Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
Serial No.02
Regular List
HIGH COURT OF MEGHALAYA
AT SHILLONG
PIL No.2/2013
Date of Order: 19.09.2018
Shella Action Committee
Coram:
Vs
State of Meghalaya & ors
Hon’ble Mr. Justice Mohammad Yaqoob Mir, Chief Justice
Hon’ble Mr. Justice S.R. Sen, Judge
Appearance:
For the Petitioner/Appellant(s)
For the Respondent(s)
: Mr. BM Roy Dolloi, Adv
: Mr. HS Thangkhiew, Sr. Adv with
Mr. N Mozika, Adv for R1-5
Mr. R Deb Nath, CGC
Mr. VGK Kynta, Sr. Adv with
Ms. M Kynta, Adv for R7-9
Mr. L Lyngdoh, Adv for R10
i)
Whether approved for reporting in
Law journals etc.:
ii)
Whether approved for publication
in press:
Yes
Yes
Per Mohammad Yaqoob Mir, ‘CJ’
1.
The petitioner claim to be a registered society formed to protect
the poor, illiterate and indigenous people of Shella village so have filed
the instant petition projecting therein that the respondents No.7 (LumMawshun Minerals Pvt. Ltd.) and 8 (Lafarge Umiam Mining Pvt. Ltd.)
are two corporate bodies incorporated under the Indian Companies Act,
1956 whereas, respondent No.9 (Lafarge Surma Cement Ltd.) is a
corporate body incorporated in Bangladesh with its headquarter at
Dhaka.
(a) The respondent No.9 is doing business at Dhaka having
cement factory located at Chatak whereas, respondents No.7 and 8
excavate and obtain mineral from Meghalaya, India and supply
the same to the respondent No.9.
(b) The income acquired therein
and
taxes levied are paid to
the Government of Bangladesh, thus, deprive the State of
Meghalaya and Union of India from receiving its due share of
taxes, causing serious loss of revenue and also irreparable loss to
the indigenous people residing within the Sixth Schedule area.
(c) The State respondents are doing business in violation of the
provision of the Foreign Exchange Management Act, 1999 and
(d) The respondents No.7 and 8 are excavating minerals in gross
violation of the Mines Act, 1952.
(e) The respondent No.10 (Headman of Shella village) is not
entitled to exercise any right over the land of the village except
that being a judicial officer to exercise judicial power when a case
is brought before it.
(f) It is alleged that an area of 4,36,643 square meter of land have
been allegedly sold and leased out in Shella and Tynger village
areas rich minerals such as limestone, silt stone, shale and other
minerals.
(g) It is alleged that the respondent No.10 has granted purported
certificates to 89 (eighty nine) villagers who are not the real
owners of the land. On the strength of such certificate, 87 (eighty
seven) persons have sold forever and other 2 (two) have leased
out the land not belonging to them they have got title deeds in
favour of the respondent No.7 who is not working for the welfare
of the tribal and there is no scheme to promote interest in the field
of education and industry. Respondent No.10 has also granted 4
(four) certificate to himself.
(h)
Respondents No.7 and 8 are operating as subsidiary
companies of the respondent No.9. They have been operating
right from the year 2004 in violation of Sections 16, 19 and 20 of
the Mines Act, 1952. Finally, it is prayed that transfer of land in
favour of the respondent No.7 and also permission for transfer of
land from respondent No.7 to respondent No.8 dated 13.03.2006
may be cancelled. Furthermore, respondents No.7, 8 and 10 may
be restrained from excavating minerals from the land in question
or conveying the same to respondent No.9.
2.
The petition originally was filed before the Gauhati High Court
and registered as PIL No.40 of 2007, same was admitted on 16.05.2007,
interim direction was issued, „not to create any fresh encumbrance on
the land in question‟. Vide order dated 17.06.2008, the proceedings were
deferred in reference to the order of the Hon‟ble Apex Court dated
23.11.2007. Then, vide order dated 04.06.2010, it was recorded that the
matter being pending before the Supreme Court, therefore, the
proceedings stand adjourned sine die. The matter pending before the
Supreme Court was disposed of on 06.07.2011.
