Judgments
LegalFirms.in Judgments · legalfirms.in/judgments/s-bimol-vs-mpsc-and-4-ors-20190919/ · Printed 27 Nov 2026
Civil

S Bimol vs Mpsc and 4 Ors

Add to a compilation

Keep judgments in folders, mark the paragraphs you rely on, and print a compilation with an index. It comes with the Research and Advocate Pro judgment plans and with a campus licence. Sign in · See the plans

Court
Manipur High Court
Date
19 September 2019
Case No.
MC(Review.Pet.) 2/2012
Result
Dismissed
Bench
Justice, Mv Muralidaran
Cite this judgment
Citation
Link for your website or blog
Cite the court's own record or the law report in court filings.

The court's order

The closing paragraphs of the judgment, in the court's own words. The reasons are in the full text below.

32. Plea of lack of knowledge in the present case really lacks bona fide. The Division Bench of the High Court has failed to keep itself alive to the concept of exercise of judicial discretion that is governed by rules of reason and justice. It should have kept itself alive to the following passage from N. Balakrishnan (1998)7 SCC 123: “The law of limitation fixes a lifespan for such legal remedy for the redress of the legal injury so suffered. Time is precious and wasted time would never revisit. During the efflux of time, newer causes would sprout up necessitating newer persons to seek legal remedy by approaching the courts. So a lifespan must be fixed for each remedy. Unending period for launching the remedy may lead to unending uncertainty and consequential anarchy. The law of limitation is thus founded on public policy. It is enshrined in the maxim interest reipublicae up sit finis litium (it is for the general welfare that a period be put to litigation). Rules of limitation are not meant to destroy the rights of the parties. They are meant to see that parties do not resort to dilatory tactics but seek their remedy promptly. The idea is that every legal remedy must be kept alive for a legislatively fixed period of time.” [15] In the present case, sufficient cause for delay of 581 days is not properly given. 137 days delay is attributed to the counsel without any affidavit or l…

Full Judgment Text

Text read from the judgment PDF published on the High Court's eCourts portal, through the Indian High Court Judgments open data set (Dattam Labs, CC BY 4.0). The court's own copy is the authoritative text.

