IN THE HIGH COURT OF DELHI AT NEW DELHI
+
ARB.P. 1902/2025
SH. ASHOK KUMAR
Through:
.....Petitioner
Mr. Avinash Trivedi and Mr.
Rahul Aggarwal, Advocates.
versus
PUBLIC WORKS DEPARTMENT GOVT OF NCT OF
DELHI
.....Respondent
Through: Mr. Abhinav Sharma, Advocate
through video-conferencing.
%
CORAM:
HON'BLE MR. JUSTICE HARISH VAIDYANATHAN
SHANKAR
ORDER
20.01.2026
1.
The present petition, under Section 11(6) of the Arbitration and
Conciliation Act, 1996 [<Act=], has been filed seeking the
appointment of an Arbitrator for the adjudication of disputes inter se
the parties.
2.
The material on record indicates that the Respondent herein
had issued an Acceptance Letter dated 24.02.2018 in favour of the
Petitioner and subsequently, the parties entered into an Agreement
bearing No. 61/EE/PWD/SWR-II/2017-18/03833 [<Agreement=].
3.
Clause 25 of the Agreement, which contains the arbitration
clause, reads as follows:
“Clause 25: Settlement of Disputes & Arbitration
Except where otherwise provided in the contract, all questions and
disputes relating to the meaning of the specifications, design,
drawing and instructions here-in before mentioned and as to the
quality of workmanship or materials used on the work or as to any
other question, claim, right, matter or thing whatsoever in any way
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
arising out of or relating to the contract, designs, drawings,
specification, estimates, instructions, orders of these conditions or
otherwise concerning the works or the execution or failure to
execute the same whether arising during the progress of the work
or after the cancellation, termination, completion or abandonment
thereof shall be dealt with as mentioned hereinafter:
(i) If the contractor considers any work demanded of him to be
outside the requirements of the contract, or disputes any
drawings, record or decision given in writing by the
Engineer-in-Charge or if the Engineer in Charge considers
any act or decision of the contractor or any matter in
connection with or arising out of the contract or carrying
out of the work, to be unacceptable and is disputed, such
party shall promptly within 15 days of the arising of the
disputes request the Chief Engineer or where there is no
Chief Engineer, the Additional Director General (CE/ADG)
who shall refer the disputes to the Dispute Reressal
Committee (DRC) within 15 days along with a list of
disputes with amounts claomed if any in respect of each
such dispute. The Dispute Redressal Committee (DRC)
shall give the opposing party two weeks for a written
response, and, and, give its decision within a period of 60
days extendable by 30 days by consent of both the parties
from the receipt of reference from CE/ADG. The
constitution of Dispute Redressal Committee (DRC) shall
be as indicated in Schedule 'F'. Provided that no party shall
be represented before the Dispute Redressal Committee by
an advocate/legal counsel etc.
If the Dispute Redressal Committee (DRC) fails to give its
decision within the aforesaid period or any party is
dissatisfied with the decision of Dispute Redressal
Committee (DRC) or expiry of time limit given above, then
either party may within a perio of 30 days from the receipt
of the decision of Dispute Redressal Committee (DRC),
give notice to the Chief Engineer, CPWD, in charge of the
work or if there be no Chief Engineer, the Additional
Director General of the concerned region of CPWD or if
there be no Additional Director General, the Director
General, CPWD (CE/ADG/DG) for appointment of
arbitrator on prescribed proforma as per Appendix XV
under intimation to the other party.
It is a term of contract that each party invoking arbitration
must exhaust the aforesaid mechanism of settlement of
claims/disputes prior to invoking arbitration.
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
The CE/ADG/DG shall in such case appoint the sole
arbitrator or one of the three arbitrators as the case may be
within 30 days of receipt of such a request and refer such
disputes to arbitration. Wherever the Arbitral Tribunal
consists of three Arbitrators, the contractor shall appoint
one arbitrator within 30 days of making request for
arbitration or of receipt of request by Engineer-in-charge to
CE/ADG/DG for appointment of arbitrator, as the case may
be, and two appointed arbitrators shall appoint the third
arbitrator who shall act as the Presiding Arbitrator. In the
event of
a. party fails to appoint the second Arbitrator, or
b. The two appointed Arbitrators fail to appoint the
Presiding Arbitrator, then
The Director General, CPWD shall appoint the second or
Presiding Arbitrator as the case may be.
(ii) Disputes or difference shall be referred for adjudication
through arbitration by a Tribunal having sole arbitrator
where Tendered amount is Rs. 100 Crore or less. Where
Tendered Value is more than Rs. 100 Crore, Tribunal shall
consist of three Arbitrators as above. The requirements of
the Arbitration and Conciliation Act, 1996 (26 of 1996) and
any further statutory modifications or re-enactment thereof
and the rules made there under and for the time being in
force shall be applicable.
It is a term of this contract that the party invoking
arbitration shall give a list of disputes with amounts
claimed, if any, in respect of each such dispute along with
the notice for appointment of arbitrator and giving
reference to the decision of the DRC.
