IN THE HIGH COURT AT CALCUTTA
CONSTITUTIONAL WRIT JURISDICTION
APPELLATE SIDE
Present:
The Hon’ble Justice Rai Chattopadhyay
WPA 22965 of 2022
With
CAN 1 of 2024
Rohini Enterprise & Anr.
Vs.
Union of India & Ors.
For the Petitioners
: Mr. Saptarshi Roy
: Ms. Kakali Das Chakraborty
For the Respondents
: Mr. Bhudeb Chatterjee
: Mr. Rajesh Kumar Shah
Judgment on
: 13.02.2026
Rai Chattopadhyay, J. :1.
The letter impugned dated September 19, 2022, of termination of
contract and forfeiture of the earnest money deposit of the petitioner, to
the tune of Rs.11,94,000/-, has been challenged by the petitioner in the
instant writ petition, on the grounds inter-alia of arbitrariness, fraud by
suppression of material facts to initiate the tender by the respondent
authority and violation of the principles of natural justice in case of the
petitioner, having not granted the proprietors of the firm an opportunity
of hearing, before termination of the contract.
2.
Relevant background facts are like this. The respondent No. 3/ the
Senior Divisional Commercial Manager, Eastern Railway, Sealdah
Division invited tender, for the purpose of awarding license for operation
of composite parking lot No.SDAH at Sealdah railway station, for a period
of three years. The closing date for submission of bid was July 4, 2022.
The area in which the license holder shall commence the parking
operation, would be comprising of 1890 square meters. According to the
writ petitioner, it was incumbent upon the respondent/Railways to hand
over to it, that is the successful bidder, an unencumbered possession of
the demarcated stipulated area of land to start the operation, at the
initiation of the contract. Instead, the Railways acted negligently and
against the norms, by not handing over the unencumbered demarcated
area of the land, in spite of, entering into an agreement with the
petitioner and accepting the earnest money from it. Allegedly, the area
map published at the time of publication of tender was not an up-to-date
one and did not reveal the exact position of the land as on the date. That,
allegedly since the map published with the tender was outdated,
pertaining to the year 2014, no encroachment thereon could be
comprehended from the said map as enclosed with the tender document,
whereas practically 1000 square meter area from the total 1890 square
meters, was actually encroached by the outsiders, rendering initiation of
the operation under tender virtually impossible. That the petitioner’s
representations dated August 24 and September 5 of 2022, remained
unattended whereas in spite of extending the time period of the bid of the
petitioner by 45 days vide letter dated August 17, 2022, on the same date
that is August 17, 2022, the respondent No.3 issued to the petitioner a
‘letter of acceptance’, directing him to execute the license agreement on
non-judicial stamp paper, within 15 days from the date of the said letter
of acceptance.
3.
The petitioner could never start the operation by executing a license
agreement as sought for by the respondent. The reason it attributes to
the failure on part of the respondent to create a conducive condition by
performing the essential conditions, for the successful bidder to initiate
the tender specified job. In this way according to the writ petitioner,
paragraphs 1.2 and 1.3 of the Commercial Circular No.4 of 2014,
published by the Director, Traffic Commercial (G), Railway Board, have
been violated. Then comes the termination order issued against the
petitioner dated September 19, 2022. The same not only terminate any
contract of the petitioner with the respondent railway for the said
specified job, but also directs for forfeiture of the earnest money
deposited by the petitioner to the tune of Rs.11,94,000/- due to alleged
non-performance of the contract. Thus the petitioner is aggrieved and
files the instant writ petition through the proprietors.
4.
Mr. Roy learned advocate has represented the writ petitioner. He has
submitted firstly, that the letter issued by the respondent dated August
17, 2022, though has been referred to as the ‘letter of acceptance’, is not
of that nature having traits of a concluded contract, but should be
considered only as an offer letter. He submits with reference to the said
document as annexed in the instant writ petition that substantially the
said letter does not culminate into a concluded contract but only
stipulates that an agreement has to be executed between the parties
within a stipulated period of time. According to Mr. Roy learned advocate,
no formal agreement has been ever executed between the parties. Hence,
there being no concluded contract at all between the parties, there would
not be any question of non-performance of contractual terms by the
petitioner as alleged and imposition of penal consequences on the
petitioner, on such allegation, would be unfounded and baseless, he
says.
