Full Judgment Text
Text read from the judgment PDF published on the High Court's eCourts portal, through the
Indian High Court Judgments open data set (Dattam Labs,
CC BY 4.0).
The court's own copy is the authoritative text.
Page No.# 1/11
GAHC010158602023
THE GAUHATI HIGH COURT
(HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)
Case No. : Crl.Rev.P./282/2023
PANKAJ KUMAR MAZUMDAR
S/O LATE PRAMOD CH. MAZUMDAR
R/O K.G. PATH, P.S. FATASIL AMBARI, GUWAHATI-781025
DIST. KAMRUP (M), ASSAM
VERSUS
RANJAN BARPATRA GOHAIN AND ANR
S/O M.B. GOHAIN
R/O HOUSE NO. 19, BYE LANE NO. 2,
BONGAON, NEAR LAKHI
MANDIR, BELTOLA,
GUWAHATI, DIST. KAMRUP (M), ASSAM
2:STATE OF ASSAM
REP. BY THE PP
ASSA
Advocate for the Petitioner
: MR. D C KALITA, MR. B K BHAGAWATI
Advocate for the Respondent : PP, ASSAM, MS. L M DAS (R-1),MS. IVY HUSSAIN (R-1),MS. A
HUSSAIN (R-1),MR. MAYUR DAS (R-1),MR. P P BORTHAKUR (R-1)
BEFORE
HONOURABLE MR. JUSTICE SANJEEV KUMAR SHARMA
JUDGMENT
Date : 14.08.2026
[1]
Heard Mr. B.K. Bhagawati, learned counsel for the
petitioner and Mr. P.P. Borthakur, learned counsel for the respondent
No. 1. Also heard Mr. K.K. Parasar, learned Addl. Public Prosecutor,
Page No.# 2/11
Assam, appearing for the State respondent No. 2.
[2]
The instant criminal revision petition has been preferred by
the petitioner under Section 397 and 401 Cr.P.C. read with Article 227
of the Constitution of India challenging the impugned order dated
25.05.2023, passed by the learned Special Judicial Magistrate,
Assam, Guwahati, District- Kamrup (Metro), in Dispur P.S. Case No.
1020 of 2015 dismissing the application for zimma filed by the present
petitioner.
[3]
The case of the petitioner, in brief, is that on 03.04. 2015,
the opposite party approached the petitioner to take on hire a
readymade steel hanger and its accessories for putting up a pendal at
Aizwal, Mizoram for the purpose of “NE Trade Expo” and accordingly
the petitioner agreed for such hire. The petitioner gives such steel
hanger pendal to the prospective hirer and the opposite party very
often used to take such pendal on hire basis from the petitioner on
the agreed terms and conditions. The petitioner handed over the steel
hanger to the opposite party on 05.04.2015 and the said hanger
consisted of Tripal/ clothes etc. with steel structure, measuring 15,000
Sq. Ft. The Trade Expo was conducted by the Organizer and the
opposite party installed the said steel hanger from 12th to 29th April,
2015 which was extended to 10th May, 2015 at Aizwal. There was
huge storm and rain which resulted damage to the said steel hanger
Page No.# 3/11
accordingly the opposite party come back to Guwahati alongwith the
steel hanger structure and demanded compensation etc. Otherwise,
he would retain the said readymade hanger. The hired materials steel
hanger was to be unloaded in the temporarily go-down of the
petitioner but some of the materials i.e. boxes numbering 8 were
unloaded at that place but the opposite party refused to unload the
other steel structures and wanted to forcefully take it but the
petitioner tried to resist the same. Then the opposite party assaulted
the petitioner and forcefully took away the hanger materials in the
same truck. The petitioner had no option but to lodge FIR before the
Dispur P.S. 1015/2015 on 23.05.2015 and it was registered U/S
385/325 of I.P.C.
[4]
The petitioner had filed a zimma petition in Dispur P.S. Case
No. 1020 of 2015 which was registered on the basis of an FIR lodged
by the present respondent. It may be mentioned that during
investigation of the Dispur P. S. Case No. 1020 of 2015 instituted by
the respondent, the I.O. had handed over zimma of the iron frame
structure weighing 2400 kgs which were seized by seizure list dated
23.05.2015 vide M.R. No. 455 of 2015 to the respondent/ informant,
Shri Ranjan Barpatra Gohain.
[5]
The accused person had filed another petition bearing No. 4921
before the Magistrate seeking the zimma of the said seized articles.
