6. Having heard the learned counsels on either side, perused the material on record. It is an undisputed fact that, already there are two existing towers. Now, the respondents are replacing the old drake conductor by installing the drake equivalent to HTLS conductor. The first submission of the petitioners is that, the consent of the petitioners has to be obtained before laying the lines. This Court do not find force in that submission. When the electric lines are laid in the larger public interest and for carrying out the developmental activities, the consent of the petitioners is not mandatory. However, they are entitled for a notice and they are entitled for compensation. Even according to the petitioners, they have received a notice. It is their case that the notice does not contain all the relevant details. The petitioners are always at liberty to approach respondent Nos. 1 and 2 to seek appropriate compensation in respect of any damage caused to the petitioners’ lands due to -9NC: 2026:KHC-D:907 WP No. 104689 of 2025 HC-KAR the activities carried out by the respondents. The respondents have to determine the compensation and if the petitioners are aggrieved by the compensation that is determined and awarded by the respondents, they have a remedy before the District Judge under Section 16 of the Indian Telegraph Act, 1885. The petitioners without availing all these remedies ca…
10. 02.2026 shall consider their representation and pass orders in accordance with law. (ii) All I.As. in this writ petition shall stand closed. Sd/JUSTICE LALITHA KANNEGANTI CT:UMD List No.: 1 Sl No.: 18
Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
-1NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
IN THE HIGH COURT OF KARNATAKA, AT DHARWAD
DATED THIS THE 23RD DAY OF JANUARY, 2026
BEFORE
THE HON'BLE SMT. JUSTICE LALITHA KANNEGANTI
WRIT PETITION NO.104689 OF 2025 (GM-KEB)
BETWEEN:
1.
SHRI. GANGADHAR REDDY,
AGE. 38 YEARS, OCC. AGRICULTURE,
R/O. NEAR KALLINATH TEMPLE,
TADKAL, TQ. YELBURGA,
DIST. KOPPAL-583231.
2.
SMT. SHARADA W/O. GANGADHAR REDDY,
AGE. 38 YEARS, OCC. AGRICULTURE,
R/O. NEAR KALLINATH TEMPLE,
TADKAL, TQ. YELBURGA,
DIST. KOPPAL-583231.
…PETITIONERS
Digitally signed
by YASHAVANT
NARAYANKAR
Location: HIGH
COURT OF
KARNATAKA
(BY SRI. S.A. NINGOJI, ADVOCATE A/W
SRI. SADYOJAT R.BALIGATTIMATH, ADVOCATE)
AND:
1.
KARNATAKA POWER TRANSMISSION
CORPORATION LTD.,
CORPORATE OFFICE AT. KAVERI BHAVAN
BENGALURU-560009,
REPRESENTED BY ITS MANAGING DIRECTOR,
DIRECTOR (ADMN AND HRD)
2.
THE ASSISTANT EXECUTIVE ENGINEER (V)
TRANSMISSION LINES
MAINTENANCE SUB-DIVISION,
KARNATAKA POWER TRANSMISSION
-2NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
CORPORATION LTD.,
MUNIRABAD, DIST. KOPPAL-583231.
3.
APAR INDUSTRIES LTD.,
301, PANORAMA COMPLEX SB-9
PANORAMA COMPLEX, RC DUTT ROAD,
VISWAS COLONY, VADIWADI, VADODARA,
GUJARAT-390007.
…RESPONDENTS
(BY SRI. SHIVARAJ P.MUDHOL, ADVOCATE FOR R1 AND R2;
SRI. MANOJ J.RAIKAR, ADV. FOR R3 (APPEARED THROUGH VC))
THIS WRIT PETITION IS FILED UNDER ARTICLES 226 AND
227 OF CONSTITUTION OF INDIA, PRAYING TO ISSUE A WRIT IN
THE NATURE OF MANDAMUS OR ANY OTHER APPROPRIATE
WRIT, ORDER, OR DIRECTION, DIRECTING RESPONDENT NO.2
NOT TO DRAW OR LAY HIGH-TENSION ELECTRICAL LINES OVER
THE PETITIONERS' LAND, IN THE INTEREST OF JUSTICE, EQUITY
AND ISSUE A WRIT OF MANDAMUS DIRECTING THE ALL THE
RESPONDENTS TO PRODUCE ALL THE DOCUMENTS, MATERIALS,
PAPERS, SURVEY, MAPS, ETC TO SATISFY/ VERIFY THAT THE
SAID PROPOSED ROUTE IS FINALIZED AFTER FOLLOWING THE
DUE PROCESS OF LAW TO LAY DOWN 400KV OVER THE HEAD
HIGH TENSIONS LINES WHICH WILL PASS FROM THE CENTER
PORTION OF THE PETITIONERS LAND AND ETC.,.
