Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
*
IN THE HIGH COURT OF DELHI AT NEW DELHI
%
Reserved on: 05th February, 2026
Pronounced on: 16th June, 2026
+
RFA 601/2024, CM APPL. 52604/2024, CM APPL. 69218/2024
CM APPL. 29627/2025
SATPAL KAUR
W/o Shri Amardeep Singh,
R/o WZ-215, G Block, Harinagar,
New Delhi-110058,
.....Appellant
Through: Mr. S.C. Anand Advocate.
versus
AITHENT TECHNOLOGIES PVT. LTD.
Through its Chief Executive Officer,
A-186, Okhla Industrial Area, Phase-I,
New Delhi-110020.
.....Respondent
Through: Ms. Venancio D'Costa and Ms. Gauri
Goel, Advocates.
CORAM:
HON'BLE MS. JUSTICE NEENA BANSAL KRISHNA
J U D G M
E N T
NEENA BANSAL KRISHNA, J.
1.
The present Regular First Appeal under Section 96 read with Order
XLI of the Code of Civil Procedure, 1908 (hereinafter referred to as
"CPC") has been preferred by the Appellant/Plaintiff, Satpal Kaur, assailing
the Judgment and Decree dated 28.03.2024 whereby the Suit for Recovery
of Rs.4,14,021/- filed by the Appellant/Plaintiff has been dismissed, by
the learned Additional District Judge, Delhi.
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
2.
The Appellant/Plaintiff instituted the CS DJ No.13355/2016
(originally numbered as CS No.85/2006) for recovery of Rs.4,14,021/(principal amount of Rs.3,04,500/- and interest of Rs.1,09,521/-).
3.
Briefly stated, the case of the Appellant/Plaintiff was that she joined
the services of the Respondent Company on 28.09.1993 and continued in
employment till 25.11.2003. At the time of her resignation, she was serving
as Senior Member Consulting Staff at the Gurgaon branch of the Respondent
Company and was drawing a gross monthly salary of Rs.61,500/-.
4.
During the financial year 2002-2003, the Respondent Company faced
financial difficulties on account of substantial investments in infrastructure
and delayed payments from its overseas affiliated entities. Consequently, in
March 2002, the Respondent Company decided to defer a portion of the
salaries payable to employees drawing salaries above Rs.12,000/- per
month, for the financial year 2002-2003 on a graded scale of 15%, 20%,
25% and 30% depending upon the salary range. The employees were also
promised one month's salary, as bonus compensation, to offset the financial
hardship occasioned by the deferment of salaries. The deferred salary was to
be paid on 01.04.2003.
5.
The deferment was implemented on a graded scale, and since her
salary exceeded Rs.60,000/- per month, 30% of her gross salary amounting
to Rs.20,250/- per month, was deferred from April, 2002 till March, 2003.
The deferred component aggregating to Rs.2,43,000/-, was agreed to be paid
on 01.04.2003.
6.
The Appellant/Plaintiff further asserted that as per the policy of
deferment, she was also entitled to Rs.61,500/- i.e. one month's salary, as
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
bonus compensation. Hence, a total amount of Rs.3,04,500/- was due and
payable to the Appellant/Plaintiff, as on 01.04.2003.
7.
As per the Appellant/Plaintiff, the said announcement had been made
with the approval of the CEO of the Respondent Company, who had sent an
e-mail dated 09.07.2002 to Mr. Raju Ahluwalia, with copies to Mr. Ajay
Malik and Mr. Sunil Vadehra regarding the preponement of the decision to
restore salaries to the earlier levels.
8.
Appellant/Plaintiff stated that during an Open-House Meeting held on
09.08.2002, the Management announced restoration of salaries of certain
employees i.e. lowest salary group of Rs.12,000/- to Rs.20,000/- per month,
with effect from 01.10.2002, and assured that the cases of other employees
would also be reviewed and their deferred salaries, would be released.
9.
While the original salary of the Appellant/Plaintiff of Rs.61,500/-,
stood restored w.e.f. 01.04.2003, the management sought more time to pay
the arrears of the deferred salary along with the compensation bonus. The
Appellant/Plaintiff has
relied upon a communication dated 05.04.2004,
issued by the CEO of the Respondent Company assuring clearance of her
dues by 31.05.2004. However, payment of the deferred salary and
compensation bonus, continued to be postponed, despite repeated requests.
10.