Item no.2 (Suppl.List) IN THE HIGH C0OURT OF MANIPUR AT IMPHAL MC(Review) No.2 of 2012 Shri. Sanasam Bimol, S/O (L) S. Bihari Singh, resident of Mongsangei Lai Leirak P.O. Canchipur, P.S. Singjamei, District: Imphal. .…. Applicant - Versus – 1. The MPSC through its Secretary 2. The Commissioner (Education) Government of Manipur. 3. Th. Ojenkumar Singh S/O Th. Ibomcha Singh, resident of Sagolband Thingom Leikai, P.O. & P.S. Imphal, District: Imphal(W) 4. Smt. Ambika Yengkhom W/O Tejmani Sinam, resident of Thangmeiband Sinam Leikai P.O. & P.S. Lamphel, District : Imphal(W) 5. Shri. Anand Yendrembam, resident of Haobam Marak Chingtham Leikai, P.O. : Imphal, P.S.: Singjamei, District: Imphal (W) .... Respondents BEFORE HON’BLE THE CHIEF JUSTICE HON’BLE MR. JUSTICE MV MURALIDARAN For the petitioner :: For the Respondents :: Date of Order :: Ms.Puspa G., Advocate Mr. Kh.Athouba, GA 19.9.2019 O R D E R (ORAL) R.S., CJ. [1] Heard Ms. Puspa Gurumayum, learned counsel for the applicant and Mr.Kh.Athouba, learned Government Advocate for the State respondents. [2] This application has been filed for condonation of 581 days in the filing the review petition to review the order of the Hon’ble Division Bench dated 28.5.2010.The petitioner is the respondent No.5 in the Writ Appeal No.87 of 2009. [3] In the final judgment of this Court in its order dated 28.5.2010, it is recorded in para No.5 that respondent No.5, despite proper service of notice, did not choose to appear. Therefore, the appeal was heard on merits and the MC(Review Petition) No.2 of 2012 Page 1 appointment of the applicant was quashed. The appellate order went against two other persons as well. In the writ appeal, the prayer of the appellant Shri Th.Ojenkumar Singh, the unsuccessful writ petitioner was accepted and the following order was passed in para No.19 as under:“19. Resultantly, the impugned judgment and order dated 16.11.2009 passed in W.P(C) No.91 of 2009 is interfered with and Accordingly, the notification dated 15.12.2008 issued by the MPSC relating to the recommendation of the private respondents 3, 4, & 5 ishereby set aside. Consequently, the appointment of the private respondents 3, 4 and 5 as Lecturers of Government College in Computer Science is quashed. The State Government is at liberty to requisition for fresh recruitment process for filling up the post of Lecturers in Government Colleges in Computer Science, if so advised. The appeal is allowed. No order as to costs.” [4] It is further brought to our notice that as against the order passed by the Division Bench of the erstwhile Gauhati High Court, Imphal Bench dated 28.5.2010 as above, one of the respondents whose appointment was set aside, namely, Smt.Ambika Yengkokpam filed SLP before the Hon'ble Supreme Court being SLP No.16833 of 2010 arising out of the judgment and order dated 28.5.2010 in WA No.87 of 2009 of the High Court of Gauhati at Imphal. Similarly, applicant/review petitioner and one other person also filed SLP. The Hon'ble Supreme Court vide its common order dated 14.10.2011 dismissed the SLP in the following manner:“ANNEXURE-D/15 SUPREME COURT OF INDIA RECORD OF PROCEEDINGS Petition(S) for special Leave to Appeal (Civil) No (s) . 16833/2010 (From the judgment and order dated 28/05/2010 in W.A. No. 87/2009 of the HIGH COURT OF GAUHATI AT IMPHAL) AMBIKA YENGKOKPAM VERSUS TH. OJENKUMAR & ORS. ……Petitioner(s) …..Respondent(s) (With prayer for interim relief and office report) WITH SLP(C) No. 19324 of 2010 (With appln. For permission to file rejoinder affidavit, prayer for interim relief and office report) MC(Review Petition) No.2 of 2012 Page 2 SLP(C) NO. 26141 OF 2010 (with appln. for exemption from filling process fee, spare copies, prayer for interim relief and office report) Date: 14/10/2011 These petitions were called on for hearing today. CORAM: HON’BLE MR. JUSTICE AFTAB ALAM HON’BLE MRS. JUSTICE RANJANA PRAKASH DESAI Counsel for the parties Mr. P.S. Narasimha, Sr. Adv. Mr. L. Roshmani Kh., Adv. Mr. Somiran Sharma, Adv. Mr. I. Lalit Kr. Singh, Sr. Adv. Ms.Ananga Bhattcharya, Adv. Mr. Suresh Ch. Gupta, Adv. Mr. Siddharth B., Adv. Mr. Jitendra Sharma, Sr. Adv. Mr. P.N. Jha, Adv. Mr. Sunil K. Jain, Adv. Mr. Aneesh Mittal, Adv. Mr. Parmatma Singh, Adv. Mr. Shachin Sharma, Adv. Mr. A.K. Soni, Adv. Mr. Khawairakpam Nobin Singh, Adv. Mr. B.K. Pal, Adv. Upon hearing counsel the Court made the following O R D E R Heard counsel for the petitioners. We find no merit in these petitions for special leave . These are dismissed.” [5] Thereafter, the review petition was filed on 6.3.2012 along with the application for condonation of delay for 609 days in M.C.