THIS WRIT PETITION, COMING ON FOR ORDERS, THIS
DAY, ORDER WAS MADE THEREIN AS UNDER:
CORAM:
THE HON'BLE SMT. JUSTICE LALITHA KANNEGANTI
-3NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
ORAL ORDER
The present writ petition is filed seeking following prayer:
“1. To issue a writ in the nature of Mandamus or any
other appropriate writ, order, or direction,
directing Respondent No.2 not to draw or lay hightension electrical lines over the Petitioners' land,
in the interest of justice, equity.
2. Issue a writ of mandamus directing the all the
respondents to produce all the documents,
materials, papers, survey, maps, etc to satisfy/
verify that the said proposed route is finalized
after following the due process of law to lay down
400kv over the head high tensions lines which will
pass from the center portion of the petitioners
land.
3. Issue such other writ or give such other direction
and pass such other order as this Hon’ble Court
deems
fit
and
proper
in
the
facts
and
circumstances of the cases.”
2.
the
It is the case of the petitioners that, petitioners are
absolute
owners
and
purchasers
of
land
in
Sy.No.2
measuring 9 acres and Sy.No.3 measuring 10.06 acres both
situated in Adavihalli Village, Kukanur Taluk, Koppal District. It is
stated that respondent No.2 has issued an endorsement without
mentioning the names of the petitioners or the date of issuance,
purporting to state that, in accordance with the public utility
requirement
and
the
Government
Order,
work
is
being
undertaken for replacement and strengthening of the existing
-4NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
220 kV DRAKE power transmission line with an equivalent HTLS
conductor. The said transmission line originates from 220 kV
power substation located in Gadag City, Gadag Taluk, Gadag
District and passes through 400 kV ferry power substation and
220 kV power substations culminating at 220 kV switching
station situated at Lingapur Village, Koppal Taluk, Koppal District
covering a total length of approximately 89.763 kilometres. The
said endorsement further indicates that, a tower relating to the
aforesaid transmission line is to be erected on the petitioners’
land allegedly pursuant to the said Government Order. It is
stated that, respondent No.1 has started laying the transmission
line. The petitioners informally requested to cooperate with the
construction of the tower and laying of the transmission line on
the ground that it is necessary for public utility. It is asserted
that, in the event of the damage or loss caused to the existing
crops
or
trees
on
the
said
land,
KPTCL
will
disburse
compensation as per the rates fixed by the Government and the
concerned
departments
including
Horticulture and Forest department.
Revenue,
Agriculture,
-5NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
3.
Learned
counsel
appearing
for
the
petitioners
submits that, the respondents without issuing any notice and
without taking consent of the petitioners are laying the lines on
their land. The activities undertaken by the respondents may
cause damage to the crops and agricultural land due to the
effects of electromagnetic waves. It is submitted that, the
respondents are bound to follow the procedure as contemplated
under the Electricity Act, 2003 and also under the Indian
Telegraph Act, 1885. Learned counsel further submits that, the
respondents without determining the compensation cannot lay
the lines. Hence, there shall be a direction to the respondents to
pay the compensation to the petitioners and then lay the lines.
4.
Learned counsels appearing for respondent Nos.1, 2
and 3 submit that, by an order dated 16.07.2025, this Court
granted an interim order staying the laying of high-tension
electric lines on the lands of the petitioners for which, vacate
petitions are filed by respondent Nos.1, 2 and 3. In the vacate
petition filed on behalf of respondent Nos.1 and 2, it is stated
that, there are two old existing towers on the lands of the
petitioners i.e. Tower Nos.296-A and 297-A. These two old
-6NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
towers are existing since more than 50 years. The authorities are
not removing the existing towers as the said towers are intact.
