[2026:RJ-JP:29]
HIGH COURT OF JUDICATURE FOR RAJASTHAN
BENCH AT JAIPUR
S.B. Civil Writ Petition No. 12108/2024
Rukmanand Sharma S/o Shri Hajari Lal Sharma, 211, Patrakar
Colony, Dhaulai, Mansarovar, Jaipur.
----Petitioner
Versus
1.
Managing Director, D.B. Corp Limi. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur.
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, In Front Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
Connected With
S.B. Civil Writ Petition No. 8672/2024
Mridul Sharma S/o Shri Shrikant Manjul, 438, Patrakar Colony,
Mansarovar, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8673/2024
Jagdish Prasad Sharma S/o Shri Heera Lal Sharma, Plot No. 3
Baldev Bada Nagar, Gandhi Nagar West, 200 Foot Bypass,
Lalarpura, Jaipur
----Petitioner
Versus
(2 of 28)
[2026:RJ-JP:29]
1.
[CW-12108/2024]
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8683/2024
Laluram Yadav S/o Shri Jagdish Prasad Yadav, Shri Sanwaliya
Sweets Caterers, Shop No. 17, Krishna Market, New Loha Mandi
Road, Vki Road No. 14, Jaipur.
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8685/2024
Hemant Kumar Patwa S/o Shri Kishan Patwa, Ward No. 12, Near
Durbalnath Mandir Bandikui, Dausa
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
(3 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
----Respondents
S.B. Civil Writ Petition No. 8686/2024
Sunil Kumar Sharma S/o Shri Gopal Lal Sharma, Plot No. 10,
Panchwati Colony, Kalwad Road, Jhotwara, Jaipur.
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur.
----Respondents
S.B. Civil Writ Petition No. 8695/2024
Mahaveer Prasad Suman S/o Shri Bihari Lal Suman, House No.
886 Keshavpura, Sector-7 Kota
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8696/2024
Ghanshyam Jangid S/o Shri Ishwar Lal Jangid, C-263, Hans
Marg, Malviya Nagar, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
(4 of 28)
[2026:RJ-JP:29]
2.
Additional
Labour
Commissioner
[CW-12108/2024]
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8699/2024
Shilendra Kumar Upadhayay S/o Shri Mangti Lal Upadhayay,
182, Banshipuri-First, Jagatpura, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8700/2024
Virendra Singh Rajput S/o Shri Kishan Singh, 85/731-32, Pratap
Nagar, Sanganer, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8701/2024
Vijay Kumawat S/o Shri Bhanwarlal Kumawat, Kumawat Colony,
(5 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
Hirnoda, Tehsil-Phulera, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8703/2024
Rajesh Grover S/o Shri Charan Lal Grover, R/o 85/403, Sector 8, Pratap Nagar, Sanganer, Jaipur.
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur.
----Respondents
S.B. Civil Writ Petition No. 8704/2024
Shrawan Kumar S/o Shri Chhitarram, Village Joshipura, Post
Marauth, Tehsil Nawan, District Nagaur.
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
(6 of 28)
[2026:RJ-JP:29]
3.
Shri
Patanjali
Bhoo,
[CW-12108/2024]
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 8711/2024
Sandeep Kumawat S/o Shri Inder Kumar Kumawat, Plot No. 53,
Shiva Nagar, Chhapolo Ki Dhani, Diggi - Malpura, Sanganer,
Jaipur.
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur.
----Respondents
S.B. Civil Writ Petition No. 9053/2024
Pradeep Kumawat S/o Shri Radheyshyam Kumawat, Plot No. 48,
Gayatri Nagar, Sodala, Ajmer Road, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 9070/2024
Ritesh
Gautam
S/o
Shri
Sushil
Mohan
Sharma,
73/97,
Paramhans Marg, Mansarovar, Jaipur
----Petitioner
(7 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 9131/2024
Sanjay Gautam S/o Shri Late Mathuresh Sharma, F-2, Tirupati
Balaji Complex, Panchwati, Udaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 9132/2024
Sandeep Pareek S/o Shri Raghunandan Pareek, Plot No. 715,
Joshi House, Pano Ka Dariba, Subhash Chowk, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
(8 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
----Respondents
S.B. Civil Writ Petition No. 9146/2024
Dalip
Kumar
S/o
Shri
Sahabram
Khileri,
Plot
No.
40,
Radhanikunj First, Iskon Mandir Road, Mansarovar, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
S.B. Civil Writ Petition No. 9147/2024
Rakesh Kumar Verma S/o Shri Satyanarayan Verma, 10 B,
Sindhi Colony, Rajapark, Jaipur
----Petitioner
Versus
1.
Managing Director, D.B. Corp Ltd. (Dainik Bhaskar) 10,
J.l.n. Marg, Jaipur
2.
Additional
Labour
Commissioner
And
Paden
Joint
Secretary, Labour Department, Rajasthan, Infront Of
N.b.c., Shanti Nagar, Hasanpura, Jaipur.
3.
Shri
Patanjali
Bhoo,
Retired
Additional
Labour
Commissioner And Paden Joint Secretary (Labour) C-128B, Nirman Nagar, Ajmer Road, Jaipur
----Respondents
For Petitioner(s)
:
Mr. Dharmendra Jain
Mr. Arvind Kumar Arora
For Respondent(s)
:
Mr. Nitish Kumar Bagri
Ms. Minakshi Jain, GC with Ms. Supriya
Rana
Mr. Udit Sharma
Mr. Kuldeep Singh Rathore & Ms. Saba
Naaz for Ms. Mahi Yadav, AAG
[2026:RJ-JP:29]
(9 of 28)
[CW-12108/2024]
HON'BLE MR. JUSTICE ASHOK KUMAR JAIN
Order
05/01/2026
1.
These writ petitions were filed by petitioners workmen
aggrieved from order dated 26.04.2023 in 21 applications filed by
different workmen under Section 33(c)(1) of Industrial Dispute
Act, 1947. The prayer of the workmen was recovery of dues
against respondent Manager/ Managing Director, D.B. Corp. Ltd.
(Dainik Bhaskar), 10, JLN Marg, Jaipur.
2.
The Additional Commissioner-cum- Joint Secretary (Labour),
Rajasthan, Jaipur has decided 21 applications of workmen by a
common order and rejected all of them.
3.
For sake of brevity, we are reproducing relief prayer of lead
matter Rukmanand Sharma Vs. Managing Director & Ors. (S.B.