5.
Mr. Roy has further contended that, had there been a contract between
the parties pursuant to the tender process, the validity thereof would
have been existing for three years that is till August 18, 2022. After the
same in terms of the tender document, a contract, even if it was there
between the petitioner and the respondent, would have automatically
terminated due to efflux of time. Mr. Roy learned advocate is reluctant to
give any credence to the letter of the respondent dated August 17, 2022,
by dint of which the bid was extended by 45 days. He says there was no
extension of the time and the offer died its natural death after expiry of
three years period, that is on August 18, 2022, on which date there was
no validly executed concluded contract between the parties.
6.
According to the petitioner, the respondent authority has failed to
perform its obligation by not providing adequate unencumbered space as
mentioned in the tender document over which parking operations ought
to have been started by the petitioner, in spite of acceptance of the
earnest money. The petitioner has raised objections as to the profound
reliance of the respondent authority, on Clause-12 of the ‘Instructions to
Tenderers’, which he denies to be such a provision so as to extend any
liberty to the authority, not to perform essential conditions for ensuring a
conducive condition to initiate the works tendered for.
7.
Mr. Roy has also expressed grievance of the petitioner that no
opportunity of hearing has ever been extended before issuance of the
impugned letter dated September 19, 2022, to the same, there by
violating the principles of fairness and natural justice.
8.
Hence, according to the petitioner, this is an arbitrary action of the
respondent, of which the petitioner has been made subject to and due to
the gross arbitrariness, such action is untenable in the eyes of law.
9.
For all the reasons as discussed above, the petitioner seeks that the
instant writ petition be allowed by quashing the impugned order dated
September 19, 2022, that being in derogation of the Commercial Circular
No.4 of 2014 and with direction upon the respondent/Railways to duly
consider the petitioner’s representation dated September 27, 2022; also,
by directing the respondent to refund the earnest money deposited with
the respondent to the tune of Rs. 11,94,000/-.
10. In support of various points raised in his argument, Mr.Roy learned
advocate has relied on the following judgments:
i.
Vidarba Irrigation Development Corporation & Others vs
Anoj Kumar Agarwala & Others – (2020) 17 SCC 577; it has
been submitted that a tender notice contains some essential
conditions of eligibility and some other ancilliary or subsidiary
conditions to achieve the main objective together; while the
authority may deviate from the strict literal compliance of the
ancilliary conditions, but can in no circumstance enjoy any
liberty to proceed without compliance with the essential
conditions of tender or else the performance would be rendered
as impossible; in this case the petitioner addresses the
requirement
for
handing
over
free
and
unencumbered
possession of the land area for due performance by the tenderer
to be such an essential and unavoidable condition for the
respondent authority, which allegedly they have failed to fulfil;
thus allegedly the work under tender has become inexecutable
at the instance of the respondent, for which the petitioner
cannot be held accountable or imposed with penal measures;
ii.
Om Prakash Sharma vs Ramesh Chandra Prasar & Others
– (2016) 12 SCC 632; the Supreme Court has held that it is
open to the authority to deviate from and not to insist upon the
strict
literal
compliance
of
the
ancillairy
or
subsidiary
conditions, excepting which are most essential for the main
object to be achieved;
iii.
Mahabir Auto Stores & Others vs Indian Oil Corporation &
Others – (1990) 3 SCC 752; the Supreme Court has held that
administrative decision can be impeached on the ground that
the decision is arbitrary or violative of Article 14 of the
Constitution, on any of the grounds available in public law
field; that even in the field of public law, the relevant persons
concerned or to be affected, should be taken into confidence;
that exercise of power cannot be dealt with by the State or its
instrumentality without informing or taking into confidence,
the party whose rights and powers are affected or sought to be
affected.
iv.
