Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
*
IN THE HIGH COURT OF DELHI AT NEW DELHI
%
Reserved on: 05th February, 2026
Pronounced on: 16th June, 2026
+
RFA 647/2024, CM APPL. 29334/2025
SANJEEV MATTA
S/o Shri Iqbal Chand Matta,
R/O 504, Sector 31,
Gurugram-122001, Haryana
Through:
.....Appellant
Mr. S.C. Anand Advocate.
versus
AITHENT TECHNOLOGIES PVT. LTD.
Through is Chief Executive Officer,
A-186, Okhla Industrial Area, Phase-1,
New Delhi-110020
.....Respondent
Through: Ms. Venancio D'Costa and Ms. Gauri
Goel, Advocates.
CORAM:
HON'BLE MS. JUSTICE NEENA BANSAL KRISHNA
J U D G M
E N T
NEENA BANSAL KRISHNA, J.
1.
The present Regular First Appeal under Section 96 read with Order
XLI of the Code of Civil Procedure, 1908 (hereinafter referred to as
"CPC") has been preferred by the Appellant/Plaintiff, Sanjeev Matta,
assailing the Judgment and Decree dated 20.04.2024, whereby the Suit for
Recovery of Rs.4,99,649/- filed by the Appellant/Plaintiff has been
dismissed, by the learned District Judge, Delhi.
2.
The Appellant/Plaintiff instituted the CS DJ No.13436/2016
(originally instituted as Civil Suit No.84 of 2006 on 29.03.2006) for
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
recovery of Rs.4,99,649/- (principal amount of Rs.3,68,000/- and interest of
Rs.1,31,649/-).
3.
Briefly stated, the case of the Appellant/Plaintiff was that he joined
the services of the Respondent Company on 05.07.1993 and continued in
employment till 12.12.2003. At the time of his resignation, he was serving
as Engineering Manager at the Gurgaon branch of the Respondent Company
and was drawing a gross monthly salary of Rs.80,000/-.
4.
During the financial year 2002-2003, the Respondent Company faced
financial difficulties on account of substantial investments in infrastructure
and delayed payments from its overseas affiliated entities. Consequently, in
March 2002, the Defendant Company decided to defer a portion of the
salaries payable to employees drawing salaries above Rs.12,000/-, per
month, for the financial year 2002–2003, on a graded scale of 15%, 20%,
25% and 30% depending upon the salary range. The employees were also
promised one month's salary, as bonus compensation, to offset the financial
hardship occasioned by the deferment of salaries. The deferred salary was to
be paid on 01.04.2003.
5.
The deferment was implemented on a graded scale, and since his
salary exceeded Rs.60,000/-, per month, 30% of his gross salary amounting
to Rs.24,000/- per month, was deferred from April, 2002 till March, 2003.
The deferred component aggregating to Rs.2,88,000/-, was agreed to be paid
on 01.04.2003.
6.
The Appellant/Plaintiff further asserted that as per the policy of
deferment, he was also entitled to Rs.80,000/-, i.e. one month's salary, as
bonus compensation. Hence, a total amount of Rs.3,68,000/-, was due and
payable to the Plaintiff, as on 01.04.2003.
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
7.
As per the Appellant/Plaintiff, the said announcement had been made
with the approval of the CEO of the Defendant Company, who had sent an
e-mail dated 09.07.2002 to Mr. Raju Ahluwalia, with copies to Mr. Ajay
Malik and Mr. Sunil Vadehra regarding the preponement of the decision to
restore salaries to the earlier levels.
8.
Appellant/Plaintiff stated that during an Open-House Meeting held on
09.08.2002, the Management announced restoration of salaries of certain
employees i.e. lowest salary group of Rs.12,000/- to Rs.20,000/- per month,
with effect from 01.10.2002, and assured that the cases of other employees
would also be reviewed and their deferred salaries, would be released.
9.
While the original salary of the Appellant/Plaintiff of Rs.80,000/-,
stood restored w.e.f. 01.04.2003, the management sought more time to pay
the arrears of the deferred salary along with the compensation bonus. The
Plaintiff has relied upon a communication dated 01.04.2005, addressed to
one of the employees of the Respondent Company, assuring clearance of
dues by 31.05.2005. However, payment of the deferred salary and
compensation bonus, continued to be postponed, despite repeated requests.
10.
The Appellant/Plaintiff additionally averred that he had availed a
Housing Loan of Rs.4,00,000/- from the Respondent Company, of which a
balance of Rs.1,29,000/- remained outstanding at the time of his separation.