(Review Petn.) No.2 of 2012. In the 609 days delay condonation application, notice was ordered on 02.8.2012. Thereafter, the petitioner did not choose to pursue the matter. On many occasions, the case was adjourned from time to time. On 1.2.2013, since there was no appearance for the petitioner, the Court dismissed the application for non-prosecution. The order reads as follows:“01.02.2013 None appears for the petitioner without showing any cause. This MC (Review petn.) is dismissed for default.” MC(Review Petition) No.2 of 2012 Page 3 [6] Thereafter, in the year 2016, the delay condonation application, which was dismissed for default, was restored on payment of cost pursuant to order of the Court dated 22.02.2013 passed in MC(Review Petn.) No. 3 of 2013. Cost was paid. Thereafter, the petitioner slept over the case for so many years. In the year 2016 i.e. on 27.6.2016, a Misc. Case (Review) No.11 of 2016 in M.C.(Review) No.2 of 2012 was filed to amend the pleadings in Miscellaneous Case, M.C.(Review) No.2 of 2012 filed for condonation of delay. It was stated that in M.C.(Review) No.2 of 2012, the delay has been wrongly mentioned as 609 days. Misc. Case (Review) No.11 of 2016 was taken up for hearing for amendment of M.C.(Review) No.2 of 2012 and an order was passed on 01.7.2016 as follows:“01.07.2016. This misc. application has been filed seeking amendment by way of incorporation of certain paragraphs which have been mentioned in para No. 1(a), 2(b), 2(c), 2(d), 2(e), and 2(f) as facts stated in those paragraphs would be relevant for the purpose of condonation of delay. In the facts and circumstances stated above, prayer made in this misc. application seeking amendments is hereby allowed. Let amendment sought be incorporated in the main petition filed for condonation of delay. Consequently, amended, petition be filed. Accordingly, this misc. application stands disposed of.” Thereafter, the petitioner also filed a recast condone delay petition in M.C.(Review) No.2 of 2012 without date and without any signature either that of the counsel or that of the party. It is totally blank and not authenticated. Be that as it may, the petitioner also filed a recast review petition i.e. on 28.6.2016 adding new documents and new pleading even before the condone delay petition is taken up. The delay was not condoned even as on 2016. The petitioner did not choose to pursue the matter for so many years. The service was not completed despite opportunity and therefore, the Court finally granted time for service of notice on the respondents. MC(Review Petition) No.2 of 2012 Page 4 [7] On 3.6.2019, the petitioner was given one week’s time to take fresh steps and the order reads as follows:“3. 6.2019 One weeks’ time is granted as a last chance taking fresh steps, failing which the petition will stand dismissed as against the unserved respondents. List on15.7.2019.” Thereafter, steps were taken. Then on 6.8.2019, another order was passed:“6.8.2019 Fresh notice to the respondents returnable by 3.9.2019. If no notice is taken, the petition will be dismissed automatically.” This is recorded to show the attitude of the petitioner in prosecuting the matter. [8] Having perused the application on the factual matrix in so far as the delay is concerned, we are not incline to grant any relief to the petitioner because on going through the application filed on condonation of delay, we find that throughout the proceedings, the petitioner has been showing supine indifference and lackadaisical conduct in seeking condonation of delay. The mere act of filing a review petition along with a condone delay petition and to keep it pending for long number of years, would make it clear that the intention of the petitioner is to protract the litigation and keep the issue pending with no intention to conclude the lis. [9] On merits of the condone delay application, we have perused the application filed for condonation of delay and we find that delay application does not give sufficient cause or bonafide conduct. The reasons are given at para No.1(a), 2(b), 2(c), 2(d), 2(e), 2(f) and 4 of the M.C.(Review) Petn. No.11 of 2016 which is filed to amend the original condone delay application, M.C.(Review) No.2 of 2012 (i.e.) the present application, which are quoted as under:MC(Review Petition) No.2 of 2012 Page 5 “1(а). That as per records of W.A no. 87 of 2010 the final hearing of the case had taken place on 22/4/2010 and the delivery of judgment was on 28/5/2010. 2(b). That as soon as the applicant came to know about such judgment the applicant preferred an S.L.P before the Hon'ble Supreme Court of India by way of engaging a counsel there. The S.L.P was filed sometime in August 2010 before the Supreme Court. 2(c). However the other two respondents in W.A No. 87 of 2010 had also filed S.L.Ps during the same time. That very unluckily all the SLPS were clubbed together on the pretext that all the SLPS were preferred against the same judgment and order dated 28/5/2010 passed in W.A no. 87 of 2010 before the Hon'ble Supreme Court. 2(d). That on 14/10/2011 all the three S.L.Ps which were clubbed together was rejected by the Hon'ble Supreme Court by passing a common order. A copy of the certified copy of the order was obtained on 19/10/2011. 