3.
The petition was transferred from Gauhati High Court to this
Court as it is reflected in the order dated 03.05.2013.
4.
Vide order dated 05.03.2014, the proceedings of this PIL were
closed on the ground that the issue raised in the petition stand answered
in the case of “Lafarge Umiam Mining Pvt. Ltd. v. Union of India & ors:
(2011) 7 SCC 338, a view was taken that no more directions are
required to be passed.
5.
A review petition was filed by the petitioner which has been
allowed vide the order dated 09.05.2017. While allowing the review
petition, the order dated 21.11.2008 passed by the Hon‟ble Supreme
Court in Civil Appeal No.6752 of 2008 has been quoted wherein, it has
been made clear that no proceedings are pending before the Supreme
Court regarding alleged violation of the provisions of the Meghalaya
Transfer of Land (Regulation) Act, 1971. Liberty was given to the High
Court to proceed with the petition filed by the appellant therein.
6.
This Court has referred to the order dated 06.07.2011 passed in
Lafarge Umiam Mining Pvt. Ltd. [(2011) 7 SCC 338] wherein, it is
mentioned that the Hon‟ble Supreme Court had made it clear in para 118
of the judgment that the observations in the order as regards the nature
of the land shall be taken into account by the competent Court in which
title dispute is pending. It was observed by this Court that one title suit is
presently pending in the Court of Assistant to Deputy Commissioner at
Sohra. It has been observed that all the issues raised in the PIL have not
been conclusively decided. It has been further observed that
consideration of the PIL on merits would obviously include all the
objections of the respondents and for that matter, even if the subject
matter of the PIL is not squarely covered by the aforesaid order in
Lafarge Umiam Mining Pvt. Ltd., the effect of the observations of the
Hon‟ble Supreme Court therein shall also be taken into consideration to
the extent applicable for the purpose of this PIL.
7.
Originally there were 17 (seventeen) respondents but during the
pendency, cause against the 7 (seven) respondents did not survive
therefore, those respondents already stand deleted from the array of
respondents.
8.
Learned counsel for the parties have filed their written
submissions. We have considered the entire material as well as written
submissions as filed by the petitioner, respondents No.1 to 5,
respondents No.7 and 8 and respondent No.10.
9.
The first issue for consideration is as to whether the petitioner is a
registered society.
(i) Respondents No.7 and 8 have contended that there is no record
of any social activities carried out by the petitioner in the area of
operation i.e. Shella and Nongtrai village. Under the Right to
Information Act, they have obtained the information that there is
no non-governmental organization under the name and style
“Shella Action Committee, Rally of Shella Natives” registered
under the Meghalaya Societies Registration Act, 1983. However,
an organization under the name and style “The Rally of Shella
Village Natives” was registered under the Societies Registration
Act 12 of 1983 (No.E.16(Rs)/of 2006/166) which is nonfunctional as the organization has not been renewed.
(ii)
In the petition (Shella Action Committee, Rally of Shella
Natives), the petitioner has claimed that it was registered under
the Meghalaya Societies Registration Act, 1983. In support
whereof, no proof has been placed on record or produced. That
being so, the respondents No.7 and 8 are right in stating that the
petitioner in fact had some personal grudge, they neither are well
wishers nor are working for the welfare of the area which position
is clearly exposed by the villagers because they have not come
forward to oppose the mining operation of respondents No.7, 8
and 9, instead respondents No.1-5 in their submissions have made
it clear that the operational activities of respondents No.7, 8 and 9
are quite beneficial to the people of the area. The position of the
petitioner claiming to be a society for the welfare of the people of
the area is eclipsed. Bona fide‟s of the petitioner are not
forthcoming.
(iii) Allegation of the petitioner to the effect that land transfer by
means of sale/lease in favour of the respondent No.7 is by the
persons who had no title. They have been issued the certificate by
the Headman as per the custom which is illegal but the petitioner
have not cleared in their pleadings as who are the actual owners of
the land, if there would have been some other owners of the land
as transferred, then, those land owners would have appeared
before the Court after all the matter is pending in the Court from
the year 2007 or otherwise they would have challenged the
certificate, sale deeds and lease deed which has not been done.