Vide e-mail dated 11.05.2004, the Appellant/Plaintiff sought adjustment of
the said balance against his deferred salary dues, which request was declined
by the Respondent Company, vide its e-mail dated 12.05.2004.
11.
Despite subsequent e-mails sent by the Plaintiff asking about his dues,
the Respondent Company failed to release the claimed amount.
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
12.
The Appellant/Plaintiff instituted the present Suit seeking recovery of
Rs.4,99,649/- inclusive of interest (Rs.3,68,000/- plus interest of
Rs.1,31,649/-).
13.
The Defendant/Respondent Company in its Written Statement,
raised a preliminary objection regarding territorial jurisdiction, asserting that
since the subject matter of the Suit pertained to the employment of the
Plaintiff at Gurgaon and disbursal of the salary also took place at Gurgaon,
the jurisdiction is of the Courts at Gurgaon and not the Delhi Courts.
14.
On merits, it was contended that there was no deferment of salary and
that the salary structure of employees had merely been restructured, in
view of prevailing business circumstances. It was specifically asserted that
the letter dated 01.04.2002 issued by the Respondent Company to the
Plaintiff, recording the restructuring of remuneration, was duly accepted by
the Plaintiff without any objection or grievance.
15.
The Respondent Company denied that any Agreement existed
whereby the reduced portion of salary was to be repaid, at a future date. It
was further asserted that the Plaintiff himself was a part of the management
team which had participated in the decision-making process relating to
restructuring of salaries.
16.
The Respondent Company admitted that one month's salary had been
discussed as a "loyalty incentive", but asserted that the same was neither a
contractual commitment nor a legally enforceable obligation, and that any
payment thereof was contingent upon the Defendant Company achieving
profitability.
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
17.
The Respondent Company further denied that any amount remained
due and payable to the Appellant/Plaintiff, at the time of cessation of his
employment and prayed for dismissal of the Suit.
18.
On the basis of the pleadings of the parties, the learned Trial Court
framed the following Issues, on 25.01.2007:
i. Whether the plaintiff is entitled for the recovery of Rs. 4,99,649/- from
the defendant as prayed for? OPP
ii. Whether the plaintiff is entitled for the interest pendent lite and future.
If yes, then at what rate? OPP
iii. Relief."
19.
The Appellant/Plaintiff examined himself as PW-1 and tendered his
affidavit Ex.PW-1/A. He relied upon the salary certificate dated 28.11.2003
(Ex. PW-1/1), pay slip for October 2003 (Ex. PW-1/2), appointment and
revision letters of subsequent employers (Ex. PW-1/3 to Ex. PW-1/6),
income tax records (Ex. PW-1/7 to Ex. PW-1/9), bank statement (Ex. PW1/10), e-mail communications exchanged between the parties (Ex. PW-1/11
(Colly.) to Ex. PW-1/13 and Ex. PW-1/15 (Colly.), copy of letter dated
01.04.2005 issued by the CEO of the Respondent Company to another
employee (Ex. PW-1/14), letter dated 02.09.2005 sent by the Plaintiff (Ex.
PW-1/16) and the courier receipt (Ex. PW-1/17).
20.
PW-2, Shri Sunil Vadehra, former Director and Head of India
Operations of the Respondent Company, supported the case of the
Appellant/Plaintiff regarding deferment of salaries and the subsequent
assurances extended by the Management. He relied upon the certified copy
of the e-mail dated 09.07.2002 of the CEO Mr. N. Venugopal along with
connected correspondence, Ex. PW-2/1.
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
21.
DW-1, Shri Banty Bisht, Manager (HR) of the Defendant
Company, reiterated the stand taken in the Written Statement and denied
existence of any agreement regarding deferred salary. He proved Board
Resolution authorising him to depose, as Ex. DW-1/A and Minute Book
containing the said authorisation as Ex. DW-1/P2.
22.
The learned District Judge, upon appreciation of the evidence led by
the parties, concluded that the Appellant/Plaintiff had failed to establish any
contractual arrangement, whereby the reduced component of salary was to
be repaid at a later date or that one month's salary was contractually payable
as bonus. Consequently, the Suit was dismissed vide Judgment and
Decree dated 20.04.2024.
23.
Aggrieved by the said Judgment and Decree dated 20.04.2024, the
present Appeal has been preferred by the Appellant/Plaintiff.
24.
The grounds of challenge primarily are that Plaintiff was serving as a
Engineering Manager of the Respondent Company and his remuneration
could not have been adversely altered, in the absence of any Resolution
passed in the Annual General Meeting. It is contended that the Respondent
failed to place on record any AGM Resolution authorizing reduction of the
remuneration payable to the Appellant.