2(e). Thereafter the applicant engaged Shri R.K Manikanta Advocate for filing a Review Petition before this Hon'ble Court. That the said counsel filed the Review Petition on 5/3/2012 before this Hon'ble court and he had taken 137 days in filing the Review Petition just after the date of receipt of the certified copy of the common order dated 14/10/2011, on behalf of the applicant. 2(f). That for preferring SLP before the Hon'ble Supreme Court the applicant had applied for a certified copy of the Judgment and order dated 28/5/2010 passed in W.A No. 87 of 2009 on 06.07/2010 and a copy of the certified copy of the said judgment and order was ready on 23/07/2010 and there is a statutory period of 30 days for preferring Appeal /Review petition against the impugned Judgment and after deducting the statutory period as well as time taken in obtaining the certified copy the limitation period ends on 23/08/2010. During the month of August 2010 itself the S.L.P was preferred and the result of the SLP was received on 19/10/2011. A certified copy of the order passed by the Supreme Court was obtained on 14/10/2011. Therefore before the Supreme Court total of 444 days was exhausted/concluded. That the applicant had gain taken a total of 137 days (i.e a total of 444days +137 days= 581 days may kindly be condoned. 4. That further the prayer portion which prayed for condoning a delay of 609 days may be allowed to correct /read as 581 days as the number of days taken by the applicant in filing the review Petition is 581 days.” [10] Excluding the delay before the Hon'ble Supreme Court, there is no explanation for the delay of 137 days as stated in para 2(e) except blaming the former counsel. The conduct of throwing blame on the earlier counsel appears to be a ruse to escape the unexplained inordinate and unexplained delay. There is no affidavit of the former counsel explaining the delay. There is no complaint against the former counsel before the statutory body for the unexplained delay. MC(Review Petition) No.2 of 2012 Page 6 A mere statement alleging inaction on the part of the former counsel appears to be a common ruse. [11] In para No.18, 19, 20 and 21 of the additional affidavit filed by the petitioner, allegations are made against the High Court, the counsel and the Hon'ble Supreme Court knowing fully well that this review petitioner, despite notice in the writ petition, chose not to appear. Para No.18, 19, 20 and 21 are extracted for clarity as under:“18. That the Writ Appeal being W.A no. 87 of 2009 filed by the writ petitioner in W.P(C) No.91 of 2009 namely Th. Ojenkumar Singh in which the State Government was not a party was finally heard on 22/04/2010 and the judgment and order was delivered 28/05/2010. That the Appellate Court had never discussed the ineligibility of the private respondent no.5 who is the deponent/petitioner herein and in the appellate proceeding the petitioner was not represented by any counsel as he was not aware of the appellate proceedings which had been taking place during that time. The appellate court finally quashed the appointment of the private respondent No.3, 4 and 5. That the petitioner submits that the Ld. Appellate court did not discuss the matter of the petitioner singly nor any specific pleading was made directly to the petitioner by the writ appellant though the same was done in case of private respondent no.3 and 4. However the Hon’ble Division Bench while quashing the respective appointment orders the appointment order of the petitioner was also included blindly without going into the merit of the petitioner’s case. Moreover in the case of the respondent no.4 there is no appointment order as such as the appointment order was only with respect to the respondent no.3 and 5. Therefore the Hon’ble Court in fact had quashed a non-existent appointment order which is not tenable in the eyes of law. (Annexure A/ ) A true copy of the judgment and order dated 28/05/2010 passed by the appellate- Court of the then Gauhati High Court, Imphal Bench in W.A No.87 of 2009 is annexed herewith as Annexure A/13. 19. That on passing of the judgment and order by the Hon’ble Division Bench the in W.A no.87 of 2009, in which the State of Manipur was also not a party, the Government of Manipur in a blatant non application of mind have issued the illegal termination order No. WA/11/33/2009 HE/Case dated 12/03/2012 without following the principles of natural justice and the termination order does not mention the effective date of the termination of the writ petitioner which itself is bad in the eyes of the law. A true copy of the termination order No. WA/11/33/2009 HE/Case dated 12/03/2012 issued by the Government of Manipur is annexed herewith as Annexure A/14. 