IN THE HIGH COURT OF DELHI AT NEW DELHI
(3)
#
CNR No. DLHC010673192025
+
ARB.P. 1434/2025
M/S JAGMOHAN ENTERPRISES LLP
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(4)
#
CNR No. DLHC010673212025
+
ARB.P. 1435/2025
M/S JAGMOHAN ENTERPRISES LLP
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(5)
#
CNR No. DLHC010673222025
+
ARB.P. 1436/2025
M/S JAGMOHAN ENTERPRISES LLP
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(6)
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
#
CNR No. DLHC010673232025
+
ARB.P. 1437/2025
M/S JAGMOHAN ENTERPRISES LLP
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(7)
#
CNR No. DLHC010674732025
+
ARB.P. 1438/2025
M/S JAGMOHAN ENTERPRISES LLP
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(8)
#
CNR No. DLHC010674802025
+
ARB.P. 1439/2025
M/S JAGMOHAN ENTERPRISES LLP
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(9)
#
CNR No. DLHC010689922025
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
+
ARB.P. 1499/2025
KUSHA VIKRAM DHAWAN
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(10)
#
CNR No. DLHC010689962025
+
ARB.P. 1503/2025
RAHUL BHARGAVA & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(11)
#
CNR No. DLHC010689972025
+
ARB.P. 1504/2025
RAHUL BHARGAVA & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(12)
#
CNR No. DLHC010689982025
+
ARB.P. 1505/2025
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
RAHUL BHARGAVA & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(13)
#
CNR No. DLHC010689992025
+
ARB.P. 1506/2025
RAHUL BHARGAVA & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(14)
#
CNR No. DLHC010690002025
+
ARB.P. 1507/2025
RAHUL BHARGAVA & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(15)
#
CNR No. DLHC010690012025
+
ARB.P. 1508/2025
RAHUL BHARGAVA & ANR.
ARB.P. 1434/2025 and connected matters
.....Petitioners
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
Through:
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(16)
#
CNR No. DLHC010690022025
+
ARB.P. 1509/2025
HARMEET SINGH KAPOOR & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(17)
#
CNR No. DLHC010690032025
+
ARB.P. 1510/2025
HARMEET SINGH KAPOOR & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(18)
#
CNR No. DLHC010690042025
+
ARB.P. 1511/2025
HARMEET SINGH KAPOOR & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(19)
#
CNR No. DLHC010690052025
+
ARB.P. 1512/2025
HARMEET SINGH KAPOOR & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(20)
#
CNR No. DLHC010690062025
+
ARB.P. 1513/2025
VIKRAM DHAWAN & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(21)
#
CNR No. DLHC010776652025
+
ARB.P. 1659/2025
TULSI MALHOTRA & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(22)
#
CNR No. DLHC010776662025
+
ARB.P. 1660/2025
PULKIT MALHOTRA
Through:
.....Petitioner
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(23)
#
CNR No. DLHC010776672025
+
ARB.P. 1661/2025
ASHWINI CHADDA
Through:
.....Petitioner
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(24)
#
CNR No. DLHC010776732025
+
ARB.P. 1667/2025
GURMEET THUKRAL & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
ARB.P. 1434/2025 and connected matters
.....Respondent
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
Through:
Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(25)
#
CNR No. DLHC010776742025
+
ARB.P. 1668/2025
M/S AB BROOKEL PVT LTD
.....Petitioner
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(26)
#
CNR No. DLHC010776752025
+
ARB.P. 1669/2025
RENU WADHERA & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(27)
#
CNR No. DLHC010776762025
+
ARB.P. 1670/2025
GURMEET THUKRAL & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
(28)
#
CNR No. DLHC010789302025
+
ARB.P. 1691/2025
SANTOSH
Through:
.....Petitioner
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(29)
#
CNR No. DLHC010789312025
+
ARB.P. 1692/2025
PRERNA RAMAWAT & ORS.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(30)
#
CNR No. DLHC010789322025
+
ARB.P. 1693/2025
PRERNA RAMAWAT & ORS.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(31)
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
#
CNR No. DLHC010789332025
+
ARB.P. 1694/2025
ANURAG MOHAN BHATNAGAR & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(32)
#
CNR No. DLHC010789342025
+
ARB.P. 1695/2025
RAJ KUMAR & ANR.
Through:
.....Petitioners
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(33)
#
CNR No. DLHC010789392025
+
ARB.P. 1700/2025
SANTOSH
Through:
.....Petitioner
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(34)
#
CNR No. DLHC010789402025
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
+
ARB.P. 1701/2025
ANITA DEVI
Through:
.....Petitioner
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(35)
#
CNR No. DLHC010789412025
+
ARB.P. 1702/2025
ANITA DEVI
Through:
.....Petitioner
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(36)
#
CNR No. DLHC010789422025
+
ARB.P. 1703/2025
PRERNA RAMAWAT & ORS.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(37)
#
CNR No. DLHC010789432025
+
ARB.P. 1704/2025
RAMA KAPOOR
ARB.P. 1434/2025 and connected matters
.....Petitioner
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
Through:
Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(38)
#
CNR No. DLHC010789472025
+
ARB.P. 1708/2025
PRERNA RAMAWAT & ORS.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
(39)
#
CNR No. DLHC010789482025
+
ARB.P. 1709/2025
YESHVIR KADYAN & ANR.