The Appellant/Plaintiff thereafter, sent letters dated 30.08.2005 and
16.03.2006, the latter dispatched by Registered Post on 17.03.2006, to the
Respondent Company, demanding payment of the outstanding deferred
dues. The Respondent Company gave a vague and evasive reply dated
28.03.2006, which is alleged to have implicitly admitted the promise to pay.
Despite the same, the Respondent Company failed to release the claimed
amount.
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
11.
The Appellant/Plaintiff instituted the present Suit seeking recovery of
Rs.4,14,021/- inclusive of interest (Rs.3,04,500/- plus interest of
Rs.1,09,521/-).
12.
The Defendant/Respondent Company in its Written Statement,
raised a preliminary objection regarding territorial jurisdiction, contending
that the subject matter of the Suit pertained to the employment of the
Appellant/Plaintiff at Gurgaon and the disbursal of salary also took place at
Gurgaon, and therefore, the Courts at Gurgaon were the appropriate venue
for filing the Suit.
13.
On merits, it was contended that there was no deferment of salary
and that the salary structure of employees had merely been restructured, in
view of prevailing business circumstances.
14.
The Respondent Company denied that any Agreement existed
whereby the reduced portion of salary was to be repaid, at a future date. It
was further asserted that the Appellant/Plaintiff herself was part of the
Management team which had participated in the decision-making process
relating to restructuring of salaries, and that the Appellant/Plaintiff had
sought to disguise the said decision by terming the restructuring of salary as
deferred salary.
15.
The Respondent Company admitted that one month's salary had been
discussed as a "loyalty bonus" payable after the Company regained its
financial health, but asserted that the same was neither a contractual
commitment nor a legally enforceable obligation, and was contemplated
only as a moral incentive.
16.
The Respondent Company further explained that the open house
meeting had been addressed by the core Management based in India and the
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
reversal of restructuring in respect of the lowest salary group, was made
effective from 01.08.2002 and not 01.10.2002 as stated by the
Appellant/Plaintiff. It was further asserted that the Appellant/Plaintiff had
received all her entitlements at the time of her relief on 25.11.2003 and
nothing remained due or payable to her thereafter.
17.
The Respondent Company further denied that any amount remained
due and payable to the Appellant/Plaintiff, at the time of cessation of her
employment and prayed for dismissal of the Suit.
18.
On the basis of the pleadings of the parties, the learned Trial Court
framed the following Issues, on 20.07.2007:
i.
ii.
iii.
iv.
v.
vi.
vii.
19.
“Whether this Court has the territorial jurisdiction to try this
suit? OPP
Whether plaintiff was a party to the restructuring of salary as
alleged by defendant? OPD
Whether plaintiff was a part of the management of defendant
and as such estopped from bringing this suit? OPD
Whether a part of the salary of the plaintiff had been deferred
with assurance to be paid at a later stage? OPP
Whether plaintiff is entitled to recovery of the suit amount?
OPP
Whether plaintiff is entitled to any interest on the suit amount?
If so, for what period and at what rate? OPP
Relief."
The Appellant/Plaintiff examined herself as PW-1 and tendered her
affidavit Ex. PW-1/A. She relied upon her Salary Slips for March 2002 (Ex.
P-1), April 2002 (Ex. P-2), April 2003 (Ex. P-3) and March 2003 (Ex. P-4),
the reply dated 28.03.2006 issued by the Respondent Company (Ex. P-5),
the appointment letter dated 18.11.2003 issued by M/s Sapient Corporation
(Ex. PW-1/1), the pay slips issued by M/s Ishir Infotech Pvt. Ltd. (Ex. PW-
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
1/2 to Ex. PW-1/5), the original Salary Slips for the intervening period from
May 2002 to February 2003 (Ex. PW-1/6 to Ex. PW-1/15), the letter dated
01.04.2005 written by the CEO of the Respondent Company to Mr. Praveen
Malik (Ex. PW-1/16), the e-mail correspondence between the CEO and Mr.
Sanjeev Matta (Ex. PW-1/17), and her own letters dated 30.08.2005 (Ex.
PW-1/18) and 16.03.2006 (Ex. PW-1/19) addressed to the Respondent
Company. The letter dated 11.11.2003 (Ex. PW-1/D-1) and the letter dated
15.12.2003 (Ex. PW-1/D-2), bearing her signatures, were exhibited during
her cross-examination.
20.