20. That the petitioner submits that as soon as the petitioner was served with a copy of the termination order dated 12/03/2012 the petitioner had informed the same to his conducting counsel Shri R.K Manikanta Singh, Advocate, however the aforesaid counsel had mishandled the case of the petitioner as he had never challenged the order by way of filing a MC(Review Petition) No.2 of 2012 Page 7 fresh writ petition before this Hon’ble Court. However the petitioner has no knowledge of the consequences of not challenging the termination order as he was under the impression that the counsel who was handling the case would act to the best interest of the petitioner with his best acquired legal knowledge. It is also a settled principle of law that a litigant must not be put to suffer for the wrong committed by the conducting counsel and hence the petitioner craves leave from the ends of this Hon’ble court for allowing him to challenge the termination order in the accompanying writ petition. ( emphasis supplied) 21. That in the mean time and on coming to know about the result of the Writ Appeal No.87 of 2010 by the petitioner the petitioner along with the two others had preferred different S.L.Ps before the Hon’ble Apex Court however it was never lamented before the Hon’ble Apex court too that in the controversial writ appeal no. 87 of 2009 the petitioner was never represented by any counsel. That to add more salt to the wound of the petitioner and to add more bad luck to the petitioner’s faith the SLPs filed by the petitioner was again clubbed together with the other SLPs filed by another who stands in a different footing from the petitioner and the Hon’ble Supreme Court without going into the merit of the case and only looking into the face of it altogether had dismissed the S.L.Ps without any observation and reasons. A true copy of the order passed in the SLPs filed before the Hon’ble Supreme Court is annexed herewith as Annexure -A/5” (emphasis supplied) [12] We disapprove the manner in which such a statement has been made in the first condoned delay petition, recast condone delay petition and in the recast review petition. We are constrained to observe as above as the said statements are part of our record of proceedings filed by the petitioner. [13] Be that as it may, we find that the explanation given for condonation of delay of 137 days is bereft of reasons and accusative. This inordinate and unexplained delay clearly shows that the petitioner has no interest in pursuing the matter diligently. This Court, therefore, is not inclined to condone the delay. [14] The principle enunciated by the Hon'ble Supreme Court in the case of Esha Bhattacharjee vs. Managing Committee of Raghunathpur Nafar Academy and others reported in 2013 (12) SCC 649 applies to the facts of the case. The Hon'ble Supreme Court in para Nos. 21, 22 and 32 held as under:MC(Review Petition) No.2 of 2012 Page 8 “21. From the aforesaid authorities the principles that can broadly be culled out are: 21.1. (i) There should be a liberal, pragmatic, justice-oriented, nonpedantic approach while dealing with an application for condonation of delay, for the courts are not supposed to legalise injustice but are obliged to remove injustice. 21.2 (ii) The terms “sufficient cause” should be understood in their proper spirit, philosophy and purpose regard being had to the fact that these terms are basically elastic and are to be applied in proper perspective to the obtaining fact- situation. 21.3. (iii) Substantial justice being paramount and pivotal the technical considerations should not be given undue and uncalled for emphasis. 21.4. (iv) No presumption can be attached to deliberate causation of delay but, gross negligence on the part of the counsel or litigant is to be taken note of. 21.5 (v) Lack of bona fides imputable to a party seeking condonation of delay is a significant and relevant fact. 21.6. (vi) It is to be kept in mind that adherence to strict proof should not affect public justice and cause public mischief because the courts are required to be vigilant so that in the ultimate eventuate there is no real failure of justice. 21.7. (vii) The concept of liberal approach has to encapsule the conception of reasonableness and it cannot be allowed a totally unfettered free play. 21.8 (viii) There is a distinction between inordinate delay and a delay of short duration or few days, for to the former doctrine of prejudice is attracted whereas to the latter it may not be attracted. That apart, the first one warrants strict approach whereas the second calls for a liberal delineation. 21.9. (ix) The conduct, behaviour and attitude of a party relating to its inaction or negligence are relevant factors to be taken into consideration. It is so as the fundamental principle is that the courts are required to weigh the scale of balance of justice in respect of both parties and the said principle cannot be given a total go by in the name of liberal approach. 21.10. (x) If the explanation offered is concocted or the grounds urged in the application are fanciful, the courts should be vigilant not to expose the other side unnecessarily to face such a litigation. 21.11. (xi) It is to be borne in mind that no one gets away with fraud, misrepresentation or interpolation by taking recourse to the technicalities of law of limitation. 