10.
The other questions as have been raised by the petitioner, have
been lucidly answered by the respondents No.1 to 5, respondents 7 and 8
and respondent No.10 in their respective written submissions. But before
coming onto those written submissions, it will be advantageous to refer
to the judgment rendered by the Hon‟ble Apex Court in “Lafarge
Umiam Mining Pvt. Ltd. v. Union of India & ors: (2011) 7 SCC 338.
The applicant therein is respondent No.8 herein in this PIL. In the said
judgment, while referring to various issues pertaining to environment
and forest clearance, nature of the land being forest or otherwise and no
objection granted. What has been agitated same is answered in para 121
of the judgment:“121. Accordingly, we see no reason to interfere with the decision
of MoEF granting site clearance dated 18-6-1999, EIA clearance
dated 9-8-2001 read with revised environmental clearance dated
19-4-2010 and Stage I forest clearance dated 22-4-2010.
Accordingly, IA No. 1868 of 2007 preferred by Lafarge stands
allowed with no order as to costs. Consequently, IA No.2937 of
2010 preferred by SAC is dismissed. The interim order passed by
this Court on 5-2-20102: (T.N. Godavarman Thirumulpad v.
Union of India, (2010) 12 SCC 376) shall also stand vacated. All
other IAs shall stand disposed of.”
11.
It is also relevant to quote as to what has been observed about
Shella Action Committee (SAC) in the said judgment. Para 113 of the
judgment is quoted hereunder:“113. The Report further notes that most of the members of the
SAC were not the residents of the locality (Shella Village) and
were living in Shillong while occasionally visiting Shella. The
Report further states that 200 persons participated in a long
interaction with the members of HPC. The Report further states
that in fact the villagers became very upset in the apprehension of
Lafarge not being allowed to mine on their community land. As
stated above, even according to the letter dated 11-5-2007, the
Principal Chief Conservator of Forests states that though the site
falls in the forest as pointed out by Shri Khazan Singh, the Chief
Conservator of Forests (C) vide letter dated 1-6-2006, still it is not
the fault of Lafarge.”
12.
In the context of various issues regarding welfare of the villagers,
mining of area, it shall be relevant to quote paras 34, 115 and 116 of the
said judgment:“34. At the same time the report states that the project is positive
and beneficial to the residents of Nongtrai Village due to huge
amount of cash going to the village durbar and reaching the
individual household improving the financial health of the
population of two villages i.e. Nongtrai and Shella. According to
the report, interaction took place between the High-Powered
Committee constituted by MoEF and the locals. That villagers of
Shella are not having any problems from Lafarge and that the
people are very satisfied with the mining company which has
provided health care facilities, drinking water facilities,
employment, schools, etc. According to the report, Lafarge has
been contributing for the benefit of the village as well as for all
the villagers by way of payment of rent for the use of the
community land as well as towards the price of limestone
exported to Bangladesh. The figures of such payments are also
indicated in the report. Further, the report states that mining is not
having any adverse effect on the human life.
115. Before concluding, we would like to refer to our order dated
12-4-2010 which recites agreed conditions between the parties
which conditions are imposed by this Court in addition to the
condition laid down by MoEF. These agreed conditions
incorporated in our order dated 12-4-2010 are in terms of our
judgment in T.N. Godavarman Thirumulpad v. Union of India
(87)4 (2006) 1 SCC 1 with regard to commercial exploitability
which even according to SAC was not considered by MoEF at the
time of granting revised environmental clearance on 19-4-2010 or
at the time of granting forest clearance on 22-4-2010.
116. We reproduce our order dated 12.4.2010, which reads as
under:
“Heard both sides. Learned Attorney General for India
stated that the Ministry of Environment & Forests will take
a decision under the Forest Conservation Act and shall
consider granting permission subject to the following
conditions:
1. The applicant shall deposit a sum of Rs.55 crores
towards five times of the normal NPV (as recommended by
the CEC) with interest @ 9% per annum from 1-4-2007, till
the date of payment. Such payment shall be made in totality
in one instalment within 4 weeks from the date of the
order.