The Court after procuring a report from the Investigating Officer in
Page No.# 4/11
this regard, rejected the petition vide order dated 20.04.2016 by
observing that as the Investigating officer had already handed over
the seized articles under Section 102 of the Cr.P.C., the seized articles
are no more in custodia legis, i.e., in custody of the Court.
[6]
The accused person thereafter preferred a revision petition
against the said order dated 20.04.2016. The revisional Court, i.e., the
Court of Additional Sessions Judge No.3, Kamrup Metro, Guwahati
vide order dated 16.10.2017, observed that as the I.O. has submitted
Final Report (F.R.) in this case holding that the dispute between the
parties is civil in nature and the FR is yet to be accepted by the Court,
the petitioner, i.e., the accused person is at liberty to move a fresh
petition before the concerned Magistrate seeking zimma of the articles
seized by the I.O. during investigation at the time of taking up of the
case record by the Eleka Magistrate for consideration of the Final
Report.
[7]
Thereafter, on 31.10.2017, the accused person filed a zimma
petition before the Magistrate and on 29.04.2019, the informant filed
an objection against the said petition. In the meantime, on
12.12.2018, the informant filed objection against the F.R. submitted
by the police and prayed for directing the police to investigate into the
case afresh.
[8]
It is submitted Inter alia on behalf of the petitioner/accused
Page No.# 5/11
person that the FIR of the instant case was lodged by the informant
falsely claiming that he purchased the steel hanger and its accessories
from the petitioner, whereas, the petitioner never sold such items nor
the accused person could show any such sale letter etc. Instead, he
forcefully took away the steel structure and illegally retained it from
the petitioner/owner and lodged an FIR making various false
statements. The police without investigation allowed the informant
Ranjan Borpatra Gohain to retain the same and submitted a report
before the Court to the effect that the police seized the steel structure
and gave the possession of the same to the informant.
[9]
It is submitted on behalf of the petitioner/ accused person
that the on 05.04.2015, petitioner had actually handed over the
seized article, i.e. the steel hanger along with other accessories on
hire to the informant for organizing an event at Alzawl, Mizoram,
namely "NE Trade Expo". As stated by the opposite party/ informant,
there was a huge storm and rain which resulted in damage to the
steel hanger structure and as such he demanded compensation,
otherwise, he would retain the same. As agreed to, the hired
materials were to be unloaded in the temporary go-down of the
petitioner but only some of the materials, i.e., 8 boxes could be
unloaded at that place as the opposite party refused to unload the
steel structure and wanted forcefully to take it but the petitioner
resisted the same. The opposite party assaulted the petitioner and
Page No.# 6/11
forcefully took away the hanger materials. The petitioner had no
option other than to lodge an FIR before the Dispur PS which was
registered as Dispur PS Case No 1015/2015.
[10]
Though, the FIR was lodged on 23.05.2015, yet the police
manipulated the date and showed it to be registered on 27.05.2015.
Thereafter, in Dispur P. S. Case No. 1015/2015, the petitioner moved a
petition claiming zimma of the hanger and its accessories, however,
the Court disposed of the same vide order dated 19.01-2016 stating
that the articles seized in Dispur PS Case No. 1015/15 have already
been given in zimma to the petitioner.
[11]
It is further submitted on behalf of the petitioner that
petitioner has submitted enough documents to prove his title and
ownership of the seized article namely the steel hanger. On the other
hand, the opposite party has merely claimed that he purchased the
same from the petitioner but he could not submit any document to
that effect. Therefore, he has illegally retained the said article in
collusion with the police.
[12]
The learned Magistrate after taking note of the fact that
despite submission of the informant/ present petitioner that he has
enclosed various documents, no such document was found in the case
record, finally, disposed of the zimma application by holding as
follows:-
Page No.# 7/11
“ Dispur P.S. Case No. 1020/2015.
Date. 25.05.2023.
Now coming back to the zimma petition, as already discussed,
the petitioner/accused person has prayed for the article which was
already given on zimma to the informant by the police. The
petitioner/accused person has claimed its ownership, but perusal of
the FIR shows that the informant has himself stated that the accused
person is the original owner of the seized article and has also stated
that later on it was sold to him by the accused. Thus, It is seen that
both the petitioner/accused person and the opposite party/informant
have claimed ownership over the concerned seized article. To decide
the ownership, a full-fledged trial is required and the matter is purely
civil in nature. Furthermore, as the Final Report is accepted, at this
stage, there is no scope of trial in this case and owing to the reasons
stated above and considering the fact that adverse claim by both
parties being a civil dispute, the prayer made by the accused person
In petition No. 2510 is rejected and the said petition is disposed of
accordingly.
However, the accused person is at liberty to approach the
appropriate forum with regard to his claim.”
