over and that the position can be finalised only upon
demarcation. This is not a mere inconsistency in pleadings. It goes to the
heart of the Petitioners’ grievance, since the relief sought turns on the
precise identification of acquired land, unacquired private land, right of way,
and encroached portions.
15.
On 19th May, 2022, this Court recorded the statement made on behalf
of Respondents No. 2 and 3 that the concerned authorities of both
departments would hold a meeting, in light of their affidavits, to arrive at a
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
conclusion regarding further action on the issue of encroachment. It also
noted that Respondents No. 2 and 3 submitted to file an affidavit regarding
the outcome of the proposed meeting.
16.
On 22nd December, 2022, the Court noted that Respondent No. 2 had
written to Respondent No. 3, but no meeting had been fixed. Respondent
No. 3 stated that the meeting would be held in January, 2023. The Court
accordingly directed that a joint meeting be convened between Respondents
No. 2 and 3 within that month, and that requisite affidavits be filed.
17.
A meeting was thereafter held on 17th January, 2023 in the chamber of
the Additional District Magistrate (North). The minutes record the presence
of officers of presence of officers of Respondent No. 2 (MCD), Respondent
No. 3 (LAC), the Tehsildar, Narela, and the Land & Building Department.
The agenda, however, is recorded as “handing over/taking over the physical
possession of land bearing Khasra Nos. 52/3(00-00-10), 52/8(00-01-00)” in
Village Narela, acquired under Award No. 02/2012-13. The minutes further
record that MCD would bear the cost of demarcation, that the Narela SubDivision would carry out demarcation within 30 days upon receipt of the
requisite communication, and that concerned LAC officials would remain
present during the demarcation process.
18.
The order dated 19th May, 2023 referred to the earlier directions
regarding the joint meeting and demarcation, took note of the minutes dated
17th January, 2023, and directed Respondent No. 2 to carry out the
demarcation process, preferably within three months from the date of order.
19.
Thereafter, Respondent No. 2 filed an affidavit stating that, in the
meantime, the RUB along with drains, street lights, sump well and pump
room had been handed over to Respondent No. 4 i.e., Public Works
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
Department [“PWD”] by letter dated 24th February, 2023. It further stated
that “MCD will assist to PWD in removal of encroachment”.
20.
The record indicates that a joint inspection was carried out by
Respondent No. 2 (MCD) along with officials of Respondent No. 4 (PWD)
officials on 16th February, 2023, and that the RUB at Narela, having a length
of approximately 565 metres, along with service roads, drains, street lights,
sump well, pump room, drawings, and remaining road portions towards the
Narela and Lampur sides, was handed over to PWD.
Discussion and Reasons
21.
The record noted above leads the Court to one conclusion: the petition
cannot be decided by accepting either side’s assertion on the basis of the
documents alone. The Petitioners cannot claim blanket protection against
every action of the public authorities on acquired land. Equally, the
authorities cannot proceed against land claimed as unacquired private land
merely by asserting that the action falls within the road or right of way. The
controversy, as it stands, turns on identification on the ground.
22.
The Court must also notice that the joint meeting dated 17th January,
2023 does not appear, on its face, to have squarely addressed Khasra No.
36/15/1 of Village Bakner, which lies at the centre of the Petitioners’
grievance. The meeting refers to Khasra Nos. 52/3 and 52/8 in Village
Narela. That land may have some connection with the larger RUB project,
but the minutes do not, by themselves, resolve the controversy raised in this
petition. The direction required identification of acquired land and private
land in relation to the Petitioners’ grievance. That exercise cannot be treated
as complete unless the disputed portion of Khasra No. 36/15/1 and the
adjoining road alignment are demarcated with reference to the relevant
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
record.
23.
In matters of this nature, the Court is not called upon to decide title as
if it were trying a civil suit. Nor is it appropriate, in writ jurisdiction, to
record final factual findings on the exact location of every encroachment
where the record itself indicates the need for field demarcation. The role of
this Court is narrower: to ensure that public authorities act on an identified
and legally supportable basis, and not on assumption.
24.
The law provides sufficient guidance for such an approach. In Vidya
Devi v. State of Himachal Pradesh & Ors.4, the Supreme Court reiterated
that the right to property, though no longer a fundamental right, continues to
be a constitutional and human right. It observed that Article 300A of the
Constitution of India mandates that no person shall be deprived of property
save by authority of law, and that the State cannot dispossess a citizen of
property except in accordance with the procedure established by law. Any
deprivation without legal sanction would be impermissible, and forcible
dispossession without due process would be violative of Article 300A. The
Court further observed that the obligation to pay compensation, though not
expressly provided, can be inferred in such cases.
25.
It is settled that once possession of acquired land is taken in terms of
the LA Act, the land vests in the State free from all encumbrances, and such
vesting is absolute.5 Thereafter, the land cannot ordinarily revert to the
original owner, nor can the validity of acquisition be reopened on that basis.
The Petitioner also does not seek to reopen the acquisition. It proceeds on
the limited premise that the identity and extent of the land so acquired, as
(2020) 2 SCC 569.
See: Indore Development Authority v. Manoharlal & Ors. (2020) 8 SCC 129.
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
reflected on the ground, must first be ascertained.
26.
Where the controversy relates to the boundary, identity of land, or
alleged encroachment between adjoining holdings, demarcation assumes
central importance. In Haryana Waqf Board v. Shanti Sarup & Ors.6, the
Supreme Court observed that where the dispute is essentially one of
demarcation of land, it is appropriate for the Court to direct a local
investigation by appointing a Local Commissioner under Order XXVI Rule
9 of the Code of Civil Procedure, and that such an exercise ought to be
considered in view of the nature of the dispute. The principle applies with
force in a case such as the present, where even the public authorities take
differing positions regarding possession and handing over.