2. An SPV shall be set up under the Chairmanship of the
Chief Secretary, Meghalaya with the Principal Chief
Conservator of Forests, Meghalaya, Tribal Secretary,
Meghalaya, Regional Chief Conservator of Forests, MoEF
at Shillong and one reputed NGO (to be nominated by
MoEF) as Members. The SPV will be set up within 4
weeks.
3. The User Agency will deposit with the SPV a sum of
Rs.90/- per tonne of the limestone mined from the date on
which mining commenced within 4 weeks of the SPV being
constituted.
4. The SPV shall follow the principles and procedure
presently applied for utilization of CAMPA money. The
account will be audited by the Accountant General,
Meghalaya. The money will be kept in an interest bearing
account with a Nationalized Bank. The Accountant General
and the SPV shall file an Annual Report before this Hon'ble
Court detailing all the work done by it in relation to the
welfare projects mandated upon it including the
development of health, education, economy, irrigation and
agriculture in the project area of 50 kms solely for the local
community and welfare of Tribals.
5. The User Agency will comply with all the conditions
imposed on it earlier as well as further recommendations
made by the Committee constituted by MoEF under the
order dated 30-3-2010, including, in particular, the
following :
(a) It shall prepare a detailed Catchment Area
Treatment Plan.
(b) It shall explore the use of surface miner
technology.
(c) It shall monitor ambient area quality as per New
National Ambient Air Quality Standards.
(d) It shall take steps to construct a Sewage
Treatment Plant and Effluent Treatment Plant.
(e) It shall discontinue any agreement for procuring
limestone on the basis of disorganized and
unscientific and ecologically unsustainable mining
in the area.
(f) It shall prepare a comprehensive forest
rehabilitation and conservation plan covering the
project as well as the surrounding area.
(g) It shall prepare a comprehensive Biodiversity
Management Plan to mitigate the possible impacts
of mining on the surrounding forest and wildlife.
(h) It shall maintain a strip of at least 100 meter of
forest area on the boundary of mining area as a
green belt.
6. MoEF shall take a final decision under the Forest
(Conservation) Act, 1980 for the revised environmental
clearance for diversion of 116 ha of forest land, taking into
consideration all the conditions stipulated hereinabove and
it may impose such further conditions as it may deem
proper.
List on 26-4-2010 at 2.00 p.m.”
13.
In the written submissions of respondents No.1 to 5 (State), the
principal contentions of the petitioner have been quoted. Then, it has
been stated:(a) that the Government of India has been making concerted
efforts for industrial development of North Eastern Region
including Meghalaya which is well endowed with natural
resources, mineral deposits, agro-horticultural resources and
hydro electric potential as it has lagged behind in industrial
development.
(b)
The respondent No.7-Lum-Mawshun Minerals Private
Limited (LMMPL) had submitted a proposal for setting up of
limestone mining project in Nongtrai area of East Khasi Hills
District which was cleared. The LMMPL jointly with land owners
submitted an application under Section 3 of the Meghalaya
Transfer of Land (Regulation) Act, 1971 for transfer of some
limestone bearing and other lands for their said limestone mining
project and for construction of the elevated belt conveyor. The
Government of Meghalaya accorded permission for transfer of the
following lands vide Notification No.RDS.25/99/11 dated
26.02.2002:“100 Hect. of land in Elaka From the village Dorbar of
Nongtrai
U Sandi Nongtrai to
LMMPL for limestone
mining.