.....Petitioners
Through: Mr. Anupam Jain and Mr. Sarth
Sharma, Advocates.
versus
M/S NEO DEVELOPERS PVT LTD
.....Respondent
Through: Mr. Jitender Chaudhary and Ms. Shilpa
Chohan, Advocates.
CORAM:
HON'BLE MR. JUSTICE TUSHAR RAO GEDELA
%
ORDER
29.10.2026
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
1.
These are petitions filed under Section 11(6) of the Arbitration &
Conciliation Act, 1996 (hereinafter referred to as ‘the Act’) seeking
appointment of a sole arbitrator to adjudicate upon the disputes which have
arisen between the parties.
2.
It has been given to understand by the learned counsel for the parties that
the petitioners had, heretofore invoked petitions under Section 9 of the Act
before the Commercial Court, Central District, Tis Hazari Courts in O.M.P. (I)
(COMM) no.470/2025 seeking interim protection orders.
3.
It is stated that after having heard the parties, the learned District Court
dismissed the said petitions vide judgement dated 09.06.2025, on the ground
that the petitioners herein had already invoked parallel proceedings before the
Haryana Real Estate Regulatory Authority (hereinafter referred to as
‘HRERA’) under the Real Estate (Regulations and Developments) Act, 2016
(hereinafter referred to as ‘RERD Act’). It is stated that in an appeal under
Section 37 of the Act bearing no.FAO (COMM) 204/2025 titled Rahul
Bhargava & Anr. vs. Neo Developers Pvt. Ltd., this Court had allowed the said
appeal and granted interim protection restraining the respondent from creating
any third party rights or interest including but not limited to leasing out the
property till the commencement of the arbitration proceedings. It is further
stated that the Appellate Court had further directed the respondent to maintain
status quo in relation to the respective units under the Builder Buyer
Agreement/Memorandum of Understanding till the date of the commencement
of arbitration proceedings.
4.
Aggrieved by the said order, the respondent herein preferred SLP (C)
nos.10086–10091/2026
which
were
converted
into
Civil
Appeal
Nos.10899–10904/2026 titled Neo Developers Private Limited vs. Rahul
Bhargava and Anr. etc. The said Civil Appeal noted hereinabove, was
disposed of by the Supreme Court vide the judgment dated 11.08.2026, holding
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
that the petitioners herein had elected by way of doctrine of election to proceed
under the RERD Act and thus having invoked such provisions, were precluded
from invoking any provision under the Arbitration Act, particularly Section 9.
5.
The order/judgment dated 11.08.2026 passed in the said Civil Appeal is
taken on record.
6.
In order to understand how the Supreme Court had appreciated the
controversy, it would be apposite to extract the relevant paragraphs hereunder:
“2. The appellant is the developer of a project titled ‘Neo Square’, who
entered into commercial agreements for sale of undivided, un-demarcated
commercial space with the respondents who agreed to purchase such space
in the project situated at Sector 109, Dwarka Expressway, Gurugram,
Haryana. Separate Builder Buyer Agreement and Memorandum of
Understanding were entered into regulating the construction, conveyance
and use of the premises. As per the BBA, there was an assured return payable
to the purchasers, which initially was paid and then defaulted. The project
too got delayed and the respondents herein approached the Haryana Real
Estate Regulatory Authority for enforcement of its rights under the BBA. The
HRERA passed an order which is produced as Annexure P-13. It is seen from
the impugned order that the respondents had initiated execution proceedings
in April 2025 for the enforcement of the order dated 14.08.2024 before the
HRERA, which is pending.
3. In the meantime, the respondent is said to have issued two communications
dated 24.02.2025 and 11.03.2025, informing that the property is proposed to
be leased out. Demands were also raised for development and fit out charges.
The respondents then approached the Commercial Court under Section 9 of
the Arbitration and Conciliation Act, 1996 , seeking interim measures against
the alienation in any manner including the leasing out of the premises. The
Commercial Court found that the respondents having first approached the
HRERA and obtained orders, cannot turn around and invoke the arbitration
clause. An appeal filed under Section 37 led to the impugned order, which
restrained the appellant herein from creating any third-party interests or
rights, including but not limited to that of leasing out the property, till the
commencement of the arbitration proceedings. The respondent was further
directed to maintain status quo in relation to the respective units under the
BBA/MoU, again till the commencement of the arbitration proceedings. The
request for arbitration is pending before the High Court.