It is also a term of this contract that any member of the
Arbitration Tribunal shall be a Graduate Engineer with
experience in handling public works engineering contracts
at a level not lower than Chief Engineer (Joint Secretary
level of Government of India) This shall be treated as a
mandatory qualification to be appointed as arbitrator.
Parties, before or at the time of appointment of Arbitral
Tribunal may agree in writing for fast track arbitration as
per the Arbitration and Conciliation Act, 1996 (26 of 1996)
as amended in 2015.
Subject to provision in the Arbitration and Conciliation
Act, 1996 (26 of 1996) as amended in 2015 whereby the
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
counter claims if any can be directly filed before the
arbitrator without any requirement of reference by the
appointing authority, the arbitrator shall adjudicate on only
such disputes as are referred to him by the appointing
authority and give separate award against each dispute and
claim referred to him and in all cases where the total
amount of the claims by any party exceeds Rs. 1,00,000/-,
the arbitrator shall give reasons for the award.
It is also a term of the contract that if any fees are payable
to the arbitrator, these shall be paid as per the Act.
The place of arbitration shall be as mentioned in Schedule
F. In case there is no mention of place of arbitration, the
arbitral tribunal shall determine the place of arbitration.
The venue of the arbitration shall be such place as may be
fixed by the Arbitral Tribunal in consultation with both the
parties. Failing any such agreement, then the Arbitral
Tribunal shall decide the venue.=
4.
The material on record further indicates that certain disputes
had arisen between the parties; consequently, the Petitioner vide
Notice dated 01.07.2024 sought the consent of the Respondent for the
constitution of the Dispute Redressal Committee (DRC), as also
invoking arbitration as per the terms of Section 21 of the Act.
5.
The Petitioner, thereafter, vide Notice dated 30.12.2024,
invoked arbitration as per Clause 25(ii) of the Agreement.
6.
Since the Respondent failed to reply to the aforenoted Notices,
the Petitioner has approached this Court by way of the present
Petition, seeking the appointment of a sole Arbitrator.
7.
The law with respect to the scope and standard of judicial
scrutiny under Section 11(6) of the 1996 Act has been fairly well
settled. This Court in Pradhaan Air Express Pvt Ltd v. Air Works
India Engineering Pvt Ltd [2025 SCC OnLine Del 3022] has
extensively dealt with the scope of interference at the stage of Section
11. The Court held as under:-
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
<9. The law with respect to the scope and standard of judicial
scrutiny under Section 11(6) of the 1996 Act has been fairly well
settled. The Supreme Court in the case of SBI General Insurance
Co. Ltd. v. Krish Spinning,1 while considering all earlier
pronouncements including the Constitutional Bench decision of
seven judges in the case of Interplay between Arbitration
Agreements under the Arbitration & Conciliation Act, 1996 &
the Indian Stamp Act, 1899, In re2 has held that scope of inquiry
at the stage of appointment of an Arbitrator is limited to the extent
of prima facie existence of the arbitration agreement and nothing
else.
10. It has unequivocally been held in paragraph no. 114 in the
case of SBI General Insurance Co. Ltd. that observations made
in Vidya Drolia v. Durga Trading Corpn.,3 and adopted in NTPC
Ltd. v. SPML Infra Ltd.,4 that the jurisdiction of the referral court
when dealing with the issue of <accord and satisfaction= under
Section 11 extends to weeding out ex-facienon-arbitrable and
frivolous disputes would not apply after the decision of Re :
Interplay. The abovenoted paragraph no. 114 in the case of SBI
General Insurance Co. Ltd. reads as under:4
<114. In view of the observations made by this Court
in In Re : Interplay (supra), it is clear that the scope of
enquiry at the stage of appointment of arbitrator is limited
to the scrutiny of prima facie existence of the arbitration
agreement, and nothing else. For this reason, we find it
difficult to hold that the observations made in Vidya
Drolia (supra) and adopted in NTPC v. SPML (supra) that
the jurisdiction of the referral court when dealing with the
issue of <accord and satisfaction= under Section 11
extends to weeding out ex-facie non-arbitrable and
frivolous disputes would continue to apply despite the
subsequent decision in In Re : Interplay (supra).=
11. Ex-facie frivolity and dishonesty are the issues, which have
been held to be within the scope of the Arbitral Tribunal which is
equally capable of deciding upon the appreciation of evidence
adduced by the parties. While considering the aforesaid
pronouncements of the Supreme Court, the Supreme Court in the
case of Goqii Technologies (P) Ltd. v. Sokrati Technologies (P)
Ltd.,5 however, has held that the referral Courts under Section 11
must not be misused by one party in order to force other parties to
the arbitration agreement to participate in a time-consuming and
costly arbitration process. Few instances have been delineated such
as, the adjudication of a non-existent and malafide claim through
arbitration. The Court, however, in order to balance the limited
scope of judicial interference of the referral Court with the interest
of the parties who might be constrained to participate in the
arbitration proceedings, has held that the Arbitral Tribunal
eventually may direct that the costs of the arbitration shall be borne
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
by the party which the Arbitral Tribunal finds to have abused the
process of law and caused unnecessary harassment to the other
parties to the arbitration.