30 Hect. of land in Elaka Shella
From various landowners to
LMMPL for construction of
a Continuous Elevated Belt
Conveyor System
(c) Subsequently, on another application for transfer of land filed
jointly by the landowners and LMMPL, permission was accorded
vide
Revenue
Department
letter
No.RDS.25/99/55
dated
03.06.2002 for transfer of the following lands:
7.6 Hect. of land in Elaka From the village Durbar of
Nongtrai
U Sandi Nongtrai to
LMMPL
for
construction/installation of
limestone crusher
(d) Subsequently, on another application for transfer of land filed
jointly by LMMPL and the landowners, permission was accorded
vide Revenue Department letter No.RDS.25/99/Pt/49 dated 18th
November 2002 for transfer of the following lands:13 Hect. of land in Mawiong From various landowners to
Shella
LMMPL for undertaking
shale/siltstone
mining
operations
(e) As permission was accorded under Section 4(1) of the
Meghalaya Transfer of Land (Regulation) Act, 1971 for transfer
of a total of 150.6 Hect. of land in favour of LMMPL.
(f) An application was submitted by Lum Mawshun Minerals Pvt.
Ltd. for grant of sanction for transfer of the aforesaid 150.6
hectares of land from Lum Mawshun Minerals Pvt. Ltd.
(LMMPL) to Lafarge Umiam Mining Pvt. Ltd (LUMPL)
respondent No.8. The State Government considered the said
application and after being satisfied about the same, in exercise of
powers under Sec. 4(1) of the Act, vide Revenue Department
letter No.RDS.25/99/Pt-1/177 dated 17th September, 2004
accorded permission for transfer of a total of 150.6 hectares of
land at Shella/Nongtrai from LMMPL to LUMPL.
14.
It shall be relevant to quote sub-para (m) (n) (o) of para 4 of the
written submission of respondents No.1 to 5:“(m) The limestone mining project of LUMPL is in operation
since the year 2006-2007 and till date has yielded the following
revenue to the State exchequer by way of royalty, mineral cess
and dead rent on mining lease:
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
Grand
Total
Royalty
/Rent
NIL
1,27,22,760
1,44,31,500
6,73,94,385
10,50,35,346
3,01,37,499
5,42,17,737
12,60,00,000
12,40,39,188
13,83,47,219
15,99,96,160
16,94,17,440
18,66,31,280
1,18,83,70,514
Mineral
Dead
Cess
Rent
NIL
40,000
14,13,640
NIL
16,03,500
NIL
74,88,265
NIL
3,85,18,000
NIL
95,67,460
NIL
1,72,11,980 50,000
4,00,00,000
NIL
3,93,77,520
NIL
4,00,00,000
NIL
7,18,51,160
NIL
11,96,96,120
NIL
13,99,73,460
NIL
52,67,01,105 90,000
Grand Total
40,000
1,41,36,400
1,60,35,000
7,48,82,650
14,35,53,346
3,97,04,959
7,14,79,717
16,60,00,000
16,34,16,708
17,83,47,219
23,18,47,320
28,91,13,560
32,66,04,740
1,71,51,61,619
(n) Apart from contributing a substantial amount of revenue to the
State, the project of the respondent No.8 is also contributing to the
economy and the livelihood of the local people in the project sites
by way of creating additional direct and indirect employment
opportunities, provision of education, skill-development and
various measures in terms of the CSR activities carried out by the
respondent No.8. Various community development activities in
the field of health, education, infrastructure development, incomegeneration programmes like skill training fully dedicated for the
benefits of the local residents are being undertaken by the
respondent No.8. The project is also contributing a substantial
amount of revenue for Nongtrai Village Durbar by way of annual
lease rent of the land which at present stands about Rs.2.6 crore
per annum for the mining area, which is a major source of
earning/revenue for people of Nongtrai village.
(o) Pursuant to the directions of the Hon‟ble Supreme Court
contained in order dated 12.04.2010, a Special Purpose Vehicle
under the Chairmanship of the Chief Secretary, Government of
Meghalaya in the form of a society registered under the Societies‟
Registration Act, has been created. The respondent No.8 has,
pursuant to the direction of the Hon‟ble Supreme Court, till
31.07.2018 deposited a sum of Rs.168 crores in the account of the
said SPV and the said amount has further accrued interest on it.
The said SPV is mandated to plan and execute welfare projects
including the development of health, education, economy,
irrigation and agriculture in the project area of 50 Kms. Thus by
way of deposit of this money, the respondent No.8 is also
contributing to welfare projects in the project area for
development of health, education, economy, irrigation and
agriculture etc.”