Civil Writ Petition No. 12108/2024);
vr% mijksDr rF;ksa ,oa vk/kkjksa ij ;g fjV ;kfpdk
izLrqr dj ;kph ekuuh; U;k;ky; ls fouez izkFkZuk
djrk gS fd ekuuh; izdj.k dk leLr fjdkMZ ryc
dj%&
01- ekuuh; U;k;ky; mfpr fjV] vkns”k ;k vU;
dksbZ funsZ”k tkjh dj izR;FkhZ Øekad 1 dks funsZf”kr
djus dh d`ik djsa fd og ;kph dks ekuuh; Je
U;k;ky;] izFke t;iqj }kjk ikfjr vkns”k fnukad 1307-2022 ds iSjk 17 esa fn;s x;s funsZ”kksa ds vuqlkj
jkf”k dk Hkqxrku djsaA
02- fodYi ds :i esa ;kph ;g fuosnu djrk gS fd
ekuuh; U;k;ky; mfpr fjV] vkns”k ;k vU; dksbZ
funsZ”k tkjh dj izR;FkhZ Øekad 2 }kjk ikfjr vkns”k
fnukad 26-04-2023 dks vikLr djrs gq;s izR;FkhZ Øekad
2 dks funsZf”kr djus dh d`ik djsa fd os ;kph dks
feyus ;ksX; jkf”k dh x.kuk djds ;kph dks
feyus ;ksX; jkf”k izR;FkhZ Øekad 1 ls olwy fd;s tkus
dh dk;Zokgh djsaA
03- fodYi ds :i esa ;kph ;g fuosnu djrk gS fd
ekuuh; U;k;ky; mfpr fjV] vkns”k ;k vU; dksbZ
funsZ”k tkjh dj ekuuh; Je U;k;ky;] izFke] t;iqj
dks funsZf”kr djus dh d`ik djsa fd os ;kph dks
feyus ;ksX; fuf”pr jkf”k dh x.kuk djrs gq, vkns”k
ikfjr djsaA
(10 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
04- ekuuh; U;k;ky; mfpr fjV] vkns”k ;k vU;
dksbZ funsZ”k tkjh dj ekuuh; U;k;ky; izR;FkhZ Øekad
3 ds fo:) ekuuh; loksZPp U;k;ky; ds fu.kZ;ksa ds
foijhr vkns”k ikfjr djus ds dkj.k mfpr dk;Zokgh
fd;s tkus gsrq jkT; ljdkj ds le{k vf/kdkjh dks
funsZf”kr djus dh d`ik djsaA
05- vU; dksbZ vuqrks’k o fjV ;kfpdk dk
gtkZ&[kpkZ tks ekuuh; vf/kdj.k mfpr le>s fnykus
dh d`ik djsA
4.
The prayer clause in other connected matters are identical,
and the Additional Commissioner has rejected the applications
dated
5.
17-10-2022
and
19-10-2022
by
a
common
order.
Brief facts of the case are that the petitioner(s) were
employed by D.B. Corp. Ltd., and their services were terminated,
by employer. The termination order was challenged, and the
Labour Court has declared the termination as illegal and arbitrary.
Thereafter, Respondent No. 1, D.B. Corp. Ltd., has not made any
payment
towards
pay
and
allowances
(salary)
and
other
emoluments to the petitioners, thus, the petitioners have filed
separate applications under Section 33C(2) of the Industrial
Disputes Act, 1947 (hereinafter referred to as “Act of 1947”), and
the Labour Court has disposed of the applications in the following
manner (one of the order reproduced):-
20- izkFkhZ dk ;g izkFkZuk i= varxZr /kkjk&33lh&2
vkS|ksfxd fookn vf/kfu;e fo#) vizkFkhZ Lohdkj
fd;k tkdj vizkFkhZ dks vkns”k fn;k tkrk gS fd
fnukad 25-5-2017 ls vDVwcj 2019 rd dh vof/k ds
lEiw.kZ osru] HkRrs o vU; ns; ykHkksa dh jkf”k ¼Vªsofyax
,.M dUoSa”k vykmUl dks NksM+dj½ rFkk izkFkhZ ds
fuyEcudky ds iw.kZ osru dh jkf”k ¼Vªsofyax ,.M
dUoSa”k vykmUl dks NksM+dj½ dh lax.kuk izdj.k esa
izLrqr M~;wMªku स्टेटमेंट izn”kZ MCY;w-5 ds vk/kkj ij
izkFkhZ ds lsok vfHkys[k ds vuqlkj dj izkFkhZ dks
fu;ekuqlkj Hkqxrku djsaA izkFkhZ dks fuyEcu dky esa
tks jkf”k dk Hkqxrku dj fn;k x;k gS o jkf”k] izkFkhZ
dks fuyEcudky esa fn;s tkus okys lEiw.kZ osru o
HkRrksa dh jkf”k esa ls lek;ksftr dh tk ldsxhA izkFkhZ
[2026:RJ-JP:29]
(11 of 28)
[CW-12108/2024]
dks mDr leLr jkf”k dh vnk;xh rhu ekg esa dh
tkosA rhu ekg esa mDr leLr jkf”k;ksa dh vnk;xh
ugha djus dh lwjr esa izkFkhZ vizkFkhZ ls vkns”k fnukad
ls 12 izfr”kr okf’kZd nj ls C;kt Hkh izkIr djus dk
vf/kdkjh gksxkA
U;k;k/kh”k
Je U;k;ky;&izFke] t;iqjA
21- izkFkhZ }kjk izLrqr izkFkZuk i= varxZr /kkjk
33lh&2 vkS|ksfxd fookn vf/kfu;e] 1947 esa ikfjr
fu.kZ; vkt fnukad dks [kqys U;k;ky; esa fy[kk;k
tkdj lquk;k x;k] tks fu;ekuqlkj lwpukFkZ jkT;
ljdkj dks Hkstk tkosA
U;k;k/kh”k
Je U;k;ky;&izFke] t;iqjA
5.