25.
It is further contended that the decision in Dale & Carrington Invt.
(P) Ltd. v. P.K. Prathapan, (2005) 1 SCC 212: 2004 SCC OnLine SC 1067
pertains to the requirement of Board Resolutions and disputes relating to
powers of Directors and do not consider the liability of a company arising
from commitments allegedly made by its Directors to employees, and were
inapplicable to the facts in hand. Rather, the communication dated
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
05.04.2004 issued by the CEO of the Respondent Company, established the
case of the plaintiff/Appellant.
26.
The Appellant has accordingly, prayed that the impugned Judgment
and Decree dated 20.04.2024 be set aside and the Suit be decreed.
27.
The Respondent in its Written Submissions, has contended that the
salary reduction during the Financial Year 2002-2003, was a restructuring of
remuneration, necessitated by the financial constraints faced by the
Company and not a deferment of salary. This is evident from the
communication dated 01.04.2002 itself, which referred to restructuring of
remuneration, and did not contain any promise for repayment of the reduced
component of salary, on a future date.
28.
It is further submitted that the Appellant, who was himself a part of
the senior management of the Company, continued in service even after
restoration
of
salary
w.e.f.
01.04.2003
and
did
not
raise
any
contemporaneous claim for the alleged arrears. Reliance has also been
placed upon the Judgment dated 06.08.2018 passed by this Court in M/s
Aithent Technologies Pvt. Ltd. v. Archana Verma (RFA 608/2014), wherein
claims arising out of the salary restructuring exercise, were rejected.
29.
The Appellant in his Written Submissions, has reiterated the grounds
taken in the Appeal.
Submissions heard and Record perused.
30.
It is the case of the Plaintiff/Appellant, Mr. Sanjeev Matta, that he
joined the services of the Defendant Company on 05.07.1993 as Engineering
Manager at its Gurgaon branch and continued in employment till
12.12.2003. The Plaintiff tendered his resignation vide letter dated
28.11.2003, pursuant to which he was relieved with effect from 12.12.2003.
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
31.
He further deposed that he was drawing a gross salary of Rs.80,000/-
per month upon restoration of his original remuneration w.e.f. 01.04.2003
and till the cessation of his services. In support thereof, he relied upon the
Salary Certificate dated 28.11.2003, exhibited as Ex. PW-1/1.
32.
The entire controversy in the present case centres around the
reduction of the Plaintiff's salary during Financial Year 01.04.2002 till
31.03.2003. It is admitted that with effect from 01.04.2002, the Plaintiff's
gross monthly remuneration stood reduced by 30%, and continued at the
reduced level until 31.03.2003. It is further undisputed that with effect from
01.04.2003, the Plaintiff's salary stood restored to Rs.80,000/- per month.
Thus, there was an admitted reduction in the Plaintiff's salary for one year
i.e. the period from 01.04.2002 to 31.03.2003.
33.
The circumstances leading to the reduction in salary for Financial
Year 2002-03, were explained by the Plaintiff in his testimony, wherein he
stated that the Defendant Company was a wholly owned subsidiary of
Aithent Inc., New York, USA, and that two affiliated entities, namely
Canyon Blue and Velos, were among the principal clients of the Defendant
Company. The said entities failed to make timely payments for services
rendered, resulting in significant outstanding receivables. The aforesaid
circumstances adversely impacted the financial position of the Defendant
Company and resulted in dwindling of available reserves with the Defendant
Company.
34.
Towards the end of March, 2002, discussions were held within the
management regarding measures to address the situation. Mr. Venu Gopal
CEO, Mr. Sunil Vadehra then Director and Head of India Operations, Mr.
Raju Ahluwalia Vice President – HR, Mr. Sanjay Verma Vice President –
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
Technology and Mr. Rajeeva Gupta, Associate Vice President –
Technology, deliberated upon the issue. It was thereafter, decided that an
open General House Meeting of all employees be convened, wherein the
financial difficulties being faced by the Company were explained and
cooperation of the employees was sought.
35.
As per the Plaintiff, under the arrangement that emerged, the
Defendant Company agreed with employees drawing a gross salary above
Rs.12,000/- per month to defer a portion of their salary for Financial Year
2002-2003, till April 2003, on a graded scale of 15%, 20%, 25% and 30%
for the respective salary brackets. Since the Plaintiff's salary exceeded
Rs.60,000/- per month, the deferred component attributable to him for the
said Financial Year, aggregated to Rs.2,88,000/-. Upon adding the promised
bonus equivalent to one month's salary, the Plaintiff claimed that a total sum
of Rs.3,68,000/- became due and payable to him, which was not paid by the
Defendant Company.