The General Manager, Eastern Railway & Others vs Dileep
Kumar Sah – MAT No.730 of 2020, order dated April 22,
2024; the Division Bench of this Court has held that
acceptence of bid would be completed only after the execution
of the agreement; that if the acceptence is coupled with certain
conditions or reasonably inferred that something more by both
the parties to be performed, it is regarded as an offer and the
acceptence cannot be presumed to take a character of a
contract; that a mere acceptence of a bid does not constitute a
concluded contract as a further agreement was required to be
executed that, a ‘letter of intent’ is construed as a ‘letter of
acceptence’, but the intention has to be gathered or evidently
found in the terms and conditions embodied therein; the Court
has entertained the writ petition and granted relief of refund of
the earnest money, to the petitioner there;
v.
Dileep Kumar Sah vs The General Manager, Eastern
Railway & Others – W.P.No.26079(w) of 2017, order dated
December 12, 2019; the Court has held the position of law to
be that it is upon acceptence of the terms and conditions
specified in the tender document by the highest bidder and
communication of such acceptence to the tender issuing
authority that the tender agreement is executed between the
parties;
vi.
The
Senior
Divisional
Commercial
Manager,
Eastern
Railway, Howrah Division and Another vs Manjee Yadav &
Others – FMA 418 of 2024, order dated June 25, 2024;
with reference to a judgment of the Supreme Court [Vedanta
Limited vs M/s Emirates Trading Agency LLC reported in AIR
2017 SC 2035] the Division Bench of this Court has found that
unless the offer made by the bidder is accepted without any
conditions or putting any rider to it shall partake a character of
a contract, otherwise it would not be treated as a concluded
contract.
11.
According to the respondent/Railways, represented by Mr. Bhudeb
Chatterjee, learned advocate, there is no sufficient or cogent ground in
the writ petition filed by the present petitioner that to be maintained or
allowed by the Court. It has been stated by the respondent that, the
prayer of the petitioner being in the nature of a money claim, is to be
adjudicated not by the Court of equity in exercise of power under Article
226 of the Constitution of India but by a competent Civil Court. That
way, the respondent has espoused the point of non-maintainability of the
writ petition in its present form.
12.
According to the respondent/Railways, the ‘Letter of Acceptance’ dated
August 17, 2022 amounts to be a concluded contract the same having
definitively expressed acceptance of tender of the petitioner by the
respondent without any condition. Therefore, the clauses enumerated in
the tender document (Instruction to tenderers) would be applicable in
case of the petitioner, in case of violation of the conditions of acceptance.
It is submitted that, the ‘Letter of Acceptance’ dated August 17, 2022 has
directed the tenderer/writ petitioner to submit security deposit amount
including performance guarantee to the tune of Rs. 49,40,241/- (after
adjustment of the earnest money deposit) and advance license fee to the
tune of Rs. 63,89,834/- within a period of 15 days from the date of
issuance of the said letter (LoA). The respondent says that evidently and
even admittedly, the tenderer has failed to comply with the said
directions which render it to be subject to the penal action in terms of
Paragraph 10 of the ‘Instructions to Tenderers’. Therefore, according to
the respondent, steps have been taken against the writ petitioner by
cancellation of its condition as well as forfeiture of earnest money was in
terms of the contract only by which, they say, the petitioner is bound.
13.
The respondent/Railways submit that instead of performing the contract,
the petitioner has sent letters dated August 24, 2022 and September 05,
2022 informing its unwillingness to participate and expressed intention
to withdraw from the process. The respondent is aggrieved that in doing
so, the petitioner, allegedly without any base, has complained about the
respondent having not handed over possession of the encumbered land
in favour of the petitioner tenderer to commence the work under tender.
In this regard, though the respondent has not denied that, the site map
which has been uploaded with the tender notice pertains to the year
2014. However, simultaneously, the respondent has challenged any
allegation of misrepresentation and concealment of material fact. By
referring to Paragraph 12 of the ‘Instruction to Tenderers’ the respondent
has indicated that, it was the bounden duty of the tenderer in terms of
the said provision to satisfy itself about the current condition of the land
by actual inspection of the site and locality of the parking lot before
submitting the tender. It is submitted that, the right of inspection of the
site before submission of tender has always been available to the
petitioner/tenderer which it should have exercised and come to its own
satisfaction as regards encumbrances, if any, over there as alleged. Given
the power of inspection being in existence in Paragraph 12 of the
‘Instruction to Tenderers’, it is presumed that, before submitting the
tender, the present petitioner has duly exercised the same and satisfied
itself about the availability of the encumbered land to be operated as the
parking space. The respondent has also denied allegations of the
petitioner of encroachment of the land and termed the same as baseless.