12. It is thus seen that the Supreme Court has deferred the
adjudication of aspects relating to frivolous, non-existent
and malafide claims from the referral stage till the arbitration
proceedings eventually come to an end. The relevant extracts
of Goqii Technologies (P) Ltd. reads as under:4
“20. As observed in Krish Spg. [SBI General Insurance
Co. Ltd. v. Krish Spg., (2024) 12 SCC 1 : 2024 INSC
532], frivolity in litigation too is an aspect which the
referral court should not decide at the stage of Section 11
as the arbitrator is equally, if not more, competent to
adjudicate the same.
21. Before we conclude, we must clarify that the
limited jurisdiction of the referral courts under Section 11
must not be misused by parties in order to force other
parties to the arbitration agreement to participate in a
time consuming and costly arbitration process. This is
possible in instances, including but not limited to, where
the claimant canvasses the adjudication of non-existent
and mala fide claims through arbitration.
22. With a view to balance the limited scope of judicial
interference of the referral courts with the interests of the
parties who might be constrained to participate in the
arbitration proceedings, the Arbitral Tribunal may direct
that the costs of the arbitration shall be borne by the party
which the Tribunal ultimately finds to have abused the
process of law and caused unnecessary harassment to the
other party to the arbitration. Having said that, it is
clarified that the aforesaid is not to be construed as a
determination of the merits of the matter before us, which
the Arbitral Tribunal will rightfully be equipped to
determine.=
13. In view of the aforesaid, the scope at the stage of Section 11
proceedings is akin to the eye of the needle test and is limited to
the extent of finding a prima facie existence of the arbitration
agreement and nothing beyond it. The jurisdictional contours of the
referral Court, as meticulously delineated under the 1996 Act and
further crystallised through a consistent line of authoritative
pronouncements by the Supreme Court, are unequivocally confined
to a prima facie examination of the existence of an arbitration
agreement. These boundaries are not merely procedural safeguards
but fundamental to upholding the autonomy of the arbitral process.
Any transgression beyond this limited judicial threshold would not
only contravene the legislative intent enshrined in Section 8 and
Section 11 of the 1996 Act but also risk undermining the sanctity
and efficiency of arbitration as a preferred mode of dispute
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
resolution. The referral Court must, therefore, exercise restraint and
refrain from venturing into the merits of the dispute or adjudicating
issues that fall squarely within the jurisdictional domain of the
arbitral tribunal. It is thus seen that the scope of enquiry at the
referral stage is conservative in nature. A similar view has also
been expressed by the Supreme Court in the case of Ajay
Madhusudan Patel v. Jyotrindra S. Patel6.=
8.
Learned counsel for the parties are ad idem that the matter may
be referred to arbitration, and the learned Arbitrator who answers to
the qualifications as set out in Clause 25 of the Agreement and is
empanelled under the Delhi International Arbitration Centre
[<DIAC=] may be appointed as an Arbitrator. The qualification as set
out in Clause 25 of the Agreement reads as under:
<….
(ii) …..
It is also a term of this contract that any member of the Arbitration
Tribunal shall be a Graduate Engineer with experience in handling
public works engineering contracts at a level not lower than Chief
Engineer (Joint Secretary level of Government of India) This shall
be treated as a mandatory qualification to be appointed as
arbitrator.
….=
9.
The material on record further indicates that the disputed
amount is stated to be Rs. 3,01,76,376/-.
10.
In view of the fact that disputes have arisen between the parties
and there is an arbitration clause in the agreement, this Court is
inclined to appoint an Arbitrator to adjudicate upon the disputes
between the parties.
11.
Accordingly, Mr. A.K. Singhal, Director General, CPWD
(e-mail : adityakumar1414@yahoo.com & Mobile No. 9910444589)
who is empanelled with the DIAC, is appointed as the sole Arbitrator.
12.
The arbitration would take place under the aegis of the Delhi
International Arbitration Centre (DIAC) and would abide by its rules
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
and regulations. The learned Arbitrator shall be entitled to fees as per
the Schedule of Fees maintained by the DIAC.
13.
The learned Arbitrator is also requested to file the requisite
disclosure under Section 12 (2) of the Act within a week of entering of
reference.
14.
The Registry is directed to send a receipt of this order to the
learned arbitrator through all permissible modes, including through email.
15.
All rights and contentions of the parties in relation to the
claims/counter-claims are kept open, to be decided by the learned
Arbitrator on their merits, in accordance with law.
16.
Needless to say, nothing in this order shall be construed as an
expression of opinion of this Court on the merits of the controversy
between the parties. Let a copy of the said order be sent to the
Arbitrator through the electronic mode as well.
17.
Accordingly, the instant petition stands disposed of.
HARISH VAIDYANATHAN SHANKAR, J.
JANUARY 20, 2026/tk/va/jk
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 24/01/2026 at 12:08:34
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review