15.
It is further stated that the transfer of land was permitted after
following due process of law under the Meghalaya Transfer of Land
(Regulation) Act, 1971. It is also stated that the project of respondent
No.8 has started contributing substantially to the State exchequer. In this
connection sub-para (c) of para 5 of the written submission is
advantageous to be quoted:“(c) The project of the respondent No.8 is contributing
substantially to the State exchequer by way of Royalty on
Limestone, Mineral Cess and Dead Rent and also by way of
deposits to SPV for welfare projects in the project area for
development of health, education, economy, irrigation and
agriculture etc.
The limestone mining project of LUMPL is in operation since the
year 2006-2007 and in its 11 years of operation till now has
contributed to the State exchequer the following amounts by way
of Royalty, Mineral Cess and Dead Rent:
Particulars
Period
Royalty/Rent 2006-07 to 2017-18
Mineral Cess 2006-07 to 2017-18
Dead Rent 2006-07 to 2017-18
TOTAL
Amount
1,18,83,70,514/52,67,01,105/90,000/1,71,51,61,619/-
Apart from the above, the limestone mining project of LUMPL
has deposited the following amount with the SPV created under
the orders of the Hon‟ble Supreme Court for welfare projects in
the project area for development of health, education, economy,
irrigation and agriculture etc.
Particulars
Period
Deposit with SPV
2006-07 to 2017-18
Interest accrued on the 2006-07 to 2017-18
above
Amount
168 Crore
About 34
Crore
As such the contention of the petitioner that – the project of the
respondent No.8 has caused deprivation of the Union of India and
the State of Meghalaya of taxes and revenues – is also factually
incorrect.”
16.
Sub-para (e) of said para 5 is also relevant to be quoted:“(e) The PIL petitioner (Shella Action Committee) is a busy-body
and a meddlesome interloper and the instant PIL petition filed by
Shella Action Committee purporting to agitate the grievances of
the so-called aggrieved landowners is misconceived one and not
maintainable when the said so-called aggrieved landowners are
satisfied and are in no way aggrieved and have chosen not to
approach the Court of law.
As stated above, permission under the Act was granted and
thereafter the lands were initially transferred from various
landowners to LLMPL as follows:From Village Durbar of U Sandi Nongtrai to LLMPL
= 100 Hectares
From individual landowners of Shella to LMMPL
= 30 Hectares
From Village Durbar of U Sandi Nongtrai to LMMPL
= 7.6 Hectares
From individuals landowners of Mawiong Shella
to LMMPL
= 13 Hectares
The landowner namely Village Durbar of U Sandi Nongtrai from
whom land measuring 107.6 Hectares (100+7.6 Hectares) was
transferred, is fully satisfied with the permission for transfer of
land and is in no way aggrieved and have chosen not to approach
the Court of law.
Similarly, the land owners in Shella from whom 30 Hectares of
land was transferred are fully satisfied with the permission for
transfer of land and are in no way aggrieved and have chosen not
to approach the Court of law or the Government of Meghalaya.
The other land-owners of Shella from whom 13 Hectares of land
was transferred are also fully satisfied and are in no way
aggrieved and have chosen not to approach the Court of law. As
such, when the real landowners, whose lands have been
transferred are satisfied and are not aggrieved, the instant PIL
filed by the Shella Action Committee is a misconceived one and
not maintainable.
No land has been taken for the project in Tynynger village as
claimed in the PIL.
If there is any other land-owner who claim right, interest and title
over any land and feels that his land has been transferred but he
had not been paid the lease rent or the sale amount by the
respondent No.7 or 8, this will tantamount to a title dispute
between the rival land-owners and the same cannot be decided by
this Hon‟ble Court in exercise of PIL jurisdiction. Such title
disputes can only be decided by the competent civil courts.”
17.
Finally, it has been stated that the PIL has been filed with mala
fide intention same may be dismissed.
18.