The respondent has submitted that the earlier contractor operated over
the site for the same purpose till August 29, 2022 which included the
period for which his contract was even extended by the respondent. Since
thereafter, the said earmarked parking space has been under operation
of the Department. Hence, according to the respondent, petitioner’s
grievance regarding unauthorized encroachment at the earmarked area is
only baseless and without substance.
14.
The respondent has also referred to Paragraph 15 of the ‘Instruction to
Tenderers’ to fortify the argument advanced that in case of failure of the
tenderer to deposit license fee, security deposit and performance
guarantee within the stipulated time, the tender is liable to be cancelled.
15.
Paragraph 5 of the ‘Instructions to Tenderers’ has also been mentioned in
support of the contention that the Railway administration has the right
to forfeit the earnest money deposit in presence of the specific conditions
as mentioned therein like, the tenderer failing to turn up for acceptance
or forfeiture in terms of the contract. It is submitted that the awardee
was supposed to deposit the advanced license fee and security money
including performance guarantee as stated above within 15 days from
the date of issuance of ‘Letter of Acceptance’ and that handing over
possession of the site, is subject to deposition of license fee and security
money by the awardee. Since the petitioner has failed to comply with
such conditions, therefore, according to the respondent/Railways,
neither there is any question of handing over possession of the site to the
petitioner nor has the respondent acted wrongly or in violation of any
terms and conditions, by cancelling tender of the petitioner and forfeiting
the earnest money amount deposited by it.
16.
It is submitted that, in view thereof, the writ petition contains not
sufficient reason or ground for the Court to interfere into the action
taken by the respondent Authority as impugned in this writ petition. The
respondent, therefore, insist that the writ petition be dismissed.
17.
It appears that the tenderer and the awardee are bound by the terms of a
concluded contract, which may not always be in the form of a duly
executed agreement. A letter of acceptance issued by the tenderer may
manifest that conclusiveness, provided that, intentions of the parties
could be gathered or evidently found in the terms and conditions as
embodied therein to immediately bind themselves. The settled position of
law is that, acceptance of offer made by the tenderer without any
conditions or putting any rider to it and/or when the acceptance is
communicated in a manner that demonstrates unequivocal intent to be
bound, that only shall partake a character of a concluded contract, not
otherwise. A letter of acceptance that is issued as a mere expression of
intention or in anticipation of further formalities, without fulfilling
essential contractual conditions, does not create legal obligations. When
the acceptance is issued as a letter of intent that clearly indicates an
intention to be bound immediately, it may amount to a concluded
contract. The context and conduct of the parties, such as commencing
work or executing parts of the contract, can sometimes imply that a
binding contract exists despite the absence of formal documentation. To
say in a concise manner, a letter of acceptance in tender process does
not automatically create a binding contract if it is conditional,
provisional, or dependent on further formalities such as signing of a
formal agreement, issuance of contractual documents, or fulfillment of
specific conditions. The intention of the parties, as evidenced by the
language used and the context, plays a pivotal role in determining
whether a binding contract has been concluded.
18.
Therefore, it is necessary to scrutinize the ‘letter of acceptance’ in this
case to find out whether actually it amounts to a concluded contract in
accordance with law and as submitted on behalf of the respondent
authority, thereby manifesting the intentions of the parties to be bound
immediately. The language used in acceptance letter and the context of
the tender process are critical in determining whether a binding contract
has been formed. There are three important points noted in the said
letter dated August 17, 2022. That the petitioner has to submit the
security deposit; that he has to remit the license fee and taxes; and that
he has to execute an agreement; all within a period of 15 days from the
date of the said letter. The authority has also mentioned that the offered
rate is accepted for a stipulated annual license fee and a stipulated
period. It has further been mentioned that the contract is subjected to
fulfilment of the said conditions, as mentioned above. Most interestingly
the authority has neither mentioned any date from when the petitioner is
expected or bound to commence the work under tender, nor mentioned
that the date of start of work was from the date of the said letter.