An application is filed by the petitioner(s) before the Labour
Commissioner under Section 33C(1) of the Act of 1947 for
recovery and payment of due salary and allowances as per
direction of the Labour Court. In all the matters, the applications
of identical nature were filed, and for ready reference, we are
reproducing the contents of application from one of the files as
under;
vkS|ksfxd fookn vf/kfu;e] 1947 dh /kkjk 33¼lh½¼1½ ds varxZr izkFkZuk&i=
ekU;oj]
mijksDr fo’k;kUrxZr izkFkhZ fuEufyf[kr
vuqlkj fuosnu djrk gS%&
1- ;g fd izkFkhZ Mh-ch- dkWiZ fyfeVsM ¼nSfud
HkkLdj½ esa lhfu;j ,XthD;qfVo ¼LdSfuax
vkWijsVj½ ds in ij dk;Zjr Jfed FkkA fnukad
25-05-2017 dks izkFkhZ dks lsokeqDr dj fn;k x;k
Fkk] ftlds fo#) izkFkhZ us vkS|ksfxd fookn
vf/kfu;e dh /kkjk 33&, ds vUrxZr ,d izkFkZuk
i= izLrqr fd;k FkkA
2- ;g fd ekuuh; Je U;k;ky;] Øe la[;k
02]] t;iqj us vius vkns”k fnukad 04-102018 }kjk izkFkhZ ds izkFkZuk i= dks Lohdkj djrs
[2026:RJ-JP:29]
(12 of 28)
[CW-12108/2024]
gq, izkFkhZ dh lsokeqfDr dks mfpr ,oa oS/k ugha
ekukA
3- ;g fd vizkFkhZ }kjk ekuuh; Je
U;k;ky;] Øe la[;k 02] t;iqj ds mDr vkns”kksa
dh ikyuk esa cdk;k osru&HkRrksa dk Hkqxrku ugha
fd;k x;kA blds i”pkr izkFkhZ us cdk;k
osru&HkRrksa ds Hkqxrku djok, tkus ds fy,
ekuuh; Je U;k;ky;] Øe la[;k izFke] t;iqj
ds le{k vkS|ksfxd fookn vf/kfu;e] 1947 dh
/kkjk 33¼lh½¼2½ ds varxZr izkFkZuk&i= izLrqr
fd;k FkkA
4- ;g fd ekuuh; Je U;k;ky;] Øe la[;k
izFke] t;iqj us vius vkns”k fnukad 13-07-2022
}kjk izkFkhZ ds izkFkZuk i= dks Lohdkj djrs gq,
cdk;k osru&HkRrksa dk Hkqxrku rhu ekg esa djus
ds vizkFkhZ dks vkns”k ikfjr fd,A
5- ;g fd ekuuh; Je U;k;ky;] Øe la[;k
izFke] t;iqj us vius vkns”kksa esa ;g Hkh mYys[k
fd;k gS fd rhu ekg esa mDr leLr jkf”k;ksa dh
vnk;xh ugha djus dh lwjr esa izkFkhZ vkns”k
fnukad ls 12 izfr”kr okf’kZd nj ls C;kt izkIr
djus dk vf/kdkjh gksxkA
6- ;g fd vizkFkhZ us izkFkhZ dks bu vkns”kksa dh
ikyuk esa vHkh rd cdk;k osru] HkRrs o vU;
ykHkksa dh jkf”k dk Hkqxrku ugha fd;k gSA
vr% vkS|ksfxd fookn vf/kfu;e] 1947 dh
/kkjk 33¼lh½¼1½ ds varxZr izkFkZuk&i= izLrqr dj
izkFkhZ fuosnu djrk fd ekuuh; Je U;k;ky;
Øe la[;k& izFke] t;iqj ds vkns”k fnukad 13
tqykbZ] 2022 ds vuqlkj izkFkhZ ds cdk;k
osru&HkRrksa dh jkf”k C;kt lfgr vizkFkhZ ls
olwyh dj izkFkhZ dks Hkqxrku djokus dh d`ik
djsaA
¼txnh”k izlkn “kekZ½
izkFkhZ
6.
The Respondent, D.B. Corp. Ltd. (Dainik Bhaskar), has filed
reply, and the same is reproduced as under;
Hkkx&1
izkFkhZ }kjk izLrqr izkFkZuk i= vUrxZr 33
¼lh½ ¼1½ vkS|ksfxd fookn vf/kfu;e 1947 fuEu
[2026:RJ-JP:29]
(13 of 28)
[CW-12108/2024]
dkj.kksa ls dkuwuu vekU; o pyus ;ksX; ugha gS
%&
1- ;g fd vkS|ksfxd fookn vf/kfu;e dh
/kkjk 33 ¼lh½ ¼2½ ds rgr ekuuh; Je
U;k;ky; dks ;g “kfDr iznku dh xbZ gS fd
og fdlh jkf”k dh ns;rk ds laca/k esa nLrkost
o lk{; ds vk/kkj ij fdlh fuf”pr jkf”k dh
x.kuk@dEI;wV dj ldrh gSA
2- ;g fd izkFkhZ }kjk vkS|ksfxd fookn
vf/kfu;e dh /kkjk 33 ¼lh½ ¼2½ ds rgr ,d
dEI;wVs”ku izkFkZuk i= ekuuh; Je U;k;ky; ds
le{k izLrqr fd;k x;k Fkk] ftlesa izkFkhZ }kjk
ekuuh; Je U;k;ky; ls :i;s 10]01]933@&
ek= dh jkf”k dh x.kuk djus dh izkFkZuk dh
xbZ Fkh ,oa ftlds laca/k esa izkFkZuk i= /kkjk 33
¼lh½ ¼2½ ds lkFk ,d vuqyXud layXu dj
jkf”k pkgh xbZ FkhA
3- ;g fd ekuuh; Je U;k;ky; la[;k
1 }kjk izkFkZuk i= varxZr 33 ¼lh½ ¼2½ }kjk
okn la[;k ,ylhlh&23@2020 ij tks yafcr
Fkk] esa fdlh Hkh izdkj ls fdlh Hkh fuf”pr
jkf”k dh ns;rk ds ckjs esa dksbZ Hkh vkns”k ikfjr
ugha fd;k gSA
4- ;g fd fofHkUu U;k;ky;ksa }kjk izfrikfnr