27.
The Court is conscious that this petition has remained pending since
2017. The RUB and allied works appear to have been completed and
thereafter handed over to Respondent No. 4 (PWD). The prayer for
completion of the project, therefore, does not survive in its original form.
The surviving controversy is whether any further action against structures or
occupation is being proposed without proper identification of acquired and
unacquired land, and whether encroachment, if any, exists over acquired
public land.
28.
Pursuant to the order dated 13th January, 2026, the Chief Engineer,
Respondent No. 4 (PWD), was directed to remain present before the Court.
He has joined the proceedings through the Video Conferencing mechanism.
It is stated on his behalf that, due to lack of proper communication, he could
not remain physically present. The explanation is accepted for the present.
His personal appearance is accordingly exempted.
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
29.
Counsel appearing for Respondent No. 4 (PWD) submits that
instructions have now been issued to the District Magistrate (North) for
carrying out demarcation. Counsel for the other Respondents also do not
dispute that demarcation is necessary before any further coercive action is
taken. The Petitioners, too, have consistently sought proper demarcation so
that their unacquired land is not affected and the acquired land, if
encroached upon, is cleared in accordance with law.
30.
In view of the above, no useful purpose will be served by keeping the
petition pending. The appropriate course is to direct a focused demarcation
by the revenue authority, with participation of the concerned executing
agencies and after notice to the Petitioners and affected persons. The result
of that demarcation will determine what action, if any, may lawfully follow.
31.
The petition is accordingly disposed of with the following directions:
(i)
The District Magistrate (North), through the competent revenue
authority, shall carry out demarcation of the disputed stretch of the NarelaLampur road, with specific reference to Khasra No. 36/15/1 of Village
Bakner, the acquired portion under Award No. 2/2012-13, and the adjoining
land covered by Award Nos. 1177 and 1216, to the extent relevant for
identifying the road alignment and alleged encroachments.
(ii)
The demarcation shall not be confined to Khasra Nos. 52/3 and 52/8
of Village Narela unless the revenue authority records, with reasons, how
those khasra numbers bear upon the Petitioners’ grievance regarding Khasra
No. 36/15/1 of Village Bakner.
(iii)
The exercise shall be carried out in the presence of authorised
representatives of the District Magistrate (North), the concerned officers of
(2008) 8 SCC 671.
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
Respondents No. 2, 3 and 4, and the concerned revenue staff. The
Petitioners shall be given at least seven days’ advance notice of the date and
time of demarcation and shall be permitted to remain present.
(iv)
If, under the applicable revenue procedure, a statutory demarcation
fee is required to be deposited by the party seeking demarcation, the
Petitioners shall deposit the same within the time indicated by the revenue
authority. However, where the demarcation is required for the public project
and for identifying acquired public land, the beneficiary department shall
also cooperate and bear such charges as may fall to its share in terms of the
minutes dated 17th January, 2023 or as directed by the District Magistrate
(North).
(v)
The demarcation shall be carried out with reference to the latest
revenue record, the khatoni, field book, aks-shajra/sizra, possession
proceedings, Award Nos. 1177, 1216 and 2/2012-13, and any sanctioned
project/site plan relied upon by Respondent No. 4 (PWD) or Respondent
No.2 (MCD).
(vi)
The demarcation report shall clearly identify:
(a)
the original road alignment;
(b)
the land acquired under Award Nos. 1177 and 1216, so far as it
concerns the Narela-Lampur road;
(c)
the land acquired under Award No. 2/2012-13, particularly the portion
recorded as 15/1 measuring 0-05-02;
(d)
the remaining portion, if any, of Khasra No. 36/15/1 not covered by
acquisition;
(e)
the existing road, drains, service lanes and right of way; and
(f)
any encroachment found on acquired public land or on land claimed
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
by the Petitioners.
(vii) The demarcation report shall record the method adopted, the fixed
points used, the documents consulted, the persons present, and the
objections, if any, raised at the site.
(viii) The demarcation shall be completed within six weeks from today. A
copy of the demarcation report shall be supplied to the Petitioners, and
Respondents No. 2, 3 and 4.
(ix)
If the demarcation shows encroachment over land acquired for the
public project and placed at the disposal of the concerned public agency, the
competent authority shall be at liberty to take action for removal of such
encroachment in accordance with law, after issuing such notice as may be
required.
(x)
If the demarcation shows that any proposed or past line of action
travels into the unacquired portion of Khasra No. 36/15/1, the Respondents
shall not proceed against that portion except in accordance with law.
(xi)
The Petitioners shall not derive any protection from this order in
respect of land which is found, upon demarcation, to be acquired public land
or part of the right of way. Conversely, the Respondents shall not treat this
order as permission to demolish or interfere with land which the
demarcation shows to be outside the acquisition and outside the lawful right
of way.
(xii) If any party is aggrieved by the demarcation report or by any
consequential action taken on its basis, it shall be open to such party to avail
remedies in accordance with law before the appropriate forum.
32.
It is clarified that this Court has not adjudicated title, possession,
compensation, validity of acquisition, or private inter se claims. All rights
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
and contentions of the parties are left open.
33.
The writ petition is, accordingly, disposed of in the above terms.
Pending application(s), if any, also stand disposed of.
SANJEEV NARULA, J
APRIL 22, 2026/ab
W.P.(C) 1918/2017
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 28/04/2026 at 12:25:51
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review