PW-2, Mr. Sunil Vadehra, former Director and Head of India
Operations of the Respondent Company, supported the case of the
Appellant/Plaintiff regarding deferment of salaries and the subsequent
assurances extended by the Management. He relied upon a certified copy of
the e-mail dated 09.07.2002 of the CEO and the connected correspondence
(Ex. PW-2/1).
21.
PW-3, Mr. Gurpreet Singh Bindra, former employee of the
Respondent Company, deposed in support of the case of the
Appellant/Plaintiff regarding re-structuring of salaries.
22.
DW-1, Mr. Banty Bisht, Manager – HR of the Respondent
Company, reiterated the stand taken in the Written Statement and denied
existence of any agreement regarding deferred salary. He relied upon the
photocopy of the Minute Book of the Respondent Company Ex. DW-1/A
and the letter dated 05.04.2004 Ex. D-3, issued by the CEO of the
Respondent Company to the Appellant/Plaintiff.
23.
The learned ADJ, upon appreciation of the evidence led by the
parties, concluded that the Appellant/Plaintiff had failed to establish any
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
contractual arrangement, whereby the reduced component of salary was to
be repaid at a later date or that one month's salary was contractually payable
as bonus. Consequently, the Suit was dismissed vide Judgment and
Decree dated 28.03.2024.
24.
Aggrieved by the said Judgment and Decree dated 28.03.2024, the
present Appeal has been preferred by the Appellant/Plaintiff.
25.
The grounds of challenge primarily are that the impugned Judgment
is self-contradictory inasmuch as the rulings cited therein emphasise the
importance of Board Resolutions, whereas there was equally no Board
Resolution to restructure the salary in the first place. It is contended that the
e-mail dated 09.07.2002 Ex. PW-2/1 and the connected e-mails, use the
terminology "deferred". The decision in Dale & Carrington Invt. (P) Ltd. v.
P.K. Prathapan, (2005) 1 SCC 212 was inapplicable to the facts in hand.
Rather, the letter dated 05.04.2004 issued by the CEO of the Respondent
Company Ex. D-3, established the case of the Appellant/Plaintiff.
26.
The Appellant has accordingly, prayed that the impugned Judgment
and Decree dated 28.03.2024 be set aside and the Suit be decreed.
27.
The Respondent in its Written Submissions, has contended that the
salary reduction during the Financial Year 2002-2003, was a restructuring of
remuneration, necessitated by the financial constraints faced by the
Company and not a deferment of salary. It is further submitted that the
Appellant/Plaintiff continued in service even after restoration of salary w.e.f.
01.04.2003 and did not raise any contemporaneous claim for the alleged
arrears.
28.
Reliance has also been placed upon the Judgment dated 06.08.2018
passed by this Court in M/s Aithent Technologies Pvt. Ltd. v. Archana
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
Verma (RFA 608/2014), wherein claims arising out of the salary
restructuring exercise, were rejected.
29.
The Appellant in her Written Submissions, has reiterated the grounds
taken in the Appeal.
Submissions heard and Record perused.
30.
It is the case of the Appellant/Plaintiff, Ms. Satpal Kaur, that she
joined the Respondent Company on 28.09.1993 and continued in
employment till 25.11.2003, last serving as Senior Member Consulting Staff
at the Gurgaon branch of the Respondent Company. She tendered her
resignation, which was accepted by the Respondent Company vide letter
dated 15.12.2003 Ex. PW-1/D-2, with effect from 25.11.2003.
31.
She further deposed that she was drawing a gross salary of
Rs.61,500/- per month (comprising salary of Rs.56,250/- and reimbursement
of Rs.5,250/-) in March 2002, as evidenced by her Salary Slip Ex. P-1, and
that the said gross salary stood restored with effect from 01.04.2003, as
evidenced by her Salary Slip Ex. P-3.
32.
The entire controversy in the present case centres around the
reduction of the Appellant/Plaintiff's salary during Financial Year
01.04.2002 till 31.03.2003. It is an admitted case that with effect from
01.04.2002, the Appellant/Plaintiff's gross salary was reduced from
Rs.61,500/- per month to Rs.36,000/- per month and continued at the
reduced level until 31.03.2003. It is further undisputed that with effect from
01.04.2003, the Appellant/Plaintiff's salary was restored to Rs.61,500/- per
month. Thus, there was an admitted reduction in the Appellant/Plaintiff's
salary for one year i.e. the period from 01.04.2002 to 31.03.2003.
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
33.