19.
The language in the letter dated August 17, 2022, is sufficiently clear
and definitive to indicate its contingent nature, as the contract's
conclusiveness is made contingent upon the future fulfilment of the
aforementioned
criteria.
Conversely,
the
contract
would
not
be
considered final and binding if the aforementioned conditions are not met
within the next 15 days. Intention of the respondent not to give any
immediate binding effect to the terms and conditions of tender is overtly
evident from the very language of the letter itself. When acceptance is
contingent upon conditions such as the signing of formal agreements,
submission of security, or fulfillment of procedural requirements at a
future date, the acceptance is not binding until those conditions are
satisfied. The Supreme Court in Maharshi Dayanand University & Anr
-versus- Anand Coop. L/C Society Ltd. & Anr reported at 2007 5 SCC
295, has held that when parties during negotiations contemplate the
execution of a formal agreement incorporating the terms of the bargain,
so long as a formal agreement has not been entered into, it may be open
to contend that there was no concluded contract between the parties.
The Division Bench of this Court in Dileep Kumar Sah (supra), has also
upheld the proposition as above. No less appropriate here to mention the
judgment in Manjee Yadav & Others (supra), wherein the Division
Bench of this Court has upheld the proposition relying on a Supreme
Court judgment in Vedanta Limited (supra).
20.
On the basis of the discussions as made above, the Court finds no force
in the submissions made on behalf of the respondent, that the letter
dated August 17, 2022, by itself would amount to a concluded and
binding contract between the parties. On the contrary, the language used
therein clearly shows its contingent nature and maker’s intent not to
consider the same as conclusive, till the time of fulfilment of the
conditions
stipulated
therein.
In
such
circumstances
the
penal
provisions of the ‘Information to Tenderers’ cannot be imposed against
the writ petitioner, on the allegation of contravention of the provision
thereof, those having no binding effect on the parties.
21.
The petitioners other contention is that the tender/respondent railways,
have not discharged the essential conditions which were unable for it, in
order to facilitate due execution of the works under tender. That is with
respect to providing the petitioner with the unencumbered and free
access and possession of the piece of land. In this regard, allegations of
misrepresentation of material, fact at the time of issuance of notice of
tender has also been levelled against the respondent authorities. The
main objective of the tender in question is for providing car parking
space, within the vicinity of the railway station, that is, Sealdah Railway
Station. The Supreme Court in Vidarba Irrigation Development
Corporation (supra) has held that a notice of tender contains some
essential conditions of eligibility and some other ancillary or subsidiary
conditions, to achieve the main objective together. There according to the
Supreme Court, regarding ancillary conditions of tender, the authority
may avail itself, some relaxation in terms of lenient literal compliance
thereof, but it cannot do so with the most essential conditions of tender
or else the performance would be rendered as impossible.
The
proposition of law as envisaged in this case is the reproduction of the
similar proposition earlier held by the same Court in the judgement of
Om Prakash Sharma (supra).
22.
An essential condition in a tender goes to the root of the contract. It is a
condition without which the object of the tender cannot be achieved. In
the case of a parking contract, the availability of an unencumbered
vacant space is fundamental, because maintenance, management, and
revenue generation from parking presuppose lawful and unhindered
possession of the site.
23.
The tender in question pertains to the maintenance and operation of a
parking space. It appears that, admittedly an old area map of 2014, of
the vacant space earmarked for the objective for which the tender was
floated, was published with the notice of tender, for knowledge of the
intending bidders, including the writ petitioner. The respondent however,
has put much emphasis to Paragraph 12 of the ‘Instructions to Tenderers’
by stating that, it was incumbent upon the prospective bidder to inspect
the site for himself for satisfaction so that no hindrance in smooth
operation of the parking lot crops up in future. The Court, finds
Paragraph 12 of the ‘Instructions to Tenderers’ to be contradictory with
the site map uploaded by the Authority with the tender notice. The site
map indicates a total of 1890 square meters of property designated for
the contractor's operations, whereas the petitioner asserts that about
1000 square meter area is being encroached upon by unauthorized
residents, which starkly contradicts the site plan. It effectively permits
the bidder/contractor to operate on a diminished area of land, as
specified in the tender notice and agreed upon by the parties, though the
effective land area has been shown in the map to be greater.