36.
The Defendant Company, on the other hand, contended that the
arrangement was not one of deferment of salary and that no promise had
been made to pay the reduced salary amount with effect from 01.04.2003 to
the employees. In fact, owing to the financial difficulties being faced by the
Company, the salaries of employees were restructured for a period of one
year. It was, therefore, asserted that there was no question of any deferred
salary becoming payable to the Plaintiff or any other employee.
37.
Although the Plaintiff sought to characterize the arrangement as one
involving deferment of salary, the admissions made by the Plaintiff and his
witness, PW-2, Sunil Vadhera, during cross-examination indicate that there
was
Signed By:VIKAS
ARORA
18:12:36
no
RFA 647/2024
formal
written
agreement,
board
resolution
or
other
contemporaneous document recording any obligation on the part of the
Defendant Company to repay the reduced salary at a future date. PW-2, Mr.
Sunil Vadehra, in his cross-examination dated 14.01.2013, has himself
admitted that "no written letter was given by the company to me and any
other employees regarding the deferred salary which was to be paid after 12
months."
38.
Furthermore, the Plaintiff, in his cross-examination dated 10.07.2013,
has admitted that "defendant has not given any written documents that the
reconstructed salary will be paid in future" and that "defendant has not
given any written assurance/letter to me regarding my reconstructed salary
will be paid."
39.
It is quite evident from the comprehensive reading of the entire
testimony, that there may have been an internal understanding amongst
the members of the Management that employees who supported the
Company during its financial difficulties would be compensated in the
future by payment of the deferred salary. However, no such understanding
was formally documented and, in the Company records, the arrangement
continued to be reflected as a restructuring of remuneration.
40.
In these circumstances, and in the absence of any formal document
evidencing a deferment of salary, the Plaintiff cannot successfully claim
recovery of the alleged deferred salary. The Plaintiff himself admitted that
no board minutes, resolution or other formal record exists to show that the
arrangement was one of deferment rather than restructuring.
41.
Equally significant is the document dated 01.04.2002 Ex. PW-1/D1,
executed at the very inception of the disputed arrangement and duly signed
by the Appellant/Plaintiff, in token of acceptance. The said document
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
specifically records the revised remuneration structure of the Plaintiff and
the nature of the arrangement between the parties. The same is produced as
under:
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
42.
Significantly, the said document, which constitutes a further contract
between the parties, characterises the arrangement in terms as one of "restructure" of the remuneration structure as an "interim measure", and is
completely silent regarding any deferment of salary, any obligation to repay
the reduced component at a future date, or the alleged compensation bonus
of Rs.80,000/-. The document bears the signatures of the Appellant/Plaintiff
in token of acceptance, and there is no mention of any deferred salary
arrangement. Rather, it specifically states about re-structuring of salary
for one year.
43.
The Plaintiff, in para 36 of his evidence affidavit, has sought to
qualify the acceptance by stating that he "merely acknowledged receipt" and
that "it was not explicitly accepted" by him. However, no such conditional
acceptance appears on the face of Ex. PW-1/D1. It is also not the case of the
Plaintiff that he was made to sign the said document under duress or
coercion. Nor is it permissible for the Plaintiff to lead oral evidence contrary
to the terms of the document Ex. PW-1/D1, having regard to Sections 91 and
92 of the Indian Evidence Act, 1872.
44.
The Plaintiff's attempt to contend, through para 39 of his evidence
affidavit, that the letter had been so worded only to save the employees from
immediate Income Tax liability and that the deferred portion was
nevertheless to be paid in April 2003. However, such contention is squarely
barred by to Sections 91 and 92 of the Indian Evidence Act, 1872.
45.
Another aspect, which is of immense importance, is that the Plaintiff,
as per his own testimony, was relieved from the services of the Defendant
Company on 12.12.2003. At that time, admittedly, all his claims and dues
were settled. The financial arrangement governing the separation of the
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
Plaintiff, stood recorded in the letter dated 11.11.2003 issued by the
Defendant Company, which was duly signed by the Plaintiff in token of
acceptance, and was further confirmed by the letter dated 28.11.2003. Both
these documents are comprehensive and address every aspect of the
Plaintiff's separation including leave encashment, gratuity, LTA and the
consolidated allowance to be paid till April 2004. Significantly, both these
documents are completely silent regarding the alleged deferred salary of
Rs.2,88,000/- or the alleged compensation bonus of Rs.80,000/-. If it was
indeed a case of deferment, and not restructuring, as alleged by the Plaintiff,
there is no reason, why he would not have protested, insisted or claimed his
outstanding dues, on account of alleged deferment of the salary.