The circumstances leading to reduction in salary for Financial Year
2002-03, were explained by PW-2 Mr. Sunil Vadehra, the then Director and
Head of India Operations of the Respondent Company, who stated that the
Respondent Company was a wholly owned subsidiary of Aithent Inc., New
York, USA with effect from 01.01.2001. He stated that the Respondent
Company had advanced an interest-free loan of Rs.739 lakhs to Aithent Inc.,
which increased to Rs.808 lakhs as on 31.03.2003.
34.
It was further deposed that two affiliated entities, namely Canyon
Blue and Velos, were among the principal clients of the Respondent
Company. A substantial number of technical resources of the Respondent
Company were deployed for development and maintenance of products for
these entities. However, the said entities failed to make timely payments for
the services rendered, resulting in significant outstanding receivables.
Despite the accumulation of such dues, the Respondent Company continued
to provide services, particularly to Canyon Blue.
35.
The aforesaid circumstances adversely impacted the financial position
of the Respondent Company and resulted in dwindling of available reserves
with the Respondent Company. Towards the end of March, 2002,
discussions were held within the management regarding measures to address
the situation. The then Director and Head of India Operations, Mr. Sunil
Vadehra, along with Mr. Venu Gopal (CEO), Mr. H.R. Ahluwalia (Vice
President – HR), Mr. Sanjay Verma (Vice President – Technology) and Mr.
Rajiv Gupta (Assistant Vice President – Technology), deliberated upon the
issue. It was thereafter decided that the prevailing situation should be shared
with the employees and their cooperation sought. Consequently, an open
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
General House Meeting of all employees was convened, wherein all the
employees had been invited.
36.
At the said meeting, Mr. Venu Gopal, CEO, and Mr. Sunil Vadehra
addressed the employees, and explained the financial difficulties being faced
by the Respondent Company, particularly on account of non-receipt of
payments from affiliated entities, and expressed the expectation that the
situation would improve in the coming months. Cooperation of the
employees in helping to tide over this temporary difficulty was sought. The
proposed measures were thereafter explained to the employees in detail.
37.
The proposed measure involved deferment of a portion of the
employees' salaries on a graded scale for a period of up to twelve months. It
was represented that upon expiry of the said period, the salaries would be
restored to their original levels. It was further stated that if any employee left
the organisation during this period, the deferred salary together with gratuity
benefits would be paid at the time of final settlement.
38.
In cases where employees were receiving both monthly and annual
remuneration components, the two components were merged with effect
from 01.04.2002 to mitigate hardship. The employees agreed to the
proposed arrangement and extended their cooperation to the management in
overcoming the financial difficulties faced by the Respondent Company.
The management also promised a special bonus equivalent to one month's
salary to each employee.
39.
As per the Appellant/Plaintiff, under the aforesaid arrangement, the
Respondent Company agreed with employees drawing a gross salary above
Rs.20,000/- per month to defer a portion of their salary for Financial Year
2002-2003, till April 2003. The deferred portion of the salary was
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
determined on a graded scale, namely 15%, 20%, 25% and 30% for
employees drawing gross monthly salaries in the ranges of Rs.12,000/- to
Rs.20,000/-, Rs.20,000/- to Rs.30,000/-, Rs.30,000/- to Rs.60,000/- and
above Rs.60,000/- respectively.
40.
Consequently, the amount of deferred salary attributable to the
Appellant/Plaintiff for Financial Year 2002-2003, was Rs.2,43,000/-. Upon
adding the promised bonus equivalent to one month's salary, the
Appellant/Plaintiff claimed that a total sum of Rs.3,04,500/- became due and
payable to her, which was not paid by the Respondent Company.
41.
The Respondent Company, on the other hand, contended that the
arrangement was not one of deferment of salary and that no promise had
been made to pay the reduced salary amount with effect from 01.04.2003 to
the employees. In fact, owing to the financial difficulties being faced by the
Company, the salaries of employees were restructured for a period of one
year. It was, therefore, asserted that there was no question of any deferred
salary becoming payable to the Appellant/Plaintiff or any other employee.
42.
The only controversy is: whether it was a deferred salary for the
Financial Year 2002-2003, with the deferred component payable on
01.04.2004 or it was a case of re-structuring of the salary for one year.
43.
Although
the
Appellant/Plaintiff
sought
to
characterise
the
arrangement as one involving deferment of salary, the evidence indicates
that the arrangement emerged from internal discussions within the
management, in which the then Director and Head of India Operations Mr.