The respondents No.7 and 8 in their written submissions have
made it clear as to how their mining activities have been beneficial to
the people of the area. It is also been made clear as to what has been
contributed by the respondents No.7 to 9 and as to how the directions of
the Hon‟ble Supreme Court in Lafarge Umiam Mining Pvt. Ltd. [(2011)
7 SCC 338] in para 116 as quoted hereinabove have been complied with.
The respondents No.7 and 8 have stated that their contributions towards
upliftment of the standard of living of the people of the area have been
noticed by the Hon‟ble Supreme Court in the said judgment at paras 34,
96, 112 and 117. The detail of the benefits of the project as highlighted
in the written submission are as under:“The company respondent is providing health care facilities,
drinking water facilities, employment for local youth, construction
of village roads, and employment for school teachers, scholarship
programmes for children, etc. and this fact is reflected in the
Report of the High Power Committee (HPC) headed by Shri B.N.
Jha, Regional Chief Conservator of Forest (C) and referred to by
the Hon‟ble Apex Court at para 34 of its judgment, supra.”
19.
Summary of the financial benefits from the inception of the
project upto 31.07.2018 is as under:“The respondent company begs to adduce below and upto date
brief summary of the financial benefits accruing to the residents
of Shella and Nongtrai villages. The upto date figures from the
inception of the project upto July 31, 2018 are provided in the
table below:SL.
PARTICULARS
AMOUNT PAID IN INR
NO.
1.
Total payments made to the Rs.23,74,31,345/- (Rupees
village Durbar of Nongtrai Twenty
Three
Crore
under an Agreement.
Seventy Four Lakh Thirty
One
Thousand
Three
Hundred and Forty Five)
only.
(The amount is distributed
among the residents of
Nongtrai village
2.
Payments made to the Rs.8,98,75,000/- (Rupees
Village Dorbar of Shella Eight Crore Ninety Eight
under an Agreement
Lakh
Seventy
Five
Thousand) only.
(This amount is distributed
to the residents of Shella
Village
Total
Rs.32,73,06,345/-
In addition to the above, the respondent company has spent over
Rs.11,00,00,000/- (Rupees Eleven Crores) towards CSR activities
around the project area.”
20.
Deposits to exchequer, payments and contributions are as under:-
“The upto date figures as of July 31, 2018 are provided as
hereunder:SL.
PARTICULARS
AMOUNT PAID IN INR
NO
1. Royalty & Mineral Cess to Rs.171,50,71,619/the Govt. of Meghalaya. (Rupees One Hundred
(w.e.f. April 2006 till date)
Seventy One Crores Fifty
Lakh
Seventy
One
Thousand Six Hundred and
Nineteen) only.
2.
Special Purpose Vehicle
(SPV) vide Apex Court order
and
direction
dated
12.4.2010 [para 116 in
(2011) 7 SCC 338]
Rs.168,87,16,350/(Rupees One Hundred
Sixty Eight Crores Eighty
Seven
Lakh
Sixteen
Thousand Three Hundred
Fifty) only
3.
Contribution to the District Rs.12,16,13,616/Mineral Foundation
(Rupees Twelve Crore
Sixteen Lakh Thirteen
Thousand Six Hundred and
Sixteen) only.
4.
Export Revenue in term of USD 27,23,22,740 (US
Export Sales accruing to Dollar Twenty Seven
Govt. of India
Crores Twenty Three Lakh
Twenty Two Thousand
Seven Hundred
Forty)
only
Equivalent
to
Rs.1599,85,33,016/(Rupees One Thousand
Five Hundred Ninety Nine
Crores Eighty Five Lakh
Thirty Three Thousand and
Sixteen) only
Total
Rs.1952,39,34,601/-
Other payments
The respondent company has been granted Forest Clearance and
Environmental Clearance. In terms of the clearance and the order
of the Hon‟ble Supreme Court, following amounts contributed for
afforestation and regeneration activities:
(i) Total Amount paid for Compensatory AfforestationRs.2,39,10,767/- (Rupees Two Crores, Thirty Nine Lakh Ten
Thousand Seven Hundred Sixty Seven) only.