However, they are required to replace the old drake conductor by
installing the drake equivalent HTLS conductor so far as in the
lands of the petitioners are concerned. It is stated that, the
replacement of the old drake conductor by new HTLS conductor
is being carried out from 220 KV Gadag substation to 220 KV
Lingapur switching station. It is stated that, this activity is for
the larger interest of the benefit of the public including the
petitioners. As the project is for the public purpose and for the
benefit of the public at large, already more than 79% of the work
has been executed. In view of the interim order, remaining
development work has been stopped.
5.
In the vacate petition that is filed by respondent
No.3, it is stated that, the respondents are not erecting new
towers on the petitioners’ lands but the only work that is being
undertaken is, drawing the HDLS conductor through the existing
towers. The petitioners suppressed the fact that there are
existing towers. Respondent No.3 is carrying out this work under
award letter dated 14.03.2024. It is stated that, the consent of
-7NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
the land owner is not required under the Electricity Act, 2003
and the other rules. Section 67 of the Electricity Act does not
mandate obtaining consent from the land owner while laying
transmission lines. Section 67(2) of the Electricity Act only
requires that, before exercising such powers, the licensee or
authorized person shall serve a notice upon the owner or
occupier of such property and such provision does not require
obtaining consent. It is stated that, when a notice is served
under Section 67(2), if the owner or occupier has any objection,
such person may file objection before the Appropriate Authority.
The intent behind Section 67 is to facilitate the development of
electrical infrastructure in public interest. It is stated that, the
respondents are in exercise of the powers under Section 164 of
the Electricity Act and the respondents are bestowed with the
powers which the Telegraph Authority possesses under the
Indian Telegraph Act, 1885 with respect to placing of telegraph
lines and pose to the purpose of a telegraph established or
maintained. It is also stated that, no orders can be passed
stalling the infrastructure projects. Further, petitioners have an
effective alternate remedy under Section 67 of the Electricity Act
for filing their objections and if they are aggrieved with the
-8NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
quantum
of
compensation
offered,
they
have
remedy
to
approach the Appropriate Forum for determination but without
availing such remedy, the petitioners have come before this
Court. Both the counsels have argued at length.
6.
Having heard the learned counsels on either side,
perused the material on record. It is an undisputed fact that,
already there are two existing towers. Now, the respondents are
replacing the old drake conductor by installing the drake
equivalent to HTLS conductor. The first submission of the
petitioners is that, the consent of the petitioners has to be
obtained before laying the lines. This Court do not find force in
that submission. When the electric lines are laid in the larger
public interest and for carrying out the developmental activities,
the consent of the petitioners is not mandatory. However, they
are entitled for a notice and they are entitled for compensation.
Even according to the petitioners, they have received a notice. It
is their case that the notice does not contain all the relevant
details. The petitioners are always at liberty to approach
respondent Nos. 1 and 2 to seek appropriate compensation in
respect of any damage caused to the petitioners’ lands due to
-9NC: 2026:KHC-D:907
WP No. 104689 of 2025
HC-KAR
the activities carried out by the respondents. The respondents
have to determine the compensation and if the petitioners are
aggrieved by the compensation that is determined and awarded
by the respondents, they have a remedy before the District
Judge under Section 16 of the Indian Telegraph Act, 1885. The
petitioners without availing all these remedies cannot come
before this Court and stall the developmental activities. Hence,
this Court is passing the following:
ORDER
(i) Accordingly, the writ petition is disposed of
directing the petitioners to make application to
respondent Nos.1 and 2 by 10.02.2026 and the
respondent Nos.1 and 2 within two months from
10.02.2026 shall consider their representation and
pass orders in accordance with law.
(ii) All I.As. in this writ petition shall stand closed.
Sd/JUSTICE LALITHA KANNEGANTI
RH
CT:UMD
List No.: 1 Sl No.: 18
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review