21.12. (xii) The entire gamut of facts are to be carefully scrutinized and the approach should be based on the paradigm of judicial discretion which is founded on objective reasoning and not on individual perception. MC(Review Petition) No.2 of 2012 Page 9 21.13. (xiii) The State or a public body or an entity representing a collective cause should be given some acceptable latitude. 22. To the aforesaid principles we may add some more guidelines taking note of the present day scenario. They are: 22.1. (a) An application for condonation of delay should be drafted with careful concern and not in a half hazard manner harbouring the notion that the courts are required to condone delay on the bedrock of the principle that adjudication of a lis on merits is seminal to justice dispensation system. 22.2. (b) An application for condonation of delay should not be dealt with in a routine manner on the base of individual philosophy which is basically subjective. 22.3. (c) Though no precise formula can be laid down regard being had to the concept of judicial discretion, yet a conscious effort for achieving consistency and collegiality of the adjudicatory system should be made as that is the ultimate institutional motto. 22.4. (d) The increasing tendency to perceive delay as a non- serious matter and, hence, lackadaisical propensity can be exhibited in a nonchallant manner requires to be curbed, of course, within legal parameters. **** **** 32. Plea of lack of knowledge in the present case really lacks bona fide. The Division Bench of the High Court has failed to keep itself alive to the concept of exercise of judicial discretion that is governed by rules of reason and justice. It should have kept itself alive to the following passage from N. Balakrishnan (1998)7 SCC 123: “The law of limitation fixes a lifespan for such legal remedy for the redress of the legal injury so suffered. Time is precious and wasted time would never revisit. During the efflux of time, newer causes would sprout up necessitating newer persons to seek legal remedy by approaching the courts. So a lifespan must be fixed for each remedy. Unending period for launching the remedy may lead to unending uncertainty and consequential anarchy. The law of limitation is thus founded on public policy. It is enshrined in the maxim interest reipublicae up sit finis litium (it is for the general welfare that a period be put to litigation). Rules of limitation are not meant to destroy the rights of the parties. They are meant to see that parties do not resort to dilatory tactics but seek their remedy promptly. The idea is that every legal remedy must be kept alive for a legislatively fixed period of time.” [15] In the present case, sufficient cause for delay of 581 days is not properly given. 137 days delay is attributed to the counsel without any affidavit or letter of the counsel to establish that petitioner was acting bonafide. The petitioner filed SLP and it was dismissed. Having known that the SLP was dismissed, the petitioner has no reason to delay any further if he was sincere in MC(Review Petition) No.2 of 2012 Page 10 agitating the matter. The petitioner who is lethargic and pedantic cannot seek liberal approach by this Court. Gross negligence disentitles the petitioner the relief of condonation of delay. In this case, the inordinate and deliberate delay is sought to be explained in a casual manner by throwing allegations against the former counsel. The application for condonation of delay was filed in a casual and haphazard manner at the first instance and thereafter, an amendment was sought for and allowed so as to give one more opportunity. Even this opportunity was not well taken as the petitioner has embarked on accusing everyone except himself for the delay. In this case, para No.22.4 (d) of Esha Bhattacharjee’s case (supra) as above, squarely applies. Hence, the petitioner does not deserve any indulgence from this Court for condonation of delay, tested on the parameters of Esha Bhattacharjee’s case (supra). [16] The unexplained and inordinate delay, casual approach of the petitioner in not seeking to review at the earliest point of time is apparent. This Court does not find any good or just reason for taking a liberal approach. The order of this Court sought to be reviewed is dated 28.5.2010. Much water has flown under the bridge. If at this belated stage the delay is condoned at the behest of a non-interested applicant, it will cause injustice to the appellant who succeeded in the year 2010. Para No.21.5 and 21.9 of Esha Bhattacharjee’s case (supra) is squarely attracted to the facts of this case. By the conduct of the petitioner, we find no reason to condone the delay in this case. Finding no merit, this Misc. Case is dismissed. JUDGE CHIEF JUSTICE FR/NFR Opendro(rt) WAIKHOM TONEN MEITEI WAIKHOM TONEN MEITEI Date: 2019.09.23 14:00:03 -07'00' MC(Review Petition) No.2 of 2012 Page 11

This page is for informational and research purposes only and does not constitute legal advice. Consult a qualified advocate for advice specific to your situation.

Is your name in this judgment and should it be masked, or is something on this page wrong? Request a review

All Manipur HC judgments →