(ii) Total Amount for Net Present Value (NPV) from April 2007
to July 2010 along with interest – Rs.72,66,48,839/- (Rupees
Seventy Two Crores Sixty Six Lakh Forty Eight Thousand Eight
Hundred Thirty Nine) only.
(iii) Amount for Biodiversity Conservation Plan –
Rs.4,39,00,000/- (Rupees Four Crore Thirty Nine Lakh) only.
Amount for Catchment Area Treatment Plan – Rs.50,00,000/(Rupees Fifty Lakh) only.”
O
21.
The contributions on health sector, tax sector, exchequer sector
and revenue as detailed hereinabove, is a glaring example of great
contributions made by respondents No.7 and 8. Valid mining operation
through them has proved to be boon for the economy of not only the
inhabitants of the area but for the State as a whole.
22.
Respondent No.7 has faced lot of litigations, firstly, Shella Action
Committee had projected before the Hon‟ble Supreme Court various
objections including environmental clearance and forest land etc.,
unsuccessfully as is clear from para 121 of the judgment rendered in
Lafarge Umiam Mining Pvt. Ltd. quoted hereinabove.
23.
A drowning man catches at a straw is a proverb applicable to the
petitioner because after failing on every ground they have raised the
issue of land title. They are nobody to raise such an issue, their
intentions stand exposed by the fact that during pendency of this matter
from 2007 till date, they have not been able to produce single individual
with an affidavit to claim that his land has been transferred illegally. No
one has come forward to claim title adverse to those land owners who
have transferred their land (sold or leased out) in favour of the
respondent No.7.
24.
The State authorities (respondents No.1 to 5) in their written
submission have made it clear that while granting permission for
transfer of land the provisions of the Meghalaya Transfer of Land
(Regulation) Act, 1971 were strictly followed.
25.
We after bestowing thoughtful consideration to the entire gamut
of the matter have reached to an inescapable conclusion that in fact the
petitioner has filed the petition (PIL) without any substantial cause, they
may be the residents of village Shella but are stated to have been
residing in Shillong and operating from there to the disadvantage of the
people of the village Shella.
26.
Industrial growth linked with development of North East, in
particular, in this case State of Meghalaya, mining operation undertaken
by the respondents No.7 to 9 as referred to hereinabove has proved
fruitful for the economic growth and welfare of the people of the area.
Mining operation by respondents No.7 to 9 has generated lot of revenue
and various measures have been taken for well being and welfare of the
area. The petitioner have not been able to take exception to the positive
stand taken by the respondents No.7 and 8 regarding payment of tax,
valid transaction and economic growth. As against the petitioner, the
respondent (State) has supported the mining operation, transfer of land
and other activities of the respondents No.7 to 9.
27.
Bona fide‟s of the petitioner is not free from blame, he has
unnecessary dragged the respondents into unwanted litigation with
disastrous consequence. Public Interest Litigation has to be for the
betterment, shall not be aimed at destruction or harassment. We have
found this petition (PIL) to be totally without any merit and tainted with
ill design.
28.
Negative approach is always detrimental to the progress,
development and prosperity. Negativity at times can be catastrophic.
29.
The Public Interest Litigation (PIL) is not permissible for
encouraging negativity, impacting the progress and welfare. The
petitioner has filed the instant petition (PIL) projecting to be the well
wishers of tribal, so protecting and safeguarding the rights of the poor,
illiterate and indigenous people of Shella village. On final analysis,
spirit of the PIL is found with lot of negativity aimed at jeopardizing the
progress of the tribal of village Shella.
30.
In the upshot, petition deserve dismissal as such is dismissed with
costs, quantified at Rs.20,000/- (Rupees twenty thousand) to be
deposited by the petitioner within one month in the relief welfare fund
maintained by the High Court of Meghalaya presently for flood sufferers
of the State of Kerela.
31.
Dismissal of this PIL petition shall be without prejudice to any
suit if pending or instituted, regarding title of the land, transferred to
respondents No.7, 8 and 9.
(S.R. Sen)
Judge
(Mohammad Yaqoob Mir)
Chief Justice
Meghalaya
19.09.2018
“Lam AR-PS”
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review