46.
The conduct of the Plaintiff, in not claiming any outstanding dues
during the entire period of his employment, which admittedly receiving
payment as stated in the Letter dated 11.11.2003 without demur, and in
filing the present Suit only on 29.03.2006, i.e. after almost two and a half
years of Service, also lend support that it was not a formal agreed policy of
the Defendant Company to pay the deferred salary.
47.
The Appellant/Plaintiff has also placed reliance upon the e-mail
correspondence exchanged with the CEO of the Respondent Company
between May 2004 and September 2005, marked as Ex. PW-1/11 (Colly.),
Ex. PW-1/12 (Colly.), Ex. PW-1/13, Ex. PW-1/15 (Colly.) and Ex. PW1/16, wherein the Plaintiff sought clearance of his alleged dues, and the
CEO indicated that he would "start thinking of timing on the deferred" once
the other outstanding payments were cleared, and that he hoped to "address
a variety of issues" in 2005.
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
48.
However, the said communications neither quantify the alleged dues
nor identify their nature as a binding obligation. There is no reference to the
reduced salary for Financial Year 2002-2003 in terms of an admitted
liability, no commitment to any specific date of payment, and no recital that
the salary reduction was merely a deferment to be repaid at a future date.
The mere unilateral use of the word "deferred" by the Plaintiff in his selfserving correspondence, cannot create a legal obligation that does not
otherwise exist.
49.
The Plaintiff has further in rely to his e-mail dated 11.05.2004, sought
adjustment of the balance of a housing loan against the alleged deferred
salary, and the response thereto dated 12.05.2004. The said reliance,
however, takes the case of the Plaintiff no further, particularly when the
Plaintiff in his cross-examination dated 10.07.2013 has admitted that he has
"not brought any loan document" and "cannot bring any document
regarding the loan", thereby failing to prove the foundational fact of the
loan itself.
50.
The Plaintiff has further placed reliance upon a letter dated
01.04.2005 stated to have been issued by the CEO of the Respondent
Company, marked as Ex. PW-1/14. However, the said letter is admittedly
not addressed to the Plaintiff but to one Mr. Praveen, and as rightly observed
by the learned Trial Court, is of no help to the Plaintiff.
51.
It is not disputed that there were discussions regarding payment of
one month's salary bonus to employees. However, the Appellant/Plaintiff
has failed to place on record any material to establish that the said bonus
crystallized into a binding contractual obligation. The consistent stand of the
Respondent has been that the same was contemplated only as an incentive
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
and not as a legal commitment. In the absence of any document or other
cogent evidence demonstrating that the bonus became payable as a matter of
right, the claim towards compensation bonus cannot be sustained.
52.
The Plaintiff has relied upon the aforesaid communications, but from
these there is no admission of there being any deferment of salary or the
entitlement of the Plaintiff for the same.
53.
The reliance placed by the Appellant on Section 88-A of the Indian
Evidence Act, 1872, in relation to the e-mail dated 09.07.2002 Ex. PW-2/1,
is equally misplaced. The said provision raises a presumption only with
respect to the authenticity of electronic records and does not assist the
Appellant on the legal character of the arrangement. Even taking Ex. PW2/1 at its highest, the document is an internal management communication
and is not addressed to the Plaintiff. The said e-mail records the CEO's
approval of the partial reversal of the salary reduction only for the lowest
salary slab, namely employees drawing between Rs.12,000/- and
Rs.20,000/- per month, with effect from 01.10.2002. The Plaintiff,
admittedly drawing a salary above Rs.60,000/- per month, was outside the
said slab. The document does not commit the Respondent Company to
repayment of any sum to the Plaintiff's slab and, in any event, the
contemplated future reversal for other slabs is expressly described as a
matter to be "reviewed", language plainly incapable of constituting a binding
obligation.
54.
The learned District Judge has carefully appreciated the evidence
brought on record and has rightly concluded that while reduction of salary
during the relevant period stands admitted, the Appellant/Plaintiff failed to
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
establish that such reduction merely constituted a deferment creating a
legally enforceable obligation to repay the amount at a later date.
55.
There is no merit in the present Appeal, which is hereby, dismissed
along with pending Applications.
(NEENA BANSAL KRISHNA)
JUDGE
JUNE 16, 2026/R
Signed By:VIKAS
ARORA
18:12:36
RFA 647/2024
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review