24.
Permitting a tenderer to operate a parking contract without providing an
unencumbered vacant space, would amount to dilution of the essential
conditions of tender, which is impermissible in law. The comprehensive
policy guideline (Commercial Circular No. 4 of 2014 dated February 12,
2014) has provided for allotment of well-demarcated, fenced and leveled
surface site to the contractor by the Railway Authority for parking
purpose including covered shelter as and when appropriate (As per
Clause 1.3). Therefore, any relaxation as to the same would not only be
arbitrary but also offend the principles of fairness, transparency and
equality governing public procurement, particularly where the bidders
are required to strictly comply with the tender conditions. Both, if
considered
together,
should
obviously
give
an
impression
that,
encroachment over the site even if any, would be removed by the
tenderer
and
ultimately
the
vacant
possession
of
the
land,
unencumbered, free from all encroachments and third party claims,
would be handed over to the successful bidder by the tenderer, in
compliance with one of the essential conditions of tender, that is,
providing the area of land to the highest bidder for operation.
25.
It cannot be construed to be a responsibility on part of the prospective
bidders to be satisfied with the condition of the site of operation as free
from all encumbrances, as put forth by the respondent/Railways; instead
the Court finds that, the tender document having made both the old site
map of 2014 and Clause 12 of the ‘Instructions to Tenderers’ as part
thereof, have created confusion and the terms of the tender are not,
therefore, very well-defined. This definitely violates the level playing field
in the entire process, in prejudice to the interests of the bidders. In
public law context, ambiguity in tender terms is construed against the
authority, not bidders, this aligns with Article 14 (of the Constitution of
India) jurisprudence. It thus, amounts to be irrational and arbitrary to
do, on part of the respondent Authority. Instead, a stipulation for
providing
unencumbered
and
free
possession
should
have
been
considered not as ancillary in nature but as an essential condition of the
tender.
26.
It is a settled principle of law that, essential conditions of a tender are
required to be strictly complied with as that go to the root of the
contractual arrangement the very object of a parking contract – namely,
lawful possession, unhindered operation and effective maintenance
cannot be achieved unless the site is delivered in an unencumbered and
vacant condition. Any deviation from this requirement would frustrate
the purpose of the tender itself. The tenderer is, therefore, legally bound
to comply with all essential conditions including providing for vacant
possession and cannot subsequently seek relaxation or justification on
the ground of existing encroachments, occupation by third parties or any
other tender conditions.
27.
It is well-settled that, while minor or non-essential deviations may be
condoned in appropriate cases, there should not be any relaxation as
regards the essential conditions of tender. Any Award of Contract (though
in this case, it is found that, there is no concluded contract between the
parties) in violation of such conditions is liable to be interfered with, as it
would vitiate the tender process itself.
28.
Therefore, for the reasons as discussed above, in the instant process,
though bid has been submitted and accepted, neither a concluded
contract can be considered to have come into existence nor the tender
process itself is liable to be upheld as a valid one, due to non-observance
of
the
compulsory
essential
condition
of
tender
by
the
tenderer/respondent, hence the entire process being arbitrary and
irrational. This entitles the writ petitioner to be remitted back with the
earnest money deposit to the tune of Rs. 11,94,000/- which it submitted
at the time of submission of the bid.
29.
Hence, the writ petition No. WPA 22965 of 2022 is hereby allowed.
Application, if any, pending therewith, is accordingly disposed of.
30.
The order passed by the respondent No. 3 dated September 19, 2022 is
set aside. Let the earnest money deposit to the tune of Rs. 11,94,000/be paid back immediately by the respondent Railway authority, to the
writ petitioner, within a maximum period of four (04) weeks from the date
of communication of copy of this judgment.
31.
Urgent certified copy of this judgment, if applied for, be supplied to the
parties upon compliance with all requisite formalities.
(Rai Chattopadhyay, J.)
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review