fl)karksa ds vuqlkj vkS|ksfxd fookn vf/kfu;e
dh /kkjk 33 ¼lh½ ¼1½ ds rgr izkFkZuk i= rc
gh izLrqr fd;k tk ldrk gS] tcfd Jfedksa
dks fdlh le>kSrs vFkok vokMZ vFkok vkS|
ksfxd fookn ds psIVj VA ,oa VB ds rgr
dksbZ jkf”k dh ik=rk cuh@curh gksA ;gka ;g
mYysf[kr djuk mfpr gksxk fd izkFkhZ ds laca/k
esa ekuuh; Je U;k;ky; }kjk ,ylhvkj
23@2017 esa ikfjr vokMZ esa ;g dgha Hkh
mYysf[kr ugha fd;k gS fd izkFkhZ fdlh osru
HkRrs vkfn dks izkIr djus dk vf/kdkjh gS@FkkA
;gka ;g Hkh mYysf[kr djuk mfpr gksxk fd
tc ekuuh; Je U;k;ky; }kjk mijksDrkuqlkj
fdlh osru HkRrs vkfn ds laca/k esa dksbZ Li’V
vkns”k ugha fn;s x;s Fks] ml lwjr esa vkS|ksfxd
fookn vf/kfu;e dh /kkjk 33 ¼lh½ ¼1½ ds rgr
dksbZ dk;Zokgh okaNuh; ugha gSA
5- ;g fd tc vkns”k fnukd 04-10-2018
Je U;k;ky; }kjk fdlh Hkh jkf”k dh ik=rk
ds dksbZ Hkh fuf”pr vkns”k ugha fn;s x;s gSa
[2026:RJ-JP:29]
(14 of 28)
[CW-12108/2024]
rks ,sls esa ekU; vf/kdkjh dks
vkS|ksfxd
fookn vf/kfu;e dh /kkjk 33 ¼lh½ ¼1½ ds rgr
dksbZ dk;Zokgh ugha djus dk dksbZ vf/kdkj ugha
gS rFkk uk gh mlds vf/kdkj {ks= esa gSA
6- ;g fd vks|ksfxd fookn vf/kfu;e dh
/kkjk 33 ¼lh½ ¼1½ ds rgr ekU; vf/kdkjh dks
fdlh Hkh jkf”k dh x.kuk djus dk dksbZ
vf/kdkj ugha gSA mDr /kkjk ds rgr ekuuh;
vf/kdkjh dks ek= lhfer vf/kdkj fn;k x;k gS]
fd l{ke U;k;ky; }kjk fuf”pr x.kuk dh
jkf”k ds fØ;kUo;u gsrq gh ekuuh; vf/kdkjh
dks “kfDr;ka nh xbZ gSa] tks fd orZeku izdj.k
esa ugha gSA
Hkkx&2
mijksDr izkjafHkd vkifRr;ksa ij viuk
vf/kdkj lqjf{kr j[krs gq;s vizkFkhZ] izkFkhZ }kjk
izLrqr izkFkZuk i= vUrxZr /kkjk 33 ¼lh½ ¼1½ dk
enokj tokc fuEu izdkj izLrqr djrk gS&
1- ;g fd] izkFkhZ }kjk izLrqr izkFkZuk i= dh
en la[;k 1 ,oa 2 ds laca/k esa vizkFkhZ dk
dFku gS fd] mDr enksa esa dFku fjdkMZ ls
lacaf/kr gSA ;gka ;g mYysf[kr djuk djuk
mfpr gksxk fd ekuuh; Je U;k;ky; }kjk tks
vokWMZ ,ylhvkj 23@2017 esa ikfjr fd;k x;k
Fkk] mlesa ekuuh; U;k;ky; }kjk fdlh Hkh
izdkj ls dksbZ cSd ostst vFkok fdlh vU;
HkRrksa ds laca/k esa dksbZ vokWMZ ikfjr ugha fd;k
Fkk ,oa dsoy ek= izkFkhZ dh lsokeqfDr dks
mfpr ,oa oS/k ugha ekuk FkkA
2- ;g fd] izkFkhZ }kjk izLrqr izkFkZuki= dh
en la[;k 3 ds laca/k esa vizkFkhZ dk dFku gS
fd] mijksDrkuqlkj tc ekuuh; Je
U;k;ky; }kjk vokWMZ esa dksbZ cSd ostst vFkok
fdUgh HkRrksa ds laca/k esa dksbZ mYys[k ugha fd;k
x;k Fkk] vr% vizkFkhZ ij fdlh Hkh izdkj ls
osru HkRrksa ds Hkqxrku dk nkf;Ro ugha FkkA
mDr en esa tgka rd izkFkZuk i= vUrxZr /kkjk
33 lh 2 lcaf/kr rF; gS og fjdkMZ las lcaf/kr
gSA
3- ;g fd] izkFkhZ }kjk izLrqr izkFkZuk i= dh en
la[;k 4 yxk;r 6 ds lca/k esa vizkFkhZ dk
dFku gS fd] ekuuh; Je U;k;ky; }kjk vius
vkns”k fnukad 13-07-2022 esa fdlh Hkh izdkj ls
fdlh Hkh jkf”k dh dksbZ fuf”pr x.kuk ugha dh
[2026:RJ-JP:29]
(15 of 28)
[CW-12108/2024]
xbZ gS] vr% vizkFkhZ ij fdlh Hkh jkf”k dks nsus
dh dksbZ ck/;rk ugha curh gSA
4- ;g fd] izkFkhZ }kjk vius izkFkZuk i= esa tks
vuqrks’k pkgk x;k gS og izkFkhZ drbZ Hkh izkIr
djus dk vf/kdkjh ugha gS D;ksafd izkFkhZ }kjk
izLrqr izkFkZuk i= vUrxZr /kkjk 33 lh 1 fdlh
Hkh izdkj ls dkuwuu vFkok vU; :i ls
pyus ;ksX; ugha gSA
vr% ekuuh; vf/kdkjh ls fuosnu gS fd
orZeku izdj.k esa muds }kjk ;g ekuk tk;s fd
%&
1- izkFkhZ }kjk izLrqr izkFkZuk i= vUrxZr /kkjk
33 lh 1 vizkFkhZ }kjk Hkkx&1 esa mYysf[kr
dkj.kksa dh otg ls dkuwuu vekU; ,oa
pyus ;ksX; ugha gSA
2- izkFkhZ fdlh Hkh izdkj ls pkgs x;s vFkok
vU; jkf”k@vuqrks’k dks izkIr djus dk
vf/kdkjh ugha gSA
3- izkFkhZ }kjk izLrqr izkFkZuk i= nqHkkZoukiw.kZ
gS ,oa lO;; fujLruh; gSA
7.