[13]
The learned Magistrate by the said order also rejected an
application filed by the informant/ respondent for further investigation
and accepted the final report submitted by the I.O. in the aforesaid
case i.e. Dispute P.S. Case No. 1020 of 2015. Since the learned
Magistrate had accepted the final report (F.R.) filed by the I.O. after
rejecting the application of the informant/ respondent for further
investigation, the inquiry had come to an end and therefore, the
Page No.# 8/11
provisions of section 452 Cr.P.C. would come into play.
[14]
The said section reads as follows
“452. Order for disposal of property at conclusion of
trial.-(1) When an inquiry or trial in any Criminal Court is concluded,
the Court may make such order as it thinks fit for the disposal, by
destruction, confiscation or delivery to any person claiming to the
entitled to possession thereof or otherwise, of any property or
document produced before it or in its custody or regarding which any
offence appears to have been committed, or which has been used for
the commission of any offence.
(2)………………………………………………………………………………
(3)…………………………………………………………………………………..”
[15]
From the above, it appears that the essential ingredients of
the offence are that (i) the inquiry or trial is concluded, (ii) the
property or document in question must be produced before the court
or is in the custody of the court or regarding which any offence
appears to have been committed or which has been used for the
commission of any offence. Therefore either the property /document
must be produced before the court or should be in its custody or
some offence must appear to have been committed in respect of such
property/ document or the same has been used for the commission of
any offence.
[16]
In the present case, the I.O. after seizing the property, in
question, handed over custody of the same to the informant/
Page No.# 9/11
respondent and therefore, the provisions of section 102 of Cr.P.C.
applies which reads as follows:“102.
Power of police officer to seize certain
property.- (1) Any police officer may seize any property which may
be alleged or suspected to have been stolen, or which may found
under circumstances which create suspicion of the commission of any
offence.
(2)
Such police officer, if subordinate to the officer in charge of a
police station, shall forthwith report the seizure to that officer.
[(3) Every police officer acting under sub-section (1) shall forthwith
report the seizure to the Magistrate having jurisdiction and where the
property seized is such that it cannot be conveniently transported to
the
Court
[or
where
there
is
difficulty
in
securing
proper
accommodation for the custody of such property, or where the
continued retention of the property in police custody may not be
considered necessary for the purpose of investigation], he may give
custody thereof to any person on his executing a bond undertaking to
produce the property before the Court as and when required and to
give effect to the further orders of the Court as to the disposal of the
same.]
……………………………………………………………………………….”
[17]
From a plain reading of sub-section (3) of Cr.P.C. above, it is
clear that the custody of the property even though seized under
section 102 Cr.P.C. continues to remain custodia legis i.e. in the
custody of the Court. Once the ingredients of section 452 Cr.P.C. are
satisfied and a party approaches the Magistrate seeking custody of
Page No.# 10/11
the property which claim is opposed by the opposite party/ by another
party, the Magistrate cannot wash his hands off by simply stating that
the matter is purely civil in nature.
[18]
It is true that to decide ownership, a full-fledged trial may
be required, as held by the learned Magistrate. But the learned
Magistrate failed to appreciate that it was not the ownership of the
property that was required to be decided by the Magistrate but only
as to who was best entitled to the custody of the property.
[19]
By rejecting the zima petition of the petitioner, without
entering into the merits of his claim, the learned Magistrate had
effectively granted or confirmed the custody of the property in favour
of the opposite party which was granted to him by the police, without
however a semblance of material in support of the custody in favour
of the opposite party. Such approach is bound to cause injustice to
the person who claimed custody and who approached the Magistrate
claiming custody of the property, in question.
[20]
The said impugned order had the effect of merely, rubber-
stamping the action of the I.O. in handing over the custody of the
property to the opposite party/ respondent without exercising proper
jurisdiction under section 452 Cr.P.C.
[21]
In view of the above, the impugned order cannot be
sustained and is accordingly set aside and the learned Magistrate is
Page No.# 11/11
directed to consider the matter afresh on the basis of materials that
have been submitted by the parties.
[22]
Since the matter is a very old pending one, it is expected
that the said exercise will be completed by the learned Magistrate as
expeditiously as possible, preferably within a period of (1) one month
from the date of receipt of a copy of this order.
[23]
With the aforesaid observation, the criminal revision petition
stands disposed of.
JUDGE
Comparing Assistant
This page is for informational and research purposes only and does not constitute legal advice.
Consult a qualified advocate for advice specific to your situation.
Is your name in this judgment and should it be masked, or is something on this page wrong?
Request a review