xxx
xxx
xxx
6. By the impugned order, the High Court found quite distinction insofar as
the prayers made before the HRERA and before the Commercial Court under
Section 9 of the Act of 1996. The impugned order held that the complaints
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
instituted by the respondents before the HRERA, were in exercise of their
statutory rights under the Real Estate (Regulation and Development) Act,
2016, whereas under Section 9, they do not seek adjudication of disputes on
merits nor do they invite the Commercial Court to sit in appeal or the order of
the HRERA, but only seeks interim measures to protect the subject property
from further alienation, and handing over of possession to lessees, which
would defeat their rights. We are unable to concur with the said finding of the
High Court.
xxx
xxx
xxx
8. Be that as it may, we have to observe that despite the arbitration clause, the
respondents elected to go before the HRERA. Before the HRERA, the reliefs
sought, as extracted in the impugned order, were a direction to the appellant
to comply with their statutory and contractual obligations, ensuring
completion of construction and handing over possession of the allotted
commercial units in accordance with the agreed timelines, including
appropriate directions for compensation and/or interest. A prayer was also
made for payment of the assured monthly returns, which though initially
made, was later stopped by the appellants. There was also a declaration
sought that the demands made as development and fit out charges were
illegal, arbitrary and contrary to the BBA. The relief claimed before the
Commercial Court was to pass an interim order of injunction restraining
leasing out of the property or creation of third party interests till the
commencement of the arbitration. It has to be emphasized that the interim
measure was sought to enable arbitration to enforce their rights under the
BBA & the MoU; which was the attempt before the HRERA, which also
attained fruition. The interim measures were sought when the respondents
had already initiated execution proceedings before the HRERA.
9. We are not convinced that parallel proceedings of arbitration and
execution of HRERA orders can be carried out and the former cannot be
resorted to, for reason of the respondents having elected first, to go before the
HRERA. The prayers made before both the authorities are substantially the
same and the respondents having elected first to approach the HRERA,
merely based on a communication issued, proposing leasing out of the
properties and demanding development and fit out charges, there cannot be a
fresh cause of action plea, to be agitated in arbitration. The application for
arbitration in the facts of this case is misplaced.
xxx
xxx
xxx
14. The above clauses would indicate that there was no handing over of
possession contemplated in the agreement but only a nominal ownership of
the un-demarcated undivided extent purchased by the allottee, which on lease
would generate a rental income in lieu of assured return, which could either
be in excess of the assured return or lesser, depending on the commercial
market conditions; which govern the rental of any commercial space. These
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
terms along with Clause 8(a) to (e) puts it beyond any cavil that the scheme of
purchase of the respondents would only give them the assured returns on the
undivided portion conveyed and not separate possession. Hence, the
direction of the High Court, not to lease out the properties would put the
spanner in the works and impede the project insofar as the Food Court not
being commenced. As we already noticed, since the respondents had
approached the HRERA and execution proceedings are pending before it,
which was first elected by the respondent, proceedings will have to be
continued there. There is no reason to now invoke the arbitration clause since
the respondents had elected to approach the HRERA in the first instance. The
proceedings under Section 9 of the Act of 1996, as held by the Commercial
Court, cannot be continued.
15. We set aside the order of the High Court impugned in the appeal and
restore the order of the Commercial Court. We make it clear that the
respondents would be entitled to approach the HRERA and agitate their
cause regarding the conveyance of the undivided area and with respect to the
development and fit out charges claimed by the developer-appellant. The
contentions of the developer-appellant would be left open before the HRERA
regarding the balance due as per the BBA & MoU.
16. We make it clear that the findings rendered by us on the assured return
scheme, are based on the BBA and the respondents cannot raise any
contention in derogation of the specific agreement entered into by both the
parties. Clause (iii) in the contract of the operative portion of the HRERA
would stand modified to this extent.
17. With the above observation, the appeals are allowed and the parties are
relegated to the HRERA, which has ample powers under Section 63 of the
Real Estate (Regulation and Development) Act of 2016 read with Rule 27 of
the Real Estate (Regulation and Development) Rules, 2017.”
7.
It may be relevant to note that in para 14, the Supreme Court had clearly
noted that since the petitioners had approached the HRERA and that the
execution proceedings were pending before it, which was first elected by the
petitioners, the proceedings will have to continue before the HRERA itself. It
was further noted that there is no reason to now invoke the arbitration clause,
since as per the doctrine of election, the petitioners have approached the
HRERA in the first instance.
8.
It is clear from the aforesaid that the Supreme Court, vide the aforesaid
judgment, has clearly proscribed any proceeding to be initiated under the
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
Arbitration Act at the behest or at the instance of the petitioners.
9.
In that view of the matter, this Court is of the considered opinion that the
present petitions are not maintainable. Accordingly, the petitions are dismissed
as not maintainable, however, without any order as to costs.
TUSHAR RAO GEDELA, J
OCTOBER 29, 2026
kct
ARB.P. 1434/2025 and connected matters
This is a digitally signed order.
The authenticity of the order can be re-verified from Delhi High Court Order Portal by scanning the QR code shown above.
The Order is downloaded from the DHC Server on 02/11/2026 at 10:50:18
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review