After considering the application and reply, 21 applications
of workmen were disposed of by a common order dated 26-042023, and the order is reproduced as under:-
vkns”k
fuEu Jfedksa us izkFkZuk i= vUrxZr vkS|ksfxd fookn vf/kfu;e 1947
fd /kkjk 33¼lh½¼1½ fnukad 17-10-2022 o 19-10-2022 is”k fd;sA ftl
ds }kjk Je U;k;ky; ds izdj.k esa fu/kkZj.k ds vuqlkj cdk;k osru jkf”k
fu;kstd uzcU/k funs”kd] Mh-ch-dk;Z- fyfeVsM ¼nSfud HkkLdj½ 10ts0,y0,u0ekxZ] t;iqj ls olwy dj Hkqxrku djus dk fuosnu fd;k%&
Ø- izdj.k ue Jfed Je U;k;ky; ds
fu/kkZfjr
nkok dh
la- la[;k
fu/kkZfjr jkf”k fnukad jkf”k esa ls xbZ jkf”k
ls fnukad rd
NksM+dj
vUrxZr
123/kkjk
fnukad ls fnukad
633¼lh½¼1½
4rd
571- 42@22 Jh :dek
17-4-18 31-01-20 Vªsofyax o vfuf”pr
uUn “kekZ
dUosal
vyk2- 43@22 Jh jkts”k
18-4-17 30-10-19
^^
^^
xzksoj
[2026:RJ-JP:29]
3- 44@22
Jh _rs”k
xksre
4- 45@22 Jh “khysUnz
dqekj
5- 46@22 Jh lanhi
dqekor
6- 47@22 Jh ykyq jke
;kno
7- 48@22 Jh iznhi
dqekor
8- 49@22 Jh fot;
dqekj
9- 50@22 Jh nyhi
dqekj
10- 51@22 Jh gseUr
dqekj
11- 52@22 Jh jkds”k
dqekj
12- 53@22 Jh Jo.k
dqekj
13- 54@22 Jh /ku”;ke
tkfxM+
14- 55@22 Jh lanhi
ikjhd
15- 56@22 Jh fd”kuohj
;kno
16- 57@22 Jh lat;
xksRre
17- 58@22 Jh e`nqy
“kekZ
18- 59@22 Jh lquhy
dqekj “kekZ
19- 60@22 Jh txnh”k
izlkn
20- 61@22 Jh egkohj
izlkn
21- 62@22 Jh ohjsUnz
flag jktiwr
(16 of 28)
[CW-12108/2024]
17-4-17
30-10-19
^^
^^
17-4-17
30-10-19
^^
^^
10-4-17
30-10-19
^^
^^
17-4-17
30-10-19
^^
^^
25-5-17
30-10-19
^^
^^
25-5-17
30-10-19
^^
^^
19-4-17
30-10-19
^^
^^
19-4-17
30-10-19
^^
^^
25-2-18
31-01-20
^^
^^
25-5-17
31-10-20
^^
^^
18-4-17
30-10-19
^^
^^
19-4-17
30-10-19
^^
^^
17-04-18
20-1-20
^^
^^
08-05-18
31-01-20
^^
^^
25-05-17
30-10-19
^^
^^
18-04-17
30-10-19
^^
^^
25-05-17
30-10-19
^^
^^
10-04-17
30-10-19
^^
^^
10-04-17
30-10-19
^^
^^
[2026:RJ-JP:29]
(17 of 28)
[CW-12108/2024]
izkFkhZx.k us izkFkZuk i= esa Je U;k;ky; ds }kjk fu/kkZfjr cdk;k jkf”k
dk Hkqxrku fu;kstd ds }kjk ugha fd;s tkus dk mYys[k dj olwyh
djokdj Hkqxrku djokus dk fuosnu fd;k gSA tcfd nkos esa cdk;k gksuk
vf/kd vof/k rd ds fy;s fd;k x;k gSA Jfed dk dFku gS fd Je
U;k;ky; ds }kjk fu/kkZfjr jkf”k ds vuqlkj gh vkxs dh vof/k dh x.kuk
dj Hkqxrku fnyk;k tkosA
vizkFkhZ us fnukad 4-1-2023 dks tokc esa mYys[k fd;k gS fd%&
1- jkf”k dh ns;rk ds lEcU/k esa nLrkostksa o lk{; ds vk/kkj ij fdlh Je
U;k;ky; ds
fu/kkZj.k ds i'pkr olwyh dh tk ldrh gSA
2- Je U;k;ky; ds }kjk vkf”kd vof/k dh gh x.kuk dh xbZ gSA
3- Je U;k;ky; ds }kjk fofu”pr jkf”k dh gh ds vUrxZr olwyh dh tk
ldrh gSA
4- iw.kZ vof/k dk osru o HkRrksa dk fu/kkZj.k Je U;k;ky; ds }kjk ugha
fd;k x;k gSA
mDr tokc o nkos ds lkFk vius dFku ds leFkZu esa nksuksa i{kksa us
U;kf;d n`’VkUr Hkh layXu@is”k fd;s gSA
i=kofy;ksa dk voyksdu fd;k x;k nksuksa i{kks dks lquus ds ckn Li’V
gS fd izkFkhZ us vius nkos esa mDr vof/k ds ckn ds osru es Hkh de Hkqxrku
fd;k tkuk crkrs gq;s vUrj jkf”k dh olwyh djokus fd izkFkZuk dh gSA
tcfd /kkjk 33¼lh½¼1½ ds vUrxZr dsoy fu/kkZfjr jkf”k dh gh olwyh dh tk
ldrh gSA lHkh Jfedksa ds lEcU/k esa ikfjr Je U;k;ky; ds vkns”k esa
vof/k ,oa izn”kZ MCY;q&5 dh vof/k esa vlekurk@vLi’Vrk gS lHkh Jfed
orZeku esa dk;Zjr gS ;g Hkh fu/kkZfjr ugha gSSA dqN Jfed lsok eqDr jgs gS]
rks dqN fuyfEcr jgs gS] dqN lsokfuo`r gks pqds gSA ,sls esa osru fu/kkZj.k
fd;k tkuk ekudj olwyh fd;k tkuk lEHko ugha gSA lHkh Jfedksa dks
viuk cdk;k iw.kZ:is.k fu/kkZj.k djok djus ds rRi”pkr gh olwyh dh
dk;Zoikgh dh tk ldrh gSA lEiw.kZ nkfor jkf”k fdlh Hkh nkos esa Je
U;k;ky; ds }kjk fu/kkZfjr ugha gSA izkFkhZx.k us Je U;k;ky; ds }kjk
fu/kkZfjr jkf”k fd vof/k ls vf/kd vof/k dk nkok olwyh gsrq izLrqr fd;k
gSA /kkjk 33¼lh½¼2½ ds vUrxZr iw.kZ fof/kd ifj{k.k ds mijkUr cdk;k jkf”k
dk fu/kkZj.k fd;k tkrk gS tcfd izLrqr izdj.kksa esa cdk;k jkf”k dk
fu/kkZj.k fu/kkZfjr izfØ;k ls iw.kZ :is.k ugha fd;k x;k gSA blfy;s izkFkhZ dk
nkok vLohdkj fd;k tkdj izkFkhx.kksa ds izkFkZuk i= [kkfjt fd;s tkrs gSA
vkns”k vkt U;k;ky; esa fnukad 26-4-23 dks lquk;s x;sA
vfrfjDr Je vk;qDrinsu la;qDr “kklu lfpo¼Je½
jktLFkku]t;iqj
8.