Sunil Vadehra played a significant role and a mechanism had been worked
out to fight through the financial difficulties of the Respondent Company.
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
44.
It is quite evident that there may have been an internal understanding
amongst the members of the Management and CEO that employees who
supported the Company during its financial difficulties would be
compensated in the future by payment of the deferred salary. However, no
such understanding was formally documented and, in the Company records,
the arrangement continued to be reflected as a restructuring of salary.
45.
Equally significant are the documents dated 11.11.2003 Ex. PW-1/D-
1 and 15.12.2003 Ex. PW-1/D-2, executed at the stage when the
Appellant/Plaintiff ceased to actively serve the Respondent Company. The
said documents specifically record the financial arrangement governing the
relationship between the parties and the benefits payable upon separation.
The same are produced as under:
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
46.
Significantly, the said documents are completely silent regarding the
alleged deferred salary of Rs.2,43,000/- or the alleged compensation bonus
of Rs.61,500/-. Though the documents bear the signatures of the
Appellant/Plaintiff in token of acceptance, there is no acknowledgment of
any outstanding liability or reference to any deferred salary arrangement.
47.
Another aspect, which is of immense importance, is that the
Appellant/Plaintiff, as per her own testimony, resigned from the Respondent
Company on 25.11.2003. At that time, admittedly, all her dues were settled
in terms of the consolidated allowance prescribed under Ex. PW-1/D-1 read
with Ex. PW-1/D-2. If it was indeed a case of deferment, and not
restructuring, as alleged by the Appellant/Plaintiff, there is no reason, why
she would not have protested, insisted or claimed her outstanding dues, on
account of alleged deferment of the salary.
48.
The admissions made by PW-1 further reveal that there was no formal
written agreement, board resolution or other contemporaneous document
recording any obligation on the part of the Respondent Company to repay
the reduced salary at a future date.
49.
The Plaintiff, PW-1 herself admitted that the only written document
she relied upon as evidencing the alleged deferment was the letter dated
05.04.2004 Ex. D-3, wherein the CEO of the Respondent Company stated
that he remained committed to clear the dues of the Appellant/Plaintiff. The
same is reproduced as under:
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
50.
However, the said communication neither quantifies the alleged dues
nor identifies their nature. There is no reference to the reduced salary for
Financial Year 2002-2003, no mention of any compensation bonus and no
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
recital that the salary reduction was merely a deferment to be repaid at a
future date.
51.
It is not disputed that there were discussions regarding payment of a
one month's salary bonus to employees. However, the Appellant/Plaintiff
has failed to place on record any material to establish that the said bonus
crystallized into a binding contractual obligation. The consistent stand of the
Respondent has been that the same was contemplated only as an incentive
and not as a legal commitment. In the absence of any document or other
cogent evidence demonstrating that the bonus became payable as a matter of
right, the claim towards compensation bonus cannot be sustained.
52.
The Appellant/Plaintiff has relied upon the aforesaid communications,
but from these communications there is no admission of there being any
deferment of salary or the entitlement of the Appellant/Plaintiff for the
same.
53.
Much emphasis has been placed by the Appellant on the absence of
any Board Resolution. However, the present Suit is not one challenging the
validity of the reduction of salary. The case of the Appellant is that the
reduced salary was deferred and remained payable. The well-settled
principle that an individual Director or CEO cannot, in the absence of
specific authorisation by the Board of Directors, bind the Company to a
novel financial commitment, applies with full force to the alleged
commitment for repayment of the deferred salary, and no Board Resolution
authorising the CEO to make any such commitment has been placed on
record.
54.
The conduct of the Appellant/Plaintiff, in not insisting on any
outstanding dues at the time of her resignation and her filing of the Suit only
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
after two and a half years of her resignation, also lend support that it was not
a formal approved policy of the Respondent Company, to pay the deferred
salary.
55.
The learned Trial Court has carefully appreciated the evidence
brought on record and has rightly concluded that while reduction of salary
during the relevant period stands admitted, the Appellant/Plaintiff failed to
establish that such reduction merely constituted a deferment creating a
legally enforceable obligation to repay the amount at a later date.
56.
There is no merit in the present Appeal, which is hereby, dismissed
along with pending Applications.
(NEENA BANSAL KRISHNA)
JUDGE
JUNE 16, 2026/R
Signed By:VIKAS
ARORA
18:17:34
RFA 601/2024
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review