Learned Counsel for the petitioners, while relying upon the
judgment in the case of Jaipur Zila Sahakari Bhoomi Vikas
Bank Ltd. Vs. Shri Ram Gopal Sharma and Ors., AIR 2002
(18 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
SC 643 (1), submitted that non-approval of the order of dismissal
or failure renders dismissal inoperative, and the employee
becomes entitled to wages from the date of dismissal to the date
of disapproval of the application. He further submitted that in the
case of Kays Construction Company (private) Ltd. v. State of
UP and others, AIR 1965 SC 1988, a Constitution Bench of the
Honorable Supreme Court has held that ascertainment of dues
involves mere arithmetical calculation, and there is no necessity to
determine entitlement. He also submitted that the Labour Court
has not only determined the due amount but directed payment
within a period of 3 months, and as a consequence of nonpayment, the respondent No.1 is duty-bound to make payment
interest at the rate of 12% per annum. He further submitted that
the respondent Nos. 2 and 3 have deliberately and malafidely
rejected the application preferred by the petitioners, hence they
are arrayed as a respondent.
9.
Aforesaid contentions were opposed by Learned counsel
appearing on behalf of Respondent No. 1 and respondent nos. 2
and 3 respectively.
10.
Learned Counsel for the respondent no.1, while referring to
the judgments in the case of Namer Ali Choudhary Vs. The
Central Inland Water Transport Corporation Ltd. & Ors.,
MANU/SC/0232 1977, Fabril Gasosa and Ors. Vs.. Labour
Commissioner and others, MANU/SC/10821997, Punjab
National
Bank
Ltd.
Vs.
K.
MANU/SC/0365/1962; Central Inland
Corporation
Limited
Vs.
The
L.
Kharbanda,
Water Transport
Workmen
and
Ors.
MANU/SC/0292 1974; U.P. Electric Supply Company Ltd. v.
[2026:RJ-JP:29]
(19 of 28)
[CW-12108/2024]
R. K. Shukla & Ors., MANU/SC/03331969; M/s. Bombay
Chemical Industries Vs. Deputy Labour Commissioner and
Ors., Civil Appeal No. 813/2022, has submitted that the
applications preferred by the petitioners under Section 33-C(1) of
the Act of 1947 were rightly dismissed by the Additional
Commissioner, and there is no illegality in the order. He further
submitted that the Labour Court has neither determined any
quantifiable amount, nor it has directed recovery of any specific
amount. He further submitted that no amount is payable to
workmen (petitioners), as no adjudication order was passed in
favour of petitioners. He further submitted that the petitioners
were fully paid by the respondents, and without determination of
specific amount as due, a recovery process cannot be instituted.
He also referred to the order passed by the Labour Court and
submitted that the Additional Commissioner is neither empowered
to determine the due amount, nor he is authorized to adjudicate
on the issue raised by the petitioners. He further submitted that
the proceedings were rightly rejected by the Additional Labour
Commissioner.
11.
Learned Counsel appearing on behalf of Respondent Nos. 2
and 3 has also opposed the personal attack on Respondent No. 3
and submitted that it is an official process and the judgment of the
Labour Court, is itself ambiguous and respondent no.2 is not
legally empowered to adjudicate upon entitlement and claim of
dues.
12.
Heard Learned Counsel for the parties and perused the
material placed on record. Also considered the judgments of
[2026:RJ-JP:29]
(20 of 28)
[CW-12108/2024]
Hon’ble Supreme Court as referred to by Learned Counsel for both
the parties.
13.
Section 33(C) of the Act of 1947 is reproduced as under;
33C. Recovery of money due from an
employer.—(1) Where any money is due
to a workman from an employer under
a settlement or an award or under the
provisions of 6 [Chapter VA or Chapter
VB], the workman himself or any other
person authorised by him in writing in
this behalf, or, in the case of the death
of the workman, his assignee or heirs
may, without prejudice to any other
mode of recovery, make an application
to the appropriate Government for the
recovery of the money due to him, and
if the appropriate Government is
satisfied that any money is so due, it
shall issue a certificate for that amount
to the Collector who shall proceed to
recover the same in the same manner
as an arrear of land revenue:
Provided that every such application
shall be made within one year from the
date on which the money became due
to the workman from the employer:
Provided
further
that
any
such
application may be entertained after
the expiry of the said period of one
year, if the appropriate Government is
satisfied
that
the
applicant
had
sufficient cause for not making the
application within the said period.
(2) Where any workman is entitled to
receive from the employer any money
or any benefit which is capable of being
computed in terms of money and if any
question arises as to the amount of
money due or as to the amount at
which such benefit should be computed,
then the question may, subject to any
rules that may be made under this Act,
be decided by such Labour Court as
may be specified in this behalf by the
appropriate Government; [within a
period not exceeding three months]
[Provided that where the presiding
officer of a Labour Court considers it
necessary or expedient so to do, he
may, for reasons to be recorded in
[2026:RJ-JP:29]
(21 of 28)
[CW-12108/2024]
writing, extend such period by such
further period as he may think fit.]
(3) For the purposes of computing the
money value of a benefit, the Labour
Court may, if it so thinks fit, appoint a
commissioner who shall, after taking
such evidence as may be necessary,
submit a report to the Labour Court and
the Labour Court shall determine the
amount after considering the report of
the
commissioner
and
other
circumstances of the case.
(4) The decision of the Labour Court
shall be forwarded by it to the
appropriate
Government
and
any
amount found due by the Labour Court
may be recovered in the manner
provided for in sub-section (1).
(5) Where workmen employed under
the same employer are entitled to
receive from him any money or any
benefit capable of being computed in
terms of money, then, subject to such
rules as may be made in this behalf, a
single application for the recovery of
the amount due may be made on behalf
of or in respect of any number of such
workmen.
Explanation.—In this section “Labour
Court” includes any court constituted
under any law relating to investigation
and settlement of industrial disputes in
force in any State.
14.
In case of Kays Construction Company (private) Ltd. v.
State of UP and others (supra), the Constitution Bench of the
Hon’ble Supreme Court has considered the provisions of the U.P.
Industrial Disputes Act, which are analogous to the Industrial
Disputes Act, 1947, in particular Section 33C and observed that
cognate section is divided into two parts. The first part deals with
the recovery of money due to a workman under an award, and the
second part deals with the benefit computable in terms of money.
It further observed that the benefit contrast in two subsections
between money due under the first subsection and the necessity
(22 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
of reckoning the benefit in terms of money before the benefit
becomes money due under the second subsection, which shows
that mere arithmetical calculation of the amount dues are not
required to be dealt with under the elaborate procedure of the
second subsection.
15.
In case of Jaipur Zila Sahakari Bhoomi Vikas Bank Ltd.
Vs. Shri Ram Gopal Sharma and Ors. (supra), considering the
provisions of Section 33(2)(b) of the Act of 1947, the Constitution
Bench of the Hon’ble Supreme Court has observed that nonapproval of the order of dismissal or failure to make an application
under Section 33(2)(b) for seeking approval renders the dismissal
inoperative, and it becomes ineffective from the date it was
passed. The employee becomes entitled to wages from the date of
dismissal till the date of disapproval of the application. There is no
need
16.
of
a
separate
or
specific
order
for
reinstatement.
In case of Namer Ali Choudhary Vs. The Central Inland
Water Transport Corporation Ltd. & Ors., (supra) Hon’ble
Supreme Court has considered Section 33C(2) of the Act of 1947
and observed that the first part is for a money claim simpliciter,
and the second part is for computing, in terms of money, any
benefit where a workman is entitled to receive any money from
the employer and any question arises as to the amount of money
due, such dispute may be decided by the Labour Court.
17.
In
case
of
Febril
Gasosa
and
Commissioner and others (supra),
Ors.
Vs..
Labour
Hon’ble Supreme Court
has considered the provisions under Section 33C of the Act of
1947 as being in the nature of execution proceedings designed to
recover the dues of the workman. The legislature has provided a
(23 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
speedy remedy to the workman to have the benefits of a
settlement or award, which are due to them and are capable of
being
computed
in
terms
of
money,
recovered
through
proceedings under the said provisions. The distinction between
subsection (1) and subsection (2) of Section 33C of the Act lies
mainly in the procedural aspect and not in any substantive right of
the workman as conferred by these provisions.
18.
In
case
of
Punjab
National
Bank
Ltd.
Vs.
K.
L.
Kharbanda (supra), Hon’ble Supreme Court, while considering
the provisions of Section 33C(2) of the Act of 1947, interpreted
the words used therein, and observed that where the amount due
to a workman is not stated in the award itself and there is a
dispute as to its calculation, subsection (2) will apply, and the
workman would be entitled to apply thereunder to have the
amount computed, provided he is entitled to a benefit, whether
monetary or non-monetary, which is capable of being computed in
terms of money.
19.
In case of Central Inland Water Transport Corporation
Limited Vs. The Workmen and Ors. (supra), Hon’ble Supreme
Court has observed that a discharged workman can obtain relief
by way of Section 10 of the Act of 1947 and not by an application
before the Labour Court under Section 33C(2) of the Act of 1947
claiming computation of the benefit on the basis that the
discharge being unlawful, his services must be deemed to be
continuous and uninterrupted.
20.
In case of U.P. Electric Supply Company Ltd. v. R. K.
Shukla & Ors. (supra), Hon’ble Supreme Court has considered
the issue of retrenchment and entitlement in light of the
(24 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
provisions under Section 33(2) of the Act of 1947. In case of M/s.
Bombay
Chemical
Industries
Vs.
Deputy
Labour
Commissioner and Ors., (supra), after considering the case of
a workman, a conclusion has been drawn that it was beyond the
scope of the Labour Court. In case of D.N. Krishnappa Vs.
Deputy General Manager, (supra), Hon’ble Supreme Court has
ruled that the jurisdiction of Section 33(2) cannot be invoked in
case of a dispute about employment.
21.
Here, in the present case, the material on record clearly
indicates that each of the petitioners filed an application under
Section 33C(2) of the Industrial Disputes Act before the Labour
Court, and the same has been decided in favour of the
petitioner(s). The order has been passed after considering the
defence and objections of Respondent No. 1. The order dated 1307-2022 indicates that the Labour Court has not only considered
the order of termination passed against the petitioner(s) but has
also referred to an award of the Labour Court, whereby the order
of termination or dismissal was not approved. The judgment in
case ofJaipur Zila Sahakari Bhoomi Vikas Bank Ltd. Vs. Shri
Ram Gopal Sharma and Ors. (supra), clearly reflects that the
dismissal becomes ineffective from the date it was passed and the
employee becomes entitled to wages from the date of dismissal.
22.
The Labour Court, after considering the application, has
computed the amount and directed Respondent No. 1 to make
payment within three months, failing which Respondent No. 1 was
also directed to pay interest at the rate of 12% per annum. The
computation has already been completed by the Labour Court in
its order, and on the basis of the due drawn statement, (Ex. W-5),
(25 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
the Labour Court has directed Respondent No. 1 to make payment
within three months. The Labour Court has also directed that the
amount already paid by the Respondent No.1 shall be adjusted
towards the dues.
23.
The order of the Labour Court from one of the files is
reproduced hereinbelow for ready reference:-
20- izkFkhZ dk ;g izkFkZuk i= varxZr
/kkjk&33lh&2 vkS|ksfxd fookn vf/kfu;e fo#)
vizkFkhZ Lohdkj fd;k tkdj vizkFkhZ dks vkns”k
fn;k tkrk gS fd fnukad 25-5-2017 ls vDVwcj
2019 rd dh vof/k ds lEiw.kZ osru] HkRrs o vU;
ns; ykHkksa dh jkf”k ¼Vªsofyax ,.M dUoSa”k
vykmUl dks NksM+dj½ rFkk izkFkhZ ds fuyEcudky
ds iw.kZ osru dh jkf”k ¼Vªsofyax ,.M dUoSa”k
vykmUl dks NksM+dj½ dh lax.kuk izdj.k esa
izLrqr M~;wMªku स्टेटमेंट izn”kZ MCY;w-5 ds vk/kkj ij
izkFkhZ ds lsok vfHkys[k ds vuqlkj dj izkFkhZ dks
fu;ekuqlkj Hkqxrku djsaA izkFkhZ dks fuyEcu dky
esa tks jkf”k dk Hkqxrku dj fn;k x;k gS o jkf”k]
izkFkhZ dks fuyEcudky esa fn;s tkus okys lEiw.kZ
osru o HkRrksa dh jkf”k esa ls lek;ksftr dh tk
ldsxhA izkFkhZ dks mDr leLr jkf”k dh vnk;xh
rhu ekg esa dh tkosA rhu ekg esa mDr leLr
jkf”k;ksa dh vnk;xh ugha djus dh lwjr esa izkFkhZ
vizkFkhZ ls vkns”k fnukad ls 12 izfr”kr okf’kZd
nj ls C;kt Hkh izkIr djus dk vf/kdkjh gksxkA
24.
The material on record clearly indicates that Respondent No.
1 has neither challenged the order passed under Section 33C(2)
nor
raised
any
objection
regarding
the
determination
and
computation of benefits, or entitlement of the petitioner(s).
However, the counsel for Respondent No. 1 has now relied upon
judgments of the Hon’ble Supreme Court to canvass the argument
that the Labour Court was not competent to determine or compute
the benefits, as the petitioner(s) were not in the employment of
Respondent No. 1. Unless the order passed under Section 33C(2)
(26 of 28)
[2026:RJ-JP:29]
[CW-12108/2024]
of the Act of 1947 by the Labour Court is challenged and until
stayed or set aside by the High Court, the Labour Commissioner is
duty bound to issue a recovery certificate so that the amount due
may be recovered in compliance of the order. The Additional
Labour Commissioner or the Labour Commissioner, or any other
authority, has no power to deviate from the directions of the
Labour
Court
or
the
Industrial
Tribunal.
The
Additional
Commissioner has committed a serious error while pointing out a
fault in the order of the Labour Court, as he is a subordinate to
the adjudicatory authority when he is required to execute an
award, by issuing a recovery certificate.
25.
The order passed by the Additional Commissioner clearly
indicates that, without assigning any reasons, he has refused to
recover the legal dues of the petitioners. The act of refusal to
execute a valid order without assigning good reasons constitutes
wilful disobedience and attracts disciplinary action, though it is a
past event. It has been brought on record that soon after the
order
the
Additional
Commissioner
(Respondent
No.3)
has
superannuated. The order passed by the Additional Commissioner
clearly indicate that either he favoured Respondent No. 1 or acted
in an arbitrary manner. Whatever be the case, justice has suffered
and the recovery process was stalled, resulting in loss to the
petitioners.
26.
In the instant case, after the determination of entitlement,
computation,
of
specific
dues
as
per
Annexure
W-5,
the
petitioner(s) filed an application for recovery, and the Labour
Commissioner or the Additional Labour Commissioner was under
[2026:RJ-JP:29]
(27 of 28)
[CW-12108/2024]
an obligation to issue a recovery certificate and ensure recovery
as per the order of the Labour Court, thus, no adjudication was
required by the Additional Commissioner; rather, on the basis of
statement Exhibit W-5, he has to calculate interest and thereafter
issue recovery certificate or recovery warrant against Respondent
No. 1, as Respondent No. 1 failed to deposit the due amount as
per the order of the Labour Court under Section 33C(2) of the Act
of 1947. The Labour Commissioner or the Additional Labour
Commissioner was not required to adjudicate upon any issue, as
adjudication had already been done by the Labour Court and the
order had not been challenged by Respondent No. 1. Therefore,
the order dated 26-04-2023 is not only arbitrary but also illegal
and is liable to be quashed.
27.
The application under Section 33C(2) of the Act of 1947 was filed
before the Labour Court, and on the basis of the statements submitted
by each of the petitioners in their computation, the Labour Court ruled
on the entitlement and computed the money due on the basis of
statement Ex. W-5, filed by the workmen. The issue of retrenchment,
termination, or reinstatement was not a subject matter required to be
considered by the Labour Commissioner or the Additional Labour
Commissioner. This Court has only considered issue arising after
dismissal of the application by the Additional Commissioner on 26-042023, therefore, the judgments relied upon by Respondent No. 1 are
not applicable in the present case to support the defence of
Respondent No. 1. Thus, these writ petitions are liable to be allowed.
28.
These writ petitions filed by petitioners are allowed and order
dated 26.04.2023 passed by the Additional Labour Commissioner-cum-
[2026:RJ-JP:29]
(28 of 28)
[CW-12108/2024]
Joint Secretary (Labour), Rajasthan, Jaipur qua petitioner(s) is
quashed and set aside. The matter is remitted back (remand) to the
Labour Commissioner for realization of dues under Section 33C(1) of
Industrial Disputes Act, 1947 with following directions:
i. After receipt of copy of the order, all the matters shall be reregistered under Section 33C(1) of the Act of 1947;
ii. After registration of matter, an opportunity for deposit of due
payments (updated dues with interest, if any) be granted to
respondent no.1 and if he fails to deposit, the Labour Commissioner
shall proceed to issue a process as provided under the law;
iii. In case petitioner(s) file an application under Section 29 of the Act
of 1947, for prosecution, the Labour Commissioner shall proceed to
examine and decide the matter for prosecution;
iv. Needless to say that the recovery process be concluded as early
as possible preferably within six months from date of receipt of copy
of this order;
v.
The petitioners and respondent no.1 are directed to appear before
the Labour Commissioner on 19.01.2026.
29.
With aforesaid, the writ petitions and misc. application(s), if
any, stands disposed of.
(ASHOK KUMAR JAIN),J
CHETNA BEHRANI /282-301
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review